CN204040507U - Girder steel People's Bank of China protector - Google Patents
Girder steel People's Bank of China protector Download PDFInfo
- Publication number
- CN204040507U CN204040507U CN201420335578.8U CN201420335578U CN204040507U CN 204040507 U CN204040507 U CN 204040507U CN 201420335578 U CN201420335578 U CN 201420335578U CN 204040507 U CN204040507 U CN 204040507U
- Authority
- CN
- China
- Prior art keywords
- girder steel
- bank
- china
- protector
- arc frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a kind of girder steel People's Bank of China protector, comprise stair-climbing mechanism and Hu Long mechanism; Described stair-climbing mechanism comprises cat ladder body, top platform and goes back to hook part, described cat ladder body is parallel to described go back to hook part, described cat ladder body is connected the two ends of described top platform respectively with the upper end of described time hook part, and described top platform length is identical with girder steel width; Described Hu Long mechanism comprise protect cage body and install vertical beam, described installation vertical beam is two and is fixedly arranged on described cat ladder body both sides respectively, the described cage body that protects has C shaped sections structure, and described in protect cage body dual-side and be fixedly arranged on respectively on two described installation vertical beams.Described girder steel People's Bank of China protector, only and need go back to cat ladder body, top platform hook part and form an overall crook and be hooked on girder steel during use, quick and easy for installation, and operating personnel to climb safety high.
Description
Technical field
The utility model relates to a kind of girder steel People's Bank of China protector, belongs to steel structure construction equipment manufacturing technology field.
Background technology
Girder steel, in build process, in order to arrive the height of girder steel operation, needs to adopt jacking equipment conveying operating personnel usually.But jacking equipment volume is larger, use underaction, therefore operating personnel is needed to carry out climbing operation under many circumstances, lack a kind of quick for installation, easy to use and can ensure that operating personnel climbs the device of safety in existing climbing operation process, therefore need to provide a kind of girder steel People's Bank of China protector for steel beam structure, to meet above-mentioned requirements.
Utility model content
The utility model for the deficiency that prior art exists, provides a kind of girder steel People's Bank of China protector, meets actual operation requirements just.
For solving the problem, technical solution adopted in the utility model is as follows:
A kind of girder steel People's Bank of China protector, comprising: stair-climbing mechanism and Hu Long mechanism;
Described stair-climbing mechanism comprises cat ladder body, top platform and goes back to hook part, described cat ladder body is parallel to described go back to hook part, described cat ladder body is connected the two ends of described top platform respectively with the upper end of described time hook part, and described top platform length is identical with girder steel width;
Described Hu Long mechanism comprise protect cage body and install vertical beam, described installation vertical beam is two and is fixedly arranged on described cat ladder body both sides respectively, the described cage body that protects has C shaped sections structure, and described in protect cage body dual-side and be fixedly arranged on respectively on two described installation vertical beams.
Only and hook part need be gone back to form cat ladder body, top platform an overall crook and be hooked on girder steel during use, quick and easy for installation, and operating personnel to climb safety high.
As the improvement of technique scheme, described stair-climbing mechanism also comprises handrail, and described handrail is arranged at the both sides of described top platform, and the height of described Hu Long mechanism is equal to or higher than the height at described handrail top.It is more convenient and safe when described structure can make operating personnel climb to the top of a mountain.
As the improvement of technique scheme, described in protect cage body and comprise arc frame and fixing rib, described fixing rib is provided with the holddown groove passed for described arc frame, and the two ends of described arc frame are fixedly arranged on described installation vertical beam.
As the improvement of technique scheme, the two ends of described arc frame are fixedly arranged on described installation vertical beam by bolt, and the two ends of described arc frame are provided with several screws coordinating described bolt.Described structure can regulate the length of described arc frame, thus is convenient to protect the in-house sectional area of cage according to the volume increase of the belongings of operating personnel, protects the in-house sectional area of cage described in also can reducing according to the needs of safety.
As the improvement of technique scheme, the two ends of described arc frame are fixedly arranged on described installation vertical beam by bolt, and the two ends of described arc frame are provided with the regulating tank coordinating described bolt.The technique effect obtained is substantially identical with structure described in the preceding paragraph, but this section of amplitude with unlimited multiple adjustment, but it is inconsistent also easily to there is all arc frame amplitudes of accommodation simultaneously, cause the problem that described fixing rib is out of shape, two kinds of structures therefore can be selected according to actual needs to realize the adjustment of described arc frame length.
As the improvement of technique scheme, described fixing rib is three, and protects the both sides of cage body and the middle part of described arc frame described in being arranged at respectively.
As the improvement of technique scheme, described fixing rib is that two blocks of strip rigidity sheet materials are formed, and be fixedly connected with by some pins between two blocks of described sheet materials, the gap between adjacent two pins forms described holddown groove.Described structure has easy to process, quick, that cost is low advantage.
Compared with prior art, implementation result of the present utility model is as follows for the utility model:
Girder steel People's Bank of China described in the utility model protector, only cat ladder body, top platform and time hook part need be formed an overall crook during use is hooked on girder steel, quick and easy for installation, and operating personnel climbs, and safety is high, not only convenient but also safety of climbing to the top of a mountain; In addition, by improving further thus the length of described arc frame can being regulated, protect the in-house sectional area of cage described in being convenient to increase according to the volume of the belongings of operating personnel, described in also can reducing according to the needs of safety, protect the in-house sectional area of cage.
Accompanying drawing explanation
Fig. 1 is girder steel People's Bank of China described in the utility model protector Facad structure schematic diagram;
Fig. 2 is girder steel People's Bank of China described in the utility model guard sideways structural representation;
Fig. 3 is girder steel People's Bank of China described in the utility model protector plan structure schematic diagram;
Fig. 4 is fixing rib structural representation described in the utility model;
Fig. 5 is the two-end structure schematic diagram of the arc frame of specific embodiment one;
Fig. 6 is the two-end structure schematic diagram of the arc frame of specific embodiment two.
Detailed description of the invention
Below in conjunction with specific embodiments content of the present utility model is described.
Specific embodiment one
As shown in Figures 1 to 5, be the girder steel People's Bank of China protective device structure schematic diagram described in the present embodiment.Girder steel People's Bank of China protector described in the present embodiment, comprising: stair-climbing mechanism and Hu Long mechanism; Described stair-climbing mechanism comprises cat ladder body 1, top platform 2 and goes back to hook part 3, described cat ladder body 1 is parallel to described go back to hook part 3, described cat ladder body 1 is connected the two ends of described top platform 2 respectively with the upper end of described time hook part 3, and described top platform 2 length is identical with girder steel width; Described Hu Long mechanism comprise protect cage body and install vertical beam 4, described installation vertical beam 4 is two and is fixedly arranged on described cat ladder body 1 both sides respectively, the described cage body that protects has C shaped sections structure, and described in protect cage body dual-side and be fixedly arranged on respectively on two described installation vertical beams 4.Particularly, described stair-climbing mechanism also comprises handrail 5, and described handrail 5 is arranged at the both sides of described top platform 2, and the height of described Hu Long mechanism is equal to or higher than the height at described handrail 5 top.
Particularly, described in protect cage body and comprise arc frame 6 and fixing rib 7, described fixing rib 7 is provided with the holddown groove 71 passed for described arc frame 6, and the two ends of described arc frame 6 are fixedly arranged on described installation vertical beam 4.The two ends of described arc frame 6 are fixedly arranged on described installation vertical beam 4 by bolt 62, and the two ends of described arc frame 6 are provided with several screws 63 coordinating described bolt 62.Described fixing rib 7 is three, and protects the both sides of cage body and the middle part of described arc frame 6 described in being arranged at respectively.Described fixing rib 7 is that two blocks of strip rigidity sheet materials 73 are formed, and be fixedly connected with by some pins 72 between two blocks of described sheet materials 73, the gap between adjacent two pins 72 forms described holddown groove 71.
Specific embodiment two
As shown in Figure 1 to Figure 4 with shown in Fig. 6, it is the girder steel People's Bank of China protective device structure schematic diagram described in the present embodiment.Girder steel People's Bank of China protector described in the present embodiment, comprising: stair-climbing mechanism and Hu Long mechanism; Described stair-climbing mechanism comprises cat ladder body 1, top platform 2 and goes back to hook part 3, described cat ladder body 1 is parallel to described go back to hook part 3, described cat ladder body 1 is connected the two ends of described top platform 2 respectively with the upper end of described time hook part 3, and described top platform 2 length is identical with girder steel width; Described Hu Long mechanism comprise protect cage body and install vertical beam 4, described installation vertical beam 4 is two and is fixedly arranged on described cat ladder body 1 both sides respectively, the described cage body that protects has C shaped sections structure, and described in protect cage body dual-side and be fixedly arranged on respectively on two described installation vertical beams 4.Particularly, described stair-climbing mechanism also comprises handrail 5, and described handrail 5 is arranged at the both sides of described top platform 2, and the height of described Hu Long mechanism is equal to or higher than the height at described handrail 5 top.
Particularly, described in protect cage body and comprise arc frame 6 and fixing rib 7, described fixing rib 7 is provided with the holddown groove 71 passed for described arc frame 6, and the two ends of described arc frame 6 are fixedly arranged on described installation vertical beam 4.The two ends of described arc frame 6 are fixedly arranged on described installation vertical beam 4 by bolt 62, and the two ends of described arc frame 6 are provided with the regulating tank 61 coordinating described bolt 62.Described fixing rib 7 is two, and protects the both sides of cage body described in being arranged at respectively.Described fixing rib 7 is that two blocks of strip rigidity sheet materials 73 are formed, and be fixedly connected with by some pins 72 between two blocks of described sheet materials 73, the gap between adjacent two pins 72 forms described holddown groove 71.
Above content is in conjunction with specific embodiments to the detailed description that the utility model is done, and can not assert that the utility model is specifically implemented to be only limitted to these explanations.For the utility model person of ordinary skill in the field, without departing from the concept of the premise utility, some simple deduction or replace can also be made, all should be considered as the scope belonging to the utility model protection.
Claims (7)
1. a girder steel People's Bank of China protector, is characterized in that, comprising: stair-climbing mechanism and Hu Long mechanism;
Described stair-climbing mechanism comprises cat ladder body (1), top platform (2) and goes back to hook part (3), described cat ladder body (1) is parallel to described go back to hook part (3), described cat ladder body (1) and the upper end of described time hook part (3) are connected the two ends of described top platform (2) respectively, and described top platform (2) length is identical with girder steel width;
Described Hu Long mechanism comprise protect cage body and install vertical beam (4), described installation vertical beam (4) is two and is fixedly arranged on described cat ladder body (1) both sides respectively, the described cage body that protects has C shaped sections structure, and described in protect cage body dual-side and be fixedly arranged on respectively on two described installation vertical beams (4).
2. girder steel People's Bank of China as claimed in claim 1 protector, it is characterized in that, described stair-climbing mechanism also comprises handrail (5), and described handrail (5) is arranged at the both sides of described top platform (2), and the height of described Hu Long mechanism is equal to or higher than the height at described handrail (5) top.
3. girder steel People's Bank of China as claimed in claim 1 or 2 protector, it is characterized in that, the described cage body that protects comprises arc frame (6) and fixing rib (7), described fixing rib (7) is provided with the holddown groove (71) passed for described arc frame (6), and the two ends of described arc frame (6) are fixedly arranged on described installation vertical beam (4).
4. girder steel People's Bank of China as claimed in claim 3 protector, it is characterized in that, the two ends of described arc frame (6) are fixedly arranged on described installation vertical beam (4) by bolt (62), and the two ends of described arc frame (6) are provided with several screws (63) coordinating described bolt (62).
5. girder steel People's Bank of China as claimed in claim 3 protector, it is characterized in that, the two ends of described arc frame (6) are fixedly arranged on described installation vertical beam (4) by bolt (62), and the two ends of described arc frame (6) are provided with the regulating tank (61) coordinating described bolt (62).
6. girder steel People's Bank of China as claimed in claim 3 protector, it is characterized in that, described fixing rib (7) is three, and protects the both sides of cage body and the middle part of described arc frame (6) described in being arranged at respectively.
7. girder steel People's Bank of China as claimed in claim 3 protector, it is characterized in that, described fixing rib (7) is two pieces of strip rigidity sheet materials (73) formation, be fixedly connected with by some pins (72) between two pieces of described sheet materials (73), the gap between adjacent two pins (72) forms described holddown groove (71).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420335578.8U CN204040507U (en) | 2014-06-23 | 2014-06-23 | Girder steel People's Bank of China protector |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420335578.8U CN204040507U (en) | 2014-06-23 | 2014-06-23 | Girder steel People's Bank of China protector |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204040507U true CN204040507U (en) | 2014-12-24 |
Family
ID=52241190
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420335578.8U Withdrawn - After Issue CN204040507U (en) | 2014-06-23 | 2014-06-23 | Girder steel People's Bank of China protector |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204040507U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104032971A (en) * | 2014-06-23 | 2014-09-10 | 铜陵有色建安钢构有限责任公司 | Steel beam walking protection device |
-
2014
- 2014-06-23 CN CN201420335578.8U patent/CN204040507U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104032971A (en) * | 2014-06-23 | 2014-09-10 | 铜陵有色建安钢构有限责任公司 | Steel beam walking protection device |
CN104032971B (en) * | 2014-06-23 | 2016-01-27 | 铜陵有色建安钢构有限责任公司 | Girder steel People's Bank of China protector |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204040507U (en) | Girder steel People's Bank of China protector | |
CN202611556U (en) | Construction operation tower wagon for subway tunnel communication system | |
CN104453694A (en) | Insulating ladder capable of carrying objects | |
CN104032971B (en) | Girder steel People's Bank of China protector | |
CN202864734U (en) | Novel double-beam bridge crane | |
CN203462997U (en) | Wrong climbing prevention type climbing ladder | |
CN204225467U (en) | The intelligent elevated climbing frame platform of a kind of protection | |
CN204186100U (en) | Locomotive servicing job platform | |
CN204960463U (en) | Abnormal shape prevents weighing down tower pole angle steel | |
CN103701070A (en) | Ground guiding wire traveling crane | |
CN205558245U (en) | Building support for construction | |
CN102780174B (en) | Double-row type pulley sheave | |
CN204781889U (en) | Utilize steel construction factory building intercolumniation to support maintenance platform of preparation | |
CN201914902U (en) | U-shaped hanging basket | |
CN204645565U (en) | A kind of spiral case overhaul working platform | |
CN206158557U (en) | Longmen ladder | |
CN206262017U (en) | A kind of electric power tower climbs safe saddle | |
CN205602925U (en) | Elevator is to heavy protector | |
CN205205689U (en) | A walking string basket for construction of overhead bridge | |
CN203430005U (en) | Overhauling platform for electric melting furnace | |
CN204571819U (en) | A kind of MW level generator unit, rotor are ascended a height safety climbing ladder | |
CN204162303U (en) | The high-altitude operation platform of single-beam crane | |
CN106693313A (en) | Safety slider for electric power tower climbing | |
CN206590715U (en) | A kind of monoblock type is exempted to climb device top sheave component | |
CN203412309U (en) | Security isolation platform of formed lift shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20141224 Effective date of abandoning: 20160127 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |