CN103947320B - A kind of beach saline land tree planting method and planting of plants structure - Google Patents

A kind of beach saline land tree planting method and planting of plants structure Download PDF

Info

Publication number
CN103947320B
CN103947320B CN201410154690.6A CN201410154690A CN103947320B CN 103947320 B CN103947320 B CN 103947320B CN 201410154690 A CN201410154690 A CN 201410154690A CN 103947320 B CN103947320 B CN 103947320B
Authority
CN
China
Prior art keywords
planting
soil
layer
salt
lay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410154690.6A
Other languages
Chinese (zh)
Other versions
CN103947320A (en
Inventor
王霞
王晓慧
李刚
李雪
薛春营
刘光生
刘英君
韩鹏龙
张泉利
姜新刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongsheng ecological Polytron Technologies Inc
Original Assignee
Shandong Dongsheng Garden Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Dongsheng Garden Engineering Co Ltd filed Critical Shandong Dongsheng Garden Engineering Co Ltd
Priority to CN201410154690.6A priority Critical patent/CN103947320B/en
Publication of CN103947320A publication Critical patent/CN103947320A/en
Application granted granted Critical
Publication of CN103947320B publication Critical patent/CN103947320B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The invention discloses a kind of beach saline land tree planting method and planting of plants structure, wherein, tree planting method comprise build cofferdam, arrange raise layer, to raising lamination salt row alkali, excavate plantation hole, lay waterproof geotextiles, lay rubble drainage layer, laying straw curtain drainage layer, backfill planting soil and the trees step of planting; The inventive method is comprehensively taked after above-mentioned steps measure, and in the accumulation of salt in the surface soil cycle of the salt affected soil that slowed down, the soil fertility of planting soil in addition, is the surviving and grow and created good condition of trees, is easy to form Afforestation Landscape after planting; Because physical features is raised, saline and alkaline original soil reduces relatively, when Specific construction, needn't re-lay Pipe for draining alkali, has both reduced the cycle of salt discharge solodization, has reduced again cost. Tree planting method of the present invention and planting of plants structure, be adapted at applying in the greening process in coastal saline-alkali area.

Description

A kind of beach saline land tree planting method and planting of plants structure
Technical field
The present invention relates to beach saline land and administer technical field, relate in particular to a kind of beach saline land planting of plantsMethod and planting of plants structure.
Background technology
Beach saline land causes soil comparatively barren because salt alkali content is high, and originally landforms only have minority Salt And Alkali Tolerance grassGrowth, and mostly be self-sow, manual inseminating trees are less, and original Salt And Alkali Tolerance grass and manual inseminating's is a small amount ofTrees, due to weather, soil reason, can not form good Afforestation Landscape, and landscape structure is comparatively single, seeReward is worth lower. And the river course of coastal region often silts up seriously, weedy, water is seriously polluted,Soil property is poor, and general ornamental trees are difficult to normal growth.
At present, improve the conventional method of this present situation mainly contain raised fields change alkali, hidden pipe row alkali, french drain row alkali,Zanjon bar field changes alkali, water pumping of the wind-force changes alkali etc., but these several Saline-alkali Field Control method ubiquity costs are higher,Operation is loaded down with trivial details, need expend the problem of a large amount of human and material resources.
Summary of the invention
A technical problem to be solved by this invention is: a kind of beach saline land tree planting method is provided,To solve traditional problem that the salt discharge solodization existing cycle of mode is long, cost is high, and improve the one-tenth of treesMotility rate.
Another technical problem to be solved by this invention is: a kind of beach saline land planting of plants structure is provided.
For solving the above-mentioned technical problem about beach saline land tree planting method, technical scheme of the present inventionBe: a kind of beach saline land tree planting method, comprises the following steps:
A. build cofferdam: on salt-soda soil, build cofferdam;
B. arrange and raise layer: extract mud from the river bed of outside, described cofferdam with slush pump, and by the silt of extractingDredge pump is delivered to the saline and alkaline original soil surface of inside, described cofferdam, through airing, shakeout, raises layer described in formation;
C. press salt row alkali: the described layer of raising is pressed to salt row alkali treatment;
D. excavate plantation hole: in described cofferdam inner excavated plantation hole;
E. lay waterproof geotextiles: on the internal perisporium in described plantation hole, lay waterproof geotextiles, described waterproofIt is suitable for reading concordant that at least cheat with described plantation the top of geotextiles, following and the described kind of described waterproof geotextilesPlant at the bottom of the hole in hole concordant;
F. lay rubble drainage layer: rubble drainage layer is laid in the bottom in described plantation hole;
G. lay straw curtain drainage layer: above described rubble drainage layer, lay straw curtain drainage layer, described inThe straw curtain straw that has at least two-layer, adjacent two-layer straw curtain setting up and down is cross-shaped;
H. backfill planting soil: backfill planting soil in cheating to described plantation, the salt content of described planting soil is less than2.5%, pH value is not higher than 8.5; Described planting soil is pressed the weight ratio of 6:3-6:4 by sand loam and fertile soilPuddle and form;
I. the trees of planting: the trees of planting in described planting soil.
In technique scheme, preferably, also comprise and build retaining ridge step, after described step I,Around trees, build overhead retaining ridge corresponding to the position of upper in described plantation hole.
In technique scheme, preferably, the particle diameter of described rubble drainage layer is 2-4cm.
In technique scheme, preferably, in described step g, described straw curtain is setting up and down three layers,The straw of every adjacent two-layer straw curtain is cross-shaped.
In technique scheme, preferably, the big up and small down trapezoidal shape in vertical section in described plantation hole.
For solving the above-mentioned technical problem about beach saline land planting of plants structure, technical scheme of the present inventionBe: a kind of beach saline land planting of plants structure, comprising: be arranged on the layer of raising on saline and alkaline original soil surface,Described raise layer or raise on layer and saline and alkaline original soil be provided with plantation hole, on the internal perisporium that described plantation is cheated, layHave waterproof geotextiles, it is suitable for reading concordant that at least cheat with described plantation the top of described waterproof geotextiles, described anti-Concordant at the bottom of the hole of cheating with described plantation below of water geotextiles; Bottom in described plantation hole is equipped with rubble filterWater layer; Above described rubble drainage layer, be equipped with straw curtain drainage layer, described straw curtain is setting up and down to be hadAt least two-layer, the straw of adjacent two-layer straw curtain is cross-shaped; The top of described straw curtain drainage layerBackfill is useful on the planting soil of the trees of planting.
In technique scheme, preferably, build and exceeded ground corresponding to the position of upper in described plantation holeThe retaining ridge of face.
In technique scheme, preferably, the particle diameter of described rubble drainage layer is 2-4cm.
In technique scheme, preferably, described straw curtain is setting up and down three layers, every adjacent two-layerThe straw of straw curtain is cross-shaped.
In technique scheme, preferably, the big up and small down trapezoidal shape in vertical section in described plantation hole.
Owing to having adopted technique scheme, beach saline land tree planting method of the present invention, comprises and buildingCofferdam, setting are raised layer, arrange alkali to raising lamination salt, are excavated to plant and cheat, lay waterproof geotextiles, layingRubble drainage layer, laying straw curtain drainage layer, backfill planting soil and the trees step of planting; Raise the setting of layerRaise the physical features in cofferdam, saline and alkaline original soil is reduced relatively, raised layer because having passed through airing and having pressed salt row alkaliProcess, salt alkali content significantly reduces, and is convenient to trees survival and growth; Plantation is laid waterproof geotextiles in hole, risesTo the saline and alkaline effect of isolation, can prevent that the saline and alkaline horizontal infiltration in the salt affected soil of outside, plantation hole from entering plantation holeIn; The rubble drainage layer arranging and straw curtain drainage layer play and on vertically, prevent salt affected soil below plantation holeIn saline and alkaline on return the effect in plantation hole, be convenient to again water simultaneously or rainwater precipitation by rubble drainage layerAnd under straw curtain drainage layer, infiltrate plantation hole below soil, prevent because of the excessive formation damage caused by waterlogging of the water yield adjacent twoThe straw of layer straw curtain is cross-shaped layout and can also improves its bearing capacity, above carrying betterPlanting soil; The planting soil of trees of planting is puddled and is formed by the weight ratio of 6:3-6:4 by sand loam and fertile soil,The planting soil of this component and proportioning had not only improved the fertilizer of soil but also had strengthened the permeability of soil, planted simultaneouslyPlant native salt content and be less than 2.5%, pH value, not higher than 8.5, is all suitable for surviving and growing of trees. ThisBright comprehensively taking after above-mentioned steps measure, the accumulation of salt in the surface soil cycle of the salt affected soil that slowed down, the in addition soil of planting soilFertility, surviving and growing and created good condition for trees; Because physical features is raised, saline and alkaline original soil is relativeReduce, when Specific construction, needn't re-lay Pipe for draining alkali, both reduced the cycle of salt discharge solodization, reduced again one-tenthThis.
Brief description of the drawings
Below in conjunction with drawings and Examples, the present invention is further non-limitingly described.
Fig. 1 adopts the structure of planting obtaining after the beach saline land tree planting method of the embodiment of the present inventionCross-sectional schematic;
In figure: the saline and alkaline original soil of 1-; 2-raises layer; 3-waterproof geotextiles; 4-planting soil; 5-trees; 6-riceStraw screen or mat drainage layer; 7-rubble drainage layer; 8-retaining ridge.
Detailed description of the invention
Shown in figure 1, the beach saline land tree planting method of the embodiment of the present invention, comprises the following steps:
A. build cofferdam: on salt-soda soil, the first selected trees region of wanting to plant, then wanting the trees region of plantingSurrounding build cofferdam according to the cofferdam method of building of routine.
B. arrange and raise layer: utilize slush pump to extract mud from the river bed of outside, cofferdam, and by the mud extractingBe pumped to the surface of the saline and alkaline original soil 1 of inside, cofferdam, by fully airing, shakeout, form and raise layer 2.Raise the setting of layer 2 and raised the physical features in cofferdam, thereby saline and alkaline original soil 1 is reduced relatively, raise layer 2Because having passed through abundant airing, the contained saline and alkaline major part of mud is discharged with drop liquid, therefore raises the saline and alkaline of layer 2Content significantly reduces, and is conducive to the survival and growth after planting of plants. The concrete thickness of raising layer 2 can be according to cultivationDifferent types of trees of planting are and different, and under normal circumstances, arbor species should raise, and shrub can be lowA bit; The seeds that are afraid of saline and alkaline waterlogging should be high, and the seeds of Salt And Alkali Tolerance waterlogging can be lower.
C. press salt row alkali: adopt and initiatively water or routine such as rainfall snowfall presses salt row alkali method to enter raising layers 2Row is pressed salt row alkali treatment, further discharges that to raise layer 2 interior contained saline and alkaline.
D. excavate plantation hole: in cofferdam inner excavated plantation hole, size and the degree of depth in plantation hole, according to differentThe trees of kind and different. Excavate plantation hole taking the thicker locust tree of the trunk diameter of a cross-section of a tree trunk 1.3 meters above the ground as example below, plantation is cheatedVertical section be preferably up big and down small trapezoidal shape, the suitable for reading of plantation hole is of a size of 5 meters * 5 meters, hole end sizeBe 3 meters * 3 meters, cheat dark 1.7 meters. The plantation hole of trapezoidal shape can increase follow-up waterproof geotextiles and plantation holeContact area, increase the space of plant pit, be convenient to fill more planting soil, be conducive to after planting of plantsSurvival and growth.
E. lay waterproof geotextiles: on the internal perisporium in plantation hole, lay waterproof geotextiles 3, wherein waterproof geotechniqueThe top of cloth 3 at least will be with plantation hole suitable for reading concordant, preferably leave remaining limit, waterproof geotextiles 3 belowConcordant at the bottom of the hole of cheating with plantation. In the present embodiment, the specification of the waterproof geotextiles 3 of employing: grammes per square metre 500g/㎡, 2 meters of fabric widths. Waterproof geotextiles is using plastic sheeting as antiseepage base material, forms with non-woven fabric compoundedGeotechnique's impervious material, the erosion of have good effect in acid, alkali, salt, can prevent in the salt affected soil of outside, plantation holeSaline and alkaline horizontal infiltration enter in plantation hole, play the saline and alkaline effect of good isolation.
F. lay rubble drainage layer: lay waterproof geotextiles 3 on the internal perisporium in plantation hole after, in plantationRubble drainage layer 7 is laid in the bottom in hole, and in the present embodiment, preferably the particle diameter of rubble drainage layer 7 is 2-4cm,Thickness is 50cm. Rubble drainage layer 7 plays and on vertical, prevents below plantation hole on saline and alkaline in salt affected soilReturn the effect in plantation hole, the while is convenient to again water or rainwater precipitation is infiltrated for 7 times and planted by rubble drainage layerPlant below, hole soil, prevent because of the excessive formation damage caused by waterlogging of the water yield.
G. lay straw curtain drainage layer: above rubble drainage layer 7, lay straw curtain drainage layer 6, this strawCurtain drainage layer 6 at least comprises two-layer straw curtain setting up and down, is preferably three layers in the present embodiment, often adjacentThe straw of two-layer straw curtain be cross-shaped, the straw of bottom and intermediate layer, intermediate layer and top layer isCross-shaped, in the present embodiment, by every laying 1 ㎡, the consumption of three layers of straw curtain is that 4kg calculates total usingAmount. Straw curtain drainage layer 6 plays and on vertical, prevents from below plantation hole returning into kind on saline and alkaline in salt affected soilPlant the effect in hole, the while is convenient to again water or rainwater precipitation passes through rubble drainage layer 7 and straw curtain drainage layer 6Below, lower infiltration plantation hole soil, prevents because of the excessive formation damage caused by waterlogging of the water yield, the straw of adjacent two-layer straw curtainBe cross-shaped layout and can also improve its bearing capacity, better the planting soil of carrying top.
H. backfill planting soil: after laying straw curtain drainage layer 6, backfill planting soil 4 in cheating to plantation, requirementThe salt content of planting soil is less than 2.5%, and pH value is not higher than 8.5; Wherein, planting soil 4 be by sand loam withFertile soil is puddled and is formed by the weight ratio of 6:3-6:4. The characteristic of sand loam: though sand content is still quite a lot of,But because also containing Shao Liang Silt grain and clay, there is the associativity between grogs, when dry, can become piece, but easily broken,When wet, can feel viscosity, clay component approximately 40%. Fertile soil is the residual leaf process of the deadwood of topsoil trees in forestAfter putrid fermentation, form over a long time. Planting soil by sand loam and these two kinds of component preparations of fertile soil was both carriedThe fertilizer of high soil has strengthened again the permeability of soil.
I. the trees of planting: the Salt And Alkali Tolerance trees 5 such as locust tree, Chinese wax, black pine of planting in planting soil. Also can be in treeThe surrounding of wood 5 builds overhead retaining ridge 8 corresponding to the position of upper in plantation hole, while building retaining ridge 8,Can utilize in passing retaining ridge 8 to push down the remaining limit of waterproof geotextiles 3. The setting on retaining ridge 8, is convenient to plantingTrees after planting are watered.
After planting of plants, according to actual conditions, the later stage can be by cofferdam demolition.
Beach saline land tree planting method of the present invention is comprehensively taked, after above-mentioned steps measure, to have slowed down saline and alkalineThe accumulation of salt in the surface soil cycle of soil, the soil fertility of planting soil in addition, for trees survive and grow created goodCondition, is easy to form Afforestation Landscape after planting; Because physical features is raised, saline and alkaline original soil reduces relatively, concreteWhen construction, needn't re-lay Pipe for draining alkali, both reduce the cycle of salt discharge solodization, reduce again cost.
After having implemented the beach saline land tree planting method of the embodiment of the present invention, obtain shown in Fig. 1Beach saline land planting of plants structure, this beach saline land planting of plants structure comprises: be arranged on saline and alkaline original soil 1Surface raise layer 2, on layer 2 and saline and alkaline original soil 1, be provided with (the i.e. plantation of plantation hole raising layer 2 or raiseCheat when more shallow, plantation hole is positioned at raises layer 2; When plantation hole is deeply a little, plantation hole is dug to saline and alkaline former soil layer),On the internal perisporium in this plantation hole, be equipped with waterproof geotextiles 3, wherein the top of waterproof geotextiles 3 at least with plantationSuitable for reading concordant (preferably the leaving remaining limit) in hole, concordant at the bottom of the hole of cheating with plantation below of waterproof geotextiles 3; ?The bottom in plantation hole is equipped with rubble drainage layer 7; Above rubble drainage layer 7, be equipped with straw curtain drainage layer6, the straw curtain straw that has at least two-layer, adjacent two-layer straw curtain setting up and down is cross-shaped; RiceThe top backfill of straw screen or mat drainage layer 6 is useful on the planting soil 4 of the trees 5 of planting.
And to the further optimal design of this beach saline land planting of plants structure: present greatly in the vertical section in plantation holeLower little trapezoidal shape; The particle diameter of rubble drainage layer 7 is 2-4cm; Straw curtain is setting up and down three layers, often adjacentThe straw of two-layer straw curtain be cross-shaped; Building and exceeding ground corresponding to the position of upper in plantation holeThe retaining ridge 8 of face.
The above is only giving an example of preferred embodiments of the present invention, and the part of wherein not addressing is in detail thisThe common practise of field those of ordinary skill. Protection scope of the present invention is as the criterion with the content of claim, appointsThe equivalent transformation what carries out based on technology enlightenment of the present invention, also within protection scope of the present invention.

Claims (5)

1. a beach saline land tree planting method, is characterized in that, comprises the following steps:
A. build cofferdam: on salt-soda soil, build cofferdam;
B. arrange and raise layer: extract mud from the river bed of outside, described cofferdam with slush pump, and by the sludge pump extractingDeliver to the saline and alkaline original soil surface of inside, described cofferdam, through airing, shakeout, raise layer described in formation;
C. press salt row alkali: the described layer of raising is pressed to salt row alkali treatment;
D. excavate plantation hole: in described cofferdam inner excavated plantation hole;
E. lay waterproof geotextiles: on the internal perisporium in described plantation hole, lay waterproof geotextiles, described waterproof geotechniqueIt is suitable for reading concordant that at least cheat with described plantation the top of cloth, the following and described plantation hole of described waterproof geotextilesHole at the bottom of concordant;
F. lay rubble drainage layer: rubble drainage layer is laid in the bottom in described plantation hole;
G. lay straw curtain drainage layer: above described rubble drainage layer, lay straw curtain drainage layer, described strawThe curtain straw that has at least two-layer, adjacent two-layer straw curtain setting up and down is cross-shaped;
H. backfill planting soil: backfill planting soil in cheating to described plantation, the salt content of described planting soil is less than 2.5%,PH value is not higher than 8.5; Described planting soil puddled by the weight ratio of 6:3-6:4 by sand loam and fertile soil andBecome;
I. the trees of planting: the trees of planting in described planting soil.
2. beach saline land tree planting method as claimed in claim 1, is characterized in that: also comprise building and holdWater ridge step after described step I, is built corresponding to the position of upper in described plantation hole around treesOverhead retaining ridge.
3. beach saline land tree planting method as claimed in claim 1 or 2, is characterized in that: described rubbleThe particle diameter of drainage layer is 2-4cm.
4. beach saline land tree planting method as claimed in claim 3, is characterized in that: in described step g,Described straw curtain is setting up and down three layers, and the straw of every adjacent two-layer straw curtain is cross-shaped.
5. beach saline land tree planting method as claimed in claim 4, is characterized in that: described plantation holeThe trapezoidal shape that vertical section is big up and small down.
CN201410154690.6A 2014-04-17 2014-04-17 A kind of beach saline land tree planting method and planting of plants structure Active CN103947320B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410154690.6A CN103947320B (en) 2014-04-17 2014-04-17 A kind of beach saline land tree planting method and planting of plants structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410154690.6A CN103947320B (en) 2014-04-17 2014-04-17 A kind of beach saline land tree planting method and planting of plants structure

Publications (2)

Publication Number Publication Date
CN103947320A CN103947320A (en) 2014-07-30
CN103947320B true CN103947320B (en) 2016-05-04

Family

ID=51324798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410154690.6A Active CN103947320B (en) 2014-04-17 2014-04-17 A kind of beach saline land tree planting method and planting of plants structure

Country Status (1)

Country Link
CN (1) CN103947320B (en)

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104106325B (en) * 2014-08-01 2016-04-27 上海市园林科学研究所 A kind of micro-territory of the root system of plant for urban afforestation soil melioration environmental system
CN104488531A (en) * 2014-12-26 2015-04-08 中国科学院华南植物园 Method for constructing close-to-nature vegetations in southern coastal sandy land
CN105144895A (en) * 2015-07-10 2015-12-16 河海大学 Method for quickly desalinizing mud flat saline and alkaline land by laying sludge on surface layer
CN105230416B (en) * 2015-09-01 2018-08-10 福建省春天生态科技股份有限公司 A kind of Coastal Sandy Land arbor implantation methods
CN105830843A (en) * 2016-04-01 2016-08-10 贵州飞水利荣科技有限公司 Planting method of kiwi seedlings
CN105900766A (en) * 2016-04-15 2016-08-31 天津泰达绿化集团有限公司 Coast saline land Quercus wutaishansea Mary planting method
CN105900765A (en) * 2016-04-15 2016-08-31 天津泰达绿化集团有限公司 Coast saline land Quercus palustris planting method
CN105850646A (en) * 2016-05-12 2016-08-17 天津泰达绿化集团有限公司 Method for planting catalpa ovata in coastal saline-alkali soil
CN106954404B (en) * 2017-04-25 2022-12-02 广东四季景山园林建设有限公司 Local isolating device in saline soil area
CN107182333A (en) * 2017-07-04 2017-09-22 上海市园林工程有限公司 A kind of salt-soda soil is every salt salt discharge structure and its method
CN108207160A (en) * 2018-01-03 2018-06-29 南京农业大学 A kind of method for preventing saline-alkali soil earth's surface salification
CN109463061A (en) * 2018-09-21 2019-03-15 江苏城中园林股份有限公司 A kind of salt-soda soil plant setting method
CN109821866B (en) * 2019-01-16 2021-02-19 安徽工程大学 Saline-alkali soil restoration structure and restoration method based on river sediment resource utilization
CN110199826B (en) * 2019-04-04 2022-01-28 中国科学院植物研究所 Method for restoring degraded grassland ecosystem by planting leymus chinensis
CN110419284A (en) * 2019-08-08 2019-11-08 上海园林绿化建设有限公司 A kind of strand greenery patches salt discharge alkali construction technology
CN110972788A (en) * 2019-12-13 2020-04-10 四川云辰园林科技有限公司 Micro-domain improvement method for tree pocket waterlogging in urban garden land
CN111937713A (en) * 2020-06-05 2020-11-17 中交天航环保工程有限公司 Method for constructing water-retaining and fertilizer-retaining composite soil structure for tropical barren soil
CN111557213A (en) * 2020-06-05 2020-08-21 中交天津航道局有限公司 Construction method of soil leaching protection structure suitable for sand reclamation by blowing and filling
CN112166931B (en) * 2020-10-30 2022-04-15 东盛生态科技股份有限公司 Method for planting sea buckthorn in saline-alkali soil
CN112166932A (en) * 2020-10-30 2021-01-05 东盛生态科技股份有限公司 Method for cultivating pomegranate and red snow fruit in saline-alkali soil
CN112544156A (en) * 2020-12-03 2021-03-26 四川云辰园林科技有限公司 Method for breaking rock and improving soil in barren land
CN112690060A (en) * 2020-12-25 2021-04-23 浙江省围海建设集团股份有限公司 Greening improvement control method on saline-alkali soil
CN113016475B (en) * 2021-03-04 2023-09-22 蒲恒恒 Tree planting method in soil moisture saturation area
CN112858140B (en) * 2021-03-23 2024-06-04 长江岩土工程总公司(武汉) Method for accurately testing water elevation of soil capillary
CN115104398A (en) * 2022-06-28 2022-09-27 重庆地质矿产研究院 Construction process of anti-side-seepage field ridge

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1231067A1 (en) * 1983-09-01 1986-05-15 Южный научно-исследовательский институт гидротехники и мелиорации Melioration agent for saline soils
CN1155371A (en) * 1996-01-26 1997-07-30 天津经济技术开发区总公司园林绿化公司 Method for converting sea-silt into planation soil
CN102150547A (en) * 2010-12-30 2011-08-17 天津泰达园林建设有限公司 Method for planting poplar trees in coastal saline-alkali soil
CN102498837A (en) * 2011-09-30 2012-06-20 山东胜伟园林科技有限公司 Seedling planting method in alkaline land
CN203167652U (en) * 2013-01-25 2013-09-04 天津滨海新区物源环境科技有限公司 Greening and planting system for saline and alkaline land
CN203896685U (en) * 2014-04-17 2014-10-29 山东潍坊东盛园艺有限公司 Tree planting structure in coastal saline-alkali land

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1231067A1 (en) * 1983-09-01 1986-05-15 Южный научно-исследовательский институт гидротехники и мелиорации Melioration agent for saline soils
CN1155371A (en) * 1996-01-26 1997-07-30 天津经济技术开发区总公司园林绿化公司 Method for converting sea-silt into planation soil
CN102150547A (en) * 2010-12-30 2011-08-17 天津泰达园林建设有限公司 Method for planting poplar trees in coastal saline-alkali soil
CN102498837A (en) * 2011-09-30 2012-06-20 山东胜伟园林科技有限公司 Seedling planting method in alkaline land
CN203167652U (en) * 2013-01-25 2013-09-04 天津滨海新区物源环境科技有限公司 Greening and planting system for saline and alkaline land
CN203896685U (en) * 2014-04-17 2014-10-29 山东潍坊东盛园艺有限公司 Tree planting structure in coastal saline-alkali land

Also Published As

Publication number Publication date
CN103947320A (en) 2014-07-30

Similar Documents

Publication Publication Date Title
CN103947320B (en) A kind of beach saline land tree planting method and planting of plants structure
CN203896685U (en) Tree planting structure in coastal saline-alkali land
CN106900342B (en) Integrated semi-lithologic high slope vegetation reconstruction protection method
CN101322470B (en) Coast saline-alkali soil forestation method
CN101849454B (en) Biological synthesis improvement method of salt-alkali shoaly land
CN102067753B (en) Long-term governance method for converting saline-alkali soil into fertile farmland
CN105230323B (en) A kind of growth-promoting binary stereoscopic configurations pattern against corrosion suitable for feldspathic sandstone small watershed
CN106818164A (en) A kind of salt-soda soil arbor implantation methods
CN101946573A (en) Method for ameliorating saline and alkaline land
CN103461068A (en) Method for transplanting large-sized landscape tree in saline-alkali soil and structural layout for transplanted-tree pit
CN102138491B (en) Soil and ecological control method for coastal beaches
CN103718686B (en) The afflux anatonosis of a kind of local presses down alkaline land improving system and the improvement method of evaporation
CN104686285A (en) Survival promoting method for planting big tree in saline and alkaline land
CN101843204A (en) Shiny-leaved yellowhorn non-irrigation culture method
CN109168385A (en) A kind of high precipitous rock slope Ecosystem restoration system and implementation method
CN102392453A (en) Terrace bank construction method for changing slope farmland into level terrace in reservoir area of Three Gorges
CN105706555B (en) Saline land greening engineering original soil structure-improved and its construction method
CN102550160A (en) Rainwater-harvesting permeability-enhancing and evaporation-inhibiting method for improving saline and alkaline lands locally
CN100500312C (en) Alkali-removing modifying method for alkaline land
CN101692760B (en) Method for improving thick-clay sand-layered soil in salinate fields
CN106818280A (en) A kind of salt-soda soil arbor planting bed
CN102498758B (en) A kind of water-saving cultivation method and growing structures
CN206602890U (en) A kind of salt-soda soil arbor planting bed
CN209099438U (en) A kind of light-duty seepage well of Dry Farmland storage rain water drainage
CN207553246U (en) Trifolium repense plants the draining system in field

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 261061 No. 3567 North East Street, Gaoxin District, Shandong, Weifang

Applicant after: SHANDONG DONGSHENG GARDEN ENGINEERING CO., LTD.

Address before: 261061 No. 3567 North East Street, Gaoxin District, Shandong, Weifang

Applicant before: Shandong Weifang Dongsheng Gardening Co., Ltd.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 261061 No. 3567 North East Street, Gaoxin District, Shandong, Weifang

Patentee after: Dongsheng ecological Polytron Technologies Inc

Address before: 261061 No. 3567 North East Street, Gaoxin District, Shandong, Weifang

Patentee before: SHANDONG DONGSHENG GARDEN ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder