CN104032971A - Steel beam walking protection device - Google Patents

Steel beam walking protection device Download PDF

Info

Publication number
CN104032971A
CN104032971A CN201410282022.1A CN201410282022A CN104032971A CN 104032971 A CN104032971 A CN 104032971A CN 201410282022 A CN201410282022 A CN 201410282022A CN 104032971 A CN104032971 A CN 104032971A
Authority
CN
China
Prior art keywords
arc frame
girder steel
bank
china
protector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410282022.1A
Other languages
Chinese (zh)
Other versions
CN104032971B (en
Inventor
黄也文
秦珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongling Ferrous Construction & Installation Steel Structure Co Ltd
Original Assignee
Tongling Ferrous Construction & Installation Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongling Ferrous Construction & Installation Steel Structure Co Ltd filed Critical Tongling Ferrous Construction & Installation Steel Structure Co Ltd
Priority to CN201410282022.1A priority Critical patent/CN104032971B/en
Publication of CN104032971A publication Critical patent/CN104032971A/en
Application granted granted Critical
Publication of CN104032971B publication Critical patent/CN104032971B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention discloses a steel beam walking protection device. The device comprises a climbing ladder mechanism and a protecting cage mechanism, wherein the climbing ladder mechanism comprises a climbing ladder main body, a top platform and a hook part, the climbing ladder main body is parallel to the hook part, the upper ends of the climbing ladder main body and the hook part are respectively connected with both ends of the top platform, and the length of the top platform is the same as the width of a steel beam; the protecting cage mechanism comprises a protecting cage main body and two vertical mounting beams, wherein the two vertical mounting beams are respectively and fixedly arranged at both sides of the climbing ladder main body, the climbing ladder main body is in a C-shaped cross section structure, and the two sides of the protecting cage main body are respectively and fixedly arranged on the two vertical mounting beams. When the steel beam walking protection device is used, the climbing ladder main body, the top platform and the hook part are only required to be formed into an integrated hook-shaped part to be hooked on the steel beam, the device is convenient and fast to mount, and the climbing safety of operating personnel is high.

Description

Girder steel People's Bank of China protector
Technical field
The present invention relates to a kind of girder steel People's Bank of China protector, belong to steel structure construction and use equipment manufacturing technology field.
Background technology
Girder steel, in build process, in order to arrive the height of girder steel operation, need to adopt jacking equipment to carry operating personnel conventionally.But jacking equipment volume is larger, use underaction, therefore need under many circumstances operating personnel to climb operation, in existing climbing operation process, lack a kind of quick for installation, easy to use and can ensure that operating personnel climbs the device of safety, therefore need to provide a kind of girder steel People's Bank of China protector for steel beam structure, to meet above-mentioned requirements.
Summary of the invention
The deficiency that the present invention exists for prior art just, provides a kind of girder steel People's Bank of China protector, meets actual operation requirements.
For addressing the above problem, the technical solution used in the present invention is as follows:
A girder steel People's Bank of China protector, comprising: stair-climbing mechanism He Hu cage mechanism;
Described stair-climbing mechanism comprises cat ladder body, top platform and goes back to hook part, described cat ladder body is parallel to the described hook part of going back to, described cat ladder body and the upper end of described time hook part are connected respectively the two ends of described top platform, and described top platform length is identical with girder steel width;
Described Hu Long mechanism comprises and protects cage body and vertical beam is installed, described installation vertical beam is two and is fixedly arranged on respectively described cat ladder body both sides, the described cage body that protects has C shaped sections structure, and described in protect cage body dual-side and be fixedly arranged on respectively on two described installation vertical beams.
During use, only need and return a hook part whole crook of formation by cat ladder body, top platform and be hooked on girder steel, quick and easy for installation, and operating personnel climbs safe.
As the improvement of technique scheme, described stair-climbing mechanism also comprises handrail, and described handrail is arranged at the both sides of described top platform, and the height of described Hu Long mechanism is equal to or higher than the height at described handrail top.It is more convenient and safe when described structure can make operating personnel climb to the top of a mountain.
As the improvement of technique scheme, described in protect cage body and comprise arc frame and fixing rib, described fixing rib is provided with the holddown groove passing for described arc frame, the two ends of described arc frame are fixedly arranged on described installation vertical beam.
As the improvement of technique scheme, the two ends of described arc frame are fixedly arranged on described installation vertical beam by bolt, and the two ends of described arc frame are provided with several screws that coordinate described bolt.Described structure can regulate the length of described arc frame, thereby protects the in-house sectional area of cage described in being convenient to increase according to the volume of operating personnel's belongings, described in also can dwindling according to the needs of safety, protects the in-house sectional area of cage.
As the improvement of technique scheme, the two ends of described arc frame are fixedly arranged on described installation vertical beam by bolt, and the two ends of described arc frame are provided with the regulating tank that coordinates described bolt.Described in the technique effect of obtaining and the preceding paragraph, structure is basic identical, but this section of amplitude with unlimited a plurality of adjustings, but also easily exist all arc frame amplitudes of accommodation inconsistent simultaneously, cause the problem of described fixing rib distortion, therefore can select according to actual needs two kinds of structures to realize the adjusting of described arc frame length.
As the improvement of technique scheme, described fixing rib is three, and described in being arranged at respectively, protects the both sides of cage body and the middle part of described arc frame.
As the improvement of technique scheme, described fixing rib is that two blocks of strip rigidity sheet materials form, and between two blocks of described sheet materials, by some pins, is fixedly connected with, and the gap between adjacent two pins forms described holddown groove.That described structure has advantages of is easy to process, quick, cost is low.
Compared with prior art, implementation result of the present invention is as follows in the present invention:
Girder steel of the present invention People's Bank of China protector, only need and go back to hook part by cat ladder body, top platform during use and form a whole crook and be hooked on girder steel, quick and easy for installation, and operating personnel climb safe, climbing to the top of a mountain not only facilitates but also safety; In addition, thereby by improving further the length that can regulate described arc frame, described in being convenient to increase according to the volume of operating personnel's belongings, protect the in-house sectional area of cage, described in also can dwindling according to the needs of safety, protect the in-house sectional area of cage.
Accompanying drawing explanation
Fig. 1 is girder steel of the present invention People's Bank of China protector Facad structure schematic diagram;
Fig. 2 is girder steel of the present invention People's Bank of China guard sideways structural representation;
Fig. 3 is girder steel of the present invention People's Bank of China protector plan structure schematic diagram;
Fig. 4 is fixing rib structural representation of the present invention;
Fig. 5 is the two-end structure schematic diagram of the arc frame of specific embodiment one;
Fig. 6 is the two-end structure schematic diagram of the arc frame of specific embodiment two.
The specific embodiment
Content of the present invention is described below in conjunction with specific embodiments.
Specific embodiment one
As shown in Figures 1 to 5, be the girder steel People's Bank of China protective device structure schematic diagram described in the present embodiment.Girder steel People's Bank of China protector described in the present embodiment, comprising: stair-climbing mechanism He Hu cage mechanism; Described stair-climbing mechanism comprises cat ladder body 1, top platform 2 and goes back to hook part 3, described cat ladder body 1 is parallel to the described hook part 3 of going back to, described cat ladder body 1 and the upper end of described time hook part 3 are connected respectively the two ends of described top platform 2, and described top platform 2 length are identical with girder steel width; Described Hu Long mechanism comprises and protects cage body and vertical beam 4 is installed, described installation vertical beam 4 is two and is fixedly arranged on respectively described cat ladder body 1 both sides, the described cage body that protects has C shaped sections structure, and described in protect cage body dual-side and be fixedly arranged on respectively on two described installation vertical beams 4.Particularly, described stair-climbing mechanism also comprises handrail 5, and described handrail 5 is arranged at the both sides of described top platform 2, and the height of described Hu Long mechanism is equal to or higher than the height at described handrail 5 tops.
Particularly, described in protect cage body and comprise arc frame 6 and fixing rib 7, described fixing rib 7 is provided with the holddown groove 71 passing for described arc frame 6, the two ends of described arc frame 6 are fixedly arranged on described installation vertical beam 4.The two ends of described arc frame 6 are fixedly arranged on described installation vertical beam 4 by bolt 62, and the two ends of described arc frame 6 are provided with several screws 63 that coordinate described bolt 62.Described fixing rib 7 is three, and described in being arranged at respectively, protects the both sides of cage body and the middle part of described arc frame 6.Described fixing rib 7 is that two blocks of strip rigidity sheet materials 73 form, and between two blocks of described sheet materials 73, by some pins 72, is fixedly connected with, and the gap between adjacent two pins 72 forms described holddown groove 71.
Specific embodiment two
With shown in Fig. 6, be the girder steel People's Bank of China protective device structure schematic diagram described in the present embodiment as shown in Figure 1 to Figure 4.Girder steel People's Bank of China protector described in the present embodiment, comprising: stair-climbing mechanism He Hu cage mechanism; Described stair-climbing mechanism comprises cat ladder body 1, top platform 2 and goes back to hook part 3, described cat ladder body 1 is parallel to the described hook part 3 of going back to, described cat ladder body 1 and the upper end of described time hook part 3 are connected respectively the two ends of described top platform 2, and described top platform 2 length are identical with girder steel width; Described Hu Long mechanism comprises and protects cage body and vertical beam 4 is installed, described installation vertical beam 4 is two and is fixedly arranged on respectively described cat ladder body 1 both sides, the described cage body that protects has C shaped sections structure, and described in protect cage body dual-side and be fixedly arranged on respectively on two described installation vertical beams 4.Particularly, described stair-climbing mechanism also comprises handrail 5, and described handrail 5 is arranged at the both sides of described top platform 2, and the height of described Hu Long mechanism is equal to or higher than the height at described handrail 5 tops.
Particularly, described in protect cage body and comprise arc frame 6 and fixing rib 7, described fixing rib 7 is provided with the holddown groove 71 passing for described arc frame 6, the two ends of described arc frame 6 are fixedly arranged on described installation vertical beam 4.The two ends of described arc frame 6 are fixedly arranged on described installation vertical beam 4 by bolt 62, and the two ends of described arc frame 6 are provided with the regulating tank 61 that coordinates described bolt 62.Described fixing rib 7 is two, and described in being arranged at respectively, protects the both sides of cage body.Described fixing rib 7 is that two blocks of strip rigidity sheet materials 73 form, and between two blocks of described sheet materials 73, by some pins 72, is fixedly connected with, and the gap between adjacent two pins 72 forms described holddown groove 71.
Above content is detailed description made for the present invention in conjunction with specific embodiments, can not assert that the concrete enforcement of the present invention only limits to these explanations.For those skilled in the art, without departing from the inventive concept of the premise, can also make some simple deduction or replace, all should be considered as belonging to the scope of protection of the invention.

Claims (7)

1.Yi Zhong girder steel People's Bank of China protector, is characterized in that, comprising: stair-climbing mechanism He Hu cage mechanism;
Described stair-climbing mechanism comprises cat ladder body (1), top platform (2) and goes back to hook part (3), described cat ladder body (1) is parallel to the described hook part (3) of going back to, described cat ladder body (1) and the upper end of described time hook part (3) are connected respectively the two ends of described top platform (2), and described top platform (2) length is identical with girder steel width;
Described Hu Long mechanism comprises and protects cage body and vertical beam (4) is installed, described installation vertical beam (4) is two and is fixedly arranged on respectively described cat ladder body (1) both sides, the described cage body that protects has C shaped sections structure, and described in protect cage body dual-side and be fixedly arranged on respectively on two described installation vertical beams (4).
2. girder steel as claimed in claim 1 People's Bank of China protector, it is characterized in that, described stair-climbing mechanism also comprises handrail (5), and described handrail (5) is arranged at the both sides of described top platform (2), and the height of described Hu Long mechanism is equal to or higher than the height at described handrail (5) top.
3. girder steel as claimed in claim 1 or 2 People's Bank of China protector, it is characterized in that, the described cage body that protects comprises arc frame (6) and fixing rib (7), described fixing rib (7) is provided with the holddown groove (71) passing for described arc frame (6), and the two ends of described arc frame (6) are fixedly arranged on described installation vertical beam (4).
4. girder steel as claimed in claim 3 People's Bank of China protector, it is characterized in that, the two ends of described arc frame (6) are fixedly arranged on described installation vertical beam (4) by bolt (62), and the two ends of described arc frame (6) are provided with several screws (63) that coordinate described bolt (62).
5. girder steel as claimed in claim 3 People's Bank of China protector, it is characterized in that, the two ends of described arc frame (6) are fixedly arranged on described installation vertical beam (4) by bolt (62), and the two ends of described arc frame (6) are provided with the regulating tank (61) that coordinates described bolt (62).
6. girder steel as claimed in claim 3 People's Bank of China protector, is characterized in that, described fixing rib (7) is three, and described in being arranged at respectively, protects the both sides of cage body and the middle part of described arc frame (6).
7. girder steel as claimed in claim 3 People's Bank of China protector, it is characterized in that, described fixing rib (7) is that two blocks of strip rigidity sheet materials (73) form, between two blocks of described sheet materials (73), by some pins (72), be fixedly connected with, the gap between adjacent two pins (72) forms described holddown groove (71).
CN201410282022.1A 2014-06-23 2014-06-23 Girder steel People's Bank of China protector Active CN104032971B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410282022.1A CN104032971B (en) 2014-06-23 2014-06-23 Girder steel People's Bank of China protector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410282022.1A CN104032971B (en) 2014-06-23 2014-06-23 Girder steel People's Bank of China protector

Publications (2)

Publication Number Publication Date
CN104032971A true CN104032971A (en) 2014-09-10
CN104032971B CN104032971B (en) 2016-01-27

Family

ID=51463943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410282022.1A Active CN104032971B (en) 2014-06-23 2014-06-23 Girder steel People's Bank of China protector

Country Status (1)

Country Link
CN (1) CN104032971B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2245112Y (en) * 1995-06-12 1997-01-15 冯国栋 Safety ladder for building tower crane
JP2004008776A (en) * 2002-06-11 2004-01-15 Komiyama Doboku:Kk Exclusive suspension tool for fall prevention equipment
CN2739339Y (en) * 2004-11-03 2005-11-09 上海市向明中学 Movable escape ladder
CN201554360U (en) * 2009-11-05 2010-08-18 宝钢工程技术集团有限公司 Vertical ladder with detachable protective cage
CN201627529U (en) * 2010-03-24 2010-11-10 陈宝文 Cage ladder
CN203066844U (en) * 2012-11-28 2013-07-17 中建钢构有限公司 Folding protective-type climbing ladder
CN204040507U (en) * 2014-06-23 2014-12-24 铜陵有色建安钢构有限责任公司 Girder steel People's Bank of China protector

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2245112Y (en) * 1995-06-12 1997-01-15 冯国栋 Safety ladder for building tower crane
JP2004008776A (en) * 2002-06-11 2004-01-15 Komiyama Doboku:Kk Exclusive suspension tool for fall prevention equipment
CN2739339Y (en) * 2004-11-03 2005-11-09 上海市向明中学 Movable escape ladder
CN201554360U (en) * 2009-11-05 2010-08-18 宝钢工程技术集团有限公司 Vertical ladder with detachable protective cage
CN201627529U (en) * 2010-03-24 2010-11-10 陈宝文 Cage ladder
CN203066844U (en) * 2012-11-28 2013-07-17 中建钢构有限公司 Folding protective-type climbing ladder
CN204040507U (en) * 2014-06-23 2014-12-24 铜陵有色建安钢构有限责任公司 Girder steel People's Bank of China protector

Also Published As

Publication number Publication date
CN104032971B (en) 2016-01-27

Similar Documents

Publication Publication Date Title
CN204703066U (en) The built-in cable channel in inter-city passenger rail T beam sidewalk
CN203959574U (en) A kind of fall protection equipment of elevator
CN204040506U (en) Hydraulic lifting protector
CN209443802U (en) A kind of telescopic assembled edge protection overhanging unloading platform
CN103967263A (en) Novel hydraulic automatic climbing discharging platform
CN204040507U (en) Girder steel People's Bank of China protector
CN104032971B (en) Girder steel People's Bank of China protector
CN216431226U (en) Novel accessible leveling support of gas chamber
CN206625600U (en) A kind of steel construction equipped with safety net hook
CN204162235U (en) Lift crosshead safety overhauling device
CN204186100U (en) Locomotive servicing job platform
CN104671110A (en) Platform for stabilizing and maintaining bridge crane trolley
CN209428961U (en) A kind of steel box-girder installation bracket equipped with safe operation platform
CN203716424U (en) Adjustable staircase device
CN203392657U (en) Machine maintenance platform
CN202272594U (en) Mounting structure of protective fence at top of elevator car
CN205558245U (en) Building support for construction
CN205000623U (en) Integrated form intelligence lift protective screen
CN204111130U (en) A kind of elevator craning cage extendable platform
CN104533033A (en) Ladder adopting sliding ladder beam
CN204283202U (en) A kind of detachable cat ladder
CN204552182U (en) A kind of inspection platform
CN204691654U (en) Elevator experimental tower cylinder inwall cat ladder
CN220767721U (en) Protective frame suitable for bridge construction
CN204645565U (en) A kind of spiral case overhaul working platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant