CN101806040A - Underpinning device and method for bridge and building - Google Patents

Underpinning device and method for bridge and building Download PDF

Info

Publication number
CN101806040A
CN101806040A CN 201010132085 CN201010132085A CN101806040A CN 101806040 A CN101806040 A CN 101806040A CN 201010132085 CN201010132085 CN 201010132085 CN 201010132085 A CN201010132085 A CN 201010132085A CN 101806040 A CN101806040 A CN 101806040A
Authority
CN
China
Prior art keywords
building
bridge
steel pipe
pile foundation
flexible cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010132085
Other languages
Chinese (zh)
Other versions
CN101806040B (en
Inventor
徐国彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010101320850A priority Critical patent/CN101806040B/en
Publication of CN101806040A publication Critical patent/CN101806040A/en
Application granted granted Critical
Publication of CN101806040B publication Critical patent/CN101806040B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The invention provides an underpinning device and an underpinning method for a bridge and a building. The underpinning device comprises a plurality of columnar pile foundations arranged along a bridge pier of the bridge or around a building foundation, wherein flexible ropes are stretched among the tops of the pile foundations; different flexible ropes are arranged in a netlike form; and the two ends of the flexible ropes are anchored on the pile foundations or ground anchors. The method comprises the following steps: (1) piling around the bridge or the building and inserting steel pipes, wherein the top ends of the steel pipes are higher than an original foundation; (2) inserting reinforcing steel bars and pouring concrete into the steel pipes and solidifying the concrete to form the pile foundations; (3) arranging the flexible ropes on the tops of the pile foundations in the netlike form, tensioning the flexible ropes by using a tensioner, supporting the bridge or the building and anchoring the two ends of the flexible ropes; (4) treating the original foundation, detaching the original foundation, adding necessary facilities and building a new foundation; and (5) placing the bridge or the building on the new foundation. A composite rope supporting structure is used, so the bridge or the building can be underpinned, construction is performed easily and the engineering quality is easy to ensure.

Description

The underpinning device of bridge and building and method
Technical field
The present invention relates to the underpinning device and the method for a kind of bridge and highrise building.
Background technology
Height after bridge construction is finished is all determined, but development along with shipbuilding technology and shipping business, large-tonnage ships is more and more, the bridge that makes some early stage designs, construction, absolute altitude does not reach the navigation requirement that boats and ships pass through, and makes some large-tonnage cargo ships by difficulty, and steamer that like this can only the little tonnage of packing could pass through, both wasted time and energy like this, increased cost again.And cost height, the cycle of removing redesign, construction are long.
In addition, along with the quickening of present urban development paces, the construction of communal facility such as underground transportation facilities such as subway or pipeline need be passed under some existing surface structureses.And the demand of open facility such as underground garage also sharply increases, yet former building is not because social at that time needs of problems has underground garage.Particularly build this class communal facility again under the high-rise building at existing building, all need foundation by existing building to underpin the basis that keeps existing building and be not subjected to disturbance, guarantee the safety of newly-built underground construction and reliable and stable between the operating period simultaneously.But what adopted in the past is beam type or board-like support and change method, all be the piling earlier of present building both sides, below foundation bed, excavate from the side then, below the basis, do plate or beam, and upper load is underpined the both sides pile foundation by plate or beam, the most of operations of this support and change method is all carried out at underground, and the excavation workload is big, long in time limit, working space is limited, and dangerous, the workmanship of construct is not easy assurance.
Summary of the invention
At the deficiency that prior art exists, the object of the present invention is to provide the underpinning device and the method for a kind of bridge and highrise building.
Technical scheme of the present invention is achieved in that the underpinning device of a kind of bridge and building, comprise many column pile foundations along bridge pier or structure foundation arranged around, stretch-draw has flexible cable between the pile foundation top, different flexible cable cloth reticulate, and the flexible cable two ends are anchored on pile foundation or the earth anchor.
Described pile foundation is the steel concrete of steel pipe and steel duct perfusion.
Described pile foundation bottom concrete to around expand the formation major part, with increase the pile foundation resistance to compression and resist, inclination, resistance to plucking can, improve its stability.
Described pile foundation top is provided with cable saddle, convenient flexible cable is positioned at the pile foundation top and with tensioner tensioning flexible cable.
Described steel pipe is rectangle or circular layout.
The support and change method of a kind of bridge and building may further comprise the steps:
(1) piling and insertion steel pipe around bridge or building, the steel pipe top is higher than former basis;
(2) in steel pipe, insert reinforcing bar and placing of concrete, make it solidify to form pile foundation;
(3) flexible cable is installed at the pile foundation top, and flexible cable cloth reticulates, hold the anchoring of flexible cable two ends with tensioner with the flexible cable tensioning and with bridge or building;
(4) handle former basis, former basis is removed, increase necessary facilities, and build new basis;
(5) bridge or building are placed on the new basis.
Also insert conduit earlier to the steel pipe bottom before in steel pipe, inserting reinforcing bar and placing of concrete, pour into explosive and ignition by conduit to the steel pipe bottom, form the cavity of a compacting in the steel pipe bottom, not only can with around the ground compacting, and when placing of concrete can pile foundation bottom form to around the major part that expands.
The ratio of cement, sand and stone is 1: 3: 7 in the middle concrete of described step (2).
In addition, whole construction course need be carried out under the construction monitoring of strictness, guarantees the safety of original structure.
Beneficial effect of the present invention: by utilizing compound rope base structure, make bridge or building can realize underpining, employing flexible cable holder structure is compared construction and is underpined process operation conveniently with board-like or beam type, and construction volume is little, the carrying out of convenient construction, workmanship also guarantees easily in addition.
Description of drawings
Fig. 1 is the plan view of underpinning device of the present invention;
Fig. 2 is the empty structural representation that forms behind the explosive initiation among the present invention;
Fig. 3 is the elevation of underpinning device;
Among the figure: 1 pile foundation, 2 flexible cables, 3 buildings, 4 cavities.
The specific embodiment
The present invention is described further in conjunction with the accompanying drawings, to help understanding content of the present invention.
Embodiment
Be illustrated in figure 1 as the structural representation of a kind of embodiment of underpinning device of the present invention, have four pairs of pile foundations 1 among the figure, pile foundation 1 forms composite pile foundation by the steel concrete of steel pipe and steel duct perfusion, pile foundation 1 forms circular layout, stretch-draw flexible cable 2 between the composite pile foundation 1 that alternate every pair of steel pipe and concrete constitute, flexible cable 2 has constituted a vang net, and every pile base top is equipped with cable saddle, conveniently flexible cable 2 two ends is positioned at the pile foundation top.Pile foundation adopt concrete to around expand the formation major part structure.
Its underpinning construction method is: as shown in Figure 1, at steel pipe with bridge or building 3 piling on every side and insertion some, the steel pipe top is higher than former basis, in steel pipe, insert glass tube, pour into explosive and ignition by glass tube to the steel pipe bottom, at this moment form a cavity 4 (as shown in Figure 2) in the steel pipe bottom, and detonation compacting on every side.In steel pipe 1, insert reinforcing bar and placing of concrete then, make concrete be full of hole and steel pipe, wherein, the ratio of cement, sand and stone is 1: 3: 7 in the concrete, treat that concrete and reinforcing bar solidify the back and form composite pile foundation 1, the bottom area of new pile foundation is big, and the pressure of pile foundation bottom reduces when loading like this, guaranteed the firm of new basis simultaneously, be not easy to become flexible; Employing is netted by cable saddle stretch-draw flexible cable 2 formations at pile foundation 1 top as shown in figures 1 and 3 then, utilizes puller system tension flexible cable 2 that bridge or building 3 are held up, and anchoring flexible cable two ends are on earth anchor or pile foundation; Handle the former basis of bridge or building, with its dismounting, increase the needed facility of engineering simultaneously, such as the indispensable facility of building underground garage or subway passage, after waiting these work to finish bridge or building 3 be put on the new basis and reinforce, at last rope base structure is removed, the enforcement of these processes needs construction monitoring, construct through calculating accurately according to the engineering science principle.

Claims (7)

1. the underpinning device of bridge and building, it is characterized in that: comprise many column pile foundations along bridge pier or structure foundation arranged around, stretch-draw has flexible cable between the pile foundation top, and different flexible cable cloth reticulate, and the flexible cable two ends are anchored on pile foundation or the earth anchor.
2. underpinning device as claimed in claim 1 is characterized in that: described pile foundation is the steel concrete of steel pipe and steel duct perfusion.
3. underpinning device as claimed in claim 2 is characterized in that: described pile foundation bottom concrete to around expand the formation major part.
4. as described underpinning device one of in the claim 1 to 3, it is characterized in that: described pile foundation top is provided with cable saddle.
5. the support and change method of bridge and building is characterized in that may further comprise the steps:
(1) piling and insertion steel pipe around bridge or building, the steel pipe top is higher than former basis;
(2) in steel pipe, insert reinforcing bar and placing of concrete, make it solidify to form pile foundation;
(3) flexible cable is installed at the pile foundation top, and flexible cable cloth reticulates, hold the anchoring of flexible cable two ends with tensioner with the flexible cable tensioning and with bridge or building;
(4) handle former basis, former basis is removed, increase necessary facilities, and build new basis;
(5) bridge or building are placed on the new basis.
6. the support and change method of bridge according to claim 5 and building also inserts conduit earlier to the steel pipe bottom before it is characterized in that inserting reinforcing bar and water cement in steel pipe, pours into explosive in the conduit and also ignites, and forms the cavity of a compacting in the steel pipe bottom.
7. according to the support and change method of claim 5 or 6 described bridges and building, it is characterized in that the weight ratio of cement, sand and stone in the middle concrete of described step (2) is 1: 3: 7.
CN2010101320850A 2010-03-25 2010-03-25 Underpinning device and method for bridge and building Expired - Fee Related CN101806040B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101320850A CN101806040B (en) 2010-03-25 2010-03-25 Underpinning device and method for bridge and building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101320850A CN101806040B (en) 2010-03-25 2010-03-25 Underpinning device and method for bridge and building

Publications (2)

Publication Number Publication Date
CN101806040A true CN101806040A (en) 2010-08-18
CN101806040B CN101806040B (en) 2012-05-30

Family

ID=42607983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101320850A Expired - Fee Related CN101806040B (en) 2010-03-25 2010-03-25 Underpinning device and method for bridge and building

Country Status (1)

Country Link
CN (1) CN101806040B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518051A (en) * 2011-12-31 2012-06-27 江苏省交通规划设计院股份有限公司 System for deviation rectifying and reinforcing pier
CN102561721A (en) * 2012-02-29 2012-07-11 化学工业岩土工程有限公司 Building jacking deviation rectifying method
CN102644294A (en) * 2012-04-10 2012-08-22 广东天竟建设有限公司 Foundation underpinning method around foundation pit
CN109653534A (en) * 2019-02-18 2019-04-19 河北建筑设计研究院有限责任公司 Set building club-footed pile strip footing straining beam and set building
CN109763509A (en) * 2019-02-28 2019-05-17 广东广强基础工程有限公司 A kind of buildings pile underpinning structure and its support and change method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1257149A (en) * 1998-12-11 2000-06-21 北京市第七城市建设工程公司 Integral foundation underpinning technology for building added floor
CN1603542A (en) * 2004-11-11 2005-04-06 徐国彬 Composite cable holding roof structure
JP2005264569A (en) * 2004-03-18 2005-09-29 Takenaka Komuten Co Ltd Construction method for extending lower story of existing building
CN101012650A (en) * 2007-02-08 2007-08-08 徐国彬 Pressing-resistant plucking-resistant pile and forming method thereof
WO2007138427A2 (en) * 2006-05-26 2007-12-06 So.L.E.S. - Societa' Lavori Edili E Serbatoi S.P.A. Method of raising a building
CN101117801A (en) * 2007-09-05 2008-02-06 哈尔滨工业大学 Superposition pile for engineering reconstruction and pile forming method
CN101294447A (en) * 2007-04-23 2008-10-29 上海市城市建设设计研究院 Buildings pile underpinning method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1257149A (en) * 1998-12-11 2000-06-21 北京市第七城市建设工程公司 Integral foundation underpinning technology for building added floor
JP2005264569A (en) * 2004-03-18 2005-09-29 Takenaka Komuten Co Ltd Construction method for extending lower story of existing building
CN1603542A (en) * 2004-11-11 2005-04-06 徐国彬 Composite cable holding roof structure
WO2007138427A2 (en) * 2006-05-26 2007-12-06 So.L.E.S. - Societa' Lavori Edili E Serbatoi S.P.A. Method of raising a building
CN101012650A (en) * 2007-02-08 2007-08-08 徐国彬 Pressing-resistant plucking-resistant pile and forming method thereof
CN101294447A (en) * 2007-04-23 2008-10-29 上海市城市建设设计研究院 Buildings pile underpinning method
CN101117801A (en) * 2007-09-05 2008-02-06 哈尔滨工业大学 Superposition pile for engineering reconstruction and pile forming method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518051A (en) * 2011-12-31 2012-06-27 江苏省交通规划设计院股份有限公司 System for deviation rectifying and reinforcing pier
CN102561721A (en) * 2012-02-29 2012-07-11 化学工业岩土工程有限公司 Building jacking deviation rectifying method
CN102561721B (en) * 2012-02-29 2015-03-25 化学工业岩土工程有限公司 Building jacking deviation rectifying method
CN102644294A (en) * 2012-04-10 2012-08-22 广东天竟建设有限公司 Foundation underpinning method around foundation pit
CN109653534A (en) * 2019-02-18 2019-04-19 河北建筑设计研究院有限责任公司 Set building club-footed pile strip footing straining beam and set building
CN109763509A (en) * 2019-02-28 2019-05-17 广东广强基础工程有限公司 A kind of buildings pile underpinning structure and its support and change method

Also Published As

Publication number Publication date
CN101806040B (en) 2012-05-30

Similar Documents

Publication Publication Date Title
CN106758841B (en) A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower
CN205776347U (en) Novel cover for subway station digs against making structural system
CN101838968B (en) Double track bridge construction process crossing existing railway operational lines
WO2017045223A1 (en) Prefabricated pier column member with steel-concrete composite structure
CN103741657B (en) The construction method of large-sized multifunction waterborne traffic accident
CN100564700C (en) The job practices of lattice type steel column tower crane pedestal
CN108060683A (en) A kind of middle weathering geology top-down construction method
CN1948633A (en) Tray type excarvating contrary construction method
CN102031784A (en) Slope protection pile pouring and cable bolting construction method for deep foundation pit
CN101806040B (en) Underpinning device and method for bridge and building
CN102953341A (en) Overhead trestle structure built on non-covering steep bare rocks in deep rapids
CN104213509B (en) A kind of cable hoisting anchor cable formula anchorage construction method
CN102162258B (en) Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof
CN107700366B (en) Deep water high-block bridge degree the bridge construction naked rock river bed trestle of hard stone and construction method
CN102979039B (en) Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
CN108004925A (en) Prestress reinforced concrete circular arch tower construction method
CN112982181A (en) Construction method for steel-concrete combined section of through-type steel box continuous arch bridge
CN104929047B (en) A kind of V-type pier outer support construction method
CN203049443U (en) High level trestle structure arranged on steep bare rock of deepwater torrent unsheathed layer
CN104711931B (en) Temporary underwater pier manufacturing, assembling and disassembling method suitable for bridge erection
CN207452738U (en) The deep water high-block bridge degree bridge construction naked rock river bed trestle of hard stone
CN212452655U (en) A reinforced structure that is used for SMW worker method stake to strut system
CN208201658U (en) A kind of steel trestle rapid construction device
CN211057808U (en) Span pipeline of foundation ditch and suspend protection architecture in midair
CN210555475U (en) Floating type drilling platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20150325

EXPY Termination of patent right or utility model