CN103266597B - A kind of cement-soil retaining wall perfusion campshed and construction method thereof - Google Patents
A kind of cement-soil retaining wall perfusion campshed and construction method thereof Download PDFInfo
- Publication number
- CN103266597B CN103266597B CN201210273656.1A CN201210273656A CN103266597B CN 103266597 B CN103266597 B CN 103266597B CN 201210273656 A CN201210273656 A CN 201210273656A CN 103266597 B CN103266597 B CN 103266597B
- Authority
- CN
- China
- Prior art keywords
- pile
- agitation
- cement
- retaining wall
- agitation pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses the construction method of a kind of cement-soil retaining wall perfusion campshed and this perfusion campshed, comprise some agitation piles arranged according to cement-soil retaining wall castinplace pile supporting and protection structure bearing of trend, arbitrary agitation pile all has and is partially submerged in another adjacent with it agitation pile, castinplace pile is equipped with in each agitation pile, carry out in the process of borehole slip casting at this type of filling pile structure of construction, agitation pile grouting agent can be saved, and transfer reinforcing cage complete cast after each cylindrical shape stake intersect each other, the water-retaining capacity of whole row's castinplace pile entirety can be strengthened, this invention is used for the realm of building construction.
Description
Technical field
The present invention relates to the realm of building construction, particularly relate to a kind of cement-soil retaining wall perfusion campshed and construction method thereof.
Background technology
Along with the development of engineering construction cause, piling Technology has had a lot of breakthrough, and new pile-type and construction technology and facility supporting with it continue to bring out.As everyone knows, boring conventional at present and Punching Borehole Cast-in-place Concrete Pile all adopt mud off mode, in pore forming process, can produce stress relaxation phenomenon, and the pit protection mud cake formed after pore-forming can weaken a side skin friction, sediment of the hole bottom can weaken bearing capacity of pile tip, a large amount of mud produced during pore-forming pollutes the environment and causes secondary public hazards, and be difficult to accomplish tangent between stake, leave certain gap between stake, thus need separately to do water-stop curtain etc., add the input cost of engineering.
Summary of the invention
For solving the problem, the invention provides a kind of can the cement-soil retaining wall perfusion campshed and construction method thereof of dash better effects if.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of cement-soil retaining wall perfusion campshed, comprises some agitation piles arranged according to cement-soil retaining wall castinplace pile supporting and protection structure bearing of trend, and arbitrary agitation pile all has and is partially submerged in another adjacent with it agitation pile, is equipped with castinplace pile in each agitation pile.
Be further used as the improvement of technical solution of the present invention, agitation pile is cylindric.
Be further used as the improvement of technical solution of the present invention, two adjacent agitation piles intersect, and the thickness intersected is not less than 100mm.
A construction method for above-mentioned cement-soil retaining wall perfusion campshed, is characterized in that, comprise the following steps:
1) cement mixing method design stake circle of position center is aimed at the stirring-head center of soil-cement stirring, stirs while sink down into the projected depth of agitation pile, water-spray type slurry stirs, promotes stirring-head to the design stake top degree of depth of agitation pile, form the 1st agitation pile;
2) according to the bearing of trend mixer of cement-soil retaining wall castinplace pile supporting and protection structure on the position of next root agitation pile, repeat step 1), complete next root agitation pile;
3) after the 1st mixing pile construction terminates to be no less than 72 hours, rig is moved on the position of the 1st agitation pile, drill hole of drilling machine fetches earth, to the projected depth of cast-in-place concrete pile;
4) holed, carried out hole clearly, put reinforcing cage, concrete perfusion, formed the 1st castinplace pile;
5) rig moves on the position of next root agitation pile, repeats operation 3), complete next root castinplace pile.
Be further used as the improvement of technical solution of the present invention, two adjacent agitation piles intersect, and the thickness intersected is not less than 100mm.
Beneficial effect of the present invention: this perfusion campshed comprises some agitation piles arranged according to cement-soil retaining wall castinplace pile supporting and protection structure bearing of trend, each agitation pile all will be partially submerged in another adjacent with it agitation pile simultaneously, carry out in the process of borehole slip casting at this type of filling pile structure of construction, agitation pile grouting agent can be saved, the method construction pile fast and pile quality be easy to control and transfer reinforcing cage complete cast after each cylindrical shape stake intersect each other, the water-retaining capacity of whole row's castinplace pile entirety can be strengthened.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the invention will be further described:
Fig. 1 is agitation pile structural representation in the present invention.
Detailed description of the invention
With reference to Fig. 1, the present invention is a kind of cement-soil retaining wall perfusion campshed, comprise some agitation piles 1 arranged according to cement-soil retaining wall castinplace pile supporting and protection structure bearing of trend, arbitrary agitation pile 1 all has and is partially submerged in another adjacent with it agitation pile 1, is equipped with castinplace pile 2 in each agitation pile 1.
As the preferred embodiment of the present invention, agitation pile 1 is cylindric.
As the preferred embodiment of the present invention, two adjacent agitation piles intersect, and the thickness intersected is not less than 100mm.
A construction method for above-mentioned cement-soil retaining wall perfusion campshed, is characterized in that, comprise the following steps:
1) cement mixing method design stake circle of position center is aimed at the stirring-head center of soil-cement stirring, stirs while sink down into the projected depth of agitation pile 1, water-spray type slurry stirs, promotes stirring-head to the design stake top degree of depth of agitation pile 1, form the 1st agitation pile 1;
2) according to the bearing of trend mixer of cement-soil retaining wall castinplace pile supporting and protection structure on the position of next root agitation pile 1, repeat step 1), complete next root agitation pile 1;
3) when the 1st agitation pile 1 is constructed after end is no less than 72 hours, rig is moved on the position of the 1st agitation pile 1, drill hole of drilling machine fetches earth, to the projected depth of cast-in-place concrete pile 2;
4) holed, carried out hole clearly, put reinforcing cage, concrete perfusion, formed the 1st castinplace pile 2;
5) rig moves on the position of next root agitation pile 1, repeats operation 3), complete next root castinplace pile 2.
This perfusion campshed comprises some agitation piles 1 arranged according to cement-soil retaining wall castinplace pile supporting and protection structure bearing of trend, each agitation pile 1 all will be partially submerged in another adjacent with it agitation pile 1 simultaneously, carry out in the process of borehole slip casting at this type of filling pile structure of construction, the grouting agent of agitation pile 1 can be saved, and transfer reinforcing cage complete cast after each cylindrical shape stake intersect each other, the water-retaining capacity of whole row's castinplace pile entirety can be strengthened.
As the preferred embodiment of the present invention, two adjacent agitation piles 1 intersect, and the thickness intersected is not less than 100mm.
This bored pile comprises the castinplace pile 2 that in the middle part of columnar agitation pile 1 and agitation pile 1, cement is built, in work progress, the one row agitation pile 1 of first constructing side by side, and each agitation pile 1 is intersected each other, the thickness intersected is not less than 100mm, also be simultaneously the overlap thickness of two adjacent agitation piles 1, this thickness, when ensureing agitation pile 1 intensity, also better can ensure the dash effect of perfusion agitation pile side by side.
Certainly, the invention is not limited to above-mentioned embodiment, those of ordinary skill in the art also can make equivalent variations or replacement under the prerequisite without prejudice to spirit of the present invention, and these equivalent modification or replacement are all included in the application's claim limited range.
Claims (2)
1. a cement-soil retaining wall perfusion campshed, it is characterized in that: comprise some agitation piles (1) arranged according to cement-soil retaining wall castinplace pile supporting and protection structure bearing of trend, arbitrary described agitation pile (1) all has and is partially submerged in another agitation pile (1) adjacent with it, castinplace pile (2) is equipped with in each described agitation pile (1), two adjacent described agitation piles (1) intersect, the thickness intersected is not less than 100mm, and described agitation pile (1) is cylindric.
2. a construction method for cement-soil retaining wall perfusion campshed according to claim 1, is characterized in that, comprise the following steps:
1), cement mixing method design stake circle of position center is aimed at the stirring-head center of soil-cement stirring, stir while sink down into the projected depth of described agitation pile (1), water-spray type slurry stirs, promote stirring-head to the design stake top degree of depth of described agitation pile (1), forms the 1st described agitation pile (1);
2), according to the bearing of trend mixer of cement-soil retaining wall castinplace pile supporting and protection structure on the position of agitation pile (1) described in next root, repeat step 1), complete agitation pile (1) described in next root, two adjacent described agitation piles (1) intersect, and the thickness intersected is not less than 100mm;
3), after the 1st described agitation pile (1) construction end is no less than 72 hours, rig is moved on the position of the 1st described agitation pile (1), drill hole of drilling machine fetches earth, to the projected depth of described castinplace pile (2);
4), holed, carried out hole clearly, put reinforcing cage, concrete perfusion, formed the 1st described castinplace pile (2);
5), rig moves on the position of agitation pile (1) described in next root, repeats operation 3), complete castinplace pile (2) described in next root.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210273656.1A CN103266597B (en) | 2012-07-31 | 2012-07-31 | A kind of cement-soil retaining wall perfusion campshed and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210273656.1A CN103266597B (en) | 2012-07-31 | 2012-07-31 | A kind of cement-soil retaining wall perfusion campshed and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103266597A CN103266597A (en) | 2013-08-28 |
CN103266597B true CN103266597B (en) | 2015-09-23 |
Family
ID=49010251
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210273656.1A Active CN103266597B (en) | 2012-07-31 | 2012-07-31 | A kind of cement-soil retaining wall perfusion campshed and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103266597B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103615000A (en) * | 2013-12-18 | 2014-03-05 | 上海强劲地基工程股份有限公司 | Construction device of original-state earth-borrowing cast-in-place pile |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1245849A (en) * | 1998-08-21 | 2000-03-01 | 中国建筑科学研究院地基基础研究所 | Dry construction composite filling pile |
CN1851154A (en) * | 2006-04-28 | 2006-10-25 | 饶之帆 | Concrete long-core cement-soil composite pile building foundation treating method |
CN101509254A (en) * | 2009-03-09 | 2009-08-19 | 天津市建工工程总承包有限公司 | Steel reinforced concrete filling pile and cement stirring pile meshing engagement type foundation pit support construction method |
CN101603309A (en) * | 2009-07-02 | 2009-12-16 | 北京建材地质工程公司 | Occlusive pile of long spiral stirring water-stop curtain and construction technology thereof |
CN201531021U (en) * | 2009-08-11 | 2010-07-21 | 上海建工(集团)总公司 | Prefabricated member cement-treated-soil drilling and filling pile |
KR101067707B1 (en) * | 2009-10-20 | 2011-09-28 | 이복우 | The earth retaining wall and waterproof construction technique for which cast in place concrete pile and grouting column was used |
-
2012
- 2012-07-31 CN CN201210273656.1A patent/CN103266597B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1245849A (en) * | 1998-08-21 | 2000-03-01 | 中国建筑科学研究院地基基础研究所 | Dry construction composite filling pile |
CN1851154A (en) * | 2006-04-28 | 2006-10-25 | 饶之帆 | Concrete long-core cement-soil composite pile building foundation treating method |
CN101509254A (en) * | 2009-03-09 | 2009-08-19 | 天津市建工工程总承包有限公司 | Steel reinforced concrete filling pile and cement stirring pile meshing engagement type foundation pit support construction method |
CN101603309A (en) * | 2009-07-02 | 2009-12-16 | 北京建材地质工程公司 | Occlusive pile of long spiral stirring water-stop curtain and construction technology thereof |
CN201531021U (en) * | 2009-08-11 | 2010-07-21 | 上海建工(集团)总公司 | Prefabricated member cement-treated-soil drilling and filling pile |
KR101067707B1 (en) * | 2009-10-20 | 2011-09-28 | 이복우 | The earth retaining wall and waterproof construction technique for which cast in place concrete pile and grouting column was used |
Also Published As
Publication number | Publication date |
---|---|
CN103266597A (en) | 2013-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204662425U (en) | Polygonal cement mixing method | |
CN203947466U (en) | A kind of bored pile Anti-floating reinforced bar cage | |
CN204662426U (en) | Cement mixing method | |
CN103321244A (en) | Construction method for additionally arranged basement in existing building on sand foundation | |
CN108035362A (en) | Mixing pile inner sleeve beats the foundation pit enclosure structure and construction method of quincunx bored concrete pile | |
CN109440778A (en) | Active inclined in two-way method for supporting and protecting row pile pit | |
CN104153357A (en) | Construction method of composite pile | |
CN105297710A (en) | High-pressure-jetting cement soil twist drill and reamed reinforced concrete grouting combined pile and manufacturing method | |
CN104420462A (en) | Super three-axis cement mixing pile device | |
CN104563104B (en) | Pile work drilling machine is with coordinated type breast wall apparatus and use its construction method | |
CN204608773U (en) | Pile work drilling machine coordinated type breast wall apparatus | |
CN103266597B (en) | A kind of cement-soil retaining wall perfusion campshed and construction method thereof | |
CN204780943U (en) | H type precast concrete pile and excavation supporting device | |
CN207904910U (en) | A kind of embedding lithotype steel cement mixing wall | |
CN205100208U (en) | Crowded, reaming reinforced concrete bored concrete pile composite pile of high water spray earth anger | |
CN103726673A (en) | Novel after-rooting composite pile foundation | |
JP2014177827A (en) | Core material and soil cement continuous wall construction method using the same | |
CN106638621A (en) | Implanting method of prefabricated plate pile | |
CN105951743A (en) | Plum blossom-shaped profile steel cement stirring wall | |
CN105000843A (en) | Cement paste for construction of structural steel cement mixing pile and use method of cement paste | |
CN108035359A (en) | A kind of slope excavating method | |
CN109440779A (en) | Active X-shaped foundation pit supporting method with double rows of piles | |
CN204662424U (en) | Soil-cement bearing peg | |
CN104929110B (en) | The long-spiral drilling machine used in variation rigidity composite pile and its construction method and construction method | |
CN107989048A (en) | Solid matter step type rotary digging pile supporting system and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB02 | Change of applicant information |
Address after: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou Applicant after: Foundation Design Group Co., Ltd of Guangdong Province Address before: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou Applicant before: Guangdong Prov. Foundation Engineering Co. |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: GUANGDONG PROV. FOUNDATION ENGINEERING CO. TO: GUANGDONG FOUNDATION ENGINEERING GROUP CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |