CN103374924B - A kind of holohedral symmetry prestressed assembly formula foundation for tower crane - Google Patents

A kind of holohedral symmetry prestressed assembly formula foundation for tower crane Download PDF

Info

Publication number
CN103374924B
CN103374924B CN201210114414.8A CN201210114414A CN103374924B CN 103374924 B CN103374924 B CN 103374924B CN 201210114414 A CN201210114414 A CN 201210114414A CN 103374924 B CN103374924 B CN 103374924B
Authority
CN
China
Prior art keywords
bar blocks
tower crane
embedded bolt
water chestnut
basis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210114414.8A
Other languages
Chinese (zh)
Other versions
CN103374924A (en
Inventor
彭宝安
黄爱君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xinhe Environmental Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210114414.8A priority Critical patent/CN103374924B/en
Publication of CN103374924A publication Critical patent/CN103374924A/en
Application granted granted Critical
Publication of CN103374924B publication Critical patent/CN103374924B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The main </b><bGreatT.Gre aT.GT of <b> the present invention " </b><bGreatT.Gre aT.GT holohedral symmetry prestressed assembly formula foundation for tower crane </b><bGreatT.Gre aT.GT " is used for fixing tower crane foundation, also can be used for the basis that other need roving equipment or structure, belong to building engineering field.It desk-top for holosymmetric water chestnut tower crane is prefabricated into some bar blocks (1) and the bar blocks (2) with pre-embedded bolt, these bar blocks be lifted into respectively with crane the basic pit that dug and be assembled into holosymmetric water chestnut platform shape, steel strand (3) and ground tackle (5) are installed again and by the tower crane Shi Hanzhang of the assembled shaping of jack pair, ground tackle (5) is fixed when prestressing force reaches design load, assembled basis completes, and return sequence is dismountable basis then.Its advantage is: flat shape is holosymmetric, overcomes weak axle problem, adds security reliability; Plane combination is simple, and basic stress is reasonable; Amount of reinforcement is little; The pre-embedded bolt assembly error of fixing tower crane is little.</b>

Description

A kind of holohedral symmetry prestressed assembly formula foundation for tower crane
one, technical field
the present invention is mainly used in fixed base tower crane basis, also can be used for the basis that other need roving equipment or structure, belongs to building engineering field.
two, background technology
china at present in various degree employ pin-connected panel tower crane, and brought huge economic benefit, but the pin-connected panel tower crane used and published several assembled tower crane patent all there are the following problems:
1, prefabricated section is complicated, component is many, prefabricated difficulty, installs trouble, and repeating transport, install repeatedly, component easily damages.
2, there is weak axle problem, for beam and slab type or the assembled foundation for tower crane of beam type, when tower crane rotates to consistent with beam direction, column foot is stressed the most reasonable, and this kind of situation is strong axle; When tower crane rotates to the direction between Liang Yuliang, this kind of situation is weak axle, and column foot is stressed very poor, basis easily unstability, the composition component of column foot be subject to curved, cut, the complex stress such as to turn round, component easily destroys.
3, current beam and slab type or the assembled foundation for tower crane of beam type, weight kicks the beam, and under the effect of tower crane dynamic load, basis easily produces resonance and destroys basis.In addition, although above-mentioned basis saves concrete material, joining reinforcing bar amount needs to strengthen, and uneconomical.
4, current beam and slab type or the assembled tower crane of beam type, its the four groups pre-embedded bolts fixing tower crane are embedded on four prefabricated units respectively, these four prefabricated units certainly will cause the relative position error of these four groups of tower crane set bolts when combining with other component assemblies, if error is excessive, cannot fixed tower loop wheel machine seat.
three, summary of the invention
the invention solves the problems referred to above, it holosymmetric tower crane is prefabricated into some bar blocks (1) and bar blocks (2), these bar blocks be lifted into respectively with crane the basic pit that dug and be assembled into holosymmetric water chestnut platform shape, steel strand (3) and ground tackle (5) are installed again and by the tower crane Shi Hanzhang of the assembled shaping of jack pair, ground tackle (5) is fixed when prestressing force reaches design load, assembled basis completes, and return sequence is dismountable basis then.
the invention has the advantages that:
1, flat shape is holosymmetric, overcomes weak axle problem.
2, plane combination is simple, only at a direction segmentation basic plane, Shi Hanzhang is also a direction, two-way Shi Hanzhang and cause the distortion of assembled rear basic plane in length and breadth need not be needed as beam and slab type or the assembled tower crane of beam type, particularly fix the relative position change of four groups of pre-embedded bolts of tower crane and the relative position error of producing.The present invention is at Shi Hanzhang and after anchoring, the basic stress after assembled is reasonable, and the frictional force between bar blocks and bar blocks can resist the shear stress suffered by basis; The steel strand (3) arranged up and down can resist the moment of flexure suffered by basis.
3, prefabricated units are simple, and shape is single, easily prefabricated, also not fragile and easily alternative in lifting and assembled process.
4, relatively the desk-top basis of water chestnut that adopts of beam foundation the present invention is more reliable and more stable, and joins reinforcing bar amount and reduce, and saves amount of reinforcement.Although multiplex concrete amount, adds basis weight, helpful to the vibrations load produced when overcoming tower crane work, add security reliability.
5, four groups of pre-embedded bolts for fixed tower loop wheel machine seat are embedded in two bar blocks (2) respectively, and the two groups of pre-embedded bolt groups making to be embedded in along bar blocks long side direction in two bar blocks do not have assembled error.
the present invention is made up of bar blocks (1), the bar blocks (2) with pre-embedded bolt, steel strand (3), pre-embedded bolt group (4), ground tackle (5), hole (6); Several bar blocks (1), be combined into the desk-top basis of holohedral symmetry water chestnut with the bar blocks (2) of pre-embedded bolt by flat shape; Steel strand (3) through each bar blocks (1), with the bar blocks (2) of pre-embedded bolt hole (6) and be connected with the ground tackle (5) at two ends; By jack pair steel strand (3) Shi Hanzhang also fixing ground tackle (5).
four, accompanying drawing explanation
description of reference numerals: 1-bar blocks, 2-with the bar blocks of pre-embedded bolt, 3-steel strand, 4-pre-embedded bolt group, 5-ground tackle, 6-hole.
fig. 1 is square composite plan view of the present invention.
fig. 2 is octagon combination view of the present invention.
fig. 3 is square composite side elevational view of the present invention.
fig. 4 is the enlarged drawing of ground tackle of the present invention (5) and hole (6).
fig. 5 is the pre-embedded bolt group layout plan fixing with different model tower crane that the present invention is arranged in bar blocks (2).
five, detailed description of the invention
below in conjunction with accompanying drawing, the specific embodiment of the present invention is described.
see Fig. 1, Fig. 2, Fig. 3, Fig. 4, by prefabrication bar blocks (1), with pre-embedded bolt bar blocks (2) and be transported to building site; First with crane by bar blocks (1), be lifted into the bar blocks (2) of pre-embedded bolt the basic pit that dug respectively and be assembled into the holohedral symmetry water chestnut platform shape of design, the plane projection of this holohedral symmetry water chestnut platform shape can be square also can be octagon, circle or other any holosymmetric shapes, so just defines the desk-top basis of holosymmetric water chestnut.Certainly, if basis is little, also can water chestnut platform shape be changed over plate shaped.It should be noted that: with two groups of pre-embedded bolt positions in the bar blocks (2) of pre-embedded bolt should with the position consistency of corresponding tower crane support bolt hole, the assembled error of the tower crane set bolt group that thus eliminating the need that this side up; By steel strand (3) through each bar blocks (1), hole (6) with the bar blocks (2) of pre-embedded bolt; At the two ends of steel strand (3), ground tackle (5) be installed and pass through jack pair steel strand (3) Shi Hanzhang, the spacing of the center line of A-A shown in Fig. 1 and B-B center line should be monitored simultaneously, the spacing of A-A center line and B-B center line is the center to center distance of two groups of fixed tower loop wheel machine seat bolt groups, and should put consistent with corresponding tower crane support spiro keyhole position.In Shi Hanzhang process, the spacing of A-A center line and B-B center line constantly can be contracted to required value, now should add drift between middle two pieces of bar blocks, the spacing of A-A center line and B-B center line is stoped to reduce further, fix ground tackle (5) when the prestress value applied reaches design load, assembled basis completes.Be easier to the assembled error eliminating A-A center line and B-B centreline space in this way, make assembled work become simple and reliable.Answer both sides symmetry to apply successively during Shi Hanzhang, progressively complete.Return sequence is dismountable basis then.In order to the tower crane making the present invention can be used in different model, as shown in Figure 5: can be that two groups of symmetries are pre-buried with the pre-embedded bolt group (4) in the bar blocks (2) of pre-embedded bolt, also can be that many groups are symmetrical pre-buried, just every two groups of pre-embedded bolt groups (4) position should with the position one_to_one corresponding of the tower crane support bolt hole of respective model, the position in another direction pre-embedded bolt group (4), namely the distance of A-A center line and B-B center line can combine with the bar blocks of different in width (1), make the distance of A-A center line and B-B center line and required distance consistent, this addresses the problem versatility of the present invention.
it should be noted that: bar blocks (1), can be steel concrete, concrete, steel box-girder or other materials with the material of pre-embedded bolt bar blocks (2).The material of steel strand (3) can be steel wire, reinforcing bar or other high-strength materials.

Claims (1)

1. a kind of holohedral symmetry prestressed assembly formula foundation for tower crane, is characterized in that: it is made up of bar blocks (1), the bar blocks (2) with pre-embedded bolt, steel strand (3), pre-embedded bolt group (4), ground tackle (5), hole (6); Several bar blocks (1), be combined into the desk-top basis of holohedral symmetry water chestnut with the bar blocks (2) of pre-embedded bolt by flat shape; Steel strand (3) through each bar blocks (1), with the bar blocks (2) of pre-embedded bolt hole (6) and be connected with the ground tackle (5) at two ends; By jack pair steel strand (3) Shi Hanzhang also fixing ground tackle (5); Bar blocks (1), be steel concrete with the material of pre-embedded bolt bar blocks (2), or concrete, or steel box-girder or other materials; The material of steel strand (3) is steel wire, or reinforcing bar; Be that two groups of symmetries are pre-buried with the pre-embedded bolt group (4) in the bar blocks (2) of pre-embedded bolt, or many groups are symmetrical pre-buried, the position one_to_one corresponding of the position of every two groups of pre-embedded bolt groups (4) and the tower crane support bolt hole of respective model; Several bar blocks (1), be combined into the desk-top basis of holohedral symmetry water chestnut with the bar blocks (2) of pre-embedded bolt by flat shape, the shape on this desk-top basis of holohedral symmetry water chestnut is water chestnut platform shape, or it is plate shaped, the plane projected shape on this desk-top basis of holohedral symmetry water chestnut is square, or octagon, or circular, or other any holosymmetric flat shape.
CN201210114414.8A 2012-04-18 2012-04-18 A kind of holohedral symmetry prestressed assembly formula foundation for tower crane Expired - Fee Related CN103374924B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210114414.8A CN103374924B (en) 2012-04-18 2012-04-18 A kind of holohedral symmetry prestressed assembly formula foundation for tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210114414.8A CN103374924B (en) 2012-04-18 2012-04-18 A kind of holohedral symmetry prestressed assembly formula foundation for tower crane

Publications (2)

Publication Number Publication Date
CN103374924A CN103374924A (en) 2013-10-30
CN103374924B true CN103374924B (en) 2015-12-09

Family

ID=49460726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210114414.8A Expired - Fee Related CN103374924B (en) 2012-04-18 2012-04-18 A kind of holohedral symmetry prestressed assembly formula foundation for tower crane

Country Status (1)

Country Link
CN (1) CN103374924B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594374A (en) * 2014-12-23 2015-05-06 上海建工材料工程有限公司 Combination construction method for combined type communication tower footing
CN106013207A (en) * 2016-06-12 2016-10-12 武汉市创先专利技术服务有限公司 Fully-symmetrical prestress assembled type tower crane foundation connected to pile foundation
CN106451300B (en) * 2016-08-29 2018-06-05 山东电力工程咨询院有限公司 The cable duct on general assemble formula GIS empty vans basis
CN106894437A (en) * 2017-02-15 2017-06-27 同济大学建筑设计研究院(集团)有限公司 Limited prestressing precast concrete foundation, communication tower building and construction method
CN112878354A (en) * 2021-02-23 2021-06-01 北京银泰建构预应力技术股份有限公司 Beam-slab assembled prestressed concrete foundation for onshore wind turbine generator
CN113668596A (en) * 2021-09-05 2021-11-19 弓健 Prefabricated iron tower basis of assembled

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61151328A (en) * 1984-12-22 1986-07-10 Hitachi Plant Eng & Constr Co Ltd Installation structure for machinery
CN101881030A (en) * 2009-05-07 2010-11-10 周长忠 Split-mounting type foundation for tower crane
CN202164619U (en) * 2011-05-13 2012-03-14 刘浦贵 Multi-functional tower machine base of pre-stressed integrated concrete member

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61151328A (en) * 1984-12-22 1986-07-10 Hitachi Plant Eng & Constr Co Ltd Installation structure for machinery
CN101881030A (en) * 2009-05-07 2010-11-10 周长忠 Split-mounting type foundation for tower crane
CN202164619U (en) * 2011-05-13 2012-03-14 刘浦贵 Multi-functional tower machine base of pre-stressed integrated concrete member

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
混凝土预制拼装多用塔机基础底面形状的优化;岳晨曦、从卫民;《建筑技术开发》;20090228;第36卷(第2期);第13-15,接18页第3小节以及图2 *
预制拼装塔机基础在工程中的应用;王军平;《山西建筑》;20120410;第38卷(第10期);第262-263页第1-3小节 *

Also Published As

Publication number Publication date
CN103374924A (en) 2013-10-30

Similar Documents

Publication Publication Date Title
CN103374924B (en) A kind of holohedral symmetry prestressed assembly formula foundation for tower crane
JP6329702B2 (en) Assembling-type reinforced concrete pier column member
CN202718022U (en) Fabricated type prestressed concrete pavement
JP2004520511A (en) Prestressed synthetic truss girder and method of manufacturing the same
CN103422434A (en) Corrugated sheet steel composite structure bridge deck system
CN102409619B (en) Method for improving cross integrity of bridge deck structure of multi-girder type combined small box girder bridge
CN104088291A (en) Annular wedge combined concrete precast block tower crane foundation
CN104695715A (en) Construction method of beam string structure of roof
CN102505636A (en) Construction method of No.0 block of continuous rigid frame bridge of double-thin-wall pier
CN102677688A (en) Prefabricated concrete assembled foundation
CN103669194A (en) Continuous rigid frame bridge based on steel truss-concrete slab composite beam
CN103774565A (en) Hollow slab grider bridge longitudinal prestressing reinforcement method
CN110878535A (en) Diagonal tension load-adjusting system for reinforcing rigid truss bridge and reinforcing method thereof
CN104631436A (en) Method for improving integral type bridge abutment sustaining pile stress performance by H-shaped concrete pile
CN110512800A (en) A kind of steel and concrete combined structure system and construction method
CN206503378U (en) Newly-increased outrigger constructing structure
CN203821428U (en) Annular wedge block assembly type concrete precast block tower crane foundation
CN102776832A (en) Combined type concrete retractable device
CN203373666U (en) Bracket pull-counter loading prepressing device
KR20130090709A (en) Construction method for corrugated steel plate web-psc composite beam
CN203007933U (en) Compound reinforcing bar non-round concrete precast pile
CN102041785B (en) Pier steel-concrete composite structure column beam
CN205012346U (en) Adopt underground structure of scalable prestressing force steel shotcrete
CN202401468U (en) Precast concrete assembly base
CN210421390U (en) Assembled steel structure-concrete mixed structure system and low-rise residential building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191126

Address after: 214500 No.8 JinDou Road, Jingjiang City, Taizhou City, Jiangsu Province

Patentee after: Jiangsu Xinhe Environmental Technology Co., Ltd

Address before: 430064 Wuhan Institute of education, Hongshan 712 District, Hubei, China

Co-patentee before: Huang Aijun

Patentee before: Peng Baoan

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151209

Termination date: 20200418

CF01 Termination of patent right due to non-payment of annual fee