BR112013026391A2 - método para particionar simulações de reservatório paralelas na presença de poços - Google Patents

método para particionar simulações de reservatório paralelas na presença de poços

Info

Publication number
BR112013026391A2
BR112013026391A2 BR112013026391A BR112013026391A BR112013026391A2 BR 112013026391 A2 BR112013026391 A2 BR 112013026391A2 BR 112013026391 A BR112013026391 A BR 112013026391A BR 112013026391 A BR112013026391 A BR 112013026391A BR 112013026391 A2 BR112013026391 A2 BR 112013026391A2
Authority
BR
Brazil
Prior art keywords
partitioning
node
nodes
wells
supernode
Prior art date
Application number
BR112013026391A
Other languages
English (en)
Inventor
Serguei Maliassov
Original Assignee
Exxonmobil Upstream Res Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Exxonmobil Upstream Res Co filed Critical Exxonmobil Upstream Res Co
Publication of BR112013026391A2 publication Critical patent/BR112013026391A2/pt

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V20/00Geomodelling in general
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V99/00Subject matter not provided for in other groups of this subclass
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00Details of seismic processing or analysis
    • G01V2210/60Analysis
    • G01V2210/66Subsurface modeling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/901Indexing; Data structures therefor; Storage structures
    • G06F16/9024Graphs; Linked lists
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling

Landscapes

  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Geophysics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Devices And Processes Conducted In The Presence Of Fluids And Solid Particles (AREA)

Abstract

resumo “método para particionar simulações de reservatório paralelas na presença de poços” é revelado um método para particionar uma grade representando um reservatório de hidrocarbonetos. a grade é composta de uma pluralidade de células. um gráfico de 5 conectividade de nodos e bordas é criado. cada uma da pluralidade de células é representada por um nodo. bordas conectam nodos vizinhos. uma borda que não deve ser cortada por um algoritmo de particionamento é designada. nodos conectados pela borda designada são mesclados em um supernodo. uma primeira borda conectando um nodo mesclado e um nodo não mesclado é substituída por uma segunda borda conectando o 10 nodo não mesclado ao supernodo. o gráfico de conectividade é usado com o supernodo e as bordas substituídas para particionar a grade. nodos mesclados em supernodos são mantidos em um único subdomínio durante o particionamento.
BR112013026391A 2011-05-17 2012-01-31 método para particionar simulações de reservatório paralelas na presença de poços BR112013026391A2 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201161487104P 2011-05-17 2011-05-17
PCT/US2012/023296 WO2012158218A1 (en) 2011-05-17 2012-01-31 Method for partitioning parallel reservoir simulations in the presence of wells

Publications (1)

Publication Number Publication Date
BR112013026391A2 true BR112013026391A2 (pt) 2016-12-27

Family

ID=47177247

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112013026391A BR112013026391A2 (pt) 2011-05-17 2012-01-31 método para particionar simulações de reservatório paralelas na presença de poços

Country Status (6)

Country Link
US (1) US20140236558A1 (pt)
EP (1) EP2712440A4 (pt)
CN (1) CN103562850A (pt)
BR (1) BR112013026391A2 (pt)
CA (1) CA2832882A1 (pt)
WO (1) WO2012158218A1 (pt)

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2534605B1 (en) 2010-02-12 2020-06-17 Exxonmobil Upstream Research Company Method and system for partitioning parallel simulation models
BR112012025995A2 (pt) 2010-04-30 2016-06-28 Exxonmobil Upstream Res Co método e sistema para simulação de fluxo de volume finito
WO2012003007A1 (en) 2010-06-29 2012-01-05 Exxonmobil Upstream Research Company Method and system for parallel simulation models
WO2012015521A1 (en) 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Method and system for reservoir modeling
EP2599029A4 (en) 2010-07-29 2014-01-08 Exxonmobil Upstream Res Co METHODS AND SYSTEMS FOR AUTOMATIC LEARNING FLOW SIMULATION
BR112013002114A2 (pt) 2010-09-20 2016-05-17 Exxonmobil Upstream Res Co formulações flexíveis e adaptáveis para simulações de reservatório complexas
US9489176B2 (en) 2011-09-15 2016-11-08 Exxonmobil Upstream Research Company Optimized matrix and vector operations in instruction limited algorithms that perform EOS calculations
WO2014051903A1 (en) 2012-09-28 2014-04-03 Exxonmobil Upstream Research Company Fault removal in geological models
GB2512372B (en) * 2013-03-28 2020-07-29 Total Sa Method of modelling a subsurface volume
GB2537769B (en) * 2014-01-03 2021-04-14 Logined Bv Graph partitioning to distribute wells in parallel reservoir simulation
GB2526300A (en) 2014-05-20 2015-11-25 Ibm Partitioning of a network using multiple poles for each part thereof
GB2527825A (en) 2014-07-03 2016-01-06 Ibm Configuration of a network partition with arrangement of intercepting/regulating elements based on distribution of residual capacity of sources to parts
US10319143B2 (en) 2014-07-30 2019-06-11 Exxonmobil Upstream Research Company Volumetric grid generation in a domain with heterogeneous material properties
EP3213125A1 (en) 2014-10-31 2017-09-06 Exxonmobil Upstream Research Company Corp-urc-e2. 4A.296 Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
AU2015339884B2 (en) 2014-10-31 2018-03-15 Exxonmobil Upstream Research Company Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
US10371142B2 (en) * 2015-07-27 2019-08-06 Bristol, Inc. Methods and apparatus for pairing rod pump controller position and load values
US9893950B2 (en) * 2016-01-27 2018-02-13 International Business Machines Corporation Switch-connected HyperX network
US10452794B2 (en) * 2016-08-25 2019-10-22 Baker Hughes, A Ge Company, Llc Generating a script for performing a well operation job
CA3043231C (en) 2016-12-23 2022-06-14 Exxonmobil Upstream Research Company Method and system for stable and efficient reservoir simulation using stability proxies
US11401786B2 (en) * 2019-03-06 2022-08-02 Saudi Arabian Oil Company Systems and methods for hydrocarbon reservoir well connectivity graph optimization, simulation and development
US11261707B2 (en) 2020-03-27 2022-03-01 Saudi Arabian Oil Company Method and system for well assignment in a reservoir simulation based on well activity

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6437804B1 (en) * 1997-10-23 2002-08-20 Aprisma Management Technologies, Inc Method for automatic partitioning of node-weighted, edge-constrained graphs
US6175957B1 (en) * 1997-12-09 2001-01-16 International Business Machines Corporation Method of, system for, and computer program product for providing efficient utilization of memory hierarchy through code restructuring
AU2001270265A1 (en) * 2000-06-29 2002-01-14 Object Reservoir, Inc. Method and system for coordinate transformation to model radial flow near a singularity
US6980935B2 (en) * 2001-07-31 2005-12-27 Schlumberger Technology Corp. Method, apparatus and system for constructing and maintaining scenegraphs for interactive feature-based geoscience geometric modeling
US20030037319A1 (en) * 2001-08-20 2003-02-20 Ankur Narang Method and apparatus for partitioning and placement for a cycle-based simulation system
US6611762B1 (en) * 2002-04-04 2003-08-26 Halliburton Energy Services, Inc. Method for determining parameters of earth formations surrounding a well bore
WO2005033739A2 (en) * 2003-09-30 2005-04-14 Exxonmobil Upstream Research Company Corp-Urc-Sw348 Characterizing connectivity in reservoir models using paths of least resistance
FR2870621B1 (fr) * 2004-05-21 2006-10-27 Inst Francais Du Petrole Methode pour generer un maillage hybride conforme en trois dimensions d'une formation heterogene traversee par une ou plusieurs discontinuites geometriques dans le but de realiser des simulations
US7596480B2 (en) * 2005-04-14 2009-09-29 Saudi Arabian Oil Company Solution method and apparatus for large-scale simulation of layered formations
US20070016389A1 (en) * 2005-06-24 2007-01-18 Cetin Ozgen Method and system for accelerating and improving the history matching of a reservoir simulation model
US8396884B2 (en) * 2006-02-27 2013-03-12 The Regents Of The University Of California Graph querying, graph motif mining and the discovery of clusters
US7644142B2 (en) * 2006-05-04 2010-01-05 Intel Corporation Methods and apparatus to perform process placement for distributed applications
WO2008054610A2 (en) * 2006-10-31 2008-05-08 Exxonmobil Upstream Research Company Modeling and management of reservoir systems with material balance groups
US8041773B2 (en) * 2007-09-24 2011-10-18 The Research Foundation Of State University Of New York Automatic clustering for self-organizing grids
US9367823B1 (en) * 2007-11-09 2016-06-14 Skyword, Inc. Computer method and system for ranking users in a network community of users
CN101896690B (zh) * 2007-12-13 2015-02-18 埃克森美孚上游研究公司 使用非结构化网格的储层模拟上的并行自适应数据分区
BRPI0922214A2 (pt) * 2008-12-03 2015-12-29 Chevron Usa Inc método implementado por computador, e, sistema para gerar uma grade usada para construir um modelo de simulação de um reservatório de subsuperfície fraturado
BR112012009045B1 (pt) * 2009-11-12 2020-12-08 Exxonmobil Upstream Research Company métodos para gerar uma grade de simulação tridimensional para um modelo de reservatório, aparelho de gradeamento de simulação e simulador de reservatório
FR2962835B1 (fr) * 2010-07-16 2013-07-12 IFP Energies Nouvelles Methode pour generer un maillage hexa-dominant d'un bassin geometriquement complexe
US8938484B2 (en) * 2012-06-01 2015-01-20 International Business Machines Corporation Maintaining dependencies among supernodes during repeated matrix factorizations
GB2537769B (en) * 2014-01-03 2021-04-14 Logined Bv Graph partitioning to distribute wells in parallel reservoir simulation
US11396795B2 (en) * 2016-03-11 2022-07-26 Halliburton Energy Services, Inc. Fracture network fluid flow simulation with enhanced fluid-solid interaction force determination

Also Published As

Publication number Publication date
EP2712440A4 (en) 2016-05-25
CA2832882A1 (en) 2012-11-22
WO2012158218A1 (en) 2012-11-22
CN103562850A (zh) 2014-02-05
EP2712440A1 (en) 2014-04-02
US20140236558A1 (en) 2014-08-21

Similar Documents

Publication Publication Date Title
BR112013026391A2 (pt) método para particionar simulações de reservatório paralelas na presença de poços
BR112012032060A2 (pt) método e sistema para modelos de simulação paralela.
BR112012031776A2 (pt) método e sistema para simulação multinível paralela
BR112016001807A2 (pt) compartimentos de atualização dinâmica que representam uma ou mais estruturas geológicas
BR112014007856A2 (pt) método 1-d melhorado para predizer a janela de peso de lama para seções subsal de poço
MY185319A (en) Solar cell assembly
PE20141811A1 (es) Un metodo para ayudar en la exploracion, diseno de mina, evaluacion y/o extraccion de depositos de mineral metalifero y/o diamante
BR112012018856A2 (pt) folha condutora, método para usar a mesma e painel sensível ao toque
PE20140627A1 (es) Ensayos interrogatorios basados en celulas y usos de los mismos
BR112015003406A2 (pt) acesso a nível de bloco para armazenamento paralelo
BR112012017182A2 (pt) método e sistema para utilizar simulação estatística multiponto para modelar tendências de propriedade de reservatório
BR112012017275A2 (pt) método e sistema para divisão de modelos de simulação paralelos
BR112016003986A2 (pt) métodos e sistemas de calibração de modelo de terra estático
WO2015142706A3 (en) Modeling intersecting faults and complex wellbores in reservoir simulation
BR112015031195A8 (pt) método e sistema para gerenciar dados em uma planilha eletrônica e método para utilizar objetos de planilha eletrônica em uma superfície de desenho eletrônica
BR112015020394A8 (pt) método para segurança de um primeiro programa, e, mídia legível por computador
Hwang A modular approach to large-scale design optimization of aerospace systems
BR112013006284A2 (pt) método de elemento discreto
BR112014014677A2 (pt) método para realizar simulação de um reservatório de xisto representado por um modelo, produto de programa de computador e método para a perfuração de um ou mais poços no reservatório de xisto
EP2860343A3 (en) Method for efficient dynamic gridding
WO2015104633A3 (en) System and method for two dimensional gravity modeling with variable densities
BR112016018520A2 (pt) Método e sistema de simulação de produção de fluido, e, meio de armazenamento legível por computador
SA516370488B1 (ar) نظام وطريقة لإجراء محاكاة تدفق وسيط أساسه cart لتصنيف الهيئات الإحصائية الجيولوجية لخواص الصخور
BR112017013803A2 (pt) método e sistema
BR112015026650A2 (pt) método para facilitar uma interface e aparelho

Legal Events

Date Code Title Description
B06F Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette]
B06U Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B11D Dismissal acc. art. 38, par 2 of ipl - failure to pay fee after grant in time