CN207904910U - A kind of embedding lithotype steel cement mixing wall - Google Patents

A kind of embedding lithotype steel cement mixing wall Download PDF

Info

Publication number
CN207904910U
CN207904910U CN201820006428.0U CN201820006428U CN207904910U CN 207904910 U CN207904910 U CN 207904910U CN 201820006428 U CN201820006428 U CN 201820006428U CN 207904910 U CN207904910 U CN 207904910U
Authority
CN
China
Prior art keywords
rock
cement
mixing
pile
mixing pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820006428.0U
Other languages
Chinese (zh)
Inventor
邓美旭
蒋宗南
张�杰
� 刘
刘一
吴艳崇
李亚洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201820006428.0U priority Critical patent/CN207904910U/en
Application granted granted Critical
Publication of CN207904910U publication Critical patent/CN207904910U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a kind of embedding lithotype steel cement mixing walls, belong to foundation pit supporting project field, by Guan Liang, shaped steel, cement mixing method and enter rock mixing pile and form;The Guan Liang is located at earth's surface or more, is reinforced concrete structure;The shaped steel connects Guan Liang and enters rock mixing pile;The cement mixing method is engaged between rock mixing pile, the water sealing structure as stirring wall;It is described that enter rock mixing pile be top is cement and the mixing pile that soil stirring, lower part are cement and rock debris stirring.The utility model is simple in structure, speed of application is fast, cement mixing pile can be efficiently solved cannot be well with rock mass be combined the problem of, the applicability for improving cement mixing method makes the application of cement mixing pile be largely increased, and effectively facilitates the continuous development of underground engineering.

Description

A kind of embedding lithotype steel cement mixing wall
Technical field
The utility model belongs to foundation pit supporting project field, and in particular to a kind of cement mixing wall, more particularly to it is a kind of embedding Lithotype steel cement mixing wall.
Background technology
China is in the eighties extensively using in building enclosure and water-stop curtain of the mixing pile in foundation pit supporting project.Although Mixing pile construction is easy to operate, construction efficiency is high, and without friction in construction, noiseless is polluted without mud waste water, but mixing pile is most It can only construct in soil, the constructional difficulties in competent bed, and the combination of cement and soil, due to there is no coarse aggregate to do wherein It is primarily subjected to the material of load, force-mechanism is simultaneously bad, and strength of the mixing pile is not high.Shaped steel cement mixing method, interpolation shaped steel improve Bearing capacity, the secondary recovery of shaped steel reduce cost, but since mixing pile is not easy to construct in competent bed, certain journey The extensive use of SMW engineering methods is limited on degree.Diaphram wall rigidity is big, good integrity, and deformation is relatively small, has preferable anti- Performance, but the grooving in rock stratum are oozed, it is difficult using common process grooving, it is less efficient, if selecting slotter, it can be met In rock grooving work efficiency, but cost higher.
Therefore in order to solve problem above, in project of national nature science fund project (number:41372288) it under subsidy, opens Great mass of data search, field research and related experiment have been opened up to be studied, invention is a kind of can both to construct in competent bed, Pile body bearing capacity can be increased substantially again, accelerates speed of application, and the lower embedding lithotype steel cement mixing wall of cost.
Invention content
The purpose of this utility model is to provide a kind of embedding lithotype steel cement mixing wall, is made using the rock debris that rock drilling generates For coarse-fine aggregate, interpolation shaped steel can construct in competent bed, increase substantially the bearing capacity of pile body;Traditional SMW engineering methods are not It is well positioned to meet the building-in depth requirement of pattern foundation pit supporting structure needs, and the utility model can be applied to the relatively thin pattern foundation pit supporting structure of soil layer In engineering, engineering adaptability is wider;Operation is simple for it, using meat and vegetables stake combination of long drives and drop shots, compared with diaphram wall, rock drilling Amount substantially reduces, and can reach and not only improve work efficiency, shortened the construction period, but also the corresponding purpose for reducing project cost.
Technical solution adopted in the utility model is:A kind of embedding lithotype steel cement mixing wall, it is by Guan Liang, shaped steel, water Soil mixing pile is formed with rock mixing pile is entered;The Guan Liang is located at earth's surface or more, is reinforced concrete structure;The shaped steel It connects Guan Liang and enters rock mixing pile;The cement mixing method is engaged between rock mixing pile, the sealing as stirring wall Structure;It is described that enter rock mixing pile be top is cement and the mixing pile that soil stirring, lower part are cement and rock debris stirring.
The construction usage method of the utility model is:A kind of embedding lithotype steel cement mixing wall, carries out in accordance with the following steps:
Step 1:It is constructed into rock mixing pile using special construction machinery, heavy bore of drilling machine stirs and pass through soil layer, into rock The rock debris of layer drilling, generation stays in above working face, and after being drilled into designed elevation, drilling machine carries brill and whitewashes and stir, and makes water Slurry liquid is sufficiently mixed with rock debris, is carried and is drilled into soil layer and is then thoroughly mixed cement grout and the soil body, ultimately forms one Root top pile body is cement to be combined with soil, lower part pile body be cement combined with rock debris enter rock mixing pile;
Step 2:Using the cement mixing method for cement-soil mixing pile machine construction and entering rock mixing pile and being engaged, and rock will be entered and stirred It mixes top pile body of the stake in soil layer and combines stirring with cement earth pile, become one;
Step 3:It is inserted into shaped steel in entering rock mixing pile, shaped steel is vibrated when being inserted into the lower part pile body into rock mixing pile, passes through The vibration of shaped steel makes the rock debris in pile body and the closely knit combination of cement grout, and it is existing to eliminate bubble, voids and pits in pile body etc. As;
Step 4:Pile body is connected into an entirety by construction Guan Liang, and Guan Liang is located at cement mixing wall top, and height 500mm is left The right side, Guan Liang top surface should be in shaped steel top surface 500mm hereinafter, extracting shaped steel after terminating so as to pattern foundation pit supporting structure.
The operation principle of the utility model is:A kind of embedding lithotype steel cement mixing wall, when constructing into rock mixing pile, drilling machine chisel The rock debris not of uniform size that rock generates is combined during proposing brill whitewashing stirring with cement grout, and rock debris is as thick Fine aggregate, cement grout is as adhesive, and shaped steel is as main force structure, and while being inserted into shaped steel vibrates rock therein Clast forms the pile body of high intensity;Due to having structure of the shaped steel cement mixing pile into rock as bearing load, Soil-cement Stake is engaged therewith, and an entirety is stirred into construction, and the stirring wall of composition has not in resistance soil pressure, sealing etc. Wrong effect;Using meat and vegetables stake combination of long drives and drop shots, compared with diaphram wall, rock drilling amount substantially reduces, and can reach and both improve work Effect shortens the construction period, and the corresponding purpose for reducing project cost.
The utility model has the beneficial effects that:A kind of embedding lithotype steel cement mixing wall, the rock debris generated using rock drilling As coarse-fine aggregate, interpolation shaped steel can construct in competent bed, increase substantially the bearing capacity of pile body;With traditional SMW works Method is compared, and can be applied in the relatively thin foundation pit supporting project of soil layer, engineering adaptability is wider;Operation is simple for it, uses Meat and vegetables stake combination of long drives and drop shots, compared with diaphram wall, rock drilling amount substantially reduces, and can reach and both improve work efficiency, shortened construction work Phase, and the corresponding purpose for reducing project cost.
Description of the drawings
Fig. 1 is a kind of general structure schematic diagram of embedding lithotype steel cement mixing wall of the utility model.
Fig. 2 is a kind of construction schematic diagram for entering rock mixing pile of embedding lithotype steel cement mixing wall of the utility model.
Fig. 3 enters rock mixing pile construction completion figure for a kind of embedding lithotype steel cement mixing wall of the utility model.
Fig. 4 is a kind of construction schematic diagram of the cement-soil mixing pile machine of embedding lithotype steel cement mixing wall of the utility model.
Fig. 5 is that a kind of cement-soil stirring pile construction of embedding lithotype steel cement mixing wall of the utility model completes figure.
Fig. 6 is a kind of construction schematic diagram for assigning shaped steel of embedding lithotype steel cement mixing wall of the utility model.
Fig. 7 is a kind of construction completion figure for assigning shaped steel of embedding lithotype steel cement mixing wall of the utility model.
Marginal data:(1)-Guan Liang;(2)-shaped steel;(3)-cement mixing method;(4)-enter rock mixing pile;(5)-rock is broken Bits;(6)-soil layer;(7)-rock stratum.
Specific implementation mode
The utility model is described further below in conjunction with the accompanying drawings.
As shown in Figure 1, a kind of embedding lithotype steel cement mixing wall, it is by Guan Liang (1), shaped steel (2), cement mixing method (3) It is formed with rock mixing pile (4) is entered;The Guan Liang (1) is located at earth's surface or more, is reinforced concrete structure;The shaped steel (2) It connects Guan Liang (1) and enters rock mixing pile (4);The cement mixing method (3) is engaged between rock mixing pile (4), as Stir the water sealing structure of wall;The rock mixing pile (4) that enters is that top is cement and soil stirring, lower part are cement and rock debris (5) mixing pile stirred.
In use, as shown in figs. 1-7, carrying out in accordance with the following steps:
Step 1:It is constructed into rock mixing pile (4) using special construction machinery, heavy bore of drilling machine stirs and passes through soil layer (6), It drills into rock stratum (7), the rock debris (5) of generation stays in above working face, and after being drilled into designed elevation, drilling machine proposes brill whitewashing And stir, so that cement grout is sufficiently mixed with rock debris (5), carries and be drilled into soil layer (6) and then fully stir cement grout with the soil body Mixing is mixed, it is that cement is combined with soil, lower part pile body is that cement enters with what rock debris (5) combined to ultimately form a top pile body Rock mixing pile (4);
Step 2:It is constructed and the cement mixing method (3) that enters rock mixing pile (4) and be engaged using cement-soil mixing pile machine, and general Enter top pile body of the rock mixing pile (4) in soil layer (6) and combine stirring with cement earth pile, becomes one;
Step 3:It is inserted into shaped steel (2) in entering rock mixing pile (4), is vibrated when being inserted into the lower part pile body into rock mixing pile (4) Shaped steel (2) makes the rock debris (5) in pile body and the closely knit combination of cement grout by the vibration of shaped steel (2), eliminates in pile body Phenomena such as bubble, voids and pits;
Step 4:Guan Liang of constructing (1), an entirety is connected by pile body, and Guan Liang (1) is located at cement mixing wall top, height 500mm or so, Guan Liang (1) top surface should be in shaped steel (2) top surface 500mm hereinafter, extracting shaped steel after terminating so as to pattern foundation pit supporting structure (2)。

Claims (1)

1. a kind of embedding lithotype steel cement mixing wall, which is characterized in that it is by Guan Liang, shaped steel, cement mixing method and enters rock stirring Stake composition;The Guan Liang is located at earth's surface or more, is reinforced concrete structure;The shaped steel connection Guan Liang is stirred with rock is entered Stake;The cement mixing method is engaged between rock mixing pile, the water sealing structure as stirring wall;Described enters rock stirring Stake is that top is cement and the mixing pile that soil stirring, lower part are cement and rock debris stirring.
CN201820006428.0U 2018-01-03 2018-01-03 A kind of embedding lithotype steel cement mixing wall Expired - Fee Related CN207904910U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820006428.0U CN207904910U (en) 2018-01-03 2018-01-03 A kind of embedding lithotype steel cement mixing wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820006428.0U CN207904910U (en) 2018-01-03 2018-01-03 A kind of embedding lithotype steel cement mixing wall

Publications (1)

Publication Number Publication Date
CN207904910U true CN207904910U (en) 2018-09-25

Family

ID=63566354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820006428.0U Expired - Fee Related CN207904910U (en) 2018-01-03 2018-01-03 A kind of embedding lithotype steel cement mixing wall

Country Status (1)

Country Link
CN (1) CN207904910U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938652A (en) * 2018-01-03 2018-04-20 山东科技大学 A kind of embedding lithotype steel cement mixing wall and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938652A (en) * 2018-01-03 2018-04-20 山东科技大学 A kind of embedding lithotype steel cement mixing wall and its construction method
CN107938652B (en) * 2018-01-03 2023-08-22 山东科技大学 Rock-inlaid steel reinforced cement stirring wall and construction method thereof

Similar Documents

Publication Publication Date Title
US5378085A (en) Methods for in situ construction of deep soil-cement structures
CN105780763B (en) Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile
CN101196117A (en) Non-blasting digging method for tunnel and underground project
CN103015413B (en) Construction method of composite pile with implanting-in rigid-body embedded into hard bearing stratum
CN105714834B (en) A kind of construction technology of hardpan preexisting hole grouting behind shaft or drift lining H profile steel stake
CN108547641A (en) The bottom stab ilization system and its construction method in rich water soft stratum heavy haul railway tunnel
CN104963346A (en) Support construction method for deep foundation pit in complex geological condition
CN104947690A (en) Grooving construction method for embedding underground continuous wall into rock
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN104164873B (en) Prestressed pipe pile and construction method thereof
CN107938652A (en) A kind of embedding lithotype steel cement mixing wall and its construction method
CN102182399A (en) Construction method and equipment for reverse circulation drill to drill hole, hammer to form hole, expand hole and remove slag
CN104153357A (en) Construction method of composite pile
CN106638579A (en) Construction method of coral sand foundation expanding cement mortar injection pile
CN106013088A (en) High-bearing-capacity drilling pile planting method
CN207904910U (en) A kind of embedding lithotype steel cement mixing wall
CN104563104B (en) Pile work drilling machine is with coordinated type breast wall apparatus and use its construction method
CN104452776B (en) Meet with the one construction Treatment Methods of diaphragm wall during boulder
CN109629590A (en) The construction method of Rock Region building pile foundation cushion cap
CN101725147A (en) Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space
CN108049804B (en) Non-excavation in-situ replacement spiral drilling method for unconsolidated formation
CN110318392A (en) A kind of major diameter cement earth pile method of construction
CN103726673A (en) Novel after-rooting composite pile foundation
CN215367226U (en) Well draw reaming body expanding pile of solid reinforcing of back slip casting root
CN205100226U (en) Underground continuous wall goes into rock grooving construction equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180925

Termination date: 20200103

CF01 Termination of patent right due to non-payment of annual fee