CN207700064U - A kind of Precast T-Beam reinforcing steel bar-binding bench - Google Patents

A kind of Precast T-Beam reinforcing steel bar-binding bench Download PDF

Info

Publication number
CN207700064U
CN207700064U CN201721769532.7U CN201721769532U CN207700064U CN 207700064 U CN207700064 U CN 207700064U CN 201721769532 U CN201721769532 U CN 201721769532U CN 207700064 U CN207700064 U CN 207700064U
Authority
CN
China
Prior art keywords
steel
bar
binding
precast
steel bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721769532.7U
Other languages
Chinese (zh)
Inventor
曾志强
白宇
李伟
翟阳
高志峰
徐曼
时稳重
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction Municipal Engineering Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201721769532.7U priority Critical patent/CN207700064U/en
Application granted granted Critical
Publication of CN207700064U publication Critical patent/CN207700064U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model is related to a kind of Precast T-Beam reinforcing steel bar-binding benchs to be made of joint bar steel pipe and column channel steel, and Precast T-Beam reinforcing steel bar-binding bench is made of T beam webs reinforcing steel bar-binding bench and T beam roof steel bars binding platform.The T beam webs reinforcing steel bar-binding bench is made of symmetrically arranged two web reinforcements binding platform, it is in laterally that spacing distance is equipped with card bottom steel bar groove that each web reinforcement binding platform, which is on bottom support channel steel, the outside lower end of several column channel steels supports the medial surface of channel steel to be linked together in spacing distance and bottom, the medial surface of side steel plate is linked together in the outer upper of spacing distance and column channel steel, is in laterally that spacing distance is equipped with joint bar steel pipe on each column channel steel.The utility model can solve the quality problems occurred in reinforcing bar process of binding, can guarantee that the spacing of web reinforcement, roof steel bar and horizontal bar is uniform, to improve cover to reinforcement qualification rate, have it is simple in structure, save labor and high-quality advantage.

Description

A kind of Precast T-Beam reinforcing steel bar-binding bench
Technical field
The utility model belongs to a kind of Precast T-Beam reinforcing steel bar-binding bench.
Background technology
Currently, at the construction field (site) in Precast T-Beam reinforcing bar process of binding, the especially larger Precast T-Beam reinforcing bar of span is tied up During bundle, web reinforcement and roof steel bar are easy to tilt, and cause bar spacing uneven.Meanwhile there is also tie up for horizontal reinforcement Bundle is not horizontal to cause bar spacing qualification rate low, so that the problems such as cover to reinforcement qualification rate is low is also also resulted in, and bar spacing Uneven, protective layer thickness is again not enough that concrete is caused the main reason for crack occur.How web reinforcement, top plate steel are solved Muscle and horizontal bar spacing are uneven and other issues, are the pressing issues that building field need to solve as early as possible.
Invention content
The purpose of this utility model is a kind of Precast T-Beam reinforcing steel bar-binding bench of design, can solve to occur in reinforcing bar process of binding Quality problems, can guarantee that the spacing of web reinforcement, roof steel bar and horizontal bar is uniform, to improve cover to reinforcement qualification Rate, have it is simple in structure, save labor and high-quality advantage.
For this reason, the utility model is made of joint bar steel pipe and column channel steel, Precast T-Beam reinforcing steel bar-binding bench is by T soffit of girder slabs Muscle binds platform and T beam roof steel bars binding platform is constituted:
The T beam webs reinforcing steel bar-binding bench is made of symmetrically arranged two web reinforcements binding platform, each web steel It is that bottom supports laterally in spacing distance equipped with card bottom steel bar groove on channel steel that muscle, which binds platform, and the outside lower end of several column channel steels is in interval Distance supports the medial surface of channel steel to be linked together the bottom of with, and the medial surface of side steel plate connects in the outer upper of spacing distance and column channel steel It is integrated, is in laterally that spacing distance is equipped with joint bar steel pipe on each column channel steel.
The T beam roof steel bars binding platform is made of symmetrically arranged two roof steel bars binding platform, each top plate steel It is to push up laterally to be equipped with card top steel bar groove in spacing distance on steel plate that muscle, which binds platform, and the outer upper end of several top support channel steels is in be spaced Distance and the inside lower end of top steel plate are linked together, and the outer upper end of top support channel steel is equipped with top and reinforces steel plate, and steel plate is reinforced on top It is welded into one with several top support channel steels end face in corresponding portion.
The position of the card bottom steel bar groove is identical as the position of lateral bottom bar dowel in Precast T-Beam.The joint bar steel The position of the axis of pipe is identical as the position of transversal web reinforcing bar in Precast T-Beam.Joint bar steel pipe, card top steel bar groove and the card The axis of bottom steel bar groove is parallel.The position of the card top steel bar groove is identical as the position for laterally pushing up bar dowel in Precast T-Beam.Institute The length that steel plate is reinforced on the bottom support channel steel stated and top is identical as the length of Precast T-Beam, is set between two roof steel bar binding platforms There is strut.
Said structure design has reached the purpose of this utility model.
The utility model can solve the quality problems occurred in reinforcing bar process of binding, can guarantee web reinforcement, roof steel bar And the spacing of horizontal bar is uniform, to improve cover to reinforcement qualification rate, have it is simple in structure, save labor with it is high-quality Advantage.
Beneficial effects of the present invention:
(1)The present invention is easy to operate understandable, and more people assembling reinforcement simultaneously, web reinforcement and roof steel bar position can be supported solid It is fixed, will not run-off the straight, and can guarantee that assembling reinforcement spacing is consistent with spacing is designed.
(2)The production qualification rate of construction site Precast T-Beam is improved, project cost is reduced.Web reinforcement and roof steel bar point Be not placed on card bottom steel bar groove and card top steel bar groove in will not run-off the straight phenomenon, horizontal bar(It is longitudinal)The bar dowel being placed on (It is 1 meter long)On, it ensure that the level and spacing of horizontal bar, ensure that cover to reinforcement qualification rate, improve beam slab qualification rate.Section About human and material resources, financial resources reduce the waste of material, reduce project cost.
Description of the drawings
Fig. 1 is that the web reinforcement of the utility model binds the structural schematic diagram of platform.
Fig. 2 is that the web reinforcement of the utility model binds the use state diagram of platform.
Fig. 3 is that the roof steel bar of the utility model binds the structural schematic diagram of platform.
Fig. 4 is that the roof steel bar of the utility model binds the use state diagram of platform.
Specific implementation mode
As shown in Figures 1 to 4, a kind of Precast T-Beam reinforcing steel bar-binding bench is made of joint bar steel pipe and column channel steel, Precast T-Beam Reinforcing steel bar-binding bench is made of T beam webs reinforcing steel bar-binding bench and T beam roof steel bars binding platform:
As shown in Figure 1 to Figure 2, the T beam webs reinforcing steel bar-binding bench binds platform by symmetrically arranged two web reinforcements Composition.Each web reinforcement binds platform:It is in laterally that spacing distance is equipped with card bottom steel bar groove 5 that bottom, which supports on channel steel 1,.The card The position of bottom steel bar groove is identical as the position of lateral bottom bar dowel in Precast T-Beam.The outside lower end of several column channel steels 4 is in interval distance The medial surface of channel steel is supported to be linked together from the bottom of with.The medial surface of side steel plate 3 connects in the outer upper of spacing distance and column channel steel It is integrated.It is in laterally that spacing distance is equipped with joint bar steel pipe 2 on each column channel steel(Diameter 30mm).The axis of the joint bar steel pipe Position it is identical as the position of transversal web reinforcing bar in Precast T-Beam.
In use, two web reinforcement binding platform axis are placed in spacing distance Parallel Symmetric, two web reinforcement bindings Distance is adapted to T beam web width between platform.The web reinforcement 8 that will be processed(T beam bottom plate transverse steels)Two ends place Into card bottom steel bar groove 5, by bar dowel 7(T beam web transverse steels)It is inserted into each joint bar steel pipe, i.e. the both ends of bar dowel are located at In joint bar steel pipe.By horizontal bar 6(T beam web longitudinal reinforcements)It is placed on bar dowel according to design drawing, with safeguard level reinforcing bar Level and spacing.Can shape assembling reinforcement of guaranteeing the quality.After the completion of binding, two web reinforcement binding platforms are withdrawn outward, respectively Bar dowel two ends are detached from each joint bar steel pipe, and each web reinforcement two ends are detached from each card bottom steel bar groove, you can take from two abdomens Plate reinforcing steel bar-binding bench.
As shown in Figure 3 to Figure 4, T beam roof steel bars binding platform binds platform by symmetrically arranged two roof steel bars Composition, each roof steel bar binding platform are:Push up on steel plate 9 is in laterally that spacing distance is equipped with card top steel bar groove 12.Several top supports The outer upper end of channel steel 11 is linked together in spacing distance with the inside lower end for pushing up steel plate.The outer upper end of top support channel steel is equipped with Steel plate 10 is reinforced on top, and top reinforces steel plate and is welded into one with several top support channel steels end face in corresponding portion.Two roof steel bar bindings Strut 14 is equipped between platform, with fixed distance between the two.The described bottom support channel steel and top reinforce the length of steel plate in advance The length of T beams processed is identical.The position of the card top steel bar groove is identical as the position for laterally pushing up bar dowel in Precast T-Beam.
In use, two roof steel bar binding platform axis are placed in spacing distance Parallel Symmetric, two roof steel bar bindings Distance is adapted to T back plate width between platform.And fixed with strut between two roof steel bar binding platforms, two roof steel bars are tied up The lower end of Zha Tai is that symmetrically arranged two web reinforcements bind platform(As described above, therefore being not repeated).The top plate that will be processed Reinforcing bar 13(T back plate transverse steels)Two ends be placed into card top steel bar groove in, by horizontal bar 6(T beam longitudinal reinforcements)According to setting Meter drawing is placed in roof steel bar, with the level and spacing of safeguard level reinforcing bar.Can shape assembling reinforcement of guaranteeing the quality.It has bound Cheng Hou, withdraws two roof steel bar binding platforms outward, and each roof steel bar two ends are detached from each card and push up steel bar groove, you can take from two A roof steel bar binds platform.
The joint bar steel pipe, card top steel bar groove are parallel with the axis of card bottom steel bar groove.
In short, the utility model can solve the quality problems occurred in reinforcing bar process of binding, web reinforcement, top plate can guarantee The spacing of reinforcing bar and horizontal bar is uniform, to improve cover to reinforcement qualification rate, has simple in structure, saves labor and quality Good advantage.

Claims (6)

1. a kind of Precast T-Beam reinforcing steel bar-binding bench, is made of joint bar steel pipe and column channel steel, it is characterised in that:Precast T-Beam reinforcing bar is tied up Zha Tai is made of T beam webs reinforcing steel bar-binding bench and T beam roof steel bars binding platform;
The T beam webs reinforcing steel bar-binding bench is made of symmetrically arranged two web reinforcements binding platform, and each web reinforcement is tied up Zha Tai is that bottom supports laterally in spacing distance equipped with card bottom steel bar groove on channel steel, and the outside lower end of several column channel steels is in spacing distance The medial surface of channel steel is supported to be linked together the bottom of with, the medial surface of side steel plate is linked as in the outer upper of spacing distance and column channel steel Integrally, it is in laterally that spacing distance is equipped with joint bar steel pipe on each column channel steel;
The T beam roof steel bars binding platform is made of symmetrically arranged two roof steel bars binding platform, and each roof steel bar is tied up It is in laterally that spacing distance is equipped with card top steel bar groove that Zha Tai, which is on the steel plate of top, and the outer upper end of several top support channel steels is in spacing distance Be linked together with the inside lower end of top steel plate, the outer upper end of top support channel steel is equipped with top and reinforces steel plate, top reinforce steel plate with it is right It answers several top support channel steels end face in portion to be welded into one, strut is equipped between two roof steel bar binding platforms.
2. a kind of Precast T-Beam reinforcing steel bar-binding bench as described in claim 1, it is characterised in that:The position of the card bottom steel bar groove It sets identical as the position of lateral bottom bar dowel in Precast T-Beam.
3. a kind of Precast T-Beam reinforcing steel bar-binding bench as described in claim 1, it is characterised in that:The axis of the joint bar steel pipe Position it is identical as the position of transversal web reinforcing bar in Precast T-Beam.
4. a kind of Precast T-Beam reinforcing steel bar-binding bench as described in claim 1, it is characterised in that:The joint bar steel pipe, card top steel Muscle slot is parallel with the axis of card bottom steel bar groove.
5. a kind of Precast T-Beam reinforcing steel bar-binding bench as described in claim 1, it is characterised in that:The position of the card top steel bar groove It sets identical as the position for laterally pushing up bar dowel in Precast T-Beam.
6. a kind of Precast T-Beam reinforcing steel bar-binding bench as described in claim 1, it is characterised in that:The bottom support channel steel and top The length for reinforcing steel plate is identical as the length of Precast T-Beam.
CN201721769532.7U 2017-12-18 2017-12-18 A kind of Precast T-Beam reinforcing steel bar-binding bench Expired - Fee Related CN207700064U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721769532.7U CN207700064U (en) 2017-12-18 2017-12-18 A kind of Precast T-Beam reinforcing steel bar-binding bench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721769532.7U CN207700064U (en) 2017-12-18 2017-12-18 A kind of Precast T-Beam reinforcing steel bar-binding bench

Publications (1)

Publication Number Publication Date
CN207700064U true CN207700064U (en) 2018-08-07

Family

ID=63026776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721769532.7U Expired - Fee Related CN207700064U (en) 2017-12-18 2017-12-18 A kind of Precast T-Beam reinforcing steel bar-binding bench

Country Status (1)

Country Link
CN (1) CN207700064U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114147290A (en) * 2021-11-12 2022-03-08 上海江南长兴造船有限责任公司 Marine T-row end difference repairing and cutting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114147290A (en) * 2021-11-12 2022-03-08 上海江南长兴造船有限责任公司 Marine T-row end difference repairing and cutting method

Similar Documents

Publication Publication Date Title
CN108677685B (en) Ultra-high-performance concrete-part steel beam combined bent cap and construction method thereof
CN106049718A (en) Novel overlapping shear wall
US20170314268A1 (en) I-shaped steel with discontinuous top flange reinforced compound concrete beam containing demolished concrete lumps and construction process of such beam
CN201665952U (en) Self-supporting floor deck
CN202706536U (en) Lateral support formwork applied to post-cast strip or construction joint
CN203440837U (en) Concrete closing net device for construction joint of base plate
CN108385503A (en) A kind of assembled light combination beam freely-supported structure changes continuous structure and its construction method
CN205024882U (en) Prefabricated assembled shaped steel concrete shear force wall
CN106930181A (en) A kind of simple-supported thencontinuous steel reinforced concrete combined bridge hogging moment area structure
CN206428968U (en) A kind of steel bar girder formula is without supporting template system
CN110005109A (en) A kind of open flume type prestressed concrete overlapped slab
CN104947851A (en) Corrugated steel baseplate and concrete composite beam
CN206438529U (en) Beam and slab type raft foundation formwork support structure
CN205531326U (en) L type dysmorphism post template
CN103498531A (en) Long-span pre-stressing I-shaped steel reinforced concrete superposed beam
CN207700064U (en) A kind of Precast T-Beam reinforcing steel bar-binding bench
CN206722216U (en) A kind of prefabricated girder of laminated floor slab
CN110952457A (en) Steel plate combined beam bridge support-free cast-in-place concrete device and construction method
CN208280454U (en) Double steel plate Combination beam of steel and concrete
CN201411626Y (en) Corrugated steel web pre-bending composite beam
CN108265883A (en) A kind of wine cup shape Section of Steel-concrete Composite Beam and its construction method
CN210288121U (en) Steel box-concrete composite beam concrete pouring system
CN104797762A (en) Building and construction method thereof
CN102587653A (en) Novel reinforcing tie bolt for side form of side beam
CN208267235U (en) A kind of double steel plate Combination beam of steel and concrete

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180807

CF01 Termination of patent right due to non-payment of annual fee