WO2022059154A1 - 空気調和機 - Google Patents

空気調和機 Download PDF

Info

Publication number
WO2022059154A1
WO2022059154A1 PCT/JP2020/035356 JP2020035356W WO2022059154A1 WO 2022059154 A1 WO2022059154 A1 WO 2022059154A1 JP 2020035356 W JP2020035356 W JP 2020035356W WO 2022059154 A1 WO2022059154 A1 WO 2022059154A1
Authority
WO
WIPO (PCT)
Prior art keywords
outdoor unit
priority
air conditioner
outdoor
control device
Prior art date
Application number
PCT/JP2020/035356
Other languages
English (en)
French (fr)
Inventor
啓 伊内
賢 三浦
Original Assignee
東芝キヤリア株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東芝キヤリア株式会社 filed Critical 東芝キヤリア株式会社
Priority to JP2022550280A priority Critical patent/JP7476328B2/ja
Priority to CN202080105249.2A priority patent/CN116113796A/zh
Priority to PCT/JP2020/035356 priority patent/WO2022059154A1/ja
Publication of WO2022059154A1 publication Critical patent/WO2022059154A1/ja
Priority to US18/185,637 priority patent/US20230221023A1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F3/00Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
    • F24F3/06Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the arrangements for the supply of heat-exchange fluid for the subsequent treatment of primary air in the room units
    • F24F3/065Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the arrangements for the supply of heat-exchange fluid for the subsequent treatment of primary air in the room units with a plurality of evaporators or condensers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/32Responding to malfunctions or emergencies
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/32Responding to malfunctions or emergencies
    • F24F11/38Failure diagnosis
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/86Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling compressors within refrigeration or heat pump circuits

Definitions

  • the embodiment relates to an air conditioner.
  • an air conditioner in which two or more outdoor units and one or more indoor units are connected in parallel to the same refrigerant pipe sets the operation priority of the two or more outdoor units.
  • a control unit for determining is provided. Based on the operating ability of the two or more outdoor units, the control unit sets the operation priority of the two or more outdoor units in descending order of the operating ability of the outdoor unit at regular intervals, and the outdoor unit. Change in ascending order of driving ability.
  • FIG. 1 is a schematic diagram showing an example of the overall configuration of an air conditioner.
  • FIG. 2 is a flowchart showing an example of control.
  • FIG. 3 is a flowchart showing an example of control.
  • FIG. 1 is a schematic diagram showing an example of the overall configuration of the air conditioner 1.
  • the air conditioner 1 has four outdoor units and five indoor units will be described, but the number of outdoor units and the number of indoor units are based on this number. It is not limited.
  • the air conditioner 1 has an outdoor unit 2, an outdoor unit 3, an outdoor unit 4, and an outdoor unit 5 as four outdoor units arranged in parallel. Further, the air conditioner 1 has an indoor unit 6, an indoor unit 7, an indoor unit 8, an indoor unit 9, and an indoor unit A as five indoor units arranged in parallel.
  • the outdoor unit 2, the outdoor unit 3, the outdoor unit 4, the outdoor unit 5, the indoor unit 6, the indoor unit 7, the indoor unit 8, the indoor unit 9, and the indoor unit A have an electric wiring 100 and a refrigerant pipe 200. Connected via.
  • the outdoor unit 2, the outdoor unit 3, the outdoor unit 4, and the outdoor unit 5 are each a compressor, a check valve, an oil separator, and a four-way valve equipped with a sensor for detecting the amount of oil, although not shown as main elements. It includes a valve, a heat exchanger, an expansion valve, a liquid tank, an outdoor unit fan, an accumulator, an on-off valve, and a sensor for detecting the flow rate of the refrigerant flowing to the refrigerant pipe 200.
  • the outdoor unit 2, the outdoor unit 3, the outdoor unit 4, and the outdoor unit 5 each have a control device 21, a control device 31, a control device 41, and a control device 51, respectively.
  • Each control device 21, control device 31, control device 41, and control device 51 includes a CPU, a memory, a storage device (nonvolatile memory), an input / output circuit, a timer, and the like, and executes predetermined arithmetic processing. Further, the control device 21, the control device 31, the control device 41, and the control device 51 are configured to be communicable via the electrical wiring 100, and information can be transmitted and received to each other.
  • the sensors included in the compressors of the outdoor units 2 to 5 and the detection values detected by the sensors that detect the flow rate of the refrigerant are set in the respective control device 21, control device 31, control device 41, and control device 51. It is output.
  • control device 21 possessed by the outdoor unit 2 operates based on the communication information received from the control device 31, the control device 41, and the control device 51 of the other outdoor unit 3, the outdoor unit 4, and the outdoor unit 5, respectively.
  • Comprehensive control of the air conditioner 1 such as calculation of integrated time, calculation of operating capacity of each outdoor unit 2 to 5 and change of operation priority described later is executed.
  • the control device 21 is a control device that plays an overall role, but the overall role may be the control device 31, the control device 41, or the control device 51. Further, the control device that plays a central role at a predetermined timing may be replaced between the control device 21, the control device 31, the control device 41, and the control device 51. Further, a plurality of control devices among the control device 21, the control device 31, the control device 41, and the control device 51 may play the overall role as described above.
  • the indoor unit 6, the indoor unit 7, the indoor unit 8, the indoor unit 9, and the indoor unit A are installed in the building and the building, respectively, and adjust the temperature of the air in the installed space.
  • the indoor unit 6, the indoor unit 7, the indoor unit 8, the indoor unit 9, and the indoor unit A each have a control device 61, a control device 71, a control device 81, a control device 91, and a control device A1.
  • the control device 61, the control device 71, the control device 81, the control device 91, and the control device A1 communicate with the control device of the outdoor unit, particularly the control device 21 which plays a central role, via the electric wiring 100.
  • the control device 21 has the outdoor unit 2, the outdoor unit 3, the outdoor unit 4, and the outdoor unit 4 in order to harmonize the air in the room where the indoor units 6 to 9 and A are installed.
  • An operating outdoor unit is selected from the outdoor units 5 based on the operation priority and is operated.
  • FIG. 2 is a flowchart showing an example of control executed by the control device 21 of the air conditioner 1.
  • the CPU executes a program stored in the memory in the control device 21 to realize the following processing.
  • a circuit is provided in the control device 21 and the following processing is performed by the circuit. May be realized.
  • the control device 21 starts the operation of the air conditioner 1 at a predetermined timing (ST101). For example, the operation of the air conditioner 1 is started based on the timing at a predetermined time and the instruction to start the operation.
  • the control device 21 sets the operation priority of each outdoor unit (outdoor unit 2 to outdoor unit 5) in descending order of operating ability (ST102). For example, when the operating capacity of the outdoor units 2 to 5 is outdoor unit 2> outdoor unit 3> outdoor unit 4> outdoor unit 5, the operation priority is the outdoor unit 2, the priority P1 for the outdoor unit 2, and the outdoor unit 3 for the outdoor unit 3.
  • the priority order P2 and the outdoor unit 4 are the priority order P3, and the outdoor unit 5 is the priority order P4.
  • the priority of the priority is P1> P2> P3> P4, the priority P1 has the highest priority, and the priority P4 has the lowest priority.
  • the control device 21 determines whether or not there is an outdoor unit that has failed and is stopped in the outdoor unit 5 from the outdoor unit 2 (ST103).
  • An outdoor unit that has failed and is stopped is an outdoor unit that has become inoperable and has stopped.
  • the control device 21 determines whether or not all the outdoor units 2 to 5 have failed and stopped (ST104).
  • the control device 21 stops the operation (ST117) and ends the operation.
  • the control device 21 determines whether or not there is an outdoor unit that has already failed and stopped. (ST105). When it is determined that there is an outdoor unit that has already failed and stopped (ST105: YES), the control device 21 fixes the operation priority of the outdoor unit that has failed and stopped to a lower level according to the lowest level (ST106). For example, when it is determined that the outdoor unit 3 has failed and stopped this time, if the outdoor unit 4 has already failed and stopped, the outdoor unit 4 is fixed to the priority P4, so that the outdoor unit 3 has priority. The order is fixed to P3 which is based on the lowest P4 (in other words, one higher priority than the lowest).
  • the control device 21 fixes the operation priority of the outdoor unit that has stopped due to failure to the lowest level (ST107). For example, when it is determined that the outdoor unit 3 has failed and stopped this time, if there is no outdoor unit that has already failed and stopped, the priority of the outdoor unit 3 is fixed to the lowest priority P4. ..
  • the control device 21 determines whether or not there is an outdoor unit that has detected an abnormality (ST108).
  • the abnormality of the outdoor unit is, for example, when it is detected that the oil content of the compressor is insufficient or the refrigerant flowing in the refrigerant pipe 200 is insufficient, and the operation is possible but the required performance may not be exhibited. Is. These can be detected based on the information received by the control device 21 from the other control devices 31 to 51 via the electrical wiring 100.
  • the control device 21 changes the operation priority of the outdoor unit that has detected an abnormality to a lower level according to the lowest level (ST109).
  • the operation priority of the outdoor unit 5 is the priority. It will be changed to P3.
  • step ST109 When the process of step ST109 is completed, or when it is determined that there is no outdoor unit whose abnormality is detected in step ST108 (ST108: NO), the control device 21 lowers the outdoor unit whose operation priority is lowered when it is higher.
  • the operation priority of the outdoor unit is moved up by one (ST112). For example, when the operation priority is set to the priority P1 for the outdoor unit 2, the priority P2 for the outdoor unit 3, the priority P3 for the outdoor unit 4, and the priority P4 for the outdoor unit 5, the outdoor unit 3 fails and stops. If this is the case, the operation priority of the outdoor unit 3 is fixed to the priority P4, and the operation priorities of the outdoor unit 4 and the outdoor unit 5 whose operation priority is lower than that of the outdoor unit 3 are prioritized P2 and P3, respectively. Move up one by one. Further, the operation priority of the outdoor unit 2 whose operation priority is higher than that of the outdoor unit 3 remains the priority P1 without being changed from the priority P1.
  • the control device 21 determines whether or not there is an outdoor unit that has detected an abnormality (ST110).
  • the outdoor unit that detects the abnormality stops normally when it receives an operation stop signal, such as when it detects that the oil content of the compressor is insufficient and the refrigerant flowing in the refrigerant pipe 200 is insufficient. It is an outdoor unit that has stopped due to a cause other than the above.
  • the control device 21 changes the operation priority of the outdoor unit that has detected an abnormality to a lower level according to the lowest level (ST111).
  • the priority of the outdoor unit 3 is fixed to the lowest priority P4. If there is one outdoor unit that has already stopped due to failure, the priority is changed to P3 according to the lowest priority.
  • step ST112 When it is determined in this way that the processing of step ST112 is completed or that there is no outdoor unit whose abnormality is detected in the processing of step ST110 (ST110: NO), has the control device 21 passed the integrated operation time of T time? It is determined whether or not (ST113).
  • the T time is a predetermined time, and for example, the T time is defined as 30 hours.
  • the control device 21 When it is determined that the integrated operation time has elapsed T time (ST113: YES), the control device 21 has an operation priority (largest and smallest operation capacity) except for the outdoor unit that has detected a failure stop or abnormality. The order) is reversed (ST114).
  • the outdoor unit 2 has priority P1
  • the outdoor unit 3 has priority P2
  • the outdoor unit 4 has priority P3, and the outdoor unit 5 has priority.
  • the order P4 the operation priority is changed to the priority P4 for the outdoor unit 2, the priority P3 for the outdoor unit 3, the priority P2 for the outdoor unit 4, and the priority P1 for the outdoor unit 5.
  • the outdoor unit 5 is fixed to the priority P4 and is excluded from the change of the operation priority.
  • the outdoor unit 2 has the priority P1 and the outdoor unit 3 has the priority.
  • the outdoor unit 2 is changed to the priority order P3
  • the outdoor unit 3 is changed to the priority order P2
  • the outdoor unit 4 is changed to the priority order P1. If the control device 21 determines that the integrated operation time has not elapsed the T time (ST113: NO), the process returns to the process of step ST103.
  • the control device 21 After completing the process of step ST114, the control device 21 resets the integrated operation time (ST115). Then, the control device 21 determines whether or not the operation stop signal has been received (ST116). The operation stop signal is transmitted to the control device 21 based on the timing at which the predetermined time has come and the instruction to stop the operation. When it is determined that the operation stop signal has been received (ST116: YES), the control device 21 stops the operation of the air conditioner 1 (ST117), and ends the operation. On the other hand, when it is determined by the control device 21 that the operation stop signal has not been received (ST116: NO), the process returns to the process of step ST103.
  • the integrated operation time is T hours (that is, a certain period) except for the outdoor unit that has stopped failure, the outdoor unit that has stopped failure, and the outdoor unit that has detected an abnormality.
  • the operation time of the outdoor units 2 to 5 can be made uniform.
  • the air conditioner 1 can perform normal operation according to the user's request by another outdoor unit. , Air conditioning can be performed without causing inconvenience to the user.
  • the control device 21 lowers the operation frequency of the outdoor unit that has detected the abnormality by placing the outdoor unit that has detected the abnormality at the lowest rank or one higher rank than the lowest rank. As a result, the air conditioner 1 can suppress the occurrence of a situation in which the outdoor unit that has detected an abnormality stops, and can perform air conditioning without causing inconvenience to the user.
  • the present embodiment is different from the first embodiment in that it is configured to change the setting of the operation priority of the outdoor unit included in the air conditioner 1. Therefore, the process of changing the setting of the operation priority will be described in detail.
  • the same components as those in the first embodiment are designated by the same reference numerals, and detailed description thereof will be omitted.
  • FIG. 3 is a flowchart showing an example of control executed by the control device 21 of the air conditioner 1.
  • the control device 21 starts the operation of the air conditioner 1 at a predetermined timing (ST201).
  • ST201 the operation of the air conditioner 1 is started based on the timing at a predetermined time or the instruction to start the operation, which is the same as the process of step ST101.
  • control device 21 sets the operation priority of each outdoor unit (outdoor unit 2 to outdoor unit 5) (ST202). For example, the control device 21 sets the priority of the outdoor unit 2 as P1, the priority of the outdoor unit 3 as P2, the priority of the outdoor unit 4 as P3, and the priority of the outdoor unit 5 as P4.
  • step ST203 to step ST213 executes the process of step ST203 to step ST213.
  • the processes from step ST203 to step ST213 are the same as the processes from step ST103 to ST113 described above (see FIG. 2). Therefore, the description of the process of step ST203 or step ST213 will be omitted.
  • step ST213 When it is determined in step ST213 that the integrated operation time has elapsed T time (ST213: YES), the control device 21 has not detected a failure or abnormality in the operation priority of the outdoor unit having the highest operation priority. Change to the lowest in the machine (ST214). When the process of step ST214 is completed, the control device 21 raises the operation priority of the outdoor unit whose operation priority is other than the highest among the outdoor units for which failure or abnormality has not been detected (ST115).
  • the outdoor unit 3 is out of order, and the operation priority is set to the priority P1 for the outdoor unit 2, the priority P4 for the outdoor unit 3, the priority P2 for the outdoor unit 4, and the priority P3 for the outdoor unit 5. If there is, the operation priority of the outdoor unit 2 having the highest operation priority becomes the lowest priority P3 among the outdoor units that have not stopped due to failure. Further, the outdoor unit 4 changes from the priority P2 to the priority P1, the outdoor unit 5 changes from the priority P3 to the priority P2, and the priority is moved up by one. In this way, except for the priority P4 of the outdoor unit 3, the priority is changed in the outdoor units 2, 4, and 5.
  • control device 21 changes the operation priority of the air conditioner 1 except for the outdoor unit that has stopped failure, or the outdoor unit that has stopped failure, and the outdoor unit that has detected an abnormality. Can be operated normally by other outdoor units, and can perform air conditioning without causing inconvenience to the user.
  • Air conditioner 2-5 ... Outdoor unit, 6-9, A ... Indoor unit, 21-51 ... Control device, 61-91, A1 ... Control device, 100 ... Electrical wiring, 200 ... Refrigerant piping, P1 ⁇ P4 ... Priority

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Signal Processing (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Air Conditioning Control Device (AREA)
  • Compression-Type Refrigeration Machines With Reversible Cycles (AREA)

Abstract

本発明は、複数の室外機のうちに室外機の故障が生じても空調性を維持できる空気調和機を提供することを目的とする。 2台以上の室外機と、1台以上の室内機とが、同一の冷媒配管に並列に接続された空気調和機は、前記2台以上の室外機の運転能力に基づいて、前記2台以上の室外機の運転優先順位を決定する制御部を備える。前記制御部は、前記2台以上の室外機の運転優先順位を、一定時間毎に前記室外機の運転能力が大きい順と、前記室外機の運転能力が小さい順とに変更する。

Description

空気調和機
 実施形態は、空気調和機に関する。
 複数台の室外機を同一の冷媒系統へ並列に接続するタイプの空気調和機において、各室外機の運転積算時間を均一化させるために室外機単位でのローテーション制御を行う技術が知られている。
特開平6-249529号公報 特開2003-166740号公報
 しかしながら、既述の技術では、複数の室外機のうち1台が故障した場合、故障直後は複数台あるうちの正常な室外機が継続運転することで、運転の継続は可能である。ところが、この継続運転では、能力不足となり、空調性を損なう事態が生じていた。さらに、空気調和機の全室外機が停止した後、再度、空気調和機が運転を開始する際に、故障した室外機の運転優先順位が上位にある場合、能力不足となるだけでなく、運転開始ができなくなる場合もあった。また、異常停止や異常を検出した室外機の運転優先順位が上位にあった場合、不調である室外機が運転中に頻繁に停止し、又は、能力不足となり、空調性を損なうことがあり、このような場合には、使用者に不快感を与えていた。
 実施形態は、複数の室外機のうちに室外機の故障が生じても空調性を維持できる空気調和機を提供することにある。
 一実施形態によると、2台以上の室外機と、1台以上の室内機とが、同一の冷媒配管に並列に接続された空気調和機は、前記2台以上の室外機の運転優先順位を決定する制御部を備える。前記制御部は、前記2台以上の室外機の運転能力に基づいて、前記2台以上の室外機の運転優先順位を、一定時間毎に前記室外機の運転能力が大きい順と、前記室外機の運転能力が小さい順とに変更する。
図1は、空気調和機の全体構成の一例を示す模式図である。 図2は、制御の一例を示すフローチャートである。 図3は、制御の一例を示すフローチャートである。
 以下、実施の形態について図面を参照して説明する。なお、開示はあくまで一例にすぎず、以下の実施形態に記載した内容により発明が限定されるものではない。当業者が容易に想到し得る変形は、当然に開示の範囲に含まれる。説明をより明確にするため、図面において、各部分のサイズ、形状等を実際の実施態様に対して変更して模式的に表す場合もある。複数の図面において、対応する要素には同じ参照数字を付して、詳細な説明を省略する場合もある。
(第1実施形態)
 以下、第1の実施形態における空気調和機について図面を参照して説明する。
 図1は、空気調和機1の全体構成の一例を示す模式図である。なお、図1においては、一例として、空気調和機1が4台の室外機、及び5台の室内機を有する場合で説明するが、室外機の台数、及び室内機の台数は、この台数に限定されるものではない。
 図1に示すように、空気調和機1は、並列に配置された室外機4台として、室外機2、室外機3、室外機4、及び室外機5を有している。また、空気調和機1は、並列に配置された室内機5台として、室内機6、室内機7、室内機8、室内機9、及び室内機Aを有している。室外機2、室外機3、室外機4、及び室外機5と、室内機6、室内機7、室内機8、室内機9、及び室内機Aとは、電気配線100、及び冷媒配管200を介して接続されている。
 室外機2、室外機3、室外機4、及び室外機5は、それぞれ、主たる要素として、図示を省略するが、油の量を検出するセンサを備える圧縮機、逆止弁、オイルセパレータ、四方弁、熱交換器、膨張弁、リキッドタンク、室外ユニットファン、アキュムレータ、開閉弁、及び冷媒配管200へ流れる冷媒の流量を検出するセンサを備えている。
 室外機2、室外機3、室外機4、及び室外機5は、それぞれ、制御装置21、制御装置31、制御装置41、及び制御装置51を有している。各制御装置21、制御装置31、制御装置41、及び制御装置51は、それぞれ、CPU、メモリ、記憶装置(不揮発メモリ)、入出力回路、タイマなどを含み、所定の演算処理を実行する。また、電気配線100を介して制御装置21、制御装置31、制御装置41、及び制御装置51が通信可能に構成され、相互に情報を送受信可能になっている。なお、各室外機2~5の圧縮機が備えるセンサ、及び、冷媒の流量を検出するセンサが検出する検出値は、それぞれの制御装置21、制御装置31、制御装置41、及び制御装置51に出力される。
 また、室外機2が有する制御装置21は、他の室外機3、室外機4、及び室外機5の制御装置31、制御装置41、及び制御装置51からそれぞれ受信する通信情報に基づいて、運転積算時間の算出、各室外機2~室外機5の運転能力の算出、及び後述する運転優先順位の変更等の空気調和機1の統括的な制御を実行する。なお、本実施形態では、制御装置21が統括的な役割を果たす制御装置であるが、この統括的な役割は、制御装置31、制御装置41、又は制御装置51であってもよい。また、所定のタイミングで統括的な役割を果たす制御装置が、制御装置21、制御装置31、制御装置41、及び制御装置51の間で入れ代わってもよい。さらに、制御装置21、制御装置31、制御装置41、及び制御装置51のうちの複数の制御装置で既述の統括的な役割を果たすようにしてもよい。
 室内機6、室内機7、室内機8、室内機9、及び室内機Aは、それぞれ、建屋、ビル内に設置され、設置された空間の空気の温度を調整する。
 室内機6、室内機7、室内機8、室内機9、及び室内機Aは、それぞれ、制御装置61、制御装置71、制御装置81、制御装置91、及び制御装置A1を有している。制御装置61、制御装置71、制御装置81、制御装置91、及び制御装置A1は、電気配線100を介して室外機の制御装置、特に統括的な役割を果たす制御装置21と通信を行う。
 上記のように構成される空気調和機1において、制御装置21は、室内機6~9,Aが設置された室内の空気を調和するために室外機2、室外機3、室外機4、及び室外機5のうちから稼働する室外機を運転優先順位に基づいて選択し、動作させる。図2は、空気調和機1の制御装置21が実行する制御の一例を示すフローチャートである。本実施形態では、制御装置21内のメモリに格納されるプログラムをCPUが実行することにより、以下の処理を実現することとするが、制御装置21内に回路を設け、当該回路により以下の処理を実現するようにしてもよい。
 図2に示すように、制御装置21は、所定のタイミングで空気調和機1の運転を開始する(ST101)。例えば、所定の時刻になったタイミングや運転開始の指示に基づいて、空気調和機1の運転が開始される。
 次に、制御装置21は、各室外機(室外機2から室外機5)の運転優先順位を運転能力の大きい順に設定する(ST102)。例えば、室外機2~5の運転能力が、室外機2>室外機3>室外機4>室外機5である場合には、運転優先順位が、室外機2は優先順位P1、室外機3は優先順位P2、室外機4は優先順位P3、室外機5は優先順位P4になる。本実施形態では、優先順位の優先度は、P1>P2>P3>P4であり、優先順位P1が最も優先度が高く、優先順位P4が最も優先度が低い。
 次に、制御装置21は、室外機2から室外機5の中で故障して停止している室外機があるか否かを判定する(ST103)。故障して停止している室外機は、運転動作が不能になり、停止している室外機である。故障して停止している室外機があると判定した場合(ST103:YES)、制御装置21は、全室外機2から室外機5が全て故障停止しているか否かを判定する(ST104)。全室外機2から室外機5が全て故障停止していると判定した場合(ST104:YES)、制御装置21は、運転をストップし(ST117)し、運転を終了する。
 また、全室外機2から室外機5が全て故障停止していないと判定した場合(ST104:NO)、制御装置21は、既に故障して停止している室外機があるか否かを判定する(ST105)。既に故障して停止している室外機があると判定した場合(ST105:YES)、制御装置21は、故障停止した室外機の運転優先順位を最下位に準ずる下位に固定する(ST106)。例えば、今回、室外機3が故障停止したと判定された際に、既に室外機4が故障停止している場合は、室外機4が優先順位P4に固定されているため、室外機3の優先順位は、最下位のP4に準ずる(言い換えれば、最下位より1つ優先度が高い)P3に固定される。
 既に故障停止している室外機がないと判定した場合(ST105:NO)、制御装置21は、故障停止した室外機の運転優先順位を最下位に固定する(ST107)。例えば、今回、室外機3が故障停止したと判定された際に、既に故障停止している室外機が存在しない場合は、室外機3の優先順位は、最下位の優先順位P4に固定される。
 ステップST106の処理、又はステップST107の処理の後、制御装置21は、異常検出した室外機があるか否かを判定する(ST108)。室外機の異常は、例えば、圧縮機の油分が不足、又は冷媒配管200に流れる冷媒の不足を検出した場合であり、運転は可能であるが、要求されるパフォーマンスを発揮できない可能性がある状態である。これらは、電気配線100を介して制御装置21が他の制御装置31~51から受信する情報に基づいて検出することが可能である。異常検出した室外機があると判定した場合(ST108:YES)、制御装置21は、異常検出した室外機の運転優先順位を最下位に準ずる下位に変更する(ST109)。例えば、既に室外機3が故障停止しており、室外機3が優先順位P4に固定されている場合、今回、室外機5に異常が検出された場合、室外機5の運転優先順位が優先順位P3に変更される。
 ステップST109の処理が終了し、又はステップST108において異常検出した室外機がないと判定した場合(ST108:NO)、制御装置21は、運転優先順位が低下した室外機が上位であった場合、下位の室外機の運転優先順位を1つ繰り上げる(ST112)。例えば、運転優先順位の設定が、室外機2は優先順位P1、室外機3は優先順位P2、室外機4は優先順位P3、室外機5は優先順位P4である場合、室外機3が故障停止した場合、室外機3の運転優先順位を優先順位P4に固定し、運転優先順位が室外機3より下位であった室外機4、及び室外機5の運転優先順位をそれぞれ優先順位P2、及びP3に1つずつ繰り上げる。また、運転優先順位が室外機3より上位であった室外機2の運転優先順位は、優先順位P1から変更せずに優先順位P1のままである。
 一方、故障停止した室外機がないと判定した場合(ST103:NO)、制御装置21は、異常検出した室外機があるか否かを判定する(ST110)。異常を検出した室外機は、既述のように、圧縮機の油分が不足、冷媒配管200に流れる冷媒の不足を検出した場合のように、運転停止信号を受信した場合、サーモオフ等の正常停止以外の原因に起因して停止した室外機である。異常検出した室外機があると判定した場合(ST110:YES)、制御装置21は、異常検出した室外機の運転優先順位を最下位に準ずる下位に変更する(ST111)。例えば、今回、室外機3が異常検出したと判定された際に、既に故障停止している室外機が存在しない場合は、室外機3の優先順位は、最下位の優先順位P4に固定され、既に故障停止している室外機が1つ存在する場合は、最下位に準ずる優先順位P3に変更される。
 このようにステップST112の処理が終了し、又は、ステップST110の処理で異常検出した室外機がないと判定した場合(ST110:NO)、制御装置21は、積算運転時間がT時間を経過したか否かを判定する(ST113)。ここで、T時間は、予め規定された規定時間であり、一例をあげれば、T時間は30時間と規定される。積算運転時間がT時間を経過したと判定した場合(ST113:YES)、制御装置21は、故障停止、又は異常を検出している室外機を除き、運転優先順位(運転能力の大きい順と小さい順)を逆転する(ST114)。例えば、故障停止している室外機、及び異常停止した室外機が無い場合において、室外機2は優先順位P1、室外機3は優先順位P2、室外機4は優先順位P3、室外機5は優先順位P4である場合、室外機2は優先順位P4、室外機3は優先順位P3、室外機4は優先順位P2、室外機5は優先順位P1に運転優先順位が変更される。また、室外機5が故障停止している場合においては、室外機5が優先順位P4に固定されているため運転優先順位の変更から除外され、室外機2は優先順位P1、室外機3は優先順位P2、室外機4は優先順位P3である場合、室外機2は優先順位P3、室外機3は優先順位P2、室外機4は優先順位P1に変更される。なお、制御装置21により積算運転時間がT時間を経過していないと判定された場合(ST113:NO)、処理は、ステップST103の処理へ戻る。
 ステップST114の処理を終了した後、制御装置21は、積算運転時間をリセットする(ST115)。そして、制御装置21は、運転停止信号を受信したか否かを判定する(ST116)。運転停止信号は、所定の時刻になったタイミングや運転停止の指示に基づいて、制御装置21に送信される。運転停止信号を受信したと判定した場合(ST116:YES)、制御装置21は、空気調和機1の運転をストップし(ST117)、運転を終了する。一方、制御装置21により運転停止信号を受信していないと判定された場合(ST116:NO)、処理は、ステップST103の処理へ戻る。
 以上のように、制御装置21が、故障停止した室外機を除いて、又は故障停止した室外機、及び異常を検出した室外機を除いて、積算運転時間がT時間(つまり、一定期間)を経過する毎に、室外機の能力に応じた運転優先順位を逆転することにより、室外機2~5の運転時間を均一化することができる。また、制御装置21が故障停止した室外機の運転優先順位を最下位に固定することにより、空気調和機1は、その他の室外機により使用者の要求に応じた通常運転を行うことができるため、使用者に不便を与えることなく空調を行うことができる。さらに、制御装置21は、異常検出した室外機を最下位、又は、最下位より1つ高い順位にすることにより、異常検出した室外機の運転頻度を低下させる。これにより、空気調和機1は、異常検出した室外機が停止する事態の発生を抑止し、使用者に不便を与えることがなく、空調を行うことができる。
 (第2実施形態)
 本実施形態は、空気調和機1に含まれる室外機の運転優先順位の設定を変更するように構成された点が上記第1実施形態と異なっている。したがって、運転優先順位の設定を変更する処理について詳細に説明する。なお、上記第1実施形態と同一の構成には同一の符号を付し、これらについては詳細な説明は省略する。
 図3は、空気調和機1の制御装置21が実行する制御の一例を示すフローチャートである。
 図3に示すように、制御装置21は、所定のタイミングで空気調和機1の運転を開始する(ST201)。例えば、所定の時刻になったタイミングや運転開始の指示に基づいて、空気調和機1の運転が開始されるのは、上記ステップST101の処理と同様である。
 次に、制御装置21は、各室外機(室外機2から室外機5)の運転優先順位を設定する(ST202)。例えば、制御装置21は、室外機2の優先順位をP1、室外機3の優先順位をP2、室外機4の優先順位をP3、室外機5の優先順位をP4と設定する。
 次に、制御装置21は、ステップST203からステップST213の処理を実行する。このステップST203からステップST213の処理は、既述のステップST103からステップST113の処理とそれぞれ同様の処理である(参照:図2)。このため、ステップST203かステップST213の処理の説明は省略する。
 ステップST213において、積算運転時間がT時間を経過したと判定した場合(ST213:YES)、制御装置21は、運転優先順位が最上位の室外機の運転優先順位を故障又は異常検出していない室外機の中で最下位に変更する(ST214)。ステップST214の処理を終えると、制御装置21は、故障又は異常検出していない室外機の中で運転優先順位が最上位以外だった室外機の運転優先順位を1つ繰り上げる(ST115)。
 例えば、室外機3が故障停止しており、運転優先順位の設定が室外機2は優先順位P1、室外機3は優先順位P4、室外機4は優先順位P2、室外機5は優先順位P3である場合、運転優先順位が最上位である室外機2の運転優先順位が故障停止していない室外機の中で最下位の優先順位P3になる。また、室外機4は優先順位P2から優先順位P1になり、室外機5は優先順位P3から優先順位P2になり、優先順位がそれぞれ1つ繰り上がる。このように室外機3の優先順位P4を除いて、室外機2,4,5で優先順位が変更される。
 次に、制御装置21が、積算運転時間をリセットし(ST216)、運転停止信号受信したか否かを判定し(ST217)、運転停止信号を受信した場合(ST217:YES)、空気調和機1の運転をストップして(ST218)、処理を終了し、運転低信号を受信していないと判定した場合、ステップST203の処理へ戻るのは、上記第1実施形態と同様である。
 以上のように、制御装置21が、故障停止した室外機を除いて、又は故障停止した室外機、及び異常を検出した室外機を除いて、運転優先順位を変更することにより、空気調和機1は、他の室外機が通常通りの運転を行うことができ、使用者に不便を与えることなく、空調を行うことができる。
 なお、本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。
1…空気調和機、2~5…室外機、6~9,A…室内機、21~51…制御装置、61~91,A1…制御装置、100…電気配線、200…冷媒配管、P1~P4…優先順位

Claims (10)

  1.  2台以上の室外機と、1台以上の室内機とが、同一の冷媒配管に並列に接続された空気調和機であって、
     前記2台以上の室外機の運転能力に基づいて、前記2台以上の室外機の運転優先順位を決定する制御部を備え、
     前記制御部は、前記2台以上の室外機の運転優先順位を、一定時間毎に前記室外機の運転能力が大きい順と、前記室外機の運転能力が小さい順とに変更する、
    空気調和機。
  2.  前記制御部は、前記2台以上の室外機のうち故障により停止した室外機が存在する場合、当該室外機の前記運転優先順位を最下位に固定する、
    請求項1に記載の空気調和機。
  3.  前記制御部は、前記運転優先順位を最下位に固定した室外機以外の室外機に異常を検出した場合、当該異常を検出した室外機の運転優先順位を前記最下位の1つ優先度が高い順位にする、
    請求項2に記載の空気調和機。
  4.  前記制御部は、前記室外機から異常を検出して停止した室外機の運転優先順位を最下位とする、
    請求項1に記載の空気調和機。
  5.  前記制御部は、前記異常を検出して停止した前記室外機以外の室外機が故障により停止した場合、前記故障により停止した室外機の前記運転優先順位を最下位に固定すると共に、前記異常を検出して停止した室外機の運転優先順位を最下位から1つ繰り上げる、
    請求項4に記載の空気調和機。
  6.  前記室外機は、圧縮機を含み、
     前記制御部は、前記圧縮機の油不足を検出した場合、当該圧縮機を含む室外機の異常を検出する、
    請求項3に記載の空気調和機。
  7.  前記制御部は、前記冷媒配管を介して流れる冷媒の冷媒不足を検出した場合、前圧縮機の冷媒が所定値以下である前記室外機を検出した場合、当該検出した室外機の異常を検出する、
    請求項3に記載の空気調和機。
  8.  前記制御部は、前記故障して停止した前記運転優先順位が最下位の前記室外機を除いて前記運転優先順位を決定する、
    請求項2に記載の空気調和機。
  9.  前記制御部は、前記故障して停止した前記運転優先順位が最下位の前記室外機、及び前記異常を検出して停止した前記最下位より1つ優先度が高い前記室外機を除いて前記運転優先順位を決定する、
    請求項3に記載の空気調和機。
  10.  前記制御部は、前記空気調和機の運転開始後、所定の累積運転時間を経過したときに前記運転優先順位の変更を行う、
    請求項1に記載の空気調和機。
PCT/JP2020/035356 2020-09-17 2020-09-17 空気調和機 WO2022059154A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2022550280A JP7476328B2 (ja) 2020-09-17 2020-09-17 空気調和機
CN202080105249.2A CN116113796A (zh) 2020-09-17 2020-09-17 空调机
PCT/JP2020/035356 WO2022059154A1 (ja) 2020-09-17 2020-09-17 空気調和機
US18/185,637 US20230221023A1 (en) 2020-09-17 2023-03-17 Air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2020/035356 WO2022059154A1 (ja) 2020-09-17 2020-09-17 空気調和機

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US18/185,637 Continuation US20230221023A1 (en) 2020-09-17 2023-03-17 Air conditioner

Publications (1)

Publication Number Publication Date
WO2022059154A1 true WO2022059154A1 (ja) 2022-03-24

Family

ID=80775996

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/035356 WO2022059154A1 (ja) 2020-09-17 2020-09-17 空気調和機

Country Status (4)

Country Link
US (1) US20230221023A1 (ja)
JP (1) JP7476328B2 (ja)
CN (1) CN116113796A (ja)
WO (1) WO2022059154A1 (ja)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS511943U (ja) * 1974-06-20 1976-01-08
JPH0510607A (ja) * 1991-06-28 1993-01-19 Toshiba Corp 空気調和機
JPH07293977A (ja) * 1994-04-28 1995-11-10 Matsushita Refrig Co Ltd 空気調和機の制御装置
JP2003166740A (ja) * 2001-11-30 2003-06-13 Sanyo Electric Co Ltd 空気調和装置
JP2006275458A (ja) * 2005-03-30 2006-10-12 Mitsubishi Electric Corp 空気調和装置
JP2011252617A (ja) * 2010-05-31 2011-12-15 Sanyo Electric Co Ltd 空気調和装置
JP2013221623A (ja) * 2012-04-12 2013-10-28 Mitsubishi Electric Corp 空気調和装置
JP2015141014A (ja) * 2014-01-30 2015-08-03 三菱重工業株式会社 空調システム及びその制御方法
WO2020065731A1 (ja) * 2018-09-25 2020-04-02 東芝キヤリア株式会社 空気調和装置

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101253231B1 (ko) * 2005-10-21 2013-04-16 삼성전자주식회사 멀티형 공기조화기의 제어방법
CN103307698B (zh) * 2012-03-16 2016-12-14 珠海格力电器股份有限公司 空调***及其控制方法和装置
JP5518130B2 (ja) * 2012-05-21 2014-06-11 三菱電機株式会社 冷凍空調装置
CN104833047B (zh) * 2015-04-22 2017-11-24 四川长虹电器股份有限公司 一种控制方法及温度调节***
CN207422557U (zh) * 2015-08-11 2018-05-29 三菱电机株式会社 空调***

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS511943U (ja) * 1974-06-20 1976-01-08
JPH0510607A (ja) * 1991-06-28 1993-01-19 Toshiba Corp 空気調和機
JPH07293977A (ja) * 1994-04-28 1995-11-10 Matsushita Refrig Co Ltd 空気調和機の制御装置
JP2003166740A (ja) * 2001-11-30 2003-06-13 Sanyo Electric Co Ltd 空気調和装置
JP2006275458A (ja) * 2005-03-30 2006-10-12 Mitsubishi Electric Corp 空気調和装置
JP2011252617A (ja) * 2010-05-31 2011-12-15 Sanyo Electric Co Ltd 空気調和装置
JP2013221623A (ja) * 2012-04-12 2013-10-28 Mitsubishi Electric Corp 空気調和装置
JP2015141014A (ja) * 2014-01-30 2015-08-03 三菱重工業株式会社 空調システム及びその制御方法
WO2020065731A1 (ja) * 2018-09-25 2020-04-02 東芝キヤリア株式会社 空気調和装置

Also Published As

Publication number Publication date
US20230221023A1 (en) 2023-07-13
CN116113796A (zh) 2023-05-12
JPWO2022059154A1 (ja) 2022-03-24
JP7476328B2 (ja) 2024-04-30

Similar Documents

Publication Publication Date Title
US20060080980A1 (en) Apparatus and method for controlling compressors of multi-chamber type air conditioner
US5276630A (en) Self configuring controller
US5050397A (en) Air conditioner apparatus with starting control for parallel operated compressors based on high pressure detection
KR100805471B1 (ko) Hvac 시스템을 위한 고장 형태
US6722143B2 (en) Air conditioning apparatus and control method thereof
KR100715999B1 (ko) 멀티형 공기조화기 및 그 운전방법
AU2006309913B8 (en) Compressor operating method of refrigeration device, and refrigeration device
EP1666818A2 (en) Method for controlling multi-unit air conditioning system
JP6433598B2 (ja) 空調システム
KR100471442B1 (ko) 공기조화기의 압축기 제어방법
JP3221232B2 (ja) ヒートポンプ式冷凍装置
JP4663483B2 (ja) 空気調和装置
JP2007255759A (ja) 空気調和装置
WO2022059154A1 (ja) 空気調和機
JP5516295B2 (ja) 空気調和機
JP2012127625A (ja) 空気調和装置に用いられる故障診断装置
JP6598986B2 (ja) 空調システム、空調制御方法およびプログラム
WO2019187760A1 (ja) 空気調和装置
JPH09287856A (ja) 空気調和機の除霜方法
JP6719651B2 (ja) 冷凍サイクルシステムおよび通信トラフィック調整方法
KR100597674B1 (ko) 멀티 에어컨 시스템의 압축기 제어방법
JP3754250B2 (ja) 空気調和機
JPH0493558A (ja) 冷凍装置の運転制御装置
WO2016002008A1 (ja) 空気調和システム
JPH034817B2 (ja)

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20954139

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2022550280

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20954139

Country of ref document: EP

Kind code of ref document: A1