CN205088676U - Shaped steel - concrete makes up stress tube stake in advance - Google Patents
Shaped steel - concrete makes up stress tube stake in advance Download PDFInfo
- Publication number
- CN205088676U CN205088676U CN201520814350.1U CN201520814350U CN205088676U CN 205088676 U CN205088676 U CN 205088676U CN 201520814350 U CN201520814350 U CN 201520814350U CN 205088676 U CN205088676 U CN 205088676U
- Authority
- CN
- China
- Prior art keywords
- shaped steel
- concrete
- concrete structure
- pile
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Revetment (AREA)
Abstract
The utility model discloses a shaped steel - concrete makes up stress tube stake in advance, including inner wall, outer wall, reinforced concrete structure, bellows with be used for the steel strand wires of stretch -draw, still including burying the shaped steel in reinforced concrete underground, shaped steel around reinforced concrete structure's axis evenly lay and its extending direction parallel with reinforced concrete structure's axis, shaped steel is laid to concrete structure part by the prestressed concrete pipe pile present, and concrete pipe pile's tensile strength is improved to profiled steel structure's purpose, but also does not change present prestressed concrete pipe pile's performance, effectively combines the high tensile strength of shaped steel and the compressive property of concrete, improves concrete pipe pile's tensile strength, rigidity and the dough stability, but also can effectively avoid appearing concrete structure 1's phenomenon at dark concrete structure 0 in -process, guarantees the normal clear of constructing.
Description
Technical field
The utility model relates to pile for prestressed pipe technical field, particularly relates to a kind of shaped steel-Combined concrete pile for prestressed pipe.
Background technology
Prestressed concrete pipe pile introduces domestic one quick foundation reinforcing structure the end of the sixties in last century, it is fast that it has speed of application, can drive piles continuously and the advantage such as applied widely, prestressed concrete pipe pile can be divided into post-tensioned prestressing stake and pretensioned-prestressed tube pile according to manufacture method.Pretensioned-prestressed tube pile is a kind of hollow cylinder elongate concrete prefabricated units adopting pretensioned prestressing technique and centrifugal casting to make, primarily of compositions such as cylindrical shape pile body, end plate and steel hoops.
But find in Specific construction, traditional prestressed concrete pipe pile tensile strength is low cannot ensure its intensity, rigidity and stability under geological process.And easily there is pile breaking phenomenon in deep foundation pit support field, affect construction speed.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of shaped steel-Combined concrete pile for prestressed pipe, fully the tensile strength of shaped steel and concrete compressive strength are combined, improve its intensity, rigidity and stability under geological process, avoid occurring broken pile in deep foundation pit support process
For solving the problems of the technologies described above, technical solution adopted in the utility model is: a kind of shaped steel-Combined concrete pile for prestressed pipe, comprise inwall, outer wall, reinforced concrete structure, bellows and the steel strand for stretch-draw, also comprise the shaped steel be embedded in steel concrete, described shaped steel is evenly laid and the axis being parallel of its bearing of trend and reinforced concrete structure around the axis of reinforced concrete structure.
Described reinforced concrete structure comprises reinforcing cage and perfusion concrete between the inner walls and the outer, and described shaped steel is positioned at inside reinforcing cage.
Described shaped steel is i iron, and the web of described i iron is radially arranged relative to the axis of concrete structure.
Described concrete structure two ends fixedly mount end plate and steel hoop respectively.
The beneficial effect adopting technique scheme to produce is: lay shaped steel by the concrete structure part at existing prestressed concrete pipe pile, the object of formed steel construction improves the tensile strength of concrete tubular pile, and do not change the performance of existing prestressed concrete pipe pile, the high tensile performance of shaped steel and concrete compressive property are effectively combined, improve the tensile strength of concrete tubular pile, rigidity and stability, and effectively can avoid the phenomenon occurring broken pile in deep foundation pit support process, guarantee that construction is normally carried out, for existing simple prestressed concrete pipe pile, when realizing identical object, shaped steel of the present utility model-Combined concrete pile for prestressed pipe is adopted to add large pile spacing, shorten stake long, engineering cost about 5% can be reduced.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
In the accompanying drawings: 1, outer wall; 2, reinforced concrete structure; 3, bellows; 4, shaped steel; 5, inwall.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
In order to solve the problem of existing pile for prestressed pipe tensile strength difference and poor stability, the utility model provides a kind of shaped steel-Combined concrete pile for prestressed pipe as shown in Figure 1, comprise inwall 5, outer wall 1, reinforced concrete structure 2, bellows 3 and the steel strand for stretch-draw, also comprise the shaped steel 4 be embedded in steel concrete, described shaped steel 4 is evenly laid and the axis being parallel of its bearing of trend and reinforced concrete structure 2 around the axis of reinforced concrete structure 2; Described reinforced concrete structure 2 comprises reinforcing cage and is poured in the concrete between inwall 5 and outer wall 1, and described shaped steel 4 is positioned at inside reinforcing cage; Described shaped steel 4 is i iron, and the web of described i iron is radially arranged relative to the axis of concrete structure; Described concrete structure two ends fixedly mount end plate and steel hoop respectively.
In embody rule process, reinforced concrete structure in the utility model and inner and outer wall are that integral type pours into a mould structure, inner and outer wall is in fact reinforcement cover, just steel welding is connected on inside reinforcing cage in reinforcing cage manufacture process, shaped steel distance inwall is avoided too closely to affect inwall shaping, shaped steel-Combined concrete the pile for prestressed pipe of casting complete adopts the maintenance process identical with existing pile for prestressed pipe, can use after shaping, using method is identical with existing pile tube, but, the utility model lays shaped steel by the concrete structure part at existing prestressed concrete pipe pile, the object of formed steel construction improves the tensile strength of concrete tubular pile, and do not change the performance of existing prestressed concrete pipe pile, the high tensile performance of shaped steel and concrete compressive property are effectively combined, improve the tensile strength of concrete tubular pile, rigidity and stability, and effectively can avoid the phenomenon occurring broken pile in deep foundation pit support process, guarantee that construction is normally carried out, for existing simple prestressed concrete pipe pile, when realizing identical object, shaped steel of the present utility model-Combined concrete pile for prestressed pipe is adopted to add large pile spacing, shorten stake long, engineering cost about 5% can be reduced.
Claims (4)
1. shaped steel-Combined concrete pile for prestressed pipe, it is characterized in that: comprise inwall (5), outer wall (1), reinforced concrete structure (2), bellows (3) and the steel strand for stretch-draw, also comprise the shaped steel (4) be embedded in steel concrete, described shaped steel (4) is evenly laid and the axis being parallel of its bearing of trend and reinforced concrete structure (2) around the axis of reinforced concrete structure (2).
2. shaped steel according to claim 1-Combined concrete pile for prestressed pipe, it is characterized in that: described reinforced concrete structure (2) comprises reinforcing cage and is poured in the concrete between inwall (5) and outer wall (1), and described shaped steel (4) is positioned at inside reinforcing cage.
3. shaped steel according to claim 2-Combined concrete pile for prestressed pipe, is characterized in that: described shaped steel (4) is i iron, and the web of described i iron is radially arranged relative to the axis of concrete structure.
4. shaped steel according to claim 3-Combined concrete pile for prestressed pipe, is characterized in that: described concrete structure two ends fixedly mount end plate and steel hoop respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520814350.1U CN205088676U (en) | 2015-10-21 | 2015-10-21 | Shaped steel - concrete makes up stress tube stake in advance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520814350.1U CN205088676U (en) | 2015-10-21 | 2015-10-21 | Shaped steel - concrete makes up stress tube stake in advance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205088676U true CN205088676U (en) | 2016-03-16 |
Family
ID=55479377
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520814350.1U Expired - Fee Related CN205088676U (en) | 2015-10-21 | 2015-10-21 | Shaped steel - concrete makes up stress tube stake in advance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205088676U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112962590A (en) * | 2021-01-28 | 2021-06-15 | 江苏东合南岩土科技股份有限公司 | Large-diameter cast-in-situ thin-wall prestressed concrete steel pipe pile and construction method thereof |
-
2015
- 2015-10-21 CN CN201520814350.1U patent/CN205088676U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112962590A (en) * | 2021-01-28 | 2021-06-15 | 江苏东合南岩土科技股份有限公司 | Large-diameter cast-in-situ thin-wall prestressed concrete steel pipe pile and construction method thereof |
CN112962590B (en) * | 2021-01-28 | 2023-05-23 | 江苏东合南岩土科技股份有限公司 | Large-diameter cast-in-situ thin-wall prestressed concrete steel pipe pile and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100393969C (en) | Ribbed concrete column with built-in high-strength or super-strength concrete core column | |
CN102259386A (en) | Production method of high-strength concrete precast pile doped with fiber enhanced plastic tendon | |
CN103867019A (en) | Assembly type external prestressing active powder concrete wind power tower | |
CN201865246U (en) | Fiber reinforce plastic (FRP)-steel composite tube concrete column | |
CN208533868U (en) | A kind of novel arrangement of reinforcement hollow steel pipe high-strength concrete column | |
CN208056422U (en) | A kind of profiled sheet-raw bamboo-concrete combined floor | |
CN211646353U (en) | Integral bridge pile foundation structure adopting ECC concrete | |
CN103276726A (en) | Pre-tensioning-method I-shaped supporting pile and manufacturing method thereof | |
CN104314075A (en) | Conical concrete pile tip, tubular pile provided with pile tip and production method of tubular pile | |
CN205088676U (en) | Shaped steel - concrete makes up stress tube stake in advance | |
CN103924676B (en) | Prestressing force connects beams of concrete concrete-filled circular steel tube column node | |
CN204098522U (en) | A kind of crack reinforced concrete post maintenance and reinforcement structure | |
CN103147438A (en) | Cast-in-place post-tensioning method-based I-shaped support pile and manufacturing method of support pile | |
CN102877681A (en) | Partially prestressed concrete electric pole | |
CN103866866A (en) | Ultra-high layer core tube and outer framework beam post-cast joint | |
CN204418172U (en) | The hollow soil nailing of precast prestressed concrete | |
CN201024422Y (en) | Pretensioned prestressed concrete shaped tube pile | |
CN105133646A (en) | Underground steel and concrete structure pipeline and manufacturing method thereof | |
CN104878872A (en) | Ultra-high performance concrete cover plate with truss structure framework and production method of ultra-high performance concrete cover plate | |
CN102975282A (en) | Method for forming unnonuniformly reinforcement-arranged precast pile | |
CN104908150B (en) | A kind of piping shaft making template and the method based on factorial praluction piping shaft | |
CN204098020U (en) | High-strength concrete pile cover | |
CN204282193U (en) | A kind of steel-concrete combination beam | |
CN207193953U (en) | A kind of reinforced concrete tubular pile of outer rim | |
CN113513000A (en) | Reinforced structure and method for flood drainage culvert pipe in tailing pond |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160316 Termination date: 20161021 |
|
CF01 | Termination of patent right due to non-payment of annual fee |