CN202627474U - Wall connecting device of building scaffold - Google Patents

Wall connecting device of building scaffold Download PDF

Info

Publication number
CN202627474U
CN202627474U CN 201220173240 CN201220173240U CN202627474U CN 202627474 U CN202627474 U CN 202627474U CN 201220173240 CN201220173240 CN 201220173240 CN 201220173240 U CN201220173240 U CN 201220173240U CN 202627474 U CN202627474 U CN 202627474U
Authority
CN
China
Prior art keywords
scaffold
building
screw rod
keeper
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220173240
Other languages
Chinese (zh)
Inventor
凌士山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI SHUCHENG SANLE BABY CARRIAGE Co Ltd
Original Assignee
ANHUI SHUCHENG SANLE BABY CARRIAGE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI SHUCHENG SANLE BABY CARRIAGE Co Ltd filed Critical ANHUI SHUCHENG SANLE BABY CARRIAGE Co Ltd
Priority to CN 201220173240 priority Critical patent/CN202627474U/en
Application granted granted Critical
Publication of CN202627474U publication Critical patent/CN202627474U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a wall connecting device of a building scaffold and relates to the field of building construction equipment. The wall connecting device consists of a positioning element, a screw bolt and a matched screw nut, wherein the positioning element is embedded at the outer side of a ring beam of a building body, the tail end of a screw rod is fixedly arranged at the end part of a short transverse pipe of the scaffold, and a bolt head of the screw rod is sheathed with a long hole arranged at the center of the positioning element and is then tightly locked by the screw nut so the fixed connection of the building body and the scaffold is realized. The construction stability of the scaffold is more reliably ensured, meanwhile, the interruption construction and the secondary mending construction caused by the existence of the scaffold can be avoided, and the construction smooth degree is greatly improved.

Description

The wall attaching parts of building scaffold
Technical field
The utility model relates to building constructions construction equipment field, the i.e. wall attaching parts of building scaffold.
Background technology
In the building site of multistory building or highrise building, the scaffold that is formed by fixedly connecting through fastener the steel pipe of three mutual vertical direction is indispensable auxiliary equipment.For guaranteeing that the anti-flare of scaffold homeostasis reaches and the constant maintenance suitable distance of building body; Take an end of one section steel pipe (or reinforcing bar) is imbedded the cement casting body of building structure at present; Long or the short steel pipe other end exposes floor side bar or floor face (tube material generally whip in the building site interim intercepting); One end of the scaffolding steel pipe (short transversal pipe) of building facade vertical direction is fixedly connected through fastener with the steel pipe of imbedding the cement casting body; The other end of the scaffolding steel pipe of building facade vertical direction also uses fastener to be fixedly connected with the steel pipe of other both direction of scaffold, realizes that so scaffold is connected with the rigid of building body.The weak point of above-mentioned scaffold and building body method of attachment comprises: 1. scaffold is in the horizontal-extending of sustained height, in the extension of the direction that makes progress; Because the superelevation body of wall is or/and the existence of ultra wide body of wall; Alternating floor is that embedded steel tube, every horizontal interval one fan column are embedded steel tube (so-called in the industry at once " three steps two strode ") between being difficult to realize whenever make progress; And " three steps two strode " is the fundamental norms requirement of building site execution control, so there are potential safety hazard in present scaffold and building body connected mode; 2, when second pouring and body of wall filling, launch because of stopping construction or inconvenience construction, embedded steel tube was whipped to remove by certain operation constructor with often being connected of scaffolding steel pipe, retained major safety risks; 3, after body frame construction in building is accomplished during filled wall; Scaffold still need exist; The embedded steel tube place just retains the hole natch, before scaffold is removed, need body of wall repairing, insulation repairing, metope paint to repair, but the body of wall compactness of mend is not enough; After the crackle crack appearred in the outer facade cement top layer of some time back wall, phenomenon such as leak infiltration promptly appearred even in mend indoor; 4, repair for the body of wall that carries out the embedded steel tube place; Need to remove embedded steel tube at the external paragraph of cement casting; The removal method generally adopts the oxygen blast cutting; It is the common cause (so each building site all need be equipped with some fire extinguishers, this also is the mandatory provisions in the daily management standard) that causes the building site fire that the high temperature slag flashes; 5, remove embedded steel tube before the external paragraph of cement casting, need utilize steel wire (or rope), lever that the scaffold tractive is located in wall body door or window, Lou Zhu etc., obtain to be connected again, cause the amount of labour used to increase once more with the displacement of building body.
Summary of the invention
The utility model task provides a kind of wall attaching parts of novel building scaffold, reliable guarantee the scaffold construction safety in, also can reduce obstruction to greatest extent to each link of building operations, improve efficiency of construction.
The characteristic of the wall attaching parts of the design's building scaffold is: it is made up of keeper, bolt and supporting nut; Keeper is embedded in the body collar tie beam outside, building; There is elongated hole in its header board central authorities; Thereafter plate and header board and the pipe fitting between them are integrated, and the screw rod tail end is fixed in scaffold short transversal pipe end, screw rod bolt head and keeper header board pivot bush unit.
Has spring washer between nut and the screw rod bolt head.
What connect keeper header board and back plate is square pipe fitting.
The mode of installing and using of the design's wall attaching parts: 1, keeper is embedded in the body collar tie beam outside, building, and the header board of keeper is concordant with the outer side elevation of collar tie beam; 2,, again the screw rod tail end is fixed in an end of scaffold short transversal pipe with screw rod pack into successively spring washer, nut; 3, make screw rod bolt head insert header board central authorities' elongated hole and rotate 90 degree, screw nut again and pressing the keeper anter by spring washer, this moment, screw rod can not come off by self-align elongated hole, and the scaffold short transversal pipe of its connection is perpendicular to the building facade; 4, by existing building steel tube fastener short transversal pipe is fixed in the vertical steel pipe (or horizontal steel pipe of parallel building facade) of scaffold.As above then realized being fixedly connected of scaffold and building body.
The contrary dismounting that is this wall attaching parts by said process.
The good effect of the utility model: screw rod spare can be reused, and only keeper is an expendable part, obviously economical with materials; Keeper is embedded in the collar tie beam, and other parts all outside collar tie beam, do not hinder any middle operation construction, can not produce because of the scaffold factor and be interrupted construction and secondary reparation construction, promotes the smooth degree of constructing, and obviously practices thrift man-hour; Pre-buried keeper exposed area is little, in practical product, and 0.5 square decimeter of each junction exposed area less than, and building body metope post processing do not had difficulty, no negative effect; Parts are few, cooperate succinctly, and the reliable in structure when assembling is used, safety guarantee property obviously surmount present scaffold connecting mode in usefulness, and last top-down layering is removed also quite simple.
Description of drawings
Fig. 1 is that the design's device, scaffold and building body (collar tie beam) position concern floor map.
Fig. 2 a-b is respectively two kinds of keepers of difference to some extent.
Fig. 3 is scaffold short transversal pipe and the design's device explosion figure.
Fig. 4 is the connection status of the design's device.
Fig. 5 be among Fig. 4 P-P cut open the position m to view.
The specific embodiment
Embodiment 1.Referring to Fig. 1-3: the wall attaching parts of this building scaffold is made up of keeper (1), bolt (2) and the nut (3) of steel; Keeper (1) is embedded in building body collar tie beam (6) outside; Its header board (13) is concordant with the outer side elevation of collar tie beam (6), and there is elongated hole (14) in header board (13) central authorities, and plate (11) and header board (13) and the pipe fitting between them (12) are integrated thereafter; Screw rod (21) tail end is fixed in scaffold short transversal pipe (4) end, bolt head (22) and keeper header board pivot bush unit.The internal diameter of circular pipe fitting (12) is not less than the length of elongated hole (14), promptly when bolt head (22) after elongated hole (14) inserts, it can rotate 90 and spend in pipe, bolt head (22) is tangled by the avris of elongated hole (14).Referring to Fig. 4: after bolt head (22) inserts elongated hole (14) and tangled; Screw nut (3) and pressing keeper anter (13); Screw rod this moment (21) is fixed with keeper (1) relative position; The scaffold short transversal pipe (4) that screw rod (21) tail end connects is perpendicular to the building facade, and short transversal pipe (4) is fixed in the vertical steel pipe (5) (referring to Fig. 1) of scaffold, and then scaffold is fixedly connected with the building body.
Embodiment 2.Screw rod pack into successively spring washer, nut are fixed in the screw rod tail end one end of scaffold short transversal pipe again.Referring to Fig. 4-5: incorporate with it between back plate (11) and header board (13) is square pipe fitting (12).Micro-sedimentation appears in scaffold sometimes, under the prerequisite of loose nut (3) slightly, compares with circular pipe fitting, and square pipe fitting (12) allows the amount of moving down of bolt head (22) (promptly allowing bolt (2)) big, can effectively avoid screw rod (21) bending.In addition; Between spring washer and bolt head (22), can also install additional again one can only cover elongated hole (14) pad; Flow into the internal cavity of keeper (1) and be difficult to discharge (this problem also can make suitably decurrence solution of elongated hole (14)) with the prevention rainwater, surplus with embodiment 1.This example example 1 is optimized.

Claims (3)

1. the wall attaching parts of building scaffold; It is characterized in that: it is made up of keeper, bolt and supporting nut; Keeper is embedded in the body collar tie beam outside, building, and there is elongated hole in its header board central authorities, and plate and header board and the pipe fitting between them are integrated thereafter; The screw rod tail end is fixed in scaffold short transversal pipe end, screw rod bolt head and keeper header board pivot bush unit.
2. the wall attaching parts of building scaffold according to claim 1 is characterized in that: have spring washer between nut and the screw rod bolt head.
3. the wall attaching parts of building scaffold according to claim 1 is characterized in that: what connect keeper header board and back plate is square pipe fitting.
CN 201220173240 2012-04-14 2012-04-14 Wall connecting device of building scaffold Expired - Fee Related CN202627474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220173240 CN202627474U (en) 2012-04-14 2012-04-14 Wall connecting device of building scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220173240 CN202627474U (en) 2012-04-14 2012-04-14 Wall connecting device of building scaffold

Publications (1)

Publication Number Publication Date
CN202627474U true CN202627474U (en) 2012-12-26

Family

ID=47380683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220173240 Expired - Fee Related CN202627474U (en) 2012-04-14 2012-04-14 Wall connecting device of building scaffold

Country Status (1)

Country Link
CN (1) CN202627474U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103375025A (en) * 2012-04-14 2013-10-30 安徽省舒城三乐童车有限责任公司 Wall connecting device for building scaffold
CN103821343A (en) * 2013-10-25 2014-05-28 南通市达欣工程股份有限公司 Quick tie bar assembling and disassembling connector device of suspension scaffold
CN104110125A (en) * 2014-07-18 2014-10-22 浙江万华建设有限公司 Scaffold wall-connecting device and waterproof method after dismantling of scaffold wall-connecting device
CN108979122A (en) * 2018-09-25 2018-12-11 中国五冶集团有限公司 A kind of scaffold wall connecting piece that can be recycled
CN109707149A (en) * 2019-01-28 2019-05-03 中核华辰建筑工程有限公司 Scaffold and its building method
CN112727062A (en) * 2021-03-30 2021-04-30 烟建集团有限公司 Wall connecting piece structure of scaffold and construction method thereof
CN115822235A (en) * 2022-11-14 2023-03-21 中国五冶集团有限公司 Pre-buried rotatory buckle formula is wall spare even

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103375025A (en) * 2012-04-14 2013-10-30 安徽省舒城三乐童车有限责任公司 Wall connecting device for building scaffold
CN103821343A (en) * 2013-10-25 2014-05-28 南通市达欣工程股份有限公司 Quick tie bar assembling and disassembling connector device of suspension scaffold
CN103821343B (en) * 2013-10-25 2016-08-17 南通市达欣工程股份有限公司 Scaffold cradle pull bar rapid-assembling/disassembling union joint device
CN104110125A (en) * 2014-07-18 2014-10-22 浙江万华建设有限公司 Scaffold wall-connecting device and waterproof method after dismantling of scaffold wall-connecting device
CN104110125B (en) * 2014-07-18 2016-08-24 浙江万华建设有限公司 Waterproof method after the dismounting of wall-connecting device of scaffold
CN108979122A (en) * 2018-09-25 2018-12-11 中国五冶集团有限公司 A kind of scaffold wall connecting piece that can be recycled
CN108979122B (en) * 2018-09-25 2023-10-13 中国五冶集团有限公司 Scaffold frame that circulated used links wall spare
CN109707149A (en) * 2019-01-28 2019-05-03 中核华辰建筑工程有限公司 Scaffold and its building method
CN109707149B (en) * 2019-01-28 2020-11-13 中核华辰建筑工程有限公司 Scaffold and construction method thereof
CN112727062A (en) * 2021-03-30 2021-04-30 烟建集团有限公司 Wall connecting piece structure of scaffold and construction method thereof
CN112727062B (en) * 2021-03-30 2021-06-18 烟建集团有限公司 Wall connecting piece structure of scaffold and construction method thereof
CN115822235A (en) * 2022-11-14 2023-03-21 中国五冶集团有限公司 Pre-buried rotatory buckle formula is wall spare even

Similar Documents

Publication Publication Date Title
CN202627474U (en) Wall connecting device of building scaffold
CN104453197B (en) High Large Cantilever concrete structural steel shape supports platform
CN106337555A (en) Method for constructing triangular steel support for cantilever structure of outer wall of building
CN202139833U (en) Cantilever scaffold for building construction
CN209099741U (en) A kind of bolt connecting type builder's jack
CN112144854A (en) Anchor pulling type section steel overhanging support operation scaffold combined system and construction method
CN107524284A (en) A kind of regularization pylon protection system and installation method
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN104847102B (en) Attachment type raise scaffold is received attached wall method and the device thereof of section in external wall
CN206157913U (en) Assembled square steel tube concrete post and girder steel connected node
CN207879008U (en) Diameter Silo structure roof support system
CN208734057U (en) A kind of wall-connecting piece
CN204343642U (en) Builder's jack corner support frame
CN103375025A (en) Wall connecting device for building scaffold
CN111519891A (en) Anchor ring buckling type rigid outer frame wall connecting piece and construction method thereof
CN207063177U (en) Cast-in-place concrete floor hanging built-in fitting
CN204343647U (en) A kind of the shaped steel suspension scaffolding bracing frame
CN107780644B (en) Operation platform for elevator shaft construction and use method thereof
CN207080169U (en) A kind of wall attaching parts for bridge construction safety climbing ladder
CN201883923U (en) Multi-purpose ladder for aloft work
CN111764623A (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss and construction method
CN206987410U (en) A kind of adjustable guard rail fixed mount
CN104499644A (en) Crossbeam with lapping bars and triangular rib plates
CN212271577U (en) Anchor ring fastening type rigid outer frame wall connecting piece
CN104100038A (en) Girder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121226

Termination date: 20140414