CN103266597B - A kind of cement-soil retaining wall perfusion campshed and construction method thereof - Google Patents

A kind of cement-soil retaining wall perfusion campshed and construction method thereof Download PDF

Info

Publication number
CN103266597B
CN103266597B CN201210273656.1A CN201210273656A CN103266597B CN 103266597 B CN103266597 B CN 103266597B CN 201210273656 A CN201210273656 A CN 201210273656A CN 103266597 B CN103266597 B CN 103266597B
Authority
CN
China
Prior art keywords
pile
agitation
cement
retaining wall
agitation pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210273656.1A
Other languages
Chinese (zh)
Other versions
CN103266597A (en
Inventor
邵孟新
叶建荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foundation Design Group Co Ltd Of Guangdong Province
Original Assignee
Foundation Design Group Co Ltd Of Guangdong Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foundation Design Group Co Ltd Of Guangdong Province filed Critical Foundation Design Group Co Ltd Of Guangdong Province
Priority to CN201210273656.1A priority Critical patent/CN103266597B/en
Publication of CN103266597A publication Critical patent/CN103266597A/en
Application granted granted Critical
Publication of CN103266597B publication Critical patent/CN103266597B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses the construction method of a kind of cement-soil retaining wall perfusion campshed and this perfusion campshed, comprise some agitation piles arranged according to cement-soil retaining wall castinplace pile supporting and protection structure bearing of trend, arbitrary agitation pile all has and is partially submerged in another adjacent with it agitation pile, castinplace pile is equipped with in each agitation pile, carry out in the process of borehole slip casting at this type of filling pile structure of construction, agitation pile grouting agent can be saved, and transfer reinforcing cage complete cast after each cylindrical shape stake intersect each other, the water-retaining capacity of whole row's castinplace pile entirety can be strengthened, this invention is used for the realm of building construction.

Description

A kind of cement-soil retaining wall perfusion campshed and construction method thereof
Technical field
The present invention relates to the realm of building construction, particularly relate to a kind of cement-soil retaining wall perfusion campshed and construction method thereof.
Background technology
Along with the development of engineering construction cause, piling Technology has had a lot of breakthrough, and new pile-type and construction technology and facility supporting with it continue to bring out.As everyone knows, boring conventional at present and Punching Borehole Cast-in-place Concrete Pile all adopt mud off mode, in pore forming process, can produce stress relaxation phenomenon, and the pit protection mud cake formed after pore-forming can weaken a side skin friction, sediment of the hole bottom can weaken bearing capacity of pile tip, a large amount of mud produced during pore-forming pollutes the environment and causes secondary public hazards, and be difficult to accomplish tangent between stake, leave certain gap between stake, thus need separately to do water-stop curtain etc., add the input cost of engineering.
Summary of the invention
For solving the problem, the invention provides a kind of can the cement-soil retaining wall perfusion campshed and construction method thereof of dash better effects if.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of cement-soil retaining wall perfusion campshed, comprises some agitation piles arranged according to cement-soil retaining wall castinplace pile supporting and protection structure bearing of trend, and arbitrary agitation pile all has and is partially submerged in another adjacent with it agitation pile, is equipped with castinplace pile in each agitation pile.
Be further used as the improvement of technical solution of the present invention, agitation pile is cylindric.
Be further used as the improvement of technical solution of the present invention, two adjacent agitation piles intersect, and the thickness intersected is not less than 100mm.
A construction method for above-mentioned cement-soil retaining wall perfusion campshed, is characterized in that, comprise the following steps:
1) cement mixing method design stake circle of position center is aimed at the stirring-head center of soil-cement stirring, stirs while sink down into the projected depth of agitation pile, water-spray type slurry stirs, promotes stirring-head to the design stake top degree of depth of agitation pile, form the 1st agitation pile;
2) according to the bearing of trend mixer of cement-soil retaining wall castinplace pile supporting and protection structure on the position of next root agitation pile, repeat step 1), complete next root agitation pile;
3) after the 1st mixing pile construction terminates to be no less than 72 hours, rig is moved on the position of the 1st agitation pile, drill hole of drilling machine fetches earth, to the projected depth of cast-in-place concrete pile;
4) holed, carried out hole clearly, put reinforcing cage, concrete perfusion, formed the 1st castinplace pile;
5) rig moves on the position of next root agitation pile, repeats operation 3), complete next root castinplace pile.
Be further used as the improvement of technical solution of the present invention, two adjacent agitation piles intersect, and the thickness intersected is not less than 100mm.
Beneficial effect of the present invention: this perfusion campshed comprises some agitation piles arranged according to cement-soil retaining wall castinplace pile supporting and protection structure bearing of trend, each agitation pile all will be partially submerged in another adjacent with it agitation pile simultaneously, carry out in the process of borehole slip casting at this type of filling pile structure of construction, agitation pile grouting agent can be saved, the method construction pile fast and pile quality be easy to control and transfer reinforcing cage complete cast after each cylindrical shape stake intersect each other, the water-retaining capacity of whole row's castinplace pile entirety can be strengthened.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the invention will be further described:
Fig. 1 is agitation pile structural representation in the present invention.
Detailed description of the invention
With reference to Fig. 1, the present invention is a kind of cement-soil retaining wall perfusion campshed, comprise some agitation piles 1 arranged according to cement-soil retaining wall castinplace pile supporting and protection structure bearing of trend, arbitrary agitation pile 1 all has and is partially submerged in another adjacent with it agitation pile 1, is equipped with castinplace pile 2 in each agitation pile 1.
As the preferred embodiment of the present invention, agitation pile 1 is cylindric.
As the preferred embodiment of the present invention, two adjacent agitation piles intersect, and the thickness intersected is not less than 100mm.
A construction method for above-mentioned cement-soil retaining wall perfusion campshed, is characterized in that, comprise the following steps:
1) cement mixing method design stake circle of position center is aimed at the stirring-head center of soil-cement stirring, stirs while sink down into the projected depth of agitation pile 1, water-spray type slurry stirs, promotes stirring-head to the design stake top degree of depth of agitation pile 1, form the 1st agitation pile 1;
2) according to the bearing of trend mixer of cement-soil retaining wall castinplace pile supporting and protection structure on the position of next root agitation pile 1, repeat step 1), complete next root agitation pile 1;
3) when the 1st agitation pile 1 is constructed after end is no less than 72 hours, rig is moved on the position of the 1st agitation pile 1, drill hole of drilling machine fetches earth, to the projected depth of cast-in-place concrete pile 2;
4) holed, carried out hole clearly, put reinforcing cage, concrete perfusion, formed the 1st castinplace pile 2;
5) rig moves on the position of next root agitation pile 1, repeats operation 3), complete next root castinplace pile 2.
This perfusion campshed comprises some agitation piles 1 arranged according to cement-soil retaining wall castinplace pile supporting and protection structure bearing of trend, each agitation pile 1 all will be partially submerged in another adjacent with it agitation pile 1 simultaneously, carry out in the process of borehole slip casting at this type of filling pile structure of construction, the grouting agent of agitation pile 1 can be saved, and transfer reinforcing cage complete cast after each cylindrical shape stake intersect each other, the water-retaining capacity of whole row's castinplace pile entirety can be strengthened.
As the preferred embodiment of the present invention, two adjacent agitation piles 1 intersect, and the thickness intersected is not less than 100mm.
This bored pile comprises the castinplace pile 2 that in the middle part of columnar agitation pile 1 and agitation pile 1, cement is built, in work progress, the one row agitation pile 1 of first constructing side by side, and each agitation pile 1 is intersected each other, the thickness intersected is not less than 100mm, also be simultaneously the overlap thickness of two adjacent agitation piles 1, this thickness, when ensureing agitation pile 1 intensity, also better can ensure the dash effect of perfusion agitation pile side by side.
Certainly, the invention is not limited to above-mentioned embodiment, those of ordinary skill in the art also can make equivalent variations or replacement under the prerequisite without prejudice to spirit of the present invention, and these equivalent modification or replacement are all included in the application's claim limited range.

Claims (2)

1. a cement-soil retaining wall perfusion campshed, it is characterized in that: comprise some agitation piles (1) arranged according to cement-soil retaining wall castinplace pile supporting and protection structure bearing of trend, arbitrary described agitation pile (1) all has and is partially submerged in another agitation pile (1) adjacent with it, castinplace pile (2) is equipped with in each described agitation pile (1), two adjacent described agitation piles (1) intersect, the thickness intersected is not less than 100mm, and described agitation pile (1) is cylindric.
2. a construction method for cement-soil retaining wall perfusion campshed according to claim 1, is characterized in that, comprise the following steps:
1), cement mixing method design stake circle of position center is aimed at the stirring-head center of soil-cement stirring, stir while sink down into the projected depth of described agitation pile (1), water-spray type slurry stirs, promote stirring-head to the design stake top degree of depth of described agitation pile (1), forms the 1st described agitation pile (1);
2), according to the bearing of trend mixer of cement-soil retaining wall castinplace pile supporting and protection structure on the position of agitation pile (1) described in next root, repeat step 1), complete agitation pile (1) described in next root, two adjacent described agitation piles (1) intersect, and the thickness intersected is not less than 100mm;
3), after the 1st described agitation pile (1) construction end is no less than 72 hours, rig is moved on the position of the 1st described agitation pile (1), drill hole of drilling machine fetches earth, to the projected depth of described castinplace pile (2);
4), holed, carried out hole clearly, put reinforcing cage, concrete perfusion, formed the 1st described castinplace pile (2);
5), rig moves on the position of agitation pile (1) described in next root, repeats operation 3), complete castinplace pile (2) described in next root.
CN201210273656.1A 2012-07-31 2012-07-31 A kind of cement-soil retaining wall perfusion campshed and construction method thereof Active CN103266597B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210273656.1A CN103266597B (en) 2012-07-31 2012-07-31 A kind of cement-soil retaining wall perfusion campshed and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210273656.1A CN103266597B (en) 2012-07-31 2012-07-31 A kind of cement-soil retaining wall perfusion campshed and construction method thereof

Publications (2)

Publication Number Publication Date
CN103266597A CN103266597A (en) 2013-08-28
CN103266597B true CN103266597B (en) 2015-09-23

Family

ID=49010251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210273656.1A Active CN103266597B (en) 2012-07-31 2012-07-31 A kind of cement-soil retaining wall perfusion campshed and construction method thereof

Country Status (1)

Country Link
CN (1) CN103266597B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615000A (en) * 2013-12-18 2014-03-05 上海强劲地基工程股份有限公司 Construction device of original-state earth-borrowing cast-in-place pile

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1245849A (en) * 1998-08-21 2000-03-01 中国建筑科学研究院地基基础研究所 Dry construction composite filling pile
CN1851154A (en) * 2006-04-28 2006-10-25 饶之帆 Concrete long-core cement-soil composite pile building foundation treating method
CN101509254A (en) * 2009-03-09 2009-08-19 天津市建工工程总承包有限公司 Steel reinforced concrete filling pile and cement stirring pile meshing engagement type foundation pit support construction method
CN101603309A (en) * 2009-07-02 2009-12-16 北京建材地质工程公司 Occlusive pile of long spiral stirring water-stop curtain and construction technology thereof
CN201531021U (en) * 2009-08-11 2010-07-21 上海建工(集团)总公司 Prefabricated member cement-treated-soil drilling and filling pile
KR101067707B1 (en) * 2009-10-20 2011-09-28 이복우 The earth retaining wall and waterproof construction technique for which cast in place concrete pile and grouting column was used

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1245849A (en) * 1998-08-21 2000-03-01 中国建筑科学研究院地基基础研究所 Dry construction composite filling pile
CN1851154A (en) * 2006-04-28 2006-10-25 饶之帆 Concrete long-core cement-soil composite pile building foundation treating method
CN101509254A (en) * 2009-03-09 2009-08-19 天津市建工工程总承包有限公司 Steel reinforced concrete filling pile and cement stirring pile meshing engagement type foundation pit support construction method
CN101603309A (en) * 2009-07-02 2009-12-16 北京建材地质工程公司 Occlusive pile of long spiral stirring water-stop curtain and construction technology thereof
CN201531021U (en) * 2009-08-11 2010-07-21 上海建工(集团)总公司 Prefabricated member cement-treated-soil drilling and filling pile
KR101067707B1 (en) * 2009-10-20 2011-09-28 이복우 The earth retaining wall and waterproof construction technique for which cast in place concrete pile and grouting column was used

Also Published As

Publication number Publication date
CN103266597A (en) 2013-08-28

Similar Documents

Publication Publication Date Title
CN204662425U (en) Polygonal cement mixing method
CN203947466U (en) A kind of bored pile Anti-floating reinforced bar cage
CN204662426U (en) Cement mixing method
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN108035362A (en) Mixing pile inner sleeve beats the foundation pit enclosure structure and construction method of quincunx bored concrete pile
CN109440778A (en) Active inclined in two-way method for supporting and protecting row pile pit
CN104153357A (en) Construction method of composite pile
CN105297710A (en) High-pressure-jetting cement soil twist drill and reamed reinforced concrete grouting combined pile and manufacturing method
CN104420462A (en) Super three-axis cement mixing pile device
CN104563104B (en) Pile work drilling machine is with coordinated type breast wall apparatus and use its construction method
CN204608773U (en) Pile work drilling machine coordinated type breast wall apparatus
CN103266597B (en) A kind of cement-soil retaining wall perfusion campshed and construction method thereof
CN204780943U (en) H type precast concrete pile and excavation supporting device
CN207904910U (en) A kind of embedding lithotype steel cement mixing wall
CN205100208U (en) Crowded, reaming reinforced concrete bored concrete pile composite pile of high water spray earth anger
CN103726673A (en) Novel after-rooting composite pile foundation
JP2014177827A (en) Core material and soil cement continuous wall construction method using the same
CN106638621A (en) Implanting method of prefabricated plate pile
CN105951743A (en) Plum blossom-shaped profile steel cement stirring wall
CN105000843A (en) Cement paste for construction of structural steel cement mixing pile and use method of cement paste
CN108035359A (en) A kind of slope excavating method
CN109440779A (en) Active X-shaped foundation pit supporting method with double rows of piles
CN204662424U (en) Soil-cement bearing peg
CN104929110B (en) The long-spiral drilling machine used in variation rigidity composite pile and its construction method and construction method
CN107989048A (en) Solid matter step type rotary digging pile supporting system and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Applicant after: Foundation Design Group Co., Ltd of Guangdong Province

Address before: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Applicant before: Guangdong Prov. Foundation Engineering Co.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: GUANGDONG PROV. FOUNDATION ENGINEERING CO. TO: GUANGDONG FOUNDATION ENGINEERING GROUP CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant