CN101774499B - Elevator management system, method and matched elevator management mainboard - Google Patents

Elevator management system, method and matched elevator management mainboard Download PDF

Info

Publication number
CN101774499B
CN101774499B CN 200910075730 CN200910075730A CN101774499B CN 101774499 B CN101774499 B CN 101774499B CN 200910075730 CN200910075730 CN 200910075730 CN 200910075730 A CN200910075730 A CN 200910075730A CN 101774499 B CN101774499 B CN 101774499B
Authority
CN
China
Prior art keywords
elevator
management
circuit
processing unit
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200910075730
Other languages
Chinese (zh)
Other versions
CN101774499A (en
Inventor
侯永捷
***
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinhuangdao Development Zone Qianjing Electronic Science and Technology Co Ltd
Original Assignee
Qinhuangdao Development Zone Qianjing Electronic Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinhuangdao Development Zone Qianjing Electronic Science and Technology Co Ltd filed Critical Qinhuangdao Development Zone Qianjing Electronic Science and Technology Co Ltd
Priority to CN 200910075730 priority Critical patent/CN101774499B/en
Publication of CN101774499A publication Critical patent/CN101774499A/en
Application granted granted Critical
Publication of CN101774499B publication Critical patent/CN101774499B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Maintenance And Inspection Apparatuses For Elevators (AREA)

Abstract

The invention discloses an elevator management system, a method thereof and a matched elevator management mainboard, solving the technical problem that the elevator management system can not realize unification and automation. The invention adopts the technical scheme that the system comprises an interface, a monitoring circuit, a central processing unit, a management program and a central data storage unit, wherein the interface and the monitoring circuit are matched with the driving and operating process of the elevator. The elevator management system is provided with a central control computer in the customer service department of an elevator manufacturer; the central control computer collects an elevator operation state signal along with the central processing unit in the elevator management circuit; after stored, analyzed and processed, the signal is stored to the system database of the central control computer by the network interface circuit according to the level of abnormal information; after analyzed and processed, processing opinions and alarming signals are replied to the central processing unit of the elevator which gives an alarm by the network interface of the system or to the local management mechanism of the elevator using units via the network interface of the system. The invention has the advantages that a several-for-one data transmission mode is carried out by the network interface so as to improve the unified management of elevator safety.

Description

A kind of lift management system, method and supporting elevator management mainboard
Technical field
The present invention relates to a kind of lift management system with the seismic monitoring device and method, be applied to seismic monitoring and elevator group controller field, particularly a kind ofly realize that the elevator originating firm unifies to monitor and control selling elevator, can realize again lift management system, method and elevator management mainboard to the unitized management of earthquake information data.
Background technology
In the prior art, lift management system has become and a plurality of lift cars can have been managed as a colony, so that high efficiency elevator operation service system to be provided to the user.This elevator operation service system is arranged on the residential property place mostly.When Lift out of order, can only call out elevator service personnel by property, can not accomplish on-call maintenance, delay the use to elevator to the rescue of passenger in elevator or user.And when earthquake is arrived, the earthquake perceptron that uses in elevator is by seismic information collection circuit acquiring seismic data information, and can trigger different energizing signal output circuits according to the earthquake intensity grade, the opening of automatic control electric ladder door makes elevator in floor unlatching recently, discharges the passenger in elevator, avoid to greatest extent the personal casualty in elevator, also can avoid simultaneously elevator also to be in running state when earthquake occurs, cause the damage of elevator, increase cost.But, when earthquake is arrived, the geological data information that the seismic information collection circuit collects, by the management that unitizes of certain device, this has not just caused the waste of resource.And prior art does not well address these problems, and has brought certain difficulty for the work of this area.
Summary of the invention
the present invention will solve the technical matters that lift management system fails to realize unitized and automation, the present invention has designed a kind of lift management system, method and supporting elevator management mainboard, at elevator foregrounding elevator management mainboard acquisition and processing elevator operation signal and ambient condition signal, Customer Service Department arranges the elevator operation signal that central control machine receives the transmission of elevator management mainboard at the elevator originating firm, after Storage and Processing, by the Long-distance Control elevator, in time get rid of elevator faults, solved the technical matters of the unrealized unitized intelligent management of elevator, extended the service life of elevator, make the safety of elevator passenger more secure.
the present invention realizes that the technical scheme that goal of the invention adopts is, a kind of lift management system, system comprises match with the driving of elevator and operational process interface and observation circuit, central processing unit, management program and intermediate data storage device unit, the background control unit of this lift management system is arranged on elevator originating firm Customer Service Department, and supporting the EPROM of system management memory program and the central control machine of system database arranged, gather the elevator operation signal with the central processing unit that is scattered in the elevator management circuit that respectively makes land used, after processing by analysis, classifying packing is stored in memory device, be sent to central control machine according to the grade that abnormal information occurs by network interface circuit after analyzing and processing, be stored in system database, after central control machine is processed data, the network interface of Help of System will comprise that the handling suggestion of expeditious measures and alerting signal are returned to the central processing unit of sending the alert news elevator or the local administration of this elevator applying unit.
A kind of elevator management mainboard, comprise match with the driving of elevator and operational process management and observation circuit, central processing unit and data storage cell, be provided with network interface circuit in the structure of above-mentioned mainboard, the elevator operation signal that central processing unit receives and ambient condition signal, the formation control signal sends to the controlled end of each servomechanism of elevator after CPU processes, and the elevator operating troubles signal that central processing unit receives and ambient condition alerting signal realize immediately being sent to related management system by network interface circuit.
A kind of elevator safety operation is realized the method for network management, this management process is by means of having configured the elevator management mainboard in elevator, set up the earthquake perceptron and store the memory device of supporting management software in the elevator management mainboard structure, and the method comprises the following steps:
Rear sorting code number storage is analyzed, contrasted to central processing unit in A, elevator management mainboard online acquisition after elevator starts to the status signal of elevator operation, to collection signal;
B, to break down in the elevator collection signal, early warning, emergency state time-division rank take to shut down to be checked, information is uploaded, the emergent alarm measure, central processing unit sends to this elevator operation information and emergency rating the central control machine of customer service system immediately by the internet between the network interface of the network interface circuit of elevator and customer service system;
The preservation of encoding of the operation information that C, central control machine report this elevator and emergency rating, start the emergency rating routine analyzer information that reports is analyzed, in the calling system data bank, related data information is analyzed in conjunction with the professional and technical personnel and is formed user and local maintenance, the administration that emergency plan returns to this elevator.
The invention has the beneficial effects as follows: carry out many-to-one data transfer mode by network interface circuit, improved the unitized intelligent management of the safety of elevator; Can realize that the elevator originating firm sells elevator to all and carry out that real-time online detects and control, make elevator passenger safety more secure; Be conducive to the various places geological data and gather, avoid the waste of earthquake information; Reserve digital communication interface in the elevator management circuit, be conducive to expanding peripherals.
The present invention is described in detail below in conjunction with accompanying drawing.
Description of drawings
Fig. 1 is lift management system functional block diagram of the present invention.
Fig. 2 is earthquake perceptron functional block diagram of the present invention.
Fig. 3 is surface displacement information acquisition circuit schematic diagram of the present invention.
In accompanying drawing, the 1st, central control machine, 1-1 is system database, the 2nd, network interface, the 3rd, elevator, 3-1 are the earthquake perceptrons, 3-1-1 is microprocessor, 3-1-2 is the acceleration analysis circuit, and 3-1-3 is filter circuit, and 3-1-4 is the A/D change-over circuit, 3-1-5 is clock circuit, 3-1-6 is the intermediate storage circuit, and 3-1-7 is the local interface end, and 3-1-8 is power circuit, 3-1-9 is the alerting signal output circuit, 3-2 is the central processing unit that is configured in elevator, and 3-3 is network interface circuit, and 3-4 is the memory device that is configured in elevator.
The specific embodiment
referring to accompanying drawing, a kind of lift management system, system comprises match with the driving of elevator and operational process interface and observation circuit, central processing unit, management program and intermediate data storage device unit, the background control unit of this lift management system is arranged on elevator originating firm Customer Service Department, and supporting the EPROM of system management memory program and the central control machine 1 of system database 1-1 arranged, gather the elevator operation signal with the central processing unit 3-2 that is scattered in elevator 3 management circuits that respectively make land used, after processing by analysis, classifying packing is stored in memory device 3-4, be sent to central control machine 1 according to the grade that abnormal information occurs by network interface circuit 3-3 after analyzing and processing, be stored in system database 1-1, after 1 pair of data of central control machine are processed, the network interface 2 of Help of System will comprise that the handling suggestion of expeditious measures and alerting signal are returned to the central processing unit 3-2 that sends the alert news elevator or the local administration of this elevator applying unit.
The network interface circuit 3-3 structure that arranges in above-mentioned elevator 3 management circuits comprises dialer circuit, mode of operation gating circuit switch, the trigger end of mode of operation gating circuit switch is connected on the gating signal output port of central processing unit 3-2, and the elevator operation signal is controlled output by central processing unit 3-2 and transferred to network interface 2 ends of central control machine 1 by network interface circuit 3-3.
Also comprise earthquake perceptron 3-1 in the management circuit structure of above-mentioned elevator 3; the local earth's surface vertical displacement that earthquake perceptron 3-1 will collect and horizontal displacement signal are sent to foreground central processing unit 3-2 and are treated as minute rank preservation of earthquake perceptual signal; the program of being managed is regarded as abnormal seismic signal and immediately is sent to the central control machine 1 of native system by network interface circuit 3-3, and abnormal seismic signal reaches the warning level alarm, floor is shut down, opened the door and evacuate the passenger nearby.
Adopt independently microprocessor 3-1-1 in the circuit structure of above-mentioned earthquake perceptron 3-1, earthquake information after the surface displacement information acquisition circuit that is connected with microprocessor 3-1-1, clock circuit 3-1-5, alerting signal output circuit 3-1-9, intermediate storage circuit 3-1-6, local side interface 3-1-7 and supporting power circuit 3-1-8, earthquake perceptron 3-1 realize with the communication of central processing unit 3-2, also processing by local side interface 3-1-7 is sent to be stored in backstage central control machine 1 and further processing processing.
The filter circuit 3-1-3 that has adopted acceleration analysis circuit 3-1-2 that MEMS acceleration pick-up and supporting Resistor-Capacitor Unit form in above-mentioned surface displacement information acquisition circuit structure, formed by capacity cell, the A/D change-over circuit 3-1-4 that is formed by A/D conversion chip and supporting Resistor-Capacitor Unit.
Be provided with in the management circuit of above-mentioned elevator 3 digital communication interface of alarm message to the peripheral hardware transmission.
A kind of elevator management mainboard, comprise match with the driving of elevator and operational process management and observation circuit, central processing unit and data storage cell, be provided with network interface circuit 3-3 in the structure of above-mentioned mainboard, the elevator operation signal that central processing unit 3-2 receives and ambient condition signal, the formation control signal sends to the controlled end of elevator 3 each servomechanisms after CPU processes, and the elevator operating troubles signal that central processing unit 3-2 receives and ambient condition alerting signal realize immediately being sent to related management system by network interface circuit 3-3.
Be provided with earthquake perceptron 3-1 circuit in the structure of above-mentioned mainboard, the local earth's surface vertical displacement that earthquake perceptron 3-1 will collect and horizontal displacement signal are sent to central processing unit 3-2 and are treated as earthquake perceptual signal minute rank and preserve, and the program of being managed is regarded as the central control machine 1 in abnormal seismic signal is sent to this mainboard immediately by network interface circuit 3-3 management system.
A kind of elevator safety operation is realized the method for network management, this management process is by means of having configured the elevator management mainboard in elevator 3, set up earthquake perceptron 3-1 and store the memory device 3-4 of supporting management software in the elevator management mainboard structure, and the method comprises the following steps:
Rear sorting code number storage is analyzed, contrasted to central processing unit 3-2 in A, elevator management mainboard online acquisition after elevator starts to the status signal of elevator operation, to collection signal;
B, to break down in elevator 3 collection signals, early warning, emergency state time-division rank take to shut down to be checked, information is uploaded, the emergent alarm measure, central processing unit 3-2 sends to this elevator operation information and emergency rating the central control machine 1 of customer service system immediately by the internet between the network interface 2 of the network interface circuit 3-3 of elevator 3 and customer service system;
The preservation of encoding of the operation information that C, central control machine 1 report this elevator 3 and emergency rating, start the emergency rating routine analyzer information that reports is analyzed, in the calling system data bank, related data information is analyzed in conjunction with the professional and technical personnel and is formed user and local maintenance, the administration that emergency plan returns to this elevator 3.
Further comprising the steps of in above-mentioned method:
D, by central processing unit 3-2 with every day the elevator operation data carry out statistic of classification and become the daily sheet data, compression packing storage, the individual event of daily sheet classification comprises: the lifting sequence number, and lifting is interval, running current, dissipation work, the lifting weight merit, lower load carrying ability merit, fault type, the eliminating time, ambient condition;
F, send form by network interface circuit 3-3 to system's central control machine 1 of customer service terminal by designated time every day, complete analysiss, arrange by central control machine 1, as the foundation of early warning, maintenance suggestion, improvement design proposition;
G, maintenance suggestion, coherent reference data are returned to the central processing unit 3-2 of related elevator, the earthquake information table that will gather directly passes and issues the earthquake supervisory management zone.
the present invention in the specific implementation, will be with earthquake perceptron 3-1, central processing unit 3-2, the elevator management mainboard of network interface circuit 3-3 and memory device 3-4 and management program thereof are supporting to be arranged in elevator 3, makers' Customer Service Department arranges central control machine 1 at elevator, elevator 3 can gather the elevator operation signal by real-time online, and signal is sent to central processing unit 3-2 classifies and be stored to memory device 3-4, break down in elevator 3 collection signals, early warning, during emergency state signal, central processing unit 3-2 immediately sends a control signal to network interface circuit 3-3 and connects network, and elevator operation signal and emergency rating signal are sent to central control machine 1 immediately by the internet, after central control machine 1 inventory analysis is processed, return to user and local maintenance that emergency plan returns to this elevator 3, administration, in time solution is rescued the passenger in elevator 3 or is made elevator 3 recover as early as possible normal operating condition.
earthquake perceptron 3-1 also can gather seismic signal by real-time online, when earthquake sense knows that device 3-1 perceives focus, send seismic signal and carry out inventory analysis to the Central Processing Unit (CPU) 3-2 of elevator 3, the program of being managed is regarded as abnormal seismic signal and will be sent to central control machine 1 by the network interface 2 of network interface circuit 3-3 and system and carry out inventory analysis, when central controlling machine 1 determines that abnormal seismic signal reaches the warning level alarm, and return control signal is to the controlled end of elevator 3, floor is shut down nearby, open the door and evacuate the passenger, make passenger in elevator at very first time flee danger.
Central processing unit 3-2 with every day the elevator operation data carry out statistic of classification and become the daily sheet data, compression packing storage sends form by network interface circuit 3-3 to system's central control machine 1 of customer service terminal by designated time every day.The individual event of daily sheet classification comprises: the lifting sequence number, lifting is interval, running current, dissipation work, lifting weight merit, lower load carrying ability merit, fault type, eliminating time, ambient condition.Central control machine 1 is completed analysis, is arranged, foundation as early warning, maintenance suggestion, improvement design proposition, and maintenance suggestion, coherent reference data are returned to the central processing unit 3-2 of related elevator 3, be conducive to the engineer and for the data that show in form, lift management system made further improvement, the direct biography of the earthquake information table that will gather is simultaneously issued the earthquake supervisory management zone and is gathered, and avoids the waste of Seismic information resource.
Also reserved digital communication interface in the elevator management mainboard, be used for sending elevator faults to the administration departments that disperses elevator 3 and report to the police.

Claims (9)

1. lift management system, system comprises match with the driving of elevator and operational process interface and observation circuit, central processing unit, management program and intermediate data storage device unit, it is characterized in that: the background control unit of this lift management system is arranged on elevator originating firm Customer Service Department, and the supporting EPROM of system management memory program and the central control machine (1) of system database (1-1) of being provided with, gather the elevator operation signal with the central processing unit (3-2) that is scattered in elevator (3) management circuit that respectively makes land used, after processing by analysis, classifying packing is stored in memory device (3-4), be sent to central control machine (1) according to the grade that abnormal information occurs by network interface circuit (3-3) after analyzing and processing, be stored in system database (1-1), after central control machine (1) is processed data, the network interface of Help of System (2) will comprise that the handling suggestion of expeditious measures and alerting signal are returned to the central processing unit (3-2) of sending alert news elevator (3) or the local administration of this elevator (3) applying unit, also comprise earthquake perceptron (3-1) in the management circuit structure of above-mentioned elevator (3), the local earth's surface vertical displacement that earthquake perceptron (3-1) will collect and horizontal displacement signal are sent to front central processing unit (3-2) and are treated as minute rank preservation of earthquake perceptual signal, the program of being managed is regarded as abnormal seismic signal and immediately is sent to the central control machine (1) of native system by network interface circuit (3-3), and abnormal seismic signal reaches the warning level alarm, floor is shut down, opened the door and evacuate the passenger nearby, the direct biography of the earthquake information table that central control machine (1) will gather is issued the earthquake supervisory management zone and is gathered.
2. a kind of lift management system according to claim 1, it is characterized in that: network interface circuit (3-3) structure that arranges in described elevator (3) management circuit comprises dialer circuit, mode of operation gating circuit switch, the trigger end of mode of operation gating circuit switch is connected on the gating signal output port of central processing unit (3-2), and the elevator operation signal is controlled output by central processing unit (3-2) and transferred to network interface (2) end of central control machine (1) by network interface circuit (3-3).
3. a kind of lift management system according to claim 1, it is characterized in that: adopt independently microprocessor (3-1-1) in the circuit structure of described earthquake perceptron (3-1), the surface displacement information acquisition circuit that is connected with microprocessor (3-1-1), clock circuit (3-1-5), alerting signal output circuit (3-1-9), intermediate storage circuit (3-1-6), local side interface (3-1-7) and supporting power circuit (3-1-8), earthquake perceptron (3-1) is by the communication of local side interface (3-1-7) realization with central processing unit (3-2), and the earthquake information after processing be sent to store in the central control machine (1) of background control unit and further processing process.
4. a kind of lift management system according to claim 3 is characterized in that: the filter circuit (3-1-3) that has adopted acceleration analysis circuit (3-1-2) that MEMS acceleration pick-up and supporting Resistor-Capacitor Unit form in described surface displacement information acquisition circuit structure, has been comprised of capacity cell, the A/D change-over circuit (3-1-4) that is comprised of A/D conversion chip and supporting Resistor-Capacitor Unit.
5. a kind of lift management system according to claim 1, is characterized in that: be provided with in the management circuit of described elevator (3) the digital communication interface of alarm message to the peripheral hardware transmission.
one kind with the supporting elevator management mainboard of lift management system claimed in claim 1, comprise the management and the observation circuit that match with driving and the operational process of elevator, central processing unit and data storage cell, it is characterized in that: be provided with network interface circuit (3-3) in the structure of described mainboard, the elevator operation signal that central processing unit (3-2) receives and ambient condition signal, the formation control signal sends to the controlled end of each servomechanism of elevator (3) after CPU processes, the elevator operating troubles signal that central processing unit (3-2) receives and ambient condition alerting signal realize immediately being sent to related management system by network interface circuit (3-3).
7. elevator management mainboard according to claim 6, it is characterized in that: be provided with earthquake perceptron (3-1) circuit in the structure of described mainboard, the local earth's surface vertical displacement that earthquake perceptron (3-1) will collect and horizontal displacement signal are sent to central processing unit (3-2) and are treated as earthquake perceptual signal minute rank and preserve, and the program of being managed is regarded as the central control machine (1) in abnormal seismic signal is sent to this mainboard immediately by network interface circuit (3-3) management system.
8. an elevator safety operation is realized the method for network management, this method is used based on lift management system claimed in claim 1, it is characterized in that: described management process is by means of having configured the said elevator management mainboard of claim 7 in elevator (3), set up earthquake perceptron (3-1) and store the memory device of supporting management software in the elevator management mainboard structure, and the method comprises the following steps:
Rear sorting code number storage is analyzed, contrasted to central processing unit (3-2) in A, elevator management mainboard online acquisition after elevator (3) starts to the status signal of elevator operation, to collection signal;
B, to break down in elevator (3) collection signal, early warning, emergency state time-division rank take to shut down to be checked, information is uploaded, the emergent alarm measure, central processing unit (3-2) sends to this elevator operation information and emergency rating the central control machine (1) of customer service system immediately by the internet between the network interface (2) of the network interface circuit (3-3) of elevator (3) and customer service system;
The preservation of encoding of the operation information that C, central control machine (1) report this elevator (3) and emergency rating, start the emergency rating routine analyzer information that reports is analyzed, in the calling system data bank, related data information is analyzed in conjunction with the professional and technical personnel and is formed user and local maintenance, the administration that emergency plan returns to this elevator (3).
9. elevator safety operation according to claim 8 is realized the method for network management, it is characterized in that: further comprising the steps of in described method:
D, by central processing unit (3-2) with every day the elevator operation data carry out statistic of classification and become the daily sheet data, compression packing storage, the individual event of daily sheet classification comprises: the lifting sequence number, and lifting is interval, running current, dissipation work, the lifting weight merit, lower load carrying ability merit, fault type, the eliminating time, ambient condition;
F, send form by network interface circuit (3-3) to system's central control machine (1) of customer service terminal by designated time every day, complete analysis, arrange by central control machine (1), as the foundation of early warning, maintenance suggestion, improvement design proposition;
G, maintenance suggestion, coherent reference data are returned to the central processing unit (3-2) of related elevator, the earthquake information table that will gather directly passes and issues the earthquake supervisory management zone.
CN 200910075730 2009-10-19 2009-10-19 Elevator management system, method and matched elevator management mainboard Expired - Fee Related CN101774499B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910075730 CN101774499B (en) 2009-10-19 2009-10-19 Elevator management system, method and matched elevator management mainboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910075730 CN101774499B (en) 2009-10-19 2009-10-19 Elevator management system, method and matched elevator management mainboard

Publications (2)

Publication Number Publication Date
CN101774499A CN101774499A (en) 2010-07-14
CN101774499B true CN101774499B (en) 2013-06-05

Family

ID=42511125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910075730 Expired - Fee Related CN101774499B (en) 2009-10-19 2009-10-19 Elevator management system, method and matched elevator management mainboard

Country Status (1)

Country Link
CN (1) CN101774499B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102556795A (en) * 2011-12-14 2012-07-11 虞海盈 Safety monitoring system and method thereof for elevators
CN102491139A (en) * 2011-12-14 2012-06-13 宁波盛德电气科技有限公司 Elevator safety monitoring device
CN102910519A (en) * 2012-10-30 2013-02-06 吴江信谊精密五金有限公司 Monitoring device for tractor for elevator
CN102897619A (en) * 2012-10-30 2013-01-30 吴江信谊精密五金有限公司 Remote monitoring device of elevator traction machine
CN103896119A (en) * 2014-04-18 2014-07-02 山东省特种设备检验研究院济宁分院 Elevator landing door counting device
CN108466884A (en) * 2017-02-23 2018-08-31 无锡鸿廷科技有限公司 A kind of elevator operation action management and analysis
CN107381259A (en) * 2017-07-11 2017-11-24 福建意昂机电股份公司 A kind of elevator patrolling and checking management system
CN108600189B (en) * 2018-04-02 2021-01-26 合肥美的电冰箱有限公司 Equipment after-sale monitoring system and method
CN113148790A (en) * 2021-03-10 2021-07-23 猫岐智能科技(上海)有限公司 Elevator information acquisition and analysis system and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1250743A (en) * 1999-09-08 2000-04-19 陈志全 Remote monitor system for elevator
CN1495122A (en) * 2002-09-18 2004-05-12 三菱电机株式会社 Remote monitoring system
WO2006097999A1 (en) * 2005-03-15 2006-09-21 Mitsubishi Denki Kabushiki Kaisha Elevator controller
CN200999167Y (en) * 2007-01-17 2008-01-02 秦皇岛开发区前景光电技术有限公司 City elevator remote collectively uniform monitoring safety guard management system
CN101300185A (en) * 2005-10-31 2008-11-05 东芝电梯株式会社 Remote monitoring system
CN201264852Y (en) * 2008-09-04 2009-07-01 秦皇岛开发区前景电子科技有限公司 Elevator earthquake control operation instrument

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1250743A (en) * 1999-09-08 2000-04-19 陈志全 Remote monitor system for elevator
CN1495122A (en) * 2002-09-18 2004-05-12 三菱电机株式会社 Remote monitoring system
WO2006097999A1 (en) * 2005-03-15 2006-09-21 Mitsubishi Denki Kabushiki Kaisha Elevator controller
CN101300185A (en) * 2005-10-31 2008-11-05 东芝电梯株式会社 Remote monitoring system
CN200999167Y (en) * 2007-01-17 2008-01-02 秦皇岛开发区前景光电技术有限公司 City elevator remote collectively uniform monitoring safety guard management system
CN201264852Y (en) * 2008-09-04 2009-07-01 秦皇岛开发区前景电子科技有限公司 Elevator earthquake control operation instrument

Also Published As

Publication number Publication date
CN101774499A (en) 2010-07-14

Similar Documents

Publication Publication Date Title
CN101774499B (en) Elevator management system, method and matched elevator management mainboard
CN206069114U (en) Lift management system based on Internet of Things
CN104555627B (en) Elevator Internet of Things operation Control management system and operation management method thereof
CN102923538A (en) Elevator health management and maintenance system based on Internet of things and collection and assessment method
CN106006276B (en) A kind of building intelligent lift management system
CN110336703A (en) Industrial big data based on edge calculations monitors system
CN100409125C (en) Monitoring system
CN103473710A (en) Graded handling method for faults of centralized operation and maintenance systems
CN110171757A (en) Elevator maintenance system based on the support of Internet of Things big data
CN102830673A (en) GPRS (General Packet Radio Service) communication-based remote online monitoring system and method for sewage treatment equipment
CN202837985U (en) GPRS-communication based remote online monitoring system for sewage treatment equipment
CN202880604U (en) Thing internet real-time monitoring system of elevator accidents
CN107918366A (en) A kind of method for safety monitoring and system based on Internet of Things
CN111273603A (en) Monitoring system and method for road tunnel electromechanical equipment
CN106696732A (en) Monitoring system and method of electromobile charging station
CN109213097A (en) robot data monitoring method and system
CN102126679A (en) Tower crane monitoring system with short message early warning function
CN102043389A (en) Multi-protocol data supervisory control system
CN103885372B (en) A kind of Switching Power Supply rectification module monitoring and early warning method and system
CN110689706A (en) Method, device and system for monitoring large construction vehicle under overhead line
CN106649034B (en) Visual intelligent operation and maintenance method and platform
CN104617668A (en) System and method for remotely monitoring transformer substation storage battery
CN111210092A (en) Stacking machine predictive maintenance method and system based on deep learning
CN203119521U (en) A charging station data acquiring gateway device and a charging station monitoring system
CN112783714A (en) Safety operation and maintenance integrated monitoring method based on big data platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130605

Termination date: 20181019

CF01 Termination of patent right due to non-payment of annual fee