CN101881030A - Split-mounting type foundation for tower crane - Google Patents

Split-mounting type foundation for tower crane Download PDF

Info

Publication number
CN101881030A
CN101881030A CN2009101391444A CN200910139144A CN101881030A CN 101881030 A CN101881030 A CN 101881030A CN 2009101391444 A CN2009101391444 A CN 2009101391444A CN 200910139144 A CN200910139144 A CN 200910139144A CN 101881030 A CN101881030 A CN 101881030A
Authority
CN
China
Prior art keywords
foundation
basis
angle
clinching
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2009101391444A
Other languages
Chinese (zh)
Inventor
李廷伟
周长忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009101391444A priority Critical patent/CN101881030A/en
Publication of CN101881030A publication Critical patent/CN101881030A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The invention discloses the split-mounting type foundation for a tower crane. The entire foundation is a concrete preformed member; and a middle foundation seat, a transitional connection foundation, a tail-end foundation and a fastener for the tail-end foundation are connected into a whole by self-fastening and by using pre-stressed steel strands. The foundation of the invention has the advantages of simple structure, high overall stability, high bearing capacity, high resistance to overturning and torsion, convenient, rapid, time-saving and labor-saving assembly, disassembly and transportation and long-term repeated use, eliminates the defects of fixed foundations for tower cranes, reduces the construction cost, saves the resources and accelerates the construction progress, thus achieving the purpose of environmental protection and bringing economic and social benefits at the same time.

Description

But split-mounting type foundation for tower crane
One, technical field
But the present invention relates to a kind of split-mounting type foundation for tower crane, belong to building machinery industry is installed.
Two, technical background
Along with the develop rapidly of building trade, the use of pillar crane is more and more, and with the increasing of annual several times, but the tower crane foundation that uses at present, great majority all adopt the cast-in-situ steel reinforced concrete basis.Every use once will be watered and smash once, remove once, cause resource, economy and artificial significant wastage; Building waste after dismounting or the explosion is contaminated environment again, is embedded in underground concrete foundation of not removing, and also will cause artificial hidden danger to the urban construction in future.Cast-in-place concrete foundation, fabrication cycle is long, a foundation for tower crane needs about about one month, if in the winter time then the time longer, not only influenced the construction speed of engineering but also reduced the turnover utilization rate of tower machine.
For overcoming the problems referred to above, but the present invention a kind of split-mounting type foundation for tower crane, adopt steel concrete, steel plate default, each basic assembly unit self-clinching connects, closely be formed by connecting with prestress wire, this foundation structure is simple, monolithic stability, anti-twisting is strong, be convenient to demolition, installation, transportation, can recycle for a long time, be i.e. environmental protection, economize on resources again, the saving of labor, save time, save land, be the cast-in-place substitute products of deciding foundation for tower crane of making firm by ramming of present building operations, have very high economic benefit and social benefit.
Three, summary of the invention
But a kind of split-mounting type foundation for tower crane of the present invention belongs to the building machinery industry.
Its objective is: but a kind of split-mounting type foundation for tower crane is provided, integral body is steel bar concrete and part steel plate, through punching block, smashing concrete is made, wherein form by 2-1 intermediate base seat, 3-1 transition connection basis, the terminal basis of 4-1, the terminal basic buckling piece of 6-1, the integral body on basis connects, be to disperse high-strength low relaxed prestress steel strand to be connected in one through self-clinching and employing, making whole basis is the full prestressing structure, the tower machine of corresponding different model on grade beam, pre-buried correspondingly foot bolt connects with the foundation for tower crane joint with stone bolt.As shown in Figure 1, integral body is 8 rib bodies, and the centre is the plum blossom body, its simple and beautiful structure, practicality.1, intermediate base seat Fig. 2, the centre is cross shape Ji Liang, leaves groove 2-2 in the middle of cross, is convenient to the easy to connect of tower machine connecting-rod bolts.Described from snapping body Fig. 2 B shape, by stretched under the last slow arc,, leave the 8-10 degree self-clinching arm of angle at the place, base angle, put into the reservation steel plate in the 2-4 position, strengthen collision lifetime, be convenient to Rapid Combination.At the 2-3 place, leave steel strand perforation place, this hole is a through hole.
2, transition connects foundation drawing 3: integral planar is shown in Fig. 3 B, for top is the semicircle angle body, in the 3-5 position is stone bolt, shown in Fig. 3 A, leave the 8-10 degree self-clinching steel plate arm of angle at Fig. 3 A3-2 place, base angle, during the weldable steel network framework and the welded corner joint of steel plate button together, 3-4 is a round end T font hook, the locking site when being used to sling.3-6 is the prestress wire perforation, and integral body is flat type, connects prestress wire with flat type ground tackle, and whole stressed more even, its drift angle form is beneficial to the alleviation of weight power.It is shown in the 3-7 that transition connects mutual pressure position, position, basis, and 4 transition connect bases as shown in Figure 1, withhold mutually, interconnect, and adherence ground is long-pending bigger, and fastness is stronger, and load-bearing will strengthen between the 10-15% than monomer.3-8 is the semicircle gusset, and purpose is used for the crowbar application point, prevents that cement from destroying, and also is beneficial to the insertion of crowbar, carries out driving fit as soon as possible, improves working efficiency.
3, a terminal basic seat integral planar is shown in Fig. 4 B, and the lower end is the semicircle angular shape, and width is bigger, adherence ground is extensive, and support force is strong, and 4-2 is the 8-10 degree self-clinching steel plate arm of angle, the 4-6 position is and withholds plate 6-2 junction that two ends closely interlock, and make whole terminal basis more firm.
4, each basis when assembly unit as shown in Figure 5, require tight and seam, the integral body on each basis connects through self-clinching and adopts and disperse high-strength low relaxed prestress prestress wire and ground tackle, be connected as a single entity by the cassette jack, there is the firm plate angle of 8-10 degree on each basis, and is closely knit for splicing, durable, snapping is rigorous, provides convenience.
5, terminal basic buckling piece as shown in Figure 6: 6-1 integral body is inverted ladder-shaped body, and 6-2 place and terminal basic 4-6 closely withhold, and increases the column foot own wt, strengthens anti-twisting, and the integral working of column foot is improved.Terminal buckling piece increases terminal basis and ground compressive stress, under the tilting moment effect, terminal basis is not occurred or occurs tensile stress less, has improved the anti-ability of inclining, thereby has guaranteed the resistance to overturning requirement, makes more steadily safety of tower machine.
6, Fig. 7 is a column foot plinth stone bolt drawing of site, and according to tower machine model difference, the stone bolt position is also different.Stone bolt gives and buries connection as shown in Figure 8: stone bolt 8-1 is a regular screw threads 45# steel, and 8-3 penetrates in the crotch of stone bolt bottom, and the lower margin bolt must not weld, and other all weld.
Description of drawings
Fig. 1 split-mounting type foundation for tower crane combination view of the present invention
2-1 intermediate base seat 2-2 intermediate base groove 3-1 transition connects the terminal basis of basic 4-1
The terminal basic buckling piece 7-1 stone bolt of 6-1
Fig. 2 split-mounting type foundation for tower crane intermediate base of the present invention seat
A, intermediate base seat plan view 2-1 intermediate base seat 2-2 intermediate base seat groove
B, intermediate base seat side view 2-3 prestress wire perforation place 2-4 clip angle plate
Fig. 3 split-mounting type foundation for tower crane transition of the present invention connects the basis
C, transition connect basic front view 2-3 clip angle plate 3-3 stone bolt 3-4 hook
D, 3-1 transition connect basic 3-7 transition and connect pressure place mutually, basis
E, 3-6 prestress wire perforation place 3-8 crowbar point
The terminal basis of Fig. 4 split-mounting type foundation for tower crane of the present invention
F, 4-2 clip angle plate 4-3 hook 4-4 stone bolt
G, 4-1 terminal basic H, 4-5 prestress wire perforation place 4-6 with withhold plate and be connected groove, 4-7 crowbar point
Fig. 5 split-mounting type foundation for tower crane of the present invention front connection layout
The 5-1 prestress wire
The terminal basic buckling piece of Fig. 6
The place is withheld on terminal basic buckling piece plan view J, terminal basic buckling piece front view 6-2 of I, 6-1 and terminal basis
Fig. 7 split-mounting type foundation for tower crane bolt of the present invention schematic diagram
The 7-1 stone bolt
The pre-buried schematic diagram of Fig. 8 split-mounting type foundation for tower crane stone bolt of the present invention
The perpendicular reinforcing bar 8-3 reinforcing bar 8-4 reinforcing bar 8-5 horizontal reinforcement in 8-1 stone bolt 8-2 basis
Concrete enforcement is as follows:
The present invention is a kind of can free split-mounting type foundation for tower crane, and the processing assembling flow path is as follows:
1, split-mounting type foundation for tower crane is with traditional rood beam basis, square foundation, square and rood beam combination foundation and pier foundation, optimize piecemeal by the plane, batch production is prefabricated into the polylith assembly, pass through composite assembly, form one eight rib peach blossom body basis (Fig. 1), the integral body on basis connects to adopt disperses high-strength low relaxed prestress steel strand stretch-draw, making whole basis is the full prestressing structure, the tower machine of corresponding different model on grade beam, pre-buried correspondingly foot bolt connects with the foundation for tower crane joint with stone bolt.
2, the basic building block that the present invention can free split-mounting type foundation for tower crane, as Fig. 2, Fig. 3, Fig. 4, shown in Figure 6, each basis is to mix earth and part steel plate by reinforcing bar, through steel mould, vibration is plugged in pump and is vibrated, and makes that concrete and reinforcing bar closely link together, concrete is closely knit, produces enough intensity; The surface does not produce quality problems such as honeycomb, pitted skin, hole, meets concrete strength grade and requires to be made.
3, wherein the intermediate base seat is shown in Figure 2, by steel mould, finishes after presetting reinforced frame, self-clinching gusset, prestress wire perforation body, smashing concrete, and the centre is a cross shape, leaves dark groove 2-2 in the middle of cross, is convenient to the easy to connect of tower machine connecting-rod bolts.Described from snapping body Fig. 2 B shape, by last slow arc lower body,, leave the default steel plate 8-10 degree self-clinching arm of angle in 2-4 position, place, base angle, strengthen collision lifetime, be convenient to Rapid Combination.
4, transition connects foundation drawing 3: manufacture craft is the same with Fig. 2, integral planar is shown in Fig. 3 B, top is the semicircle angle body, the centre is tower machine crossing skeleton position, leave stone bolt in the 3-5 position, leaving the 8-10 degree self-clinching steel plate arm of angle, 3-4 at base angle 3-2 place is round end T font hook, and during the weldable steel network framework and steel plate button angle and T type hook weld together.3-6 is the prestress wire perforation, and integral body is flat type, and its drift angle form is beneficial to the alleviation of weight power.It is shown in the 3-7 that transition connects mutual pressure position, position, basis, and 4 transition connect bases as shown in Figure 1, withhold mutually, interconnect, and adherence ground is long-pending bigger, and fastness is stronger, and load-bearing will strengthen between the 10-15% than monomer.3-8 is the semicircle gusset, and purpose is used for the crowbar application point, prevents that cement from destroying, and also is beneficial to the insertion of crowbar, carries out driving fit as soon as possible, improves working efficiency.
5, a terminal basic seat integral planar is shown in Fig. 4 B, and the lower end is the semicircle angular shape, and width is bigger, adherence ground is extensive, and support force is strong, and 4-2 is the 8-10 degree self-clinching steel plate arm of angle, the 4-6 position is and withholds plate 6-2 junction that two ends closely interlock, and make whole terminal basis more firm.
6, art end group plinth buckling piece as shown in Figure 6: Fig. 6 A integral body is inverted ladder-shaped body, and 6-2 place and terminal basic Fig. 4-6 closely withhold, and increases the column foot own wt, strengthens anti-twisting, makes the steady more safety of integral working of column foot.Fig. 7 is a column foot plinth stone bolt drawing of site, and according to tower machine model difference, the stone bolt position is also different.Stone bolt gives and buries connection as shown in Figure 8: stone bolt 8-1 is a regular screw threads 45# steel, and 8-3 penetrates in the crotch of stone bolt bottom, and the lower margin bolt must not weld, and other all weld.
7, each basis as shown in Figure 5, requires tight and seam when assembly unit, and the connection on each basis disperses high-strength low relaxed prestress prestress wire and ground tackle through self-clinching and employing, be connected as a single entity by the cassette jack, foundation bottom has the firm plate angle of 8-10 degree, and is can better snapping closely knit, coincide mutually, form the hardware of shearing resistance effect, with manpower crowbar column foot the time,, can not prize bad column foot to have reserved the crowbar point, prevent the damage of column foot, for installation is provided convenience.
But 8, for split-mounting type foundation for tower crane, fractionation becomes: 1 of intermediate base seat, transition connects 4 on basis, 4 on terminal basis, 4 of edge termination basis buckling pieces.The prestress wire hole of each basic body will connect the back and form same cross-drilled hole at same position, makes things convenient for the cross-under of steel strand.
But the present invention's split-mounting type foundation for tower crane, simple installation, the on-site consolidation time is short, the recycling rate of waterused height, can satisfy the needs of various tower machines commonly used by different schemes, its simple and beautiful structure, resistance to overturning is good, bearing capacity is big, anti-twisting is strong, get rid of fixedly many drawbacks of foundation for tower crane, saved cost, saved resource, accelerated construction speed, reached the purpose of environmental protection simultaneously again, be widely used in tower machine construction project, have very high economy, society and environmental benefit.

Claims (9)

1. but split-mounting type foundation for tower crane, form through the punching block casting by steel bar concrete prefabricated component and part steel plate, wherein integral body is divided into: intermediate base seat, transition connect basis, terminal basis, terminal basic buckling piece, are connected in one by self-clinching connection and prestress wire, and be simple in structure, monolithic stability, bearing capacity is big, and anti-twisting is strong, has got rid of fixedly many drawbacks of foundation for tower crane, save cost, saved resource, accelerated progress, reached the purpose of environmental protection.
2. according to claim: intermediate base seat Fig. 2 is characterized in that the centre is a cross shape, leaves groove 2-2 in the middle of cross, is convenient to the easy to connect of tower machine connecting-rod bolts.According to claim: self-clinching connection layout 2B shape is described, by stretched under the last slow arc, at the place, base angle, leaves the 8-10 degree self-clinching arm of angle, is steel plate in the 2-4 position, strengthens collision lifetime, is convenient to Rapid Combination.According to claim: transition connects foundation drawing 3 and is characterized as: integral planar is the semicircle angle body shown in 3-1, the centre is tower machine cross position, in the 3-5 position is stone bolt, leave the 8-10 degree self-clinching steel plate arm of angle at base angle 3-2 place, the 3-4 place is a hook, the locking site when being used to sling.
3. according to claim: 3-6 is characterized as the prestress wire perforation, and it is shaped as shown in the 3-6, and integral body is flat type, and the upper end becomes the drift angle type, makes things convenient for the cross-under of prestress wire, and stressed more even, its drift angle form is beneficial to the alleviation of weight power.
4. according to claim: 3-7 is that transition connects pressure position, position mutually, basis, and 4 transition connect bases as shown in Figure 1, withhold mutually, interconnect, and adherence ground is long-pending bigger, and fastness is stronger.
5. according to claim: 3-8 is the semicircle gusset, and purpose is used for the crowbar application point, prevents that cement from destroying, and also is beneficial to the insertion of crowbar, carries out driving fit as soon as possible, improves working efficiency.
6. according to claim: Fig. 4 feature: 4-1 is a terminal basis seat, become the semicircle angular shape, width is bigger, adherence ground is extensive, bearing capacity, and anti-twisting is strong, 4-2 is the 8-10 degree self-clinching steel plate arm of angle, the 4-6 position with withhold plate 6-2 junction, two ends closely interlock, and make whole terminal basis more firm.
7. according to claim Fig. 5 feature: each basis is when assembly unit, want tight and seam, behind the connection assembly unit self-clinching, by prestress wire and ground tackle, closely become one by machine, shown in Figure 5, when assembling, the firm plate angle of 8-10 degree is left on each basis, closely knit for splicing, durable, snapping is rigorous, provides convenience.
8. claim such as Fig. 6 feature: integral body is prismatoid, and the 6-2 place strengthens own wt for to withhold the place with the basic 4-6 of end, strengthens firmness, makes more steadily safety of tower machine.Fig. 7 is characterized as column foot plinth stone bolt drawing of site, and according to tower machine model difference, the stone bolt position is also different.
9. shown in Figure 8 according to right: 8-1 is a stone bolt, and 8-2 is a vertically reinforcing bar of basis, the horizontal hook reinforcing bar of 8-3, the vertical reinforcing bar of 8-4,8-5 foundation level reinforcing bar.
CN2009101391444A 2009-05-07 2009-05-07 Split-mounting type foundation for tower crane Pending CN101881030A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101391444A CN101881030A (en) 2009-05-07 2009-05-07 Split-mounting type foundation for tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101391444A CN101881030A (en) 2009-05-07 2009-05-07 Split-mounting type foundation for tower crane

Publications (1)

Publication Number Publication Date
CN101881030A true CN101881030A (en) 2010-11-10

Family

ID=43053156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101391444A Pending CN101881030A (en) 2009-05-07 2009-05-07 Split-mounting type foundation for tower crane

Country Status (1)

Country Link
CN (1) CN101881030A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102887446A (en) * 2011-07-19 2013-01-23 上海庞源机械租赁股份有限公司 Detachable fixed leg structure of tower crane
CN103374924A (en) * 2012-04-18 2013-10-30 彭宝安 Full-symmetry prestressed assembled tower crane foundation
CN103938646A (en) * 2014-04-21 2014-07-23 段家忠 Bracket for leveling tower cane foundation pit terrace and positioning embedded bolts
CN109837923A (en) * 2019-01-18 2019-06-04 上海远东杨园道桥有限公司 A kind of prefabricated component rood beam and its construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102887446A (en) * 2011-07-19 2013-01-23 上海庞源机械租赁股份有限公司 Detachable fixed leg structure of tower crane
CN102887446B (en) * 2011-07-19 2016-01-06 上海庞源机械租赁股份有限公司 The detachable fixed feet structure of a kind of tower crane
CN103374924A (en) * 2012-04-18 2013-10-30 彭宝安 Full-symmetry prestressed assembled tower crane foundation
CN103374924B (en) * 2012-04-18 2015-12-09 彭宝安 A kind of holohedral symmetry prestressed assembly formula foundation for tower crane
CN103938646A (en) * 2014-04-21 2014-07-23 段家忠 Bracket for leveling tower cane foundation pit terrace and positioning embedded bolts
CN109837923A (en) * 2019-01-18 2019-06-04 上海远东杨园道桥有限公司 A kind of prefabricated component rood beam and its construction method
CN109837923B (en) * 2019-01-18 2020-11-10 上海远东杨园道桥有限公司 Prefabricated member cross beam and construction method thereof

Similar Documents

Publication Publication Date Title
CN103074941B (en) Assembling regeneration concrete node and the practice of steel bar girder beam are contained in a kind of end
CN108049633A (en) A kind of precast concrete concrete frame joint construction method
CN208668721U (en) Detachable prefabricated assembled steel-concrete composite beam plate
CN201883600U (en) Fiber reinforced plastic (FRP) and concrete composite board
CN203174621U (en) Tower crane foundation
CN101881030A (en) Split-mounting type foundation for tower crane
CN205475929U (en) Steel construction arch without beam plate -column structure
CN211772853U (en) Assembled suspension bridge tower
CN205741942U (en) A kind of great cantilever chooses arm pier cap beam segmental timbering
CN202227584U (en) Non-welding high-strength bolt shear key structure
CN106906749A (en) The construction method of full assembled steel-concrete combined structure box beam
CN201981549U (en) Precast electric pole pile
CN217027617U (en) FRP (fiber reinforced Plastic) mixed reinforced concrete shear wall with replaceable wall foot component
CN213951909U (en) Tubular connecting piece suitable for steel-concrete composite structure
CN213978605U (en) Assembled pier stud connection structure
CN212129882U (en) Prefabricated construction outrigger drawknot structure
CN214784813U (en) Section steel lattice column connecting node structure
CN201850558U (en) Assembled steel structure tower crane foundation
CN210369025U (en) Floor-free tower crane foundation construction structure with steel structure
CN203113320U (en) H-shaped supporting pile
CN208815672U (en) The connecting joint structure of circular steel tube concrete column and reinforced beam
CN206902719U (en) Preassembling support beam combines support system
CN206570674U (en) Assembled pretensioned prestressing corrugated steel web plate composite box girder
CN212026240U (en) Prestressed recycled concrete precast pile
CN215802298U (en) Shear connector and steel reinforced concrete composite structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20101110