US20140314497A1 - Polymer grouting method for constructing gravel pile - Google Patents

Polymer grouting method for constructing gravel pile Download PDF

Info

Publication number
US20140314497A1
US20140314497A1 US14/158,862 US201414158862A US2014314497A1 US 20140314497 A1 US20140314497 A1 US 20140314497A1 US 201414158862 A US201414158862 A US 201414158862A US 2014314497 A1 US2014314497 A1 US 2014314497A1
Authority
US
United States
Prior art keywords
pile
grouting
polymer
soil
forming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/158,862
Inventor
Fuming Wang
Yanhui Zhong
Mingsheng Shi
Bei Zhang
Xiaolong Li
Haizhou Zhao
Liang Dong
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Safekey Engineering Technology Zhengzhou Ltd
Original Assignee
Henan Polytech Infrastructure Rehabilitation Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Polytech Infrastructure Rehabilitation Ltd filed Critical Henan Polytech Infrastructure Rehabilitation Ltd
Publication of US20140314497A1 publication Critical patent/US20140314497A1/en
Assigned to SAFEKEY ENGINEERING TECHNOLOGY (ZHENGZHOU), LTD. reassignment SAFEKEY ENGINEERING TECHNOLOGY (ZHENGZHOU), LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: HENAN POLYTECH INFRASTRUCTURE REHALILITATION LTD.
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing

Definitions

  • the present invention relates to a foundation processing technology, and more particularly to a polymer grouting method for constructing gravel pile for reinforcing soft foundation and special soil foundation.
  • the existing foundation treatment methods can be generally divided into five major categories of replacement method, drainage consolidation method, chemical reinforcement method, reinforced method and compacting method.
  • the replacement method excavates the surface soft soil to backfill the hard coarse grained materials and tamp for improving the bearing capacity of the foundation, and is mainly adapted for dealing with the shallow weak foundation and uneven foundation with the depth of 2-3 m.
  • the drainage consolidation method adopts the heap load or vacuum preloading to discharge pore water in the soil for improving the soil strength, and partially or totally eliminating the foundation settlement, and is not adapted for the foundation soil with low water content.
  • the chemical reinforcement method adopts the perfusion pressing-in, high-pressure injection, or mechanical stirring to cement the cement or chemical grout with the soil particles together for improving the physical and mechanical properties of the foundation soil, and it has complex construction process, environmental contamination and high cost.
  • the reinforced method lays layer-by-layer the reinforced cushion consisting of earthwork synthetic materials and sand stone as the foundation bearing layer, uses the friction function between the reinforcement and soil to improve the tensile and shear performance of the soil, and is not adapted for dealing with a wide range of deep soft foundation.
  • the compacting method can be divided into two types: one is reduce the void ratio of the soil and improve the bearing capacity thereof by virtue of rolling and dynamic compaction, which is mainly adapted for dealing with the shallow foundations; the other is composite foundation method, in which the flexible pile with higher strength is formed by squeezing the soil into the hole and filling with granular materials, and then the composition foundation is formed by the flexible pile with the surrounding soil to bear the upper load together.
  • the flexible pile can be divided into several types of sand pile, gravel pile and cement pile, which are adapted for dealing with different types of deep and shallow soft foundations.
  • the composite foundation reinforcement method based on the compaction and filling principle is widely used in the highway and high-speed railway soft foundation and special soil foundation treatment.
  • the gravel pile method is favored by engineers and technicians because of its economical materials, relatively simple construction process and so on.
  • the existing gravel pile reinforcement technology generally uses the vibrating sinking pipe, the hammer sinking pipe or the impact holing method to form the pile hole, and then fills in the gravel while tapping, and finally forms the pile body. Due to the compressibility of the gravel pile less than that of the soft soil, the additional stress basically transferred to the foundation is gradually concentrated on the pile body with the deformation of the foundation, simultaneously, the pile body produces the lateral deformation to compress the soil between piles for transferring the stress to the soil between piles, a composite stress system is formed by the interaction between the pile body and the soil between piles, thus improving the bearing capability and reducing the settlement of the foundation.
  • the gravel pile reinforcement method has the outstanding advantages, and is increasingly widely used, it still has some deficiencies for the demand of the foundation treatment engineering which are mainly manifested in: (1) adopting the high-pressure water punching cutting pile technology in the vibroflotation process, which is not adapted for the foundation treatment engineering with higher sensitivity to water; (2) more complex construction process and difficult to control the construction quality; (3) greater disturbances to the foundation in the construction process and polluting the environment due to produced large amounts of liquid waste; (4) large construction equipment, high energy consumption, poor applicability and high requirements on the construction site; (5) the vertical bearing capacity and the settlement of the gravel pile largely depending on the binding force of the surrounding soil to the gravel pile, wherein if the surrounding soil is soft, the binding force of the surrounding soil to the gravel pile is poor, the vertical bearing capacity of the pile body is restricted; (6) the pile body consisting of granular mixture materials, wherein almost no cohesive force exists between the particles, so that the horizontal bearing capacity of the pile body is poor, the composite foundation is invalid due to the sheared gravel pile while with
  • China's transportation infrastructure construction faces a lot of foundation treatment problems, how to according to the deficiencies of the existing foundation treatment technology, develop new materials, technologies and equipments for the foundation treatment is significant for improving China's foundation treatment technical level, guaranteeing the quality and the operational safety of the transportation infrastructure.
  • the polymer grouting technology is a foundation quick reinforcement technology developed in 1970s. It injects the polymer materials to the foundation for filling the pores and compacting the soil, making use of the characteristics that the volume of the polymer material is rapidly expanded and solidified after the chemical reaction.
  • the polymer grouting technology is mainly applied to foundation reinforcement and road maintenance of the industrial and civil buildings. No polymer grouting method for constructing gravel pile is reported.
  • An object of the present invention is to provide a fast, safe and high-strength and environmentally-friendly polymer grouting method for constructing gravel pile, aiming at the deficiencies of the existing foundation treatment technologies, and especially, the maladjustment of the grouting technology with water reaction for the collapsible loess or water expansion soil.
  • the present invention can rapidly reinforce the soft foundation and special soil foundation, thereby providing an advanced, highly efficient, safe and practical method for reinforcing the soft foundation and special soil foundation.
  • a polymer grouting method for constructing gravel pile comprises steps of:
  • pile-position-pore-forming according to design requirements, constructing a pile hole at a pile position by a drilling tool, whose depth reaches a design depth;
  • (2) installing a grouting pipe installing a grouting pipe in the pile hole, wherein the grouting pipe is located in a middle of the pile hole, and a grouting outlet of the grouting pipe is close to a bottom of the pile hole;
  • pile-forming upwardly lifting the grouting pipe according to the set rate, the injected two-component expansive polymer material expanding rapidly after a chemical reaction, and solidifying with the graded stones for filling in the pile hole from below to above, expansion compacting a blast hole wall rock-soil and fully integrating with a surrounding rock-soil, thus forming a polymer gravel pile.
  • the pile body and the soil around the pile of the present invention are further compacted, thus forming the composite foundation consisting of the polymer grouting gravel pile, the modified soil around the pile and the soil between piles.
  • the present invention has some advantages as below.
  • the formed polymer gravel pile of the present invention and the soil around the pile form the composite foundation, which has the replacement, vertical enhancement, drainage, exhausting, cementation, compaction, filling and other mechanisms;
  • the present invention is non-water reacted and strong applicability.
  • the non-water reacted polymer material is not shrunk, and has strong tensile performance and vibration and crack resistance performances, large volume expansion ratio.
  • the pile body has full form, is capable of filling the pile hole, is adapted for not only general geotechnical environment, but also the soft foundation reinforcement of collapsible loess or water expansion soil for which the cement-based materials are not adapted;
  • the present invention has high strength.
  • the polymer grouting material is fully integrated with the surrounding rock and soil to form the root-like cementation structure with strong adhesive force. Compared with the cement material under the same circumstance, the anchoring force is increased by nearly one time;
  • the present invention has fast construction without need to be cured.
  • the drilling and lifting grouting continuous operates, and the construction is fast.
  • About 90% strength is formed after the reaction of material for 15 minutes without need to be cured;
  • the present invention has convenient construction.
  • the polymer grouting serial equipment is adapted for different sites, easy to approach, and has small construction electricity consumption;
  • the present invention has good durability.
  • the polymer grouting material has stable performance, no pollution, good flexibility and small permeability coefficient, and is closely bonded with the rock and soil and compatible deformed. It has good chemical solvent corrosion resistance and impermeability performance.
  • the polymer grouting method for constructing gravel pile developed in the present invention has many advantages in the soft foundation rehabilitation project. Compared with the existing foundation processing technology, the polymer grouting method for constructing gravel pile is a new technology and mainly manifested in the following aspects:
  • Piling materials and piling concept based on the concept of the flexible pile, the polymer grouting method for constructing gravel pile uses the new grouting material of non-water reacted polymer, so it has safety and environmental protection, lightweight durability, high expansion rate, good impermeability, and early strength.
  • the constructed polymer gravel pile is a flexible body, closely bonded with the soil, compatibly deformed, and has good impermeability and crack resistance.
  • the polymer grouting method for constructing gravel pile uses the expansive force after the polymer material reacting to fill the pile hole, expansively compact the hole wall rock and soil, and fully integrate with the surrounding rock and soil, the polymer material is solidified with the stone together during the expansion process, and then forms the composite foundation with the surrounding soil, thus rapidly reinforcing the soft foundation.
  • Construction mode by drilling, putting stones, polymer grouting pile-forming, the present invention has convenient construction.
  • the present invention uses the polymer lifting grouting technology to rapidly and stably reinforce the soft foundation.
  • the present invention is obviously different from the existing foundation processing method, has strong applicability, fastness, high toughness, good durability and other advantages, and has great economic and social benefits and broad prospects for the development and application.
  • FIG. 1 is a schematic view of a polymer gravel pile pile-position-pore-forming according to a preferred embodiment of the present invention.
  • FIG. 2 shows a grouting pipe is installed in the pile hole.
  • FIG. 3 shows the graded stones are put into the pile hole.
  • FIG. 4 is a schematic view of the polymer lifting grouting.
  • FIG. 5 is a sectional view of the polymer gravel pile.
  • FIG. 6 is a top view of the polymer gravel pile.
  • a polymer gravel pile grouting method comprises steps of:
  • pile-position-pore-forming according to design requirements, constructing a pile hole at a pile position by a drilling tool 1 , whose depth reaches a design depth, as shown in FIG. 1 ;
  • (2) installing a grouting pipe installing a grouting pipe 3 in the pile hole 2 , wherein the grouting pipe 3 is located in a middle of the pile hole, and a grouting outlet of the grouting pipe 3 is close to a bottom of the pile hole 2 , as shown in FIG. 2 ;
  • pile-forming upwardly lifting the grouting pipe according to the set rate, the injected two-component expansive polymer material expanding rapidly after a chemical reaction, and solidifying with the graded stones for filling in the pile hole from below to above, expansion compacting a blast hole wall rock-soil and fully integrating with a surrounding rock-soil, thus forming a polymer gravel pile 7 , as shown in FIGS. 5 and 6 .

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A polymer grouting method for constructing gravel pile for reinforcing the soft and special soil foundation includes steps of: (1) pile-position-pore-forming; (2) installing a grouting pipe; (3) putting graded stones; (4) polymer lifting grouting; and (5) pile-forming. By pile-position-pore-forming, putting graded stones, polymer lifting grouting in the reinforcement site and other steps, the injected two-component expansive polymer material expands rapidly after a chemical reaction, and then is solidified with the graded stones for filling in the pile hole from below to above, the blast hole wall rock-soil is expansive compacted and fully integrating with the surrounding rock-soil, thus forming the polymer gravel pile. The present invention can rapidly reinforce the soft and special soil foundation, thereby providing an advanced, highly efficient, safe and practical method for reinforcing the soft and special soil foundation. It has great economic and social benefits and broad development prospects.

Description

    FIELD OF INVENTION
  • The present invention relates to a foundation processing technology, and more particularly to a polymer grouting method for constructing gravel pile for reinforcing soft foundation and special soil foundation.
  • DESCRIPTION OF RELATED ARTS
  • Since the 1990s, with the steady and healthy development of the national economic construction, China's highways, high-speed railways and other large-scale foundation engineering facilities constructions enter a period of rapid development, and have made remarkable achievements. Due to China's vast territory and complicated variable geological conditions, a large number of highways and high-speed railways pass through the soft soil, the collapsible loess and other adverse geological zones, thus facing very prominent engineering geological problems. The soft soil has physical and mechanical characteristics of large water content, high compressibility, low intensity and small permeability coefficient, when constructing the roadbeds in such area, due to long ground foundation cycle, large post-construction settlement deformation, the long-term stability of the roadbeds is seriously affected. In the collapsible loess, under flooding conditions, the foundation strength of the natural loess is dramatically decreased, and significantly additional settlement is produced, thereby posing a serious threat to the stability of the roadbeds. Therefore, how to effectively deal with the weak foundation and the special foundation, for meeting the requirements of safe and proper use of engineering structures, has become the most important issue that must be solved in the construction of high-speed transport infrastructures.
  • In recent 30 years, combined with China's engineering geological features, engineers and technicians have proposed dozens of foundation treatment methods to be widely used in the civil engineering construction. Depending on various reinforcement mechanisms, the existing foundation treatment methods can be generally divided into five major categories of replacement method, drainage consolidation method, chemical reinforcement method, reinforced method and compacting method. The replacement method excavates the surface soft soil to backfill the hard coarse grained materials and tamp for improving the bearing capacity of the foundation, and is mainly adapted for dealing with the shallow weak foundation and uneven foundation with the depth of 2-3 m. The drainage consolidation method adopts the heap load or vacuum preloading to discharge pore water in the soil for improving the soil strength, and partially or totally eliminating the foundation settlement, and is not adapted for the foundation soil with low water content. The chemical reinforcement method adopts the perfusion pressing-in, high-pressure injection, or mechanical stirring to cement the cement or chemical grout with the soil particles together for improving the physical and mechanical properties of the foundation soil, and it has complex construction process, environmental contamination and high cost. The reinforced method lays layer-by-layer the reinforced cushion consisting of earthwork synthetic materials and sand stone as the foundation bearing layer, uses the friction function between the reinforcement and soil to improve the tensile and shear performance of the soil, and is not adapted for dealing with a wide range of deep soft foundation. The compacting method can be divided into two types: one is reduce the void ratio of the soil and improve the bearing capacity thereof by virtue of rolling and dynamic compaction, which is mainly adapted for dealing with the shallow foundations; the other is composite foundation method, in which the flexible pile with higher strength is formed by squeezing the soil into the hole and filling with granular materials, and then the composition foundation is formed by the flexible pile with the surrounding soil to bear the upper load together. According to different filling materials, the flexible pile can be divided into several types of sand pile, gravel pile and cement pile, which are adapted for dealing with different types of deep and shallow soft foundations.
  • In recent years, the composite foundation reinforcement method based on the compaction and filling principle is widely used in the highway and high-speed railway soft foundation and special soil foundation treatment. Specially, the gravel pile method is favored by engineers and technicians because of its economical materials, relatively simple construction process and so on.
  • The existing gravel pile reinforcement technology generally uses the vibrating sinking pipe, the hammer sinking pipe or the impact holing method to form the pile hole, and then fills in the gravel while tapping, and finally forms the pile body. Due to the compressibility of the gravel pile less than that of the soft soil, the additional stress basically transferred to the foundation is gradually concentrated on the pile body with the deformation of the foundation, simultaneously, the pile body produces the lateral deformation to compress the soil between piles for transferring the stress to the soil between piles, a composite stress system is formed by the interaction between the pile body and the soil between piles, thus improving the bearing capability and reducing the settlement of the foundation.
  • Although the gravel pile reinforcement method has the outstanding advantages, and is increasingly widely used, it still has some deficiencies for the demand of the foundation treatment engineering which are mainly manifested in: (1) adopting the high-pressure water punching cutting pile technology in the vibroflotation process, which is not adapted for the foundation treatment engineering with higher sensitivity to water; (2) more complex construction process and difficult to control the construction quality; (3) greater disturbances to the foundation in the construction process and polluting the environment due to produced large amounts of liquid waste; (4) large construction equipment, high energy consumption, poor applicability and high requirements on the construction site; (5) the vertical bearing capacity and the settlement of the gravel pile largely depending on the binding force of the surrounding soil to the gravel pile, wherein if the surrounding soil is soft, the binding force of the surrounding soil to the gravel pile is poor, the vertical bearing capacity of the pile body is restricted; (6) the pile body consisting of granular mixture materials, wherein almost no cohesive force exists between the particles, so that the horizontal bearing capacity of the pile body is poor, the composite foundation is invalid due to the sheared gravel pile while withstanding the horizontal loads under special circumstances.
  • In conclusion, China's transportation infrastructure construction faces a lot of foundation treatment problems, how to according to the deficiencies of the existing foundation treatment technology, develop new materials, technologies and equipments for the foundation treatment is significant for improving China's foundation treatment technical level, guaranteeing the quality and the operational safety of the transportation infrastructure.
  • The polymer grouting technology is a foundation quick reinforcement technology developed in 1970s. It injects the polymer materials to the foundation for filling the pores and compacting the soil, making use of the characteristics that the volume of the polymer material is rapidly expanded and solidified after the chemical reaction. Currently, the polymer grouting technology is mainly applied to foundation reinforcement and road maintenance of the industrial and civil buildings. No polymer grouting method for constructing gravel pile is reported.
  • SUMMARY OF THE PRESENT INVENTION
  • An object of the present invention is to provide a fast, safe and high-strength and environmentally-friendly polymer grouting method for constructing gravel pile, aiming at the deficiencies of the existing foundation treatment technologies, and especially, the maladjustment of the grouting technology with water reaction for the collapsible loess or water expansion soil. The present invention can rapidly reinforce the soft foundation and special soil foundation, thereby providing an advanced, highly efficient, safe and practical method for reinforcing the soft foundation and special soil foundation.
  • Accordingly, in order to accomplish the above object, the technical solution adopted by the present invention is as below.
  • A polymer grouting method for constructing gravel pile comprises steps of:
  • (1) pile-position-pore-forming: according to design requirements, constructing a pile hole at a pile position by a drilling tool, whose depth reaches a design depth;
  • (2) installing a grouting pipe: installing a grouting pipe in the pile hole, wherein the grouting pipe is located in a middle of the pile hole, and a grouting outlet of the grouting pipe is close to a bottom of the pile hole;
  • (3) putting graded stones: according to different geological conditions, putting graded stones into the pile hole;
  • (4) polymer lifting grouting: putting a polymer lifting grouting control equipment on a hole of the grouting pipe; placing the grouting pipe into a pipe fixing device of the polymer lifting grouting control equipment; injecting two-component expansive polymer material to the pile hole via the grouting pipe by a polymer grouting system, and simultaneously opening the lifting grouting control equipment; and
  • (5) pile-forming: upwardly lifting the grouting pipe according to the set rate, the injected two-component expansive polymer material expanding rapidly after a chemical reaction, and solidifying with the graded stones for filling in the pile hole from below to above, expansion compacting a blast hole wall rock-soil and fully integrating with a surrounding rock-soil, thus forming a polymer gravel pile.
  • According to the foundation processing requirements, by pile-position-pore-forming, putting graded stones and polymer lifting grouting in the reinforcement site, the pile body and the soil around the pile of the present invention are further compacted, thus forming the composite foundation consisting of the polymer grouting gravel pile, the modified soil around the pile and the soil between piles.
  • Compared with the traditional foundation processing methods, the present invention has some advantages as below.
  • (1) The formed polymer gravel pile of the present invention and the soil around the pile form the composite foundation, which has the replacement, vertical enhancement, drainage, exhausting, cementation, compaction, filling and other mechanisms;
  • (2) The present invention is non-water reacted and strong applicability. The non-water reacted polymer material is not shrunk, and has strong tensile performance and vibration and crack resistance performances, large volume expansion ratio. The pile body has full form, is capable of filling the pile hole, is adapted for not only general geotechnical environment, but also the soft foundation reinforcement of collapsible loess or water expansion soil for which the cement-based materials are not adapted;
  • (3) The present invention has high strength. The polymer grouting material is fully integrated with the surrounding rock and soil to form the root-like cementation structure with strong adhesive force. Compared with the cement material under the same circumstance, the anchoring force is increased by nearly one time;
  • (4) The present invention has fast construction without need to be cured. The drilling and lifting grouting continuous operates, and the construction is fast. About 90% strength is formed after the reaction of material for 15 minutes without need to be cured;
  • (5) The present invention has convenient construction. The polymer grouting serial equipment is adapted for different sites, easy to approach, and has small construction electricity consumption;
  • (6) The present invention has good durability. The polymer grouting material has stable performance, no pollution, good flexibility and small permeability coefficient, and is closely bonded with the rock and soil and compatible deformed. It has good chemical solvent corrosion resistance and impermeability performance.
  • Therefore, the polymer grouting method for constructing gravel pile developed in the present invention has many advantages in the soft foundation rehabilitation project. Compared with the existing foundation processing technology, the polymer grouting method for constructing gravel pile is a new technology and mainly manifested in the following aspects:
  • (1) Piling materials and piling concept: based on the concept of the flexible pile, the polymer grouting method for constructing gravel pile uses the new grouting material of non-water reacted polymer, so it has safety and environmental protection, lightweight durability, high expansion rate, good impermeability, and early strength. The constructed polymer gravel pile is a flexible body, closely bonded with the soil, compatibly deformed, and has good impermeability and crack resistance.
  • (2) Reinforcement mechanism: the polymer grouting method for constructing gravel pile uses the expansive force after the polymer material reacting to fill the pile hole, expansively compact the hole wall rock and soil, and fully integrate with the surrounding rock and soil, the polymer material is solidified with the stone together during the expansion process, and then forms the composite foundation with the surrounding soil, thus rapidly reinforcing the soft foundation.
  • (3) Construction mode: by drilling, putting stones, polymer grouting pile-forming, the present invention has convenient construction. The present invention uses the polymer lifting grouting technology to rapidly and stably reinforce the soft foundation.
  • In summary, either from the piling material, the piling concept, the reinforcement mechanism or the construction mode, the present invention is obviously different from the existing foundation processing method, has strong applicability, fastness, high toughness, good durability and other advantages, and has great economic and social benefits and broad prospects for the development and application.
  • These and other objectives, features, and advantages of the present invention will become apparent from the following detailed description, the accompanying drawings, and the appended claims.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a schematic view of a polymer gravel pile pile-position-pore-forming according to a preferred embodiment of the present invention.
  • FIG. 2 shows a grouting pipe is installed in the pile hole.
  • FIG. 3 shows the graded stones are put into the pile hole.
  • FIG. 4 is a schematic view of the polymer lifting grouting.
  • FIG. 5 is a sectional view of the polymer gravel pile.
  • FIG. 6 is a top view of the polymer gravel pile.
  • In the drawings, 1: drilling tool; 2: pile hole; 3: grouting pipe; 4: graded stones; 5: polymer lifting control equipment; 6: polymer material; 7: polymer gravel pile.
  • DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
  • The present invention is further explained in detail with the accompanying drawings.
  • A polymer gravel pile grouting method comprises steps of:
  • (1) pile-position-pore-forming: according to design requirements, constructing a pile hole at a pile position by a drilling tool 1, whose depth reaches a design depth, as shown in FIG. 1;
  • (2) installing a grouting pipe: installing a grouting pipe 3 in the pile hole 2, wherein the grouting pipe 3 is located in a middle of the pile hole, and a grouting outlet of the grouting pipe 3 is close to a bottom of the pile hole 2, as shown in FIG. 2;
  • (3) putting graded stones: according to different geological conditions, putting graded stones 4 into the pile hole, as shown in FIG. 3;
  • (4) polymer lifting grouting: putting a polymer lifting grouting control equipment 5 on a hole of the grouting pipe 3; placing the grouting pipe 3 into a pipe fixing device of the polymer lifting grouting control equipment 5; injecting two-component expansive polymer material 6 to the pile hole via the grouting pipe by a polymer grouting system, and simultaneously opening the lifting grouting control equipment 5, as shown in FIG. 4; and
  • (5) pile-forming: upwardly lifting the grouting pipe according to the set rate, the injected two-component expansive polymer material expanding rapidly after a chemical reaction, and solidifying with the graded stones for filling in the pile hole from below to above, expansion compacting a blast hole wall rock-soil and fully integrating with a surrounding rock-soil, thus forming a polymer gravel pile 7, as shown in FIGS. 5 and 6.
  • One skilled in the art will understand that the embodiment of the present invention as shown in the drawings and described above is exemplary only and not intended to be limiting.
  • It will thus be seen that the objects of the present invention have been fully and effectively accomplished. Its embodiments have been shown and described for the purposes of illustrating the functional and structural principles of the present invention and is subject to change without departure from such principles. Therefore, this invention includes all modifications encompassed within the spirit and scope of the following claims.

Claims (1)

What is claimed is:
1. A polymer grouting method for constructing gravel pile, comprising steps of:
(1) pile-position-pore-forming: according to design requirements, constructing a pile hole at a pile position by a drilling tool, whose depth reaches a design depth;
(2) installing a grouting pipe: installing a grouting pipe in the pile hole, wherein the grouting pipe is located in a middle of the pile hole, and a grouting outlet of the grouting pipe is close to a bottom of the pile hole;
(3) putting graded stones: according to different geological conditions, putting graded stones into the pile hole;
(4) polymer lifting grouting: putting a polymer lifting grouting control equipment on a hole of the grouting pipe; placing the grouting pipe into a pipe fixing device of the polymer lifting grouting control equipment; injecting two-component expansive polymer material to the pile hole via the grouting pipe by a polymer grouting system, and simultaneously opening the lifting grouting control equipment; and
(5) pile-forming: upwardly lifting the grouting pipe according to the set rate, the injected two-component expansive polymer material expanding rapidly after a chemical reaction, and solidifying with the graded stones for filling in the pile hole from below to above, expansion compacting a blast hole wall rock-soil and fully integrating with a surrounding rock-soil, thus forming a polymer gravel pile.
US14/158,862 2013-04-18 2014-01-19 Polymer grouting method for constructing gravel pile Abandoned US20140314497A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201310134917.6 2013-04-18
CN2013101349176A CN103233468A (en) 2013-04-18 2013-04-18 Polymer gravel pile grouting method

Publications (1)

Publication Number Publication Date
US20140314497A1 true US20140314497A1 (en) 2014-10-23

Family

ID=48881532

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/158,862 Abandoned US20140314497A1 (en) 2013-04-18 2014-01-19 Polymer grouting method for constructing gravel pile

Country Status (2)

Country Link
US (1) US20140314497A1 (en)
CN (1) CN103233468A (en)

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284349A (en) * 2015-05-18 2017-01-04 五冶集团上海有限公司 Auxiliary pore-forming hammer piling construction method
CN107964947A (en) * 2017-12-25 2018-04-27 武汉广益交通科技股份有限公司 Method for processing foundation and structure
CN108797578A (en) * 2018-07-12 2018-11-13 上海市城市建设设计研究总院(集团)有限公司 Crushed stone grouting pile and its construction method with classification enlarged footing
CN109753670A (en) * 2017-11-04 2019-05-14 中国石油化工股份有限公司 Non-anchored storage tank intensity evaluation method and device after settlement of foundation
CN110750923A (en) * 2019-09-18 2020-02-04 中铝国际工程股份有限公司 Method for calculating single-pile ultimate bearing capacity of coastal sludge soft soil foundation through dynamic compaction replacement treatment
CN111177833A (en) * 2019-12-27 2020-05-19 中铁大桥勘测设计院集团有限公司 Method for calculating vertical bearing capacity of cast-in-place concrete pile drilled in clear water in reef limestone geology
CN111663555A (en) * 2020-06-24 2020-09-15 浙江大学 Jacket pile shoe sealing system based on expanded high polymer and sealing method thereof
CN111695178A (en) * 2020-05-19 2020-09-22 中国电建集团西北勘测设计研究院有限公司 Method for finely distributing piles through compaction treatment of foundation
CN112394021A (en) * 2021-01-20 2021-02-23 西南交通大学 Indoor testing arrangement of permeable pavement structure osmotic coefficient
CN112575803A (en) * 2020-12-16 2021-03-30 中科鼎实环境工程有限公司 Construction method of flexible vertical impervious wall for blocking underground water pollution
CN112683233A (en) * 2020-12-15 2021-04-20 温州鼎玛建筑技术有限公司 Building settlement detection method
CN112922019A (en) * 2021-03-08 2021-06-08 中国长江三峡集团有限公司 Single-pile foundation for reinforcing soft soil foundation by offshore wind power vibroflotation cemented pile and construction method
CN112922018A (en) * 2021-03-08 2021-06-08 中国长江三峡集团有限公司 Construction method of gravity foundation of offshore wind power cemented gravel pile reinforced soft soil foundation
CN113863277A (en) * 2021-10-14 2021-12-31 华地恒工程咨询有限公司 Shallow soft soil composite reinforcement structure and method for reinforcing shallow soft soil foundation
CN114045834A (en) * 2021-12-03 2022-02-15 中国人民解放军陆军工程大学 Sand soil fast curing grouting pile forming device
CN114351681A (en) * 2021-12-30 2022-04-15 中国水利水电第七工程局有限公司 Construction method for back filter layer of vibroflotation pile
CN114411827A (en) * 2022-01-12 2022-04-29 西安理工大学 Vacuum prepressing microorganism grouting rib composite pile foundation model for foundation stabilization
CN114737554A (en) * 2022-03-30 2022-07-12 中建路桥集团有限公司 Construction method for treating soft foundation at bridge head by using gravel compaction pile
CN114775351A (en) * 2022-04-29 2022-07-22 浙江实路工程技术有限公司 Composite grouting pile treatment process for road deep diseases
US11453991B2 (en) * 2020-07-22 2022-09-27 Zhejiang University High strength grouting method for single pile rock-socketed foundation of weakly weathered bed rock for offshore wind power
WO2022213766A1 (en) * 2021-04-08 2022-10-13 中国长江三峡集团有限公司 Microbiologically induced calcium carbonate precipitation gravel composite pile reinforcement structure and construction method
CN116201103A (en) * 2023-03-27 2023-06-02 中国水利水电第三工程局有限公司 Construction method for pile plate wall of rotary drilling bored pile
US20240133144A1 (en) * 2022-10-23 2024-04-25 Nanjing Hydraulic Research Institute Method for reinforcing soft ground by post-grouting combined with air-boosted vacuum preloading

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669340A (en) * 2013-12-06 2014-03-26 上海申元岩土工程有限公司 Polyurethane gravel pile and construction technology and application thereof
CN106948340B (en) * 2015-11-22 2019-02-12 合肥工业大学 A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
CN108035344A (en) * 2017-12-20 2018-05-15 河海大学 A kind of permeable rigid pile of high polymer rubble and its construction technology
CN110331698A (en) * 2019-06-11 2019-10-15 徐州工程学院 A kind of system that polyurethane formation curtain was constructed and be rapidly injected to casement
CN111501456A (en) * 2020-04-29 2020-08-07 山东交通学院 Reinforcing treatment method for soft foundation of newly-built highway engineering
CN117027012A (en) * 2023-08-08 2023-11-10 福建省地质工程勘察院 High-polymer grouting rapid reinforced high-fill side slope and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5145284A (en) * 1990-02-23 1992-09-08 Exxon Production Research Company Method for increasing the end-bearing capacity of open-ended piles
US6869255B1 (en) * 2002-11-05 2005-03-22 Beck, Iii August H. Post-stressed pile

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10204876A (en) * 1997-01-21 1998-08-04 Fujita Corp Soil improvement method by using pile
KR20100086146A (en) * 2009-01-22 2010-07-30 이엑스티 주식회사 Construction method for composite pile using digging and hardenning
KR101026188B1 (en) * 2010-06-17 2011-03-31 토양건영 주식회사 Pile made by using grouting method and construction method for as the same
CN102444128B (en) * 2011-09-26 2013-11-13 郑州优特基础工程维修有限公司 Grouting method for ultrathin high polymer cutoff wall
CN102418342B (en) * 2011-09-26 2014-01-29 郑州优特基础工程维修有限公司 High polymer hoisting grouting method
CN102561271B (en) * 2012-01-11 2015-04-08 河海大学 Polymer grout injected earth-rock dam and construction method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5145284A (en) * 1990-02-23 1992-09-08 Exxon Production Research Company Method for increasing the end-bearing capacity of open-ended piles
US6869255B1 (en) * 2002-11-05 2005-03-22 Beck, Iii August H. Post-stressed pile

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284349A (en) * 2015-05-18 2017-01-04 五冶集团上海有限公司 Auxiliary pore-forming hammer piling construction method
CN109753670A (en) * 2017-11-04 2019-05-14 中国石油化工股份有限公司 Non-anchored storage tank intensity evaluation method and device after settlement of foundation
CN107964947A (en) * 2017-12-25 2018-04-27 武汉广益交通科技股份有限公司 Method for processing foundation and structure
CN108797578A (en) * 2018-07-12 2018-11-13 上海市城市建设设计研究总院(集团)有限公司 Crushed stone grouting pile and its construction method with classification enlarged footing
CN110750923A (en) * 2019-09-18 2020-02-04 中铝国际工程股份有限公司 Method for calculating single-pile ultimate bearing capacity of coastal sludge soft soil foundation through dynamic compaction replacement treatment
CN111177833A (en) * 2019-12-27 2020-05-19 中铁大桥勘测设计院集团有限公司 Method for calculating vertical bearing capacity of cast-in-place concrete pile drilled in clear water in reef limestone geology
CN111695178A (en) * 2020-05-19 2020-09-22 中国电建集团西北勘测设计研究院有限公司 Method for finely distributing piles through compaction treatment of foundation
CN111663555A (en) * 2020-06-24 2020-09-15 浙江大学 Jacket pile shoe sealing system based on expanded high polymer and sealing method thereof
US11453991B2 (en) * 2020-07-22 2022-09-27 Zhejiang University High strength grouting method for single pile rock-socketed foundation of weakly weathered bed rock for offshore wind power
CN112683233A (en) * 2020-12-15 2021-04-20 温州鼎玛建筑技术有限公司 Building settlement detection method
CN112575803A (en) * 2020-12-16 2021-03-30 中科鼎实环境工程有限公司 Construction method of flexible vertical impervious wall for blocking underground water pollution
CN112394021A (en) * 2021-01-20 2021-02-23 西南交通大学 Indoor testing arrangement of permeable pavement structure osmotic coefficient
CN112922018A (en) * 2021-03-08 2021-06-08 中国长江三峡集团有限公司 Construction method of gravity foundation of offshore wind power cemented gravel pile reinforced soft soil foundation
CN112922019A (en) * 2021-03-08 2021-06-08 中国长江三峡集团有限公司 Single-pile foundation for reinforcing soft soil foundation by offshore wind power vibroflotation cemented pile and construction method
WO2022213766A1 (en) * 2021-04-08 2022-10-13 中国长江三峡集团有限公司 Microbiologically induced calcium carbonate precipitation gravel composite pile reinforcement structure and construction method
CN113863277A (en) * 2021-10-14 2021-12-31 华地恒工程咨询有限公司 Shallow soft soil composite reinforcement structure and method for reinforcing shallow soft soil foundation
CN114045834A (en) * 2021-12-03 2022-02-15 中国人民解放军陆军工程大学 Sand soil fast curing grouting pile forming device
CN114351681A (en) * 2021-12-30 2022-04-15 中国水利水电第七工程局有限公司 Construction method for back filter layer of vibroflotation pile
CN114411827A (en) * 2022-01-12 2022-04-29 西安理工大学 Vacuum prepressing microorganism grouting rib composite pile foundation model for foundation stabilization
CN114737554A (en) * 2022-03-30 2022-07-12 中建路桥集团有限公司 Construction method for treating soft foundation at bridge head by using gravel compaction pile
CN114775351A (en) * 2022-04-29 2022-07-22 浙江实路工程技术有限公司 Composite grouting pile treatment process for road deep diseases
US20240133144A1 (en) * 2022-10-23 2024-04-25 Nanjing Hydraulic Research Institute Method for reinforcing soft ground by post-grouting combined with air-boosted vacuum preloading
US11982065B1 (en) * 2022-10-24 2024-05-14 Nanjing Hydraulic Research Institute Method for reinforcing soft ground by post-grouting combined with air-boosted vacuum preloading
CN116201103A (en) * 2023-03-27 2023-06-02 中国水利水电第三工程局有限公司 Construction method for pile plate wall of rotary drilling bored pile

Also Published As

Publication number Publication date
CN103233468A (en) 2013-08-07

Similar Documents

Publication Publication Date Title
US20140314497A1 (en) Polymer grouting method for constructing gravel pile
Patel Geotechnical investigations and improvement of ground conditions
Han Recent research and development of ground column technologies
US8974152B2 (en) Polymer grouting method for constructing vertical supporting system
Terashi et al. Ground improvement-state of the art
CN103184734B (en) A kind of construction method implanting slip casting compound pile
CN103321244B (en) Sand foundation existing building sets up the construction method of basement
KR20140075767A (en) Retaining wall construction using site compaction and excavation
CN106948340B (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
CN102011399A (en) PHC pile-based multiple high jet pedestal pile construction method
CN103233473A (en) Polymer multi-edge pile grouting method
CN108560542A (en) A kind of waste tire cladding builds the two-directed reinforcement and its construction method of slag
CN103603379A (en) Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system
CN203213101U (en) Embedding grouting combined pile
KR101466563B1 (en) Method for Soft Ground Improvement using Light-Weighted Foam Soil
CN100595397C (en) Anti-floating construction method by combination of bar-planting and anchoring-bolt
CN102296591A (en) Rapid drainage solidifying treatment method of soft soil foundation
Raju Ground improvement-applications and quality control
CN105421446A (en) Mixed soil extruded and cured precast pile for soft foundation treatment as well as construction method
CN205874851U (en) Ballastless track roadbed structure is made up with stake raft with section to flexible stake
CN211773563U (en) Pile foundation structure
CN104594331B (en) A kind of method that highway high roadbed culvert foundation is reinforced
Zhang et al. Application of polymer grouting reinforcement technology in the treatment of slope collapse
CN116752554B (en) High slope support system based on controlled cement grouting and implementation method
CN112030870B (en) Building rubbish reinforcing river levee under sandy soil geology

Legal Events

Date Code Title Description
AS Assignment

Owner name: SAFEKEY ENGINEERING TECHNOLOGY (ZHENGZHOU), LTD.,

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:HENAN POLYTECH INFRASTRUCTURE REHALILITATION LTD.;REEL/FRAME:035280/0941

Effective date: 20150128

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION