CN101408025A CNA2008102190217A CN200810219021A CN101408025A CN 101408025 A CN101408025 A CN 101408025A CN A2008102190217 A CNA2008102190217 A CN A2008102190217A CN 200810219021 A CN200810219021 A CN 200810219021A CN 101408025 A CN101408025 A CN 101408025A
Authority
CN
China
Prior art keywords
construction
area
zone
construction method
central island
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008102190217A
Other languages
English (en)
Other versions
CN101408025B (zh
Inventor
朱宗明
王文杰
刘志宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Design Institute
Original Assignee
Guangzhou Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Design Institute filed Critical Guangzhou Design Institute
Priority to CN2008102190217A priority Critical patent/CN101408025B/zh
Publication of CN101408025A publication Critical patent/CN101408025A/zh
Application granted granted Critical
Publication of CN101408025B publication Critical patent/CN101408025B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明公开了一种利用主体结构作为支撑点的基坑施工方法,其特征在于:将基坑分成若干个区域,按工期的要求进行分区:1)对于工期要求不严、开挖深度及土方量大的区域,采用中心岛施工法进行施工,即将该区域分成中心岛和周边区,对中心岛进行顺作施工,利用主体结构作为支撑点,对周边区进行顺作施工;2)对工期紧有条件顺作的区域,采用综合施工法进行施工,即将该区域分成锚拉体系区域和核心筒区域,对锚拉体系区域采用顺作施工,对核心筒区域中位置不足的区域采用局部逆作施工。本发明采用分区综合施工方法,避免现有技术施工方法存在的出土周期长的问题,缩短了工程工期;具有提高施工速度、降低了基坑的整体造价的有益效果。

Description

利用主体结构作为支撑点的基坑施工方法
技术领域
本发明涉及一种工程施工方法,特别涉及一种利用主体结构作为支撑点的基坑施工方法。属于土质工程建设领域。
背景技术
随着社会经济的发展,城市地下空间开发的规模和深度越来越大,深大基坑工程的设计和施工受区域地质构造、场地工程地质与水文地质条件及周边环境影响。在现有技术中,大多数深大基坑工程都是采用单一的支护结构及中顺边逆的施工方法。该方法存在以下缺点:(1)由于采用单一的支护结构,因此,施工的安全系数低;(2)基坑的挖掘采用中顺边逆的方法,导致出土周期变长,一方面影响工程的工期,另一方面提高了基坑整体造价;(3)不能再满足复杂的环境要求。
发明内容
本发明的目的,是为了克服现有基坑工程施工中存在工期长、安全系数低的缺点,提供一种利用主体结构作为支撑点的基坑施工方法。
本发明的目的可以通过采取以下技术方案达到:
利用主体结构作为支撑点的基坑施工方法,其特征在于:将基坑分成若干个区域,按工期的要求进行分区:
1)对于工期要求不严、开挖深度及土方量大的区域,采用中心岛施工法进行施工,即将该区域分成中心岛和周边区,对中心岛进行顺作施工,利用主体结构作为支撑点,对周边区进行顺作施工;
2)对工期紧有条件顺作的区域,采用综合施工法进行施工,即将该区域分成锚拉体系区域和核心筒区域,对锚拉体系区域采用顺作施工,对核心筒区域中位置不足的区域采用局部逆作施工。
本发明的目的还可以通过采取以下技术方案达到:
本发明作再进一步改进:采用中心岛施工法进行施工时,对周边区进行施工时,采用围护结构与主体结构对撑的支护方式。
与现有技术相比较,本发明具有以下优点:
本发明采用分区施工和中顺边顺的施工方法,避免现有技术中中顺边逆的施工方法存在的出土周期长的问题,使基坑主体施工工期不再受到限制,缩短了工程工期;同时,由于对整体上采用中顺边顺的施工方法,对受条件限制的局部区域采用逆作施工,结合多种施工方法,从而降低了基坑的整体造价。另外,本发明采用围护结构与主体结构对撑的支护方式,解决了深大基坑(长度超过300m)无法采用内支撑支护的问题,从而提高了基坑施工的安全系数。
附图说明
图1是本发明的一个具体施工方法示意图。
具体实施方式
具体实施例1
如图1所示,本发明的一种施工方法如下:将基坑分成若干个区域,按工期的要求进行分区:对于工期要求不严、开挖深度及土方量大的区域,采用中心岛施工法进行施工,即将该区域分成中心岛1和周边区2,对中心岛1进行顺作施工,利用主体结构作为支撑点,对周边区2进行顺作施工;其具体过程如下:
首先,按基坑地质要求和工程工期要求将整个基坑分成若干个区域。然后,沿着建筑物地下室边线施工地下连续墙,作为地下室的外墙和基坑的围护结构,同时在建筑物内部的有关位置浇筑或打下临时支承立柱及立柱桩,一般立柱桩应尽量利用工程桩,当不能利用工程桩时需另外加设。接着,对中心岛区采用盆式开挖,挖到基坑底部,随后浇注中心岛底板。待中心岛底板施工完毕后,依次由下至上顺作施工结构中板和结构顶板。最后,对周边的施工,采用自上而下分层开挖,并依次设置临时水平支撑梁,使水平支撑梁的一端支撑在中心岛的中板和顶板上,另一端支撑在围护结构上,构成了周边围护结构与中心岛主体结构通过临时水平支撑梁对撑的支护***。开挖到基坑底部后,再由下而上大顺作施工周边区的底板、中板和顶板,并依次自下而上拆除临时水平支撑***,完成周边区的施工。
由于基坑周边区部分的支撑采用临时支撑***,可以设有多个出土口。当对周边基坑开挖土层时,可以将土方由周边的出土口直接运走,避免了逆作施工时要将土方运输到一个或多个指定的出土口,再经中心岛主体顶板出口运走的问题。同时,周边区域的出口无需要经过中心岛区域,因此,中心岛的进一步施工不再受周边地区的影响,从而缩短了工程的工期。
具体实施例2
在实施例1的基础上,本实施例稍作改进:对于工期紧有条件顺作的区域,锚拉体系区域采用顺作施工,核心筒部位位置不足的区域3采用局部逆作施工。锚拉体系区域中涉及的“锚拉”为常规的锚拉技术。
具体实施例3
在实施例2的基础上,本实施例作进一步改进:采用中心岛施工法进行施工时,对周边区2进行施工时,采用围护结构与主体结构对撑的支护方式。当对中心岛施工时,将在中心岛区域由下而上顺作建成由基板,中板和顶板以及三者之间的支撑柱构成的主体结构。当对周边区进行施工时,使用地下线连续墙作为其围护结构,并采取自上而下开挖土方。当开挖土方到周边顶板高度时,设置临时水平支撑梁,使水平支撑梁的一端支撑在中心岛的中板上,另一端支撑在围护结构上,构成了周边围护结构与中心岛主体结构通过临时水平支撑梁对撑的支护***。当开挖到中板和底板时,设置同样的临时水平支撑梁。通过上述方法建立起来的围护结构与主体结构对撑的支护方式,提高周边区域的施工安全程度。

Claims (2)

1、利用主体结构作为支撑点的基坑施工方法,其特征在于:将基坑分成若干个区域,按工期的要求进行分区:
1)对于工期要求不严、开挖深度及土方量大的区域,采用中心岛施工法进行施工,即将该区域分成中心岛(1)和周边区(2),对中心岛(1)进行顺作施工,利用主体结构作为支撑点,对周边区(2)进行顺作施工;
2)对工期紧有条件顺作的区域,采用综合施工法进行施工,即将该区域分成锚拉体系区域和核心筒区域,对锚拉体系区域采用顺作施工,对核心筒区域中位置不足的区域(3)采用局部逆作施工。
2、根据权利要求1所述的基坑施工方法,其特征在于:采用中心岛施工法进行施工时,对周边区(2)进行施工时,采用围护结构与主体结构对撑的支护方式。
CN2008102190217A 2008-11-11 2008-11-11 利用主体结构作为支撑点的基坑施工方法 Active CN101408025B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008102190217A CN101408025B (zh) 2008-11-11 2008-11-11 利用主体结构作为支撑点的基坑施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008102190217A CN101408025B (zh) 2008-11-11 2008-11-11 利用主体结构作为支撑点的基坑施工方法

Publications (2)

Publication Number Publication Date
CN101408025A true CN101408025A (zh) 2009-04-15
CN101408025B CN101408025B (zh) 2011-06-01

Family

ID=40571215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008102190217A Active CN101408025B (zh) 2008-11-11 2008-11-11 利用主体结构作为支撑点的基坑施工方法

Country Status (1)

Country Link
CN (1) CN101408025B (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892667A (zh) * 2010-07-23 2010-11-24 中国建筑第二工程局有限公司 基坑支护装置及施工方法
CN101705685B (zh) * 2009-11-06 2011-12-28 上海市第一建筑有限公司 地下结构周边梁板踏步式逆作施工方法
CN102425171A (zh) * 2011-09-25 2012-04-25 湖南省勘测设计院 深大基坑中心岛顺逆工法
CN102704495A (zh) * 2012-07-02 2012-10-03 上海建工集团股份有限公司 顺作大直径圆形无内支撑深基坑岛盆结合土方开挖方法
CN102943479A (zh) * 2012-12-11 2013-02-27 同济大学建筑设计研究院(集团)有限公司 分区卸荷控制深大基坑变形的***及方法
CN103510520A (zh) * 2013-10-09 2014-01-15 上海市建工设计研究院有限公司 深大基坑的分区施工方法
CN103541364A (zh) * 2013-10-10 2014-01-29 上海申元岩土工程有限公司 一种大面积基坑环岛法变形控制设计施工方法
CN104005413A (zh) * 2014-05-07 2014-08-27 广州市市政工程设计研究院 一种深基坑中加强型钢板桩与核心筒对撑的支护结构
CN104404964A (zh) * 2014-10-15 2015-03-11 中建四局第六建筑工程有限公司 一种含厚淤泥层深大基坑四同步作业开挖支护施工方法
CN104532854A (zh) * 2014-12-26 2015-04-22 上海建工一建集团有限公司 周边地下结构作支护体系的深基坑施工方法
CN104594358A (zh) * 2015-01-07 2015-05-06 江苏中南建筑产业集团有限责任公司 异型平面深基坑顺逆结合施工方法
CN105350543A (zh) * 2015-11-04 2016-02-24 中铁六局集团有限公司 深基坑单通道开挖方法
CN105569048A (zh) * 2014-10-20 2016-05-11 中建四局第一建筑工程有限公司 一种加快基坑施工进度的方法
CN113529694A (zh) * 2021-06-29 2021-10-22 北京华城工程管理咨询有限公司 地下逆作法与地上结构顺作同步实施的工法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1982546A (zh) * 2005-12-12 2007-06-20 上海市第七建筑有限公司 中心岛顺作局部裙边逆作施工方法
CN101294390B (zh) * 2007-04-27 2010-09-08 上海市第五建筑有限公司 一平一抛局部中心岛基坑支撑***及施工方法

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101705685B (zh) * 2009-11-06 2011-12-28 上海市第一建筑有限公司 地下结构周边梁板踏步式逆作施工方法
CN101892667A (zh) * 2010-07-23 2010-11-24 中国建筑第二工程局有限公司 基坑支护装置及施工方法
CN102425171A (zh) * 2011-09-25 2012-04-25 湖南省勘测设计院 深大基坑中心岛顺逆工法
CN102704495A (zh) * 2012-07-02 2012-10-03 上海建工集团股份有限公司 顺作大直径圆形无内支撑深基坑岛盆结合土方开挖方法
CN102943479A (zh) * 2012-12-11 2013-02-27 同济大学建筑设计研究院(集团)有限公司 分区卸荷控制深大基坑变形的***及方法
CN103510520A (zh) * 2013-10-09 2014-01-15 上海市建工设计研究院有限公司 深大基坑的分区施工方法
CN103541364A (zh) * 2013-10-10 2014-01-29 上海申元岩土工程有限公司 一种大面积基坑环岛法变形控制设计施工方法
CN104005413B (zh) * 2014-05-07 2016-06-15 广州市市政工程设计研究总院 一种深基坑中加强型钢板桩与核心筒对撑的支护结构
CN104005413A (zh) * 2014-05-07 2014-08-27 广州市市政工程设计研究院 一种深基坑中加强型钢板桩与核心筒对撑的支护结构
CN104404964A (zh) * 2014-10-15 2015-03-11 中建四局第六建筑工程有限公司 一种含厚淤泥层深大基坑四同步作业开挖支护施工方法
CN104404964B (zh) * 2014-10-15 2016-04-27 中建四局第六建筑工程有限公司 一种含厚淤泥层深大基坑四同步作业开挖支护施工方法
CN105569048A (zh) * 2014-10-20 2016-05-11 中建四局第一建筑工程有限公司 一种加快基坑施工进度的方法
CN104532854A (zh) * 2014-12-26 2015-04-22 上海建工一建集团有限公司 周边地下结构作支护体系的深基坑施工方法
CN104594358A (zh) * 2015-01-07 2015-05-06 江苏中南建筑产业集团有限责任公司 异型平面深基坑顺逆结合施工方法
CN104594358B (zh) * 2015-01-07 2017-01-18 江苏中南建筑产业集团有限责任公司 异型平面深基坑顺逆结合施工方法
CN105350543A (zh) * 2015-11-04 2016-02-24 中铁六局集团有限公司 深基坑单通道开挖方法
CN113529694A (zh) * 2021-06-29 2021-10-22 北京华城工程管理咨询有限公司 地下逆作法与地上结构顺作同步实施的工法
CN113529694B (zh) * 2021-06-29 2022-06-28 北京华城工程管理咨询有限公司 地下逆作法与地上结构顺作同步实施的工法

Also Published As

Publication number Publication date
CN101408025B (zh) 2011-06-01

Similar Documents

Publication Publication Date Title
CN101408025B (zh) 利用主体结构作为支撑点的基坑施工方法
CN1948633A (zh) 盆式开挖逆作法施工方法
CN205975626U (zh) 一种松软土层基坑中支护与止水合一的组合结构
CN104196034A (zh) 一种利用钢板桩作为支护围堰的基坑施工方法
CN103321230A (zh) 在运行浅埋地铁长距离穿越场地中的深大基坑开挖方法
CN104711994A (zh) 基坑深井降水及封堵施工方法
CN106522241A (zh) 超大层高地下室结构的深基坑支护方法
CN103195076A (zh) 淤泥质深基坑塔吊基础施工方法
CN100510281C (zh) 超大直径、超埋深度调蓄池的半逆作施工方法
CN107794946B (zh) 一种深埋于软土中的地下综合管廊结构及其施工方法
CN102444143B (zh) 一种取消地下室外立面操作通道的施工方法
CN109555112A (zh) 一种结构叠合式地下连续墙及施工方法
CN205530280U (zh) 一种新型预制两墙合一基坑围护体系
CN207092107U (zh) 一种利用地下连续墙的抗沉陷结构
CN104775439B (zh) 一种基坑支护止水一体化结构及其施工方法
CN101372872A (zh) 逆作法施工热轧旋流池结构工程的方法
CN101949226A (zh) 大型池体的交叉施工方法
CN108316283A (zh) 采用坑底注浆地连墙控制基坑开挖影响的装置及其方法
CN105484277A (zh) 一种电梯基坑或集水坑内管井降水施工用构件及施工方法
CN205205844U (zh) 一种电梯基坑或集水坑内管井降水施工用构件
CN110144936A (zh) 一种毗邻支护桩地下室外墙单边支模及施工方法
CN207211158U (zh) 装配式桩柱板墙基坑支护结构
CN104131570B (zh) 用于基坑施工的钢箱围护装置及其施工方法
CN105625480A (zh) 敞开段隧道结构的抗浮方法及抗浮结构
CN103628487B (zh) 圆形深基坑护壁逆作施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant