CN105672110A - Assembled twelve-way pedestrian overpass and assembling method - Google Patents
Assembled twelve-way pedestrian overpass and assembling method Download PDFInfo
- Publication number
- CN105672110A CN105672110A CN201610019581.2A CN201610019581A CN105672110A CN 105672110 A CN105672110 A CN 105672110A CN 201610019581 A CN201610019581 A CN 201610019581A CN 105672110 A CN105672110 A CN 105672110A
- Authority
- CN
- China
- Prior art keywords
- floorings
- connects
- safety tread
- viaduct
- bank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D1/00—Bridges in general
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to an assembled twelve-way pedestrian overpass and an assembling method. The assembled twelve-way pedestrian overpass comprises a square ring bridge deck slab. The four corners of the square ring bridge deck slab are each provided with a bevel edge. Each bevel edge is connected with a lap joint bridge deck. Each lap joint bridge deck is arranged at the bottom of a door of a building in a lap joint mode. The end of each lap joint bridge deck is connected with a transverse hollow round bar. Each transverse hollow round bar is provided with a set of rotating openings and connected with a rotating rod. Each rotating rod is connected with a set of rotating plates which penetrate through the corresponding rotating openings. The rotating plates are connected with suspension bridges. The assembling method is used for the twelve-way pedestrian overpass.
Description
Technical field:
The present invention relates to a kind of ten two-way People's Bank of China and assemble viaduct and assemble method.
Background technology:
Existing People's Bank of China viaduct is typically all 4 directions and passes through, is preferably at most what passed through in 8 directions, and it is all outdoor layout, first rainy day or snowy day upper and lower People's Bank of China viaduct people all there is potential safety hazard, and action inconvenient people also cannot upper and lower People's Bank of China viaduct; If existing viaduct needs the position beyond 4 directions, just it is merely able to descend viaduct inconvenient further around road.
Summary of the invention:
It is an object of the invention to provide and a kind of 12 directions are arbitrarily current on People's Bank of China's grade separation, upper and lower bridge is convenient, safe ten two-way People's Bank of China can assemble viaduct and assemble methods.
Above-mentioned purpose is realized by following technical scheme:
A kind of ten two-way People's Bank of China assemble viaduct, its composition includes: Q-RING floorings, four angles of described Q-RING floorings are respectively provided with chamfered edge, described chamfered edge connects overlap joint bridge floor, described overlap joint bridge floor is overlapped on the bottom of the door of building, the end of described overlap joint bridge floor connects horizontal Hollow circular beam, described horizontal Hollow circular beam has one group and rotates mouth, described horizontal Hollow circular beam connects bull stick, described bull stick connects one group of swivel plate, described swivel plate is through described rotation mouth, and described swivel plate connects suspension bridge.
Ten described two-way People's Bank of China assemble viaduct, described building connects support annulus and fixation hook, described support annulus connects jack, described suspension bridge connects elliptical ring, described elliptical ring connects open elastic ring, described open elastic ring connects described jack, and described jack connects described fixation hook.
Ten described two-way People's Bank of China assemble viaduct, described Q-RING floorings include left floorings, described left floorings connect front floorings, described front floorings connect right floorings, floorings after described right floorings connection, described rear floorings connect described left floorings, described overlap joint bridge floor, described left floorings, described front floorings, described right floorings, described rear floorings are all connected with supporting beam, described support beam connects support column, and described support column is fixed on ground.
Ten described two-way People's Bank of China assemble viaduct, it is connected by one group of perpendicular I-steel between described left floorings and described right floorings, it is connected by one group of horizontal I-steel between described front floorings and described rear floorings, described horizontal I-steel is arranged with described perpendicular I-steel decussation, described horizontal I-steel and described perpendicular I-steel organization center joist, described center joist connects sightseeing elevator, the described horizontal I-steel in outside connects road sign display direction board, and the described perpendicular I-steel in outside connects described road sign display direction board.
Ten described two-way People's Bank of China assemble viaduct, and described left floorings, described right floorings, described front floorings, described rear floorings are all connected with a bidirectional inductive rotating ladder, two-way stair of marking time, No. two bidirectional inductive rotating ladders, No. two two-way stair of marking time.
Ten described two-way People's Bank of China assemble viaduct, a described bidirectional inductive rotating ladder connects a support bar, described two-way stair of marking time connect No. two support bars, No. two described bidirectional inductive rotating ladders connect a described support bar, No. two described two-way stair of marking time connect No. two described support bars, are connected by transparent adumbral canopy between a described support bar with described No. two support bars.
Ten described two-way People's Bank of China assemble viaduct, described left floorings, described right floorings, described front floorings, described rear floorings outside be all connected with bridge floor guardrail, chamfered edge connects skew bridge face guardrail, the pillar of described bridge floor guardrail extends up, the top of described pillar connects awning, described left floorings, described right floorings, described front floorings, described rear floorings are all connected with Relaxing chair, and described awning is positioned at the top of described Relaxing chair.
Ten described two-way People's Bank of China assemble viaduct, described center joist connects left safety tread, right safety tread, front safety tread, rear safety tread, described left safety tread, described right safety tread, described front safety tread, described rear safety tread all communicate with the door of described sightseeing elevator, and described left safety tread, described right safety tread, described front safety tread, described rear safety tread are all connected with safety barrier.
A kind of ten two-way People's Bank of China assemble the assemble method of viaduct, this method includes 11 steps, the first step is installed support column and is fixed on ground, second step is built support beam on the support columns and fixes, 3rd step supports lays overlap joint bridge floor on beam, left floorings, front floorings, right floorings, rear floorings are also fixed, 4th step installs a bidirectional inductive rotating ladder, number two-way stair of marking time, No. two bidirectional inductive rotating ladders, No. two two-way stair of marking time, and debug a bidirectional inductive rotating ladder, No. two bidirectional inductive rotating ladders, 5th step assembles suspension bridge, jack, the 6th step perpendicular I-steel of welding and horizontal I-steel, 7th step lays left safety tread, right safety tread, front safety tread, rear safety tread, 8th step is installed sightseeing elevator and debugs, 9th step installs safety barrier, skew bridge face guardrail, a number support bar, No. two support bars, tenth step installs awning, transparent adumbral canopy, 11st step installs Relaxing chair and road sign display direction board.
Beneficial effect:
1. the present invention is in the centre position of grade separation bridge floor equipped with three-dimensional sightseeing elevator, makes the existing suitability of People's Bank of China's viaduct, has again sight, multiple functional, practicality is good, and can gather in the crops economic benefit, the visual field of three-dimensional sightseeing elevator is good, and the urban look that can see is comprehensive, effective.
2. the suspension bridge that the present invention adopts, namely can use as the safety door of building, can use as bridge plate again, or have the view of ornamental value together, and function is complete, easy to use, flexible; Novel structure.
3. the road sign display direction board that the present invention adopts can make people clear, clear and definite know the direction to walk and position, reduce the trouble needing to ask the way, easy to use, effective.
4. the present invention adopts a bidirectional inductive rotating ladder and No. two bidirectional inductive rotating ladders neither waste the energy, provide convenient can to again the people being inconvenient to walk, and the viaduct of the design of this hommization can warm their hearts significantly, provides convenient to everyone.
5. the present invention adopts transparent adumbral canopy, awning can make this device rainy day, snow sky not slide, and walk safe, non-slip, and can block the sun, use safe, flexible.
6. the Relaxing chair that the present invention adopts can be had a rest for pedestrian, and humanistic care is good, human oriented design, practical, attractive in appearance, complete function.
7. the present invention adopt safety barrier, bridge floor guardrail, skew bridge face guardrail with the use of, it is possible to make this viaduct use safety.
8. the present invention can pass through simultaneously, extend in all direction in 12 directions, good directionality, current convenient, can go to arbitrary direction on this viaduct, current very convenient, is that existing overpass is incomparable.
Accompanying drawing illustrates:
Accompanying drawing 1 is the structural representation of this product.
Accompanying drawing 2 is the structural representation of suspension bridge in accompanying drawing 1.
Detailed description of the invention:
Embodiment 1:
A kind of ten two-way People's Bank of China assemble viaduct, its composition includes: Q-RING floorings, four angles of described Q-RING floorings are respectively provided with chamfered edge 1, described chamfered edge connects overlap joint bridge floor 2, described overlap joint bridge floor is overlapped on the bottom of the door of building 3, the end of described overlap joint bridge floor connects horizontal Hollow circular beam 4, described horizontal Hollow circular beam has one group and rotates mouth 5, described horizontal Hollow circular beam connects bull stick 6, described bull stick connects one group of swivel plate 7, described swivel plate is through described rotation mouth, and described swivel plate connects suspension bridge 8. The bottom of suspension bridge connects inverted U-shaped fastener.
Embodiment 2:
Ten two-way People's Bank of China described in embodiment 1 assemble viaduct, described building connects support annulus 9 and fixation hook 10, described support annulus connects jack 11, described suspension bridge connects elliptical ring 12, described elliptical ring connects open elastic ring 13, described open elastic ring connects described jack, and described jack connects described fixation hook.
Embodiment 3:
Ten two-way People's Bank of China described in embodiment 1 assemble viaduct, described Q-RING floorings include left floorings 14, described left floorings connect front floorings 15, described front floorings connect right floorings 16, floorings 17 after described right floorings connection, described rear floorings connect described left floorings, described overlap joint bridge floor, described left floorings, described front floorings, described right floorings, described rear floorings are all connected with supporting beam 18, described support beam connects support column 19, and described support column is fixed on ground. Described overlap joint bridge floor has two rectangular apertures, when suspension bridge puts down, inverted U-shaped fastener inserts in two rectangular apertures fixing, ensure that what be connected between suspension bridge with overlap joint bridge floor stablizes, the front end of suspension bridge connects skewback, the low end in contact overlap joint bridge floor of described skewback, formed domatic, pedestrian will not be mixed, use safety.
Embodiment 4:
Ten two-way People's Bank of China described in embodiment 3 assemble viaduct, it is welded to connect by one group of perpendicular I-steel 20 between described left floorings and described right floorings, it is welded to connect by one group of horizontal I-steel 21 between described front floorings and described rear floorings, described horizontal I-steel arranges with described perpendicular I-steel decussation and is welded to connect, described horizontal I-steel and described perpendicular I-steel organization center joist, described center joist connects sightseeing elevator 22, the described horizontal I-steel in outside connects road sign display direction board 23, the described perpendicular I-steel in outside connects described road sign display direction board.Road sign display direction board can indicate that the title on clear each outlet, the direction of entrance and street road.
Embodiment 5:
Ten two-way People's Bank of China described in embodiment 3 assemble viaduct, and described left floorings, described right floorings, described front floorings, described rear floorings are all connected with two-way 26, No. two two-way stair 27 of marking time of 25, No. two bidirectional inductive rotating ladders of stair of marking time of a bidirectional inductive rotating ladder 24.
Embodiment 6:
Ten two-way People's Bank of China described in embodiment 5 assemble viaduct, a described bidirectional inductive rotating ladder connects a support bar 28, described two-way stair of marking time connect No. two support bars 29, No. two described bidirectional inductive rotating ladders connect a described support bar, No. two described two-way stair of marking time connect No. two described support bars, are connected by transparent adumbral canopy 30 between a described support bar with described No. two support bars.
Embodiment 7:
Ten two-way People's Bank of China described in embodiment 3 assemble viaduct, described left floorings, described right floorings, described front floorings, described rear floorings outside be all connected with bridge floor guardrail 31, chamfered edge connects skew bridge face guardrail 32, the pillar of described bridge floor guardrail extends up, the top of described pillar connects awning 33, described left floorings, described right floorings, described front floorings, described rear floorings are all connected with Relaxing chair 34, and described awning is positioned at the top of described Relaxing chair.
Embodiment 8:
Ten two-way People's Bank of China described in embodiment 4 assemble viaduct, described center joist connects left safety tread 35, right safety tread 36, front safety tread 37, rear safety tread 38, described left safety tread, described right safety tread, described front safety tread, described rear safety tread all communicate with the door of described sightseeing elevator, and described left safety tread, described right safety tread, described front safety tread, described rear safety tread are all connected with safety barrier 39.
Embodiment 9:
A kind of ten two-way People's Bank of China assemble the assemble method of viaduct, this method includes 11 steps, the first step is installed support column and is fixed on ground, second step is built support beam on the support columns and fixes, 3rd step supports lays overlap joint bridge floor on beam, left floorings, front floorings, right floorings, rear floorings are also fixed, 4th step installs a bidirectional inductive rotating ladder, number two-way stair of marking time, No. two bidirectional inductive rotating ladders, No. two two-way stair of marking time, and debug a bidirectional inductive rotating ladder, No. two bidirectional inductive rotating ladders, 5th step assembles suspension bridge, jack, the 6th step perpendicular I-steel of welding and horizontal I-steel, 7th step lays left safety tread, right safety tread, front safety tread, rear safety tread, 8th step is installed sightseeing elevator and debugs, 9th step installs safety barrier, skew bridge face guardrail, a number support bar, No. two support bars, tenth step installs awning, transparent adumbral canopy, 11st step installs Relaxing chair and road sign display direction board.
Claims (9)
1. a two-way People's Bank of China assembles viaduct, its composition includes: Q-RING floorings, it is characterized in that: four angles of described Q-RING floorings are respectively provided with chamfered edge, described chamfered edge connects overlap joint bridge floor, described overlap joint bridge floor is overlapped on the bottom of the door of building, the end of described overlap joint bridge floor connects horizontal Hollow circular beam, described horizontal Hollow circular beam has one group and rotates mouth, described horizontal Hollow circular beam connects bull stick, described bull stick connects one group of swivel plate, described swivel plate is through described rotation mouth, and described swivel plate connects suspension bridge.
2. ten two-way People's Bank of China according to claim 1 assemble viaduct, it is characterized in that: described building connects support annulus and fixation hook, described support annulus connects jack, described suspension bridge connects elliptical ring, described elliptical ring connects open elastic ring, described open elastic ring connects described jack, and described jack connects described fixation hook.
3. ten two-way People's Bank of China according to claim 1 assemble viaduct, it is characterized in that: described Q-RING floorings include left floorings, described left floorings connect front floorings, described front floorings connect right floorings, floorings after described right floorings connection, described rear floorings connect described left floorings, described overlap joint bridge floor, described left floorings, described front floorings, described right floorings, described rear floorings are all connected with supporting beam, described support beam connects support column, and described support column is fixed on ground.
4. ten two-way People's Bank of China according to claim 3 assemble viaduct, it is characterized in that: be connected by one group of perpendicular I-steel between described left floorings and described right floorings, it is connected by one group of horizontal I-steel between described front floorings and described rear floorings, described horizontal I-steel is arranged with described perpendicular I-steel decussation, described horizontal I-steel and described perpendicular I-steel organization center joist, described center joist connects sightseeing elevator, the described horizontal I-steel in outside connects road sign display direction board, the described perpendicular I-steel in outside connects described road sign display direction board.
5. ten two-way People's Bank of China according to claim 3 assemble viaduct, it is characterized in that: described left floorings, described right floorings, described front floorings, described rear floorings are all connected with a bidirectional inductive rotating ladder, two-way stair of marking time, No. two bidirectional inductive rotating ladders, No. two two-way stair of marking time.
6. ten two-way People's Bank of China according to claim 5 assemble viaduct, it is characterized in that: a described bidirectional inductive rotating ladder connects a support bar, described two-way stair of marking time connect No. two support bars, No. two described bidirectional inductive rotating ladders connect a described support bar, No. two described two-way stair of marking time connect No. two described support bars, are connected by transparent adumbral canopy between a described support bar with described No. two support bars.
7. ten two-way People's Bank of China according to claim 3 assemble viaduct, it is characterized in that: described left floorings, described right floorings, described front floorings, described rear floorings outside be all connected with bridge floor guardrail, chamfered edge connects skew bridge face guardrail, the pillar of described bridge floor guardrail extends up, the top of described pillar connects awning, described left floorings, described right floorings, described front floorings, described rear floorings are all connected with Relaxing chair, and described awning is positioned at the top of described Relaxing chair.
8. ten two-way People's Bank of China according to claim 4 assemble viaduct, it is characterized in that: described center joist connects left safety tread, right safety tread, front safety tread, rear safety tread, described left safety tread, described right safety tread, described front safety tread, described rear safety tread all communicate with the door of described sightseeing elevator, and described left safety tread, described right safety tread, described front safety tread, described rear safety tread are all connected with safety barrier.
9. the assemble method of a two-way People's Bank of China assembling viaduct, it is characterized in that: this method includes 11 steps, the first step is installed support column and is fixed on ground, second step is built support beam on the support columns and fixes, 3rd step supports lays overlap joint bridge floor on beam, left floorings, front floorings, right floorings, rear floorings are also fixed, 4th step installs a bidirectional inductive rotating ladder, number two-way stair of marking time, No. two bidirectional inductive rotating ladders, No. two two-way stair of marking time, and debug a bidirectional inductive rotating ladder, No. two bidirectional inductive rotating ladders, 5th step assembles suspension bridge, jack, the 6th step perpendicular I-steel of welding and horizontal I-steel, 7th step lays left safety tread, right safety tread, front safety tread, rear safety tread, 8th step is installed sightseeing elevator and debugs, 9th step installs safety barrier, skew bridge face guardrail, a number support bar, No. two support bars, tenth step installs awning, transparent adumbral canopy, 11st step installs Relaxing chair and road sign display direction board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610019581.2A CN105672110B (en) | 2016-01-06 | 2016-01-06 | Ten two-way people rows assemble viaduct and assemble method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610019581.2A CN105672110B (en) | 2016-01-06 | 2016-01-06 | Ten two-way people rows assemble viaduct and assemble method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105672110A true CN105672110A (en) | 2016-06-15 |
CN105672110B CN105672110B (en) | 2017-08-25 |
Family
ID=56300209
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610019581.2A Expired - Fee Related CN105672110B (en) | 2016-01-06 | 2016-01-06 | Ten two-way people rows assemble viaduct and assemble method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105672110B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4272210A (en) * | 1978-09-12 | 1981-06-09 | Sanae Shoji | Interchange system |
CN1125282A (en) * | 1994-12-20 | 1996-06-26 | 赖永清 | Traffic diversion bridge at junction of urban district |
CN201245811Y (en) * | 2008-08-29 | 2009-05-27 | 付锦超 | Multifunctional overbridge |
CN201262025Y (en) * | 2008-07-30 | 2009-06-24 | 朱祚睿 | Multi-stage slipping extending suspension bridge type earthquake evacuation bevel ladder door |
CN102031739A (en) * | 2010-11-13 | 2011-04-27 | 张光裕 | Overhead pavement for urban road |
CN202081372U (en) * | 2011-02-25 | 2011-12-21 | 渠仁书 | Suspension bridge for passage of amusement submarine |
CN202626809U (en) * | 2012-06-14 | 2012-12-26 | 黑龙江建筑职业技术学院 | Combined bridge |
CN103758024A (en) * | 2014-01-15 | 2014-04-30 | 云南昆钢钢结构有限公司 | Quick assembling and disassembling steel-structure pedestrian overpass |
-
2016
- 2016-01-06 CN CN201610019581.2A patent/CN105672110B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4272210A (en) * | 1978-09-12 | 1981-06-09 | Sanae Shoji | Interchange system |
CN1125282A (en) * | 1994-12-20 | 1996-06-26 | 赖永清 | Traffic diversion bridge at junction of urban district |
CN201262025Y (en) * | 2008-07-30 | 2009-06-24 | 朱祚睿 | Multi-stage slipping extending suspension bridge type earthquake evacuation bevel ladder door |
CN201245811Y (en) * | 2008-08-29 | 2009-05-27 | 付锦超 | Multifunctional overbridge |
CN102031739A (en) * | 2010-11-13 | 2011-04-27 | 张光裕 | Overhead pavement for urban road |
CN202081372U (en) * | 2011-02-25 | 2011-12-21 | 渠仁书 | Suspension bridge for passage of amusement submarine |
CN202626809U (en) * | 2012-06-14 | 2012-12-26 | 黑龙江建筑职业技术学院 | Combined bridge |
CN103758024A (en) * | 2014-01-15 | 2014-04-30 | 云南昆钢钢结构有限公司 | Quick assembling and disassembling steel-structure pedestrian overpass |
Also Published As
Publication number | Publication date |
---|---|
CN105672110B (en) | 2017-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ewing | Eight qualities of pedestrian-and transit-oriented design | |
CN211524021U (en) | Climbing frame with good safety | |
CN105672110A (en) | Assembled twelve-way pedestrian overpass and assembling method | |
CN203701646U (en) | Zebra pavilion | |
CN204767314U (en) | Double entry football court | |
CN213269278U (en) | Construction guardrail of noise reduction | |
CN210086873U (en) | Building construction safety protection structure | |
CN211115159U (en) | Highway bridge construction safety device | |
CN212956284U (en) | Urban road and bridge protection device | |
CN217151502U (en) | Safety fence for building | |
CN206157500U (en) | Bridging apparatus | |
CN104499724A (en) | Edge protection fence | |
CN203144883U (en) | Anti-congestion and anti-stampeding passenger foot-bridge | |
CN214943076U (en) | High-speed railway isolation protective fence | |
CN213806775U (en) | Road sunshade with foldable top | |
CN212897718U (en) | Movable curtain wall head protection shed | |
CN216239944U (en) | Mountain top view viewing platform | |
CN213330231U (en) | Overpass type public parking space based on three-dimensional space construction | |
CN213538657U (en) | Assembled municipal pedestrian bridge | |
CN219711192U (en) | Rail guard convenient to install for civil engineering | |
CN211081241U (en) | Multifunctional guardrail for economic building | |
CN211342102U (en) | Building construction site is with safety control rail that can make up | |
CN212801205U (en) | Combined shunting type guard railing at suspension end of pedestrian overpass | |
CN107489286A (en) | A kind of Combined type safety ladder | |
CN202509353U (en) | Flyover central passenger footbridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170825 Termination date: 20180106 |