CN105019422B - Topsoil is cured in situ the foundation construction method that carrying is combined with stake - Google Patents

Topsoil is cured in situ the foundation construction method that carrying is combined with stake Download PDF

Info

Publication number
CN105019422B
CN105019422B CN201510302548.6A CN201510302548A CN105019422B CN 105019422 B CN105019422 B CN 105019422B CN 201510302548 A CN201510302548 A CN 201510302548A CN 105019422 B CN105019422 B CN 105019422B
Authority
CN
China
Prior art keywords
pile
situ
cured
layer
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510302548.6A
Other languages
Chinese (zh)
Other versions
CN105019422A (en
Inventor
陈永辉
王颖
李斌
陈建荣
王新泉
陈海峰
季小英
曹洪
张正刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Techeng Foundation Engineering Technology Co ltd
Shaoxing Traffic Investment Group Co ltd
Hohai University HHU
Zhejiang Shuzhijiaoyuan Technology Co Ltd
Hangzhou City University
Original Assignee
Hangzhou Techeng Foundation Engineering Co Ltd
Shaoxing Traffic Investment Group Co Ltd
ZHEJIANG PROVINCIAL KEWE ENGINEERING CONSULTING Co Ltd
Hohai University HHU
Zhejiang University City College ZUCC
Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Techeng Foundation Engineering Co Ltd, Shaoxing Traffic Investment Group Co Ltd, ZHEJIANG PROVINCIAL KEWE ENGINEERING CONSULTING Co Ltd, Hohai University HHU, Zhejiang University City College ZUCC, Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd filed Critical Hangzhou Techeng Foundation Engineering Co Ltd
Priority to CN201510302548.6A priority Critical patent/CN105019422B/en
Publication of CN105019422A publication Critical patent/CN105019422A/en
Application granted granted Critical
Publication of CN105019422B publication Critical patent/CN105019422B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The foundation construction method that carrying is combined with stake, including step are cured in situ this application discloses a kind of topsoil:Cured skin soil;Pile foundation construction;Pile foundation hole is backfilled with not pre-hardening solidified earth, cement mortar or plain concrete;The application is also disclosed another topsoil and is cured in situ the foundation construction method for combining carrying with stake, and construction procedure is first to carry out pile foundation construction resolidification topsoil.Setting work and can intersecting progress for the generation of cured layer and mixing pile, complements each other, is not necessarily to secondary basement process, construction efficiency is high, lower than traditional mixing pile comparative cost.

Description

Topsoil is cured in situ the foundation construction method that carrying is combined with stake
Technical field
This application involves a kind of method for processing foundation, in particular to a kind of topsoil is cured in situ the ground that carrying is combined with stake Base processing method is suitable for processing weak soil, ultra-soft soil deep soft foundation engineering.
Technical background
With the fast development of the engineering constructions such as coastal port, industrial building, highway communication, especially some engineerings need to be built It makes containing Deep Thick Soft Ground Area, weak soil is characterized in an important factor for influencing its compressive deformation in the high porosity in microstructure, Lead to that weak soil compressibility is big, shearing strength is low and poor permeability, so need to reinforce to Deep Thick Soft Ground.
Currently, being divided into draining concretion method and composite foundation method to the reinforcement means of deep soft foundation.Discharging consolidation method side Method is required to the long duration, and intensity raising has certain restriction.Relatively tightly and foundation bearing capacity is wanted for the duration Relatively high area is asked generally to use the processing mode of vertical composite foundation.When vertical composite foundation progress pile foundation is set, ground Surface should reach the bearing capacity that pile foundation is set.So topsoil water content is big when encountering, when the high silt soil of compressibility, the above place Reason method cannot construct in process face.Currently used processing mode is that shallow-layer discharging consolidation and composite foundation combination are answered Method for processing foundation, when shallow-layer vacuum preloading processing, need to spread a layer of clay work grid, geotextiles, manually carry out inserting modeling on it Plate-laying only handles 4m or so, carries out the vacuum preloading of no bed course later, such method generally requires the 3-4 month, foundation bearing capacity 50kPa-55kPa is commonly reached, it is even lower.In order to meet the bearing capacity that pile foundation is set, generally need to also in process face sanding Stone bed course then carries out the construction of composite foundation.
Meanwhile above method is both needed to using bed course during processing soft soil, bed course plays diffusion-induced stress and coordinates stake soil The effect of deformation.Currently used sand-gravel cushion belongs to discrete material, does not have cohesive strength between particle and particle, causes in ground When processing, deforms inconsistent between stake soil, lead to differential settlement, prevent differential settlement in light fill road, need Densely covered pile increases engineering cost.And sand-gravel cushion generally uses the materials such as sand, stone, in recent years, due to largely opening for mountain stone It adopts, causes the in short supply of resource, material cost is high;The natural calamity of landslide, mud-rock flow etc. is caused simultaneously.And the fortune of material Defeated cost is also higher, to cause the cost of such processing method higher.It also will cause waste in transportational process, it also can be on the way Environment causes different degrees of pollution.
In consideration of it, currently in order to the engineering of solution deep soft foundation, needs to apply for a kind of sand pad that can be replaced in conventional method The method for processing foundation that layer is combined with stake can not only meet ground requirement for bearing capacity and guarantee ground uniform settlement but also rapid construction, Save the novel foundation processing method of sand and stone resources.
Apply for content
A kind of topsoil of being designed to provide of the application is cured in situ the foundation construction method that carrying is combined with stake, to mention The bearing capacity of high soft soil foundation reduces basement process expense, guarantees the uniform settlement of ground.
In order to achieve the above technical purposes, the application uses following technical scheme:
A kind of topsoil is cured in situ the foundation construction method that carrying is combined with stake, includes the following steps:
Step 1, cured skin soil;Native surface layer is carried out curing materials and in-situ soil on the spot using curing apparatus in situ Solid stirring solidification, is allowed to form cured layer, and the intensity of cured layer is 60-1000kPa;
Step 2, pile foundation construction;When the bearing capacity of cured layer meet pile foundation construction equipment and personnel enter safely want When asking, pile foundation is carried out on the cured layer sets construction;
When the intensity of cured layer is more than 1000kPa, when so that pile foundation can not be set, pilot hole should be first carried out near pile foundation And local excavation, after being set to pile foundation because caused by pilot hole and local excavation hole carry out curing process again;
Step 3, backfill or stirring;After pile foundation is set, use not pre-hardening solidified earth, cement mortar or plain concrete To stayed in because setting pile foundation the hole on cured layer carry out backfill or to within the scope of 0.2-1 times of Pile Diameter by broken Bad cured layer is stirred solidification again, it is made to be connected to become entirety with not destroyed cured layer.
Cured layer with a thickness of 0.5-3.0m in the step 1.
The mode that cured layer is formed in the step 1 is that in-situ soil, machinery is stirred up and down vertically using equipment is cured in situ It mixes solidification or rear resolidification is turned over using layering stirring pine.
The step 2 pile foundation is one or any two kinds of the combination of flexible pile or rigid pile, and wherein rigid pile is Prefabricated pile, in situ concrete pile or plastic sleeve concrete pile, before setting rigid pile, first with steel plate or prefabricated components by stake Top seals up;During setting rigid pile, there are the gaps of 5-20cm with cured layer bottom for pile foundation upper end, then with concrete or Pre-hardening solidified earth back-filling in layers does not stay in the hole on cured layer because setting pile foundation.
The step 2 pile foundation is one or any two kinds of the combination of flexible pile or rigid pile, and wherein flexible pile is Cement mixing pile or other cement earth piles during setting flexible pile, are in flexible pile upper end in cured layer, make pile body and consolidate Change layer to be completely embedded, and pile foundation top is higher by cured layer bottom 5-30cm;Continue to carry out again upper earthing with mixing plant later Secondary curing process, and expand the range of stirring.
When being backfilled in the step 3 with not pre-hardening solidified earth, using the method for being layered the compacting that paves, formation is fallen Trapezium structure.
A kind of topsoil is cured in situ the foundation construction method that carrying is combined with stake, includes the following steps:
Step A, pile foundation construction, when the bearing capacity of in-situ soil meets the requirement of pile foundation construction equipment and personnel entered safely When, pile foundation is carried out in the in-situ soil sets construction;
Step B, cured skin soil first use curing apparatus to carry out curing materials and soil layer in situ on the spot on weak soil surface layer Solid stirring solidification, is allowed to form cured layer.
The mode that cured layer is formed in the step B is that soil layer in situ, machinery is stirred up and down vertically using equipment is cured in situ It mixes solidification or rear resolidification is turned over using layering stirring pine.
The step A pile foundation is one or any two kinds of the combination of flexible pile or rigid pile, and wherein flexible pile is Cement mixing pile or other cement earth piles, rigid pile are prefabricated pile, in situ concrete pile or plastic sleeve concrete pile, are set just Property stake before stake top is sealed with steel plate or prefabricated components.
The application has the following advantages that by adopting the above technical scheme:
(1)Topsoil be cured in situ can use curing apparatus injection curing agent and topsoil once stirred at design thickness Completion is mixed, while replacing the sand bedding course in conventional procedure, project cost is reduced, economizes on resources, while playing holding for different pile foundations Load feature.
(2)It is that soil body curing agent is chemically reacted with native Minerals that topsoil, which is cured in situ the cured layer formed after processing, The plate body of formation has certain cohesiveness, can give full play to the characteristic of inter-pile soil, and load-carrying properties improve.
(3)Topsoil, which is cured in situ the cured layer to be formed, can satisfy artificial and mechanical equipment bearing capacity, apply to be subsequent The development of work provides job platform.
(4)Setting work and can intersecting progress for the generation of cured layer and mixing pile, complements each other, without at secondary ground Reason, construction efficiency is high, lower than traditional mixing pile comparative cost.
Detailed description of the invention
Fig. 1 shows that topsoil is cured in situ the foundation structure that carrying is combined with stake;
Fig. 2 is that topsoil is cured in situ the work progress that the foundation structure of carrying is combined with stake;
Fig. 2-a is the work progress that topsoil is cured in situ;
Fig. 2-b is the process of the construction stake on cured layer;
Fig. 2-c is that topsoil is cured in situ the schematic diagram that the foundation structure construction completion of carrying is combined with stake;
Fig. 3 is the connection for stirring stake top and cured layer;
Fig. 4 is the connection of prefabricated pile or plastic sleeve concrete pile stake top and cured layer;
Fig. 5 is the overall structure of mixing plant;
Fig. 6 is the overall structure of blade mechanisms;
Main mark is described as follows in attached drawing:1- curing process region;2- cured layer;3- in-situ soil;4- pile foundation;5- holding force Layer;6- curing apparatus;7- curing agent automatic ration feeder apparatus;8- conveying pipeline;9- stirring-head;10- pile body construction machinery;11- Set equipment;12- filling soil.
Specific embodiment
The mode for forming cured layer 2 is determining according to the intensity of soil layer 3 in situ, can benefit when 3 intensity of soil layer in situ is lower With 6 pairs of the curing apparatus vertical mechanical stirring curing process up and down of soil layer 3 in situ;When curing apparatus 6 can not directly handle in-situ soil 9 mechanical stirring pine of stirring-head can be used when layer 3 and turn over multi-shell curing.
If shallow-layer be cured as piling machinery smooth construction provide job platform, curing depth can be controlled in 0.5 ~ 3.0m it Between, can satisfy the requirement for bearing capacity of mechanical equipment, solidify soil layer 2 without lateral confinement strength control in 60 ~ 1000kPa or so Meet the requirement that pile foundation is set.
In the sequence of construction of the application, can be constructed pile foundation 4 again using first construction and solidification layer 2, can also be used and first be constructed The mode of the construction and solidification layer 2 again of pile foundation 4, embodiment 1-3 are that first construction and solidification layer 2 is constructed the construction method of pile foundation 4 again, embodiment 4 for first construction pile foundation 4 construction and solidification layer 2 again construction method.
Embodiment 1
When pile foundation 4 is cement mixing pile, the method for processing foundation is:
As shown in Fig. 2, soil layer 3 in situ is carried out smooth location, and curing process region 1 is carried out in soil layer 3 in situ It divides, solidification construction equipment 6 is driven into predeterminated position, by curing agent automatic ration feeding system 7 and conveying pipeline 8, solidification Material is transported to the stirring-head 9 solidified in construction equipment 6, and the cured layer 2 of 2.0m thickness is formed in curing process region 1.? The cured layer 2 of completion can carry out the construction of cement mixing pile above, and cured layer intensity should control between 60kPa-1000kPa, Stake spacing is 3.1m, and processing depth is 20m.
When 2 intensity of cured layer is higher, pile foundation 4 be can not be successfully when squeezing into, and be can be used and is first carried out pilot hole and mechanical local excavation It sets pile foundation 4 smoothly, curing process is carried out to upper earthing body with mixing plant again later.
When being cured in situ processing and cement mixing pile is set when cannot carry out simultaneously, cured layer intensity is higher at this time, pile foundation 4 Cannot smoothly set, the topsoil in 4 position range of pile foundation can be used without solidification, pile body set after again to this part Carry out curing process.
It is shorter when the duration, when needing to carry out the construction of pile foundation 4 immediately, to meet rapidly entering for machinery, shallow-layer can be increased Curing depth, or early strength agent or retarder are added on the basis of conventional solidified dose simultaneously.
As shown in Fig. 2, first using curing apparatus that curing materials and soil layer progress in situ are disposable on the spot on weak soil surface layer Solid stirring solidification, is allowed to form cured layer.By pile body construction machinery 10 and mixing plant 11, in hardened cured layer By stirring material by automatic ration feeding system 7 on 2, stirring material and soil layer 3 in situ are stirred shape on the position of design At cement mixing pile, cement mixing pile, which is stirred to the above 5-30cm in 2 design thickness bottom of cured layer, to be stopped, again with mixing plant later Secondary to be again stirring for above covering solidified earth, when stirring, expands stirring range, as shown in figure 3, in order to cured good with other Soil coheres Cheng Yiti, avoids damage to, and is stirred using step.Original position as shown in Figure 1 is ultimately formed to be cured in situ and cement The foundation structure of mixing pile combination carrying.
Embodiment 2
When pile foundation 4 is prefabricated pile, foundation construction method:
Such as Fig. 2, soil layer 3 in situ is subjected to smooth location, and curing process region 1 is divided in soil layer 3 in situ, Drive solidification construction equipment 6 into predeterminated position, it is by curing agent automatic ration feeding system 7 and conveying pipeline 8, curing materials are defeated It is sent to the stirring-head 9 solidified in construction equipment 6, forms the cured layer 2 of 1.7m thickness in curing process region 1.Then, complete At cured layer 2 can carry out the construction of prefabricated pile above, cured layer intensity should control between 60kPa-1000kPa, stake spacing For 3.0m, processing depth is that 20m consolidates as shown in Fig. 2, by pile body construction machinery 10 and setting equipment 11 in hardened The pile foundation for changing progress end part seal on layer 2 is set, and is carried out using steel plate or prefabricated components to the cavity of prefabricated pile before setting Sealing, so as not on cover sealing material and enter inside prefabricated pile.Prefabricated pile is set to 5cm-20cm below 2 design thickness bottom of cured layer Stop, being carried out being backfilled to the design of cured layer 2 bottom later with filling soil 12, expand when being backfilled with filling soil 12 and backfill range(Such as Fig. 4), it is preferable that filling soil 12 is not pre-hardening solidified earth, cement mortar or plain concrete, is ultimately formed as shown in Figure 1 Original position is cured in situ the foundation structure that carrying is combined with prefabricated pile.
Embodiment 3
When pile foundation 4 is plastic sleeve concrete pile, foundation construction method:
As shown in Fig. 2,2-a, 2-b, 2-c, by soil layer 3 in situ carry out smooth location, and in situ in soil layer 3 to solidification at Reason region 1 is divided, and is driven solidification construction equipment 6 into predeterminated position, is passed through curing agent automatic ration feeding system 7 and conveying Pipe 8 is transported to curing materials the stirring-head 9 solidified in construction equipment 6, and consolidating for 2.0m thickness is formed in curing process region 1 Change layer 2.Then, can carry out the construction of plastic bushing on completed cured layer 2, construct plastic bushing when, need to design Length top adds a segment elongation pipe, and the length of extension tubing should be greater than cured thickness.
As shown in Fig. 2, according to design length, such as 20m by pile body construction machinery 10 and sets equipment 11, firmly Plastic bushing construction is carried out on the cured layer 2 of change, is poured later with concrete, is poured to solidification design thickness bottom 10cm-15cm, extension tubing is pulled out in stopping, after concrete setting, being backfilled to not pre-hardening solidified earth or plain concrete Cured layer designs bottom, and when use not pre-hardening solidified earth back-filling in layers expands backfill range(Such as Fig. 4), ultimately form such as Fig. 1 Shown in be cured in situ in situ with plastic sleeve concrete pile close carrying foundation structure.
Embodiment 4
This embodiment is the sequence of construction of construction and solidification layer 2 after first constructing pile foundation 4, and the pile foundation 4 is also flexible pile or rigid Property stake one or any two kinds of combination, wherein flexible pile be cement mixing pile or other cement earth piles, rigid pile is pre- Stake, in situ concrete pile or plastic sleeve concrete pile processed.
When pile foundation 4 is prefabricated pile, foundation construction method:
Step A, the construction of pile foundation 4, when the safety that the bearing capacity of soil layer 3 in situ meets pile foundation construction equipment and personnel enters Requirement when, carry out pile foundation 4 on the original position soil layer 3 and set construction;
Certain foundation bearing capacity is needed because construction of prefabricated piles equipment is set, if the bearing capacity of soil layer 3 in situ meets stake When the requirement of base construction equipment and personnel entered safely, stake machine is positioned, is then set, the process of piling ensures Stake is sent under the bottom surface absolute altitude of cured layer at 5-20cm, enhance process control and record, inspection by the verticality of stake using Pile feeder Pile length, verticality and stake top absolute altitude.
Step B, cured skin soil, the use of 3 surface of soil layer is cured in situ equipment and carries out on vertical to soil layer 3 in situ in situ Lower mechanical stirring, which solidifies or the stirring-head of curing apparatus 6 is used to carry out layering stirring pine, turns over rear resolidification, is allowed to form cured layer 2。
As shown in figure 5, a kind of mixing plant, including mixing arm, mixing arm two sides of the bottom have intilted two inclined-plane, At least one mixing roller bearing is respectively arranged on each inclined-plane, mixing roller bearing is driven by driving equipment to be rotated, and mixing roller bearing is in Frustroconical;Blade mechanisms are distributed on the mixing roller bearing;The curing agent of extension type is installed inside the mixing arm Conveying pipeline.
Preferably, the end of the curing agent conveying pipeline is provided with spraying device.When mixing plant processing surface location is adopted When with curing agent being pulvis, in order to avoid environmental pollution, in due course beginning spraying device.Spraying device in use, will not with it is solid Agent occurs chemical reaction liquid and is added in spraying device, and the content of the liquid is usually 4-8% of solid or so.
Mixing roller bearing is designed to that in frustroconical be to reduce the frictional resistance in whipping process between the soil body.Solidification Agent conveying pipeline is designed to extension type, the pollution of curing agent when can reduce surface stirring.
Preferably, blade mechanisms are distributed on mixing roller bearing in one-way spiral type, and mixing roller bearing rotation rotates model after a week The soil body in enclosing can be contacted and be disturbed, and can continuously be stirred without blind spot solid, and the uniformity of mixture after stirring, and one are improved Secondary property processing depth reaches 3m.
As shown in fig. 6, the blade mechanisms include the fixed plate being set on mixing roller bearing and are set in fixed plate Two orthogonal blades one and blade two.Blade was second is that in order to destroy ground soil structure, blade one was used for stirring Cheng Zhong cuts in-situ soil using blade two, is carried out later using blade one and mixing roller bearing to the in-situ soil of destroyed Stirring, helically type is distributed on mixing roller bearing blade mechanisms, may be implemented to stir soil body solid.
Before being cured in situ, stake top need to be closed using steel plate or concrete(Purpose is that the top soil body is not allowed to fall into Among tubular pole).Later according to design thickness, curing process is carried out using curing apparatus 6(It should be noted:There is portion existing for tubular pole Position, when being constructed using strong mixer, to avoid the Mixing Machine of curing apparatus from influencing tubular pole, stirring can when solidifying Suitably with a distance from 5-20cm at the top of tubular pole or so, after reaching design thickness, precompressed maintenance is carried out.
The application can also be used in combination with geosynthetics, TGXG and geotextiles etc..
Above-mentioned specific embodiment does not limit the technical solution of the application in any form, all to use equivalent replacement or wait The mode technical solution obtained of effect transformation all falls within the protection scope of the application.

Claims (1)

1. a kind of topsoil is cured in situ the foundation construction method for combining carrying with stake, which is characterized in that include the following steps:
Step 1, cured skin soil;Soil layer in situ is subjected to smooth location, and curing process region is carried out in soil layer in situ It divides, solidification construction equipment is driven into predeterminated position, by curing agent automatic ration feeding system and conveying pipeline, curing materials It is transported in solidification construction equipment, when soil layer intensity in situ is lower, using curing apparatus, to soil layer in situ, machinery is stirred up and down vertically Mix curing process;Multi-shell curing is turned over using stirring-head mechanical stirring pine when curing apparatus directly can not handle soil layer in situ, In-situ soil surface layer is formed with a thickness of 0.5-3.0m, and intensity is the cured layer of 60-1000kPa;
Step 2, pile foundation construction;When the bearing capacity of cured layer meets the requirement of pile foundation construction equipment and personnel entered safely, Pile foundation is carried out on the cured layer sets construction;
When pile foundation is rigid pile, which is prefabricated pile, in situ concrete pile or plastic sleeve concrete pile, sets rigidity Before stake, first stake top is sealed up with steel plate or prefabricated components;During setting rigid pile, pile foundation upper end and cured layer bottom There are the gaps of 5-20cm, are carried out being backfilled to cured layer design bottom later with filling soil, expand when with filling earthen backfill and backfill Range forms step and backfills structure;
When pile foundation is flexible pile, which is cement mixing pile, during setting flexible pile, flexible pile upper end is made to be in solid Change in layer, is completely embedded pile body with cured layer, and pile foundation top is higher by cured layer bottom 5-30cm, again with mixing plant later Secondary to be again stirring for above covering solidified earth, when stirring, expands stirring range, forms step stirring;
When the intensity of cured layer is more than 1000kPa, when so that pile foundation can not be set, pilot hole drawn game should be first carried out near pile foundation Portion is excavated, after being set to pile foundation because caused by pilot hole and local excavation hole carry out curing process again;
Step 3, backfill or stirring;After pile foundation is set, use not pre-hardening solidified earth, cement mortar or plain concrete to because It sets pile foundation and stays in the hole on cured layer and carry out backfill or to be destroyed within the scope of 0.2-1 times of Pile Diameter Cured layer is stirred solidification again, it is made to be connected to become entirety with not destroyed cured layer.
CN201510302548.6A 2015-06-04 2015-06-04 Topsoil is cured in situ the foundation construction method that carrying is combined with stake Active CN105019422B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510302548.6A CN105019422B (en) 2015-06-04 2015-06-04 Topsoil is cured in situ the foundation construction method that carrying is combined with stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510302548.6A CN105019422B (en) 2015-06-04 2015-06-04 Topsoil is cured in situ the foundation construction method that carrying is combined with stake

Publications (2)

Publication Number Publication Date
CN105019422A CN105019422A (en) 2015-11-04
CN105019422B true CN105019422B (en) 2018-11-16

Family

ID=54409694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510302548.6A Active CN105019422B (en) 2015-06-04 2015-06-04 Topsoil is cured in situ the foundation construction method that carrying is combined with stake

Country Status (1)

Country Link
CN (1) CN105019422B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108049398A (en) * 2017-12-05 2018-05-18 中交第四公路工程局有限公司 Bridge location is in the pile base construction method in mud area
CN110835908A (en) * 2018-08-16 2020-02-25 云南华坤装配式建筑有限公司 Soft soil curing composite foundation treatment technology for assembled thin-wall light steel structure
CN110835923A (en) * 2018-08-16 2020-02-25 云南华坤装配式建筑有限公司 Fabricated thin-wall light steel structure steel pile raft plate solidified soil composite foundation technology
CN109826221A (en) * 2019-03-27 2019-05-31 华北水利水电大学 A kind of large bridge pile base construction method that pile bearing capacity is high
CN110241695A (en) * 2019-06-19 2019-09-17 贵州正业工程技术投资有限公司 A kind of gravelly soil superelevation fill foundation reinforcement means
CN110886287A (en) * 2019-09-29 2020-03-17 中交第一航务工程勘察设计院有限公司 Shallow soft soil foundation curing structure and construction method thereof
CN110700232A (en) * 2019-10-15 2020-01-17 中瀛港湾(厦门)建设工程有限公司 Construction method for soft foundation treatment
CN111877302B (en) * 2020-08-25 2021-09-10 广东劲拓建设工程有限公司 Foundation construction method for in-situ solidification of surface soil and pile combined bearing
CN112195909A (en) * 2020-10-20 2021-01-08 云南建投第一勘察设计有限公司 Method for reinforcing soft foundation of road and parking lot
CN112962608B (en) * 2021-02-25 2022-08-05 江苏地基工程有限公司 Method for reducing bending damage of pipe pile in soft soil
CN113373867A (en) * 2021-06-30 2021-09-10 上海热湾环境科技有限公司 Coastline soft foundation solidified soil structure and process

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101100855A (en) * 2007-06-04 2008-01-09 天津城市建设学院 Method for solidifying beach salty soil
CN101220590A (en) * 2008-01-04 2008-07-16 东南大学 Sullage solidifying method
CN101225659A (en) * 2008-01-24 2008-07-23 北京中永基固化剂科技发展有限公司 Construction method for treating soft soil foundation by solidifying agent
CN101476319A (en) * 2009-01-14 2009-07-08 河海大学 Curing method for fast forming crust layer on yard surface
CN201437588U (en) * 2009-05-13 2010-04-14 中冶天工上海十三冶建设有限公司 Rotary stirring machine for superficial soft soil layer
CN101704649A (en) * 2009-11-16 2010-05-12 苏州市能工基础工程有限责任公司 Slurry formula of pile-sinking technique of non-soil borrowing lead-hole prestress pipe pile or prefabricated square pile
CN102011401A (en) * 2010-09-09 2011-04-13 平煤建工集团有限公司 High-intensity prestressed concrete tubular pile lead hole hammering construction method for soft soil layer
CN102134861A (en) * 2011-02-17 2011-07-27 苏州市建筑设计研究院有限责任公司 Method for testing precast pile in soil body
CN102720192A (en) * 2012-05-18 2012-10-10 程松林 Construction method for piling prestressed concrete hollow pile into thick-layer soft soil processed by cement mixing piles
CN103243713A (en) * 2013-05-07 2013-08-14 天津建城基业集团有限公司 Method for planting prestressed pipe pile at one step
CN103774514A (en) * 2014-01-10 2014-05-07 江苏中瑞路桥建设有限公司 Prefabricated tube pile embankment structure and construction method thereof
CN104234067A (en) * 2014-10-08 2014-12-24 潘林有 Method for treating coast weak soil unconsolidated soil

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0593421A (en) * 1991-04-11 1993-04-16 Asou Cement Kk Excavator
CN1869339A (en) * 2006-05-22 2006-11-29 张继红 Construction method of precast pile non-precast pile sinking
CN101148891A (en) * 2007-10-09 2008-03-26 水利部交通部电力工业部南京水利科学研究院 Rigid and flexible long-short pile composite foundation used for highway soft soil foundation treatment
CN104612127B (en) * 2015-01-30 2017-02-22 唐山工业职业技术学院 Three-dimensional deep soft soil composite foundation and construction method

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101100855A (en) * 2007-06-04 2008-01-09 天津城市建设学院 Method for solidifying beach salty soil
CN101220590A (en) * 2008-01-04 2008-07-16 东南大学 Sullage solidifying method
CN101225659A (en) * 2008-01-24 2008-07-23 北京中永基固化剂科技发展有限公司 Construction method for treating soft soil foundation by solidifying agent
CN101476319A (en) * 2009-01-14 2009-07-08 河海大学 Curing method for fast forming crust layer on yard surface
CN201437588U (en) * 2009-05-13 2010-04-14 中冶天工上海十三冶建设有限公司 Rotary stirring machine for superficial soft soil layer
CN101704649A (en) * 2009-11-16 2010-05-12 苏州市能工基础工程有限责任公司 Slurry formula of pile-sinking technique of non-soil borrowing lead-hole prestress pipe pile or prefabricated square pile
CN102011401A (en) * 2010-09-09 2011-04-13 平煤建工集团有限公司 High-intensity prestressed concrete tubular pile lead hole hammering construction method for soft soil layer
CN102134861A (en) * 2011-02-17 2011-07-27 苏州市建筑设计研究院有限责任公司 Method for testing precast pile in soil body
CN102720192A (en) * 2012-05-18 2012-10-10 程松林 Construction method for piling prestressed concrete hollow pile into thick-layer soft soil processed by cement mixing piles
CN103243713A (en) * 2013-05-07 2013-08-14 天津建城基业集团有限公司 Method for planting prestressed pipe pile at one step
CN103774514A (en) * 2014-01-10 2014-05-07 江苏中瑞路桥建设有限公司 Prefabricated tube pile embankment structure and construction method thereof
CN104234067A (en) * 2014-10-08 2014-12-24 潘林有 Method for treating coast weak soil unconsolidated soil

Also Published As

Publication number Publication date
CN105019422A (en) 2015-11-04

Similar Documents

Publication Publication Date Title
CN105019422B (en) Topsoil is cured in situ the foundation construction method that carrying is combined with stake
CN104863113B (en) The method and mixing plant of original place curing process are carried out to in-situ soil
JP6166264B2 (en) How to build a retaining wall
WO2017185817A1 (en) Construction method for on-site mixing cement-soil pile overground
CN108560542B (en) Waste tire coated building slag bidirectional reinforcement and construction method thereof
CN107740434B (en) Construction method for waterproof curtain of foundation pit with dam for broken sand pebbles and dolomite
CN105019425B (en) A kind of construction method of displacement hull and cured layer combined foundation structure
CN107513994A (en) One kind segmentation becomes supporting rotary digging stake and its construction method without leave
CN101008178B (en) Soft base processing construction process using excavating and stirring method
CN107587502B (en) Construction method for rotary drilling hole-forming pressure-grouting cement soil occlusion curtain pile
CN107916663B (en) Construction method for soft soil foundation
CN104988914A (en) Cast-in-situ bored pile breakage processing method under water area environment
CN109763513B (en) Construction method of anchor cable lattice and modified soil retaining wall composite supporting and retaining structure
CN102605775B (en) Combination pile of flexible pile and rigid pile concentrically arranged at upper end and lower end and pile forming method
CN207244657U (en) A kind of vertical antifouling isolation wall construction of both sides ground local stiffening type
CN211171922U (en) Construction structure for improving stability of groove wall
CN204875831U (en) Top layer soil solidifies on spot and closes foundation structure that bears with pile cluster
CN214993745U (en) Be applicable to artifical hole digging pile foundation pile week slip casting and consolidate subassembly
CN106703024B (en) Construction process of slurry-solidified gravel composite pile
JP3874734B2 (en) Impermeable wall construction method
AU2021105983A4 (en) A Construction Method for Reinforced-hoop Gravel Piles by Means of Immersed Tubes for Strengthening Soft Foundations
CN213741092U (en) Foundation pit supporting structure
CN207419448U (en) Novel composite foundation pile based on static pressure construction
CN215051733U (en) Construction access road structure in deep soft soil area
CN115450082B (en) Light solidifying and modifying construction method for soft soil

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 211100 No. 8 West Buddha Road, Jiangning Development Zone, Jiangsu, Nanjing, China

Patentee after: HOHAI University

Patentee after: SHAOXING TRAFFIC INVESTMENT GROUP Co.,Ltd.

Patentee after: Zhejiang shuzhijiaoyuan Technology Co.,Ltd.

Patentee after: Zhejiang University City College

Patentee after: ZHEJIANG PROVINCIAL KEWE ENGINEERING CONSULTING Co.,Ltd.

Patentee after: HANGZHOU TECHENG FOUNDATIONS Co.,Ltd.

Address before: 211100 No. 8 West Buddha Road, Jiangning Development Zone, Jiangsu, Nanjing, China

Patentee before: HOHAI University

Patentee before: SHAOXING TRAFFIC INVESTMENT GROUP Co.,Ltd.

Patentee before: ZHEJIANG PROVINCIAL INSTITUTE OF COMMUNICATIONS PLANNING, DESIGN & RESEARCH

Patentee before: Zhejiang University City College

Patentee before: ZHEJIANG PROVINCIAL KEWE ENGINEERING CONSULTING Co.,Ltd.

Patentee before: HANGZHOU TECHENG FOUNDATIONS Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20211021

Address after: 211100 No. 8 West Buddha Road, Jiangning Development Zone, Jiangsu, Nanjing, China

Patentee after: HOHAI University

Patentee after: SHAOXING TRAFFIC INVESTMENT GROUP Co.,Ltd.

Patentee after: Zhejiang shuzhijiaoyuan Technology Co.,Ltd.

Patentee after: HANGZHOU City University

Patentee after: Hangzhou Techeng Foundation Engineering Technology Co.,Ltd.

Address before: 211100 No. 8 West Buddha Road, Jiangning Development Zone, Jiangsu, Nanjing, China

Patentee before: HOHAI University

Patentee before: SHAOXING TRAFFIC INVESTMENT GROUP Co.,Ltd.

Patentee before: Zhejiang shuzhijiaoyuan Technology Co.,Ltd.

Patentee before: Zhejiang University City College

Patentee before: ZHEJIANG PROVINCIAL KEWE ENGINEERING CONSULTING Co.,Ltd.

Patentee before: HANGZHOU TECHENG FOUNDATIONS Co.,Ltd.

TR01 Transfer of patent right