CN104032971B - Girder steel People's Bank of China protector - Google Patents
Girder steel People's Bank of China protector Download PDFInfo
- Publication number
- CN104032971B CN104032971B CN201410282022.1A CN201410282022A CN104032971B CN 104032971 B CN104032971 B CN 104032971B CN 201410282022 A CN201410282022 A CN 201410282022A CN 104032971 B CN104032971 B CN 104032971B
- Authority
- CN
- China
- Prior art keywords
- girder steel
- cat ladder
- arc frame
- bank
- china
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Ladders (AREA)
- Steps, Ramps, And Handrails (AREA)
Abstract
The invention discloses a kind of girder steel People's Bank of China protector, comprise stair-climbing mechanism and Hu Long mechanism; Described stair-climbing mechanism comprises cat ladder body, top platform and goes back to hook part, described cat ladder body is parallel to described go back to hook part, described cat ladder body is connected the two ends of described top platform respectively with the upper end of described time hook part, and described top platform length is identical with girder steel width; Described Hu Long mechanism comprise protect cage body and install vertical beam, described installation vertical beam is two and is fixedly arranged on described cat ladder body both sides respectively, the described cage body that protects has C shaped sections structure, and described in protect cage body dual-side and be fixedly arranged on respectively on two described installation vertical beams.Described girder steel People's Bank of China protector, only and need go back to cat ladder body, top platform hook part and form an overall crook and be hooked on girder steel during use, quick and easy for installation, and operating personnel to climb safety high.
Description
Technical field
The present invention relates to a kind of girder steel People's Bank of China protector, belong to steel structure construction equipment manufacturing technology field.
Background technology
Girder steel, in build process, in order to arrive the height of girder steel operation, needs to adopt jacking equipment conveying operating personnel usually.But jacking equipment volume is larger, use underaction, therefore operating personnel is needed to carry out climbing operation under many circumstances, lack a kind of quick for installation, easy to use and can ensure that operating personnel climbs the device of safety in existing climbing operation process, therefore need to provide a kind of girder steel People's Bank of China protector for steel beam structure, to meet above-mentioned requirements.
Summary of the invention
The present invention for the deficiency that prior art exists, provides a kind of girder steel People's Bank of China protector, meets actual operation requirements just.
For solving the problem, the technical solution used in the present invention is as follows:
A kind of girder steel People's Bank of China protector, comprising: stair-climbing mechanism and Hu Long mechanism;
Described stair-climbing mechanism comprises cat ladder body, top platform and goes back to hook part, described cat ladder body is parallel to described go back to hook part, described cat ladder body is connected the two ends of described top platform respectively with the upper end of described time hook part, and described top platform length is identical with girder steel width;
Described Hu Long mechanism comprise protect cage body and install vertical beam, described installation vertical beam is two and is fixedly arranged on described cat ladder body both sides respectively, the described cage body that protects has C shaped sections structure, and described in protect cage body dual-side and be fixedly arranged on respectively on two described installation vertical beams.
Only and hook part need be gone back to form cat ladder body, top platform an overall crook and be hooked on girder steel during use, quick and easy for installation, and operating personnel to climb safety high.
As the improvement of technique scheme, described stair-climbing mechanism also comprises handrail, and described handrail is arranged at the both sides of described top platform, and the height of described Hu Long mechanism is equal to or higher than the height at described handrail top.It is more convenient and safe when described structure can make operating personnel climb to the top of a mountain.
As the improvement of technique scheme, described in protect cage body and comprise arc frame and fixing rib, described fixing rib is provided with the holddown groove passed for described arc frame, and the two ends of described arc frame are fixedly arranged on described installation vertical beam.
As the improvement of technique scheme, the two ends of described arc frame are fixedly arranged on described installation vertical beam by bolt, and the two ends of described arc frame are provided with several screws coordinating described bolt.Described structure can regulate the length of described arc frame, thus is convenient to protect the in-house sectional area of cage according to the volume increase of the belongings of operating personnel, protects the in-house sectional area of cage described in also can reducing according to the needs of safety.
As the improvement of technique scheme, the two ends of described arc frame are fixedly arranged on described installation vertical beam by bolt, and the two ends of described arc frame are provided with the regulating tank coordinating described bolt.The technique effect obtained is substantially identical with structure described in the preceding paragraph, but this section of amplitude with unlimited multiple adjustment, but it is inconsistent also easily to there is all arc frame amplitudes of accommodation simultaneously, cause the problem that described fixing rib is out of shape, two kinds of structures therefore can be selected according to actual needs to realize the adjustment of described arc frame length.
As the improvement of technique scheme, described fixing rib is three, and protects the both sides of cage body and the middle part of described arc frame described in being arranged at respectively.
As the improvement of technique scheme, described fixing rib is that two blocks of strip rigidity sheet materials are formed, and be fixedly connected with by some pins between two blocks of described sheet materials, the gap between adjacent two pins forms described holddown groove.Described structure has easy to process, quick, that cost is low advantage.
Compared with prior art, implementation result of the present invention is as follows in the present invention:
Girder steel People's Bank of China of the present invention protector, only and need go back to cat ladder body, top platform hook part and form an overall crook and be hooked on girder steel during use, quick and easy for installation, and operating personnel climbs, and safety is high, climbing to the top of a mountain not only facilitates but also safety; In addition, by improving further thus the length of described arc frame can being regulated, protect the in-house sectional area of cage described in being convenient to increase according to the volume of the belongings of operating personnel, described in also can reducing according to the needs of safety, protect the in-house sectional area of cage.
Accompanying drawing explanation
Fig. 1 is girder steel People's Bank of China of the present invention protector Facad structure schematic diagram;
Fig. 2 is girder steel People's Bank of China of the present invention guard sideways structural representation;
Fig. 3 is girder steel People's Bank of China of the present invention protector plan structure schematic diagram;
Fig. 4 is fixing rib structural representation of the present invention;
Fig. 5 is the two-end structure schematic diagram of the arc frame of specific embodiment one;
Fig. 6 is the two-end structure schematic diagram of the arc frame of specific embodiment two.
Detailed description of the invention
Below in conjunction with specific embodiments content of the present invention is described.
Specific embodiment one
As shown in Figures 1 to 5, be the girder steel People's Bank of China protective device structure schematic diagram described in the present embodiment.Girder steel People's Bank of China protector described in the present embodiment, comprising: stair-climbing mechanism and Hu Long mechanism; Described stair-climbing mechanism comprises cat ladder body 1, top platform 2 and goes back to hook part 3, described cat ladder body 1 is parallel to described go back to hook part 3, described cat ladder body 1 is connected the two ends of described top platform 2 respectively with the upper end of described time hook part 3, and described top platform 2 length is identical with girder steel width; Described Hu Long mechanism comprise protect cage body and install vertical beam 4, described installation vertical beam 4 is two and is fixedly arranged on described cat ladder body 1 both sides respectively, the described cage body that protects has C shaped sections structure, and described in protect cage body dual-side and be fixedly arranged on respectively on two described installation vertical beams 4.Particularly, described stair-climbing mechanism also comprises handrail 5, and described handrail 5 is arranged at the both sides of described top platform 2, and the height of described Hu Long mechanism is equal to or higher than the height at described handrail 5 top.
Particularly, described in protect cage body and comprise arc frame 6 and fixing rib 7, described fixing rib 7 is provided with the holddown groove 71 passed for described arc frame 6, and the two ends of described arc frame 6 are fixedly arranged on described installation vertical beam 4.The two ends of described arc frame 6 are fixedly arranged on described installation vertical beam 4 by bolt 62, and the two ends of described arc frame 6 are provided with several screws 63 coordinating described bolt 62.Described fixing rib 7 is three, and protects the both sides of cage body and the middle part of described arc frame 6 described in being arranged at respectively.Described fixing rib 7 is that two blocks of strip rigidity sheet materials 73 are formed, and be fixedly connected with by some pins 72 between two blocks of described sheet materials 73, the gap between adjacent two pins 72 forms described holddown groove 71.
Specific embodiment two
As shown in Figure 1 to Figure 4 with shown in Fig. 6, it is the girder steel People's Bank of China protective device structure schematic diagram described in the present embodiment.Girder steel People's Bank of China protector described in the present embodiment, comprising: stair-climbing mechanism and Hu Long mechanism; Described stair-climbing mechanism comprises cat ladder body 1, top platform 2 and goes back to hook part 3, described cat ladder body 1 is parallel to described go back to hook part 3, described cat ladder body 1 is connected the two ends of described top platform 2 respectively with the upper end of described time hook part 3, and described top platform 2 length is identical with girder steel width; Described Hu Long mechanism comprise protect cage body and install vertical beam 4, described installation vertical beam 4 is two and is fixedly arranged on described cat ladder body 1 both sides respectively, the described cage body that protects has C shaped sections structure, and described in protect cage body dual-side and be fixedly arranged on respectively on two described installation vertical beams 4.Particularly, described stair-climbing mechanism also comprises handrail 5, and described handrail 5 is arranged at the both sides of described top platform 2, and the height of described Hu Long mechanism is equal to or higher than the height at described handrail 5 top.
Particularly, described in protect cage body and comprise arc frame 6 and fixing rib 7, described fixing rib 7 is provided with the holddown groove 71 passed for described arc frame 6, and the two ends of described arc frame 6 are fixedly arranged on described installation vertical beam 4.The two ends of described arc frame 6 are fixedly arranged on described installation vertical beam 4 by bolt 62, and the two ends of described arc frame 6 are provided with the regulating tank 61 coordinating described bolt 62.Described fixing rib 7 is two, and protects the both sides of cage body described in being arranged at respectively.Described fixing rib 7 is that two blocks of strip rigidity sheet materials 73 are formed, and be fixedly connected with by some pins 72 between two blocks of described sheet materials 73, the gap between adjacent two pins 72 forms described holddown groove 71.
Above content is detailed description made for the present invention in conjunction with specific embodiments, can not assert that the present invention specifically implements to be only limitted to these explanations.For those skilled in the art, without departing from the inventive concept of the premise, some simple deduction or replace can also be made, all should be considered as belonging to the scope of protection of the invention.
Claims (4)
1. a girder steel People's Bank of China protector, is characterized in that, comprising: stair-climbing mechanism and Hu Long mechanism;
Described stair-climbing mechanism comprises cat ladder body (1), top platform (2) and goes back to hook part (3), described cat ladder body (1) is parallel to described go back to hook part (3), described cat ladder body (1) and the upper end of described time hook part (3) are connected the two ends of described top platform (2) respectively, and described top platform (2) length is identical with girder steel width;
Described Hu Long mechanism comprise protect cage body and install vertical beam (4), described installation vertical beam (4) is two and is fixedly arranged on described cat ladder body (1) both sides respectively, the described cage body that protects has C shaped sections structure, and described in protect cage body dual-side and be fixedly arranged on two described installation vertical beams (4) respectively;
The described cage body that protects comprises arc frame (6) and fixing rib (7), and described fixing rib (7) is provided with the holddown groove (71) passed for described arc frame (6), and the two ends of described arc frame (6) are fixedly arranged on described installation vertical beam (4);
The two ends of described arc frame (6) are fixedly arranged on described installation vertical beam (4) by bolt (62), and the two ends of described arc frame (6) are provided with the regulating tank (61) coordinating several screws (63) of described bolt (62) or the two ends of described arc frame (6) to be provided with the described bolt of cooperation (62).
2. girder steel People's Bank of China as claimed in claim 1 protector, it is characterized in that, described stair-climbing mechanism also comprises handrail (5), and described handrail (5) is arranged at the both sides of described top platform (2), and the height of described Hu Long mechanism is equal to or higher than the height at described handrail (5) top.
3. girder steel People's Bank of China as claimed in claim 1 protector, it is characterized in that, described fixing rib (7) is three, and protects the both sides of cage body and the middle part of described arc frame (6) described in being arranged at respectively.
4. girder steel People's Bank of China as claimed in claim 1 protector, it is characterized in that, described fixing rib (7) is two pieces of strip rigidity sheet materials (73) formation, be fixedly connected with by some pins (72) between two pieces of described sheet materials (73), the gap between adjacent two pins (72) forms described holddown groove (71).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410282022.1A CN104032971B (en) | 2014-06-23 | 2014-06-23 | Girder steel People's Bank of China protector |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410282022.1A CN104032971B (en) | 2014-06-23 | 2014-06-23 | Girder steel People's Bank of China protector |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104032971A CN104032971A (en) | 2014-09-10 |
CN104032971B true CN104032971B (en) | 2016-01-27 |
Family
ID=51463943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410282022.1A Active CN104032971B (en) | 2014-06-23 | 2014-06-23 | Girder steel People's Bank of China protector |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104032971B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2245112Y (en) * | 1995-06-12 | 1997-01-15 | 冯国栋 | Safety ladder for building tower crane |
JP2004008776A (en) * | 2002-06-11 | 2004-01-15 | Komiyama Doboku:Kk | Exclusive suspension tool for fall prevention equipment |
CN2739339Y (en) * | 2004-11-03 | 2005-11-09 | 上海市向明中学 | Movable escape ladder |
CN201554360U (en) * | 2009-11-05 | 2010-08-18 | 宝钢工程技术集团有限公司 | Vertical ladder with detachable protective cage |
CN201627529U (en) * | 2010-03-24 | 2010-11-10 | 陈宝文 | Cage ladder |
CN203066844U (en) * | 2012-11-28 | 2013-07-17 | 中建钢构有限公司 | Folding protective-type climbing ladder |
CN204040507U (en) * | 2014-06-23 | 2014-12-24 | 铜陵有色建安钢构有限责任公司 | Girder steel People's Bank of China protector |
-
2014
- 2014-06-23 CN CN201410282022.1A patent/CN104032971B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2245112Y (en) * | 1995-06-12 | 1997-01-15 | 冯国栋 | Safety ladder for building tower crane |
JP2004008776A (en) * | 2002-06-11 | 2004-01-15 | Komiyama Doboku:Kk | Exclusive suspension tool for fall prevention equipment |
CN2739339Y (en) * | 2004-11-03 | 2005-11-09 | 上海市向明中学 | Movable escape ladder |
CN201554360U (en) * | 2009-11-05 | 2010-08-18 | 宝钢工程技术集团有限公司 | Vertical ladder with detachable protective cage |
CN201627529U (en) * | 2010-03-24 | 2010-11-10 | 陈宝文 | Cage ladder |
CN203066844U (en) * | 2012-11-28 | 2013-07-17 | 中建钢构有限公司 | Folding protective-type climbing ladder |
CN204040507U (en) * | 2014-06-23 | 2014-12-24 | 铜陵有色建安钢构有限责任公司 | Girder steel People's Bank of China protector |
Also Published As
Publication number | Publication date |
---|---|
CN104032971A (en) | 2014-09-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203959574U (en) | A kind of fall protection equipment of elevator | |
CN204040507U (en) | Girder steel People's Bank of China protector | |
CN104032971B (en) | Girder steel People's Bank of China protector | |
CN203947758U (en) | Novel hydraulic automatic climbing discharging platform | |
CN204163616U (en) | A kind of vertical shaft cat ladder | |
CN204186100U (en) | Locomotive servicing job platform | |
CN103701070A (en) | Ground guiding wire traveling crane | |
CN203794502U (en) | Movable small crane for bridge construction | |
CN204225467U (en) | The intelligent elevated climbing frame platform of a kind of protection | |
CN103213901A (en) | Automotive wheel hub surface treatment automatic hoisting production line | |
CN103899121A (en) | Communication tower with falling-preventing device | |
CN207776393U (en) | Lighting roof steel construction operating platform | |
CN205558245U (en) | Building support for construction | |
CN206407511U (en) | Safety moving conveyer belt | |
CN204781889U (en) | Utilize steel construction factory building intercolumniation to support maintenance platform of preparation | |
CN204324645U (en) | A kind of counterweight housing of elevator | |
CN204645565U (en) | A kind of spiral case overhaul working platform | |
CN204824006U (en) | Cut fork lifter | |
CN203430005U (en) | Overhauling platform for electric melting furnace | |
CN204283200U (en) | Electric power steel pipe tower cat ladder | |
CN203248473U (en) | T-type connecting piece mechanism | |
CN204162303U (en) | The high-altitude operation platform of single-beam crane | |
CN204111130U (en) | A kind of elevator craning cage extendable platform | |
CN206590715U (en) | A kind of monoblock type is exempted to climb device top sheave component | |
CN202295789U (en) | Accommodating device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |