WO2020195579A1 - 成形装置及び成形方法 - Google Patents

成形装置及び成形方法 Download PDF

Info

Publication number
WO2020195579A1
WO2020195579A1 PCT/JP2020/008691 JP2020008691W WO2020195579A1 WO 2020195579 A1 WO2020195579 A1 WO 2020195579A1 JP 2020008691 W JP2020008691 W JP 2020008691W WO 2020195579 A1 WO2020195579 A1 WO 2020195579A1
Authority
WO
WIPO (PCT)
Prior art keywords
metal pipe
molding
pipe material
electrode
sliding
Prior art date
Application number
PCT/JP2020/008691
Other languages
English (en)
French (fr)
Inventor
正之 石塚
公宏 野際
章博 井手
紀条 上野
Original Assignee
住友重機械工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 住友重機械工業株式会社 filed Critical 住友重機械工業株式会社
Priority to JP2021508882A priority Critical patent/JPWO2020195579A1/ja
Priority to CA3129578A priority patent/CA3129578A1/en
Priority to EP20778654.2A priority patent/EP3950163A4/en
Priority to KR1020217021404A priority patent/KR20210142089A/ko
Priority to CN202080009310.3A priority patent/CN113573824A/zh
Publication of WO2020195579A1 publication Critical patent/WO2020195579A1/ja
Priority to US17/398,689 priority patent/US20210362208A1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D9/00Bending tubes using mandrels or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies
    • B21D26/041Means for controlling fluid parameters, e.g. pressure or temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D37/00Tools as parts of machines covered by this subclass
    • B21D37/16Heating or cooling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D39/00Application of procedures in order to connect objects or parts, e.g. coating with sheet metal otherwise than by plating; Tube expanders
    • B21D39/08Tube expanders
    • B21D39/20Tube expanders with mandrels, e.g. expandable
    • B21D39/203Tube expanders with mandrels, e.g. expandable expandable by fluid or elastic material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D51/00Making hollow objects
    • B21D51/02Making hollow objects characterised by the structure of the objects
    • B21D51/10Making hollow objects characterised by the structure of the objects conically or cylindrically shaped objects
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/18Hardening; Quenching with or without subsequent tempering
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/56General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering characterised by the quenching agents
    • C21D1/60Aqueous agents
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/62Quenching devices
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/62Quenching devices
    • C21D1/673Quenching devices for die quenching
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/08Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for tubular bodies or pipes
    • C21D9/085Cooling or quenching

Definitions

  • the present disclosure relates to a molding apparatus and a molding method.
  • the molding apparatus disclosed in Patent Document 1 includes an electrode, an insulating material, a sliding material, and a molding mold.
  • the metal pipe material held by the electrodes, the insulating material and the sliding material is energized and heated by the electric power supplied from the electrodes, and the molding dies are placed in the molding dies in a closed state.
  • the metal pipe is formed by expanding the metal pipe material.
  • the metal pipe molded by the molding device as described above may be joined to other members.
  • the metal pipe is connected to the other member by forming a bolt hole at the end of the metal pipe or welding the end of the metal pipe to another member.
  • the hardness of the end portion of the metal pipe is too high, it becomes difficult to drill or weld the end portion.
  • sufficient hardness is required in some places such as the central part of the metal pipe.
  • an object of the present disclosure is to provide a molding apparatus and a molding method capable of molding a metal pipe capable of adjusting a place having a low hardness and a place having a high hardness.
  • the molding apparatus is a molding apparatus that expands a metal pipe material to form a metal pipe, holds the metal pipe material, and supplies power to the metal pipe material to heat the metal pipe material.
  • a metal pipe is provided with an electrode, a molding die for quenching and molding an expanded metal pipe, and a member arranged between the electrode and the molding die, and the length of the member is adjusted. The area where quenching does not occur is adjusted.
  • the member is placed between the electrode and the molding die.
  • the place corresponding to the molding die in the metal pipe material is hardened by the molding die after being heated to a high temperature, so that the hardness is increased.
  • the place corresponding to the member in the metal pipe material is a place where quenching is not performed.
  • the region of the metal pipe where quenching is not performed is adjusted. Therefore, the place where the hardness is low and the place where the hardness is high can be adjusted.
  • the members are an insulating material and a sliding material arranged in order from the electrode side, and the sum of the thickness of the insulating material and the thickness of the sliding material in the arrangement direction of the insulating material and the sliding material is the longitudinal direction of the metal pipe material. It may be larger than the contact length between the electrode and the metal pipe material in.
  • the part held by the insulating material and the sliding material has a slow cooling rate and is hard to be hardened. Therefore, by providing a relatively thick insulating material and the sliding material, the end portion of the metal pipe is provided. It is possible to increase the region of low hardness formed in.
  • the molding method according to one aspect is a molding method for molding a metal pipe by expanding the metal pipe material, and is a step of heating the metal pipe material and a step of molding the expanded metal pipe material using a molding die.
  • the length-adjusted member is placed between the electrode and the molding die to adjust the region of the metal pipe that is not hardened.
  • the place where the hardness is low and the place where the hardness is high can be adjusted.
  • FIG. 1 It is a schematic block diagram which shows the molding apparatus which concerns on one Embodiment. It is a perspective view which shows the periphery of an electrode enlarged. It is sectional drawing along the line III-III shown in FIG. It is a front view of an electrode. It is an enlarged view of the periphery of an electrode, (a) is a cross-sectional view showing a state in which an electrode holds a metal pipe material, and (b) is a sectional view showing a state in which gas is supplied to the metal pipe material. It is a figure which shows the manufacturing process of a metal pipe, (a) is a figure which shows the state which the metal pipe material is arranged in the mold, (b) is the state which the end part of the metal pipe material is heated.
  • FIG. 1 is a schematic configuration diagram of a molding apparatus according to an embodiment.
  • the molding apparatus 10 for molding a metal pipe includes a molding mold 13 composed of an upper mold 12 and a lower mold 11 and a drive mechanism 80 for moving at least one of the upper mold 12 and the lower mold 11.
  • high-pressure gas gas
  • the metal pipe material 14 is a long steel material having a hollow tubular shape, and has a pair of end portions 14a and 14b located on both end sides thereof and a central portion 14c located between the pair of end portions 14a and 14b. (See FIG. 6 (a)). As will be described later, by forming the metal pipe material 14, the pair of ends 14a and 14b of the metal pipe material 14 become the pair of ends 100a and 100b of the metal pipe 100, and the center of the metal pipe material 14 becomes. The portion 14c becomes the central portion 100c of the metal pipe 100.
  • the lower mold 11 which is one of the molding dies 13 is fixed to the base 15.
  • the lower mold 11 is composed of a large steel block, and has, for example, a rectangular cavity (recess) 16 on the upper surface thereof.
  • a cooling water passage 19 is formed in the lower mold 11, and a thermocouple 21 inserted from below is provided substantially in the center.
  • the thermocouple 21 is supported by a spring 22 so as to be vertically movable.
  • a space 11a is formed in the vicinity of the left and right ends (left and right ends in FIG. 1) of the lower mold 11, and the lower electrodes 17a and 18a, which will be described later, are movable parts of the pipe holding mechanism 30 in the space 11a. Etc. are arranged so that they can move up and down. Then, by placing the metal pipe material 14 on the lower electrodes 17a and 18a, the lower electrodes 17a and 18a come into contact with the metal pipe material 14 arranged between the upper mold 12 and the lower mold 11. To do. As a result, the lower electrodes 17a and 18a are electrically connected to the metal pipe material 14.
  • the upper mold 12 which is the other side of the molding mold 13, is fixed to a slide 81, which will be described later, which constitutes the drive mechanism 80.
  • the upper mold 12 is composed of a large steel block, has a cooling water passage 25 formed therein, and has, for example, a rectangular cavity (recess) 24 on the lower surface thereof.
  • the cavity 24 is provided at a position facing the cavity 16 of the lower mold 11.
  • a space 12a is formed in the vicinity of the left and right ends (left and right ends in FIG. 1) of the upper mold 12, and a movable portion of the pipe holding mechanism 30 is described later in the space 12a.
  • the upper electrodes 17b, 18b, etc. are arranged so as to be able to move up and down. Then, in a state where the metal pipe material 14 is placed on the lower electrodes 17a and 18a, the upper electrodes 17b and 18b are arranged between the upper mold 12 and the lower mold 11 by moving downward. Contact the metal pipe material 14. As a result, the upper electrodes 17b and 18b are electrically connected to the metal pipe material 14. In the following, when it is not necessary to distinguish between the lower electrodes 17a and 18a and the upper electrodes 17b and 18b, these are collectively referred to as electrodes 17 and 18.
  • FIG. 2 is an enlarged perspective view of the vicinity of the electrode 18, and FIG. 3 is a cross-sectional view taken along the line III-III shown in FIG.
  • the first insulating material 91a and the sliding material 92 are arranged in order from the lower electrode 18a side. That is, the first insulating material 91a is provided between the lower electrode 18a and the lower mold 11, and the sliding material 92 is provided between the first insulating material 91a and the lower mold 11. Further, between the upper electrode 18b and the upper mold 12, the first insulating material 101a and the sliding material 102 are arranged in order from the upper electrode 18b side. That is, the first insulating material 101a is provided between the upper electrode 18b and the upper mold 12, and the sliding material 102 is provided between the first insulating material 101a and the upper mold 12.
  • the first insulating materials 91a and 101a are plate materials made of a material having heat resistance and insulating properties, and have a function of preventing energization between the electrode 18 and the molding die 13.
  • As the first insulating materials 91a and 101a for example, a ceramic plate made of alumina is used.
  • the first insulating material 91a has a thickness d1 in the arrangement direction of the first insulating material 91a and the sliding material 92, and the first insulating material 101a is the first insulating material 101a and the sliding material. It has a thickness d1 in the arrangement direction of 102.
  • the sliding materials 92 and 102 are plate materials made of a heat-resistant material.
  • As the sliding materials 92 and 102 for example, an alloy plate made of lead bronze, gunmetal, brass, phosphor bronze or white metal is used.
  • the sliding material 92 has a thickness d2 in the arrangement direction of the first insulating material 91a and the sliding material 92, and the sliding material 102 has the thickness d2 in the arrangement direction of the first insulating material 101a and the sliding material 102.
  • a second insulating material 91b is fixed to the lower surface of the lower electrode 18a.
  • An advancing / retreating rod 95 is connected to the second insulating material 91b, and the advancing / retreating rod 95 is connected to an actuator (see FIG. 1).
  • This actuator is for moving the lower electrodes 17a, 18a and the like up and down, and the fixed portion of the actuator is held on the base 15 side together with the lower mold 11.
  • the first insulating material 91a and the sliding material 92 are fixed to each other by a fixing means 93 having a bolt 93a and a female screw member 93b.
  • the bolt 93a that penetrates the sliding member 92 and enters the opening of the first insulating material 91a is screwed into the female screw member 93b embedded in the opening of the first insulating material 91a.
  • the first insulating material 91a and the sliding material 92 are fastened to each other and fixed to each other.
  • the lower electrode 18a and the first insulating material 91a are fixed to each other by the fixing means 94.
  • the second insulating material 91b is fixed to the lower surfaces of the lower electrode 18a and the first insulating material 91a.
  • a second insulating material 101b is attached to the upper surface of the upper electrode 18b.
  • An advancing / retreating rod 96 is connected to the second insulating material 101b, and the advancing / retreating rod 96 is connected to an actuator.
  • This actuator is for moving the upper electrodes 17b, 18b and the like up and down, and the fixed portion of the actuator is held on the slide 81 side of the drive mechanism 80 together with the upper mold 12.
  • the first insulating material 101a and the sliding material 102 are fixed to each other by a fixing means 93 having a bolt 93a and a female screw member 93b.
  • the bolt 93a that penetrates the sliding member 102 and enters the opening of the first insulating material 101a is screwed into the female screw member 93b embedded in the opening of the first insulating material 101a.
  • the first insulating material 101a and the sliding material 102 are fastened to each other and fixed to each other.
  • the upper electrode 18b and the first insulating material 101a are fixed to each other by the fixing means 94.
  • the second insulating material 101b is fixed to the upper surfaces of the upper electrode 18b and the first insulating material 101a.
  • FIG. 4 is a front view of the electrodes 17 and 18.
  • a semicircular groove 20a corresponding to the shape of the outer peripheral surface of the metal pipe material 14 is formed on each of the surfaces of the lower electrode 18a and the upper electrode 18b facing each other.
  • the metal pipe material 14 can be placed so as to fit into the recessed groove 20a.
  • semicircular concave grooves are formed on the surfaces of the first insulating material 91a and the first insulating material 101a facing each other and the surfaces of the sliding material 92 and the sliding material 102 facing each other. It is formed. These concave grooves have a diameter larger than the diameter of the concave groove 20a.
  • the metal pipe material 14 when the metal pipe material 14 is sandwiched from the vertical direction by the right side portion of the pipe holding mechanism 30, it is configured so that the outer periphery of the end portion 14a of the metal pipe material 14 can be surrounded and held so as to be in close contact with the entire circumference. ing.
  • a refrigerant flow path 26 for circulating the cooling medium R is formed inside the lower electrode 18a.
  • a pipe 28 is connected to the refrigerant flow path 26, and a refrigerant supply device 32 is connected to the pipe 28.
  • the refrigerant supply device 32 supplies the cooling medium R to the refrigerant flow path 26 via the pipe 28, and recovers the cooling medium R that has exchanged heat with the lower electrode 18a from the refrigerant flow path 26.
  • a refrigerant flow path 27 for circulating the cooling medium R is formed inside the upper electrode 18b.
  • a pipe 29 is connected to the refrigerant flow path 27, and a refrigerant supply device 31 is connected to the pipe 29.
  • the refrigerant supply device 31 supplies the cooling medium R to the refrigerant flow path 27 via the pipe 29, and recovers the cooling medium R that has exchanged heat with the upper electrode 18b from the refrigerant flow path 27.
  • control unit 70 is connected to the refrigerant supply devices 31 and 32, and is supplied from the refrigerant supply devices 31 and 32 to the refrigerant flow paths 26 and 27 in response to a control signal from the control unit 70.
  • the flow rate of the cooling medium R may be controlled.
  • cooling medium R circulates in the refrigerant channels 26 and 27 in this way, the heat of the electrode 18 is taken away by the cooling medium R, and the electrode 18 is cooled.
  • cooling medium R for example, cooling water is used.
  • the cooling medium R is not limited to a liquid, and the electrode 18 may be cooled by using phase change cooling using heat of vaporization or gas cooling using gas.
  • the left side portion of the pipe holding mechanism 30 has the same configuration as the right side portion of the pipe holding mechanism 30 described above. That is, the left side portion of the pipe holding mechanism 30 is a slide that faces the lower electrodes 17a and 17b that face each other in the vertical direction and the first insulating materials 91a and 101a that face each other in the vertical direction. It has moving materials 92 and 102. More specifically, the first insulating material 91a is provided between the lower electrode 17a and the lower mold 11, and the sliding material 92 is provided between the first insulating material 91a and the lower mold 11. ing.
  • An advancing / retreating rod 95 is connected to the second insulating material 91b, and the advancing / retreating rod 95 is connected to an actuator for moving the lower electrode 17a or the like up and down. Further, the first insulating material 101a is provided between the upper electrode 17b and the upper mold 12, and the sliding material 102 is provided between the first insulating material 101a and the upper mold 12. An advancing / retreating rod 96 is connected to the second insulating material 101b, and the advancing / retreating rod 96 is connected to an actuator for moving the upper electrode 17b or the like up and down.
  • each of the surfaces of the lower electrode 17a and the upper electrode 17b facing each other has a semicircular arc shape corresponding to the shape of the outer peripheral surface of the metal pipe material 14.
  • the concave groove 20b is formed, and the metal pipe material 14 can be placed so as to fit into the concave groove 20b.
  • a semicircular concave groove is also formed on the surface where the first insulating material 91a and the first insulating material 101a face each other and the surface where the sliding material 92 and the sliding material 102 face each other. ing.
  • These concave grooves have a diameter larger than the diameter of the concave groove 20b.
  • the lower electrode 17a and the upper electrode 18b are formed with refrigerant flow paths 26 and 27, respectively.
  • Refrigerant supply devices 31 and 32 are connected to the refrigerant flow paths 26 and 27 via pipes 28 and 29, respectively.
  • the refrigerant supply devices 31 and 32 circulate and supply the cooling medium R to the refrigerant flow paths 26 and 27. As the cooling medium R circulates in the refrigerant flow paths 26 and 27, the heat of the lower electrode 17a and the upper electrode 17b is taken away by the cooling medium R, and the electrode 17 is cooled.
  • FIG. 5A is a diagram showing a state in which the electrode 18 holds the metal pipe material 14.
  • the first The sum D of the thickness d1 of the insulating material 91a and the thickness d2 of the sliding material 92 is set to be larger than the contact length L.
  • the contact length between the electrode 17 and the metal pipe material 14 held on the electrode 17 in the longitudinal direction of the metal pipe material 14 is L, it slides with the thickness d1 of the first insulating material 91a.
  • the sum D of the material 92 with the thickness d2 is set to be larger than the contact length L.
  • the sum D of the thickness d1 of the first insulating materials 91a and 101a and the thickness d2 of the sliding materials 92 and 102 is the contact length L between the electrodes 17 and 18 and the metal pipe material 14.
  • the sum D of the thicknesses may be the contact length L or less.
  • the drive mechanism 80 includes a slide 81 for moving the upper die 12 so that the upper die 12 and the lower die 11 are aligned with each other, and a shaft 82 for generating a driving force for moving the slide 81. And a connecting rod 83 for transmitting the driving force generated by the shaft 82 to the slide 81.
  • the shaft 82 extends in the left-right direction above the slide 81 and is rotatably supported, and an eccentric crank 82a protruding from the left-right end and extending in the left-right direction at a position separated from the axis thereof. Have.
  • the eccentric crank 82a and the rotating shaft 81a provided on the upper part of the slide 81 and extending in the left-right direction are connected by a connecting rod 83.
  • the rotation of the shaft 82 is controlled by the control unit 70 to change the height of the eccentric crank 82a in the vertical direction, and the position change of the eccentric crank 82a is transmitted to the slide 81 via the connecting rod 83.
  • the vertical movement of the slide 81 can be controlled.
  • the swing (rotational motion) of the connecting rod 83 that occurs when the position change of the eccentric crank 82a is transmitted to the slide 81 is absorbed by the rotating shaft 81a.
  • the shaft 82 rotates or stops according to the drive of a motor or the like controlled by, for example, the control unit 70.
  • the power supply unit 50 has a power supply 51, a bus bar 52 connected to the electrodes 17 and 18 below the power supply 51, and a switch 53 provided on the bus bar 52.
  • the electric power supply unit 50 supplies electric power to the electrodes 17 and 18 for energizing and heating the metal pipe material 14.
  • the power supply unit 50 is controlled by a control signal from the control unit 70 so that the metal pipe material 14 is heated to the quenching temperature (AC3 transformation point temperature or higher).
  • the power supply unit 50 constitutes a heating unit that heats the metal pipe material 14 together with the electrodes 17 and 18.
  • Each of the pair of gas supply mechanisms 40 includes a cylinder unit 42, a cylinder rod 43 that moves forward and backward in accordance with the operation of the cylinder unit 42, and a seal member 44 connected to the tip of the cylinder rod 43 on the pipe holding mechanism 30 side.
  • the cylinder unit 42 is supported on the block 41.
  • the tip of the seal member 44 is formed with a tapered surface 45 so as to be tapered, and is configured so that it can be fitted and contacted with the tapered concave surfaces 17t and 18t of the electrodes 17 and 18 (FIG. 5). See (b)).
  • the seal member 44 is connected to the cylinder unit 42 via the cylinder rod 43, and can move forward and backward in accordance with the operation of the cylinder unit 42.
  • the cylinder unit 42 is placed and fixed on the base 15 via the block 41.
  • the seal member 44 is formed with a gas passage 46 through which the high-pressure gas supplied from the gas supply unit 60 flows.
  • the gas passage 46 opens at the tip of the seal member 44, and the gas flowing through the gas passage 46 is injected from the opening.
  • the gas supply unit 60 includes a gas source 61, an accumulator 62 for storing the gas supplied by the gas source 61, a first tube 63 extending from the accumulator 62 to the cylinder unit 42 of the gas supply mechanism 40, and a first tube 63 thereof.
  • a pressure control valve 64 and a switching valve 65 interposed in a tube 63, a second tube 67 connecting the accumulator 62 and a gas passage 46, and a pressure control valve 68 interposed in the second tube 67.
  • a check valve 69 The pressure control valve 64 supplies the cylinder unit 42 with a high-pressure gas for pressing the metal pipe material 14 of the seal member 44.
  • the check valve 69 prevents the high pressure gas from flowing back in the second tube 67.
  • the pressure control valve 68 supplies the gas passage 46 with a gas having an operating pressure for expanding the metal pipe material 14.
  • a control unit 70 is connected to the pressure control valve 68, and the control unit 70 controls the opening degree of the pressure control valve 68 of the gas supply unit 60 to obtain a desired operating pressure in the metal pipe material 14. Gas can be supplied.
  • the control unit 70 acquires temperature information from the thermocouple 21 by transmitting information from (A) shown in FIG. 1, and controls the drive mechanism 80, the power supply unit 55, and the like.
  • the water circulation mechanism 72 includes a water tank 73 for storing water, a water pump 74 that pumps up the water stored in the water tank 73, pressurizes it, and sends it to the cooling water passage 19 of the lower mold 11 and the cooling water passage 25 of the upper mold 12. It consists of a pipe 75. Although omitted, it is permissible to interpose a cooling tower for lowering the water temperature or a filter for purifying water in the pipe 75.
  • FIG. 6 shows from a pipe charging step of charging the metal pipe material 14 as a material to an energizing heating step of energizing and heating the metal pipe material 14.
  • a hardenable steel grade cylindrical metal pipe material 14 is prepared.
  • the metal pipe material 14 is placed (loaded) on the electrodes 17 and 18 provided on the lower mold 11 side by using, for example, a robot arm or the like. Since the concave grooves 20a and 20b are formed in the electrodes 17 and 18, the metal pipe material 14 is positioned by the concave grooves 20a and 20b.
  • the control unit 70 controls the drive mechanism 80 and the pipe holding mechanism 30 so that the pipe holding mechanism 30 holds the ends 14a and 14b of the metal pipe material 14.
  • an actuator (not shown) that allows the pipe holding mechanism 30 to move forward and backward is operated to move the forward and backward rods 95 and 96 up and down, respectively.
  • the sliding member 92 and the sliding member 102 slide with respect to the lower die 11 and the upper die 12, respectively.
  • the end portions 14a and 14b of the metal pipe material 14 are sandwiched from the vertical direction by the pipe holding mechanism 30.
  • This pinching is performed at both ends of the metal pipe material 14 due to the presence of the concave grooves 20a and 20b formed in the electrodes 17 and 18 and the concave grooves formed in the first insulating materials 91a and 101a and the sliding materials 92 and 102. It will be sandwiched in such a way that it adheres to the entire circumference near the portion.
  • the structure is not limited to the structure in which the metal pipe material 14 is in close contact with the entire circumference, and the electrodes 17 and 18 may be in contact with a part of the metal pipe material 14 in the circumferential direction.
  • control unit 70 heats the metal pipe material 14 by controlling the power supply unit 50. Specifically, when the switch 53 is turned on by the control signal from the control unit 70, the electric power from the power supply 51 is supplied to the electrodes 17 and 18 via the bus bar 52. The electric power supplied to the electrodes 17 and 18 is transmitted to the metal pipe material 14, and the metal pipe material 14 itself generates heat due to the resistance existing in the metal pipe material 14 (Joule heat).
  • the current since the current has the property of selectively flowing through a portion having a low resistance, as shown in FIG. 5A, the current C supplied from the electrode 18 is evenly distributed over the entire length of the metal pipe material 14. Instead of flowing, it mainly flows into the metal pipe material 14 from the vicinity of the boundary between the electrode 18 and the first insulating materials 91a and 101a. That is, at the interface between the electrodes 18a and 18b and the metal pipe material 14, the region on the first insulating material 91a and 101a side is a region in which a larger current flows than the region on the end portion 14a side.
  • the metal pipe material 14 when the metal pipe material 14 is energized and heated, a current smaller than that of the central portion 14c of the metal pipe material 14 flows through the end portions 14a and 14b of the metal pipe material 14.
  • FIG. 5A only the main flow of the current C is indicated by an arrow, but the current also flows in the vicinity of the end portion 14a.
  • the metal pipe material 14 has a temperature distribution in which the temperatures of the end portions 14a and 14b are lower than the temperature of the central portion 14c of the metal pipe material 14. More specifically, the temperature of the end portion 14a of the metal pipe material 14 is lower than the quenching temperature of the metal pipe material 14, and the temperature of the central portion 14c is higher than the quenching temperature of the metal pipe material 14. It is heated so that it becomes.
  • the electrodes 17 and 18 are controlled to a low temperature by the cooling medium R flowing through the refrigerant flow path 26, the temperature rise of the ends 14a and 14b of the metal pipe material 14 is suppressed.
  • the temperature of the central portion 14c of the metal pipe material 14 is constantly measured by the thermocouple 21, and the electric power supplied to the electrodes 17 and 18 is controlled based on the measurement result.
  • the molding die 13 is closed with respect to the heated metal pipe material 14 by the control of the drive mechanism 80 by the control unit 70.
  • the cavity 16 of the lower mold 11 and the cavity 24 of the upper mold 12 are combined, and the metal pipe material 14 is arranged and sealed in the cavity portion MC between the lower mold 11 and the upper mold 12.
  • the sliding member 92 slides with respect to the lower mold 11, and the sliding member 102 slides with respect to the upper mold 12.
  • the sealing member 44 is advanced to seal both ends of the metal pipe material 14 (see also FIG. 5B).
  • the pressure control valve 68 is opened to blow the high-pressure gas from the accumulator 62 into the metal pipe material 14 through the gas passage 46.
  • the central portion 14c of the metal pipe material 14 is heated to a high temperature (around 950 ° C.) and softened, the gas supplied into the metal pipe material 14 thermally expands. Therefore, for example, the supplied gas is compressed air, and the central portion 14c of the metal pipe material 14 can be easily expanded by the compressed air obtained by thermally expanding the metal pipe material 14 at 950 ° C. As a result, as shown in FIGS. 8A and 8B, the central portion 14c of the metal pipe material 14 arranged in the cavity portion MC of the molding die 13 is molded so as to follow the shape of the cavity portion MC. Will be done.
  • the outer peripheral surface of the central portion 14c of the blow-molded and swollen metal pipe material 14 contacts the cavity 16 of the lower mold 11 and the cavity 24 of the upper mold 12 and is rapidly cooled (the upper mold 12 and the lower mold 11 have a large heat capacity and Since it is controlled at a low temperature, if the metal pipe material 14 comes into contact with the metal pipe material 14, the heat on the surface of the pipe is taken away to the mold side at once) and quenching is performed.
  • Such a cooling method is called mold contact cooling or mold cooling.
  • austenite transforms into martensite hereinafter, the transformation of austenite into martensite is referred to as martensite transformation).
  • cooling may be performed by supplying a cooling medium, for example, into the cavity 24, instead of cooling the mold or in addition to cooling the mold. For example, until the temperature at which martensitic transformation begins, the metal pipe material 14 is brought into contact with the molds (upper mold 12 and lower mold 11) for cooling, and then the mold is opened and the cooling medium (cooling gas) is used as the metal pipe material. Martensitic transformation may be generated by spraying on 14.
  • the ends 14a and 14b of the metal pipe material 14 are heated so as to be lower than the quenching temperature, so that the end 14a is quenched. Absent.
  • the electrodes 17 and 18 are controlled to a low temperature by the cooling medium R flowing through the refrigerant flow path 26, the temperature rise of the ends 14a and 14b of the metal pipe material 14 is further suppressed during energization heating, and the metal pipe material Burning is suppressed at the ends 14a and 14b of 14.
  • the portion of the metal pipe material 14 held between the first insulating materials 91a and 101a and the sliding materials 92 and 102 does not come into contact with the molding die 13, it is compared with the central portion 14c of the metal pipe material 14. And the cooling rate slows down. Therefore, it becomes difficult for the metal pipe material 14 to be hardened. From the above, among the metal pipes, the regions corresponding to the electrodes 17, 18 and the insulating materials 91a, 101a and the sliding materials 92, 102 at the time of molding are regions where quenching is not performed.
  • the metal pipe material 14 is blow-molded, then cooled, and the mold is opened to obtain a metal pipe 100 having a substantially rectangular tubular body portion.
  • the sliding member 92 slides with respect to the lower mold 11, and the sliding material 102 slides with respect to the upper mold 12.
  • FIG. 9 is a diagram showing a metal pipe 100 which is a finished product.
  • the metal pipe 100 which is a molded product, has a pair of end portions 100a and 100b and a central portion 100c.
  • the pair of end portions 100a and 100b are formed by molding the pair of end portions 14a and 14b of the metal pipe material 14, and the central portion 100c is formed by molding the central portion 14c of the metal pipe material 14. It was done.
  • the pair of end portions 100a and 100b are not hardened, the pair of end portions 100a and 100b are uncured portions having relatively low hardness.
  • the central portion 100c is hardened, the central portion 100c is a hardened portion having a hardness higher than that of the end portions 100a and 100b. Therefore, by molding the metal pipe material 14 using the molding apparatus 10, it is possible to mold the metal pipe 100 having a low hardness of the pair of end portions 100a and 100b and a high hardness of the central portion 100c.
  • the Vickers hardness of the pair of end portions 100a and 100b is increased by controlling the temperature distribution of the metal pipe material 14 at the time of molding, the temperatures of the electrodes 17 and 18, the temperature of the molding die 13, and the like.
  • a metal pipe 100 having a Vickers hardness of less than 300 HV and a central portion 100 c of 300 HV or more may be formed.
  • the molding die 13 when the molding die 13 is moved by the drive mechanism 80, the molding die 13 is moved between the lower mold 11 and the first insulating material 91a, and the upper mold 12 and the first insulating material 101a. Since the sliding members 92 and 102 are interposed between the two, the molding die 13 and the first insulating materials 91a and 101a do not come into contact with each other. Therefore, wear of the first insulating materials 91a and 101a can be suppressed.
  • the molding device 10 is a molding device 10 that expands the metal pipe material 14 to form the metal pipe 100, holds the metal pipe material 14, and supplies power to the metal pipe material 14 to supply the metal. Electrodes 17 and 18 for heating the pipe material 14, molding dies 13 for quenching and molding the expanded metal pipe 100, and sliding members 92 and 102 arranged between the electrodes 17 and 18 and the molding dies 13. And the insulating materials 91a, 91b, 101a, 101b are provided, and the lengths of the sliding materials 92, 102 and the insulating materials 91a, 91b, 101a, 101b are adjusted, so that the metal pipe 100 is hardened. The untouched area is adjusted.
  • the sliding members 92, 102 and the insulating materials 91a, 91b, 101a, 101b are arranged between the electrodes 17 and 18 and the molding die 13.
  • the place corresponding to the molding die 13 in the metal pipe material 14 is hardened by the molding die 13 after being heated to a high temperature, so that the hardness is increased.
  • the places corresponding to the sliding materials 92, 102 and the insulating materials 91a, 91b, 101a, 101b in the metal pipe material 14 are places where quenching is not performed.
  • the region of the metal pipe 100 where quenching is not performed is adjusted. Therefore, the place where the hardness is low and the place where the hardness is high can be adjusted.
  • the molding method is a molding method in which the metal pipe material 14 is expanded to form the metal pipe 100, and the step of heating the metal pipe material 14 and the expanded metal pipe material 14 are formed using the molding die 13.
  • the sliding members 92, 102 and the insulating materials 91a, 91b, 101a, 101b whose lengths have been adjusted are arranged between the electrodes 17 and 18 and the molding die 13. , Adjust the region of the metal pipe 100 where quenching is not performed.
  • FIG. 10 is a graph showing the hardness distribution of the metal pipe according to the embodiment. This metal pipe is obtained by molding a metal pipe material using the molding apparatus 10 described above.
  • the metal pipe according to the embodiment formed in this way had the hardness distribution shown in FIG. Specifically, the metal pipe according to the embodiment has a Vickers hardness of less than 300 HV within a distance of 0 mm to 55 mm from one end, and has a Vickers hardness of about 500 HV within a distance of 65 mm to 150 mm from one end. It had Vickers hardness. From this example, it was confirmed that by molding the metal pipe material using the molding apparatus 10, it is possible to mold a metal pipe having a low hardness at the end portion and a high hardness at the center portion.
  • the sum of the thickness of the first insulating material 91a and the thickness of the sliding material 92 is set to be the same as the sum of the thickness of the first insulating material 101a and the thickness of the sliding material 102.
  • the sum of these thicknesses may be different from each other.
  • the length of the uncured portion can be made different between the upper side and the lower side of the metal pipe 100.
  • the first insulating materials 91a and 101a and the sliding materials 92 and 102 are configured as independent members, but the sliding materials 92 and 102 are the first insulating materials 91a and 101a.
  • the first insulating materials 91a and 101a and the sliding materials 92 and 102 may be integrally formed by being sprayed against each other.
  • the first insulating materials 91a and 101a and the sliding materials 92 and 102 can be fixed without using the fixing means 93, the number of parts can be reduced and the cost can be reduced. Will be.
  • the sliding materials 92 and 102 are fixed to the first insulating materials 91a and 101a, respectively, but the sliding material 92 is attached to the lower mold 11 and the sliding material 102 is attached to the upper mold 12. Each may be fixed. Even in this case, since the molding die 13 and the first insulating materials 91a and 101a do not come into contact with each other, wear of the first insulating materials 91a and 101a can be suppressed.
  • the drive mechanism 80 moves only the upper die 12, the lower die 11 may move in addition to or in place of the upper die 12.
  • the lower mold 11 moves, the lower mold 11 is not fixed to the base 15, but is attached to, for example, the slide 81 of the drive mechanism 80.
  • the metal pipe 100 may have one or a plurality of flange portions.
  • the upper mold 12 and the lower mold 11 are fitted to each other, one or a plurality of sub-cavity portions communicating with the cavity portion MC are formed in the molding mold 13.
  • a pressure cylinder, a guide cylinder and a servomotor may be used instead of the shaft 82.
  • the slide 81 is suspended by the pressure cylinder and guided by the guide cylinder so as not to swing sideways.
  • the servomotor functions as a fluid supply unit that supplies the fluid that drives the pressure cylinder (when a hydraulic cylinder is used as the pressure cylinder, operating oil) to the pressure cylinder.
  • the metal pipe molded by the molding device may be joined to other members.
  • the metal pipe is connected to the other member by forming a bolt hole at the end of the metal pipe or welding the end of the metal pipe to another member.
  • the hardness of the end portion of the metal pipe is too high, it becomes difficult to drill or weld the end portion.
  • sufficient hardness is required in the central portion of the metal pipe.
  • a molding device for expanding a metal pipe material to form a metal pipe holds the end of the metal pipe material, supplies power to the metal pipe material to heat the metal pipe material, and supplies gas into the heated metal pipe material to expand it. It includes a gas supply unit and a molding mold for molding an expanded metal pipe. This electrode heats the metal pipe material so that the temperature at the ends of the metal pipe material is lower than the temperature at the center of the metal pipe material.
  • the metal pipe material is heated so that the temperature at the end of the metal pipe material is lower than the temperature at the center of the metal pipe material. If the temperature rise at the end of the metal pipe material is suppressed during molding of the metal pipe material, it becomes difficult for the end of the metal pipe material to be hardened, so that the increase in hardness is suppressed. On the other hand, since the central portion of the metal pipe is heated to a high temperature, it is then cooled to quench it and increase its hardness. Therefore, according to the molding apparatus of the above aspect, it is possible to mold a metal pipe having a low hardness at the end portion and a high hardness at the central portion.
  • the electrode may be formed with a refrigerant flow path through which the cooling medium flows.
  • Insulating material and sliding material are arranged in order from the electrode side between the electrode and the molding die, and the sum of the thickness of the insulating material and the thickness of the sliding material in the arrangement direction of the insulating material and the sliding material. However, it may be larger than the contact length between the electrode and the metal pipe material in the longitudinal direction of the metal pipe material.
  • the part held by the insulating material and the sliding material has a slow cooling rate and is hard to be hardened. Therefore, by providing a relatively thick insulating material and the sliding material, the end portion of the metal pipe is provided. It is possible to increase the region of low hardness formed in.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Fluid Mechanics (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)

Abstract

成形装置(成形装置10)は、金属パイプ材料(金属パイプ材料14)を膨張させて金属パイプ(金属パイプ100)を成形する成形装置であって、金属パイプ材料を保持すると共に、金属パイプ材料へ電力を供給して該金属パイプ材料を加熱する電極(電極17、18)と、膨張した金属パイプを焼き入れ成形する成形金型(成形金型30)と、電極と成形金型との間に配置される部材(第1の絶縁材91a、101a、摺動材92、102)と、を備え、部材の長さの調整が行われることで、金属パイプにおいて焼き入れが行われない領域が調整される。

Description

成形装置及び成形方法
 本開示は、成形装置及び成形方法に関する。
 従来、金属パイプ材料を膨張させて成形金型により金属パイプを成形する成形装置が知られている。例えば、特許文献1に開示された成形装置は、電極、絶縁材、摺動材及び成形金型を備えている。この成形装置では、電極、絶縁材及び摺動材によって保持された金属パイプ材料を電極から供給された電力によって通電加熱し、成形金型を型閉した状態で当該成形金型内に配置された金属パイプ材料を膨張させることによって金属パイプを成形している。
特開2016-190248号公報
 上述のような成形装置で成形された金属パイプは、他の部材に接合される場合がある。この場合には、金属パイプの端部にボルト孔を形成したり、金属パイプの端部を他の部材に溶接したりすることで、金属パイプが他の部材に対して連結される。このとき、金属パイプの端部の硬度が高すぎると、当該端部に孔あけ加工を行うことや溶接を施すことが困難となる。一方、金属パイプの剛性を確保するために金属パイプの中央部など、場所によっては十分な硬度が求められる。
 そこで、本開示は、硬度が低い場所と硬度が高い場所を調整できる金属パイプを成形することができる成形装置及び成形方法を提供することを目的とする。
 一態様に係る成形装置は、金属パイプ材料を膨張させて金属パイプを成形する成形装置であって、金属パイプ材料を保持すると共に、金属パイプ材料へ電力を供給して該金属パイプ材料を加熱する電極と、膨張した金属パイプを焼き入れ成形する成形金型と、電極と成形金型との間に配置される部材と、を備え、部材の長さの調整が行われることで、金属パイプにおいて焼き入れが行われない領域が調整される。
 この態様では、部材が、電極と成形金型との間に配置される。金属パイプ材料の成形時、金属パイプ材料における成形金型と対応する場所は、高温に加熱された後に成形金型により焼き入れ成形されるので、硬度が高められる。一方、金属パイプ材料における部材と対応する場所は、焼き入れが行われない場所となる。ここで、部材の長さの調整が行われることで、金属パイプにおいて焼き入れが行われない領域が調整される。したがって、硬度が低い場所と硬度が高い場所を調整できる。
 部材は、電極側から順に配列された絶縁材及び摺動材であり、絶縁材及び摺動材の配列方向における絶縁材の厚さと摺動材の厚さの和は、金属パイプ材料の長手方向における電極と金属パイプ材料との接触長さよりも大きくてもよい。金属パイプ材料のうち絶縁材及び摺動材に保持されている部分は、冷却速度が遅く、焼きが入りにくいので、相対的に厚い絶縁材及び摺動材を備えることにより、金属パイプの端部に形成される硬度の低い領域を大きくすることができる。
  一態様に係る成形方法は、金属パイプ材料を膨張させて金属パイプを成形する成形方法であって、金属パイプ材料を加熱する工程と、成形金型を用いて膨張した金属パイプ材料を成形する工程と、を含み、加熱する工程では、長さの調整がされた部材を電極と成形金型との間に配置し、金属パイプにおいて焼き入れが行われない領域を調整する。
 この態様では、上述の成形装置と同様な作用・効果を得ることができる。
 本開示の一態様によれば、硬度が低い場所と硬度が高い場所を調整できる。
一実施形態に係る成形装置を示す概略構成図である。 電極周辺を拡大して示す斜視図である。 図2に示すIII-III線に沿った断面図である。 電極の正面図である。 電極周辺の拡大図であって、(a)は電極が金属パイプ材料を保持した状態を示す断面図であり、(b)は金属パイプ材料に気体を供給した状態を示す断面図である。 金属パイプの製造工程を示す図であって、(a)は金型内に金属パイプ材料が配置された状態を示す図であり、(b)は金属パイプ材料の端部が加熱された状態を示す図である。 ブロー成形を行った状態を示す図である。 成形金型の断面図である。(a)はブロー成形前の図であり、(b)はブロー成形後の図である。 完成品である金属パイプの一例を示す図である。 実施例に係る金属パイプの硬度分布を示すグラフである。
 以下、本開示による成形装置の好適な実施形態について図面を参照しながら説明する。なお、各図において同一部分又は相当部分には同一符号を付し、重複する説明は省略する。
 〈成形装置の構成〉
 図1は、一実施形態に係る成形装置の概略構成図である。図1に示されるように、金属パイプを成形する成形装置10は、上型12及び下型11からなる成形金型13と、上型12及び下型11の少なくとも一方を移動させる駆動機構80と、上型12と下型11との間に配置される金属パイプ材料14を保持するパイプ保持機構30と、パイプ保持機構30で保持されている金属パイプ材料14を加熱するための電力を供給する電力供給部50と、上型12及び下型11の間に保持され加熱された金属パイプ材料14内に高圧ガス(気体)を供給するための気体供給部60と、パイプ保持機構30で保持された金属パイプ材料14内に気体供給部60からの気体を供給するための一対の気体供給機構40と、成形金型13を強制的に水冷する水循環機構72と、上記駆動機構80の駆動、上記パイプ保持機構30の駆動、電力供給部50の駆動、及び、上記気体供給部60の気体供給を制御する制御部70と、を備えている。
 なお、以下の説明では、完成品に係るパイプを金属パイプ100(図9参照)と称し、完成に至る途中の段階のパイプを金属パイプ材料14と称するものとする。金属パイプ材料14は、中空筒状を有する長尺の鋼材であり、その両端側に位置する一対の端部14a,14bと、一対の端部14a,14bの間に位置する中央部14cを有している(図6(a)参照)。後述するように、この金属パイプ材料14が成形されることによって、金属パイプ材料14の一対の端部14a,14bが金属パイプ100の一対の端部100a,100bになり、金属パイプ材料14の中央部14cが金属パイプ100の中央部100cになる。
 図1に示すように、成形金型13の一方である下型11は、基台15に固定されている。下型11は、大きな鋼鉄製ブロックで構成され、その上面に例えば矩形状のキャビティ(凹部)16を備える。下型11には冷却水通路19が形成され、略中央に下から差し込まれた熱電対21を備えている。この熱電対21はスプリング22により上下移動自在に支持されている。
 更に、下型11の左右端(図1における左右端)近傍にはスペース11aが形成されており、当該スペース11a内には、パイプ保持機構30の可動部である後述する下側電極17a,18a等が、上下に進退動可能に配置されている。そして、下側電極17a,18a上に金属パイプ材料14が載置されることで、下側電極17a,18aは、上型12と下型11との間に配置される金属パイプ材料14に接触する。これにより、下側電極17a,18aは金属パイプ材料14に電気的に接続される。
 成形金型13の他方である上型12は、駆動機構80を構成する後述のスライド81に固定されている。上型12は、大きな鋼鉄製ブロックで構成され、内部に冷却水通路25が形成されると共に、その下面に例えば矩形状のキャビティ(凹部)24を備える。このキャビティ24は、下型11のキャビティ16に対向する位置に設けられる。
 上型12の左右端(図1における左右端)近傍には、下型11と同様に、スペース12aが形成されており、当該スペース12a内には、パイプ保持機構30の可動部である後述する上側電極17b,18b等が、上下に進退動可能に配置されている。そして、下側電極17a,18a上に金属パイプ材料14が載置された状態において、上側電極17b,18bは、下方に移動することで、上型12と下型11との間に配置された金属パイプ材料14に接触する。これにより、上側電極17b,18bは金属パイプ材料14に電気的に接続される。なお、以下では、下側電極17a,18aと上側電極17b,18bとを特に区別する必要がない場合には、これらをまとめて電極17,18と称する。
 図2は電極18付近を拡大して示す斜視図であり、図3は図2に示すIII-III線に沿った断面図である。
 図2及び図3に示すように、下側電極18aと下型11との間には、下側電極18a側から順に第1の絶縁材91a及び摺動材92が配列されている。すなわち、第1の絶縁材91aは下側電極18aと下型11との間に設けられており、摺動材92は第1の絶縁材91aと下型11との間に設けられている。また、上側電極18bと上型12との間には、上側電極18b側から順に第1の絶縁材101a及び摺動材102が配列されている。すなわち、第1の絶縁材101aは上側電極18bと上型12との間に設けられており、摺動材102は第1の絶縁材101aと上型12との間に設けられている。
 第1の絶縁材91a,101aは、耐熱性及び絶縁性を有する材料から構成された板材であり、電極18と成形金型13との通電を防ぐ機能を有する。第1の絶縁材91a,101aとしては、例えばアルミナ製のセラミックス板が利用される。第1の絶縁材91aは、第1の絶縁材91a及び摺動材92の配列方向において厚さd1を有しており、第1の絶縁材101aは、第1の絶縁材101a及び摺動材102の配列方向において厚さd1を有している。
 摺動材92,102は、耐熱性を有する材料から構成された板材である。摺動材92,102としては、例えば鉛青銅、砲金、黄銅、リン青銅又はホワイトメタル製の合金板が利用される。摺動材92は、第1の絶縁材91a及び摺動材92の配列方向において厚さd2を有しており、摺動材102は、第1の絶縁材101a及び摺動材102の配列方向において厚さd2を有している。
 下側電極18aの下面には、第2の絶縁材91bが固定されている。第2の絶縁材91bには、進退ロッド95が接続されており、当該進退ロッド95にはアクチュエータに接続されている(図1参照)。このアクチュエータは、下側電極17a,18a等を上下動させるためのものであり、アクチュエータの固定部は、下型11と共に基台15側に保持されている。
 図3に示すように、第1の絶縁材91a及び摺動材92は、ボルト93a及び雌ねじ部材93bを有する固定手段93によって互いに固定されている。具体的には、摺動材92を貫通して第1の絶縁材91aの開口部に進入するボルト93aが、第1の絶縁材91aの開口部に埋め込まれた雌ねじ部材93bに螺合することにより、第1の絶縁材91a及び摺動材92が互いに締結され固定されている。また、下側電極18aと第1の絶縁材91aとは固定手段94によって互いに固定されている。また、第2の絶縁材91bは、下側電極18a及び第1の絶縁材91aの下面に固定されている。
 同様に、上側電極18bの上面には、第2の絶縁材101bが取り付けられている。第2の絶縁材101bには、進退ロッド96が接続されており、当該進退ロッド96にはアクチュエータに接続されている。このアクチュエータは、上側電極17b,18b等を上下動させるためのものであり、アクチュエータの固定部は、上型12と共に駆動機構80のスライド81側に保持されている。
 第1の絶縁材101a及び摺動材102は、ボルト93a及び雌ねじ部材93bを有する固定手段93によって互いに固定されている。具体的には、摺動材102を貫通して第1の絶縁材101aの開口部に進入するボルト93aが、第1の絶縁材101aの開口部に埋め込まれた雌ねじ部材93bに螺合することにより、第1の絶縁材101a及び摺動材102が互いに締結され固定されている。上側電極18bと第1の絶縁材101aとは固定手段94によって互いに固定されている。また、第2の絶縁材101bは、上側電極18b及び第1の絶縁材101aの上面に固定されている。
 図4は、電極17,18の正面図である。図4に示すように、下側電極18aと上側電極18bとが互いに対向する面のそれぞれには、金属パイプ材料14の外周面の形状に対応した半円弧状の凹溝20aが形成されていて、当該凹溝20aの部分に丁度金属パイプ材料14が嵌り込むように載置可能とされている。また、第1の絶縁材91aと第1の絶縁材101aが互いに対向する面、及び、摺動材92と摺動材102とが互いに対向する面のそれぞれにも、半円弧状の凹溝が形成されている。これらの凹溝は、凹溝20aの径よりも大きな径を有している。したがって、金属パイプ材料14が上側電極18bと下側電極18aとの間で保持されているときに、第1の絶縁材91a,101a及び摺動材92,102は金属パイプ材料14に非接触となる。また、電極18の正面(金型の外側方向の面)には、凹溝20aに向って周囲がテーパー状に傾斜して窪んだテーパー凹面18tが形成されている(図5(a),(b)を併せて参照)。よって、パイプ保持機構30の右側部分で金属パイプ材料14を上下方向から挟持すると、丁度金属パイプ材料14の端部14aの外周を全周に渡って密着するように取り囲んで保持できるように構成されている。
 また、図4に示すように、下側電極18aの内部には、冷却媒体Rを流通させるための冷媒流路26が形成されている。冷媒流路26には、配管28が接続されており、当該配管28には冷媒供給装置32が接続されている。冷媒供給装置32は、配管28を介して冷媒流路26に冷却媒体Rを供給すると共に、下側電極18aと熱交換を行った冷却媒体Rを冷媒流路26から回収する。同様に、上側電極18bの内部には、冷却媒体Rを流通させるための冷媒流路27が形成されている。冷媒流路27には、配管29が接続されており、配管29には冷媒供給装置31が接続されている。冷媒供給装置31は、配管29を介して冷却媒体Rを冷媒流路27に供給し、上側電極18bと熱交換を行った冷却媒体Rを冷媒流路27から回収する。
 一実施形態では、冷媒供給装置31,32には制御部70が接続されており、制御部70からの制御信号に応じて、冷媒供給装置31,32から冷媒流路26,27に供給される冷却媒体Rの流量が制御されてもよい。
 このように、冷媒流路26,27を冷却媒体Rが循環することにより、電極18の熱が冷却媒体Rに奪われ、電極18が冷却される。冷却媒体Rとしては、例えば冷却水が用いられる。なお、冷却媒体Rは液体に限らず、気化熱を利用した相変化冷却や、ガスを用いたガス冷却を用いて電極18を冷却してもよい。
 パイプ保持機構30の左側部分は、上述したパイプ保持機構30の右側部分と同様の構成を有している。すなわち、パイプ保持機構30の左側部分は、上下方向にて対向する下側電極17a及び上側電極17bと、上下方向にて対向する第1の絶縁材91a,101aと、上下方向にて対向する摺動材92,102とを有している。より詳細には、第1の絶縁材91aは下側電極17aと下型11との間に設けられており、摺動材92は第1の絶縁材91aと下型11との間に設けられている。第2の絶縁材91bには、進退ロッド95が接続されており、当該進退ロッド95には下側電極17a等を上下動させるためのアクチュエータに接続されている。また、第1の絶縁材101aは上側電極17bと上型12との間に設けられており、摺動材102は第1の絶縁材101aと上型12との間に設けられている。第2の絶縁材101bには、進退ロッド96が接続されており、当該進退ロッド96には上側電極17b等を上下動させるためのアクチュエータに接続されている。
 図4に示すように、パイプ保持機構30の左側部分において、下側電極17aと上側電極17bとが互いに対向する面のそれぞれには、金属パイプ材料14の外周面の形状に対応した半円弧状の凹溝20bが形成されていて、当該凹溝20bの部分に丁度金属パイプ材料14が嵌り込むように載置可能とされている。また、第1の絶縁材91aと第1の絶縁材101aが互いに対向する面、及び、摺動材92と摺動材102とが互いに対向する面にも、半円弧状の凹溝が形成されている。これらの凹溝は、凹溝20bの径よりも大きな径を有している。したがって、金属パイプ材料14が上側電極17bと下側電極17aとの間で保持されているときに、第1の絶縁材91a,101a及び摺動材92,102は金属パイプ材料14に非接触となる。また、電極17の正面(金型の外側方向の面)には、凹溝20bに向って周囲がテーパー状に傾斜して窪んだテーパー凹面17tが形成されている。よって、パイプ保持機構30の左側部分で金属パイプ材料14を上下方向から挟持すると、丁度金属パイプ材料14の端部14bの外周を全周に渡って密着するように取り囲んで保持できるように構成されている。
 下側電極18a及び上側電極18bと同様に、下側電極17a及び上側電極18bには、それぞれ冷媒流路26,27が形成されている。冷媒流路26,27には、配管28,29を介して冷媒供給装置31,32がそれぞれ接続されている。冷媒供給装置31,32は、冷却媒体Rを冷媒流路26,27に循環供給する。冷媒流路26,27を冷却媒体Rが循環することにより、下側電極17a及び上側電極17bの熱が冷却媒体Rに奪われ、電極17が冷却される。
 図5(a)は、電極18が金属パイプ材料14を保持した状態を示す図である。ここで、図5(a)に示すように、金属パイプ材料14の長手方向における電極18と当該電極18上に保持された金属パイプ材料14との接触長さをLとしたとき、第1の絶縁材91aの厚さd1と摺動材92の厚さd2との和Dは、接触長さLよりも大きく設定されている。同様に、金属パイプ材料14の長手方向における電極17と当該電極17上に保持された金属パイプ材料14との接触長さをLとしたとき、第1の絶縁材91aの厚さd1と摺動材92の厚さd2との和Dは、接触長さLよりも大きく設定されている。厚さの和Dを、接触長さLよりも大きくすることで、金属パイプ100の端部100a,100bに形成される硬度の低い領域を大きくすることができる。
 ただし、上述の例では、第1の絶縁材91a,101aの厚さd1と摺動材92,102の厚さd2の和Dは、電極17,18と金属パイプ材料14との接触長さLよりも大きく設定されているが、厚さの和Dは接触長さL以下であってもよい。厚さの和Dを大きくすることにより、金属パイプ100の端部側に形成される非硬化部の長さを調整することができる。すなわち、和Dの調整が行われることで、金属パイプ100において焼き入れが行われない領域が調整される。したがって、要求される非硬化部の長さに応じて、第1の絶縁材91a,101aの厚さd1と摺動材92,102の厚さd2の和Dを適宜調整してもよい。
 再び図1を参照する。図1に示されるように、駆動機構80は、上型12及び下型11同士が合わさるように上型12を移動させるスライド81と、上記スライド81を移動させるための駆動力を発生するシャフト82と、該シャフト82で発生した駆動力をスライド81に伝達するためのコネクティングロッド83とを備えている。シャフト82は、スライド81上方にて左右方向に延在していると共に回転自在に支持されており、その軸心から離間した位置にて左右端から突出して左右方向に延在する偏心クランク82aを有している。この偏心クランク82aと、スライド81の上部に設けられると共に左右方向に延在している回転軸81aとは、コネクティングロッド83によって連結されている。駆動機構80では、制御部70によってシャフト82の回転を制御することにより偏心クランク82aの上下方向の高さを変化させ、この偏心クランク82aの位置変化をコネクティングロッド83を介してスライド81に伝達することにより、スライド81の上下動を制御できる。ここで、偏心クランク82aの位置変化をスライド81に伝達する際に発生するコネクティングロッド83の揺動(回転運動)は、回転軸81aによって吸収される。なお、シャフト82は、例えば制御部70によって制御されるモータ等の駆動に応じて回転又は停止する。
 電力供給部50は、電源51と、この電源51から下側の電極17,18に接続するブスバー52と、このブスバー52上に設けられたスイッチ53とを有している。電力供給部50は、金属パイプ材料14を通電加熱するための電力を電極17,18に供給する。具体的には、電力供給部50は、制御部70からの制御信号によって、金属パイプ材料14を焼入れ温度(AC3変態点温度以上)まで加熱されるように制御せれる。この電力供給部50は、電極17,18と共に金属パイプ材料14を加熱する加熱部を構成している。
 一対の気体供給機構40の各々は、シリンダユニット42と、シリンダユニット42の作動に合わせて進退動するシリンダロッド43と、シリンダロッド43のパイプ保持機構30側の先端に連結されたシール部材44とを有する。シリンダユニット42はブロック41上に支持されている。なお、シール部材44の先端は先細となるようにテーパー面45が形成されており、電極17,18のテーパー凹面17t、18tに丁度嵌合当接することができる形状に構成されている(図5(b)参照)。なお、シール部材44は、シリンダロッド43を介してシリンダユニット42に連結されていて、シリンダユニット42の作動に合わせて進退動することが可能となっている。また、シリンダユニット42はブロック41を介して基台15上に載置固定されている。また、シール部材44には、気体供給部60から供給された高圧ガスが流れるガス通路46が形成されている。ガス通路46は、シール部材44の先端に開口しており、ガス通路46を流れるガスは当該開口から噴射される。
 気体供給部60は、ガス源61と、このガス源61によって供給されたガスを溜めるアキュムレータ62と、このアキュムレータ62から気体供給機構40のシリンダユニット42まで延びている第1チューブ63と、この第1チューブ63に介設されている圧力制御弁64及び切替弁65と、アキュムレータ62とガス通路46とを接続する第2チューブ67と、この第2チューブ67に介設されている圧力制御弁68及び逆止弁69とを有している。圧力制御弁64は、シール部材44の金属パイプ材料14に押圧するための高圧ガスをシリンダユニット42に供給する。逆止弁69は、第2チューブ67内で高圧ガスが逆流することを防止する。
 圧力制御弁68は、金属パイプ材料14を膨張させるための作動圧力を有するガスをガス通路46に供給する。圧力制御弁68には制御部70が接続されており、当該制御部70は、気体供給部60の圧力制御弁68の開度を制御することにより、金属パイプ材料14内に所望の作動圧力のガスを供給することができる。
 制御部70は、図1に示す(A)から情報が伝達されることによって、熱電対21から温度情報を取得し、駆動機構80及び電力供給部55等を制御する。水循環機構72は、水を溜める水槽73と、この水槽73に溜まっている水を汲み上げ、加圧して下型11の冷却水通路19及び上型12の冷却水通路25へ送る水ポンプ74と、配管75とからなる。省略したが、水温を下げるクーリングタワーや水を浄化する濾過器を配管75に介在させることは差し支えない。
 〈成形装置を用いた金属パイプの成形方法〉
 次に、成形装置10を用いた金属パイプの成形方法について説明する。図6は材料としての金属パイプ材料14を投入するパイプ投入工程から、金属パイプ材料14に通電して加熱する通電加熱工程までを示す。最初に、焼入れ可能な鋼種の円筒状の金属パイプ材料14を準備する。図6(a)に示すように、この金属パイプ材料14を、例えばロボットアーム等を用いて、下型11側に備わる電極17,18上に載置(投入)する。電極17,18には凹溝20a,20bが形成されているので、当該凹溝20a,20bによって金属パイプ材料14が位置決めされる。
 次に、制御部70は、駆動機構80及びパイプ保持機構30を制御することによって、当該パイプ保持機構30に金属パイプ材料14の端部14a,14bを保持させる。具体的には、具体的には、図6(b)のように、パイプ保持機構30を進退動可能としているアクチュエータ(図示しない)を作動させて、進退ロッド95,96をそれぞれ上下動させる。この上下動の際に、摺動材92及び摺動材102が下型11及び上型12に対してそれぞれ摺動する。また、この上下動によって、金属パイプ材料14の端部14a,14bは、パイプ保持機構30によって上下方向から挟持される。この挟持は電極17,18に形成される凹溝20a,20b、及び、第1の絶縁材91a,101a及び摺動材92,102に形成される凹溝の存在によって、金属パイプ材料14の両端部付近の全周に渡って密着するような態様で挟持されることとなる。なお、金属パイプ材料14の全周に渡って密着する構成に限られず、金属パイプ材料14の周方向における一部に電極17,18が当接するような構成であってもよい。
 続いて、制御部70は、電力供給部50を制御することによって、金属パイプ材料14を加熱する。具体的には、制御部70からの制御信号によってスイッチ53がONになると、電源51からの電力がブスバー52を介して電極17,18に供給される。電極17,18に供給された電力は、金属パイプ材料14に伝達され、金属パイプ材料14に存在する抵抗により、金属パイプ材料14自体が発熱する(ジュール熱)。
 ここで、電流には抵抗の低い部分を選択的に流れる性質があるので、図5(a)に示すように、電極18から供給される電流Cは、金属パイプ材料14の全長において、均等に流れるのではなく、主に、電極18と第1の絶縁材91a,101aとの境界付近から金属パイプ材料14に流入する。すなわち、電極18a,18bと金属パイプ材料14との境界面では、第1の絶縁材91a,101a側の領域の方が、端部14a側の領域よりも多くの電流が流れる領域となる。したがって、金属パイプ材料14の通電加熱時に、金属パイプ材料14の端部14a,14bには、金属パイプ材料14の中央部14cよりも小さな電流が流れることとなる。なお、図5(a)では、電流Cのメインの流れだけが矢印で示されているが、端部14a付近にも電流は流れる。これにより、金属パイプ材料14は、端部14a,14bの温度が金属パイプ材料14の中央部14cの温度よりも低い温度分布を有することとなる。より詳細には、金属パイプ材料14は、その端部14aの温度が金属パイプ材料14の焼入温度よりも低い温度となり、その中央部14cが金属パイプ材料14の焼入温度よりも高い温度となるように加熱される。
 特に、冷媒流路26を流れる冷却媒体Rによって、電極17,18が低温に管理されているので、金属パイプ材料14の端部14a,14bの温度上昇が抑制される。一方、金属パイプ材料14の中央部14cの温度は、熱電対21によって常に測定され、この測定結果に基づいて電極17,18に供給される電力が制御される。
 次いで、図7に示すように、制御部70による駆動機構80の制御によって、加熱後の金属パイプ材料14に対して成形金型13が閉じられる。これにより、下型11のキャビティ16と上型12のキャビティ24とが組み合わされ、下型11と上型12との間のキャビティ部MC内に金属パイプ材料14が配置密閉される。この型閉じの際に、摺動材92が下型11に対して摺動すると共に、摺動材102が上型12に対して摺動する。
 その後、気体供給機構40のシリンダユニット42を作動させることによってシール部材44を前進させて金属パイプ材料14の両端をシールする(図5(b)も併せて参照)。シール完了後、圧力制御弁68を開放することによって、アキュムレータ62からの高圧ガスをガス通路46を介して金属パイプ材料14内へ吹き込む。
 金属パイプ材料14の中央部14cは高温(950℃前後)に加熱されて軟化しているので、金属パイプ材料14内に供給されたガスは、熱膨張する。このため、例えば供給するガスを圧縮空気とし、950℃の金属パイプ材料14を熱膨張した圧縮空気によって金属パイプ材料14の中央部14cを容易に膨張させることができる。これにより、図8(a)及び(b)に示すように、成形金型13のキャビティ部MC内に配置された金属パイプ材料14の中央部14cは、キャビティ部MCの形状に沿うように成形される。
 ブロー成形されて膨らんだ金属パイプ材料14の中央部14cの外周面は、下型11のキャビティ16及び上型12のキャビティ24に接触して急冷(上型12と下型11は熱容量が大きく且つ低温に管理されているため、金属パイプ材料14が接触すればパイプ表面の熱が一気に金型側へと奪われる。)されて焼き入れが行われる。このような冷却法は、金型接触冷却又は金型冷却と呼ばれる。急冷された直後はオーステナイトがマルテンサイトに変態する(以下、オーステナイトがマルテンサイトに変態することをマルテンサイト変態とする)。冷却の後半は冷却速度が小さくなったので、復熱によりマルテンサイトが別の組織(トルースタイト、ソルバイトなど)に変態する。したがって、別途焼戻し処理を行う必要がない。また、本実施形態においては、金型冷却に代えて、あるいは金型冷却に加えて、冷却媒体を例えばキャビティ24内に供給することによって冷却が行われてもよい。例えば、マルテンサイト変態が始まる温度までは金型(上型12及び下型11)に金属パイプ材料14を接触させて冷却を行い、その後型開きすると共に冷却媒体(冷却用気体)を金属パイプ材料14へ吹き付けることにより、マルテンサイト変態を発生させてもよい。
 一方、金属パイプ材料14の通電加熱時には、金属パイプ材料14の端部14a,14bが焼入温度よりも低い温度になるように加熱されているので、当該端部14aには焼き入れが行われない。特に、冷媒流路26を流れる冷却媒体Rによって、電極17,18が低温に管理されているので、通電加熱時に金属パイプ材料14の端部14a,14bの温度上昇がより抑制され、金属パイプ材料14の端部14a、14bに焼きが入ることが抑制される。また、金属パイプ材料14の第1の絶縁材91a,101a及び摺動材92,102の間に保持された部分は、成形金型13に接触しないので金属パイプ材料14の中央部14cと比較して冷却速度が遅くなる。したがって、金属パイプ材料14の当該部分にも焼きが入りにくくなる。以上より、金属パイプのうち、成形時に電極17,18、絶縁材91a,101a及び摺動材92,102に対応する領域は、焼き入れが行われない領域となる。
 上記のように金属パイプ材料14に対してブロー成形を行った後に冷却を行い、型開きを行うことにより、略矩形筒状の本体部を有する金属パイプ100を得る。型開きの際にも、摺動材92が下型11に対して摺動すると共に、摺動材102が上型12に対して摺動する。
 図9は、完成品である金属パイプ100を示す図である。図9に示すように、成形品である金属パイプ100は、一対の端部100a,100b及び中央部100cを有している。一対の端部100a,100bは、金属パイプ材料14の一対の端部14a,14bが成形されることによって形成され、中央部100cは、金属パイプ材料14の中央部14cが成形されることによって形成されたものである。上記のように、一対の端部100a,100bには焼き入れが行われていないので、一対の端部100a,100bは相対的に硬度の低い非硬化部となっている。これに対し、中央部100cには焼き入れが行われているので、中央部100cは、端部100a,100bよりも高い硬度を有する硬化部となっている。したがって、成形装置10を用いて金属パイプ材料14を成形することで、一対の端部100a,100bの硬度が低く、中央部100cの硬度が高い金属パイプ100を成形することができる。
 なお、一実施形態では、成形時の金属パイプ材料14の温度分布、電極17,18の温度、成形金型13の温度等を制御することによって、一対の端部100a,100bのビッカース硬さが300HV未満であり、中央部100cのビッカース硬さが300HV以上である金属パイプ100を成形してもよい。一対の端部100a,100bのビッカース硬さを300HV未満に設定することにより、一対の端部100a,100bに孔あけ加工及び溶接といった加工を施すことが可能となる。
 また、上記成形装置10によれば、駆動機構80による成形金型13の移動の際に、下型11と第1の絶縁材91aとの間、及び、上型12と第1の絶縁材101aとの間には、摺動材92,102がそれぞれ介在しているので、成形金型13と第1の絶縁材91a,101aとが接触することがない。したがって、第1の絶縁材91a,101aの摩耗を抑制することができる。
 以上より、成形装置10は、金属パイプ材料14を膨張させて金属パイプ100を成形する成形装置10であって、金属パイプ材料14を保持すると共に、金属パイプ材料14へ電力を供給して該金属パイプ材料14を加熱する電極17,18と、膨張した金属パイプ100を焼き入れ成形する成形金型13と、電極17,18と成形金型13との間に配置される摺動材92,102及び絶縁材91a,91b,101a,101bと、を備え、摺動材92,102及び絶縁材91a,91b,101a,101bの長さの調整が行われることで、金属パイプ100において焼き入れが行われない領域が調整される。
 この態様では、摺動材92,102及び絶縁材91a,91b,101a,101bが、電極17,18と成形金型13との間に配置される。金属パイプ材料14の成形時、金属パイプ材料14における成形金型13と対応する場所は、高温に加熱された後に成形金型13により焼き入れ成形されるので、硬度が高められる。一方、金属パイプ材料14における摺動材92,102及び絶縁材91a,91b,101a,101bと対応する場所は、焼き入れが行われない場所となる。ここで、摺動材92,102及び絶縁材91a,91b,101a,101bの長さの調整が行われることで、金属パイプ100において焼き入れが行われない領域が調整される。したがって、硬度が低い場所と硬度が高い場所を調整できる。
  成形方法は、金属パイプ材料14を膨張させて金属パイプ100を成形する成形方法であって、金属パイプ材料14を加熱する工程と、成形金型13を用いて膨張した金属パイプ材料14を成形する工程と、を含み、加熱する工程では、長さの調整がされた摺動材92,102及び絶縁材91a,91b,101a,101bを電極17,18と成形金型13との間に配置し、金属パイプ100において焼き入れが行われない領域を調整する。
 この態様では、上述の成形装置と同様な作用・効果を得ることができる。
 以下、実施例に基づいて本開示をより具体的に説明するが、本開示は以下の実施例に限定されるものではない。
 図10は、実施例に係る金属パイプの硬度分布を示すグラフである。この金属パイプは、上述した成形装置10を用いて金属パイプ材料を成形することによって得られたものである。
 このように形成された実施例に係る金属パイプは、図10に示す硬度分布を有していた。具体的には、実施例に係る金属パイプは、一端からの距離が0mm~55mmの範囲内で300HV未満のビッカース硬さを有し、一端からの距離が65mm~150mmの範囲内で500HV程度のビッカース硬さを有していた。この実施例から、成形装置10を用いて金属パイプ材料を成形することによって、端部の硬度が低く、中央部の硬度が高い金属パイプを成形する事ができることが確認された。
 以上、種々の実施形態に係る成形装置10について説明してきたが、上述した実施形態に限定されることなく開示の要旨を変更しない範囲で種々の変形態様を構成可能である。
 また、上記実施形態では、第1の絶縁材91aの厚さと摺動材92の厚さの和が、第1の絶縁材101aの厚さと摺動材102の厚さの和と同じに設定されているが、これらの厚さの和は互いに異なっていてもよい。この場合には、金属パイプ100の上側と下側との間で非硬化部の長さを異ならせることができる。
 また、上記実施形態では、第1の絶縁材91a,101a及び摺動材92,102は、互いに独立した部材として構成されているが、摺動材92,102が第1の絶縁材91a,101aに対してそれぞれ溶射されることで、第1の絶縁材91a,101a及び摺動材92,102が一体的に形成されていてもよい。この場合には、固定手段93を用いずに第1の絶縁材91a,101a及び摺動材92,102を固定することができるので、部品点数が減少し、低コスト化が実現することが可能となる。
 また、上記実施形態では、摺動材92,102は第1の絶縁材91a,101a側にそれぞれ固定されているが、摺動材92は下型11に、摺動材102は上型12にそれぞれ固定されてもよい。この場合であっても、成形金型13と第1の絶縁材91a,101aとは互いに接触しないので、第1の絶縁材91a,101aの摩耗を抑制できる。
 また、上記実施形態に係る駆動機構80は、上型12のみを移動させているが、上型12に加えて、または上型12に代えて下型11が移動するものであってもよい。下型11が移動する場合、当該下型11は基台15に固定されず、例えば駆動機構80のスライド81に取り付けられる。
 また、上記実施形態に係る金属パイプ100は、一又は複数のフランジ部を有していてもよい。この場合、上型12及び下型11が互いに嵌合する際にキャビティ部MCに連通する一又は複数のサブキャビティ部が成形金型13に形成される。
 また、上記実施形態に係る駆動機構80は、例えば加圧シリンダ、ガイドシリンダ及びサーボモータをシャフト82の代わりに用いてもよい。この場合、スライド81は加圧シリンダによって吊られ、ガイドシリンダによって横振れしないようにガイドされる。サーボモータは、加圧シリンダを駆動させる流体(加圧シリンダとして油圧シリンダを採用する場合は、動作油)を当該加圧シリンダへ供給する流体供給部として機能する。
 成形装置で成形された金属パイプは、他の部材に接合される場合がある。この場合には、金属パイプの端部にボルト孔を形成したり、金属パイプの端部を他の部材に溶接したりすることで、金属パイプが他の部材に対して連結される。このとき、金属パイプの端部の硬度が高すぎると、当該端部に孔あけ加工を行うことや溶接を施すことが困難となる。一方、金属パイプの剛性を確保するために金属パイプの中央部には十分な硬度が求められる。
 そこで、一態様において、端部の硬度が低く、中央部の硬度が高い金属パイプを成形することができる成形装置及び成形方法を提供することが求められる。
 一態様では、金属パイプ材料を膨張させて金属パイプを成形する成形装置が提供される。この成形装置は、金属パイプ材料の端部を保持すると共に、金属パイプ材料へ電力を供給して該金属パイプ材料を加熱する電極と、加熱された金属パイプ材料内に気体を供給して膨張させる気体供給部と、膨張した金属パイプを成形する成形金型と、を備えている。この電極は、金属パイプ材料の端部の温度が金属パイプ材料の中央部の温度よりも低くなるように金属パイプ材料を加熱する。
 この態様では、金属パイプ材料の端部の温度が金属パイプ材料の中央部の温度よりも低くなるように金属パイプ材料が加熱される。金属パイプ材料の成形時に金属パイプ材料の端部の温度上昇が抑えられると、金属パイプ材料の端部には焼きが入りにくくなるので、硬度の上昇が抑制される。一方、金属パイプの中央部は、高温に加熱されるので、その後冷却されることで焼き入れが行われ、硬度が高められる。したがって、上記態様の成形装置によれば、端部の硬度が低く、中央部の硬度が高い金属パイプを成形することができる。
 電極には、冷却媒体を流通させる冷媒流路が形成されていてもよい。この冷媒流路を冷却媒体が流通することで、電極からの電力供給時に金属パイプ材料の端部の温度上昇を抑制することができる。したがって、当該電極に保持される金属パイプ材料の端部に焼き入れが行われにくくなり、端部の硬度が低い金属パイプをより確実に形成することができる。
 電極と成形金型との間には、電極側から順に絶縁材及び摺動材が配列されており、絶縁材及び摺動材の配列方向における絶縁材の厚さと摺動材の厚さの和が、金属パイプ材料の長手方向における電極と金属パイプ材料との接触長さよりも大きくてもよい。金属パイプ材料のうち絶縁材及び摺動材に保持されている部分は、冷却速度が遅く、焼きが入りにくいので、相対的に厚い絶縁材及び摺動材を備えることにより、金属パイプの端部に形成される硬度の低い領域を大きくすることができる。
 一態様によれば、端部の硬度が低く、中央部の硬度が高い金属パイプを成形することができる。
 10…成形装置、11…下型、12…上型、13…成形金型、14…金属パイプ材料、14a,14b…端部、14c…中央部、17,18…電極、26,27…冷媒流路、30…パイプ保持機構、31,32…冷媒供給装置、40…気体供給機構、50…電力供給部、60…気体供給部、70…制御部、91a,101a…第1の絶縁材(部材)、91b,101b…第2の絶縁材(部材)、92,102…摺動材(部材)、100…金属パイプ、100a,100b…端部、100c…中央部、D…厚さの和、L…接触長さ、MC…キャビティ部、R…冷却媒体。
 

Claims (3)

  1.  金属パイプ材料を膨張させて金属パイプを成形する成形装置であって、
     前記金属パイプ材料を保持すると共に、前記金属パイプ材料へ電力を供給して該金属パイプ材料を加熱する電極と、
     膨張した前記金属パイプを焼き入れ成形する成形金型と、
     前記電極と前記成形金型との間に配置される部材と、を備え、
     前記部材の長さの調整が行われることで、前記金属パイプにおいて焼き入れが行われない領域が調整される、成形装置。
  2.  前記部材は、前記電極側から順に配列された絶縁材及び摺動材であり、
     前記絶縁材及び前記摺動材の配列方向における前記絶縁材の厚さと前記摺動材の厚さの和は、前記金属パイプ材料の長手方向における前記電極と前記金属パイプ材料との接触長さよりも大きい、請求項1に記載の成形装置。
  3.  金属パイプ材料を膨張させて金属パイプを成形する成形方法であって、
     前記金属パイプ材料を加熱する工程と、
     成形金型を用いて膨張した前記金属パイプ材料を成形する工程と、
    を含み、
     前記加熱する工程では、長さの調整がされた部材を前記電極と前記成形金型との間に配置し、前記金属パイプにおいて焼き入れが行われない領域を調整する、成形方法。
PCT/JP2020/008691 2019-03-27 2020-03-02 成形装置及び成形方法 WO2020195579A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
JP2021508882A JPWO2020195579A1 (ja) 2019-03-27 2020-03-02
CA3129578A CA3129578A1 (en) 2019-03-27 2020-03-02 Molding apparatus and molding method
EP20778654.2A EP3950163A4 (en) 2019-03-27 2020-03-02 MOLDING APPARATUS AND METHOD
KR1020217021404A KR20210142089A (ko) 2019-03-27 2020-03-02 성형장치 및 성형방법
CN202080009310.3A CN113573824A (zh) 2019-03-27 2020-03-02 成型装置及成型方法
US17/398,689 US20210362208A1 (en) 2019-03-27 2021-08-10 Forming apparatus and forming method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019060898 2019-03-27
JP2019-060898 2019-03-27

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US17/398,689 Continuation US20210362208A1 (en) 2019-03-27 2021-08-10 Forming apparatus and forming method

Publications (1)

Publication Number Publication Date
WO2020195579A1 true WO2020195579A1 (ja) 2020-10-01

Family

ID=72610032

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/008691 WO2020195579A1 (ja) 2019-03-27 2020-03-02 成形装置及び成形方法

Country Status (7)

Country Link
US (1) US20210362208A1 (ja)
EP (1) EP3950163A4 (ja)
JP (1) JPWO2020195579A1 (ja)
KR (1) KR20210142089A (ja)
CN (1) CN113573824A (ja)
CA (1) CA3129578A1 (ja)
WO (1) WO2020195579A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023157698A1 (ja) * 2022-02-17 2023-08-24 住友重機械工業株式会社 成形装置

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111727663B (zh) * 2018-03-06 2024-03-26 住友重机械工业株式会社 电加热装置
CN114453503B (zh) * 2021-12-29 2023-11-14 江苏铠杰轻合金材料有限公司 曲铝板在线整形装置
CN116441420B (zh) * 2023-06-16 2023-08-22 江苏巨登不锈钢管业有限公司 一种不锈钢管冲压成型装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6613164B2 (en) * 1999-09-24 2003-09-02 Hot Metal Gas Forming Intellectual Property, Inc. Method of forming a tubular blank into a structural component and die therefor
US20070101786A1 (en) * 2005-11-10 2007-05-10 Gm Global Technology Operations, Inc. Method for tube forming
JP2015221445A (ja) * 2014-05-22 2015-12-10 住友重機械工業株式会社 成形装置及び成形方法
JP2016190248A (ja) 2015-03-31 2016-11-10 住友重機械工業株式会社 成形装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7159427B2 (en) * 2004-02-27 2007-01-09 General Motors Corporation Heated and insulated tool container for hot gas blow-forming
US7732734B2 (en) * 2004-09-17 2010-06-08 Noble Advanced Technologies, Inc. Metal forming apparatus and process with resistance heating
JP4447635B2 (ja) * 2007-12-13 2010-04-07 アイシン高丘株式会社 電極支持構造及びそれを有する通電加熱装置
JPWO2014061473A1 (ja) * 2012-10-18 2016-09-05 株式会社アステア 通電加熱装置
JP6745090B2 (ja) * 2015-03-31 2020-08-26 住友重機械工業株式会社 成形装置
DE112016001842T5 (de) * 2015-04-23 2017-12-28 Magna International Inc. Lasergesinterte Oberfläche einer Matritze für ein Werkzeug
CA2993609C (en) * 2015-08-28 2023-09-12 Sumitomo Heavy Industries, Ltd. Forming device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6613164B2 (en) * 1999-09-24 2003-09-02 Hot Metal Gas Forming Intellectual Property, Inc. Method of forming a tubular blank into a structural component and die therefor
US20070101786A1 (en) * 2005-11-10 2007-05-10 Gm Global Technology Operations, Inc. Method for tube forming
JP2015221445A (ja) * 2014-05-22 2015-12-10 住友重機械工業株式会社 成形装置及び成形方法
JP2016190248A (ja) 2015-03-31 2016-11-10 住友重機械工業株式会社 成形装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3950163A4

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023157698A1 (ja) * 2022-02-17 2023-08-24 住友重機械工業株式会社 成形装置

Also Published As

Publication number Publication date
CA3129578A1 (en) 2020-10-01
EP3950163A1 (en) 2022-02-09
CN113573824A (zh) 2021-10-29
JPWO2020195579A1 (ja) 2020-10-01
US20210362208A1 (en) 2021-11-25
EP3950163A4 (en) 2022-05-04
KR20210142089A (ko) 2021-11-24

Similar Documents

Publication Publication Date Title
WO2020195579A1 (ja) 成形装置及び成形方法
KR102362771B1 (ko) 성형장치
WO2016009854A1 (ja) 成形装置及び成形方法
JP6396249B2 (ja) 成形装置
JP6670543B2 (ja) 成形装置及び成形方法
JP7286535B2 (ja) 金属パイプの製造方法、及び成形装置
JP6757553B2 (ja) 成形装置
WO2016159134A1 (ja) 成形装置
JP2023065552A (ja) 成形装置、成形方法、及び金属パイプ
JP2021185002A (ja) 成形装置、及び成形方法
JP2016002577A (ja) 成形装置
WO2018179865A1 (ja) 通電加熱装置
JP7009264B2 (ja) 成形装置
JP2018001210A (ja) 成形装置
WO2019171867A1 (ja) 成形装置、及び金属パイプ
JP2020157354A (ja) 金属パイプ及び金属パイプの成形方法
JP6970163B2 (ja) 成形装置
JP2018196894A (ja) 通電加熱装置、及び通電加熱方法
JP7080085B2 (ja) 成形装置
WO2019163190A1 (ja) 成形装置
JP2018167284A (ja) 金属体及び通電加熱方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20778654

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021508882

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 3129578

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2020778654

Country of ref document: EP

Effective date: 20211027