CN102016199A - 包括爬升导轨接长件的导轨导向的自爬升模板*** - Google Patents

包括爬升导轨接长件的导轨导向的自爬升模板*** Download PDF

Info

Publication number
CN102016199A
CN102016199A CN200980115987.9A CN200980115987A CN102016199A CN 102016199 A CN102016199 A CN 102016199A CN 200980115987 A CN200980115987 A CN 200980115987A CN 102016199 A CN102016199 A CN 102016199A
Authority
CN
China
Prior art keywords
guide rail
climbs
climbing
extension piece
guiding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200980115987.9A
Other languages
English (en)
Inventor
A·施沃雷尔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Peri GmbH
Original Assignee
Peri GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Peri GmbH filed Critical Peri GmbH
Priority to CN201310272050.0A priority Critical patent/CN103556816B/zh
Publication of CN102016199A publication Critical patent/CN102016199A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3505Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by the in situ moulding of large parts of a structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

在一种在建筑领域内的导轨导向的自爬升模板***中,多个爬升导轨(18)在爬升承座(24、26、34、36)中导向,其中各爬升导轨集成在一脚手架单元中。脚手架单元还包括工作台(12)和随动台架(16),它们同样固定在各爬升导轨(18)上,其中在各爬升导轨(18)的自由端上可以安装爬升导轨接长件(20、22)并且抗弯地固定在那里。爬升导轨接长件(20、22)具有比爬升导轨(18)短的长度。

Description

包括爬升导轨接长件的导轨导向的自爬升模板***
技术领域
本发明涉及一种在建筑领域内的导轨导向的自爬升模板***,包括在多个爬升承座中导向的爬升导轨,它们集成在一脚手架单元中,其中各爬升承座能固定在已时效硬化的混凝土部分上或多个混凝土部分上并且各爬升导轨在各爬升承座中导向、支承和是可移动的。
背景技术
这样的自爬升模板***由国际的专利申请WO 2007/000139A1、WO 2007/000136A1、WO 2007/000134A1和WO 2007/000137A1是已知的。
在已知的导轨导向的自爬升模板***中,在可以使用已知的自爬升模板之前,必须制造至少两个具有已知的模板***的楼层部分或混凝土部分。因此这是必要的,因为所使用的爬升导轨在多个爬升承座中导向、支承和移动,它们固定在不同的混凝土部分上。为了爬升承座从一个混凝土部分转到另一混凝土部分还需要一个大面积的脚手架单元,以便可以实施各个对于爬升过程所需要的工作,而不需要使用吊车。
例如由WO 2007/000139A1已知,在使用一自爬升模板***时由于爬升导轨的长度首先必须达到一个足够的楼房高度,这够用,以便爬升导轨的下自由端不与地面或不与一楼层天花板相撞,在所述地面上建造第一混凝土部分,该楼层天花板可以建造在第一混凝土部分的下面。因此通常必须首先完成两楼层,以便可以使用自爬升模板***。在此通过待完成的各楼层的高度或各混凝土部分和在较高的混凝土部分的情况下一随动台架的存在的必要性确定各爬升导轨的长度。各爬升导轨的长度因此显著大于待建造的混凝土部分的高度。
发明内容
本发明的目的是,简化已知的导轨导向的自爬升模板***,使其可达到一个扩大的使用范围。
通过各权利要求的主题达到该目的。诸从属权利要求描述本发明主题的优选的实施形式。
在此在爬升导轨的自由端上能固定爬升导轨接长件,所述爬升导轨接长件具有比爬升导轨短的长度。
利用爬升导轨的这样的实施形式有可能以多个较短的爬升导轨实施爬升过程,而不由此产生提高的安全危险。为了安全的自爬升过程,至少两个平行和彼此间隔开延伸的爬升导轨必须总是至少分别支承在两个上下相叠设置的爬升承座中,并且即使在爬升过程中,在人们拆除三对上下相叠设置的爬升承座的第一对之前,也必须将各爬升导轨经由在其上安装的爬升导轨接长件缩回到另一第三对爬升承座上并且保持在那里,以便将其例如重新用作为在第三爬升承座上方的第四爬升承座。对于这样的爬升过程,相应的爬升导轨必须具有一最小长度,其明显大于一待浇灌混凝土的楼层高度。借助爬升导轨接长件的使用可以大大缩短原来的爬升导轨,而其在其总长上不再高出一待建造的混凝土部分,亦即各爬升导轨的长度基本上相当于已时效硬化的混凝土部分的高度,在该混凝土部分上经由各爬升承座固定爬升导轨。
这意味着,已在第一楼层或第一混凝土部分完成以后就可以使用一按照本发明缩短的爬升导轨或爬升导轨对。对于继续的爬升过程,在第二混凝土部分完成以后至少两个爬升导轨接长件抗弯地连接于各爬升导轨的上自由端,借此各爬升导轨在爬升过程中可以插进各爬升承座中,它们安装在最后建造的和已时效硬化的混凝土部分上。但同时爬升导轨或各爬升导轨则也仍然支承在两个处在下面的爬升承座中,从而甚至可以以大的安全规定实现爬升过程。
对于新的浇灌混凝土过程,如果各爬升导轨分别导向地支承在两对上下相叠固定的爬升承座中,则重新从各爬升导轨的上端取走爬升导轨接长件。因此利用这些措施可以使用导轨导向的自爬升模板***,它在浇灌混凝土过程中以其各爬升导轨不再高于混凝土部分或建造的楼层。在此爬升导轨的长度基本上相当于一待建造的混凝土部分的高度或小于一待建造的混凝土部分的高度。
有利地,可以至少在各爬升导轨的下自由端上可拆式和/或可转动地固定各爬升导轨接长件。
可以已在完成第一混凝土部分以后就使用按照本发明的自爬升模板***。为此首先将各爬升导轨接长件从各爬升导轨的下自由端上拆卸或在各爬升导轨上偏转地固定各爬升导轨接长件。各爬升导轨选择如此之短,使得它们基本上具有一相当于混凝土部分的高度。于是各爬升导轨的下自由端不与地面相撞或不与一楼层天花板相撞,在所述地面上建造第一混凝土部分,所述楼层天花板可以建造在第一混凝土部分的下面。如果达到足够的楼层高度,则将各爬升导轨接长件可拆卸和/或可偏转地固定在各爬升导轨的下自由端上,以便可以在其上设置例如一随动台架。
在本发明的另一实施形式中,各爬升导轨接长件短于待建造的混凝土部分的高度。借此一方面达到所要求的适用性而另一方面经由爬升导轨接长件的长度确保,在每一爬升过程中这样接长的爬升导轨可以可靠地达到下一个爬升承座并且在那里支承。优选在这一方面中,爬升导轨接长件的长度长于或等于两个直接上下相叠设置的爬升承座的间距的一半。
如果各爬升接长件经由定位销连接于各爬升导轨的各自由端,这样可以以简单的结构上的装置在各爬升导轨自由端与各爬升导轨接长件之间建立抗弯的连接。同时可以快速而简单地重新拆卸这样的连接,因为在每一结束的爬升过程以后必须从爬升导轨中取走爬升导轨接长件,以便外模板和/或内模板可以处于一个要制造新的待建造的混凝土部分的位置上。
有利的是,每一爬升导轨接长件可经由两个定位销连接于一爬升导轨的自由端。利用该措施可以一方面建立铰链连接,只要使用仅一个定位销并且两个定位销用于爬升导轨与爬升导轨接长件彼此间隔开的连接,这样在爬升导轨与爬升导轨接长件之间形成抗弯的连接。
如果爬升导轨以及爬升导轨接长件由两个成型导轨构成,则确保按照本发明的导轨导向的自爬升模板***的简化的结构,所述两个成型导轨经由支承销和必要时经由间隔垫片、连接螺栓彼此间隔开地连接在一起。其优点是,可以简单地在这样构成的爬升导轨中或上连接爬升导轨接长件,并且同时一系列在爬升导轨中设置的支承销可以在一爬升导轨接长件中无间隙地继续。
导轨导向的自爬升模板***具有一脚手架单元,在该脚手架单元中构成工作台和随动台架。各爬升导轨集成在脚手架单元中。在与按照本发明缩短的爬升导轨的关系中足够的是,脚手架单元只具有一个工作台和一个随动台架。如在现有技术中,在自爬升模板***的按照本发明的实施形式中可以放弃中间台架。借此显著简化整个的导轨导向的***。
在工作台上有利地设置可移动的外模板或内模板。所述外模板或内模板在需要时可以这样移动,使得一方面在工作台上可以极简单地将各爬升承座固定在已时效硬化的混凝土部分上或从其上拆卸,而另一方面可以将外模板或内模板在工作台上移到一个可以制造另一混凝土部分位置上。
在各爬升承座上可安装爬升缸,从而借助于这些爬升缸可以在建造的混凝土部分上向上和在需要时甚至向下移动整个的脚手架单元。如果爬升过程结束,则能从爬升承座上取走爬升缸并且在一较高的或较低的位置重新安装在爬升承座上。安装的爬升缸分别经由一构成在爬升缸的自由端上的卡爪嵌入爬升导轨或爬升导轨接长件的支承销中。如果各爬升缸伸出,则使各爬升导轨和爬升导轨接长件与整个的脚手架单元一起移动。
按照本发明在本发明的优选的实施形式中,在爬升导轨接长件的下自由端上设置一随动台架的部件,所述爬升导轨接长件的以相对置的另一端铰链地连接于爬升导轨的下自由端。其优点是,也可以将在第一混凝土部分上的一随动台架已安装在脚手架单元上。如果在第一混凝土部分上开始爬升过程,则随动台架仍处在地基上,在所述地基上也建成第一混凝土部分并以继续的爬升过程将各爬升导轨接长件及在其上固定的各随动台架的部件转到建成的第一混凝土部分上并且随动台架自行地竖起。
附图说明
由附图的描述得出其他的优点。同样按照本发明可以分别单独地或任意的相互组合地使用上述的和还要进一步说明的特征。各上述实施形式不应该被理解为穷尽的列举,而更确切地说具有示例的性质。本发明示于附图中并且借助附图中的各实施例更详细地说明。其中:
图1示出导轨导向的自爬升模板***的侧视图,所述自爬升模板***在一工作台上承载外模板,该外模板可以借助于导轨导向的自爬升模板***沿各混凝土部分移动;
图2示出图1的各部分的放大的侧视图;
图3示出爬升导轨和爬升导轨接长件的立体图,如它们可以组装在一起;
图4示出按照本发明的爬升导轨接长件的立体图;
图5示出按照本发明的爬升导轨接长件的前视图;
图6示出分为爬升顺序a)至e)的爬升过程的顺序,其利用按照本发明的导轨导向的自爬升模板***,所述自爬升模板***在一工作台上承载一内模板;
图7示出利用按照本发明的导轨导向的自爬升模板***的分为爬升顺序a)至d)的爬升过程顺序,所述自爬升模板***包括一工作台,该工作台承载外模板和脚手架单元,所述脚手架单元附加地具有一随动台架。
在附图的各图中大大简化示出按照本发明的导轨导向的自爬升模板***并且各个特征组不按比例理解。
具体实施方式
图1用10示出一个导轨导向的自爬升模板***,所述自爬升模板***在一脚手架单元中具有工作台12,在所述工作台上竖立一外模板13。外模板13在工作台12上可沿箭头方向14移动。在脚手架单元中还集成一随动台架16,其如同工作台12固定在爬升导轨18上。图1只示出导轨导向的自爬升模板***的侧视图,其遮挡另一爬升导轨18,所述另一爬升导轨平行于所示的爬升导轨18并且与所示的爬升导轨18间隔开延伸。因此脚手架单元经由各爬升导轨18连接(现有技术)。
在爬升导轨18上,在上自由端上安装一第一爬升导轨接长件20并且在爬升导轨18的下自由端上固定一第二爬升导轨接长件22。爬升导轨18在提升承座24、26中导向并且可移动地支承。在爬升承座26上安装一爬升缸28,该爬升缸在其自由端上具有一卡爪30,该卡爪从下面嵌接第一爬升导轨接长件20的支承销32。多个支承销32沿第一爬升导轨接长件20和沿第二爬升导轨接长件22和沿爬升导轨18以设定的间距构成。爬升承座24、26以已知的方式同样具有卡爪,它们从下面嵌接各支承销32并且可以将爬升导轨18或爬升导轨接长件20保持就位。整个的导轨导向的自爬升模板***经由各卡爪保持在爬升承座24、26中,爬升导轨18或爬升导轨接长件20的相应的支承销32放置在所述爬升承座上。
爬升承座34、36经由各锚栓点38固定在一混凝土部分上。在该图中示出第一混凝土部分40、第二混凝土部分42和第三混凝土部分44。这些混凝土部分40、42、44是时效硬化的并且可以支承一导轨导向的自爬升模板***10的载荷。在这些混凝土部分40、42、44中设置多个锚栓点38,经由它们可以固定用于导轨导向的自爬升模板***10的各爬升承座。在该图中还示出天花板部分45、46、47,它们在一侧面限定各相应的混凝土部分。当然,为了建造一混凝土部分40、42、44相应于图中所示外模板13也分别竖立一内模板。以已知的在图中未示出天花板模板***制造天花板部分45、46、47。
图2示出图1的第二混凝土部分42和第三混凝土部分44的各部分的放大的侧视图。示出天花板部分46。在第二和第三混凝土部分42、44的各锚栓点38中固定爬升承座26和34。在爬升承座26上以已知方式安装一爬升缸28,其以卡爪30从下面嵌接第一爬升导轨接长件20的支承销32。沿第一爬升导轨接长件20和沿爬升导轨18设置多个支承销32,它们全部可以由在爬升承座26和34中的卡爪从下面嵌接。
第一爬升导轨接长件20经由一连接件48***到爬升导轨18的自由端并且经由各定位销50抗弯地连接第一爬升导轨接长件20与爬升导轨18。
爬升导轨18还支承工作台12,在该工作台上可移动地固定外模板13。
图3示出爬升导轨18和一第一爬升导轨接长件20的立体图,如它们在导轨导向的自爬升模板***10中使用。爬升导轨18由两U形型材组成。多个支承销32在一侧面将各U形型材连接在一起。支承销32的长度也决定两U形型材彼此的间距。沿爬升导轨18的全长,各支承销32以预定的间距与各U形型材拧紧。
第一爬升导轨接长件20可以经由连接件48***到爬升导轨18的自由端中并且在那里利用各定位销50抗弯地连接于爬升导轨18。经由各弹簧销51可以固定各定位销50。各连接螺栓52对置于各支承销32将对置的U形型材连接。各连接螺栓52可以与各支承销32相对应并且确保各U形型材彼此的相同间距,如同其由各支承销32预先设定。
图4示出第一爬升导轨接长件20的另一立体图。经由连接件48实现在一爬升导轨上的连接并且经由各定位销50将第一爬升导轨接长件20抗弯地连接于一爬升导轨。利用各弹簧销51固定各定位销50。可以由各爬升承座或爬升缸的卡爪从下面嵌接图1所示的各支承销32。
图5示出第一爬升导轨接长件20的前视图。在这里各支承销32是可见的,并且在连接件48上***到各定位销50并用各弹簧销51固定所述定位销。
图6大大简化示出利用导轨导向的自爬升模板***的爬升过程的顺序。在图部分a)中示出两个混凝土部分40和42。利用一已知的壁模板制成第一混凝土部分40,并且在第一混凝土部分40时效硬化以后将爬升承座24和26安装在第一混凝土部分40上。紧接着将爬升导轨18装入爬升承座24和26。在此爬升承座24、26支承爬升导轨18以及与其连接的脚手架单元,该脚手架单元在一工作台12上可移动地支承一内模板13′。混凝土部分42利用该内模板13′浇灌混凝土并且在混凝土部分42时效硬化以后将内模板13′移到所示的位置中并且安装爬升承座34、36。同样在爬升导轨18上安装第一爬升导轨接长件20并且抗弯地连接于爬升导轨18。在爬升承座26上安装一爬升缸28,其在移进的状态下以其卡爪从下面嵌接第一爬升导轨接长件20。
如果现在利用导轨导向的自爬升模板***开始爬升过程(图部分b))并且爬升缸28伸出,则第一爬升导轨接长件20的自由端在多个汽缸行程以后缩回到爬升承座34中,直到爬升承座34的卡爪可以从下面嵌接和支承第一爬升导轨接长件20的一个支承销。可选择地,爬升承座24、26在爬升过程中也可以支承整个的脚手架,而对于一个新的爬升承座,爬升缸28缩回。基本上只由爬升承座对24或26或34的各卡爪可靠地承受整个的自爬升模板***的重量。各爬升导轨18的可靠的导向总是经由两对爬升承座实现,它们沿垂直的方向上下相叠地设置。然后爬升缸28回缩并且被这样地重新置于位置中,使得爬升缸28的卡爪可以重新从下面嵌接第一爬升导轨接长件20或爬升导轨18的支承销。如果紧接着爬升缸28重新伸出,则整个的导轨导向的自爬升模板***继向上爬升。一旦爬升导轨18向上爬升这么远,使得另一爬升导轨接长件20′可以安装在爬升导轨18的下自由端上,通过例如经由定位销固定在爬升导轨18上,将爬升导轨接长件20′抗弯地连接于爬升导轨18。
在图部分c)的爬升状态下,导轨导向的自爬升模板***经由爬升导轨18支承在爬升承座26和34中并且爬升导轨接长件20、20′的端部仍处在爬升承座24和36中。
在图部分d)中,爬升过程继续前进并且导轨导向的自爬升模板***处在一个位置,在该位置可以建造第三混凝土部分。爬升导轨18经由爬升承座34和36支承,亦即通过爬升导轨34、36的卡爪从下面嵌接爬升导轨18的支承销。现在可以从爬升导轨18中取走第一爬升导轨接长件20并且为了导轨导向的自爬升模板***的导向或固定也不再需要爬升导轨接长件20′。同样可以从爬升承座26中取走爬升缸28。同样从第一混凝土部分40中拧出爬升承座26。
在图e)中示出现在内模板13′移近混凝土部分42,从而可以在第二混凝土部分42的上面建造一第三混凝土部分。同时有可能借助于一天花板模板53和同时装上的各天花板支柱54浇灌一天花板部分54的混凝土。当然,对于图6中所示的爬升顺序中同时也将一导轨导向的自爬升模板***用于外模板。为了清晰起见未将其示出。
图7示出爬升顺序的四个顺序a)至d)的侧视图,如其利用一个工作台12和一个外模板实施的。如其在图6中所示,为了建造混凝土部分,图7中所示的导轨导向的自爬升模板***可以作为外模板来使用。
在图a)中第一混凝土部分40利用已知的壁模板元件浇灌混凝土以后,将导轨导向的自爬升模板***经由爬升承座24和26固定在已时效硬化的第一混凝土部分40上。利用外模板13也已制成第二混凝土部分42。图7中在图a)中外模板13已从已时效硬化的第二混凝土部分42移走并且爬升承座34和36已安装在已时效硬化的第二混凝土部分上。第一爬升导轨接长件20已抗弯地连接在爬升导轨18的上自由端上并且在爬升导轨18的下自由端上,一个第二爬升导轨接长件22仍铰接固定在爬升导轨18上。第二爬升导轨接长件22支承一随动台架的部件。如果现在在爬升承座26上安装一爬升缸28并且紧接着经由爬升缸28开始爬升过程,则整个的导轨导向的自爬升模板***沿混凝土部分40、42向上移动并且随动台架自行随着重力竖立。经由工作台12和随动台架16可以实施在导轨导向的自爬升模板***的范围内的全部工作。在图c)和d)中现在继续向上移动导轨导向的自爬升模板***,直到外模板13可以处于一用于第三混凝土部分的位置。经由工作台12可以取走第一爬升导轨接长件20并且经由随动台架16可以在需要时拆除爬升承座24或爬升承座26,只要涉及可分开的爬升承座。
在建筑领域内的导轨导向的自爬升模板***10中,多个爬升导轨18在爬升承座24、26、34、36中导向,其中各爬升导轨集成在一脚手架单元中。脚手架单元还包括一工作台12和一随动台架16,其同样固定在各爬升导轨18上。在爬升导轨18的各自由端上可以安装爬升导轨接长件20、22并且抗弯地固定在那里。爬升导轨接长件20、22具有比爬升导轨18短的长度。

Claims (11)

1.在建筑领域内的混凝土部分(40、42、44)及导轨导向的自爬升模板***(10),包括在各爬升承座(24、26、34、36)中导向的多个爬升导轨(18),它们集成在一脚手架单元中,其中各爬升承座(24、26、34、36)固定在已时效硬化的混凝土部分(40、42、44)上并且爬升导轨在爬升承座(24、26、34、36)中导向、支承且可移动,其中在爬升导轨(18)的自由端上能固定爬升导轨接长件(20、20′、22),所述爬升导轨接长件具有比爬升导轨(18)短的长度;其特征在于,爬升导轨(18)的长度基本上相当于混凝土部分(40、42、44)的高度。
2.按照权利要求1所述的混凝土部分(40、42、44)及导轨导向的自爬升模板***,其特征在于,至少在各爬升导轨(18)的下自由端上可拆式和/或可转动地固定具有比爬升导轨(18)短的长度的爬升导轨接长件(20′、22)。
3.按照权利要求1或2所述的混凝土部分(40、42、44)及导轨导向的自爬升模板***,其特征在于,爬升导轨接长件(20、20′、22)短于一待建造的混凝土部分(40、42、44)的高度。
4.按照权利要求1至3之一项所述的混凝土部分(40、42、44)及导轨导向的自爬升模板***,其特征在于,爬升导轨接长件(20、20′、22)的长度长于或等于两个相邻上下重叠设置的爬升承座(24、26、34、36)的间距的一半。
5.按照权利要求1至4之一项所述的混凝土部分(40、42、44)及导轨导向的自爬升模板***,其特征在于,爬升导轨接长件(20、20′、22)经由定位销(50)连接于爬升导轨(18)的自由端。
6.按照权利要求5所述的混凝土部分(40、42、44)及导轨导向的自爬升模板***,其特征在于,每一个爬升导轨接长件(20、20′、22)能经由两个定位销(50)连接于一个爬升导轨(18)的自由端。
7.按照权利要求1至6之一项所述的混凝土部分(40、42、44)及导轨导向的自爬升模板***,其特征在于,爬升导轨(18)以及爬升导轨接长件(20、20′、22)由两个成型导轨构成,所述两个成型导轨经由支承销(32)和必要时经由间隔垫片、连接螺栓(52)彼此间隔开地连接在一起。
8.按照权利要求1至7之一项所述的混凝土部分(40、42、44)及导轨导向的自爬升模板***,其特征在于,脚手架单元具有工作台(12)和随动台架(16)。
9.按照权利要求8所述的混凝土部分(40、42、44)及导轨导向的自爬升模板***,其特征在于,在工作台(12)上设有能在工作台(12)上移动的外模板或内模板(13、13′)。
10.按照权利要求1至9之一项所述的混凝土部分(40、42、44)及导轨导向的自爬升模板***,其特征在于,在爬升承座(24、26、34、36)上能安装爬升缸(28)。
11.按照权利要求1至10之一项所述的混凝土部分(40、42、44)及导轨导向的自爬升模板***,其特征在于,在爬升导轨接长件(22)的下自由端上设有随动台架(16)的部件,所述爬升导轨接长件以相对置的另一端部铰链地连接于爬升导轨(18)的下端部。
CN200980115987.9A 2008-03-25 2009-03-21 包括爬升导轨接长件的导轨导向的自爬升模板*** Pending CN102016199A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310272050.0A CN103556816B (zh) 2008-03-25 2009-03-21 包括爬升导轨接长件的导轨导向的自爬升模板***

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102008015682A DE102008015682A1 (de) 2008-03-25 2008-03-25 Schienengeführtes Selbstkletterschalungssystem mit Kletterschienen-Verlängerungsstücken
DE102008015682.5 2008-03-25
PCT/DE2009/000380 WO2009117986A1 (de) 2008-03-25 2009-03-21 Schienengeführtes selbstkletterschalungssystem mit kletterschienen-verlängerunqsstücken

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201310272050.0A Division CN103556816B (zh) 2008-03-25 2009-03-21 包括爬升导轨接长件的导轨导向的自爬升模板***

Publications (1)

Publication Number Publication Date
CN102016199A true CN102016199A (zh) 2011-04-13

Family

ID=40933124

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201310272050.0A Expired - Fee Related CN103556816B (zh) 2008-03-25 2009-03-21 包括爬升导轨接长件的导轨导向的自爬升模板***
CN200980115987.9A Pending CN102016199A (zh) 2008-03-25 2009-03-21 包括爬升导轨接长件的导轨导向的自爬升模板***

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201310272050.0A Expired - Fee Related CN103556816B (zh) 2008-03-25 2009-03-21 包括爬升导轨接长件的导轨导向的自爬升模板***

Country Status (12)

Country Link
US (2) US20110171336A1 (zh)
EP (2) EP2725166B1 (zh)
JP (1) JP5335889B2 (zh)
KR (1) KR101225811B1 (zh)
CN (2) CN103556816B (zh)
AU (1) AU2009229528B2 (zh)
CA (1) CA2718609C (zh)
DE (1) DE102008015682A1 (zh)
ES (2) ES2599427T3 (zh)
HK (1) HK1147536A1 (zh)
RU (1) RU2459058C2 (zh)
WO (1) WO2009117986A1 (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711308A (zh) * 2014-01-17 2014-04-09 上海建工集团股份有限公司 工具式钢柱支撑钢平台爬升***及其使用方法
CN103967263A (zh) * 2014-05-23 2014-08-06 北京市建筑工程研究院有限责任公司 新型液压自动爬升卸料平台
CN105298114A (zh) * 2015-02-11 2016-02-03 中建四局第三建筑工程有限公司 一种铝合金模板与爬架配合施工方法

Families Citing this family (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2650366C (en) * 2008-01-22 2015-10-27 Dayton Superior Corporation Jump form system
DE102008021202A1 (de) * 2008-04-28 2009-10-29 Marcus Sundermann Schalung und Schalungsverfahren des Betonbaus
PL2365159T3 (pl) * 2010-03-05 2013-07-31 Ulma C Y E S Coop Samowznoszący, obwodowy system zabezpieczania dla prac budowlanych w budynkach
ES2539815T3 (es) 2010-04-14 2015-07-06 Vsl International Ag Plataforma trepante de encofrado ajustable
CN102134914B (zh) * 2011-02-17 2012-05-23 三一重工股份有限公司 建筑机械爬升装置及其自爬升方法、导向座和布料杆
US8714306B2 (en) 2011-03-29 2014-05-06 ULMA CyE, S. Coop. Perimetric protection system for buildings undergoing construction
KR101050493B1 (ko) * 2011-04-18 2011-07-21 명보산공 주식회사 수직 거푸집 지지용 거푸집지지 조립체를 설치하기 위한 매립 콘 장치, 이를 이용한 거푸집지지 조립체의 설치구조, 및 이를 이용한 수직 콘크리트 부재의 시공방법
KR101312400B1 (ko) * 2012-02-08 2013-09-27 현대알루미늄(주) 거푸집 고정수단이 구비된 안전작업발판 구조
US20130263549A1 (en) * 2012-04-04 2013-10-10 Helmark Steel, Inc. Safety screen system for steel erection work
JP5990427B2 (ja) * 2012-08-02 2016-09-14 鹿島建設株式会社 昇降式型枠の耐風補強方法
FI10031U1 (fi) * 2012-09-10 2013-03-26 Pohjolan Design Talo Oy Seinäteline
ES2589585T3 (es) * 2013-04-09 2016-11-15 Meva Schalungs-Systeme Gmbh Sujeción para un patín de guía de un sistema trepante para encofrados de hormigón
CN103342269B (zh) * 2013-07-11 2016-03-30 中建三局建设工程股份有限公司 一种超高层施工电梯的附着机构及顶升方法
PL2871304T3 (pl) * 2013-11-12 2017-07-31 Ulma C Y E, S. Coop. System samowznoszący do zespołów rusztowań w budowie budynków
US9963889B2 (en) * 2013-12-17 2018-05-08 Shenzhen Techen Technology Co., Ltd Sealed and integrated climbing scaffold and method for using the same
KR101604994B1 (ko) 2014-01-10 2016-03-21 주식회사 엔텍이엔지 추락방지 장치
CN103806645B (zh) * 2014-02-18 2016-01-06 中国建筑股份有限公司 一种具有良好抗风防火性能的轻型智能液压爬模装置
US9422732B2 (en) 2014-04-28 2016-08-23 Ted Gower Slidable barriers
CN106150059B (zh) * 2015-03-23 2019-05-24 深圳市特辰科技股份有限公司 一种爬楼机器人
US10465401B2 (en) * 2015-04-15 2019-11-05 Ronald A. Bullock Construction safety net support apparatus
DE102016205956A1 (de) * 2016-04-08 2017-10-12 Peri Gmbh Selbstklettersystem, Selbstklettereinheit sowie Verfahren zum Umsetzen einer solchen Selbstklettereinheit an einem Betonbaukörper
CN106185549A (zh) * 2016-09-22 2016-12-07 中建八局第四建设有限公司 一种施工电梯的附墙装置
DE102016125549A1 (de) * 2016-12-23 2018-06-28 Tries Gmbh & Co. Kg Klettervorrichtung mit einer Kletterschiene
US11136769B2 (en) 2017-06-02 2021-10-05 James Zitting System and method for automating vertical slip forming in concrete construction
ES2695626B2 (es) 2017-06-30 2020-05-19 Hws Concrete Towers S L Dispositivo auto-trepante por superficies de hormigón verticales y cuasi-verticales y procedimiento de operación.
CN107762143A (zh) * 2017-09-27 2018-03-06 中国建筑股份有限公司海拓工程分公司 用于改善剪力墙钢筋施工空间的爬模***
EP3470602A1 (en) * 2017-10-10 2019-04-17 DOKA GmbH Formwork and method for erection of a concrete structure
DE102018202097A1 (de) * 2018-02-12 2019-08-14 Peri Gmbh Klettersystem und Verfahren zum Betrieb eines Klettersystems
DE102018117727A1 (de) * 2018-07-23 2020-01-23 Peri Gmbh Hubantrieb für ein schienengeführtes klettersystem
IT201800008149A1 (it) * 2018-08-22 2020-02-22 Faresin Formwork Spa Trave di cassaforma rampicante, atta alla connessione con un dispositivo di supporto e guida della stessa trave
IT201800008150A1 (it) * 2018-08-22 2020-02-22 Faresin Formwork Spa Dispositivo di supporto e guida di una trave di cassaforma rampicante e tale trave
CN109252656B (zh) * 2018-09-20 2021-07-16 南通四建集团有限公司 高层建筑爬升模板及组装、灌注和提升方法
DE102018123405A1 (de) 2018-09-24 2020-03-26 Peri Gmbh Klettereinrichtung für ein schalungsgerüst
CN109797967A (zh) * 2019-03-20 2019-05-24 杭州昂创科技有限公司 高大模板对称悬挂爬升式三角桁架支撑体系的施工方法
DE102019203959A1 (de) 2019-03-22 2020-09-24 Hünnebeck GmbH Tragwerksystem für die Herstellung von Bauwerken
DE102019115346A1 (de) * 2019-06-06 2020-12-10 Peri Gmbh Anordnung von einer kletterschiene und einer kletterhubschiene für ein schienengeführtes klettersystem
CN110388048A (zh) * 2019-07-16 2019-10-29 中交一公局第二工程有限公司 一种液压爬模装置
ES2804038B2 (es) 2019-07-30 2021-11-18 Hws Concrete Towers S L Anclaje para estructura autotrepante
US11655641B2 (en) * 2019-12-29 2023-05-23 The Third Construction Co., Ltd Of China Construction Third Engneering Bureau Construction building equipment and construction method thereof
DE102020214454A1 (de) 2020-11-17 2022-05-19 Doka Gmbh Klettergerüst
DE102020214455A1 (de) 2020-11-17 2022-05-19 Doka Gmbh Klettergerüst
US20220412105A1 (en) 2021-06-25 2022-12-29 Premform Limited Climbing system for multi-level building construction
DE102021130381A1 (de) * 2021-11-19 2023-05-25 Werner Badorrek Mobile Plattform für Fassade
US12049764B1 (en) 2022-05-24 2024-07-30 II David R. Lyle Wall jack
DE102022214177A1 (de) 2022-07-20 2024-01-25 Hünnebeck GmbH Kletterschuh, Klinkenvorrichtung, Befestigungsteil und Verfahren

Family Cites Families (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2118374A (en) * 1936-02-19 1938-05-24 Doyle Conrad Walton Concrete form
US3071837A (en) * 1959-10-02 1963-01-08 Blaw Knox Co Concrete forms
US3472477A (en) * 1967-01-16 1969-10-14 Paul Juhl Support bracket for concrete forms
FR2298662A1 (fr) 1975-01-27 1976-08-20 St Amand Outinord Coffrage auto-relevable
US4040774A (en) * 1976-04-29 1977-08-09 Research-Cottrel, Inc. Apparatus for constructing concrete walls
US4140466A (en) * 1977-05-31 1979-02-20 Snow Harold A Apparatus for forming walls
JPS54108430A (en) * 1978-02-14 1979-08-25 Morooka Tatsuo Method of constructing concrete structure and flask device used for said method
DE2814930C2 (de) * 1978-04-06 1986-07-03 Peri-Werk Artur Schwörer GmbH & Co KG, 7912 Weißenhorn Klettergerüst
SU850846A1 (ru) * 1979-10-22 1981-07-30 Mezhevoj Genij N Способ возведени вертикальнойКОНСТРуКции из МОНОлиТНОгО жЕлЕзО-бЕТОНА
DE2947210C2 (de) * 1979-11-23 1986-05-15 Industrie-Gleitbaugesellschaft Ahl & Co mbH, 5000 Köln Gerät zum Heben gleitender Formen an Stahlstangen zur Herstellung von Betonbauwerken u.dgl.
DE3006491C2 (de) * 1980-02-21 1983-01-05 Streif AG, 5461 Vettelschoß Versetzbares, an einem Bauwerk verankertes Gerüst
FR2487410A1 (fr) * 1980-07-24 1982-01-29 Bouygues Sa Coffrage grimpant pour la coulee de parois en beton
US4397441A (en) * 1981-07-23 1983-08-09 Anthes Equipment Ltd. Wall form and method of assembly thereof
JPS59136844A (ja) 1983-01-26 1984-08-06 Nec Corp デ−タ入力装置
JPS59136844U (ja) * 1983-03-01 1984-09-12 石川島播磨重工業株式会社 スリツプフオ−ム装置
US4562989A (en) * 1984-10-02 1986-01-07 Peabody Continental-Heine Co. Apparatus for construction of concrete walls
US4611784A (en) * 1985-01-10 1986-09-16 Harsco Corporation Safety lock for jump scaffolding
ATA165386A (de) * 1986-06-17 1992-10-15 Rund Stahl Bau Gmbh & Co Schalung
CN1037184A (zh) 1988-04-29 1989-11-15 吕琼茹 整装整拆提升钢模
DE3842092A1 (de) * 1988-12-14 1990-06-21 Peri Werk Schwoerer Kg Artur Schalungsvorrichtung
DE3844977C2 (de) * 1988-12-14 1997-10-23 Peri Werk Schwoerer Kg Artur Kletterschalungs-Verschiebebühne und Verfahren zu deren Betrieb
FR2644498B1 (fr) * 1989-03-16 1991-07-05 Gen Ind Entreprise Procede de montage de planchers dans une coque dont la paroi de beton est erigee par une installation de coffrage autogrimpant continu; installation de coffrage autogrimpant continu pour la mise en oeuvre du procede
JP3020186B2 (ja) * 1992-01-16 2000-03-15 大成建設株式会社 ダム型わくの移設作業装置
AT397404B (de) * 1992-06-12 1994-04-25 Rund Stahl Bau Gmbh & Co Einrichtung zum errichten von bauwerkswänden
DE4302197A1 (de) * 1993-01-27 1994-07-28 Peri Gmbh Klettervorrichtung, insbesondere für ein Klettergerüst
JP2874539B2 (ja) * 1993-12-10 1999-03-24 株式会社大林組 コンクリート構造物の構築方法及びこの方法に用いられる堰板
JPH08144514A (ja) * 1994-11-17 1996-06-04 Hory Corp 昇降機能を備えた足場付型枠装置及び足場付型枠装置を利用したコンクリート壁等の構築方法
DE19639038C1 (de) * 1996-09-23 1998-06-04 Doka Ind Gmbh Kletterschalungssystem und Verfahren zum sukzessiven Betonieren von hohen vertikalen Wänden
CN2303893Y (zh) * 1997-08-07 1999-01-13 桂向东 多功能滑车升降模架
US6557817B2 (en) * 2000-01-18 2003-05-06 Wilian Holding Company Wall climbing form hoist
AU2002951070A0 (en) * 2002-08-29 2002-09-12 Formula One Self Driving Screens Pty Ltd A lifting or transporting means using a reciprocating jack
CN2653044Y (zh) * 2003-09-02 2004-11-03 江都市庆华机械制造厂 筑墙升模装置
CN2660028Y (zh) * 2003-09-18 2004-12-01 山东省路桥集团有限公司 液压自升爬模
EP1698746B1 (en) * 2003-11-27 2010-02-17 ULMA C y E, S. COOP. Rigging system for formwork, scaffolding or moving loads in general
KR100475544B1 (ko) * 2004-08-04 2005-03-14 주식회사 용주 고층건물의 콘크리트벽체 시공을 위한 거푸집 승강시스템
DE102005030336A1 (de) * 2005-06-29 2007-01-04 Peri Gmbh Schienengeführtes Klettersystem
DE102005030333C5 (de) 2005-06-29 2017-09-28 Peri Gmbh Teilbarer Kletterschuh einer Kletterschalung
DE102005030335A1 (de) 2005-06-29 2007-01-04 Peri Gmbh Kletterzylinder einer Selbstkletterschalung
DE102005030332A1 (de) * 2005-06-29 2007-01-04 Peri Gmbh Angelenkter Kletterschuh einer Kletterschalung
CN100351484C (zh) * 2005-11-07 2007-11-28 中建一局建设发展公司 可升降液压爬升模板及其施工方法
KR200423750Y1 (ko) * 2006-05-19 2006-08-11 금강공업 주식회사 가설대 승강장치
DE102006026201B4 (de) 2006-06-06 2008-04-10 Doka Industrie Gmbh Selbstklettersystem
CN100387796C (zh) * 2006-08-28 2008-05-14 杨秋利 自动液压爬升模板
DE102007018853A1 (de) 2007-04-20 2008-10-30 Doka Industrie Gmbh Selbstklettersystem

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711308A (zh) * 2014-01-17 2014-04-09 上海建工集团股份有限公司 工具式钢柱支撑钢平台爬升***及其使用方法
CN103711308B (zh) * 2014-01-17 2016-05-04 上海建工集团股份有限公司 工具式钢柱支撑钢平台爬升***及其使用方法
CN103967263A (zh) * 2014-05-23 2014-08-06 北京市建筑工程研究院有限责任公司 新型液压自动爬升卸料平台
CN103967263B (zh) * 2014-05-23 2016-04-20 北京市建筑工程研究院有限责任公司 液压自动爬升卸料平台
CN105298114A (zh) * 2015-02-11 2016-02-03 中建四局第三建筑工程有限公司 一种铝合金模板与爬架配合施工方法

Also Published As

Publication number Publication date
CA2718609C (en) 2013-06-04
US20130318888A1 (en) 2013-12-05
EP2279310A1 (de) 2011-02-02
KR20100123737A (ko) 2010-11-24
KR101225811B1 (ko) 2013-01-23
CA2718609A1 (en) 2009-10-01
CN103556816B (zh) 2016-06-22
AU2009229528A1 (en) 2009-10-01
RU2010143426A (ru) 2012-04-27
HK1147536A1 (en) 2011-08-12
US8673189B2 (en) 2014-03-18
AU2009229528B2 (en) 2011-07-14
JP2011515602A (ja) 2011-05-19
RU2459058C2 (ru) 2012-08-20
ES2599427T3 (es) 2017-02-01
CN103556816A (zh) 2014-02-05
EP2725166A1 (de) 2014-04-30
JP5335889B2 (ja) 2013-11-06
EP2279310B1 (de) 2013-12-04
EP2725166B1 (de) 2016-09-14
DE102008015682A1 (de) 2009-10-08
WO2009117986A8 (de) 2009-12-17
WO2009117986A1 (de) 2009-10-01
US20110171336A1 (en) 2011-07-14
ES2447867T3 (es) 2014-03-13

Similar Documents

Publication Publication Date Title
CN102016199A (zh) 包括爬升导轨接长件的导轨导向的自爬升模板***
KR100707549B1 (ko) 레일식 상승 시스템
JP2010048060A (ja) 構造物の構築方法
CN109537865A (zh) 一种超高层多曲率变化弧线外爬架
CN104060844A (zh) 高层钢结构转换层桁架滑移设备、提升装置及施工方法
US20120006621A1 (en) Movable modular scaffold system for building works and method to form it
JP3344354B2 (ja) 鉄筋コンクリート柱の鉄筋籠横組立法
CN105888706A (zh) 一种可移动升降的多功能钢台车及顶拱弧板钢罩安装方法
KR101889064B1 (ko) 장대교량의 주탑 시공방법
CN110805289A (zh) 插接式卸料平台及施工方法
CN109469083B (zh) 基础梁钢筋笼装配***及其施工方法
CN106150525A (zh) 一种岩锚梁施工台车及其施工方法
CN109778713A (zh) 一种钢桁梁桥现场悬吊滑移拼装装置及方法
NO20121187A1 (no) Fremgangsmåte og anordning til en glideforskaling som ikke har sammenbindende åk.
CN106522541B (zh) 一种钢平台的模板吊点承重梁及模板***的吊装方法
JPH10339033A (ja) コンクリート高構造物構築装置およびコンクリート斜柱の構築方法
KR20110105489A (ko) 슬래브 개구부를 통해 상승하는 테이블폼을 이용한 고층 건축물 축조 공법
CN114232968B (zh) 一种附着式升降脚手架装置
CN206111212U (zh) 一种岩锚梁施工台车
CN2853976Y (zh) 用于中空形建筑物施工的套装自升径向伸缩结构式工作架
CN103821360A (zh) 高空大跨度悬挑模架施工方法
CN204982686U (zh) 用于建筑桥面的三角挂篮
CN207143751U (zh) 上行式节段拼接墩顶块支撑托架
CN203394008U (zh) 用于平面桁架上的悬挂式吊架
KR20100042377A (ko) 건축물의 슬래브 성형을 위한 거푸집 받침장치

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1152360

Country of ref document: HK

RJ01 Rejection of invention patent application after publication