CN203924484U - A kind of precast beam and there is the reinforced concrete structure of tenon anchor system - Google Patents

A kind of precast beam and there is the reinforced concrete structure of tenon anchor system Download PDF

Info

Publication number
CN203924484U
CN203924484U CN201320861698.7U CN201320861698U CN203924484U CN 203924484 U CN203924484 U CN 203924484U CN 201320861698 U CN201320861698 U CN 201320861698U CN 203924484 U CN203924484 U CN 203924484U
Authority
CN
China
Prior art keywords
precast beam
tenon
vertical member
precast
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320861698.7U
Other languages
Chinese (zh)
Inventor
鲁军波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320861698.7U priority Critical patent/CN203924484U/en
Application granted granted Critical
Publication of CN203924484U publication Critical patent/CN203924484U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a kind of precast beam, comprise precast beam body, it is characterized in that: described precast beam body two ends are provided with precast beam tenon.The utility model also comprises a kind of reinforced concrete structure with tenon anchor system that adopts said structure precast beam.Precast beam described in the utility model and there is the reinforced concrete structure of tenon anchor system, a kind of reliable in structure is provided, and construction technology is simple, the precast assembly structural system that construction organization is easy, can realize construction work prefabrication amount and maximize, the minimized target of the on-the-spot amount of labour used.

Description

A kind of precast beam and there is the reinforced concrete structure of tenon anchor system
Technical field
The utility model relates to building field, particularly a kind of precast beam and have the reinforced concrete structure of tenon anchor system.
Background technology
Particularity due to construction work, current building engineering construction is is mostly to take open work as main, and be accompanied by improving constantly of social development, labour's remuneration, a lot of industrial workers has been unwilling to enter into the building operations of open work environment, and this just makes the labor service recruitment of current builing industry progressively occur nervous situation.The situation of this anxiety also will further be aggravated predictably.Taking measures, most on-the-spot labor changes batch production recruitment into even, the amount of labour used that reduces open work just can crack the quagmire of building operations recruitment famine by a part, so industrialization of construction industry is an inexorable trend.
Utility model content
For the problems referred to above, the purpose of this utility model is to provide a kind of reliable in structure, construction technology is simple, construction organization is easy precast beam and splicing structure system, and to realizing, the prefabricated amount of construction work batch production maximizes, the minimized target of the on-the-spot amount of labour used.
For achieving the above object, the technical scheme that the utility model proposes is: a kind of precast beam, comprise precast beam body, and it is characterized in that: described precast beam body two ends are provided with precast beam tenon.
Preferably, described precast beam tenon cross section is less than this body section of precast beam.
Preferably, the tenon of described precast beam tenon end bottom is higher than precast beam focus point.
Preferably, described precast beam tenon is that difform cone or column are joined steel concrete.
Preferably, described precast beam tenon is reinforced concrete prefabricated beam tenon or steel part precast beam tenon.
The utility model also comprises a kind of reinforced concrete structure with tenon anchor system that adopts above-mentioned precast beam tenon, comprise crossbeam, vertical member and horizontal structure plate, it is characterized in that: in described vertical member, be provided with reinforcing bar, described crossbeam is above-mentioned precast beam, described reinforcing bar is provided with support portion, the tenon of described precast beam tenon is supported on support portion, concrete has been built in described vertical member and precast beam tenon and vertical member junction, described precast beam tenon is anchored in the steel concrete of vertical member, described horizontal structure plate is supported on precast beam.
Adopt technique scheme, precast beam described in the utility model and there is the reinforced concrete structure of tenon anchor system, because precast beam tenon bottom is higher than precast beam center of gravity, precast beam is homeostasis state after hanging on the support portion of vertical member, does not need to set up in addition bracing frame and assists firmly; Precast beam tenon is anchored in the stressed problem of shearing resistance that can solve again precast concrete and cast-in-situ concrete binding site in vertical member, so precast beam described in the utility model and there is the reinforced concrete structure of tenon anchor system, a kind of reliable in structure is provided, construction technology is simple, the precast assembly structural system that construction organization is easy, can realize construction work prefabrication amount and maximize, the minimized target of the on-the-spot amount of labour used.
Accompanying drawing explanation
Fig. 1 is precast beam structural representation described in the utility model;
Fig. 2 is not for building the precast beam structural representation of overlapping layers;
Fig. 3 is the reinforced concrete structure schematic diagram with tenon anchor system described in the utility model;
Fig. 4 is for adopting the support portion schematic diagram of ox leg structure;
Fig. 5 is the vertical muscle construction in precast beam bottom way schematic diagram;
Fig. 6, Fig. 7 are the precast beam upper longitudinal bar construction way schematic diagram that is provided with overlapping layers.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described further.
As shown in Figure 1, precast beam 1, comprises precast beam body 10 and is embedded in precast beam body 10 and extends the longitudinal reinforcement 12 of precast beam body 10, longitudinal reinforcement 12 can be located at precast beam body 10 tops and/or bottom; Precast beam body 10 two ends are provided with precast beam tenon 11, and the end of precast beam tenon 11 is tenon 111, and tenon 111 bottoms of precast beam tenon 11 ends are preferably higher than precast beam body 10 focus points and precast beam tenon 11 cross sections and are less than precast beam body 10 cross sections; As Fig. 2 precast beam 1 is preferably the superposed beam that precast beam body 10 and precast beam tenon 11 are provided with cast-in-place overlapping layers, the overlapping layers scope stirrup 13 that is embedded in precast beam body 10 and extends precast beam body 10 is arranged at its top.
As shown in Figure 3, a kind of reinforced concrete structure with tenon anchor system, comprise that top is cast with the precast beam 1 of overlapping layers 14, vertical member 2 and horizontal structure plate (not shown, place on precast beam or water construction with precast beam overlapping layers is simultaneously folded), vertical member 2 is cast-in-place combined steel and concrete column or wall, prefabricated combined steel and concrete column or wall or prefabricated reinforced concrete column or wall (top is embedded with one section of reinforcing bar); In vertical member 2, be provided with reinforcing bar 20 as H shaped steel, reinforcing bar 20 is provided with support portion 201, the tenon 111 of precast beam tenon 11 is supported on support portion 201, vertical member 2 and precast beam tenon 11 have been built concrete with vertical member 2 junctions, precast beam tenon 11 is anchored in the steel concrete of vertical member 2, and horizontal structure plate is supported in (or fold and water construction simultaneously with precast beam overlapping layers) on precast beam 1.In addition, bottom longitudinal reinforcement 12 can directly be anchored in as shown in Figure 5 in vertical member and not hinder position at reinforcing bar 20 and adopt U-shaped reinforcing bar 21 to carry out connection reinforcement; Top longitudinal reinforcement 12 also can directly be anchored in vertical member, when employing has the precast beam of overlapping layers, when beam top longitudinal reinforcement 12 is hindered by reinforcing bar as shown in Figure 6, Figure 7, weld straight screw sleeve 22 on the reinforcing bar of longitudinal reinforcement 12 correspondences and connected, while hindered by reinforcing bar, upper reinforcement can elongatedly not arrange.
As shown in Figure 4, support portion 201 can be bracket portion structure, and tenon 111 is placed on ox leg structure, by bracket portion support structure.
Concrete, precast beam site operation relies on the tenon of precast beam tenon to place on vertical member support portion while installing, to bear precast beam deadweight and the part working load of construction period.The contact surface that when precast beam site operation is installed, load transmission is carried out in tenon and vertical member support portion is during higher than the focus point of precast beam install state, and precast beam is hanging state, and construction period self remains relatively stable; The contact site that when precast beam site operation is installed, the projection (bracket) of tenon and vertical member or vertical member carries out load transmission is during lower than the focus point of precast beam install state, place that a contact site need be welded to connect or bolt connection etc. effectively connects, to guarantee the stable of precast beam construction period.The preferred tenon of the utility model bottom places (hanging) mounting means higher than precast beam install state focus point.
Precast beam tenon can be steel concrete, also can be steel part; When precast beam tenon is steel concrete, precast beam tenon can be column or the frustum of various shapes; When for steel part, can be rod member or the body of various shapes.The utility model is preferably the square cone armored concrete of butt of incomplete symmetry, is called cone tenon, and that tenon bottom is preferably is flat, material is preferably pre-embedded steel slab.
Precast beam tenon from tenon outside toward precast beam longitudinal reinforcement within the scope of interior certain length and do not build precast concrete around, this part longitudinal reinforcement does not have precast concrete parcel, after tenon places on vertical member, precast beam longitudinal reinforcement can be realized the direct anchoring in vertical member, also can carry out easily spreading.
The reinforced concrete structure site operation with tenon anchor system described in the utility model install before preparation flow process as follows:
1) precast beam preparation: make the form removal of precast beam → precast beam, cut off at the bottom of beam presstressed reinforcing steel and with interior 20mm, bend up or down (while needing bending) from tenon outside, take left and right bending mode avoid welding on reinforcing bar bracket and the main muscle of vertical member → tenon bottom pre-embedded steel slab anti-sideslip bar dowel → precast beam upper longitudinal bar penetrate in stirrup and tie up temporarily fixing when superimposed sheet (preferably) → cover put beam head hoop muscle and interim concentrated tie up firm;
2) vertical member preparation: processing is welded support portion on reinforcing bar → reinforcing bar and put vertical member stirrup concentrated placing bottom the vertical member with assembled junction plate → cover as welded grider upper reinforcement branch sleeve on bracket and class bracket steel plate → reinforcing bar when superimposed sheet (preferably) → welding reinforcing bar spreading;
3) beam, the processing of post (wall) node typified form;
4) tool type scaffold processing.
The structure of reinforced concrete order of tenon anchor system is as follows: install reinforcing bar → hang tool type scaffold in the floor plates of having constructed → hoisting prefabricated beam to top → precast beam two ends, corresponding two reinforcing bar support portions tenon aim at support portion and place steadily → precast beam longitudinal reinforcement in column cap beam forms within the scope of a beam stirrup → vertical member reinforcing bar binding → vertical member and tenon within the scope of anchoring or spreading → colligation tenon → water vertical member and tenon scope inner beam concrete to the following position → removal tool of overlapping layers formula scaffold, prop up floor plates template → colligation floor plates reinforcing bar → water floor plates and beam overlapping layers concrete → enter next floor to construct.When adopting Prefabricated stacking floor mode, the beam below overlapping layers, post (wall) node concrete answer maintenance to could hoisting prefabricated floor plates after prescribed strength.
Although specifically show and introduced the utility model in conjunction with preferred embodiment; but those skilled in the art should be understood that; within not departing from the spirit and scope of the present utility model that appended claims limits; in the form and details the utility model is made a variety of changes, be protection domain of the present utility model.

Claims (6)

1. a precast beam, comprises precast beam body, it is characterized in that: described precast beam body two ends are provided with precast beam tenon.
2. a kind of precast beam according to claim 1, is characterized in that: described precast beam tenon cross section is less than this body section of precast beam.
3. a kind of precast beam according to claim 1, is characterized in that: the tenon bottom of described precast beam tenon end is higher than precast beam focus point.
4. a kind of precast beam according to claim 1, is characterized in that: described precast beam tenon is that difform cone or column are joined steel concrete.
5. a kind of precast beam according to claim 2, is characterized in that: described precast beam tenon is reinforced concrete prefabricated beam tenon or steel part precast beam tenon.
6. a reinforced concrete structure with tenon anchor system, comprise crossbeam, vertical member and horizontal structure plate, it is characterized in that: in described vertical member, be provided with reinforcing bar, described crossbeam is the precast beam described in the arbitrary claim of claim 1-5, described reinforcing bar is provided with support portion, the tenon of described precast beam tenon is supported on support portion, concrete has been built in described vertical member and precast beam tenon and vertical member junction, described precast beam tenon is anchored in the steel concrete of vertical member, and described horizontal structure plate is supported on precast beam.
CN201320861698.7U 2013-12-25 2013-12-25 A kind of precast beam and there is the reinforced concrete structure of tenon anchor system Expired - Fee Related CN203924484U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320861698.7U CN203924484U (en) 2013-12-25 2013-12-25 A kind of precast beam and there is the reinforced concrete structure of tenon anchor system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320861698.7U CN203924484U (en) 2013-12-25 2013-12-25 A kind of precast beam and there is the reinforced concrete structure of tenon anchor system

Publications (1)

Publication Number Publication Date
CN203924484U true CN203924484U (en) 2014-11-05

Family

ID=51820334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320861698.7U Expired - Fee Related CN203924484U (en) 2013-12-25 2013-12-25 A kind of precast beam and there is the reinforced concrete structure of tenon anchor system

Country Status (1)

Country Link
CN (1) CN203924484U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669720A (en) * 2013-12-25 2014-03-26 鲁军波 Precast beam and reinforced concrete structure with tenon anchor system
CN106894573A (en) * 2017-03-31 2017-06-27 中民筑友科技投资有限公司 A kind of connecting node of multilayer wallboard and wallboard and floor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669720A (en) * 2013-12-25 2014-03-26 鲁军波 Precast beam and reinforced concrete structure with tenon anchor system
CN106894573A (en) * 2017-03-31 2017-06-27 中民筑友科技投资有限公司 A kind of connecting node of multilayer wallboard and wallboard and floor

Similar Documents

Publication Publication Date Title
CN205531315U (en) Can dismantle steel bar truss building carrier plate support system
CN103669720A (en) Precast beam and reinforced concrete structure with tenon anchor system
CN103452039B (en) Cast-in-situs type Inverted T beam and bridge pier and Bridge Pier Construction technique thereof
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN205712590U (en) A kind of fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post
CN105525753A (en) Method and structure for simultaneously constructing constructional column and main body structure
CN201268921Y (en) Reinforced bar split heads
CN102505849B (en) Construction method of membrane shell ribbed floor formwork supporting system
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN103741809B (en) The method of attachment of sleeper formula prefabricated units
CN103806593B (en) A kind of precast concrete
CN205224288U (en) Connection node of reinforced concrete superposed beam and steel pipe column
CN203924484U (en) A kind of precast beam and there is the reinforced concrete structure of tenon anchor system
CN105088961B (en) The construction method that a kind of end bay closure segment is merged with Cast-in-Situ Segment
CN102808511B (en) Steel box column-concrete girder connection construction method
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN204081070U (en) A kind of large span steel frame beam cantilevered structure
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN202369931U (en) Arch ring bracket
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN203668894U (en) Concrete prefabricated form structure allowing rapid installation
CN209260922U (en) Band girder rib laminated floor slab pre-tensioning system connecting joint structure
CN103061444B (en) Self-supporting deformed steel-encased concrete composite beam
CN206957184U (en) External corner column sleeve buries screw rod and fixes suspension scaffold shaped steel connector
CN103572891B (en) A kind of pregroove plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105

Termination date: 20191225