CN103374924A - Full-symmetry prestressed assembled tower crane foundation - Google Patents

Full-symmetry prestressed assembled tower crane foundation Download PDF

Info

Publication number
CN103374924A
CN103374924A CN2012101144148A CN201210114414A CN103374924A CN 103374924 A CN103374924 A CN 103374924A CN 2012101144148 A CN2012101144148 A CN 2012101144148A CN 201210114414 A CN201210114414 A CN 201210114414A CN 103374924 A CN103374924 A CN 103374924A
Authority
CN
China
Prior art keywords
tower crane
symmetry
foundation
full
bar blocks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101144148A
Other languages
Chinese (zh)
Other versions
CN103374924B (en
Inventor
彭宝安
黄爱君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xinhe Environmental Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210114414.8A priority Critical patent/CN103374924B/en
Publication of CN103374924A publication Critical patent/CN103374924A/en
Application granted granted Critical
Publication of CN103374924B publication Critical patent/CN103374924B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The invention relates to a full-symmetry prestressed assembled tower crane foundation, and belongs to the field of building engineering. The full-symmetry prestressed assembled tower crane foundation is mainly use as a foundation for a fixed tower crane and also can be used as a foundation for other equipment or structures which need to move frequently. The full-symmetry prestressed assembled tower crane foundation is characterized in that a plurality of strip-shaped blocks (1) and strip-shaped blocks (2) with embedded bolts of a full-symmetry prismatic table type tower crane foundation are prefabricated, the strip-shaped blocks are respectively hoisted to a dug foundation pit by a hoist and are assembled to form a full-symmetry prismatic table, steel stranded wires (3) and anchor gears (5) are mounted on the full-symmetry prismatic table, prestress is applied to an assembled and formed crane foundation via a jack, and the anchor gears (5) are fixed when the prestress meets the requirement of a designed value, so that the foundation is completely assembled, and the foundation can be disassembled according to a reverse procedure. The full-symmetry prestressed assembled tower crane foundation has the advantages that the planar shape of the full-symmetry prestressed assembled tower crane foundation is full-symmetry, the problem of weak axes is solved, and the safety and the reliability are improved; components of the full-symmetry prestressed assembled tower crane foundation can be easily combined with one another on a plane, and the foundation is stressed reasonably; consumption of reinforcing steel bars is low; assembly errors of embedded bolt groups of the fixed tower crane are low.

Description

A kind of holohedral symmetry prestressed assembly formula foundation for tower crane
One, technical field
The present invention is mainly used in the fixed base tower crane basis, also can be used for the basis of the roving equipment of other needs or structure, belongs to building engineering field.
Two, background technology
China at present in various degree use the pin-connected panel tower crane, and brought huge economic benefit, but the pin-connected panel tower crane that has used and published several assembly unit tower crane patent all there are the following problems:
1, prefabricated section is complicated, member is many, and prefabricated difficulty is installed trouble, and repeating transportation, install repeatedly, and member damages easily.
2, have weak axle problem, for beam and slab type or beam type assembly unit foundation for tower crane, when tower crane rotates to when consistent with the beam direction, column foot is stressed the most reasonable, and this kind situation is strong axle; The complex stresses such as when tower crane rotated to direction between the Liang Yuliang, this kind situation was weak axle, and column foot is stressed very poor, and the basis is unstability easily, and that the composition member of column foot is subject to is curved, cut, turn round, member destroys easily.
3, present beam and slab type or beam type assembly unit foundation for tower crane, weight kicks the beam, and under the effect of tower crane dynamic load, the basis produces resonance easily and destroys the basis.In addition, although concrete material has been saved on above-mentioned basis, join the reinforcing bar amount and need strengthen, and uneconomical.
4, present beam and slab type or beam type assembly unit tower crane, its four groups fixedly the pre-embedded bolt of tower crane be embedded in respectively on four prefabricated units, these four prefabricated units certainly will cause the relative position error of these four groups of tower crane set bolts with other component assembly combinations the time, if error is excessive, can't fixed tower loop wheel machine seat.
Three, summary of the invention
The invention solves the problems referred to above, it is that holosymmetric tower crane is prefabricated into some bar blocks (1) and bar blocks (2), with crane these bar blocks are lifted into respectively the basic pit that has dug and are assembled into holosymmetric water chestnut platform shape, the tower crane of steel strand (3) and ground tackle (5) being installed again and being shaped by the jack pair assembly unit applies prestressing force, fixing ground tackle (5) when prestressing force reaches design load, finish on the assembly unit basis, and the return order is dismountable basis then.
The invention has the advantages that:
1, flat shape is holosymmetric, has overcome weak axle problem.
2, plane combination is simple, only cut apart basic plane in a direction, applying prestressing force also is a direction, needn't be as beam and slab type or beam type assembly unit tower crane need two-wayly in length and breadth to apply prestressing force and cause basic plane distortion after the assembly unit, particularly fixedly the relative position of four of tower crane groups of pre-embedded bolts changes and the relative position error of producing.The present invention is after applying prestressing force and anchoring, and the basic stress after the assembly unit is reasonable, and the frictional force between bar blocks and bar blocks can be resisted the suffered shear stress in basis; The steel strand (3) of arranging up and down can be resisted the suffered moment of flexure in basis.
3, prefabricated units are simple, and shape is single, and are prefabricated easily, also not fragile and alternative easy in lifting and assembly unit process.
4, relatively beam foundation the present invention desk-top basis of water chestnut of adopting is more reliable and more stable, and joins the reinforcing bar amount and reduce, and has saved amount of reinforcement.Although multiplex concrete amount has increased basis weight, the vibrations load that produces when overcoming tower crane work is helpful, has increased security reliability.
5, four groups of pre-embedded bolts that are used for fixed tower loop wheel machine seat are embedded in respectively two bar blocks (2), make to be embedded in that two groups of pre-embedded bolt groups along the bar blocks long side direction do not have the assembly unit error on two bar blocks.
The present invention is comprised of bar blocks (1), the bar blocks (2) with pre-embedded bolt, steel strand (3), pre-embedded bolt group (4), ground tackle (5), hole (6); Several bar blocks (1), be combined into the desk-top basis of holohedral symmetry water chestnut with the bar blocks (2) of pre-embedded bolt by flat shape; Steel strand (3) pass each bar blocks (1), are connected with the hole (6) of the bar blocks (2) of pre-embedded bolt and with the ground tackle (5) at two ends; Apply prestressing force and fixing ground tackle (5) by jack pair steel strand (3).
Four, description of drawings
Description of reference numerals: the 1-bar blocks, 2-is with the bar blocks of pre-embedded bolt, 3-steel strand, 4-pre-embedded bolt group, 5-ground tackle, 6-hole.
Fig. 1 is square combination view of the present invention.
Fig. 2 is octagon combination view of the present invention.
Fig. 3 is square combination side elevational view of the present invention.
Fig. 4 is the enlarged drawing of ground tackle of the present invention (5) and hole (6).
Fig. 5 be the present invention be arranged on the bar blocks (2) with the fixing pre-embedded bolt group layout plan of different model tower crane.
Five, the specific embodiment
Below in conjunction with description of drawings the specific embodiment of the present invention.
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4 are by prefabrication bar blocks (1), with the bar blocks (2) of pre-embedded bolt and be transported to the building site; The holohedral symmetry water chestnut platform shape that is lifted into respectively the basic pit that has dug and is assembled into design with bar blocks (1), with the bar blocks (2) of pre-embedded bolt with crane first, the plane projection of this holohedral symmetry water chestnut platform shape can be that square also can be octagon, circle or other any holosymmetric shapes, has so just formed the desk-top basis of holosymmetric water chestnut.Certainly, if the basis is little, also can change over water chestnut platform shape plate shaped.It should be noted that: with two groups of pre-embedded bolt positions on the bar blocks (2) of pre-embedded bolt should with the position consistency of corresponding tower crane support bolt hole, the assembly unit error of the tower crane set bolt group of so just having eliminated that this side up; With steel strand (3) pass each bar blocks (1), with the hole (6) of the bar blocks (2) of pre-embedded bolt; Ground tackle (5) is installed and is applied prestressing force by jack pair steel strand (3) at the two ends of steel strand (3), should monitor simultaneously the spacing of A-A center line shown in Figure 1 and B-B center line, the spacing of A-A center line and B-B center line is the center to center distance of two groups of fixed tower loop wheel machine seat bolt groups, and should put consistent with corresponding tower crane support spiro keyhole position.In applying the prestressing force process, the spacing of A-A center line and B-B center line can constantly be contracted to required value, should add drift this moment between two middle bar blocks, stop the spacing of A-A center line and B-B center line further to be dwindled, fixing ground tackle (5) when the prestress value that applies reaches design load, finish on the assembly unit basis.Be easier in this way eliminate the assembly unit error of A-A center line and B-B centreline space, make assembly unit work become simple and reliable.Answer the both sides symmetry to apply successively when applying prestressing force, progressively finish.The return order is dismountable basis then.In order to make the present invention can be used in the tower crane of different model, as shown in Figure 5: can be that two groups of symmetries are pre-buried with the pre-embedded bolt group (4) on the bar blocks (2) of pre-embedded bolt, also can be that many groups are symmetrical pre-buried, the position that is per two groups of pre-embedded bolt groups (4) should be corresponding one by one with the position of the tower crane support bolt hole of respective model, the position of another direction pre-embedded bolt group (4), the distance that is A-A center line and B-B center line can make up with the bar blocks (1) of different in width, make the A-A center line consistent with desired distance with the distance of B-B center line, so just solved versatility of the present invention.
It should be noted that: bar blocks (1), can be steel concrete with the material of pre-embedded bolt bar blocks (2), concrete, steel case beam or other materials.The material of steel strand (3) can be steel wire, reinforcing bar or other high-strength materials.
?

Claims (5)

1. holohedral symmetry prestressed assembly formula foundation for tower crane, it is characterized in that: it is comprised of bar blocks (1), the bar blocks (2) with pre-embedded bolt, steel strand (3), pre-embedded bolt group (4), ground tackle (5), hole (6); Several bar blocks (1), be combined into the desk-top basis of holohedral symmetry water chestnut with the bar blocks (2) of pre-embedded bolt by flat shape; Steel strand (3) pass each bar blocks (1), are connected with the hole (6) of the bar blocks (2) of pre-embedded bolt and with the ground tackle (5) at two ends; Apply prestressing force and fixing ground tackle (5) by jack pair steel strand (3).
2. a kind of holohedral symmetry prestressed assembly formula foundation for tower crane according to claim 1 is characterized in that described bar blocks (1), can be steel concrete with the material of pre-embedded bolt bar blocks (2), concrete, steel case beam or other materials.
3. a kind of holohedral symmetry prestressed assembly formula foundation for tower crane according to claim 1, the material that it is characterized in that described steel strand (3) can be steel wire, reinforcing bar or other high-strength materials.
4. a kind of holohedral symmetry prestressed assembly formula foundation for tower crane according to claim 1, it is characterized in that the pre-embedded bolt group (4) on the described bar blocks with pre-embedded bolt (2) can be that two groups of symmetries are pre-buried, also can be that many groups are symmetrical pre-buried, the position that is per two groups of pre-embedded bolt groups (4) should be corresponding one by one with the position of the tower crane support bolt hole of respective model.
5. a kind of holohedral symmetry prestressed assembly formula foundation for tower crane according to claim 1, it is characterized in that described several bar blocks (1), be combined into the desk-top basis of holohedral symmetry water chestnut with the bar blocks (2) of pre-embedded bolt by flat shape, the shape on the desk-top basis of this holohedral symmetry water chestnut can be that water chestnut platform shape also can be plate shaped; The plane projection shape on the desk-top basis of this holohedral symmetry water chestnut can be square, also can be octagon, circular or other any holosymmetric flat shapes.
CN201210114414.8A 2012-04-18 2012-04-18 A kind of holohedral symmetry prestressed assembly formula foundation for tower crane Expired - Fee Related CN103374924B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210114414.8A CN103374924B (en) 2012-04-18 2012-04-18 A kind of holohedral symmetry prestressed assembly formula foundation for tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210114414.8A CN103374924B (en) 2012-04-18 2012-04-18 A kind of holohedral symmetry prestressed assembly formula foundation for tower crane

Publications (2)

Publication Number Publication Date
CN103374924A true CN103374924A (en) 2013-10-30
CN103374924B CN103374924B (en) 2015-12-09

Family

ID=49460726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210114414.8A Expired - Fee Related CN103374924B (en) 2012-04-18 2012-04-18 A kind of holohedral symmetry prestressed assembly formula foundation for tower crane

Country Status (1)

Country Link
CN (1) CN103374924B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594374A (en) * 2014-12-23 2015-05-06 上海建工材料工程有限公司 Combination construction method for combined type communication tower footing
CN106013207A (en) * 2016-06-12 2016-10-12 武汉市创先专利技术服务有限公司 Fully-symmetrical prestress assembled type tower crane foundation connected to pile foundation
CN106451300A (en) * 2016-08-29 2017-02-22 山东电力工程咨询院有限公司 Cable trench of general assembly type GIS empty casing foundation
CN106894437A (en) * 2017-02-15 2017-06-27 同济大学建筑设计研究院(集团)有限公司 Limited prestressing precast concrete foundation, communication tower building and construction method
CN112878354A (en) * 2021-02-23 2021-06-01 北京银泰建构预应力技术股份有限公司 Beam-slab assembled prestressed concrete foundation for onshore wind turbine generator
CN113668596A (en) * 2021-09-05 2021-11-19 弓健 Prefabricated iron tower basis of assembled

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61151328A (en) * 1984-12-22 1986-07-10 Hitachi Plant Eng & Constr Co Ltd Installation structure for machinery
CN101881030A (en) * 2009-05-07 2010-11-10 周长忠 Split-mounting type foundation for tower crane
CN202164619U (en) * 2011-05-13 2012-03-14 刘浦贵 Multi-functional tower machine base of pre-stressed integrated concrete member

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61151328A (en) * 1984-12-22 1986-07-10 Hitachi Plant Eng & Constr Co Ltd Installation structure for machinery
CN101881030A (en) * 2009-05-07 2010-11-10 周长忠 Split-mounting type foundation for tower crane
CN202164619U (en) * 2011-05-13 2012-03-14 刘浦贵 Multi-functional tower machine base of pre-stressed integrated concrete member

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
岳晨曦、从卫民: "混凝土预制拼装多用塔机基础底面形状的优化", 《建筑技术开发》, vol. 36, no. 2, 28 February 2009 (2009-02-28) *
王军平: "预制拼装塔机基础在工程中的应用", 《山西建筑》, vol. 38, no. 10, 10 April 2012 (2012-04-10) *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594374A (en) * 2014-12-23 2015-05-06 上海建工材料工程有限公司 Combination construction method for combined type communication tower footing
CN106013207A (en) * 2016-06-12 2016-10-12 武汉市创先专利技术服务有限公司 Fully-symmetrical prestress assembled type tower crane foundation connected to pile foundation
CN106451300A (en) * 2016-08-29 2017-02-22 山东电力工程咨询院有限公司 Cable trench of general assembly type GIS empty casing foundation
CN106451300B (en) * 2016-08-29 2018-06-05 山东电力工程咨询院有限公司 The cable duct on general assemble formula GIS empty vans basis
CN106894437A (en) * 2017-02-15 2017-06-27 同济大学建筑设计研究院(集团)有限公司 Limited prestressing precast concrete foundation, communication tower building and construction method
CN112878354A (en) * 2021-02-23 2021-06-01 北京银泰建构预应力技术股份有限公司 Beam-slab assembled prestressed concrete foundation for onshore wind turbine generator
CN113668596A (en) * 2021-09-05 2021-11-19 弓健 Prefabricated iron tower basis of assembled

Also Published As

Publication number Publication date
CN103374924B (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN103374924A (en) Full-symmetry prestressed assembled tower crane foundation
CN102704386B (en) Prefabricated component assembly type segment assembling corrugated steel web RPC (Reactive Powder Concrete) combination box girder and method therefor
KR101080942B1 (en) Portable pretension making apparatus and prestressed concrete structure making method using the same
CN102409619B (en) Method for improving cross integrity of bridge deck structure of multi-girder type combined small box girder bridge
CN103422434A (en) Corrugated sheet steel composite structure bridge deck system
CN104088291A (en) Annular wedge combined concrete precast block tower crane foundation
CN102505636A (en) Construction method of No.0 block of continuous rigid frame bridge of double-thin-wall pier
CN106013207A (en) Fully-symmetrical prestress assembled type tower crane foundation connected to pile foundation
CN103774565A (en) Hollow slab grider bridge longitudinal prestressing reinforcement method
CN102677688A (en) Prefabricated concrete assembled foundation
CN203383221U (en) Foundation pit support structure formed by armoured concrete and steel structure
CN207739130U (en) A kind of concrete-filled double skin steel tube bridge pier
CN109854868A (en) The assembled steel reinforced concrete foundation of construction hoisting machinery
CN104562944B (en) Long span steel-concrete composite beam cable-stayed bridge limit steel case anchoring temporarily system
KR101536659B1 (en) Prestressed steel composite structure
CN102619335A (en) Construction method of large-height small-sized cast-in-place concrete beam slab
KR20130090709A (en) Construction method for corrugated steel plate web-psc composite beam
CN210421390U (en) Assembled steel structure-concrete mixed structure system and low-rise residential building
JP5439016B2 (en) Buried formwork
KR100794444B1 (en) Construction Method of Composite Slab Bridge Using Composite Truss Girder
CN207538199U (en) A kind of support construction of Applying Steel Structures To A Villa
CN110284534B (en) Horizontal load loading device for civil engineering field test
CN110318557B (en) Prestressed concrete hollow slab reinforcing device and method
CN102041785A (en) Pier steel-concrete composite structure column beam
CN202401468U (en) Precast concrete assembly base

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191126

Address after: 214500 No.8 JinDou Road, Jingjiang City, Taizhou City, Jiangsu Province

Patentee after: Jiangsu Xinhe Environmental Technology Co., Ltd

Address before: 430064 Wuhan Institute of education, Hongshan 712 District, Hubei, China

Co-patentee before: Huang Aijun

Patentee before: Peng Baoan

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151209

Termination date: 20200418