BR112012031776A2 - método e sistema para simulação multinível paralela - Google Patents

método e sistema para simulação multinível paralela

Info

Publication number
BR112012031776A2
BR112012031776A2 BR112012031776A BR112012031776A BR112012031776A2 BR 112012031776 A2 BR112012031776 A2 BR 112012031776A2 BR 112012031776 A BR112012031776 A BR 112012031776A BR 112012031776 A BR112012031776 A BR 112012031776A BR 112012031776 A2 BR112012031776 A2 BR 112012031776A2
Authority
BR
Brazil
Prior art keywords
interconnect
simulation
threshold value
weight
data representation
Prior art date
Application number
BR112012031776A
Other languages
English (en)
Inventor
Serguei Maliassov
Original Assignee
Exxonmobil Upstream Res Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Exxonmobil Upstream Res Co filed Critical Exxonmobil Upstream Res Co
Publication of BR112012031776A2 publication Critical patent/BR112012031776A2/pt

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/28Design optimisation, verification or simulation using fluid dynamics, e.g. using Navier-Stokes equations or computational fluid dynamics [CFD]
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V9/00Prospecting or detecting by methods not provided for in groups G01V1/00 - G01V8/00
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/23Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/10Numerical modelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geophysics (AREA)
  • Algebra (AREA)
  • Computing Systems (AREA)
  • Fluid Mechanics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Mathematical Physics (AREA)
  • Pure & Applied Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

método e sistema para simulação multinível paralela. modos de realização exemplificativos das técnicas atuais proveem métodos e sistemas para emgrossamento de uma rede computacional, por exemplo, para uso em uma simulação de reservatório. um método exemplificativo de executar uma simulação de reservatório inclui gerar uma representação de dados em um sistema de armazenamento, onde a representação de dados inclui um peso de interconexão que representa a magnitude de uma interconexão entre cada uma de uma pluraridade de células compatacionais em uma rede computacional. um valor de limiar é comparado com cada peso de enterconexão, e qualquer peso de interconexão que seja igual ou menor do que o valor de limiar é ajustado para zero.
BR112012031776A 2010-07-26 2011-04-25 método e sistema para simulação multinível paralela BR112012031776A2 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US36771310P 2010-07-26 2010-07-26
PCT/US2011/033793 WO2012015500A1 (en) 2010-07-26 2011-04-25 Method and system for parallel multilevel simulation

Publications (1)

Publication Number Publication Date
BR112012031776A2 true BR112012031776A2 (pt) 2016-11-01

Family

ID=45530423

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112012031776A BR112012031776A2 (pt) 2010-07-26 2011-04-25 método e sistema para simulação multinível paralela

Country Status (5)

Country Link
US (1) US9418180B2 (pt)
EP (1) EP2599028B1 (pt)
BR (1) BR112012031776A2 (pt)
CA (1) CA2801387A1 (pt)
WO (1) WO2012015500A1 (pt)

Families Citing this family (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2010318657B2 (en) * 2009-11-12 2016-07-28 Exxonmobil Upstream Research Company Method and system for rapid model evaluation using multilevel surrogates
US9594186B2 (en) 2010-02-12 2017-03-14 Exxonmobil Upstream Research Company Method and system for partitioning parallel simulation models
US9134454B2 (en) 2010-04-30 2015-09-15 Exxonmobil Upstream Research Company Method and system for finite volume simulation of flow
WO2012003007A1 (en) 2010-06-29 2012-01-05 Exxonmobil Upstream Research Company Method and system for parallel simulation models
CA2803066A1 (en) 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
US9058445B2 (en) 2010-07-29 2015-06-16 Exxonmobil Upstream Research Company Method and system for reservoir modeling
CA2805446C (en) 2010-07-29 2016-08-16 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
CA2803315A1 (en) 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
WO2012039811A1 (en) 2010-09-20 2012-03-29 Exxonmobil Upstream Research Company Flexible and adaptive formulations for complex reservoir simulations
US9164191B2 (en) * 2011-02-09 2015-10-20 Saudi Arabian Oil Company Sequential fully implicit well model for reservoir simulation
US10175386B2 (en) 2011-02-09 2019-01-08 Saudi Arabian Oil Company Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation
US10113400B2 (en) 2011-02-09 2018-10-30 Saudi Arabian Oil Company Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation
CA2843929C (en) 2011-09-15 2018-03-27 Exxonmobil Upstream Research Company Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations
US9261869B2 (en) * 2012-02-13 2016-02-16 Emerson Process Management Power & Water Solutions, Inc. Hybrid sequential and simultaneous process simulation system
US9208268B2 (en) * 2012-02-14 2015-12-08 Saudi Arabian Oil Company Giga-cell linear solver method and apparatus for massive parallel reservoir simulation
US10036829B2 (en) 2012-09-28 2018-07-31 Exxonmobil Upstream Research Company Fault removal in geological models
KR101358037B1 (ko) * 2012-11-28 2014-02-05 한국과학기술정보연구원 대용량 cfd 병렬 데이터의 가시화를 위한 데이터 파일 포맷 구조로 데이터가 기록된 기록 매체 및 그 데이터 파일 포맷 구조 생성 방법
EP2784704A1 (en) * 2013-03-26 2014-10-01 Fujitsu Limited Multi-component computational fluid dynamics simulations
US20160177674A1 (en) * 2013-08-27 2016-06-23 Halliburton Energy Services, Inc. Simulating Fluid Leak-Off and Flow-Back in a Fractured Subterranean Region
US10491663B1 (en) * 2013-10-28 2019-11-26 Amazon Technologies, Inc. Heterogeneous computations on homogeneous input data
US20150186563A1 (en) * 2013-12-30 2015-07-02 Halliburton Energy Services, Inc. Preconditioning Distinct Subsystem Models in a Subterranean Region Model
WO2015108980A1 (en) * 2014-01-17 2015-07-23 Conocophillips Company Advanced parallel "many-core" framework for reservoir simulation
CA2946835C (en) * 2014-06-19 2019-02-12 Landmark Graphics Corporation Multi-stage linear solution for implicit reservoir simulation
WO2016018723A1 (en) 2014-07-30 2016-02-04 Exxonmobil Upstream Research Company Method for volumetric grid generation in a domain with heterogeneous material properties
CA2959375A1 (en) * 2014-08-27 2016-03-03 Digital H2O, Inc Oilfield water management
AU2015339883B2 (en) 2014-10-31 2018-03-29 Exxonmobil Upstream Research Company Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
CA2963416A1 (en) 2014-10-31 2016-05-06 Exxonmobil Upstream Research Company Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
US10242136B2 (en) * 2015-05-20 2019-03-26 Saudi Arabian Oil Company Parallel solution for fully-coupled fully-implicit wellbore modeling in reservoir simulation
CN104880539B (zh) * 2015-06-02 2016-05-25 太原理工大学 地下采矿中围岩受矿井水影响的相似模拟装置及方法
CN106209189A (zh) * 2016-07-19 2016-12-07 清华大学 大规模mimo***中信号检测装置及方法
US10452794B2 (en) * 2016-08-25 2019-10-22 Baker Hughes, A Ge Company, Llc Generating a script for performing a well operation job
US10839114B2 (en) 2016-12-23 2020-11-17 Exxonmobil Upstream Research Company Method and system for stable and efficient reservoir simulation using stability proxies
US10570706B2 (en) 2017-06-23 2020-02-25 Saudi Arabian Oil Company Parallel-processing of invasion percolation for large-scale, high-resolution simulation of secondary hydrocarbon migration
DE102017127276A1 (de) * 2017-08-30 2019-02-28 Taiwan Semiconductor Manufacturing Co., Ltd. Standardzellen und abwandlungen davon innerhalb einer standardzellenbibliothek
US10913901B2 (en) 2017-09-12 2021-02-09 Saudi Arabian Oil Company Integrated process for mesophase pitch and petrochemical production
US11461514B2 (en) * 2018-09-24 2022-10-04 Saudi Arabian Oil Company Reservoir simulation with pressure solver for non-diagonally dominant indefinite coefficient matrices
CN109209327B (zh) * 2018-10-12 2020-10-23 广东石油化工学院 一种沟通断层的高产水煤层气井组主动排水采气方法
EP3819723B1 (en) * 2019-11-05 2022-10-05 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Simulation method and system for the management of a pipeline network
CN111914455B (zh) * 2020-07-31 2024-03-15 英特工程仿真技术(大连)有限公司 基于节点重叠型区域分解无Schwarz交替的有限元并行计算方法

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6052520A (en) 1998-02-10 2000-04-18 Exxon Production Research Company Process for predicting behavior of a subterranean formation
US6662146B1 (en) 1998-11-25 2003-12-09 Landmark Graphics Corporation Methods for performing reservoir simulation
US6230101B1 (en) 1999-06-03 2001-05-08 Schlumberger Technology Corporation Simulation method and apparatus
US20080167849A1 (en) 2004-06-07 2008-07-10 Brigham Young University Reservoir Simulation
CN100489558C (zh) * 2004-06-07 2009-05-20 埃克森美孚上游研究公司 用于求解隐式储层仿真矩阵的方法
US7596480B2 (en) 2005-04-14 2009-09-29 Saudi Arabian Oil Company Solution method and apparatus for large-scale simulation of layered formations
US7516056B2 (en) 2005-04-26 2009-04-07 Schlumberger Technology Corporation Apparatus, method and system for improved reservoir simulation using a multiplicative overlapping Schwarz preconditioning for adaptive implicit linear systems
WO2006138530A1 (en) 2005-06-14 2006-12-28 Schlumberger Technology Corporation Apparatus, method and system for improved reservoir simulation using an algebraic cascading class linear solver
EP1955238A4 (en) * 2005-11-22 2014-08-27 Exxonmobile Upstream Res Company SIMULATION SYSTEM AND METHOD
US7822289B2 (en) * 2006-07-25 2010-10-26 Microsoft Corporation Locally adapted hierarchical basis preconditioning
WO2008091880A1 (en) * 2007-01-23 2008-07-31 Adobe Systems, Incorporated System and method for simulating shallow water effects on arbitrary surfaces
GB2455077A (en) 2007-11-27 2009-06-03 Polyhedron Software Ltd Estimating the state of a physical system using generalized nested factorisation
CA2702965C (en) * 2007-12-13 2014-04-01 Exxonmobil Upstream Research Company Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
BRPI0919207B1 (pt) * 2008-09-19 2020-08-18 Chevron U.S.A. I.N.C método e sistema implementado por computador para uso na modelagem de um sistema de reservatório geomecânico, e, método implementado por computador para uso na modelagem de uma fratura
CN102165413A (zh) 2008-09-30 2011-08-24 埃克森美孚上游研究公司 自适应迭代求解器
CN102648425B (zh) * 2009-10-28 2014-12-10 雪佛龙美国公司 用于储集层仿真的多尺度有限体积方法

Also Published As

Publication number Publication date
WO2012015500A1 (en) 2012-02-02
EP2599028B1 (en) 2019-10-02
CA2801387A1 (en) 2012-02-02
US20130116993A1 (en) 2013-05-09
EP2599028A1 (en) 2013-06-05
EP2599028A4 (en) 2017-10-04
US9418180B2 (en) 2016-08-16

Similar Documents

Publication Publication Date Title
BR112012031776A2 (pt) método e sistema para simulação multinível paralela
BR112019004798A8 (pt) Método implantado por computador e mídia de armazenamento
BR112012017275A2 (pt) método e sistema para divisão de modelos de simulação paralelos
BR112012032060A2 (pt) método e sistema para modelos de simulação paralela.
BR112012017226A8 (pt) métodos de recomendações dinâmicas de aprendizado e meio de armazenamento não transitório legível em computador
BR112013002114A2 (pt) formulações flexíveis e adaptáveis para simulações de reservatório complexas
BR112017003893A8 (pt) Rede dnn aluno aprendiz via distribuição de saída
EP2858026A3 (en) Systems and methods for dynamic mapping for locality and balance
BR112015009246A2 (pt) métodos e sistemas para determinar o uso e o conteúdo de pymk com base em um modelo de valores
BR112016001807A2 (pt) compartimentos de atualização dinâmica que representam uma ou mais estruturas geológicas
WO2014120699A3 (en) Scaling statistical language understanding systems across domains and intents
BR112018009072A8 (pt) identificação de itens de conteúdo usando um modelo de aprendizagem profunda
IN2012CN06919A (pt)
BR112012017182A2 (pt) método e sistema para utilizar simulação estatística multiponto para modelar tendências de propriedade de reservatório
BR112013026391A2 (pt) método para particionar simulações de reservatório paralelas na presença de poços
BR112015025384A2 (pt) método
BR112017000880A2 (pt) "método para injetar sinais em uma rede de distribuição de serviços públicos e sistema de rede de distribuição de serviços públicos"
BR112017002636A2 (pt) compartilhamento equitativo de recursos de sistema em execução de fluxo de trabalho
BR112014014382A2 (pt) sistema e método para simulação flexível e eficiente de densidade de fratura variando em um simulador de reservatório
BR112017025947A2 (pt) sistema e método para facilitar a tomada de decisões em uma embarcação, programa ou pluralidade de programas, e, meio de armazenamento legível por máquina.
EP2919182A3 (en) Method for risk management of marine mooring systems
BR112019013444A8 (pt) Sistema implementado em computador e método para conformidade de procedimento
BR112016001923A2 (pt) método implementado por computador, meio legível por computador não transitório e sistema para realizar simulações de fluxo de árvore declassificação e regressão (cart) para um reservatório
CL2016002376A1 (es) Seguimiento del rendimiento de un sistema de almacenamiento de energía eléctrica
BR112015031139A2 (pt) método e sistema para analisar um grau de uma disfunção autônoma de um sistema nervoso autônomo

Legal Events

Date Code Title Description
B06F Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B11D Dismissal acc. art. 38, par 2 of ipl - failure to pay fee after grant in time