CN102092096A - Method for fixing pre-stressed hose of precast beam - Google Patents
Method for fixing pre-stressed hose of precast beam Download PDFInfo
- Publication number
- CN102092096A CN102092096A CN 201010561355 CN201010561355A CN102092096A CN 102092096 A CN102092096 A CN 102092096A CN 201010561355 CN201010561355 CN 201010561355 CN 201010561355 A CN201010561355 A CN 201010561355A CN 102092096 A CN102092096 A CN 102092096A
- Authority
- CN
- China
- Prior art keywords
- hose
- precast beam
- bar
- stressed
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
The invention belongs to the technical field of laying and fixing pre-stressed steel wire bundles and hoses for precast beams in railway engineering, in particular to a method for fixing the pre-stressed hose of the precast beam, solving the problems that the pre-stressed hose of the conventional precast beam is difficult to lay and fix, and the hose which easily deviates from the designed position possibly enables the whole beam to be scrapped. The method comprises the following steps: soldering a lower positioning reinforcement bar on a bound precast beam steel reinforcement cage according to a pre-stressed steel wire bundle designing position; enabling a hose with the pre-stressed steel wire bundle to penetrating through the lower positioning reinforcement bar; and fixing the hose on the lower positioning reinforcement bar by a double-sided hooked reinforcement bar after the hose is laid to a preset position. The method has the following advantages: the hose can pass through the steel reinforcement case by a simple and quick method, accurate position of the hose is ensured, displacement of the hose during concrete pouring in later stage is avoided, construction period is saved and the quality of the precast beam is greatly improved, the operation is simple, the cost is low and the method in the invention is easy to popularize.
Description
Technical field
The invention belongs to the technical field that railway construction precast beam prestressing steel wire bunch and hose are laid and fixed, be specifically related to a kind of precast beam prestressing force hose fixing means.
Background technology
In recent years, country strengthens the investment of railway, railway development is rapid, the railway engineering project increases, in the railway engineering particularly in the mountain railway engineering mainly based on the bridge-type roadbed, wherein major part is a precast bridge, and at present a lot of railway constructions all will be built the precast beam field simultaneously, to guarantee the supply of the precast beam that bridge erection is required.Precast beam substantially all needs to lay prestressing steel wire bunch, after prestressing steel wire bunch is put in hose in advance, treat that beam is tied up muscle and finished after, again the hose that has steel tendon is penetrated into the precalculated position in the lump.
The method of laying hose at present is: weld two bar reinforcements up and down in advance by design attitude on the good steel reinforcement cage of colligation, form the direction reinforcing steel bar frame, as shown in Figure 1.Then the hose that has steel tendon from one end to the other side manually is punctured into the reinforcing steel bar frame that the welded reinforcement clavate becomes in the lump, through predetermined design position as shown in Figure 2.
In the practice of construction operating process, the shortcoming of this kind method is obvious, be mainly: bar reinforcement all fixes the back and forms reinforcing steel bar frame up and down, the prestressing steel wire bunch hose is difficult to penetrate smoothly, for this reason, move a lot on bar reinforcement often needs, the rich size that is reinforcing steel bar frame is bigger, when treating that the later stage concrete is poured into a mould, because concrete buoyancy is added top bigger rich space is arranged, hose and steel tendon float in the lump, the off-design position, cause the not in place or stressed complexity of later stage prestressing steel wire bunch stretch-draw, may cause the full wafer beam to be scrapped when serious.
Summary of the invention
The present invention lays and the fixing operation difficulty in order to solve existing prefabricated girder pre-stressed hose, and the easy off-design of hose position, and the problem that may cause the full wafer beam to be scrapped provides a kind of precast beam prestressing force hose fixing means.
The present invention adopts following technical scheme to realize:
A kind of precast beam prestressing force hose fixing means is characterized in that step is as follows:
1), on the good precast beam steel reinforcement cage of colligation, welds bottom spacer bar rod according to the position of prestressing steel wire bunch design earlier;
2), penetrate the hose that has prestressing steel wire bunch;
3), treat that hose is routed to the precalculated position after, with two-sided hooked bar bar hose is fixed on the spacer bar rod of bottom, with iron wire the fixedly colligation of two-sided hooked bar bar.
The present invention has following beneficial effect: realized penetrating the hose that is installed with prestressing steel wire bunch in the steel reinforcement cage smoothly with the method for simple and fast, and the position that can guarantee hose is accurate, hose is shifted when avoiding later stage concreting simultaneously, both save the duration and improved the quality of precast beam simultaneously greatly, simple to operate, with low cost, very easily promote, in current flourishing railway market especially precast beam market, economic benefit and social benefit are very considerable.
Description of drawings
The reinforcing steel bar frame schematic diagram that the bar reinforcement that Fig. 1 welds when laying hose for having now forms
Fig. 2 penetrates the hose schematic diagram of band prestressing steel wire bunch when laying hose for having now
Fig. 3 presses the schematic diagram of design attitude welding bottom spacer bar rod for the present invention
Fig. 4 lays the schematic diagram of the hose that is installed with steel tendon for the present invention
Fig. 5 is the schematic diagram of the present invention with two-sided hooked bar bar fixing glue leather hose
Fig. 6 is the thin portion of a Fig. 5 structural representation
Among the figure: 1-reinforcing steel bar frame, 2-hose, 3-bottom spacer bar rod, the two-sided hooked bar bar of 4-.
The specific embodiment
In conjunction with the accompanying drawings the specific embodiment of the present invention is described further.
As shown in Figure 6, precast beam prestressing force hose fixture comprises according to the bottom spacer bar rod 3 of the position welding of prestressing steel wire bunch design and removable and hose 2 can be fixed in two-sided hooked bar bar 4 on the bottom spacer bar rod 3.Two-sided hooked bar bar 4 is reinforcing rods that two ends have crotch.
The present invention is directed to the laying and the location of bridge precast beam prestressing steel wire bunch and hose, its concrete implementation method is: weld bottom spacer bar rod 3 according to the position of prestressing steel wire bunch design earlier on the good precast beam steel reinforcement cage of colligation, as shown in Figure 3.Then, penetrate the hose 2 that has prestressing steel wire bunch, as shown in Figure 4.Treat with two-sided hooked bar bar 4 hose to be fixed on the bottom spacer bar rod 3 after hose 2 is routed to the precalculated position, fixedly colligation can be as shown in Figure 5 two-sided hooked bar bar 4 with iron wire.
Claims (1)
1. precast beam prestressing force hose fixing means is characterized in that step is as follows:
1), on the good precast beam steel reinforcement cage of colligation, welds bottom spacer bar rod (3) according to the position of prestressing steel wire bunch design earlier;
2), penetrate the hose (2) that has prestressing steel wire bunch;
3), treat that hose (2) is routed to the precalculated position after, with two-sided hooked bar bar (4) hose (2) is fixed on the bottom spacer bar rod (3), with iron wire fixedly colligation of two-sided hooked bar bar (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010561355XA CN102092096B (en) | 2010-11-27 | 2010-11-27 | Method for fixing pre-stressed hose of precast beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010561355XA CN102092096B (en) | 2010-11-27 | 2010-11-27 | Method for fixing pre-stressed hose of precast beam |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102092096A true CN102092096A (en) | 2011-06-15 |
CN102092096B CN102092096B (en) | 2012-04-04 |
Family
ID=44125453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010561355XA Active CN102092096B (en) | 2010-11-27 | 2010-11-27 | Method for fixing pre-stressed hose of precast beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102092096B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103015326A (en) * | 2012-12-28 | 2013-04-03 | 中铁二十四局集团有限公司 | Automatic rubber tube inserting machine and application method thereof in box girder reinforcement cage |
CN107297811A (en) * | 2017-08-25 | 2017-10-27 | 李全民 | A kind of arcual component prestress application device and the method with the device concrete |
CN109162206A (en) * | 2018-10-30 | 2019-01-08 | 中国十七冶集团有限公司 | A kind of constructing structure and its construction method of cast-in-situ box girder prestressed strand |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100705367B1 (en) * | 2006-02-24 | 2007-04-12 | (주)내경엔지니어링 | Prestressed concrete corrugated steel plate composition type slab bridge and the construction method of this |
CN101413323A (en) * | 2008-11-25 | 2009-04-22 | 中铁大桥局集团第五工程有限公司 | Method for preparing and preventing plug of wide-span case beam rear tension method prestress pore passage |
CN201301520Y (en) * | 2008-11-25 | 2009-09-02 | 浙江省交通工程建设集团有限公司 | Prestressed beam drilling bellow positioning reinforced net |
CN101596744A (en) * | 2009-07-06 | 2009-12-09 | 中冶建工有限公司 | The continuity stirrups colligation installation method of post-stretching prestressed reinforced concrete case beam |
-
2010
- 2010-11-27 CN CN201010561355XA patent/CN102092096B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100705367B1 (en) * | 2006-02-24 | 2007-04-12 | (주)내경엔지니어링 | Prestressed concrete corrugated steel plate composition type slab bridge and the construction method of this |
CN101413323A (en) * | 2008-11-25 | 2009-04-22 | 中铁大桥局集团第五工程有限公司 | Method for preparing and preventing plug of wide-span case beam rear tension method prestress pore passage |
CN201301520Y (en) * | 2008-11-25 | 2009-09-02 | 浙江省交通工程建设集团有限公司 | Prestressed beam drilling bellow positioning reinforced net |
CN101596744A (en) * | 2009-07-06 | 2009-12-09 | 中冶建工有限公司 | The continuity stirrups colligation installation method of post-stretching prestressed reinforced concrete case beam |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103015326A (en) * | 2012-12-28 | 2013-04-03 | 中铁二十四局集团有限公司 | Automatic rubber tube inserting machine and application method thereof in box girder reinforcement cage |
CN103015326B (en) * | 2012-12-28 | 2016-04-20 | 中铁二十四局集团有限公司 | A kind ofly automatically wear rubber tube machine and the application process in case beam steel cage thereof |
CN107297811A (en) * | 2017-08-25 | 2017-10-27 | 李全民 | A kind of arcual component prestress application device and the method with the device concrete |
CN107297811B (en) * | 2017-08-25 | 2023-08-01 | 南京钜砼建筑工业技术研究所有限公司 | Method for manufacturing concrete by using arch member prestress applying device |
CN109162206A (en) * | 2018-10-30 | 2019-01-08 | 中国十七冶集团有限公司 | A kind of constructing structure and its construction method of cast-in-situ box girder prestressed strand |
Also Published As
Publication number | Publication date |
---|---|
CN102092096B (en) | 2012-04-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105839510B (en) | A kind of steel and ultra-high performance concrete composite continuous bridge structure and its construction method | |
CN102154992B (en) | Dislocation installation method of corrugated steel web | |
CN107938504A (en) | A kind of wet seam construction of floorings using T reinforcing bars and its construction method | |
CN101748682A (en) | Steel-concrete composite beam adopting corrugated steel web and construction method thereof | |
CN102251667B (en) | Construction method for reinforced concrete arched roof of grain store | |
CN201474095U (en) | Combined connection device of reverse construction concrete beam steel bar and positive construction type steel column | |
CN102092096B (en) | Method for fixing pre-stressed hose of precast beam | |
CN203200656U (en) | Light corrugated steel-high strength reactive powder concrete combined bridge deck slab | |
CN105088961B (en) | The construction method that a kind of end bay closure segment is merged with Cast-in-Situ Segment | |
CN207062746U (en) | The precast pier of steel pipe built in a kind of band | |
CN103924676B (en) | Prestressing force connects beams of concrete concrete-filled circular steel tube column node | |
CN109208823A (en) | It is a kind of can quick assembling built-in steel-case formula steel core concrete column and its production technology | |
CN205296522U (en) | Super thick cast -in -place post stretching of large -span prestressing force hollow floor that slowly bonds | |
CN109267489B (en) | Construction method for cable-stayed bridge cable tower anchoring area | |
CN206693470U (en) | A kind of cast-in-place secondary beam T-shaped floor | |
CN201900677U (en) | Fixing device of prestressed hose of precast beam | |
CN216740371U (en) | Large-diameter reinforcement superposed beam structure spliced by inner-concave-angle shear-resistant pieces | |
CN109322446A (en) | The positioning device and localization method of presstressed reinforcing steel in beam | |
CN201605538U (en) | Truss frame type surrounding purlin and no-pull rod rollover device for high tower construction | |
CN105862572A (en) | Super-long vertical unbonded prestress structure and assembling method thereof | |
CN203924484U (en) | A kind of precast beam and there is the reinforced concrete structure of tenon anchor system | |
CN207700064U (en) | A kind of Precast T-Beam reinforcing steel bar-binding bench | |
CN205688330U (en) | The vertical unbonded pre-stressed construction of overlength | |
CN201424706Y (en) | Novel connecting structure of steel secondary beam and concrete main beam | |
CN205088676U (en) | Shaped steel - concrete makes up stress tube stake in advance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |