CN102418342B - High polymer hoisting grouting method - Google Patents

High polymer hoisting grouting method Download PDF

Info

Publication number
CN102418342B
CN102418342B CN201110288194.6A CN201110288194A CN102418342B CN 102418342 B CN102418342 B CN 102418342B CN 201110288194 A CN201110288194 A CN 201110288194A CN 102418342 B CN102418342 B CN 102418342B
Authority
CN
China
Prior art keywords
grouting
high polymer
hoisting
reductor
control equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110288194.6A
Other languages
Chinese (zh)
Other versions
CN102418342A (en
Inventor
王复明
刘文廷
张蓓
***
王小亮
郝志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Safekey Engineering Technology Zhengzhou Ltd
Original Assignee
ZHENGZHOU YOUTE INFRASTRUCTURE ENGINEERING MAINTAINANCE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU YOUTE INFRASTRUCTURE ENGINEERING MAINTAINANCE Co Ltd filed Critical ZHENGZHOU YOUTE INFRASTRUCTURE ENGINEERING MAINTAINANCE Co Ltd
Priority to CN201110288194.6A priority Critical patent/CN102418342B/en
Publication of CN102418342A publication Critical patent/CN102418342A/en
Application granted granted Critical
Publication of CN102418342B publication Critical patent/CN102418342B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a high polymer hoisting grouting method which comprises the following steps: arranging slotted holes in a dam body and a foundation, which are in need of anti-seepage reinforcement, according to the design, using slot-forming equipment to construct continuous grouting slotted holes; inserting high polymer grouting guide pipes into the grouting slotted holes, placing high polymer hoisting grouting control equipment above the slotted holes of the grouting guide pipes; placing the grouting guide pipes into the high polymer hoisting grouting control equipment and fixing the guide pipes; injecting a high polymer material into the slotted holes through the grouting guide pipes, simultaneously opening the high polymer hoisting grouting control equipment and hoisting the grouting guide pipes upward at a set speed; and closing a power supply of the high polymer hoisting grouting control equipment when the grouting guide pipes are hoisted to the required height, moving the grouting guide pipes away and completing the hoisting operation. The high polymer hoisting grouting method has the advantages of being convenient and fast to construct, being uniform and regular in a formed high polymer purdah or a wall body, completing filling the slotted holes with the high polymer material and the like.

Description

High polymer hoisting grouting method
Technical field
The invention belongs to the infrastructure anti-seepage reinforcing technical fields such as water conservancy, mine, environmental protection, the high polymer hoisting grouting method using while being specifically related to the anti-seepage reinforcings such as earth embankment, earth dam, tailing dam, section dirty dam.
Background technology
Since founding of New, the infrastructure constructions such as the water conservancy of China, mine, environmental protection have obtained the economic growth and social progress of remarkable achievement ,Dui China and have brought into play important function.Aspect water resource infrastructure construction, because the most water conservancy projectss of China are built last century 50 to the seventies, be limited to economic technology condition at that time, many Design of Reservoirs and construction quality " inadequate natural endowment ".Through long-term operation, long neglected and in disrepair, aging serious, sick dangerous problem is very outstanding.At present, the built all kinds of reservoirs of China reach 8.7 ten thousand, occupy first place in the world.But approximately 40% small reservoir, 25% big-and-middle-sized reservoir belong to dangerously weak reseroirs, people's lives and properties and social stability are formed to great threat.China dyke is built with a long history, but mostly through heightening and thickening gradually over the years, forms, and levee body fills soil and mostly is different times and fetches earth on the spot, fills quality nearly less than designing requirement, has different potential safety hazards.In existing more than 40,000 dangerously weak reseroirs of China, more than 90% be earth and rockfill dam, and most dyke is soil property dyke.According to initial estimate, approximately more than 50% small-sized dangerously weak reseroirs need to carry out anti-seepage reinforcing.Aspect the infrastructure of mine, the key facility that tailing dam is produced as mine ore dressing, it is that accident is easily sent out position, is also the dangerous matter sources of latent huge potential safety hazard.In addition, also contain various poisonous and harmful substances in Tailings Dam, and be a kind of artificial debris flow formation region with high potential energy, its safe operation is directly connected to the ecological environment of downstream the people's lives and property safety and surrounding area, reservoir area.In the many Tailings Dams in China mine, the current less than 70% in normal operation, some industries surpass 40% Tailings Dam in dangerous, sick, the service state of exceeding the time limit, and Tailings Dam major accident happens occasionally.And seepage is as the one of the main reasons of tailing dam accident, how effectively administers seepage and guarantee that Safety of Tailings Dam operation seems very urgent and important.Aspect Environmental Protection Infrastructure construction, according to statistics, in the existing refuse landfill of China, simple and easy landfill and accurate sanitary landfills account for more than 95% at present.Because most of landfill yards do not adopt horizontal leakage preventing measure, add upper bottom portion percolate exhaust system perfect not, thereby cause that a large amount of percolates are unprocessed just directly have been entered in soil, underground water, environment has been caused to severe contamination.In recent years, country more and more paid attention to garbage loading embeading problem, and many provinces and cities have set up novel refuse landfill.But the quantity in existing garbage disposal plant and scale also can not adapt to the growing requirement of municipal refuse far away, the rubbish of really realizing harmless treatment is only 2.3%.How preventing and treating leachate contamination is the subject matter that first rubbish city landfill yard must be considered.Controlling leachate contamination is generally refuse landfill to be cut to the geographical environment and the geological conditions that carry out the most landfill yards of antiseepage processing ,Er China in dirty dam be difficult to meet antiseepage requirement.
Visible, seepage is the common problem that water conservancy, mine, the Environmental Protection Infrastructures such as soil property dykes and dams, tailing dam, section dirty dam exist, and anti-seepage reinforcing is long-term, the difficult task that these infrastructure face.Seepage control technique conventional in engineering has: concrete anti-seepage wall technology, cement mixing method technology, High Pressure Jet Grouting Technique etc.These anti-seepage reinforcing technology are widely used at home, for the infrastructure such as Chinese large-sized reservoir, Tailings Dam, refuse landfill brought into play important function except danger and anti-seepage reinforcing, but also there are some technical deficiencies.Aspect leakage proof wall material, what existing several impervious wall technology adopted is cement class material, and the antiseepage body of structure is rigidity antiseepage body, larger with elastic modulus of soil body difference, and impervious cracking resistance is not enough; Aspect wall forming machine reason, when existing one-tenth wall class seepage control technique becomes wall, material and the soil body depart from, and grouting class is difficult to form complete continuous body of wall; Aspect form of construction work, existing several impervious wall technology are that the job practices by slotting, stir, spray and vibrating forms antiseepage body in the soil body, to dykes and dams disturbance, destroy larger.The problem such as on the inhomogeneities that cement mixing method technology exist to stir, slurries, emit, stressed unreasonable and pile body is discontinuous, so that pile strength is too low, construction quality poor controllability, anti-seepage effect are undesirable.And High Pressure Jet Grouting Technique makes slurries obtain huge energy by high-pressure installation, easily cause soil body punching failure, at slurries, form in intensity process and very easily cause bulk strength inhomogeneous.As can be seen here, in engineering, these conventional seepage control techniques exist dam body disturbance are destroyed to the shortcomings such as large, the duration is long, cost is higher, construction is inconvenient, particularly for the middle-size and small-size dykes and dams of One's name is legion, existing technological means is not only subject to the restriction of funds, and because equipment is bulky, the difficulty of marching into the arena, this and current China dykes and dams, tailing dam, the growth requirement that cuts dirty dam anti-seepage reinforcing are also far from suitable.Therefore, the research and development of quickening anti-seepage reinforcing new material, new technology, new equipment are current earth embankment, earth dam, tailing dam, cut the infrastructure anti-seepage reinforcing great Scientific And Technical Problems urgently to be resolved hurrily such as water conservancy, mine, environmental protection such as dirty dam.
High polymer grouting technology is the foundation rapid reinforcement technology that 20 century 70s grow up.This technology is by injecting high polymer material in ground, utilize high polymer material generation chemical reaction after volume expand rapidly and curing characteristic, reach consolidated subsoil, fill the object of coming to nothing or promoting floor.At present, high polymer grouting technology is mainly used in ground stabilization and the road maintenance of industry and civilian construction.In recent years, the inventor is for the growth requirement of China's dykes and dams reinforcement and the deficiency that dyke seepage control technology exists at present, be devoted to the research and development of dyke seepage control high polymer grouting technology, and applied for the patents of invention such as " dyke seepage control high polymer directional splitting grouting method (200910066334.8) ", " high polymer heavy curtain grouting technology (200910066335.2) "." dyke seepage control high polymer directional splitting grouting method " and " high polymer heavy curtain grouting technology " have been started the new way that builds laminar high polymer antiseepage body, in its implementing process, an important step is exactly in slotted eye, to inject two component dilatancy high polymer grouting materials by Grouting Pipe.After high polymer grouting material generation chemical reaction, volume expands rapidly, slotted eye is filled to expire and solidify form afterwards high polymer sheet.The inventor is through a large amount of field trials, find the formation of high polymer grouting curtain, if directly fill from top to bottom slotted eye by high polymer material self-expansion or artificial hoisting grouting conduit makes high polymer material fill slotted eye from top to bottom, there is sometimes Density inhomogeneity or because slotted eye can not be filled completely, so that can not form the phenomenon of complete continuous high polymer antiseepage body in the high polymer curtain forming.Therefore, how building continuous, even, regular high polymer antiseepage body, is the key that improves high polymer seepage control technique anti-seepage effect.
Summary of the invention
The object of the invention is for the deficiencies in the prior art, a kind of high polymer hoisting grouting method is provided, the speed that can regulate conduit to promote according to the slotted eye volume size that becomes frid to build, and in conjunction with high polymer self expansion force, can make slotted eye can be completely filled and form continuous, even, regular high polymer antiseepage body, thereby reach the object that strengthens high polymer grouting technology anti-seepage effect.
For achieving the above object, the present invention adopts following technical scheme: a kind of high polymer hoisting grouting method, is comprised of following step:
(1), within needing the dam body and ground of anti-seepage reinforcing, by design arrangement slotted eye, use the continuous grouting slot of grooving equipment construction;
(2) in grouting slot, insert high polymer grouting conduit, high polymer hoisting grouting control equipment is placed into the slotted eye top of grouting pipe;
(3) grouting pipe is placed in high polymer hoisting grouting control equipment to A/C;
(4) by grouting pipe, in slotted eye, inject high polymer material, open high polymer hoisting grouting control equipment simultaneously, grouting pipe upwards promotes by setting speed;
(5) when grouting pipe rises to requirement height, close high polymer hoisting grouting control equipment power supply, remove grouting pipe, promote operation and complete.
Described high polymer hoisting grouting control equipment, comprise frame, the first reductor is housed in frame, motor is connected with the first reductor, in frame, also have final drive shaft and time power transmission shaft, final drive shaft is connected with the first reductor, inferior power transmission shaft is connected with final drive shaft by driving chain, in frame, also have left panel and right panel, on final drive shaft and time power transmission shaft, two driving bevel gears are respectively housed, two passive bevel gears that mesh with driving bevel gear are respectively housed in left panel and right panel, and two passive bevel gears that are connected with right panel are embedded in respectively two and right panel bearing connected vertically inner side, two driving bevel gears that are meshed with two passive bevel gears that are connected with right panel and final drive shaft, between inferior power transmission shaft, all by spline, be connected with key nail, spline is positioned at this two driving bevel gear inner sides, key nail is embedded on final drive shaft and time power transmission shaft, the other end of each passive angular wheel shaft is respectively equipped with a concave gear, the second reductor is also housed in frame, capstan handle is connected with the second reductor, right panel is connected with the second reductor by separated screw mandrel, handrail is also housed in frame.
Described high polymer hoisting grouting control equipment also comprises controls case, controls case and is connected with motor, controls voltmeter, ammeter, frequency converter, master switch are housed in case.
The present invention have the high polymer curtain of convenient and quick construction, formation or body of wall evenly rule, slotted eye can be completely by advantages such as high polymer material fillings, for high polymer grouting technology provides supporting technology and technique, and be successfully applied to multinomial reservoir dam and dyke reinforcement engineering, demonstrate huge economical, societal benefits and wide development and application prospect.
Accompanying drawing explanation
Fig. 1 is the structural representation of high polymer hoisting grouting control equipment.
Fig. 2 is that the A-A of Fig. 1 is to view.
The specific embodiment
, by following step, formed:
(1), within needing the dam body and ground of anti-seepage reinforcing, by design arrangement slotted eye, use the continuous grouting slot of grooving equipment construction;
(2) in grouting slot, insert high polymer grouting conduit, high polymer hoisting grouting control equipment is placed into the slotted eye top of grouting pipe;
(3) grouting pipe is placed in high polymer hoisting grouting control equipment to A/C;
(4) by grouting pipe, in slotted eye, inject high polymer material, open high polymer hoisting grouting control equipment simultaneously, grouting pipe upwards promotes by setting speed;
(5) when grouting pipe rises to requirement height, close high polymer hoisting grouting control equipment power supply, remove grouting pipe, promote operation and complete.In conduit lifting process, after high polymer material generation chemical reaction, volume expands rapidly, and high polymer material is uniform filling in slotted eye, forms continuous, even, regular high polymer curtain or body of wall.
Its structure of aforesaid high polymer hoisting grouting control equipment is as Fig. 1, shown in Fig. 2, comprise frame, the first reductor 3 is housed in frame, motor 1 is connected with the first reductor 3, in frame, also have final drive shaft 7 and time power transmission shaft 8, final drive shaft 7 is connected with the first reductor 3, inferior power transmission shaft 8 is connected with final drive shaft 7 by driving chain 4, in frame, also have left panel 5 and right panel 6, on final drive shaft 7 and time power transmission shaft 8, two driving bevel gears 12 are respectively housed, two passive bevel gears 14 that mesh with driving bevel gear are respectively housed in left panel and right panel, the other end of each passive angular wheel shaft is respectively equipped with a concave gear 13, the second reductor 10 is also housed in frame, capstan handle 9 is connected with the second reductor 10, right panel 6 is connected with the second reductor 10 by separated screw mandrel 11, handrail 2 is also housed in frame.Two passive bevel gears that are connected with right panel are embedded in respectively two bearing inner sides with right panel vertical welding, two driving bevel gears that are meshed with two passive bevel gears that are connected with right panel and final drive shaft, between inferior power transmission shaft, all by spline, be connected with key nail, spline is positioned at this two driving bevel gear inner sides, key nail is embedded on final drive shaft and time power transmission shaft, can move left and right right panel by separated screw mandrel 11 like this, by final drive shaft 7 and time power transmission shaft 8, drive driving bevel gear, bearing plays two relatively-stationary effects of driving bevel gear of 6 in right panel 6 and right panel.
Also comprise and control case, control case and be connected with motor, control voltmeter, ammeter, frequency converter and master switch are housed in case.Controlling case is mainly to control the closed and disconnected that equipment starts power supply.
The first reductor coordinates with frequency converter, and major function is to regulate equipment to obtain rational grouting pipe hoisting velocity.The first reductor can adopt 90 type worm reduction gears.
Capstan handle coordinates with the second reductor, by separated screw mandrel, drive right panel to move, make left panel separated with right panel, grouting pipe is inserted between two concave gears and is fixed grouting pipe, by two different concave gears of rotation direction, carrys out hoisting grouting conduit.The second reductor can adopt 25 type worm reduction gears.
The course of work of high polymer hoisting grouting control equipment is:
(1) high polymer hoisting grouting control equipment is placed into the casement top of inserting grouting pipe;
(2) rotate capstan handle, by left and right panel separately;
(3) regulate equipment position, grouting pipe is placed between two the concave gears in left and right, and at grade;
(4) again rotate capstan handle, by grouting pipe fixation;
(5) connect 220v AC power, open and control case, grouting pipe hoisting velocity is set;
(6) open equipment switch, equipment is started working, and conduit promotes operation to start;
(7) when grouting pipe rises to requirement height, close equipment power supply, rotate capstan handle, by left and right panel separately, remove grouting pipe, promote operation and complete.

Claims (2)

1. a high polymer hoisting grouting method, is characterized in that being comprised of following step:
(1), within needing the dam body and ground of anti-seepage reinforcing, by design arrangement slotted eye, use the continuous grouting slot of grooving equipment construction;
(2) in grouting slot, insert high polymer grouting conduit, high polymer hoisting grouting control equipment is placed into the slotted eye top of grouting pipe;
(3) grouting pipe is placed in high polymer hoisting grouting control equipment to A/C;
(4) by grouting pipe, in slotted eye, inject high polymer material, open high polymer hoisting grouting control equipment simultaneously, grouting pipe upwards promotes by setting speed, described high polymer hoisting grouting control equipment, comprise frame, the first reductor is housed in frame, motor is connected with the first reductor, in frame, also have final drive shaft and time power transmission shaft, final drive shaft is connected with the first reductor, inferior power transmission shaft is connected with final drive shaft by driving chain, in frame, also have left panel and right panel, on final drive shaft and time power transmission shaft, two driving bevel gears are respectively housed, two passive bevel gears that mesh with driving bevel gear are respectively housed in left panel and right panel, and two passive bevel gears that are connected with right panel are embedded in respectively two and right panel bearing connected vertically inner side, two driving bevel gears that are meshed with two passive bevel gears that are connected with right panel and final drive shaft, between inferior power transmission shaft, all by spline, be connected with key nail, spline is positioned at this two driving bevel gear inner sides, key nail is embedded on final drive shaft and time power transmission shaft, the other end of each passive angular wheel shaft is respectively equipped with a concave gear, the second reductor is also housed in frame, capstan handle is connected with the second reductor, right panel is connected with the second reductor by separated screw mandrel, handrail is also housed in frame, the first reductor coordinates with frequency converter, and major function is to regulate equipment to obtain rational grouting pipe hoisting velocity, capstan handle coordinates with the second reductor, by separated screw mandrel, drive right panel to move, make left panel separated with right panel, grouting pipe is inserted between two concave gears and is fixed grouting pipe, by two different concave gears of rotation direction, carrys out hoisting grouting conduit,
(5) when grouting pipe rises to requirement height, close high polymer hoisting grouting control equipment power supply, remove grouting pipe, promote operation and complete.
2. high polymer hoisting grouting method as claimed in claim 1, is characterized in that: described high polymer hoisting grouting control equipment also comprises controls case, controls case and is connected with motor, controls voltmeter, ammeter, frequency converter, master switch are housed in case.
CN201110288194.6A 2011-09-26 2011-09-26 High polymer hoisting grouting method Active CN102418342B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110288194.6A CN102418342B (en) 2011-09-26 2011-09-26 High polymer hoisting grouting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110288194.6A CN102418342B (en) 2011-09-26 2011-09-26 High polymer hoisting grouting method

Publications (2)

Publication Number Publication Date
CN102418342A CN102418342A (en) 2012-04-18
CN102418342B true CN102418342B (en) 2014-01-29

Family

ID=45942971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110288194.6A Active CN102418342B (en) 2011-09-26 2011-09-26 High polymer hoisting grouting method

Country Status (1)

Country Link
CN (1) CN102418342B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103215863B (en) * 2013-04-11 2015-07-01 郑州安源工程技术有限公司 High polymer grouting method for lifting ballastless track of high speed railway
CN103233468A (en) * 2013-04-18 2013-08-07 河南博特工程防护有限公司 Polymer gravel pile grouting method
CN104234057A (en) * 2013-10-22 2014-12-24 王磊 Polymer grouting curtain and prestressed pipe pile combined foundation pit supporting structure
CN111749198B (en) * 2020-05-30 2022-11-25 郑州安源工程技术有限公司 Channel slab underwater grouting stabilizing and lifting method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4496268A (en) * 1983-03-01 1985-01-29 Finic, B.V. Method and apparatus for constructing reinforced concrete walls in the earth
JPH10331149A (en) * 1997-05-30 1998-12-15 Toda Constr Co Ltd Improving method for poor clayey soil
CN101660309B (en) * 2009-08-07 2011-06-08 赵延龙 Construction method of multi-drill high-pressure jet agitation based anti-seepage reinforcing equipment
CN102051869B (en) * 2009-11-02 2012-05-09 郑州优特基础工程维修有限公司 High polymer heavy curtain grouting technology
CN101736719B (en) * 2010-01-22 2011-03-16 中国水电顾问集团华东勘测设计研究院 Construction method for dam body seepage preventing curtain grouting

Also Published As

Publication number Publication date
CN102418342A (en) 2012-04-18

Similar Documents

Publication Publication Date Title
US9080300B2 (en) Polymer grouting method for constructing ultra-thin anti-seepage wall
CN101250868B (en) Precipitation prepressing association motive power induration deep densification method
US20140314497A1 (en) Polymer grouting method for constructing gravel pile
CN105019422B (en) Topsoil is cured in situ the foundation construction method that carrying is combined with stake
CN102444128B (en) Grouting method for ultrathin high polymer cutoff wall
CN106077074B (en) A kind of in-situ remediation method of deep layer heavy-metal contaminated soil
CN106734178A (en) Comprehensive restoration system and method for polluted site
CN103215960A (en) Grouting method for high polymer vertical support system
CN105839622B (en) Soft soil foundation reinforcing method based on flying dust, flying dust stake and foundation stabilization pipe casing
CN105019425B (en) A kind of construction method of displacement hull and cured layer combined foundation structure
CN102418342B (en) High polymer hoisting grouting method
CN201485823U (en) Anti-seepage structure of hydraulic asphalt concrete panel
CN103233473A (en) Polymer multi-edge pile grouting method
WO2019214701A1 (en) Modular soil pressure applying and molding device and soft soil foundation treatment method
CN102425199B (en) Tri-cone-head pressing grooving plate and grouting slot construction method
CN102418343B (en) High polymer hoisting grouting control equipment
CN205714282U (en) Waterproof/drainage structure at the bottom of a kind of soft stratum tunnel
CN105363759B (en) Flexible landfill yard rigidity landfill stabilization device and burying method
CN103993609B (en) The multi-functional fast hard concrement manual repair foundation pit waterproof curtain of silicon ash sand guide drainage
CN206157726U (en) Composite pile type structure suitable for coast deep dredger fill soil foundation handle
CN207013441U (en) Comprehensive restoration system for polluted site
CN204252140U (en) A kind of expansiveness device for casting
CN203741855U (en) Foundation pit waterproof curtain capable of being repaired manually and with multifunctional coagulation body with quickly hardening silica fume layer and integrating water guiding, discharging and filtering functions
CN203768927U (en) Flexible underground impervious curtain structure
CN208578002U (en) Composite structure of banketing is changed in a kind of control heightening and thickening dike relative settlement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NANTONG ANYUAN ENGINEERING TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: ZHENGZHOU YOUTE FOUNDATION ENGINEERING MAINTENANCE CO., LTD.

Effective date: 20150226

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 450016 ZHENGZHOU, HENAN PROVINCE TO: 226009 NANTONG, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150226

Address after: Room 330-D No. 188 A Avenue Nantong michimori Business Outsourcing Development Zone of Jiangsu province 226009

Patentee after: Nantong Anyuan Engineering Technology Co.,Ltd.

Address before: 450016 A6 villa Green, 1369 East Road, Zhengzhou economic and Technological Development Zone, Henan, China

Patentee before: Zhengzhou Youte Foundation Engineering Maintenance Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201016

Address after: 450000 floor 15, workshop 58, Second Avenue, economic and Technological Development Zone, Zhengzhou City, Henan Province

Patentee after: Zhengzhou Weilin Engineering Technology Co.,Ltd.

Address before: Room 330-D No. 188 A Avenue Nantong michimori Business Outsourcing Development Zone of Jiangsu province 226009

Patentee before: Nantong Anyuan Engineering Technology Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20231019

Address after: 450000 Henan Zhengzhou economic and technological development zone passes through eight North two North Road and four port linkage West Avenue.

Patentee after: SAFEKEY Engineering Technology(Zhengzhou), Ltd.

Address before: 450000 15 / F, No.58 Second Street, Zhengzhou Economic and Technological Development Zone, Henan Province

Patentee before: Zhengzhou Weilin Engineering Technology Co.,Ltd.

TR01 Transfer of patent right