CN101509254A
CN101509254A CNA2009100680752A CN200910068075A CN101509254A CN 101509254 A CN101509254 A CN 101509254A CN A2009100680752 A CNA2009100680752 A CN A2009100680752A CN 200910068075 A CN200910068075 A CN 200910068075A CN 101509254 A CN101509254 A CN 101509254A
Authority
CN
China
Prior art keywords
pile
cement mixing
mixing pile
reinforced concrete
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2009100680752A
Other languages
Chinese (zh)
Inventor
***
孙健
翟树起
李忠雨
娄维萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN JIANGONG CONSTRUCTION CO Ltd
Original Assignee
TIANJIN JIANGONG CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN JIANGONG CONSTRUCTION CO Ltd filed Critical TIANJIN JIANGONG CONSTRUCTION CO Ltd
Priority to CNA2009100680752A priority Critical patent/CN101509254A/en
Publication of CN101509254A publication Critical patent/CN101509254A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a mesh-type foundation pit support construction method of a reinforced concrete perfusion pile and a cement mixing pile, comprising the follow steps: turning over grooves according to the position of the foundation pit support, carrying out construction of the cement mixing pile or a single row cement mixing pile group by adopting 'two spraying and four mixing' or 'three spraying and six mixing' technique; 24-120 hours after the construction of the cement mixing pile and the single row cement mixing pile group, carrying out construction of a reinforced concrete perfusion pile between the cement mixing piles or between the cement mixing pile groups, and then enabling the reinforced concrete perfusion pile to be in single row straight line mesh with the cement mixing pile. The method of the invention enables the reinforced concrete perfusion pile and the cement mixing pile to mesh and form foundation pit support, which has the advantages of utilizing site effectively, covering less floor space, fully unleashing the advantages of the two kinds of pile types, improving security of the foundation ditch construction, at the same time reducing usage amount of the cement mixing pile, and lowering project cost, and the method is especially applicable to various deep foundation pit support structures construction within 9 meters in depth in soft soil and high water level district.

Description

Deposited reinforced concrete pile and cement stirring pile meshing engagement type foundation pit support construction method
Technical field
The invention belongs to building engineering field, relate to a kind of base pit stand construction.
Background technology
In weak soil high water level area, the 9m degree of depth adopts the foundation pit supporting method of inboard deposited reinforced concrete pile support retaining, outside cement mixing pile water-stop curtain usually with interior deep foundation pit support, one circle deposited reinforced concrete pile promptly is set in the inboard, at the single or double cement mixing pile of arranged outside, two class stakes combine and form the support system of foundation ditch.The problem that this support system exists is: cost is higher, the construction period is long, occupied ground is bigger.And because the gap is bigger between the deposited reinforced concrete pile, inter-pile soil might run off, and causes the cement mixing pile cracking.
Summary of the invention
It is longer to the objective of the invention is to overcome cost height, construction period that existing technology exists, and the deficiency that occupied ground is bigger provides a kind of deposited reinforced concrete pile and cement stirring pile meshing engagement type foundation pit support construction method.
Technical scheme of the present invention is summarized as follows:
A kind of deposited reinforced concrete pile and cement stirring pile meshing engagement type foundation pit support construction method comprise the steps:
(1) turns over groove by the pattern foundation pit supporting structure position;
(2) adopt " two sprays four are stirred " or " three sprays six are stirred " technology to carry out the construction of cement mixing pile or single cement mixing pile group, the spacing of described cement mixing pile spacing or single cement mixing pile group end points is 300-400mm;
(3) constructed back 24-120 hour at cement mixing pile or single cement mixing pile group, between the cement mixing pile or carry out the construction of deposited reinforced concrete pile between the cement mixing pile group, the deposited reinforced concrete pile diameter is 700-800mm, makes deposited reinforced concrete pile and cement mixing pile be single straight line engagement and is provided with.
Described single cement mixing pile group is single straight line engagement by 2-4 root cement mixing pile and constitutes.
Another kind of deposited reinforced concrete pile and cement stirring pile meshing engagement type foundation pit support construction method comprise the steps:
(1) turns over groove by the pattern foundation pit supporting structure position;
(2) adopt " two sprays four are stirred " or " three sprays six are stirred " technology to carry out the construction of double cement mixing pile, described double cement mixing pile carries out transversely arranged construction for a pair of cement mixing pile of vertically engagement formation, and the lateral separation of every pair of cement mixing pile is spaced apart 300-400mm;
(3) back 24-120 hour of double cement mixing pile construction, carry out the construction of deposited reinforced concrete pile in the center of every pair of double cement mixing pile, described deposited reinforced concrete pile diameter is 700-800mm.
The third deposited reinforced concrete pile and cement stirring pile meshing engagement type foundation pit support construction method comprise the steps:
(1) turns over groove by the pattern foundation pit supporting structure position;
(2) adopt " two sprays four are stirred " or " three spray six stirs " technology to carry out the construction of double cement mixing pile, described double cement mixing pile laterally meshes the arrangement construction for vertical engagement constitutes a pair of cement mixing pile;
(3) in double cement mixing pile construction the last 24-120 hour, every one vertically the engagement center that constitutes a pair of cement mixing pile carrying out the construction of deposited reinforced concrete pile, described deposited reinforced concrete pile diameter is 700-800mm.
Deposited reinforced concrete pile of the present invention and cement stirring pile meshing engagement type foundation pit support construction method, make deposited reinforced concrete pile and cement mixing pile engagement formation pattern foundation pit supporting structure, can effectively utilize the place, floor space is less, and given full play to the speciality of two class stake types, improve the safety of foundation pit construction, reduced the consumption of cement mixing pile simultaneously, reduced construction costs.The 9m degree of depth in particularly suitable weak soil high water level area is with the construction of interior various deep foundation pit supporting structures.
Description of drawings
Fig. 1 is a cement mixing pile spacing schematic diagram;
Fig. 2 is first kind of deposited reinforced concrete pile and cement stirring pile meshing engagement type foundation pit support construction schematic diagram;
Fig. 3 is first kind of deposited reinforced concrete pile and the cement stirring pile meshing engagement type foundation pit support another kind of embodiment schematic diagram of constructing;
Fig. 4 is second kind of deposited reinforced concrete pile and cement stirring pile meshing engagement type foundation pit support construction schematic diagram;
Fig. 5 is the third deposited reinforced concrete pile and cement stirring pile meshing engagement type foundation pit support construction schematic diagram.
The specific embodiment
The present invention is further illustrated below in conjunction with drawings and Examples.
Embodiment 1
A kind of deposited reinforced concrete pile and cement stirring pile meshing engagement type foundation pit support construction method comprise the steps:
(1) turns over groove by the pattern foundation pit supporting structure position;
(2) adopt " two sprays four are stirred " technology to carry out the construction of cement mixing pile 1 (also can adopt " three sprays six are stirred " technology to carry out the construction of cement mixing pile 1), the spacing of per two cement mixing piles 2 is seen Fig. 1 for 300mm (also can be 350mm or 400mm);
(3) cement mixing pile construct back 24 hours (also can be 30 hours, or 36 hours, or 48 hours, or 60 hours, or 72 hours, or 84 hours, or 96 hours, or 108 hours, or 120 hours), carry out the construction of deposited reinforced concrete pile 3 between per two cement mixing piles, the deposited reinforced concrete pile diameter is 700mm (also can be 750mm or 800mm), makes deposited reinforced concrete pile and cement mixing pile be single straight line engagement and is provided with.See Fig. 2.
Embodiment 2
A kind of deposited reinforced concrete pile and cement stirring pile meshing engagement type foundation pit support construction method comprise the steps:
(1) turns over groove by the pattern foundation pit supporting structure position;
(2) adopt " two sprays four are stirred " technology to carry out the construction of single cement mixing pile group 4 (also can adopt " three sprays six are stirred " technology to carry out the construction of single cement mixing pile group 4), the spacing of per two single cement mixing pile group end points is 300mm (also can be 350mm or 400mm);
(3) single cement mixing pile group construct back 24 hours (also can be 30 hours, or 36 hours, or 48 hours, or 60 hours, or 72 hours, or 84 hours, or 96 hours, or 108 hours, or 120 hours), carry out the construction of deposited reinforced concrete pile 3 between per two cement mixing pile groups, the deposited reinforced concrete pile diameter is 700mm (also can be 750mm or 800mm), makes deposited reinforced concrete pile and cement mixing pile group be single straight line engagement and is provided with.Single cement mixing pile group is single straight line engagement by 4 cement mixing piles (also can be 2 or 3) and constitutes.See Fig. 3.
Embodiment 3
A kind of deposited reinforced concrete pile and cement stirring pile meshing engagement type foundation pit support construction method comprise the steps:
(1) turns over groove by the pattern foundation pit supporting structure position;
(2) adopt " two sprays four are stirred " to carry out the construction of double cement mixing pile 5 (also can adopt " three sprays six are stirred " technology to carry out the construction of double cement mixing pile), double cement mixing pile carries out transversely arranged construction for a pair of cement mixing pile of vertically engagement formation, and the lateral separation of every pair of cement mixing pile is spaced apart 300mm (also can be 350mm or 400mm);
(3) double cement mixing pile construct back 24 hours (also can be 30 hours, or 36 hours, or 48 hours, or 60 hours, or 72 hours, or 84 hours, or 96 hours, or 108 hours, or 120 hours), carry out the construction of deposited reinforced concrete pile in the center of every pair of double cement mixing pile, described deposited reinforced concrete pile diameter is 700mm (also can be 750mm or 800mm).See Fig. 4.
Embodiment 4
A kind of deposited reinforced concrete pile and cement stirring pile meshing engagement type foundation pit support construction method comprise the steps:
(1) turns over groove by the pattern foundation pit supporting structure position;
(2) adopt " two sprays four are stirred " to carry out the construction of double cement mixing pile 6 (also can adopt " three spray six stirs " technology to carry out the construction of double cement mixing pile), described double cement mixing pile laterally meshes the arrangement construction for vertical engagement constitutes a pair of cement mixing pile;
(3) double cement mixing pile construct back 24 hours (also can be 30 hours, or 36 hours, or 48 hours, or 60 hours, or 72 hours, or 84 hours, or 96 hours, or 108 hours, or 120 hours), carry out the construction of deposited reinforced concrete pile in the center of vertically meshing a pair of cement mixing pile of formation every, described deposited reinforced concrete pile diameter is 700mm (also can be 750mm or 800mm).See Fig. 5.
Cement mixing content among each embodiment in the cement mixing pile stake (weight) technology routinely carries out, and preferably is controlled at 15%, water/binder ratio 0.5-0.55.

Claims (4)

1. deposited reinforced concrete pile and cement stirring pile meshing engagement type foundation pit support construction method is characterized in that comprising the steps:
(1) turns over groove by the pattern foundation pit supporting structure position;
(2) adopt " two sprays four are stirred " or " three sprays six are stirred " technology to carry out the construction of cement mixing pile or single cement mixing pile group, the spacing of described cement mixing pile spacing or single cement mixing pile group end points is 300-400mm;
(3) constructed back 24-120 hour at cement mixing pile or single cement mixing pile group, between the cement mixing pile or carry out the construction of deposited reinforced concrete pile between the cement mixing pile group, the deposited reinforced concrete pile diameter is 700-800mm, makes deposited reinforced concrete pile and cement mixing pile be single straight line engagement and is provided with.
2. deposited reinforced concrete pile according to claim 1 and cement stirring pile meshing engagement type foundation pit support construction method is characterized in that described single cement mixing pile group is single straight line engagement by 2-4 root cement mixing pile and constitutes.
3. deposited reinforced concrete pile and cement stirring pile meshing engagement type foundation pit support construction method is characterized in that comprising the steps:
(1) turns over groove by the pattern foundation pit supporting structure position;
(2) adopt " two sprays four are stirred " or " three sprays six are stirred " technology to carry out the construction of double cement mixing pile, described double cement mixing pile carries out transversely arranged construction for a pair of cement mixing pile of vertically engagement formation, and the lateral separation of every pair of cement mixing pile is spaced apart 300-400mm;
(3) back 24-120 hour of double cement mixing pile construction, carry out the construction of deposited reinforced concrete pile in the center of every pair of double cement mixing pile, described deposited reinforced concrete pile diameter is 700-800mm.
4. deposited reinforced concrete pile and cement stirring pile meshing engagement type foundation pit support construction method is characterized in that comprising the steps:
(1) turns over groove by the pattern foundation pit supporting structure position;
(2) adopt " two sprays four are stirred " or " three spray six stirs " technology to carry out the construction of double cement mixing pile, described double cement mixing pile laterally meshes the arrangement construction for vertical engagement constitutes a pair of cement mixing pile;
(3) in double cement mixing pile construction the last 24-120 hour, every one vertically the engagement center that constitutes a pair of cement mixing pile carrying out the construction of deposited reinforced concrete pile, described deposited reinforced concrete pile diameter is 700-800mm.
CNA2009100680752A 2009-03-09 2009-03-09 Steel reinforced concrete filling pile and cement stirring pile meshing engagement type foundation pit support construction method Pending CN101509254A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009100680752A CN101509254A (en) 2009-03-09 2009-03-09 Steel reinforced concrete filling pile and cement stirring pile meshing engagement type foundation pit support construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009100680752A CN101509254A (en) 2009-03-09 2009-03-09 Steel reinforced concrete filling pile and cement stirring pile meshing engagement type foundation pit support construction method

Publications (1)

Publication Number Publication Date
CN101509254A true CN101509254A (en) 2009-08-19

Family

ID=41001775

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009100680752A Pending CN101509254A (en) 2009-03-09 2009-03-09 Steel reinforced concrete filling pile and cement stirring pile meshing engagement type foundation pit support construction method

Country Status (1)

Country Link
CN (1) CN101509254A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015443A (en) * 2013-01-01 2013-04-03 中国建筑西南勘察设计研究院有限公司 Cemented-type high-pressure swing guniting and supporting pile combined water-blocking curtain
CN103266597A (en) * 2012-07-31 2013-08-28 广东省基础工程公司 Cemented soil retaining dado cast-in-place row pile and construction method thereof
CN103397644A (en) * 2013-07-30 2013-11-20 江苏翔森建设工程有限公司 Combined special-shape steel plate stiffened-core cement foundation pit support structure and construction method thereof
CN103967017A (en) * 2013-02-06 2014-08-06 上海城地建设股份有限公司 Novel vertical building envelope with high-tensile reinforcement cast-in-place piles and FCW mixing piles engaged and construction method of novel vertical building envelope
CN104088285A (en) * 2014-07-24 2014-10-08 上海强劲地基工程股份有限公司 Method for constructing cement soil mixing pile and concrete pile meshed foundation pit supporting structure
CN104196017A (en) * 2014-08-15 2014-12-10 中国轻工业武汉设计工程有限责任公司 Method for preventing lava zone hole punching/drilling cast-in-place pile mud leakage and hole collapse
CN104278680A (en) * 2013-07-01 2015-01-14 上海城地建设股份有限公司 Envelope structure combining five (six) shaft mixing piles with press grouting piles and construction method
CN104278679A (en) * 2013-07-01 2015-01-14 上海城地建设股份有限公司 Envelope structure combining five (six) shaft mixing piles with precast tubular piles and construction method
CN104652445A (en) * 2013-11-22 2015-05-27 中冶天工上海十三冶建设有限公司 Pile and column steel latticed column location device for deep foundation pits and construction method for location device
CN104790411A (en) * 2014-01-17 2015-07-22 上海城地建设股份有限公司 Vertical foundation pit bracing soil blocking structure with PC steel bar
CN108035362A (en) * 2018-01-15 2018-05-15 上海建工二建集团有限公司 Mixing pile inner sleeve beats the foundation pit enclosure structure and construction method of quincunx bored concrete pile
CN111663536A (en) * 2020-06-08 2020-09-15 瑞腾基础工程技术(北京)股份有限公司 Green assembly type vertical protection method
CN113622409A (en) * 2021-08-06 2021-11-09 中电建振冲建设工程股份有限公司 Underground water sealing construction method for building foundation pit

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266597A (en) * 2012-07-31 2013-08-28 广东省基础工程公司 Cemented soil retaining dado cast-in-place row pile and construction method thereof
CN103266597B (en) * 2012-07-31 2015-09-23 广东省基础工程集团有限公司 A kind of cement-soil retaining wall perfusion campshed and construction method thereof
CN103015443B (en) * 2013-01-01 2015-09-30 中国建筑西南勘察设计研究院有限公司 The spray of felted high pressure swing combines with soldier pile the curtain that blocks water
CN103015443A (en) * 2013-01-01 2013-04-03 中国建筑西南勘察设计研究院有限公司 Cemented-type high-pressure swing guniting and supporting pile combined water-blocking curtain
CN103967017A (en) * 2013-02-06 2014-08-06 上海城地建设股份有限公司 Novel vertical building envelope with high-tensile reinforcement cast-in-place piles and FCW mixing piles engaged and construction method of novel vertical building envelope
CN104278679A (en) * 2013-07-01 2015-01-14 上海城地建设股份有限公司 Envelope structure combining five (six) shaft mixing piles with precast tubular piles and construction method
CN104278680A (en) * 2013-07-01 2015-01-14 上海城地建设股份有限公司 Envelope structure combining five (six) shaft mixing piles with press grouting piles and construction method
CN103397644B (en) * 2013-07-30 2015-05-27 江苏翔森建设工程有限公司 Combined special-shape steel plate stiffened-core cement foundation pit support structure and construction method thereof
CN103397644A (en) * 2013-07-30 2013-11-20 江苏翔森建设工程有限公司 Combined special-shape steel plate stiffened-core cement foundation pit support structure and construction method thereof
CN104652445A (en) * 2013-11-22 2015-05-27 中冶天工上海十三冶建设有限公司 Pile and column steel latticed column location device for deep foundation pits and construction method for location device
CN104652445B (en) * 2013-11-22 2016-08-17 中冶天工上海十三冶建设有限公司 Deep basal pit one one post steel lattice column positioner and construction method thereof
CN104790411A (en) * 2014-01-17 2015-07-22 上海城地建设股份有限公司 Vertical foundation pit bracing soil blocking structure with PC steel bar
CN104088285A (en) * 2014-07-24 2014-10-08 上海强劲地基工程股份有限公司 Method for constructing cement soil mixing pile and concrete pile meshed foundation pit supporting structure
CN104196017A (en) * 2014-08-15 2014-12-10 中国轻工业武汉设计工程有限责任公司 Method for preventing lava zone hole punching/drilling cast-in-place pile mud leakage and hole collapse
CN104196017B (en) * 2014-08-15 2016-02-10 中国轻工业武汉设计工程有限责任公司 A kind of method of preventing and treating lava area punching/bored pile spillage, collapse hole
CN108035362A (en) * 2018-01-15 2018-05-15 上海建工二建集团有限公司 Mixing pile inner sleeve beats the foundation pit enclosure structure and construction method of quincunx bored concrete pile
CN111663536A (en) * 2020-06-08 2020-09-15 瑞腾基础工程技术(北京)股份有限公司 Green assembly type vertical protection method
CN113622409A (en) * 2021-08-06 2021-11-09 中电建振冲建设工程股份有限公司 Underground water sealing construction method for building foundation pit

Similar Documents

Publication Publication Date Title
CN101509254A (en) Steel reinforced concrete filling pile and cement stirring pile meshing engagement type foundation pit support construction method
CN204662426U (en) Cement mixing method
CN203729324U (en) Anchor rod lattice type retaining wall structure
CN106013171A (en) Semi-rigid and semi-flexible support structure and method for deep foundation pit side wall
CN102691302A (en) Concrete structure for supporting deep foundation pit
CN110952567A (en) Front wall and rear pile composite double-row foundation pit supporting structure and construction method thereof
CN103437370A (en) Method and supporting structure for slip resisting and soil retaining of abrupt slope
CN108049423A (en) Ecological landscape retaining wall
CN102330436B (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN104294829A (en) Rock slope combined type protective structure and method
CN211340808U (en) Pile foundation pit supporting construction behind preceding wall
CN202519697U (en) Steel hoop truss high pile-cap tower crane basic structure
CN205954638U (en) Half semi -rigid flexible supporting construction of deep basal pit lateral wall
CN204780990U (en) Combined type retaining wall structure
CN207295756U (en) Coating subgrade strengthening structure
CN106120804A (en) A kind of two grades of support systems of super-giant foundation pit double-row pile and construction method thereof
CN202730796U (en) Existing retaining wall rib plate type unloading reinforcing structure
CN210216444U (en) Foundation pit supporting structure of section steel micro pile combined cast-in-place pile
CN204001705U (en) Outer wall of basement single surface formwork constructing structure based on earth anchor truss
CN107034898A (en) A kind of combined type foundation ditch concrete supporting structure
CN102943480A (en) Loess foundation pit supporting method
CN202672161U (en) Cement-soil mixing drum sheet-pile united slope structure with soil nails
CN204000936U (en) Outer wall of basement single surface formwork system based on fastener type steel pipe earth anchor truss
CN102383417B (en) Combined framework pile
CN114809005A (en) Construction method for double-wheel milling cement-soil wall composite anchor cable supporting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090819