CN103938646A - Bracket for leveling tower cane foundation pit terrace and positioning embedded bolts - Google Patents

Bracket for leveling tower cane foundation pit terrace and positioning embedded bolts Download PDF

Info

Publication number
CN103938646A
CN103938646A CN201410158720.0A CN201410158720A CN103938646A CN 103938646 A CN103938646 A CN 103938646A CN 201410158720 A CN201410158720 A CN 201410158720A CN 103938646 A CN103938646 A CN 103938646A
Authority
CN
China
Prior art keywords
punching block
terrace
bolt
level
leveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410158720.0A
Other languages
Chinese (zh)
Inventor
段家忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410158720.0A priority Critical patent/CN103938646A/en
Publication of CN103938646A publication Critical patent/CN103938646A/en
Pending legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

A bracket for leveling a tower cane foundation pit terrace and positioning embedded bolts overcomes the defects that in a traditional tower crane foundation and embedded bolt building process, as a leveling instrument and a flexible rule are simply used for leveling the foundation l and positioning the embedded bolts, so that a terrace is easily caused to be not level, the size of the bolts is not accurate, and a tower cane may tilt after being installed, which causes hidden safety hazards. To overcome the defects, according to the bracket for leveling the tower cane foundation pit terrace and positioning the embedded bolts, standard-size bolt holes in transverse and longitudinal steel formworks are used for positioning the bolts, the transverse and longitudinal steel formworks are provided with high-precision leveling instruments which are used for performing level detection on the terrace, and therefore it is ensured that the tower crane is perpendicular to the ground after being installed.

Description

The support of tower crane foundation ditch terrace level and pre-embedded bolt location
Technical field
The support of patent tower crane foundation ditch terrace level of the present invention and pre-embedded bolt location, belongs to building implements field, particularly tower crane terrace level and pre-embedded bolt accurate positioning when mounted.
Background technology
Just simple with spirit level and tape measure in tradition tower crane ground and pre-embedded bolt work progress, level to ground and the location of pre-embedded bolt operate, and easily cause terrace out-of-level, and bolt size is not accurate, after tower crane installs, there is tilt phenomenon, cause potential safety hazard.
Patent of invention content
The support of tower crane foundation ditch terrace level of the present invention and pre-embedded bolt location, overcome in traditional tower crane ground and pre-embedded bolt process of construction just simple with spirit level and tape measure, level to ground and the location of pre-embedded bolt operate, easily cause terrace out-of-level, bolt size is not accurate, after tower crane installs, there is tilt phenomenon, cause potential safety hazard.The deficiency that solves the former has been invented the support of tower crane foundation ditch terrace level and pre-embedded bolt location, utilize horizontal and vertical punching block standard size bolt hole to position bolt, high level of accuracy instrument is housed on horizontal and vertical punching block Horizon is carried out to horizontal detection, guarantee that tower crane installs perpendicular to the ground.
Patent content of the present invention is achieved through the following technical solutions:
The support of tower crane foundation ditch terrace level and pre-embedded bolt location: can be divided into longitudinal punching block 1, horizontal punching block 2, Bolt to position punching block 3, pre-embedded bolt 4, lateral level 5, vertical equity instrument 6, center set bolt 7, longitudinally punching block 1 is connected with horizontal punching block 2 by center set bolt 7, Bolt to position punching block 3 is connected with the two ends of longitudinal punching block 1 and horizontal punching block 2 successively, pre-embedded bolt 4 is connected with Bolt to position punching block 3, lateral level 5 is connected with horizontal punching block 2, and vertical equity instrument 6 is connected with longitudinal punching block 1.
What longitudinally installed respectively at the two ends of punching block 1 and horizontal punching block 2 has Bolt to position punching block 3.
Longitudinally punching block 1 and having of installing respectively above horizontal punching block 2, vertical equity instrument 6 and lateral level 5.
Brief description of the drawings
Fig. 1 is the support front view of tower crane foundation ditch terrace level and pre-embedded bolt location:
Detailed description of the invention
Now 1 further illustrate the present invention and how to implement by reference to the accompanying drawings:
The support of tower crane foundation ditch terrace level and pre-embedded bolt location: can be divided into longitudinal punching block, horizontal punching block, Bolt to position punching block, pre-embedded bolt, lateral level, vertical equity instrument, center set bolt, longitudinally punching block is connected with horizontal punching block by center set bolt, Bolt to position punching block is connected with the two ends of longitudinal punching block and horizontal punching block respectively, pre-embedded bolt is connected with Bolt to position punching block, lateral level is connected with horizontal punching block, and vertical equity instrument is connected with longitudinal punching block.
What longitudinally installed respectively at the two ends of punching block and horizontal punching block has Bolt to position punching block.
Longitudinally punching block and having of installing respectively above horizontal punching block, vertical equity instrument and lateral level.
The support of tower crane foundation ditch terrace level and pre-embedded bolt location in use, first foundation ditch is dug to specified standard, the concrete of pouring into foundation ditch again, the pre-embedded bolt supporting with tower crane base is connected and installed successively with the Bolt to position punching block of horizontal location support, the bottom surface of horizontal stand is brushed to release agent, pre-embedded bolt and horizontal location support entirety are put into foundation ditch, pre-embedded bolt band hook one upside down, one of horizontal location supporting band level gauge faces up, the bottom surface of horizontal stand and ground maintenance level and be suspended on foundation ditch central authorities, foundation ditch concrete is filled up, vibratory concrete is reached to closely knit effect with vibrating head, and adjust the horizontal and vertical level of horizontal stand by level gauge, make the close combination of concrete and horizontal stand bottom surface, after treating 120 hours, unload horizontal location support, just can construction and installation tower crane.

Claims (3)

1. the support of tower crane foundation ditch terrace level and pre-embedded bolt location: it is characterized in that longitudinal punching block (1), laterally punching block (2), Bolt to position punching block (3), pre-embedded bolt (4), lateral level (5), vertical equity instrument (6), center set bolt (7), longitudinally punching block (1) is connected with horizontal punching block (2) by center set bolt (7), Bolt to position punching block (3) is connected with the two ends of longitudinal punching block (1) and horizontal punching block (2) successively, pre-embedded bolt (4) is connected with Bolt to position punching block (3), lateral level (5) is connected with horizontal punching block (2), vertical equity instrument (6) is connected with longitudinal punching block (1).
2. the support of tower crane foundation ditch terrace level and pre-embedded bolt location according to claim 1: what it is characterized in that the two ends of longitudinal punching block (1) and horizontal punching block (2) install respectively has a Bolt to position punching block (3).
3. the support of tower crane foundation ditch terrace level and pre-embedded bolt location according to claim 1: it is characterized in that longitudinal punching block (1) and horizontal the having of installation respectively above of punching block (2), vertical equity instrument (6) and lateral level (5).
CN201410158720.0A 2014-04-21 2014-04-21 Bracket for leveling tower cane foundation pit terrace and positioning embedded bolts Pending CN103938646A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410158720.0A CN103938646A (en) 2014-04-21 2014-04-21 Bracket for leveling tower cane foundation pit terrace and positioning embedded bolts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410158720.0A CN103938646A (en) 2014-04-21 2014-04-21 Bracket for leveling tower cane foundation pit terrace and positioning embedded bolts

Publications (1)

Publication Number Publication Date
CN103938646A true CN103938646A (en) 2014-07-23

Family

ID=51186501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410158720.0A Pending CN103938646A (en) 2014-04-21 2014-04-21 Bracket for leveling tower cane foundation pit terrace and positioning embedded bolts

Country Status (1)

Country Link
CN (1) CN103938646A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060352A (en) * 2017-05-23 2017-08-18 广西建宁输变电工程有限公司 Movably foot bolt locating rack

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5578722A (en) * 1978-12-11 1980-06-13 Mitsubishi Heavy Ind Ltd Groundwork construction of steel smoke stuck
JPS5961626A (en) * 1982-09-29 1984-04-07 Nippon Kokan Kk <Nkk> Construction of foundation, pillar and leg
CN2921109Y (en) * 2006-01-20 2007-07-11 赵正义 Mast type machinery equipment combined foundation
CN101798816A (en) * 2010-03-17 2010-08-11 赵正义 Positioning and connecting structure of tower mast type mechanical equipment and foundation
CN101881030A (en) * 2009-05-07 2010-11-10 周长忠 Split-mounting type foundation for tower crane
CN201865119U (en) * 2010-12-04 2011-06-15 中铁建电气化局集团北方工程有限公司 Foundation bolt fixing support

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5578722A (en) * 1978-12-11 1980-06-13 Mitsubishi Heavy Ind Ltd Groundwork construction of steel smoke stuck
JPS5961626A (en) * 1982-09-29 1984-04-07 Nippon Kokan Kk <Nkk> Construction of foundation, pillar and leg
CN2921109Y (en) * 2006-01-20 2007-07-11 赵正义 Mast type machinery equipment combined foundation
CN101881030A (en) * 2009-05-07 2010-11-10 周长忠 Split-mounting type foundation for tower crane
CN101798816A (en) * 2010-03-17 2010-08-11 赵正义 Positioning and connecting structure of tower mast type mechanical equipment and foundation
CN201865119U (en) * 2010-12-04 2011-06-15 中铁建电气化局集团北方工程有限公司 Foundation bolt fixing support

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060352A (en) * 2017-05-23 2017-08-18 广西建宁输变电工程有限公司 Movably foot bolt locating rack
CN107060352B (en) * 2017-05-23 2023-06-30 广西建宁输变电工程有限公司 Movable anchor bolt locating rack

Similar Documents

Publication Publication Date Title
CN204286365U (en) Foundation pit side-wall displacement monitor
CN202562406U (en) Mining fissure monitoring device
CN204781624U (en) Floor elevation and roughness controlling means
CN204059327U (en) The stratum deformation monitoring device in precipitation region
CN205808417U (en) A kind of vertical detection device of building template
CN203881339U (en) Detachable monitoring pier
CN203798350U (en) Open caisson squareness measurement device
CN203908537U (en) Earth&#39; surface three dimensional deformation integrated monitoring device
CN103938646A (en) Bracket for leveling tower cane foundation pit terrace and positioning embedded bolts
CN103644891B (en) The measuring method of top of ultrahigh column absolute altitude
CN202041208U (en) Stable direct-buried GPS (global positioning system) observation sign
CN104006798B (en) Pier stud verticality measuring instrument
CN203846521U (en) Support for leveling terrace of foundation ditch of tower crane and positioning embedded bolts
CN203323740U (en) Building settlement nondestructive measurement leveling rod bracket
CN204059326U (en) A kind of pit retaining monitoring device
CN202577264U (en) Turning device for inclinometer pipe
CN107542104A (en) A kind of pre-buried support of derrick crane lower margin
CN105091871A (en) Marker post for building construction measuring
CN105297762A (en) Adjustable high-precision supporting frame
CN204435892U (en) The concealed device for measuring height of the floating flooring of clear-water concrete magma
CN201561756U (en) Assistant alignment device for construction setting-out
CN204163124U (en) In a kind of cotton rope formula hole, position embedded device demarcated by instrument
CN209025090U (en) A kind of foundation pit construction parameter detection device
CN107542100A (en) A kind of fixing means of derrick crane lower margin embedded bracket
CN109750685A (en) A kind of tower crane bracket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140723