CN102261041B - 后张预应力桥梁预埋胶管端部固定装置 - Google Patents

后张预应力桥梁预埋胶管端部固定装置 Download PDF

Info

Publication number
CN102261041B
CN102261041B CN 201110134417 CN201110134417A CN102261041B CN 102261041 B CN102261041 B CN 102261041B CN 201110134417 CN201110134417 CN 201110134417 CN 201110134417 A CN201110134417 A CN 201110134417A CN 102261041 B CN102261041 B CN 102261041B
Authority
CN
China
Prior art keywords
big nut
screw thread
post
sebific duct
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110134417
Other languages
English (en)
Other versions
CN102261041A (zh
Inventor
张长林
田东升
王茂
田大军
***
白峰
刘明
吴仁友
闫晓光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN 201110134417 priority Critical patent/CN102261041B/zh
Publication of CN102261041A publication Critical patent/CN102261041A/zh
Application granted granted Critical
Publication of CN102261041B publication Critical patent/CN102261041B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

为解决后张预应力桥梁预应力钢筋孔道成型质量的问题,本发明提供一种后张预应力桥梁预埋胶管端部固定装置,包括上套管、下套管、大螺母和夹片,上套管的下半部为一钢管,上半部为一喇叭管,钢管前端表面上设有反向丝扣;下套管的上半部为一钢管,下半部为一喇叭管,钢管前端表面上设有正向丝扣;大螺母的内侧一端设有正向丝扣,另一侧设有反向丝扣;夹片的截面为楔形,在大螺母的侧面开有四个圆孔。通过旋动大螺母和上下套管间的正反丝扣方法,使套管带动胶管张紧,达到了预期的固定效果,可使预埋胶管在混凝土浇筑时不变形移位,成型孔道顺直,保证了孔道摩阻符合设计要求。

Description

后张预应力桥梁预埋胶管端部固定装置
技术领域
本发明涉及一种固定装置,具体为一种后张预应力桥梁预埋胶管端部固定装置。
背景技术
后张预应力桥梁是采用后张法施工的桥梁,因此需要在混凝土梁体上形成安装预应力钢筋的孔道。常用的方法为在混凝土浇筑前预埋胶管,在混凝土浇筑凝固后拔出胶管。但以往预埋胶管安装是沿钢筋骨架摆放铺设的,没有可靠的约束固定,所以在混凝土浇筑时,由于混凝土下落的冲击和振动棒插捣时的挤碰,预埋胶管往往变形移位,从而使成型的孔道也就不顺直,造成了孔道摩阻加大,预应力张拉值难以控制的不良后果。
发明内容
为解决后张预应力桥梁预应力钢筋孔道成型质量的问题,本发明提供了一种后张预应力桥梁预埋胶管端部固定装置。
为解决上述问题,本发明所述的一种后张预应力桥梁预埋胶管端部固定装置,包括上套管、下套管、大螺母和夹片,上套管的下半部为一钢管,上半部为一喇叭管,钢管前端表面上设有反向丝扣;下套管的上半部为一钢管,下半部为一喇叭管,钢管前端表面上设有正向丝扣;大螺母的内侧一端设有正向丝扣,另一侧设有反向丝扣;夹片的截面为楔形。
使用时,将上下套管用大螺母组装成整体,套在预埋胶管上,将下套管推至锚穴,顶在锚穴端面上,在上套管喇叭口和胶管之间***夹片并楔紧,旋转大螺母,通过正反丝扣的作用使上套管向外移动,通过夹片带动胶管使之张紧固定。
为了便于旋转大螺母,在大螺母的侧面开有四个圆孔,在圆孔中***钢筋就可以转动大螺母。
本发明具有以下有益效果:
(1) 构思新颖,首创设计了后张预应力桥梁预埋胶管端部固定装置,解决了后张预应力桥梁预应力钢筋孔道成型质量控制难题。
(2)设计巧妙,采用了在上套管喇叭口和胶管之间放置楔型夹片的方法,既解决了夹紧胶管的问题,又不致造成胶管表面损伤;通过旋动大螺母和上下套管间的正反丝扣方法,使套管带动胶管张紧,达到了预期的固定效果。
(3)使用该装置后,可使预埋胶管在混凝土浇筑时不变形移位,成型孔道顺直,保证了孔道摩阻符合设计要求,提高了预应力张拉质量。
(4)使用该装置后,由于预埋胶管在混凝土浇筑时不产生变形移位,也减小了拔出胶管时的难度,加快了拔管进度,提高了工作效率。
(5)结构简单,制作容易,装卸简便,成本较低。
附图说明
图1为本发明组合安装后的结构示意图。
图2为上套管。
图3为下套管。
图4为大螺母。
图5为图5的侧视图。
图6为夹片。
图中,1-上套管,2-下套管,3-大螺母,4-夹片,5-圆孔,6-胶管,7-锚穴。
具体实施方式
以下结合附图对本发明做进一步说明。
本发明所述的一种后张预应力桥梁预埋胶管端部固定装置,包括上套管1、下套管2、大螺母3和夹片4,上套管1的下半部为一钢管,钢管内径略大于预埋胶管外径,上半部为一喇叭管,喇叭口直径根据自锁角度需要设计,钢管前端表面上设有反向丝扣;下套管2的上半部为一钢管,钢管内径与上套管1钢管内径相同,下半部为一喇叭管,喇叭口直径大于锚穴上圆孔直径,以便支撑于锚穴底面上,钢管前端表面上设有正向丝扣;大螺母2的内侧一端设有正向丝扣,另一侧设有反向丝扣;大螺母3为钢制构件,其内丝扣的加工是与上下套管外丝扣相配套。夹片4的截面为楔形,为钢制构件,尺寸与上套管喇叭口和胶管外径之间的间隙相适应,为方便使用,可以设计为两瓣。
大螺母3的侧面开有四个圆孔5。四个圆孔5用于***钢筋旋转大螺母3,通过大螺母3将上下套管组装成整体。
使用时,两个固定装置为一套,用于一根胶管6的两端,先将上下套管用大螺母3组装成整体,套在预埋胶管6上,将组合体推至锚穴内,顶在锚穴7端面上,每根胶管6一头安装一个。在上套管1喇叭口和胶管之间***夹片4,并楔紧。在大螺母3圆孔中***钢筋向外旋转大螺母3,通过正反丝扣的作用使上套管1向外移动,通过夹片4带动胶管6使之张紧固定。

Claims (2)

1.一种后张预应力桥梁预埋胶管端部固定装置,其特征在于:包括上套管(1)、下套管(2)、大螺母(3)和夹片(4),上套管(1)的下半部为一钢管,上半部为一喇叭管,钢管前端表面上设有反向丝扣;下套管(2)的上半部为一钢管,下半部为一喇叭管,钢管前端表面上设有正向丝扣;上套管(1)和下套管(2)通过大螺母(3)组装,套在预埋胶管上,大螺母(3)的内侧一端设有与下套管(2)前端表面连接的正向丝扣,另一侧设有与上套管(1)前端表面连接反向丝扣;在上套管(1)喇叭管和胶管之间***夹片(4),夹片(4)的截面为楔形。
2.根据权利要求1所述的一种后张预应力桥梁预埋胶管端部固定装置,其特征在于:大螺母(3)的侧面开有四个圆孔(5)。
CN 201110134417 2011-05-24 2011-05-24 后张预应力桥梁预埋胶管端部固定装置 Active CN102261041B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110134417 CN102261041B (zh) 2011-05-24 2011-05-24 后张预应力桥梁预埋胶管端部固定装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110134417 CN102261041B (zh) 2011-05-24 2011-05-24 后张预应力桥梁预埋胶管端部固定装置

Publications (2)

Publication Number Publication Date
CN102261041A CN102261041A (zh) 2011-11-30
CN102261041B true CN102261041B (zh) 2013-07-17

Family

ID=45007859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110134417 Active CN102261041B (zh) 2011-05-24 2011-05-24 后张预应力桥梁预埋胶管端部固定装置

Country Status (1)

Country Link
CN (1) CN102261041B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817315B (zh) * 2012-05-22 2015-04-08 北京交通大学 一种支座柔性锚固***
CN102995556B (zh) * 2012-12-04 2014-11-05 北京交通大学 一种用于跨座式单轨交通轨道梁的支座
CN105889625B (zh) * 2016-04-13 2018-01-09 中国科学院武汉岩土力学研究所 一种用于顶管施工的组合式钢管中继间设备及施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2739290Y (zh) * 2004-09-18 2005-11-09 柳州欧维姆机械股份有限公司 钢绞线竖向预应力锚固体系
JP2007254975A (ja) * 2006-03-20 2007-10-04 Dps Bridge Works Co Ltd 鋼とコンクリートの複合桁とこの複合桁の製造方法
JP2008231700A (ja) * 2007-03-16 2008-10-02 Anderson Technology Kk ポストテンション方式pc床版用扁平型定着具、及び同定着具を使用したポストテンション方式pc床版、並びに同ポストテンション方式pc床版の構築方法
CN101736701A (zh) * 2009-12-15 2010-06-16 中交路桥华北工程有限公司 桥梁钢混结合段施工方法
CN201704628U (zh) * 2010-03-16 2011-01-12 中国建筑土木建设有限公司 箱梁梁端锚穴封堵模板
CN202073042U (zh) * 2011-05-24 2011-12-14 中铁三局集团有限公司 后张预应力桥梁预埋胶管端部固定装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2739290Y (zh) * 2004-09-18 2005-11-09 柳州欧维姆机械股份有限公司 钢绞线竖向预应力锚固体系
JP2007254975A (ja) * 2006-03-20 2007-10-04 Dps Bridge Works Co Ltd 鋼とコンクリートの複合桁とこの複合桁の製造方法
JP2008231700A (ja) * 2007-03-16 2008-10-02 Anderson Technology Kk ポストテンション方式pc床版用扁平型定着具、及び同定着具を使用したポストテンション方式pc床版、並びに同ポストテンション方式pc床版の構築方法
CN101736701A (zh) * 2009-12-15 2010-06-16 中交路桥华北工程有限公司 桥梁钢混结合段施工方法
CN201704628U (zh) * 2010-03-16 2011-01-12 中国建筑土木建设有限公司 箱梁梁端锚穴封堵模板
CN202073042U (zh) * 2011-05-24 2011-12-14 中铁三局集团有限公司 后张预应力桥梁预埋胶管端部固定装置

Also Published As

Publication number Publication date
CN102261041A (zh) 2011-11-30

Similar Documents

Publication Publication Date Title
CN102261041B (zh) 后张预应力桥梁预埋胶管端部固定装置
US10024051B2 (en) Embedded concrete anchor system
CN109235779B (zh) 一种可实现钢筋自定心的全灌浆套筒构造及作法
WO2014199706A1 (ja) 既設管の更生方法および更生管の支持部材
CN108797897B (zh) 预制构件自锁式钢筋连接器
CN202073042U (zh) 后张预应力桥梁预埋胶管端部固定装置
CN211524173U (zh) 一种铝合金模板螺杆洞封堵组合装置
CN216553005U (zh) 一种用于爬模架体的新型附墙装置
CN201671339U (zh) 一种用于建筑物的墙体、梁柱模板的固定装置
CN205000329U (zh) 接头器
KR102096802B1 (ko) 마개와 원통부가 일체로 형성된 다줄 나사산을 갖는 벽체옹벽용 관통슬리브 제조 장치 및 그 방법
CN204040316U (zh) 钢筋连接装置
CN202416878U (zh) 一种钢绞线预应力结构扁锚张拉端锚具
CN201474290U (zh) 一种脚手架搭接构件
JP5002085B2 (ja) 誘導埋込み材及びそれを用いたひび割れ誘導構造
KR102446331B1 (ko) 거푸집용 세파타이 고정장치
CN211447799U (zh) 一种混凝土结构浇筑用模板对拉装置
KR102528443B1 (ko) 건축 구조물의 가설재 지지용 클램프 바
KR100771232B1 (ko) 거푸집 간격 유지구
CN204492205U (zh) 一种钢筋连接装置
CN214460324U (zh) 一种预制建筑单体装配结构
CN219261360U (zh) 一种前段固定防灌浆的可靠预埋装置
CN208618793U (zh) 新型装配式建筑剪力墙板成型模具
CN205063335U (zh) 喷泉混凝土浇筑模固定装置
CN203831571U (zh) 多用途预应力张拉板

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant