CN207904910U - A kind of embedding lithotype steel cement mixing wall - Google Patents
A kind of embedding lithotype steel cement mixing wall Download PDFInfo
- Publication number
- CN207904910U CN207904910U CN201820006428.0U CN201820006428U CN207904910U CN 207904910 U CN207904910 U CN 207904910U CN 201820006428 U CN201820006428 U CN 201820006428U CN 207904910 U CN207904910 U CN 207904910U
- Authority
- CN
- China
- Prior art keywords
- rock
- cement
- mixing
- pile
- mixing pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model discloses a kind of embedding lithotype steel cement mixing walls, belong to foundation pit supporting project field, by Guan Liang, shaped steel, cement mixing method and enter rock mixing pile and form;The Guan Liang is located at earth's surface or more, is reinforced concrete structure;The shaped steel connects Guan Liang and enters rock mixing pile;The cement mixing method is engaged between rock mixing pile, the water sealing structure as stirring wall;It is described that enter rock mixing pile be top is cement and the mixing pile that soil stirring, lower part are cement and rock debris stirring.The utility model is simple in structure, speed of application is fast, cement mixing pile can be efficiently solved cannot be well with rock mass be combined the problem of, the applicability for improving cement mixing method makes the application of cement mixing pile be largely increased, and effectively facilitates the continuous development of underground engineering.
Description
Technical field
The utility model belongs to foundation pit supporting project field, and in particular to a kind of cement mixing wall, more particularly to it is a kind of embedding
Lithotype steel cement mixing wall.
Background technology
China is in the eighties extensively using in building enclosure and water-stop curtain of the mixing pile in foundation pit supporting project.Although
Mixing pile construction is easy to operate, construction efficiency is high, and without friction in construction, noiseless is polluted without mud waste water, but mixing pile is most
It can only construct in soil, the constructional difficulties in competent bed, and the combination of cement and soil, due to there is no coarse aggregate to do wherein
It is primarily subjected to the material of load, force-mechanism is simultaneously bad, and strength of the mixing pile is not high.Shaped steel cement mixing method, interpolation shaped steel improve
Bearing capacity, the secondary recovery of shaped steel reduce cost, but since mixing pile is not easy to construct in competent bed, certain journey
The extensive use of SMW engineering methods is limited on degree.Diaphram wall rigidity is big, good integrity, and deformation is relatively small, has preferable anti-
Performance, but the grooving in rock stratum are oozed, it is difficult using common process grooving, it is less efficient, if selecting slotter, it can be met
In rock grooving work efficiency, but cost higher.
Therefore in order to solve problem above, in project of national nature science fund project (number:41372288) it under subsidy, opens
Great mass of data search, field research and related experiment have been opened up to be studied, invention is a kind of can both to construct in competent bed,
Pile body bearing capacity can be increased substantially again, accelerates speed of application, and the lower embedding lithotype steel cement mixing wall of cost.
Invention content
The purpose of this utility model is to provide a kind of embedding lithotype steel cement mixing wall, is made using the rock debris that rock drilling generates
For coarse-fine aggregate, interpolation shaped steel can construct in competent bed, increase substantially the bearing capacity of pile body;Traditional SMW engineering methods are not
It is well positioned to meet the building-in depth requirement of pattern foundation pit supporting structure needs, and the utility model can be applied to the relatively thin pattern foundation pit supporting structure of soil layer
In engineering, engineering adaptability is wider;Operation is simple for it, using meat and vegetables stake combination of long drives and drop shots, compared with diaphram wall, rock drilling
Amount substantially reduces, and can reach and not only improve work efficiency, shortened the construction period, but also the corresponding purpose for reducing project cost.
Technical solution adopted in the utility model is:A kind of embedding lithotype steel cement mixing wall, it is by Guan Liang, shaped steel, water
Soil mixing pile is formed with rock mixing pile is entered;The Guan Liang is located at earth's surface or more, is reinforced concrete structure;The shaped steel
It connects Guan Liang and enters rock mixing pile;The cement mixing method is engaged between rock mixing pile, the sealing as stirring wall
Structure;It is described that enter rock mixing pile be top is cement and the mixing pile that soil stirring, lower part are cement and rock debris stirring.
The construction usage method of the utility model is:A kind of embedding lithotype steel cement mixing wall, carries out in accordance with the following steps:
Step 1:It is constructed into rock mixing pile using special construction machinery, heavy bore of drilling machine stirs and pass through soil layer, into rock
The rock debris of layer drilling, generation stays in above working face, and after being drilled into designed elevation, drilling machine carries brill and whitewashes and stir, and makes water
Slurry liquid is sufficiently mixed with rock debris, is carried and is drilled into soil layer and is then thoroughly mixed cement grout and the soil body, ultimately forms one
Root top pile body is cement to be combined with soil, lower part pile body be cement combined with rock debris enter rock mixing pile;
Step 2:Using the cement mixing method for cement-soil mixing pile machine construction and entering rock mixing pile and being engaged, and rock will be entered and stirred
It mixes top pile body of the stake in soil layer and combines stirring with cement earth pile, become one;
Step 3:It is inserted into shaped steel in entering rock mixing pile, shaped steel is vibrated when being inserted into the lower part pile body into rock mixing pile, passes through
The vibration of shaped steel makes the rock debris in pile body and the closely knit combination of cement grout, and it is existing to eliminate bubble, voids and pits in pile body etc.
As;
Step 4:Pile body is connected into an entirety by construction Guan Liang, and Guan Liang is located at cement mixing wall top, and height 500mm is left
The right side, Guan Liang top surface should be in shaped steel top surface 500mm hereinafter, extracting shaped steel after terminating so as to pattern foundation pit supporting structure.
The operation principle of the utility model is:A kind of embedding lithotype steel cement mixing wall, when constructing into rock mixing pile, drilling machine chisel
The rock debris not of uniform size that rock generates is combined during proposing brill whitewashing stirring with cement grout, and rock debris is as thick
Fine aggregate, cement grout is as adhesive, and shaped steel is as main force structure, and while being inserted into shaped steel vibrates rock therein
Clast forms the pile body of high intensity;Due to having structure of the shaped steel cement mixing pile into rock as bearing load, Soil-cement
Stake is engaged therewith, and an entirety is stirred into construction, and the stirring wall of composition has not in resistance soil pressure, sealing etc.
Wrong effect;Using meat and vegetables stake combination of long drives and drop shots, compared with diaphram wall, rock drilling amount substantially reduces, and can reach and both improve work
Effect shortens the construction period, and the corresponding purpose for reducing project cost.
The utility model has the beneficial effects that:A kind of embedding lithotype steel cement mixing wall, the rock debris generated using rock drilling
As coarse-fine aggregate, interpolation shaped steel can construct in competent bed, increase substantially the bearing capacity of pile body;With traditional SMW works
Method is compared, and can be applied in the relatively thin foundation pit supporting project of soil layer, engineering adaptability is wider;Operation is simple for it, uses
Meat and vegetables stake combination of long drives and drop shots, compared with diaphram wall, rock drilling amount substantially reduces, and can reach and both improve work efficiency, shortened construction work
Phase, and the corresponding purpose for reducing project cost.
Description of the drawings
Fig. 1 is a kind of general structure schematic diagram of embedding lithotype steel cement mixing wall of the utility model.
Fig. 2 is a kind of construction schematic diagram for entering rock mixing pile of embedding lithotype steel cement mixing wall of the utility model.
Fig. 3 enters rock mixing pile construction completion figure for a kind of embedding lithotype steel cement mixing wall of the utility model.
Fig. 4 is a kind of construction schematic diagram of the cement-soil mixing pile machine of embedding lithotype steel cement mixing wall of the utility model.
Fig. 5 is that a kind of cement-soil stirring pile construction of embedding lithotype steel cement mixing wall of the utility model completes figure.
Fig. 6 is a kind of construction schematic diagram for assigning shaped steel of embedding lithotype steel cement mixing wall of the utility model.
Fig. 7 is a kind of construction completion figure for assigning shaped steel of embedding lithotype steel cement mixing wall of the utility model.
Marginal data:(1)-Guan Liang;(2)-shaped steel;(3)-cement mixing method;(4)-enter rock mixing pile;(5)-rock is broken
Bits;(6)-soil layer;(7)-rock stratum.
Specific implementation mode
The utility model is described further below in conjunction with the accompanying drawings.
As shown in Figure 1, a kind of embedding lithotype steel cement mixing wall, it is by Guan Liang (1), shaped steel (2), cement mixing method (3)
It is formed with rock mixing pile (4) is entered;The Guan Liang (1) is located at earth's surface or more, is reinforced concrete structure;The shaped steel (2)
It connects Guan Liang (1) and enters rock mixing pile (4);The cement mixing method (3) is engaged between rock mixing pile (4), as
Stir the water sealing structure of wall;The rock mixing pile (4) that enters is that top is cement and soil stirring, lower part are cement and rock debris
(5) mixing pile stirred.
In use, as shown in figs. 1-7, carrying out in accordance with the following steps:
Step 1:It is constructed into rock mixing pile (4) using special construction machinery, heavy bore of drilling machine stirs and passes through soil layer (6),
It drills into rock stratum (7), the rock debris (5) of generation stays in above working face, and after being drilled into designed elevation, drilling machine proposes brill whitewashing
And stir, so that cement grout is sufficiently mixed with rock debris (5), carries and be drilled into soil layer (6) and then fully stir cement grout with the soil body
Mixing is mixed, it is that cement is combined with soil, lower part pile body is that cement enters with what rock debris (5) combined to ultimately form a top pile body
Rock mixing pile (4);
Step 2:It is constructed and the cement mixing method (3) that enters rock mixing pile (4) and be engaged using cement-soil mixing pile machine, and general
Enter top pile body of the rock mixing pile (4) in soil layer (6) and combine stirring with cement earth pile, becomes one;
Step 3:It is inserted into shaped steel (2) in entering rock mixing pile (4), is vibrated when being inserted into the lower part pile body into rock mixing pile (4)
Shaped steel (2) makes the rock debris (5) in pile body and the closely knit combination of cement grout by the vibration of shaped steel (2), eliminates in pile body
Phenomena such as bubble, voids and pits;
Step 4:Guan Liang of constructing (1), an entirety is connected by pile body, and Guan Liang (1) is located at cement mixing wall top, height
500mm or so, Guan Liang (1) top surface should be in shaped steel (2) top surface 500mm hereinafter, extracting shaped steel after terminating so as to pattern foundation pit supporting structure
(2)。
Claims (1)
1. a kind of embedding lithotype steel cement mixing wall, which is characterized in that it is by Guan Liang, shaped steel, cement mixing method and enters rock stirring
Stake composition;The Guan Liang is located at earth's surface or more, is reinforced concrete structure;The shaped steel connection Guan Liang is stirred with rock is entered
Stake;The cement mixing method is engaged between rock mixing pile, the water sealing structure as stirring wall;Described enters rock stirring
Stake is that top is cement and the mixing pile that soil stirring, lower part are cement and rock debris stirring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820006428.0U CN207904910U (en) | 2018-01-03 | 2018-01-03 | A kind of embedding lithotype steel cement mixing wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820006428.0U CN207904910U (en) | 2018-01-03 | 2018-01-03 | A kind of embedding lithotype steel cement mixing wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207904910U true CN207904910U (en) | 2018-09-25 |
Family
ID=63566354
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820006428.0U Expired - Fee Related CN207904910U (en) | 2018-01-03 | 2018-01-03 | A kind of embedding lithotype steel cement mixing wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207904910U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107938652A (en) * | 2018-01-03 | 2018-04-20 | 山东科技大学 | A kind of embedding lithotype steel cement mixing wall and its construction method |
-
2018
- 2018-01-03 CN CN201820006428.0U patent/CN207904910U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107938652A (en) * | 2018-01-03 | 2018-04-20 | 山东科技大学 | A kind of embedding lithotype steel cement mixing wall and its construction method |
CN107938652B (en) * | 2018-01-03 | 2023-08-22 | 山东科技大学 | Rock-inlaid steel reinforced cement stirring wall and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5378085A (en) | Methods for in situ construction of deep soil-cement structures | |
CN105780763B (en) | Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile | |
CN101196117A (en) | Non-blasting digging method for tunnel and underground project | |
CN103015413B (en) | Construction method of composite pile with implanting-in rigid-body embedded into hard bearing stratum | |
CN105714834B (en) | A kind of construction technology of hardpan preexisting hole grouting behind shaft or drift lining H profile steel stake | |
CN108547641A (en) | The bottom stab ilization system and its construction method in rich water soft stratum heavy haul railway tunnel | |
CN104963346A (en) | Support construction method for deep foundation pit in complex geological condition | |
CN104947690A (en) | Grooving construction method for embedding underground continuous wall into rock | |
CN103321244A (en) | Construction method for additionally arranged basement in existing building on sand foundation | |
CN104164873B (en) | Prestressed pipe pile and construction method thereof | |
CN107938652A (en) | A kind of embedding lithotype steel cement mixing wall and its construction method | |
CN102182399A (en) | Construction method and equipment for reverse circulation drill to drill hole, hammer to form hole, expand hole and remove slag | |
CN104153357A (en) | Construction method of composite pile | |
CN106638579A (en) | Construction method of coral sand foundation expanding cement mortar injection pile | |
CN106013088A (en) | High-bearing-capacity drilling pile planting method | |
CN207904910U (en) | A kind of embedding lithotype steel cement mixing wall | |
CN104563104B (en) | Pile work drilling machine is with coordinated type breast wall apparatus and use its construction method | |
CN104452776B (en) | Meet with the one construction Treatment Methods of diaphragm wall during boulder | |
CN109629590A (en) | The construction method of Rock Region building pile foundation cushion cap | |
CN101725147A (en) | Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space | |
CN108049804B (en) | Non-excavation in-situ replacement spiral drilling method for unconsolidated formation | |
CN110318392A (en) | A kind of major diameter cement earth pile method of construction | |
CN103726673A (en) | Novel after-rooting composite pile foundation | |
CN215367226U (en) | Well draw reaming body expanding pile of solid reinforcing of back slip casting root | |
CN205100226U (en) | Underground continuous wall goes into rock grooving construction equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180925 Termination date: 20200103 |
|
CF01 | Termination of patent right due to non-payment of annual fee |