WO2024037042A1 - Procédé de construction pour ériger une ferme d'acier à section entière inter-sections à l'aide d'une grue d'érection de poutre - Google Patents

Procédé de construction pour ériger une ferme d'acier à section entière inter-sections à l'aide d'une grue d'érection de poutre Download PDF

Info

Publication number
WO2024037042A1
WO2024037042A1 PCT/CN2023/091549 CN2023091549W WO2024037042A1 WO 2024037042 A1 WO2024037042 A1 WO 2024037042A1 CN 2023091549 W CN2023091549 W CN 2023091549W WO 2024037042 A1 WO2024037042 A1 WO 2024037042A1
Authority
WO
WIPO (PCT)
Prior art keywords
steel truss
girder
crane
segment
erecting
Prior art date
Application number
PCT/CN2023/091549
Other languages
English (en)
Chinese (zh)
Inventor
梁辉
朱东明
李桐
夏朝鹃
张延辉
王员根
向华
任华焘
郑奕
杨志明
赵梦春
闵理
李勇刚
高峰
Original Assignee
中铁九桥工程有限公司
中铁高新工业股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中铁九桥工程有限公司, 中铁高新工业股份有限公司 filed Critical 中铁九桥工程有限公司
Publication of WO2024037042A1 publication Critical patent/WO2024037042A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • E01D21/105Balanced cantilevered erection
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections

Definitions

  • the invention relates to the technical field of bridge construction, and specifically to a construction method for erecting a double-intersection whole-section steel truss beam using a girder erecting crane.
  • the whole-segment hoisting method has the advantages of fewer on-site bolting or welding parts, reliable installation quality, and fast installation speed. It is often used for the installation of steel trusses.
  • the whole-segment hoisting method is usually carried out by a bridge deck crane. Erection.
  • the construction schedule is usually tight and the construction tasks are heavy.
  • it is necessary to adopt Construction is carried out by hoisting double-section whole sections.
  • the weight of the whole-section steel truss beam between double sections is usually more than twice that of the single whole-section steel truss beam.
  • the existing steel truss beams erected by the existing bridge deck crane are generally It uses a single-section whole-segment hoisting method, and its lifting capacity cannot meet the erection needs of double-segment whole-segment steel truss beams.
  • the problem solved by the invention is how to erect the entire section steel truss beam between double sections.
  • the present invention provides a construction method for erecting a double-section full-section steel truss beam using a girder erecting crane, which includes:
  • the steel truss beam segment is installed, the connection between the hoisting mechanism and the steel truss beam segment is released, the overhead crane mechanism is retracted and locked, and the girder erecting crane moves to the next girder erecting position.
  • the moving the girder erecting crane to the girder erecting position, and preparing the girder erection includes:
  • the traveling mechanism of the girder erecting crane drives the girder erecting crane to move to the girder erecting position;
  • the traveling mechanism of the girder erecting crane drives the girder erecting crane to move to the girder erecting position including:
  • the sliding shoe cylinder of the traveling mechanism contracts upward to drive the track beam of the traveling mechanism off the ground;
  • the traveling oil cylinder of the traveling mechanism is connected to the limit hole of the track beam.
  • the contraction of the traveling oil cylinder drives the track beam to move forward.
  • the connection between the traveling oil cylinder and the limit hole is released.
  • the traveling oil cylinder extends Go out to the next limit hole and repeat the above operations until the track beam moves into place;
  • the sliding shoe cylinder extends downward to drive the track beam to touch the ground and receive force
  • the traveling oil cylinder is connected to the limit hole of the track beam.
  • the traveling oil cylinder extends to drive the girder crane to move forward, and the connection between the traveling oil cylinder and the limiting hole is released.
  • the traveling oil cylinder Shrink to the next limiting hole and repeat the above operation until the girder crane moves into place.
  • the overhead crane mechanism includes a large beam and a small beam, the large beam and the small beam are arranged in parallel and are respectively slidingly connected to the frame of the girder crane, and the large beam and the small beam are Used to slide along the length direction of the frame, the hoisting mechanism includes three sets of spreaders arranged in a Z-shaped arrangement. The first set of spreaders is arranged at one end of the large beam, and the second set of spreaders is arranged at one end of the large beam. At the other end of the large beam, a third group of the spreaders is arranged on the small beam.
  • the spreaders include a distribution beam, a lifting point slider and an adjustment oil cylinder. The lifting point slider is connected to all the lifting points through a wire rope.
  • the crane mechanism is movably connected, the distribution beam is slidingly connected to the lifting point slider, one end of the adjustment oil cylinder is connected to the distribution beam, and the other end of the adjustment oil cylinder is connected to the suspension point slider,
  • the distribution beam is used to connect with the steel truss beam segments.
  • the distance between the lifting point slide blocks of the first group of the spreaders, the suspension point slide blocks of the second group of the spreaders and the hanging point slide blocks of the third group of the spreaders is equal to The distance between the large beam and the small beam.
  • the construction method after moving the girder erecting crane to the girder erecting position and preparing the girder erection, and before lowering the hoisting mechanism of the girder erecting crane, the construction method also includes:
  • the construction method Also includes:
  • the adjustment of the longitudinal slope of the steel truss beam segment includes:
  • the construction method when erecting to the closing port, also includes closing the steel truss beam segments with the opposite erected steel truss beams, and closing the steel truss beam segments with the opposite erected steel truss beams.
  • the erected steel truss beams include the lower chords, diagonal bars and upper chords of the steel truss beam segments, wherein the lower chords include the middle truss lower chords and side truss lower chords, which are connected in sequence.
  • the diagonal rods include the diagonal rods of the middle truss and the diagonal rods of the side girders, and the upper chord rods include the upper chord rods of the side girders and the upper chord rods of the middle girders.
  • the present invention has the following beneficial effects:
  • the girder erecting crane In the process of erecting the steel truss beam segment, the girder erecting crane first lifts the steel truss beam segment to the preset height so that the steel truss beam segment is in a suspended state, and then adjusts the posture of the three spreaders of the hoisting mechanism.
  • the center of gravity of the steel truss beam segment and the centroid of the hoisting mechanism are on a vertical line, so that the steel truss beam can be
  • the weight of the segment is evenly distributed on the three spreaders, which can maximize the hoisting capacity of each spreader and improve the lifting capacity of the girder crane, which can meet the requirements for erecting the entire segment steel truss beam between double sections.
  • the steel truss beam segments can maintain a stable rise during the entire hoisting process, and the safety of the steel truss beam segment hoisting is ensured.
  • the crane structure moves the steel truss beam segment to the position where it docks with the erected steel truss beam, the coincidence degree between the rear end face of the steel truss beam segment and the front end face of the erected steel truss beam is higher. high, making docking more convenient.
  • Figure 1 is a schematic structural diagram of a girder crane in an embodiment of the present invention
  • Figure 2 is an enlarged view of position A in Figure 1 according to the embodiment of the present invention.
  • Figure 3 is an enlarged view of B in Figure 1 according to the embodiment of the present invention.
  • Figure 4 is a schematic structural diagram of the girder erecting crane from another perspective according to the embodiment of the present invention.
  • Figure 5 is a schematic structural diagram of the girder erecting crane from another perspective according to the embodiment of the present invention.
  • Figure 6 is a schematic diagram of the state of S100 in the embodiment of the present invention.
  • Figure 7 is a schematic diagram of the state of S200 in the embodiment of the present invention.
  • Figure 8 is a schematic diagram of the states from S300 to S400 in the embodiment of the present invention.
  • Figure 9 is a schematic diagram of the states from S500 to S600 in the embodiment of the present invention.
  • Figure 10 is a schematic diagram of the states from S700 to S800 in the embodiment of the present invention.
  • Figure 11 is a schematic diagram of the state of S800 in the embodiment of the present invention.
  • embodiments of the present invention provide a construction method for erecting a double-section full-section steel truss beam using a girder erecting crane, which includes:
  • the girder crane is composed of a frame 5, a support mechanism, a traveling mechanism 3, an anchoring mechanism 4, a lifting mechanism, a crane mechanism 2 and a hoisting mechanism 1.
  • the frame 5 is composed of a bottom front beam, a lower main beam, a rear anchor beam, an upper front beam, an upper main beam, an upper rear beam, a column, a front support rod, a rear tie rod, and multiple connecting systems using high-strength bolts. Or it is connected by pins.
  • the lower main beam, upper main beam, front support rod and rear tie rod located on the left and right sides respectively form a diamond-shaped left truss and a diamond-shaped right truss.
  • the two sets of lower main beams and upper main beams located in the middle , the front support rod and the rear tie rod respectively form a diamond-shaped left middle truss and a diamond-shaped right middle truss.
  • the beam 200 passes through the cables of the bridge tower.
  • the structural forms of the middle truss and the side truss are similar, except that the cross-section of the rod used in the middle truss is slightly smaller.
  • the traveling mechanism 3 of the girder erecting crane drives the girder erecting crane to move to the girder erecting position;
  • each group of traveling mechanisms 3 includes two sets of front and rear traveling components.
  • Each group of traveling components consists of track beams 31, traveling sliding shoes, traveling cylinders 32 and push supports.
  • the traveling sliding shoe is composed of a connecting seat, a sliding shoe cylinder 33 and a sliding sleeve.
  • the connecting seat is fixedly connected to the frame 5, the sliding sleeve is slidingly connected to the track beam 31, and the sliding shoe cylinder 33 is arranged between the connecting seat and the sliding sleeve. It can telescope up and down.
  • One end of the traveling oil cylinder 32 is detachably connected to the track beam 31 through a push support.
  • the other end of the traveling oil cylinder 32 is connected to the sliding sleeve of the traveling sliding shoe.
  • the track beam 31 is provided with multiple sets of limit holes. 311 is used for detachable connection with the push support.
  • the process of the traveling mechanism 3 driving the girder crane to move is as follows:
  • the sliding shoe cylinder 33 of the traveling mechanism 3 contracts upward to drive the track beam 31 of the traveling mechanism 3 to lift off the ground;
  • the support mechanism consists of a left front outrigger, a middle front outrigger, a right front outrigger and four rear outriggers.
  • the left front outrigger and right front outrigger The legs are respectively set at the left and right ends of the bottom front beam, the middle front leg is set in the middle of the bottom front beam, and is located between the left middle truss and the right middle truss.
  • the four rear legs are evenly distributed along the width direction of the frame 5
  • the left front leg, right front leg and four rear legs all use adjustable screw rigid legs
  • the middle front leg uses constant pressure flexible legs .
  • the support force of the left front outrigger and right front outrigger can be designed to be 1400t
  • the support force of the four rear outriggers can be designed to be 100t
  • the middle front outrigger can be equipped with a 2000t level constant pressure cylinder to control the middle truss support. Reaction force.
  • the support mechanism uses rigid support through the left front outrigger and right front outrigger, and the middle front outrigger uses constant pressure flexible outriggers, which can maintain the pressure on the middle front outrigger as the total reaction under any working conditions.
  • One-third of the force, and the girder crane has a symmetrical structure, so the remaining two-thirds of the total reaction force will be automatically shared evenly by the left front leg and the right front leg. Therefore, the girder crane can be lowered to the maximum extent.
  • the beam crane exerts a local load on the steel truss beam 200 at which it is located, so that the bearing capacity of the steel truss beam 200 at which it is located can be utilized to the maximum extent to erect a steel truss beam segment 100 of greater weight.
  • the width direction of the frame 5 refers to the X-axis direction.
  • the four track beams 31 of the four sets of traveling mechanisms 3 need to be operated synchronously according to the above steps, and the traveling speed needs to be accurately controlled.
  • the rated traveling speed is set to 1m/min.
  • the working level of the traveling mechanism is M4.
  • the sliding shoe cylinder 33 extends downward to drive the track beam 31 to touch the ground and receive force;
  • the length of the sliding shoe cylinder 33 extending downward must be sufficient to make each leg of the support mechanism in an off-the-ground state, and the beam erecting crane is converted from a state supported by the support mechanism to a state supported by the four track beams 31. state.
  • the beam erecting crane itself has a large dead weight, it can be placed at the bottom of the track beam 31 Install a support pad with a larger friction coefficient. After the track beam 31 touches the ground and is stressed, the static friction between the track beam 31 and the erected steel truss beam 200 can be used to ensure that the track is moved when the girder erecting crane is subsequently moved. The beam 31 is in a stationary state, and there is no need to temporarily fix the track beam 31 to the erected steel truss beam 200 by means of bolts or welding.
  • the front leg of the support mechanism is equipped with a flip cylinder and a corresponding connecting rod structure.
  • a flip cylinder When in use, just retract the oil cylinder to realize automatic flip of the front leg, avoiding the anchor of the erected steel truss beam 200 box; and the anchoring tie rod assemblies on the left and right sides of the anchoring mechanism 4 are also equipped with flipping cylinders. Just flip it outward when the machine is moving.
  • the frame 5 of the girder crane has a diamond-shaped structure as a whole, when the front end of the girder crane is hoisting the beam, in order to improve the stability of the girder crane and prevent overturning during the erection of the steel truss segment 100, After the traveling mechanism 3 drives the girder crane to move into place, the following steps need to be implemented:
  • the anchoring mechanism 4 is composed of four sets of bolt-type anchor tie rod assemblies.
  • Each set of anchor tie rod assemblies is composed of screw rods, distribution beams 111, tie plates and other parts.
  • the four sets of anchor tie rod assemblies are respectively arranged on the machine.
  • the rear anchor beam and the anchor ear seat are connected through rear anchor tie rods or bolts.
  • the anchor tie rods of this structure The components are clearly stressed, safe and reliable, and the height of the rear anchor can be easily adjusted.
  • the bottom rear side of the frame 5 of the girder crane is also equipped with a winch unit.
  • the wire rope of the winch unit is connected to the hoisting structure through the crane mechanism 2.
  • the winch unit The hoisting mechanism 1 can be raised or lowered by retracting and releasing the wire rope.
  • the descending process is in an unloaded state.
  • the descending speed of the hoisting mechanism 1 can be controlled between 0 and 3.6m/min. After the hoisting mechanism 1 is lowered in place, it can pass through the hoisting tool 11
  • Structures such as upper mounting booms are connected to the lifting lugs of the steel truss beam segments 100 .
  • centroid of the hoisting mechanism 1 refers to the geometric center of the triangle formed by the lines connecting the geometric centers of each group of hoists 11.
  • the plumb line refers to the straight line in the Z-axis direction.
  • the preset height should not be set too high. It is usually appropriate to hoist the steel truss segments to a suspended state with a certain amount of adjustment space.
  • the bridge is an inclined tower with three cable planes arranged on the main channel of the Yangtze River.
  • the double-segment steel truss girder 200 was rolled onto the ship at the Nantong Rugao manufacturing base, and was transferred by barge to the bottom of the girder crane on the river.
  • the hoisting mechanism 1 After the hoisting mechanism 1 is in place, connect the three sets of spreaders 11 to the steel truss beam segments 100.
  • the hoisting mechanism 1 lifts the steel truss beam segments 100 to a height of 300mm away from the hull. At this time, it can be the steel truss beam segment. 100 and the shaking of the hull provide enough space to ensure that the steel truss beam segment 100 is in a completely suspended state, making it easy to adjust the posture of the spreader 11 and ensuring the safety of the hoisting.
  • the operation of the lifting and hoisting mechanism 1 is opposite to the operation of the above-mentioned lowering and hoisting mechanism 1, which will not be described in detail here.
  • the difference is that the process of the lifting operation is a heavy load state, and the lifting speed should be controlled at 0 to 1.8m/min.
  • the steel truss beam section 100 when the hoisting mechanism 1 lifts the steel truss beam section 100, in order to avoid the steel truss beam section 100 colliding with the erected steel truss beam 200 and ensure the safety of the construction process, the steel truss beam section A certain misalignment needs to be maintained between the rear end face of the section 100 and the front end face of the erected steel truss 200.
  • a double-intersection whole-segment steel section with a length of 28m and a weight of 1800t is erected on the Hutong Yangtze River Bridge.
  • a 200mm misalignment needs to be maintained.
  • the crane mechanism 2 drives it to move along the length direction of the frame 5 through the longitudinal oil cylinder provided on the main beam of the frame 5, thereby hoisting the
  • the mechanism 1 and the steel truss beam segment 100 are translated as a whole to a position where they are docked with the erected steel truss beam 200 .
  • the length direction of the frame 5 refers to the Y-axis direction.
  • the stay cables dropped from the bridge tower can be connected to the anchor boxes on the steel truss girder section 100, and then connected by welding or bolting. Connect and fix it with the erected steel truss beam 200 in other ways, then release the connection between the hoisting mechanism 1 and the steel truss segment, retract the crane mechanism 2 and lock it to move the center of gravity of the girder erecting crane backward. After making preparations You can then walk to the next beam erection position for subsequent beam erection construction.
  • the crane mechanism 2 includes a large beam 21 and a small beam 22.
  • the large beam 21 and the small beam 22 are arranged in parallel and are respectively slidingly connected to the frame 5 of the girder crane, and the large beam 21 and the small beam 22 are arranged in parallel.
  • the beam 22 is used to slide along the length direction of the frame 5.
  • the hoisting mechanism 1 includes three sets of spreaders 11 arranged in a Z-shaped arrangement. The first set of spreaders 11 is arranged at one end of the large beam 21, and the second set of spreaders 11 is arranged at the large beam 21. At the other end of the beam 21, the third group of spreaders 11 is set on the small beam 22.
  • the spreader 11 includes a distribution beam 111, a lifting point slider 112 and an adjustment cylinder 113.
  • the lifting point slider 112 moves with the crane mechanism 2 through a wire rope. connection, the distribution beam 111 is slidingly connected to the lifting point slider 112, one end of the adjustment cylinder 113 is connected to the distribution beam 111, the other end of the adjustment cylinder 113 is connected to the lifting point slider 112, the distribution beam 111 is used to connect with the steel truss beam section 100 connections.
  • the left and right ends of the large cross beam 21 are slidingly connected to the left upper main beam and the right upper main beam of the frame 5 respectively, and the small cross beam 22
  • the left and right ends are slidingly connected to the upper middle main beam on the left and the upper main beam on the right respectively, and a set of longitudinal oil cylinders are provided between the two and the upper main beams carrying their respective parts to drive the large cross beam 21 and the small cross beam 22 longitudinally. shift.
  • the large crossbeam 21 and the small crossbeam 22 are arranged one behind the other.
  • the large crossbeam 21 can be in the front and the small crossbeam 22 can be in the back.
  • the large crossbeam 21 can be arranged in the back and the small crossbeam 22 can be arranged in the front as needed. , there is no restriction here.
  • the small beam 22 can be arranged at the rear, so that the third group of spreaders 11 in the middle can be easily stored in a deeper position in the space between the left middle truss and the right middle truss, making the whole machine more compact.
  • the center of gravity is further back, which is safer.
  • the distribution beam 111 of the spreader 11 is arranged along the length direction of the frame 5, and its front and rear ends are provided with lifting holes.
  • the positions of the lifting holes match the positions of the lifting lugs of the steel truss beam segments 100, and the suspension rods and steel beams can be inserted.
  • the lifting lugs of the truss beam segments 100 are connected.
  • the lifting point slider 112 adopts a frame with a C-shaped cross-section.
  • the distribution beam 111 is provided with slideways and multiple slots along the length direction.
  • the C-shaped frame is set on the distribution beam 111 On the sliding movement, one end of the adjusting cylinder 113 is connected to the distribution beam 111, and the other end of the adjusting cylinder 113 is connected to the C-shaped frame.
  • the upper part of the C-shaped frame is provided with an ear plate that can be hinged with the movable pulley provided on the wire rope.
  • the adjusting cylinder When 113 telescopes it can drive the C-shaped frame to slide on the slide of the distribution beam 111.
  • the C-shaped frame can be locked at a certain slot on the distribution beam 111 through the locking structure.
  • the locking structure can be unlocked, and the adjustment cylinder 113 drives the C-shaped frame to slide on the slide of the distribution beam 111 again.
  • the C-shaped frame in the process of lowering the hoisting mechanism 1, in order to maintain the balance of the distribution beam 111, the C-shaped frame is usually located on the vertical line of the center of gravity of the distribution beam 111. During the hoisting process, The centroid of the hoisting mechanism 1 and the center of gravity of the steel truss beam segment 100 are always on the same vertical line. Therefore, when the position of the C-shaped frame is adjusted, the distribution beam 111 will not tilt.
  • the lifting point of the second group of spreaders 11 located in the middle will deviate from the midpoint of the distribution beam 111 by a certain distance, the load received by each part of the distribution beam 111 is not uniform. Therefore, in order to ensure that the distribution beam 111 For the strength of each part of 111, the end relatively close to the hanging point can be strengthened, and the end relatively far away can be appropriately reduced in weight.
  • the first group of hoists The distance between the lifting point slider 112 of the lifting device 11 and the lifting point slider 112 of the second group of lifting fixtures 11 and the lifting point slider 112 of the third group of lifting fixtures 11 is equal to the distance between the large beam 21 and the small beam 22 .
  • the steel wire ropes connecting the three groups of spreaders 11 are always along the In the direction of the plumb line, when adjusting the hanging point sliders 112 of the three sets of spreaders 11, it is necessary to keep the hanging point sliders 112 of the first set of spreaders 11 and the hanging point sliders 112 of the second set of spreaders 11 in contact with the third set of spreaders 11.
  • the distance between the lifting point slide blocks 112 of the group spreader 11 is equal to the distance between the large beam 21 and the small beam 22 .
  • the distance between the large beam 21 and the small beam 22 is 4050mm, that is to say, the first
  • the distance between the lifting point slider 112 of the first set of spreaders 11 and the second set of spreaders 11 and the third set of spreaders 11 is also 4050mm, where the first set of lifts
  • the lifting point slider 112 of the hoisting tool 11 and the hanging point slider 112 of the second group of hoisting tools 11 allow an adjustment range of 0 to 2080mm on their corresponding distribution beams 111.
  • the hanging point slider 112 of the second group of hoisting tools 11 The allowable adjustment range value on its corresponding distribution beam 111 is 0 to 4010 mm.
  • the three groups of spreaders 11 are lifted synchronously at a preset speed, which refers to the average speed within a preset time.
  • synchronous promotion means starting to improve at the same moment or stopping the promotion at the same moment.
  • the preset speed refers to the average speed within the preset time, not the instant speed at a certain moment. In this way, even at a certain moment The real-time speed of a certain group of spreaders 11 is too fast. As long as the real-time speed can be reduced within a preset time, the dynamic balance of the hoisting mechanism 1 can be maintained, making the operability stronger.
  • the steel truss beam sections to be erected will The greater the possibility of shaking in segment 100, the worse the stability.
  • the shorter the preset time the harder it is to maintain dynamic balance, but the better the stability.
  • the specific settings can be set according to needs. There are no restrictions here.
  • the preset time can be set to 10s, 20s or 30s
  • the preset speed can be set to 0.6m/min, 1.2m/min or 1.8m/min
  • the synchronous lifting accuracy is 50mm.
  • the construction method after moving the girder erecting crane to the girder erecting position, preparing to erect the girder, and before lowering the hoisting mechanism 1 of the girder erecting crane, the construction method also includes:
  • the construction method also includes:
  • adjusting the longitudinal slope of the steel truss segment 100 includes the following steps:
  • the adjustment cylinder 113 of the second group of spreaders 11 in the middle can be adjusted first.
  • the adjustment cylinders 113 of the two sets of spreaders 11 located on both sides try to achieve simultaneous and same-amplitude adjustment.
  • the overall lifting or lowering of the hoisting mechanism 1 aligns the rear end surface of the steel truss beam segment 100 with the front end surface of the erected steel truss beam 200.
  • the steel truss beam segment 100 after adjusting the longitudinal inclination angle of the steel truss beam segment 100, the steel truss beam segment 100 will tilt forward or backward as a whole. Therefore, the rear end surface of the steel truss beam segment 100 will not be in contact with the erected steel beam There will inevitably be a certain height difference on the front end surface of the truss beam 200. At this time, in order to maintain the longitudinal inclination angle of the steel truss beam segment 100, this height difference cannot be adjusted by adjusting the attitude of the hoisting mechanism 1, and the entire body needs to be raised or lowered. The hoisting mechanism 1 is used to eliminate this height difference, thereby making the steel truss segment 100 and the erected steel truss 200 more accurately connected.
  • the construction method also includes closing the steel truss beam section 100 with the opposite erected steel truss beam 200, and connecting the steel truss beam section 100 with the opposite erected steel truss beam.
  • the 200 joints include the lower chords, diagonal bars and upper chords of the steel truss beam segments 100.
  • the lower chords include the middle truss lower chords and the side truss lower chords.
  • the diagonal bars include the middle truss diagonal bars and the side truss lower chords.
  • the side truss diagonal rods and the top chord rods of the side girders include the upper chord rods of the side girders and the upper chord rods of the center girders.
  • the following article takes the erection of a double-intersection whole-segment steel truss beam with a length of 28m and a weight of 1800t on the Hutong Yangtze River Bridge as an example to illustrate the auxiliary span steel truss beam closing construction.
  • the span steel truss beam is closed, the main channel bridge steel truss beam is in the maximum double cantilever state.
  • the auxiliary span steel truss beam closure is constructed in the order of closing the lower chord first, then closing the diagonal beam, and then closing the upper chord.
  • the main truss upper chord and diagonal beam high-bolt construction platform of the Helong section steel truss beam segment 100 can be directly used as a standard segment steel truss beam construction platform and sent to the steel truss girder assembly yard for installation in the factory.
  • the splicing joints between the Z12 ⁇ Z13 steel truss beam segments 100 and the Z14 ⁇ Z15 steel truss beam segments 100 are equipped with belts in a normal "Z" shape under standard section cantilever erection conditions, and the bottom string is pole and slope
  • the splicing plate of the rod is normally placed between Z13 sections, and the upper chord bar is placed between Z14; the lower chord bar and the upper chord bar are spliced at the joint position of the Z12 ⁇ Z13 steel truss beam segment 100 and the Z11 steel truss beam segment 100
  • the plate is normally strapped between the sections of Z12 steel truss beam section 100.
  • the splicing plate shrink strap is flush with the diagonal rod port between the sections of Z12 steel truss beam section 100; the cantilever end steel truss
  • the linear adjustment of the beam is mainly before the auxiliary pier is closed.
  • the linear shape of the steel truss beam can be calculated and analyzed based on the load conditions of the steel truss beam and the tension situation of the stay cables, and the cable force of the stay cables can be controlled to ensure the stability of the auxiliary pier.
  • Helongkou is within 300mm below the design elevation; the top of the auxiliary pier uses two 200t horizontal longitudinal jacks, 12 500t vertical jacks and four 200t horizontal transverse jacks to realize the linear adjustment of the steel trusses on the top of the pier.
  • the construction process of the auxiliary span closing is as follows: the three single sections Z9 to Z11 on the pier top of the auxiliary pier are erected 30cm below the design elevation in advance and are pre-deviated 3m. When it is close to erection to the closing entrance, the auxiliary pier completes the jack debugging and slider in advance Position adjustment, installation of traction and longitudinal movement equipment and lateral limit installation, and linear re-measurement.
  • the cable-stayed cable tower end of the first floor is hung, and the alignment of the steel truss beam at the cantilever end is finely adjusted according to the monitoring instructions (mainly the pressure on the main span side) to prepare for the auxiliary span closing;
  • the Z9 ⁇ Z11 steel truss beam segments on the top of the pier are 100 first Through 2 sets of 200t longitudinal jacks, the main span is moved 2.9m longitudinally, and then through 12 sets of 500t vertical jacks and 4 sets of 200t transverse jacks to adjust the vertical and lateral deviations.
  • the positions and postures of the steel truss beam segments 100 on both sides of the gantry are consistent.
  • the steel truss beam segments 100 on the top of the pier are moved longitudinally by 0.1m as a whole to realize the docking of the lower chord poles.
  • the lower chord poles are docked, they are then docked in sequence by lifting and lowering the Z9 to Z11 steel truss beam segments 100 and normal tension.
  • the diagonal rod and upper chord rod are finally punched, high bolted and welded in sequence; finally, the steel truss section 100 on the top of the pier is jacked vertically, the top slideway and slider of the padstone are removed, and the steel truss beam on the top of the pier is installed.
  • the truss beam is permanently supported, and the integral lifting jack on the pier top is arranged simultaneously.
  • auxiliary span steel truss girder closing bolt hole alignment in order to eliminate the deformation difference of the steel truss beam segments 100 on both sides of the closing opening caused by the steel truss girder's own weight and the position of the girder erecting crane, the bolts need to be The hole deviation is controlled within 1mm to facilitate the insertion of punching nails.
  • the major sections are arranged according to the cantilever erection process of the steel truss beam.
  • the adjustment device A, the adjustment device B/C and the inclined rod can be arranged on both sides of the closing mouth to adjust the bolt hole deviation.
  • chords when the auxiliary span steel truss girder is closed to the closing position, the chords must be closed according to the following procedures: closing the lower chord (first the center truss and then the side truss), closing the diagonal rod (first the center truss and then the side truss), and closing the upper chord (first the center truss and then the side truss). Construction is carried out in the order of side girders, middle girders, and rear girders.
  • the vertical jack on the bracket next to the pier adjusts the steel truss segment 100 at the Z9 ⁇ Z11 position of the pier top, so that the rod end of the lower chord
  • the axis and inclination angle match the axis and inclination angle of the front-end lower chord of the cantilever steel truss beam, and then the longitudinal movement jack is used to push the pier top steel truss beam segment 100 toward the mid-span direction, and then close the lower chord middle truss and side truss.
  • Helong diagonal bar After the lower chord of the steel truss beam is docked, a 5t inverted chain can be set between the diagonal bar and the vertical bar. After adjusting the axis slope of the diagonal bar, the diagonal bar can be connected. The punching nails are arranged in a plum blossom shape. The total number 10% of the number of bolt holes.
  • the counter-pressure vertical adjustment and pull device can be set to match the rod end axis and inclination of the upper chord with the upper chord axis and inclination of the front end of the cantilevered steel truss beam. Eliminate the bolt hole deviation, insert punching nails in sequence to make the side girders and middle girders of the upper chord rod closed. The punching nails are arranged in a plum blossom shape, and the total number is 10% of the number of bolt holes.
  • the railway bridge deck and the upper chord small longitudinal beams can be butt welded.
  • the load conditions of the auxiliary span steel truss beams on the north and south sides are when they are closed. Basically the same, the construction process is similar.
  • the docking sequence of first lowering the chord, then the inclined rod, and then the upper chord is adopted.
  • measures such as jack counter-pressure, diagonal pulling and axial pulling (top-pull) are adopted to solve the problem of large steel sections.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

La présente invention se rapporte au domaine technique de la construction de ponts, et concerne un procédé de construction pour ériger une ferme d'acier de section entière inter-sections à l'aide d'une grue d'érection de poutre, consistant à : déplacer une grue d'érection de poutre vers une position d'érection de poutre, et préparer une poutre ; abaisser un mécanisme de levage de la grue d'érection de poutre et le relier à une section de ferme en acier ; lever la section de ferme en acier à une hauteur prédéfinie, et ajuster une assiette du mécanisme de levage pour permettre au centre de gravité de la section de ferme en acier et au barycentre du mécanisme de levage d'être sur la même ligne verticale ; lever le mécanisme de levage pour que la section de ferme en acier atteigne une hauteur d'installation ; ajuster un mécanisme de grue en surplomb pour que la section de poutre de ferme en acier atteigne une position de jonction bout à bout avec une poutre de ferme en acier érigée ; installer la section de poutre de ferme en acier, désengager le mécanisme de levage de la section de poutre de ferme en acier, ramener le mécanisme de grue en surplomb et verrouiller celui-ci ; et déplacer la grue d'érection de poutre vers une position d'érection de poutre suivante. La présente invention peut satisfaire les exigences pour ériger une ferme en acier de section entière inter-sections, et une section de ferme en acier et une ferme en acier érigée forment ainsi une jonction bout à bout plus commodément.
PCT/CN2023/091549 2022-08-15 2023-04-28 Procédé de construction pour ériger une ferme d'acier à section entière inter-sections à l'aide d'une grue d'érection de poutre WO2024037042A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202210974317.XA CN115305835B (zh) 2022-08-15 2022-08-15 一种运用架梁起重机架设双节间整节段钢桁梁的施工方法
CN202210974317.X 2022-08-15

Publications (1)

Publication Number Publication Date
WO2024037042A1 true WO2024037042A1 (fr) 2024-02-22

Family

ID=83863452

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2023/091549 WO2024037042A1 (fr) 2022-08-15 2023-04-28 Procédé de construction pour ériger une ferme d'acier à section entière inter-sections à l'aide d'une grue d'érection de poutre

Country Status (2)

Country Link
CN (1) CN115305835B (fr)
WO (1) WO2024037042A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118211311A (zh) * 2024-05-21 2024-06-18 四川路桥华东建设有限责任公司 一种用于跨径钢桁梁桥无应力合龙的辅助设计方法及辅助设计***

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115305835B (zh) * 2022-08-15 2023-07-11 中铁九桥工程有限公司 一种运用架梁起重机架设双节间整节段钢桁梁的施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012039547A2 (fr) * 2010-09-20 2012-03-29 이케이중공업주식회사 Grue de construction de ponts pour installer une poutre dans une section incurvée
CN103243659A (zh) * 2013-05-21 2013-08-14 中铁八局集团第一工程有限公司 悬臂吊架及其使用方法
CN104763357A (zh) * 2015-03-24 2015-07-08 四川宏华石油设备有限公司 一种自动化钻具移运装置
KR101609661B1 (ko) * 2015-06-09 2016-04-06 박재현 교량용 중공 강합성 거더 및 그 제작 방법
CN111532999A (zh) * 2020-04-28 2020-08-14 中铁大桥局集团有限公司 一种架梁吊机和一种架梁方法
CN115305835A (zh) * 2022-08-15 2022-11-08 中铁九桥工程有限公司 一种运用架梁起重机架设双节间整节段钢桁梁的施工方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1900423A (zh) * 2006-07-10 2007-01-24 中铁大桥局股份有限公司 钢桁梁整体节段架设方法
CN101508403B (zh) * 2009-03-06 2011-05-25 武桥重工集团股份有限公司 利用三吊点超静定起重***的架梁起重机
CN108275574A (zh) * 2018-04-16 2018-07-13 四川路桥华东建设有限责任公司 自适应钢桁梁重心、安装倾角变化吊装吊具及施工方法
CN113846563B (zh) * 2021-09-18 2023-04-07 中铁大桥局集团有限公司 一种大跨度斜拉桥边跨及辅助跨钢桁梁架设的施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012039547A2 (fr) * 2010-09-20 2012-03-29 이케이중공업주식회사 Grue de construction de ponts pour installer une poutre dans une section incurvée
CN103243659A (zh) * 2013-05-21 2013-08-14 中铁八局集团第一工程有限公司 悬臂吊架及其使用方法
CN104763357A (zh) * 2015-03-24 2015-07-08 四川宏华石油设备有限公司 一种自动化钻具移运装置
KR101609661B1 (ko) * 2015-06-09 2016-04-06 박재현 교량용 중공 강합성 거더 및 그 제작 방법
CN111532999A (zh) * 2020-04-28 2020-08-14 中铁大桥局集团有限公司 一种架梁吊机和一种架梁方法
CN115305835A (zh) * 2022-08-15 2022-11-08 中铁九桥工程有限公司 一种运用架梁起重机架设双节间整节段钢桁梁的施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JUN-TANG LI: "Integral Manufacturing and Erection Techniques for Steel Truss Girder of Main Navigational Channel Bridge of Shanghai-Suzhou-Nantong Changjiang River Bridge", BRIDGE CONSTRUCTION, vol. 50, no. 5, 28 October 2020 (2020-10-28), pages 10 - 15, XP093140811 *
YUN-PING ZHU, TANG YONG; XU JIA-PING: "Erection Schemes for Pier-Top Steel Girder of Main Navigational Channel Bridge of Hutong Changjiang River Bridgeeering", WORLD BRIDGES, vol. 46, no. 1, 28 January 2018 (2018-01-28), pages 1 - 5, XP093140813 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118211311A (zh) * 2024-05-21 2024-06-18 四川路桥华东建设有限责任公司 一种用于跨径钢桁梁桥无应力合龙的辅助设计方法及辅助设计***

Also Published As

Publication number Publication date
CN115305835B (zh) 2023-07-11
CN115305835A (zh) 2022-11-08

Similar Documents

Publication Publication Date Title
WO2024037042A1 (fr) Procédé de construction pour ériger une ferme d'acier à section entière inter-sections à l'aide d'une grue d'érection de poutre
WO2022048320A1 (fr) Coffrage de levage de pont haubané intégré à auto-élévation hydraulique
CN113882279B (zh) 能自行走和调节的混凝土连续梁悬臂浇筑施工装备及工艺
CN208815424U (zh) 一种桥梁下行式挂篮
CN112030767A (zh) 一种钢塔单侧爬升式提升模架及应用在倾斜独柱式钢索塔
CN110396931B (zh) 一种中央双索面斜拉桥过索式桥面吊机及其施工方法
CN110004829B (zh) 一种钢拱塔提升方法
CN105714690A (zh) 大跨度钢混组合梁架设施工用节段悬拼提梁机
CN109183620A (zh) 伸缩托架、钢箱梁吊装设备及吊装方法
WO2022184136A1 (fr) Procédé de construction de levage complet de station de métro de type à assemblage dans un système de structure de retenue d'ancrage de pieu
CN207987749U (zh) 骑索式桥面吊机
WO2024087901A1 (fr) Machine intégrée de coulée en porte-à-faux et de locomotion
CN108086168A (zh) 骑索式桥面吊机
CN116289620A (zh) 箱梁钢筋部品组合式运输装置及方法
KR100627102B1 (ko) 리프팅트레블러를 이용한 프리캐스트 세그먼트교량상부시공방법
CN212077660U (zh) 大跨度宽幅桥梁主梁菱形挂篮施工结构
CN105672136A (zh) 一种大跨度钢混组合梁架设施工工艺
CN115613478A (zh) 一种连续梁悬臂浇筑方法
KR200363059Y1 (ko) 리프팅트레블러를 이용한 프리캐스트 세그먼트교량상부시공시스템
CN212052371U (zh) 用于变宽混凝土箱梁悬浇施工的挂篮装置
CN209922694U (zh) 一种吊具
CN217417939U (zh) 一种大角度重载爬坡架梁吊机走行***
CN219527360U (zh) 一种用于高墩施工的稳定升降结构
KR100465882B1 (ko) 잭 시스템에 의한 리그선의 육상 데크메이팅 공법
CN219342880U (zh) 基于花架爬升的高墩稳固结构

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23853949

Country of ref document: EP

Kind code of ref document: A1