CN103758024A - Quick assembling and disassembling steel-structure pedestrian overpass - Google Patents

Quick assembling and disassembling steel-structure pedestrian overpass Download PDF

Info

Publication number
CN103758024A
CN103758024A CN201410017649.4A CN201410017649A CN103758024A CN 103758024 A CN103758024 A CN 103758024A CN 201410017649 A CN201410017649 A CN 201410017649A CN 103758024 A CN103758024 A CN 103758024A
Authority
CN
China
Prior art keywords
hole
bridge
nut
bolt
iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410017649.4A
Other languages
Chinese (zh)
Other versions
CN103758024B (en
Inventor
田睿
宁晓骏
成耀华
李灿琼
付汝高
仝冰冰
钟炳波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN KUNGANG STEEL STRUCTURE CO Ltd
Original Assignee
YUNNAN KUNGANG STEEL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN KUNGANG STEEL STRUCTURE CO Ltd filed Critical YUNNAN KUNGANG STEEL STRUCTURE CO Ltd
Priority to CN201410017649.4A priority Critical patent/CN103758024B/en
Publication of CN103758024A publication Critical patent/CN103758024A/en
Application granted granted Critical
Publication of CN103758024B publication Critical patent/CN103758024B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a quick assembling and disassembling steel-structure pedestrian overpass which comprises piers, a bridge arranged on the piers and provided with a bridge deck, stairs arranged at two ends of the bridge, and guardrails arranged on two sides of the bridge and the stairs. The quick assembling and disassembling steel-structure pedestrian overpass is characterized in that the bridge is composed of a plurality of I-beams with through holes and connecting components; the connecting components include end plates, clamping plates and connecting plates, the end plates are arranged at the head and tail ends of each I-beam and provided with through holes, the clamping plates are arranged in grooves of the I-beams and provided with through holes, and each connecting plate provided with through holes is arranged between every two adjacent clamping plates, and bolts and nuts are arranged in the through holes. The pedestrian overpass can be assembled or disassembled quickly and conveniently, so that time for building or demolishing is shortened greatly, and road traffic pressure is relieved; furthermore, the disassembled pedestrian overpass is reusable, thus materials and cost are saved greatly. In addition, due to an assembled structure, assembly parts can be produced and transported in batches, and the pedestrian overpass is beneficial to large-scale and intensive production, transportation and assembly.

Description

The steel structure footbridge of quickly dismantled
 
Technical field
The present invention relates to the steel structure footbridge of a kind of pedestrian overcrossing, particularly a kind of quickly dismantled, belong to bridge construction design and manufacturing technology field.
Background technology
Pedestrian overcrossing is indispensable architectural construction in urban construction, and it can solve people, car mixes the current traffic safety problem existing.But because existing pedestrian overcrossing mostly is steel and concrete structure, while building in the city many people, vehicle flowrate is large, understand because the time is long, take limited path resource, and bring adverse effect to urban highway traffic and people's trip.Meanwhile, this permanent bridge changes need to remove time in urban planning, not only time-consuming taking a lot of work, once and remove and again cannot utilize, cause waste of raw materials.Though also develop the pedestrian overcrossing of steel work at present, but still have Heavy Weight, welding procedure amount is large, dismounting inconvenience, volume is large, transports the problems such as difficulty.Therefore be necessary prior art to be improved.
Summary of the invention
For solving existing pedestrian overcrossing because adopting steel and concrete structure, and take path resource when building or remove, time-consuming taking a lot of work, can not reuse, or because adopting steel work to have Heavy Weight, the problems such as welding procedure amount is large, dismounting inconvenience, the invention provides a kind of steel structure footbridge of quickly dismantled.
The present invention completes by following technical proposal: a kind of steel structure footbridge of quickly dismantled, comprise bridge pier, and be located at the bridge with bridge floor on bridge pier, with the ladder of being located at bridge two ends, be located at the guardrail of bridge and ladder both sides, it is characterized in that bridge consists of several i iron and the coupling assembling of establishing through hole on it, many i iron are connected into bridge by coupling assembling.
Described coupling assembling comprises the end plate of establishing through hole on its that be located at i iron head and the tail two ends, and be located at the clamp of establishing through hole on its in i iron groove, and be located at the connecting plate of establishing through hole on its between clamp between two, in through hole, be provided with bolt and nut, to longitudinally connect i iron between two by end plate, thereby extend bridge length, more laterally connect i iron between two by clamp and connecting plate, increase bridge width, and fix by bolt and nut.
Described bridge floor comprises is located at the several piece panel of establishing through hole on its on bridge successively, is provided with bolt and nut in through hole, and this through hole is corresponding with the through hole on i iron, to connect panel on bridge by bolt and nut.
Described ladder comprises two cant beams arranged side by side, and be located at successively several grades of L-squares on two cant beams, wherein, each cant beam by i iron with and on establish through hole connection end plate form, in through hole, be provided with bolt and nut, to longitudinally connect i iron between two by connecting end plate, and be fixed by bolt and nut, thereby extend cant beam length.
The horizontal end face of described each L-square and the vertically two ends of end face are welded on respectively on two cant beams, to form multistage ladder.
Described bridge pier is made as several circles or ellipse or the rectangle column of different length, the top of each root post and bottom are respectively equipped with top board and the chassis with through hole, in through hole, be provided with bolt and nut, to pass through bolt and nut fixed underpan in underground reinforced concrete foundation, by bolt and nut, fix bridge, ladder on several bridge piers again, thereby form the pedestrian overcrossing with ladder, bridge.
Described guardrail comprises vertical rod, is fixed on the cross bar between vertical rod, and the bottom of each vertical rod is provided with the base plate with through hole on it, is provided with bolt and nut in through hole, to connect guardrail in bridge and ladder both sides by bolt and nut.
The present invention has following advantages and effect: adopt such scheme; can assemble quickly and easily or remove pedestrian overcrossing; greatly shortened the time of building or dismounting, alleviated road traffic pressure, and the pedestrian overcrossing after removing is reusable; material and cost have greatly been saved; in addition, owing to having adopted modular construction, can be mass, transport assembly; being conducive to scale, intensive production, transportation and installation, is a desirable pedestrian overcrossing in fact.
Accompanying drawing explanation
Fig. 1 is the present invention's front view;
Fig. 2 is the present invention's top view;
Fig. 3 is the A-A view of Fig. 1;
Fig. 4 is the present invention's bridge vertical structure figure;
Fig. 5 is the B-B view of Fig. 4;
Fig. 6 is the present invention's cross-section of bridge structure chart;
Fig. 7 is the present invention's the structure chart of winning in succession;
Fig. 8 is the present invention's deck structrue figure;
Fig. 9 is the present invention's hierarchic structure figure;
Figure 10 is the present invention's guard bar structure figure;
Figure 11 is the present invention's bridge pier chassis structure figure;
Figure 12 is the present invention's guardrail base arrangement figure.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is described further.
The steel structure footbridge of quickly dismantled provided by the invention, comprise bridge pier 9, and be located at the bridge with bridge floor 81 on bridge pier 9, with the ladder 2 of being located at bridge 1 two ends, be located at the guardrail 3 of bridge 1 and ladder 2 both sides, bridge 1 consists of several i iron 10 and the coupling assembling of establishing the first through hole 19 on it, coupling assembling comprises the end plate 11 of establishing the second through hole 12 on its that be located at i iron 10 head and the tail two ends, and be located at the clamp 14 of establishing third through-hole 13 on its in i iron 10 grooves, and be located at the connecting plate 15 of establishing fourth hole 16 on its between clamp 14 between two, the first through hole 19, the second through hole 12, in third through-hole 13, be equipped with bolt and nut, bridge floor 8 comprises is located at the several piece panel 17 of establishing fifth hole 18 on its on bridge 1 successively, in fifth hole 18, be provided with bolt and nut, this fifth hole 18 is corresponding with the first through hole 19 on i iron 10, to facilitate, fix with bolts and nuts, ladder 2 comprises two cant beams 7 arranged side by side, and be located at successively the several piece L-square 21 on two cant beams 7, wherein each cant beam by i iron 20 with and on establish the second through hole 12 connection end plate 11 form, in the second through hole 12, be provided with bolt and nut, to facilitate, connect i iron 20 between two, the horizontal end face of described each L-square 21 and the vertically two ends of end face are welded on respectively on two cant beams 7, to form multistage ladder, bridge pier 9 is made as several circular abutments of different length, the napex of each root circular abutment and bottom are respectively equipped with top board 22 and the chassis 23 with the 6th through hole 24, top board 22 and bridge 1, ladder 2 is connected, and fix by screw bolt and nut, chassis 23 is connected with underground concrete foundation, and fix by screw bolt and nut, guardrail 3 comprises vertical rod 6, be fixed on the cross bar 5 between vertical rod 6, the bottom of each vertical rod is provided with the base plate 4 with the 7th through hole 25 on it, in the 7th through hole 25, be provided with bolt and nut, so that nonfloating rail 3 is in bridge 1, ladder 2 both sides, as Fig. 1~Figure 12.

Claims (5)

1. the steel structure footbridge of a quickly dismantled, comprise bridge pier, and be located at the bridge with bridge floor on bridge pier, and be located at the ladder at bridge two ends, be located at the guardrail of bridge and ladder both sides, it is characterized in that bridge consists of several i iron and the coupling assembling of establishing through hole on it; Described coupling assembling comprises on its that be located at i iron head and the tail two ends establishes the end plate of through hole, and is located on its in i iron groove and establishes the clamp of through hole, and is located at the connecting plate of establishing through hole on its between clamp between two, is provided with bolt and nut in through hole.
2. the steel structure footbridge of quickly dismantled according to claim 1, is characterized in that described bridge floor comprises to be located at successively the several piece panel of establishing through hole on its on bridge, in through hole, be provided with bolt and nut, this through hole is corresponding with the through hole on i iron.
3. the steel structure footbridge of quickly dismantled according to claim 1, it is characterized in that described ladder comprises two cant beams arranged side by side, and be located at successively several grades of L-squares on two cant beams, wherein, each cant beam by i iron with and on establish through hole connection end plate form, in through hole, be provided with bolt and nut.
4. the steel structure footbridge of quickly dismantled according to claim 1, it is characterized in that described bridge pier is made as several circles or ellipse or the rectangle column of different length, the top of each root post and bottom are respectively equipped with top board and the chassis with through hole, are provided with bolt and nut in through hole.
5. the steel structure footbridge of quickly dismantled according to claim 1, is characterized in that described guardrail comprises vertical rod, is fixed on the cross bar between vertical rod, and the bottom of each vertical rod is provided with the base plate with through hole on it, is provided with bolt and nut in through hole.
CN201410017649.4A 2014-01-15 2014-01-15 The steel structure footbridge of quickly dismantled Active CN103758024B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410017649.4A CN103758024B (en) 2014-01-15 2014-01-15 The steel structure footbridge of quickly dismantled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410017649.4A CN103758024B (en) 2014-01-15 2014-01-15 The steel structure footbridge of quickly dismantled

Publications (2)

Publication Number Publication Date
CN103758024A true CN103758024A (en) 2014-04-30
CN103758024B CN103758024B (en) 2015-12-30

Family

ID=50525333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410017649.4A Active CN103758024B (en) 2014-01-15 2014-01-15 The steel structure footbridge of quickly dismantled

Country Status (1)

Country Link
CN (1) CN103758024B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672110A (en) * 2016-01-06 2016-06-15 黑龙江建筑职业技术学院 Assembled twelve-way pedestrian overpass and assembling method
CN105755957A (en) * 2016-03-01 2016-07-13 共享钢构有限责任公司 Rapid hoisting method for large-span pedestrian overcrossing striding over rail
CN106638269A (en) * 2017-02-13 2017-05-10 南京邮电大学 Temporary arc bridge facing traffic jam problem caused by city competing
CN111520063A (en) * 2020-03-30 2020-08-11 北京航空航天大学 Rapid building and assembling module for field operation
CN113652953A (en) * 2021-09-01 2021-11-16 福州轨道交通设计院有限公司 Novel assembled overline bridge ramp
CN114016447A (en) * 2021-11-25 2022-02-08 中铁隧道局集团有限公司 Method for quickly dismantling overpass pedestrian overpass of main road

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000024166A (en) * 2000-01-26 2000-05-06 박창열 Structure of sidewalk overpass with elevator in steel piers
JP2008223341A (en) * 2007-03-13 2008-09-25 Mitsubishi Electric Corp Mobile installation type pedestrian overpass
CN202416153U (en) * 2011-12-07 2012-09-05 北京市三一重机有限公司 Crawler-type urban pedestrian bridge
CN102864737A (en) * 2012-09-11 2013-01-09 天津市市政工程设计研究院 Steel-structured passenger foot bridge
CN202688846U (en) * 2012-06-18 2013-01-23 中交第二航务工程勘察设计院有限公司 Pedestrian steel bridge
CN202809476U (en) * 2012-08-21 2013-03-20 北京市市政专业设计院股份公司 Passenger foot bridge rapid to splice
CN203684061U (en) * 2014-01-15 2014-07-02 云南昆钢钢结构有限公司 Steel pedestrian overcrossing fast to disassemble or assemble

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000024166A (en) * 2000-01-26 2000-05-06 박창열 Structure of sidewalk overpass with elevator in steel piers
JP2008223341A (en) * 2007-03-13 2008-09-25 Mitsubishi Electric Corp Mobile installation type pedestrian overpass
CN202416153U (en) * 2011-12-07 2012-09-05 北京市三一重机有限公司 Crawler-type urban pedestrian bridge
CN202688846U (en) * 2012-06-18 2013-01-23 中交第二航务工程勘察设计院有限公司 Pedestrian steel bridge
CN202809476U (en) * 2012-08-21 2013-03-20 北京市市政专业设计院股份公司 Passenger foot bridge rapid to splice
CN102864737A (en) * 2012-09-11 2013-01-09 天津市市政工程设计研究院 Steel-structured passenger foot bridge
CN203684061U (en) * 2014-01-15 2014-07-02 云南昆钢钢结构有限公司 Steel pedestrian overcrossing fast to disassemble or assemble

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
佚名: "成都市红星路上架起全钢结构人行天桥", 《工业建筑》, no. 3, 31 December 2010 (2010-12-31), pages 65 *
楼国彪等: "钢结构高强度螺栓端板连接研究现状(Ⅰ)", 《建筑钢结构进展》, vol. 8, no. 2, 30 April 2006 (2006-04-30) *
王小平等: "某钢结构人行天桥可靠性评估", 《人民长江》, vol. 36, no. 7, 31 July 2005 (2005-07-31), pages 57 - 59 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672110A (en) * 2016-01-06 2016-06-15 黑龙江建筑职业技术学院 Assembled twelve-way pedestrian overpass and assembling method
CN105755957A (en) * 2016-03-01 2016-07-13 共享钢构有限责任公司 Rapid hoisting method for large-span pedestrian overcrossing striding over rail
CN106638269A (en) * 2017-02-13 2017-05-10 南京邮电大学 Temporary arc bridge facing traffic jam problem caused by city competing
CN106638269B (en) * 2017-02-13 2018-05-04 南京邮电大学 A kind of interim arch bridge towards city race traffic jam issue
CN111520063A (en) * 2020-03-30 2020-08-11 北京航空航天大学 Rapid building and assembling module for field operation
CN111520063B (en) * 2020-03-30 2021-03-12 北京航空航天大学 Rapid building and assembling module for field operation
CN113652953A (en) * 2021-09-01 2021-11-16 福州轨道交通设计院有限公司 Novel assembled overline bridge ramp
CN114016447A (en) * 2021-11-25 2022-02-08 中铁隧道局集团有限公司 Method for quickly dismantling overpass pedestrian overpass of main road

Also Published As

Publication number Publication date
CN103758024B (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN103758024B (en) The steel structure footbridge of quickly dismantled
CN102758499B (en) Precast prestressed steel girder with post-seismic restorable function
US11105084B1 (en) Dry connection prefabricated assembly steel-concrete composite beam
KR101391637B1 (en) Constrution methoed for Prestressed Composite Truss girder using steel truss member
CN103741881B (en) Assembling frame post and construction method
JP6180376B2 (en) Main girder provision method in composite girder floor slab replacement method, composite girder floor slab replacement method, and main girder provision structure in composite girder floor slab replacement method
CN203684061U (en) Steel pedestrian overcrossing fast to disassemble or assemble
CN210067544U (en) Prefabricated steel structure protective shed frame for railway business line
KR20160026260A (en) Long span pedestrian bridge design and construction method using barrier for girder
CN106758741B (en) Modular box type plate beam structure and pontic erection method based on box type plate beam structure
CN110374018B (en) Method for reinforcing combined steel large cross beam erected multi-span temporary beam line
CN105672145A (en) Structure for broadening bridge by additionally arranging steel cap beam on top of pier
CN202577162U (en) Combined-type steel pipe bracket
CN101899816A (en) Steel structure hangar tunnel and installation method
KR200408399Y1 (en) Slav building structure used transparent deck plate
CN108316119B (en) Steel construction overpass convenient to installation
CN203639814U (en) Assembled monolithic hollow slab bridge
CN210067418U (en) Portable aluminum frame template
CN201351262Y (en) Light self-balancing assembly car platform bridge
JP6435120B2 (en) Temporary bridge structure
CN202248510U (en) Transversely arranged brace rod type bailey
CN106592434A (en) Modular box-type beam-slab structure and bridge erection method based on box-type beam-slab structure
CN207987788U (en) A kind of stone arch bridge strengthening structure
RU2506367C2 (en) Method to dismantle t-shaped frame of bridge span and top-trolley beam for realisation of this method
CN201843089U (en) Vertical lifting bin for overhauling overpass ramp bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant