CN102561721A - Building jacking deviation rectifying method - Google Patents

Building jacking deviation rectifying method Download PDF

Info

Publication number
CN102561721A
CN102561721A CN2012100491165A CN201210049116A CN102561721A CN 102561721 A CN102561721 A CN 102561721A CN 2012100491165 A CN2012100491165 A CN 2012100491165A CN 201210049116 A CN201210049116 A CN 201210049116A CN 102561721 A CN102561721 A CN 102561721A
Authority
CN
China
Prior art keywords
building
jack
foundation
pile
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100491165A
Other languages
Chinese (zh)
Other versions
CN102561721B (en
Inventor
程华根
王涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Chemical Civil Engineering Co ltd
Original Assignee
Chemical Industry Geotechnical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chemical Industry Geotechnical Engineering Co ltd filed Critical Chemical Industry Geotechnical Engineering Co ltd
Priority to CN201210049116.5A priority Critical patent/CN102561721B/en
Publication of CN102561721A publication Critical patent/CN102561721A/en
Application granted granted Critical
Publication of CN102561721B publication Critical patent/CN102561721B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a building jacking deviation rectifying method, which comprises the following steps: excavating a pilot pit on the outer side of a foundation of a building to be rectified, transversely expanding the pilot pit along the foundation of the building, and excavating downwards along the vertical lower part of the foundation until reaching a bearing layer to form a underpinning gallery below the foundation; pouring concrete underpinning pile piers in the underpinning gallery, wherein a gap with a certain distance is reserved between the upper ends of the underpinning pile piers and the lower end of the building foundation; erecting a jack on the underpinning pile pier, jacking a building foundation upwards by using the jack, and then putting a plurality of prefabricated reinforced concrete pile caps; (a plurality of expansion bolts are arranged at the upper end of the pile cap), and the jack is dismantled after the expansion bolts are stressed to expand. Then pouring expanded concrete on the side surface of the prefabricated reinforced concrete pile cap; grouting between underpinning piers causes the soil layer under the building foundation to become dense. Because the expansion screw and the expansion concrete are used in the construction process, the problem that the foundation of the upper building is rebounded and reduced after the jack is removed is solved.

Description

A kind of building rectifying by jack up method
Technical field
The present invention relates to the building method field, especially is a kind of building rectifying by jack up method.
Background technology
The inclination of building is a problem that in worldwide, exists.Owing to structure foundation soil became uneven, soft or hard is irregular, foundation stability is poor, affected by environment big, prospecting is inaccurate, design is wrong, bearing capacity of foundation soil is not enough, layout or improper use cause the building center of gravity and the substrate centre of form to depart from reason such as excessive, that foundation soil is weak, embedded depth of foundation is little often to make the building uneven subsidence, disease phenomenons such as run-off the straight, warpage, cracking, sinking.Urban architecture is in a compact mass in addition; Underground space development, deep pit digging also often make and close on the above ground structure uneven subsidence; Cause the disease of phenomenons such as above ground structure cracking, inclination, these diseases the lighter influences the normal use of building, makes its forfeiture function of use when serious; Even the destruction of collapsing, cause heavy economic losses and casualties.For the still good building of globality after inclination, if use as usual, always have no a sense of safety, if give it up, then cause the wasting of resources, very be unfortunately, then waste its dismounting very big.Therefore, building is rectified a deviation, and to make its differential settlement stable then be the method for economical rationality.Now inclined building is rectified a deviation and mainly contain forced landing and jacking two class methods.Can be divided in the lift-up method and cut the stake correction and underpin straightening method etc.Underpin correction, promptly earlier the basis is held up, change supporting-point again.Existing jacking underpins method for correcting error can be because the load of upper building add the basis bounce-back decline that basis and the prefabricated reinforced concrete stake gap between emitting causes after jack is removed.
Summary of the invention
The object of the invention is to overcome the deficiency of above-mentioned new prior art, and the building rectifying by jack up method that provides a kind of building foundation bounce-back afterwards that effectively prevents to rectify a deviation to descend specifically comprises the steps:
1), in the outside, basis of the building of waiting to rectify a deviation the excavation base tunnel, extending transversely from this base tunnel along said building foundation, and along said basic vertical lower downwards excavation form the tunnel that underpins of below, basis until bearing stratum;
2), underpin said that concreting underpins pile pier in the tunnel, this underpins certain distance is left in the pile pier upper end apart from the lower end, building foundation gap, and the said pile pier that underpins is built the back maintenance certain hour that finishes, up to the requirement of strength that satisfies regulation;
3), put on the shelf and establish jack underpining pile pier, and with this jack said building foundation of jacking that makes progress, put into several prefabricated reinforced concrete pile covers underpining the pile pier upper end again;
4), some swell fixtures are set, and make the expansion direction of said swell fixture consistent with the direction in said gap in said prefabricated reinforced concrete pile cover upper end, said swell fixture reinforcing is made it expansion after, the dismounting jack.Build expansive concrete in said prefabricated reinforced concrete pile cover side again;
5), slip casting makes the soil layer under the building foundation become closely knit between the pile pier underpining;
The soil backfill of 6), said base tunnel being excavated out is smooth.
The further design of said method is that the said gap that underpins pile pier upper end and lower end, building foundation is 500mm.
The further design of said method is that said prefabricated reinforced concrete pile cover is a hollow shell pill, and this prefabricated reinforced concrete pile cover upper end is provided with steel plate, upwards is uniformly distributed with four M8X70 swell fixtures in this steel plate week.
The further design of said method is, after slip casting is accomplished, base tunnel with underpin between the tunnel along basic base block downwards and establish one and be used for the brick wall mould that seals in the tunnel to underpining.
The present invention has been owing to used setscrew and expansive concrete in work progress, efficiently solve when removing jack after because the load of upper building adds the rebound problem of decline of basis that basis and the prefabricated reinforced concrete stake gap between emitting causes.This technology duration is short; The jacking amount can accurately be controlled, and rectifying effect is desirable, and success rate is high, and ground level can be recovered basically.
Description of drawings
Fig. 1 underpinning construction excavation sketch map.
Fig. 2 is a pile pier top pile cover construction sketch map.
Fig. 3 is a pile cover upper end structural representation.
Among the figure, 1 grade, 2 indoor terraces, 3 base tunnels, 4 bases, 5 underpin the tunnel, and 6 underpin pile pier.
The specific embodiment
Below in conjunction with Figure of description the present invention is further specified.
 
Present embodiment is to wall crazing correction that differential settlement causes in the building.
At first according to the gradient of this body of wall, estimating required jacking amount, is 350mm like the jacking amount.Then excavate base tunnel, map 1, excavation base tunnel 3 on the grade 1 on body of wall basis 4 of waiting to rectify a deviation, extending transversely from base tunnel 3 along this body of wall basis, and continue to be excavated to bearing stratum downwards along basic vertical lower, below, basis this moment forms and underpins tunnel 5; Concreting underpins pile pier 6 in underpining tunnel 5, the lower surface 500mm up to the upper surface that underpins pile pier 6 far from the building foundation.Underpin after pile pier 6 builds completion, maintenance 28 days reaches the above requirement of strength of C30.Set up jack 9 underpining on the pile pier 6 corresponding basic both sides symmetry; See also Fig. 2; Be furnished with a plurality of jack on the pile pier 6 below the body of wall basis, underpining, erect a scale that posts millimeter section paper in that every jack is other, set the gradation top lifting height of this liter point; Gradation jacking body of wall basis, strict control each item rises the jacking amount of point in this process.Underpining several prefabricated reinforced concrete pile covers 8 of placement on the pile pier then; Prefabricated reinforced concrete pile cover 8 is the hollow shell pill that 450mm is high, 100mm is thick; Prefabricated reinforced concrete pile cover 8 upper ends are provided with steel plate, four swell fixtures 81 of the even horizontal that makes progress in the week of this steel plate, and the expansion direction of swell fixture is consistent with the direction that needs jacking; This swell fixture specification is M8X70, and is as shown in Figure 3.
After 81 reinforcings make it to expand to swell fixture, jack 9 is removed.Build expansive concrete in prefabricated reinforced concrete pile cover 8 sides again; Cement injection makes the soil layer under the building foundation 4 become closely knit between the pile pier 6 underpining then, afterwards at base tunnel 3 and underpin between the tunnel 5 to build downwards along basic base and establish one and be used for the brick wall mould 7 that seals in the tunnel to underpining.
The base tunnel 3 soil backfill of excavating out is smooth the most at last.After January is accomplished in this construction, above-mentioned body of wall is measured once more, its sedimentation tends towards stability, and body of wall tilts to have obtained correction.
The present invention adopts setscrew and is used in combination expansive concrete in the work progress of correction, efficiently solve when removing jack after because the load of upper building adds the rebound problem of decline of basis that basis and the prefabricated reinforced concrete stake gap between emitting causes.This technology duration is short; The jacking amount can accurately be controlled, and rectifying effect is desirable, and success rate is high, and ground level can be recovered basically.

Claims (4)

1. a building rectifying by jack up method is characterized in that this method comprises the steps:
1), in the outside, basis of the building of waiting to rectify a deviation the excavation base tunnel, extending transversely from this base tunnel along said building foundation, and along said basic vertical lower downwards excavation form the tunnel that underpins of below, basis until bearing stratum;
2), underpin said that concreting underpins pile pier in the tunnel, this underpins certain distance is left in the pile pier upper end apart from the lower end, building foundation gap, and the said pile pier that underpins is built the back maintenance certain hour that finishes, up to the requirement of strength that satisfies regulation;
3), put on the shelf and establish jack underpining pile pier, and with this jack said building foundation of jacking that makes progress, put into several prefabricated reinforced concrete pile covers underpining the pile pier upper end again;
4), some swell fixtures are set in said prefabricated reinforced concrete pile cover upper end; And make the expansion direction of said swell fixture consistent with the direction in said gap; After said swell fixture reinforcing made it to expand, remove jack, build expansive concrete in said prefabricated reinforced concrete pile cover side again;
5), slip casting makes the soil layer under the building foundation become closely knit between the pile pier underpining;
The soil backfill of 6), said base tunnel being excavated out is smooth.
2. building rectifying by jack up method according to claim 1 is characterized in that: the said gap that underpins pile pier upper end and lower end, building foundation is 500mm.
3. building rectifying by jack up method according to claim 1 is characterized in that: said prefabricated reinforced concrete pile cover is a hollow shell pill, and this prefabricated reinforced concrete pile cover upper end is provided with steel plate, upwards is uniformly distributed with four M8X70 swell fixtures in this steel plate week.
4. building rectifying by jack up method according to claim 1 is characterized in that: after slip casting is accomplished, base tunnel with underpin between the tunnel along basic base block downwards and establish one and be used for the brick wall mould that seals in the tunnel to underpining.
CN201210049116.5A 2012-02-29 2012-02-29 Building jacking deviation rectifying method Active CN102561721B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210049116.5A CN102561721B (en) 2012-02-29 2012-02-29 Building jacking deviation rectifying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210049116.5A CN102561721B (en) 2012-02-29 2012-02-29 Building jacking deviation rectifying method

Publications (2)

Publication Number Publication Date
CN102561721A true CN102561721A (en) 2012-07-11
CN102561721B CN102561721B (en) 2015-03-25

Family

ID=46408188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210049116.5A Active CN102561721B (en) 2012-02-29 2012-02-29 Building jacking deviation rectifying method

Country Status (1)

Country Link
CN (1) CN102561721B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817381A (en) * 2012-08-05 2012-12-12 河北省建筑科学研究院 Construction method of rear-embedded pile foundation
CN104131585A (en) * 2014-08-18 2014-11-05 慕江源 Deviation rectifying and reinforcing method for collapsible salty land building foundation mud jacking and pile pressing resetting method
CN108425386A (en) * 2018-05-24 2018-08-21 山东建筑大学 Frame structure building promotes correcting method
CN109056859A (en) * 2018-09-11 2018-12-21 中国电建集团华东勘测设计研究院有限公司 A kind of tubular type slip casting blower foundation method for correcting error
CN110512665A (en) * 2019-07-18 2019-11-29 上海建工一建集团有限公司 The synchronous lifting of existing sinking old building and error-correction structure and its construction method
CN110747914A (en) * 2019-10-15 2020-02-04 中国化学工程第四建设有限公司 Large tower equipment inclination correction method
CN113216692A (en) * 2021-04-13 2021-08-06 广东睿固建设科技有限公司 Underpinning and jacking masonry construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1888331A (en) * 2006-07-28 2007-01-03 谭新平 Guide pit type manual pot holing pile reinforing and underpinning method for building foundation and composite supporting pile
CN101387114A (en) * 2008-09-19 2009-03-18 天津市市政工程设计研究院 Active underpinning structure of hyperstation foot stall or pile foundation and construction method thereof
CN101806040A (en) * 2010-03-25 2010-08-18 徐国彬 Underpinning device and method for bridge and building
JP4550534B2 (en) * 2004-09-14 2010-09-22 森 直樹 Building basic structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4550534B2 (en) * 2004-09-14 2010-09-22 森 直樹 Building basic structure
CN1888331A (en) * 2006-07-28 2007-01-03 谭新平 Guide pit type manual pot holing pile reinforing and underpinning method for building foundation and composite supporting pile
CN101387114A (en) * 2008-09-19 2009-03-18 天津市市政工程设计研究院 Active underpinning structure of hyperstation foot stall or pile foundation and construction method thereof
CN101806040A (en) * 2010-03-25 2010-08-18 徐国彬 Underpinning device and method for bridge and building

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
叶书麟等: "托换技术综述", 《中国土木工程学会土力学及基础工程学会地基处理学术委员会第三届地基处理学术讨论会》, 31 December 1992 (1992-12-31) *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817381A (en) * 2012-08-05 2012-12-12 河北省建筑科学研究院 Construction method of rear-embedded pile foundation
CN104131585A (en) * 2014-08-18 2014-11-05 慕江源 Deviation rectifying and reinforcing method for collapsible salty land building foundation mud jacking and pile pressing resetting method
CN104131585B (en) * 2014-08-18 2016-06-22 慕江源 Building basis, settlement by soaking salting soil mud jacking piling reduced method correcting and then reinforcing method
CN108425386A (en) * 2018-05-24 2018-08-21 山东建筑大学 Frame structure building promotes correcting method
CN109056859A (en) * 2018-09-11 2018-12-21 中国电建集团华东勘测设计研究院有限公司 A kind of tubular type slip casting blower foundation method for correcting error
CN110512665A (en) * 2019-07-18 2019-11-29 上海建工一建集团有限公司 The synchronous lifting of existing sinking old building and error-correction structure and its construction method
CN110747914A (en) * 2019-10-15 2020-02-04 中国化学工程第四建设有限公司 Large tower equipment inclination correction method
CN113216692A (en) * 2021-04-13 2021-08-06 广东睿固建设科技有限公司 Underpinning and jacking masonry construction method

Also Published As

Publication number Publication date
CN102561721B (en) 2015-03-25

Similar Documents

Publication Publication Date Title
CN102561721B (en) Building jacking deviation rectifying method
CN109356210B (en) Pile foundation building inclination correction pile interception underpinning limiting structure and construction method thereof
CN109339029B (en) Construction method for resisting uplift deformation in excavation of foundation pit above existing tunnel
CN112554198B (en) Construction method of deep foundation pit protection structure adjacent to high-rise building
CN105804119A (en) Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure
RU2414563C1 (en) Method to erect multistory subsurface structure
CN104988948B (en) A kind of construction method of fin-plate type retaining wall
CN214530750U (en) Bridge pile foundation structure suitable for rock mass abrupt slope
CN107044142B (en) Adjustable reinforcement deviation correcting method and structure for reducing uneven settlement of house
CN214993554U (en) Hydraulic engineering's side slope reinforced structure
CN106760620A (en) A kind of utilization open caisson increases the construction method for building the underground space under existing building
CN104264683B (en) Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition
CN111456081A (en) Pile foundation retaining wall structure and construction method
CN209923959U (en) Open caisson structure for dry-process operation of high-groundwater-level soft soil field
CN109706987B (en) Jacking and inclination correcting method for interior of frame structure building
CN109914470A (en) A kind of road shoulder barricade and its construction method
US6948885B2 (en) Method for constructing foundation
CN104963348A (en) Soft soil area tower crane foundation construction supporting structure and construction method thereof
CN107700434A (en) A kind of dome grating formula armored concrete mud-rock flow blocking dam and its construction process
CN204898700U (en) Bridge foundation structure
CN212052780U (en) Oblique supporting type deep foundation pit supporting structure
CN210507517U (en) Combined member suitable for retaining wall heightening
CN206591526U (en) A kind of super-huge karst dead zone embedded rock pile wall-attaching type backfill steel reinforced concrete dado structure
CN113833012B (en) Pile type adjustable fan foundation and construction method
CN219992525U (en) Middle-layer building bearing type shallow foundation structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 210031 building 4, Yangzi science and technology innovation headquarters base, No.5, Pudong North Road, Jiangbei new district, Nanjing City, Jiangsu Province

Patentee after: China Chemical Civil Engineering Co.,Ltd.

Address before: No. 357, Dachang Yangxin Road, Liuhe District, Nanjing, Jiangsu 210044

Patentee before: CHEMICAL INDUSTRY GEOTECHNICAL ENGINEERING Co.,Ltd.