WO2018143291A1 - 射出成形機 - Google Patents

射出成形機 Download PDF

Info

Publication number
WO2018143291A1
WO2018143291A1 PCT/JP2018/003263 JP2018003263W WO2018143291A1 WO 2018143291 A1 WO2018143291 A1 WO 2018143291A1 JP 2018003263 W JP2018003263 W JP 2018003263W WO 2018143291 A1 WO2018143291 A1 WO 2018143291A1
Authority
WO
WIPO (PCT)
Prior art keywords
valve body
screw
molding material
pressure
mold
Prior art date
Application number
PCT/JP2018/003263
Other languages
English (en)
French (fr)
Inventor
智人 両角
太郎 小木曽
佐々木 淳
Original Assignee
住友重機械工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=63040705&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=WO2018143291(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 住友重機械工業株式会社 filed Critical 住友重機械工業株式会社
Priority to CN202310797311.4A priority Critical patent/CN116653213A/zh
Priority to CN201880009377.XA priority patent/CN110234487B/zh
Priority to JP2018565617A priority patent/JP6918841B2/ja
Priority to EP18748469.6A priority patent/EP3578333B1/en
Publication of WO2018143291A1 publication Critical patent/WO2018143291A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/20Injection nozzles
    • B29C45/23Feed stopping equipment
    • B29C45/234Valves opened by the pressure of the moulding material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/20Injection nozzles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/1751Adjustment means allowing the use of moulds of different thicknesses
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/40Removing or ejecting moulded articles
    • B29C45/4005Ejector constructions; Ejector operating mechanisms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/46Means for plasticising or homogenising the moulding material or forcing it into the mould
    • B29C45/47Means for plasticising or homogenising the moulding material or forcing it into the mould using screws
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/64Mould opening, closing or clamping devices
    • B29C45/66Mould opening, closing or clamping devices mechanical
    • B29C45/661Mould opening, closing or clamping devices mechanical using a toggle mechanism for mould clamping
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/72Heating or cooling
    • B29C45/74Heating or cooling of the injection unit
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/76Measuring, controlling or regulating
    • B29C45/77Measuring, controlling or regulating of velocity or pressure of moulding material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/76Measuring, controlling or regulating
    • B29C45/78Measuring, controlling or regulating of temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/20Injection nozzles
    • B29C45/23Feed stopping equipment
    • B29C2045/235Feed stopping equipment axially movable inclined or orthogonal valves
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/64Mould opening, closing or clamping devices
    • B29C45/66Mould opening, closing or clamping devices mechanical
    • B29C45/661Mould opening, closing or clamping devices mechanical using a toggle mechanism for mould clamping
    • B29C2045/662Mould opening, closing or clamping devices mechanical using a toggle mechanism for mould clamping using toggles directly connected or linked to the fixed platen and indirectly to the movable platen
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2945/00Indexing scheme relating to injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould
    • B29C2945/76Measuring, controlling or regulating
    • B29C2945/76494Controlled parameter
    • B29C2945/76498Pressure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2945/00Indexing scheme relating to injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould
    • B29C2945/76Measuring, controlling or regulating
    • B29C2945/76655Location of control
    • B29C2945/76658Injection unit
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2945/00Indexing scheme relating to injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould
    • B29C2945/76Measuring, controlling or regulating
    • B29C2945/76655Location of control
    • B29C2945/76765Moulding material

Definitions

  • the present invention relates to an injection molding machine.
  • Patent Document 1 has a shut-off nozzle that can be opened and closed by a needle valve at the top of the cylinder in order to prevent the molten resin in the cylinder from leaking when the mold is opened.
  • a driving method of the needle valve there are a straight cam type, a direct acting type, a lever type and the like. In either method, the needle valve is moved back and forth, and the force of the actuator is used when the needle valve is closed, and the resin pressure generated when the resin is injected when the needle valve is opened (Patent Document 1). Paragraph 0004).
  • the nozzle is provided with a valve body in which a flow path of a molding material such as resin is formed and moved between an open position for opening the flow path and a closed position for closing the flow path.
  • the moving direction of the valve body may be the axial direction of the nozzle or a direction orthogonal to the axial direction of the nozzle.
  • the pressure of the molding material generated in the filling process has been used for the movement of the valve body from the closed position to the open position, and the pressure of the molding material generated in the filling process has been large.
  • the valve body and the valve body moving mechanism that moves the valve body are damaged by the impact.
  • the present invention has been made in view of the above problems, and a main object of the present invention is to provide an injection molding machine that can reduce an impact caused by movement of a valve body that opens and closes a flow path of a molding material in a nozzle.
  • a nozzle for injecting molding material into the mold apparatus A flow path opening and closing mechanism for opening and closing the flow path of the molding material in the nozzle; A cylinder provided with the nozzle at the front end; A screw that is rotatably and reciprocally disposed within the cylinder; A drive source for driving the screw; A controller for controlling the flow path opening and closing mechanism and the drive source,
  • the flow path opening / closing mechanism moves a valve body that is moved between an open position that opens the flow path and a closed position that closes the flow path, and moves the valve body that is in the open position to the closed position, The operation of fixing the valve body in the closed position and the movement of the valve body to the open position by the pressure of the molding material accumulated in the nozzle by releasing the fixation of the valve body in the closed position
  • a valve body moving mechanism that performs an operation that enables The control device, after the start of the metering step of storing the molding material in the front portion of the cylinder, before the
  • an injection molding machine that can reduce an impact caused by movement of a valve body that opens and closes a flow path of a molding material in a nozzle.
  • FIG. 1 is a diagram illustrating a state when mold opening of an injection molding machine according to an embodiment is completed.
  • FIG. 2 is a diagram illustrating a state during mold clamping of the injection molding machine according to the embodiment. 1 and 2, the X direction, the Y direction, and the Z direction are directions perpendicular to each other. The X direction and the Y direction represent the horizontal direction, and the Z direction represents the vertical direction.
  • the mold clamping device 100 is a horizontal mold
  • the X direction is the mold opening / closing direction
  • the Y direction is the width direction of the injection molding machine.
  • the injection molding machine includes a mold clamping device 100, an ejector device 200, an injection device 300, a moving device 400, a control device 700, and a frame Fr.
  • each component of the injection molding machine will be described.
  • the mold clamping apparatus 100 performs mold closing, mold clamping, and mold opening of the mold apparatus 10.
  • the mold clamping device 100 is, for example, a horizontal mold, and the mold opening / closing direction is the horizontal direction.
  • the mold clamping device 100 includes a fixed platen 110, a movable platen 120, a toggle support 130, a tie bar 140, a toggle mechanism 150, a mold clamping motor 160, a motion converting mechanism 170, and a mold thickness adjusting mechanism 180.
  • the fixed platen 110 is fixed to the frame Fr.
  • the fixed mold 11 is attached to the surface of the fixed platen 110 facing the movable platen 120.
  • the movable platen 120 is movable in the mold opening / closing direction with respect to the frame Fr.
  • a guide 101 for guiding the movable platen 120 is laid on the frame Fr.
  • the movable mold 12 is attached to the surface of the movable platen 120 that faces the fixed platen 110.
  • the mold is closed, clamped, and opened by moving the movable platen 120 forward and backward with respect to the fixed platen 110.
  • the fixed mold 11 and the movable mold 12 constitute a mold apparatus 10.
  • the toggle support 130 is connected to the fixed platen 110 at an interval, and is placed on the frame Fr so as to be movable in the mold opening / closing direction.
  • the toggle support 130 may be movable along a guide laid on the frame Fr.
  • the guide of the toggle support 130 may be the same as the guide 101 of the movable platen 120.
  • the fixed platen 110 is fixed to the frame Fr, and the toggle support 130 is movable in the mold opening / closing direction with respect to the frame Fr.
  • the toggle support 130 is fixed to the frame Fr and fixed to the fixed platen. 110 may be movable in the mold opening / closing direction with respect to the frame Fr.
  • the tie bar 140 connects the fixed platen 110 and the toggle support 130 with an interval L in the mold opening / closing direction.
  • a plurality (for example, four) of tie bars 140 may be used.
  • Each tie bar 140 is parallel to the mold opening / closing direction and extends according to the mold clamping force.
  • the at least one tie bar 140 may be provided with a tie bar distortion detector 141 that detects distortion of the tie bar 140.
  • the tie bar distortion detector 141 sends a signal indicating the detection result to the control device 700.
  • the detection result of the tie bar distortion detector 141 is used for detecting the clamping force.
  • the tie bar strain detector 141 is used as a mold clamping force detector for detecting the mold clamping force, but the present invention is not limited to this.
  • the clamping force detector is not limited to the strain gauge type, and may be a piezoelectric type, a capacitive type, a hydraulic type, an electromagnetic type, and the like, and the mounting position thereof is not limited to the tie bar 140.
  • the toggle mechanism 150 is disposed between the movable platen 120 and the toggle support 130, and moves the movable platen 120 relative to the toggle support 130 in the mold opening / closing direction.
  • the toggle mechanism 150 includes a cross head 151, a pair of links, and the like.
  • Each link group includes a first link 152 and a second link 153 that are connected to each other by a pin or the like.
  • the first link 152 is swingably attached to the movable platen 120 with a pin or the like
  • the second link 153 is swingably attached to the toggle support 130 with a pin or the like.
  • the second link 153 is attached to the crosshead 151 via the third link 154.
  • the configuration of the toggle mechanism 150 is not limited to the configuration shown in FIGS.
  • the number of nodes in each link group is five, but four may be used, and one end of the third link 154 is coupled to the node between the first link 152 and the second link 153. May be.
  • the mold clamping motor 160 is attached to the toggle support 130 and operates the toggle mechanism 150.
  • the mold clamping motor 160 causes the first link 152 and the second link 153 to bend and extend by advancing and retracting the cross head 151 relative to the toggle support 130, and advances and retracts the movable platen 120 relative to the toggle support 130.
  • the mold clamping motor 160 is directly connected to the motion conversion mechanism 170, but may be connected to the motion conversion mechanism 170 via a belt, a pulley, or the like.
  • the motion conversion mechanism 170 converts the rotational motion of the mold clamping motor 160 into the linear motion of the cross head 151.
  • the motion conversion mechanism 170 includes a screw shaft 171 and a screw nut 172 that is screwed onto the screw shaft 171.
  • a ball or a roller may be interposed between the screw shaft 171 and the screw nut 172.
  • the mold clamping apparatus 100 performs a mold closing process, a mold clamping process, a mold opening process, and the like under the control of the control apparatus 700.
  • the mold clamping motor 160 is driven to advance the cross head 151 to a mold closing completion position at a set speed, thereby moving the movable platen 120 forward and causing the movable mold 12 to touch the fixed mold 11.
  • the position and speed of the cross head 151 are detected using, for example, a mold clamping motor encoder 161.
  • the mold clamping motor encoder 161 detects the rotation of the mold clamping motor 160 and sends a signal indicating the detection result to the control device 700.
  • the crosshead position detector that detects the position of the crosshead 151 and the crosshead speed detector that detects the speed of the crosshead 151 are not limited to the mold clamping motor encoder 161, and general ones can be used.
  • the movable platen position detector that detects the position of the movable platen 120 and the movable platen speed detector that detects the speed of the movable platen 120 are not limited to the mold clamping motor encoder 161, and general ones can be used.
  • a mold clamping force is generated by further driving the mold clamping motor 160 to further advance the cross head 151 from the mold closing completion position to the mold clamping position.
  • a cavity space 14 (see FIG. 2) is formed between the movable mold 12 and the fixed mold 11, and the injection device 300 fills the cavity space 14 with a liquid molding material.
  • a molded product is obtained by solidifying the filled molding material.
  • a plurality of cavity spaces 14 may be provided, and in this case, a plurality of molded products can be obtained simultaneously.
  • the mold clamping motor 160 is driven to retract the cross head 151 to the mold opening completion position at a set speed, thereby retracting the movable platen 120 and separating the movable mold 12 from the fixed mold 11. Thereafter, the ejector device 200 ejects the molded product from the movable mold 12.
  • Setting conditions in the mold closing process and the mold clamping process are collectively set as a series of setting conditions.
  • the speed and position of the crosshead 151 in the mold closing process and the mold clamping process (including the mold closing start position, the speed switching position, the mold closing completion position, and the mold clamping position) and the mold clamping force are set as a series of setting conditions.
  • the mold closing start position, the speed switching position, the mold closing completion position, and the mold clamping position are arranged in this order from the rear side to the front side, and represent the start point and end point of the section where the speed is set.
  • a speed is set for each section. There may be one or more speed switching positions.
  • the speed switching position may not be set.
  • the setting conditions in the mold opening process are set similarly.
  • the speed and position (including the mold opening start position, the speed switching position, and the mold opening completion position) of the cross head 151 in the mold opening process are collectively set as a series of setting conditions.
  • the mold opening start position, the speed switching position, and the mold opening completion position are arranged in this order from the front side to the rear side, and represent the start point and end point of the section where the speed is set.
  • a speed is set for each section. There may be one or more speed switching positions.
  • the speed switching position may not be set.
  • the mold opening start position and the mold clamping position may be the same position. Further, the mold opening completion position and the mold closing start position may be the same position.
  • the speed and position of the movable platen 120 may be set.
  • a mold clamping force may be set instead of the position of the cross head (for example, the mold clamping position) or the position of the movable platen.
  • the toggle mechanism 150 amplifies the driving force of the mold clamping motor 160 and transmits it to the movable platen 120.
  • the amplification magnification is also called toggle magnification.
  • the toggle magnification changes in accordance with an angle ⁇ formed by the first link 152 and the second link 153 (hereinafter also referred to as “link angle ⁇ ”).
  • the link angle ⁇ is obtained from the position of the crosshead 151. When the link angle ⁇ is 180 °, the toggle magnification is maximized.
  • the mold thickness adjustment is performed so that a predetermined mold clamping force can be obtained at the time of mold clamping.
  • the distance L between the fixed platen 110 and the toggle support 130 is set so that the link angle ⁇ of the toggle mechanism 150 becomes a predetermined angle when the movable mold 12 touches the fixed mold 11. Adjust.
  • the mold clamping device 100 includes a mold thickness adjusting mechanism 180 that performs mold thickness adjustment by adjusting the distance L between the fixed platen 110 and the toggle support 130.
  • the mold thickness adjusting mechanism 180 rotates a screw shaft 181 formed at the rear end portion of the tie bar 140, a screw nut 182 that is rotatably held by the toggle support 130, and a screw nut 182 that is screwed onto the screw shaft 181.
  • a mold thickness adjusting motor 183 a mold thickness adjusting mechanism 180 that performs mold thickness adjustment by adjusting the distance L between the fixed platen 110 and the toggle support 130.
  • the mold thickness adjusting mechanism 180 rotates a screw shaft 181 formed at the rear end portion of the tie bar 140, a screw nut 182 that is rotatably held by the toggle support 130, and a screw nut 182 that is screwed onto the screw shaft 181.
  • a mold thickness adjusting motor 183 a mold thickness adjusting motor
  • the screw shaft 181 and the screw nut 182 are provided for each tie bar 140.
  • the rotation of the mold thickness adjusting motor 183 may be transmitted to the plurality of screw nuts 182 via the rotation transmitting unit 185.
  • a plurality of screw nuts 182 can be rotated synchronously.
  • Rotation transmission unit 185 is configured with a gear, for example.
  • a passive gear is formed on the outer periphery of each screw nut 182
  • a drive gear is attached to the output shaft of the mold thickness adjusting motor 183
  • a plurality of passive gears and an intermediate gear that meshes with the drive gear are in the central portion of the toggle support 130. It is held rotatably.
  • the rotation transmission part 185 may be comprised with a belt, a pulley, etc. instead of a gearwheel.
  • the operation of the mold thickness adjusting mechanism 180 is controlled by the control device 700.
  • the control device 700 drives the mold thickness adjusting motor 183 to rotate the screw nut 182, thereby adjusting the position of the toggle support 130 that rotatably holds the screw nut 182 with respect to the fixed platen 110.
  • the interval L with the toggle support 130 is adjusted.
  • the screw nut 182 is rotatably held with respect to the toggle support 130, and the tie bar 140 on which the screw shaft 181 is formed is fixed to the fixed platen 110, but the present invention is not limited to this.
  • the screw nut 182 may be rotatably held with respect to the fixed platen 110, and the tie bar 140 may be fixed with respect to the toggle support 130.
  • the interval L can be adjusted by rotating the screw nut 182.
  • the screw nut 182 may be fixed to the toggle support 130, and the tie bar 140 may be held rotatably with respect to the fixed platen 110. In this case, the interval L can be adjusted by rotating the tie bar 140.
  • the screw nut 182 may be fixed to the fixed platen 110, and the tie bar 140 may be held rotatably with respect to the toggle support 130. In this case, the interval L can be adjusted by rotating the tie bar 140.
  • Interval L is detected using a mold thickness adjusting motor encoder 184.
  • the mold thickness adjustment motor encoder 184 detects the amount and direction of rotation of the mold thickness adjustment motor 183 and sends a signal indicating the detection result to the control device 700.
  • the detection result of the mold thickness adjusting motor encoder 184 is used for monitoring and controlling the position and interval L of the toggle support 130.
  • the toggle support position detector for detecting the position of the toggle support 130 and the interval detector for detecting the interval L are not limited to the mold thickness adjusting motor encoder 184, and general ones can be used.
  • the mold thickness adjusting mechanism 180 adjusts the interval L by rotating one of the screw shaft 181 and the screw nut 182 that are screwed together.
  • a plurality of mold thickness adjusting mechanisms 180 may be used, and a plurality of mold thickness adjusting motors 183 may be used.
  • the mold thickness adjusting mechanism 180 of this embodiment has a screw shaft 181 formed on the tie bar 140 and a screw nut 182 screwed to the screw shaft 181 in order to adjust the interval L. It is not limited to.
  • the mold thickness adjusting mechanism 180 may include a tie bar temperature controller that adjusts the temperature of the tie bar 140.
  • the tie bar temperature controller is attached to each tie bar 140 and adjusts the temperature of the plurality of tie bars 140 in cooperation with each other. As the temperature of the tie bar 140 increases, the tie bar 140 becomes longer due to thermal expansion, and the interval L increases. The temperature of the plurality of tie bars 140 can be adjusted independently.
  • the tie bar temperature controller includes a heater such as a heater, and adjusts the temperature of the tie bar 140 by heating.
  • the tie bar temperature controller may include a cooler such as a water cooling jacket, and the temperature of the tie bar 140 may be adjusted by cooling.
  • the tie bar temperature controller may include both a heater and a cooler.
  • the mold clamping device 100 of the present embodiment is a horizontal mold in which the mold opening / closing direction is the horizontal direction, but may be a vertical mold in which the mold opening / closing direction is the vertical direction.
  • the vertical mold clamping apparatus includes a lower platen, an upper platen, a toggle support, a tie bar, a toggle mechanism, and a mold clamping motor.
  • One of the lower platen and the upper platen is used as a fixed platen, and the other is used as a movable platen.
  • a lower mold is attached to the lower platen, and an upper mold is attached to the upper platen.
  • the lower die and the upper die constitute a mold apparatus.
  • the lower mold may be attached to the lower platen via a rotary table.
  • the toggle support is disposed below the lower platen and connected to the upper platen via a tie bar.
  • the tie bar connects the upper platen and the toggle support at intervals in the mold opening / closing direction.
  • the toggle mechanism is disposed between the toggle support and the lower platen, and moves the movable platen up and down.
  • the mold clamping motor operates a toggle mechanism.
  • the number of tie bars is usually three. The number of tie bars is not particularly limited.
  • the mold clamping device 100 includes the mold clamping motor 160 as a drive source, but may include a hydraulic cylinder instead of the mold clamping motor 160.
  • the mold clamping device 100 may include a linear motor for opening and closing the mold and an electromagnet for mold clamping.
  • the ejector device 200 projects a molded product from the mold device 10.
  • the ejector device 200 includes an ejector motor 210, a motion conversion mechanism 220, an ejector rod 230, and the like.
  • the ejector motor 210 is attached to the movable platen 120.
  • the ejector motor 210 is directly connected to the motion conversion mechanism 220, but may be connected to the motion conversion mechanism 220 via a belt, a pulley, or the like.
  • the motion conversion mechanism 220 converts the rotational motion of the ejector motor 210 into the linear motion of the ejector rod 230.
  • the motion conversion mechanism 220 includes a screw shaft and a screw nut that is screwed onto the screw shaft. A ball or a roller may be interposed between the screw shaft and the screw nut.
  • the ejector rod 230 is allowed to advance and retract in the through hole of the movable platen 120.
  • the front end portion of the ejector rod 230 is in contact with the movable member 15 which is disposed inside the movable mold 12 so as to be able to advance and retract.
  • the front end portion of the ejector rod 230 may or may not be connected to the movable member 15.
  • the ejector device 200 performs the ejection process under the control of the control device 700.
  • the ejector motor 210 is driven to advance the ejector rod 230 from the standby position to the ejecting position at a set speed, thereby moving the movable member 15 forward and ejecting the molded product. Thereafter, the ejector motor 210 is driven to retract the ejector rod 230 at a set speed, and the movable member 15 is retracted to the original standby position.
  • the position and speed of the ejector rod 230 are detected using the ejector motor encoder 211, for example.
  • the ejector motor encoder 211 detects the rotation of the ejector motor 210 and sends a signal indicating the detection result to the control device 700.
  • the ejector rod position detector that detects the position of the ejector rod 230 and the ejector rod speed detector that detects the speed of the ejector rod 230 are not limited to the ejector motor encoder 211, and general ones can be used.
  • injection device Injection device, unlike the description of the mold clamping device 100 and the description of the ejector device 200, the moving direction of the screw 330 during filling (the left direction in FIGS. 1 and 2) is the front, and the screw 330 during weighing is used. The moving direction (right direction in FIGS. 1 and 2) will be described as the rear.
  • the injection device 300 is installed on a slide base 301 that can move forward and backward with respect to the frame Fr, and can move forward and backward with respect to the mold device 10.
  • the injection apparatus 300 touches the mold apparatus 10 and fills the cavity space 14 in the mold apparatus 10 with a molding material.
  • the injection device 300 includes, for example, a cylinder 310, a nozzle 320, a screw 330, a metering motor 340, an injection motor 350, a pressure detector 360, and the like.
  • the cylinder 310 heats the molding material supplied from the supply port 311 to the inside.
  • the molding material includes, for example, a resin.
  • the molding material is formed in a pellet shape, for example, and is supplied to the supply port 311 in a solid state.
  • the supply port 311 is formed at the rear part of the cylinder 310.
  • a cooler 312 such as a water-cooled cylinder is provided on the outer periphery of the rear portion of the cylinder 310.
  • a heater 313 such as a band heater and a temperature detector 314 are provided on the outer periphery of the cylinder 310.
  • the cylinder 310 is divided into a plurality of zones in the axial direction of the cylinder 310 (the left-right direction in FIGS. 1 and 2).
  • a heater 313 and a temperature detector 314 are provided in each zone.
  • the control device 700 controls the heater 313 so that the temperature detected by the temperature detector 314 becomes a set temperature.
  • the nozzle 320 is provided at the front end of the cylinder 310 and is pressed against the mold apparatus 10.
  • a heater 313 and a temperature detector 314 are provided on the outer periphery of the nozzle 320.
  • the control device 700 controls the heater 313 so that the detected temperature of the nozzle 320 becomes the set temperature.
  • the screw 330 is disposed in the cylinder 310 so as to be freely rotatable and movable back and forth.
  • the molding material is fed forward along the spiral groove of the screw 330.
  • the molding material is gradually melted by the heat from the cylinder 310 while being fed forward.
  • the screw 330 is retracted. Thereafter, when the screw 330 is advanced, the liquid molding material accumulated in front of the screw 330 is injected from the nozzle 320 and filled in the mold apparatus 10.
  • a backflow prevention ring 331 is attached to the front part of the screw 330 as a backflow prevention valve that prevents the backflow of the molding material from the front to the back of the screw 330 when the screw 330 is pushed forward.
  • the backflow prevention ring 331 When the screw 330 is advanced, the backflow prevention ring 331 is pushed backward by the pressure of the molding material in front of the screw 330 and is relatively relative to the screw 330 to a closed position (see FIG. 2) that closes the flow path of the molding material. fall back. This prevents the molding material accumulated in front of the screw 330 from flowing backward.
  • the backflow prevention ring 331 is pushed forward by the pressure of the molding material sent forward along the spiral groove of the screw 330 to open the flow path of the molding material. It moves forward relative to the screw 330 up to (see FIG. 1). Thereby, a molding material is sent ahead of the screw 330.
  • the backflow prevention ring 331 may be either a co-rotating type that rotates with the screw 330 or a non-co-rotating type that does not rotate with the screw 330.
  • the injection device 300 may have a drive source for moving the backflow prevention ring 331 forward and backward between the open position and the closed position with respect to the screw 330.
  • the weighing motor 340 rotates the screw 330.
  • the drive source for rotating the screw 330 is not limited to the metering motor 340, and may be a hydraulic pump, for example.
  • the injection motor 350 moves the screw 330 back and forth. Between the injection motor 350 and the screw 330, a motion conversion mechanism for converting the rotational motion of the injection motor 350 into the linear motion of the screw 330 is provided.
  • the motion conversion mechanism includes, for example, a screw shaft and a screw nut that is screwed onto the screw shaft. A ball, a roller, or the like may be provided between the screw shaft and the screw nut.
  • the drive source for moving the screw 330 back and forth is not limited to the injection motor 350, and may be a hydraulic cylinder, for example.
  • the pressure detector 360 detects the pressure transmitted between the injection motor 350 and the screw 330.
  • the pressure detector 360 is provided in a force transmission path between the injection motor 350 and the screw 330 and detects the pressure acting on the pressure detector 360.
  • the pressure detector 360 sends a signal indicating the detection result to the control device 700.
  • the detection result of the pressure detector 360 is used for control and monitoring of the pressure received by the screw 330 from the molding material, the back pressure against the screw 330, the pressure acting on the molding material from the screw 330, and the like.
  • the injection apparatus 300 performs a measurement process, a filling process, a pressure holding process, and the like under the control of the control apparatus 700.
  • the weighing motor 340 is driven to rotate the screw 330 at the set rotation speed, and the molding material is fed forward along the spiral groove of the screw 330. Along with this, the molding material is gradually melted. As the liquid molding material is fed forward of the screw 330 and accumulated in the front of the cylinder 310, the screw 330 is retracted.
  • the number of rotations of the screw 330 is detected by using, for example, a weighing motor encoder 341.
  • the weighing motor encoder 341 detects the rotation of the weighing motor 340 and sends a signal indicating the detection result to the control device 700.
  • the screw rotation number detector for detecting the rotation number of the screw 330 is not limited to the metering motor encoder 341, and a general one can be used.
  • the set back pressure may be applied to the screw 330 by driving the injection motor 350 in order to limit the rapid retreat of the screw 330.
  • the back pressure with respect to the screw 330 is detected using, for example, a pressure detector 360.
  • the pressure detector 360 sends a signal indicating the detection result to the control device 700.
  • the injection motor 350 is driven to advance the screw 330 at a set speed, and the liquid molding material accumulated in front of the screw 330 is filled into the cavity space 14 in the mold apparatus 10.
  • the position and speed of the screw 330 are detected using, for example, the injection motor encoder 351.
  • the injection motor encoder 351 detects the rotation of the injection motor 350 and sends a signal indicating the detection result to the control device 700.
  • V / P switching switching from the filling process to the pressure holding process
  • a position where the V / P switching is performed is also referred to as a V / P switching position.
  • the set speed of the screw 330 may be changed according to the position and time of the screw 330.
  • the screw 330 may be temporarily stopped at the set position, and then V / P switching may be performed. Immediately before the V / P switching, instead of stopping the screw 330, the screw 330 may be moved forward or backward at a slow speed.
  • the screw position detector that detects the position of the screw 330 and the screw speed detector that detects the speed of the screw 330 are not limited to the injection motor encoder 351, and general ones can be used.
  • the injection motor 350 is driven to push the screw 330 forward, and the pressure of the molding material at the front end portion of the screw 330 (hereinafter also referred to as “holding pressure”) is maintained at a set pressure, The remaining molding material is pushed toward the mold apparatus 10. Insufficient molding material due to cooling shrinkage in the mold apparatus 10 can be replenished.
  • the holding pressure is detected using a pressure detector 360, for example.
  • the pressure detector 360 sends a signal indicating the detection result to the control device 700.
  • the set value of the holding pressure may be changed according to the elapsed time from the start of the pressure holding process.
  • the molding material in the cavity space 14 in the mold apparatus 10 is gradually cooled, and when the pressure holding process is completed, the inlet of the cavity space 14 is closed with the solidified molding material. This state is called a gate seal, and the backflow of the molding material from the cavity space 14 is prevented.
  • the cooling process is started. In the cooling process, the molding material in the cavity space 14 is solidified. In order to shorten the molding cycle time, a metering step may be performed during the cooling step.
  • the injection apparatus 300 of this embodiment is an inline screw system, a pre-plastic system etc. may be sufficient.
  • a pre-plastic injection device supplies a molding material melted in a plasticizing cylinder to the injection cylinder, and injects the molding material from the injection cylinder into a mold device.
  • a screw is rotatably or rotatably and reciprocally disposed
  • a plunger is reciprocally disposed.
  • the injection device 300 of the present embodiment is a horizontal type in which the axial direction of the cylinder 310 is the horizontal direction, but may be a vertical type in which the axial direction of the cylinder 310 is the vertical direction.
  • the clamping device combined with the vertical injection device 300 may be vertical or horizontal.
  • the mold clamping device combined with the horizontal injection device 300 may be a horizontal type or a saddle type.
  • the moving device 400 moves the injection device 300 forward and backward with respect to the mold device 10. Further, the moving device 400 presses the nozzle 320 against the mold device 10 to generate a nozzle touch pressure.
  • the moving device 400 includes a hydraulic pump 410, a motor 420 as a drive source, a hydraulic cylinder 430 as a hydraulic actuator, and the like.
  • the hydraulic pump 410 has a first port 411 and a second port 412.
  • the hydraulic pump 410 is a bi-directionally rotatable pump, and by switching the rotation direction of the motor 420, hydraulic fluid (for example, oil) is sucked from one of the first port 411 and the second port 412 and discharged from the other. Then, hydraulic pressure is generated.
  • the hydraulic pump 410 can also suck the working fluid from the tank 413 and discharge the working fluid from either the first port 411 or the second port 412.
  • the motor 420 operates the hydraulic pump 410.
  • the motor 420 drives the hydraulic pump 410 with a rotation direction and a rotation torque according to a control signal from the control device 700.
  • the motor 420 may be an electric motor or an electric servo motor.
  • the hydraulic cylinder 430 includes a cylinder body 431, a piston 432, and a piston rod 433.
  • the cylinder body 431 is fixed with respect to the injection device 300.
  • the piston 432 divides the interior of the cylinder body 431 into a front chamber 435 as a first chamber and a rear chamber 436 as a second chamber.
  • the piston rod 433 is fixed to the fixed platen 110. Since the piston rod 433 passes through the front chamber 435, the cross-sectional area of the front chamber 435 is smaller than the cross-sectional area of the rear chamber 436.
  • the front chamber 435 of the hydraulic cylinder 430 is connected to the first port 411 of the hydraulic pump 410 via the first flow path 401.
  • the hydraulic fluid discharged from the first port 411 is supplied to the front chamber 435 via the first flow path 401, whereby the injection device 300 is pushed forward.
  • the injection device 300 is advanced, and the nozzle 320 is pressed against the fixed mold 11.
  • the front chamber 435 functions as a pressure chamber that generates the nozzle touch pressure of the nozzle 320 by the pressure of the hydraulic fluid supplied from the hydraulic pump 410.
  • the rear chamber 436 of the hydraulic cylinder 430 is connected to the second port 412 of the hydraulic pump 410 via the second flow path 402.
  • the hydraulic fluid discharged from the second port 412 is supplied to the rear chamber 436 of the hydraulic cylinder 430 through the second flow path 402, whereby the injection device 300 is pushed backward.
  • the injection device 300 is retracted, and the nozzle 320 is separated from the fixed mold 11.
  • the first relief valve 441 opens when the pressure in the first flow path 401 exceeds a set value, returns the excess hydraulic fluid in the first flow path 401 to the tank 413, and Keep pressure below set point.
  • the second relief valve 442 opens when the pressure in the second flow path 402 exceeds a set value, returns excess hydraulic fluid in the second flow path 402 to the tank 413, and Keep pressure below set point.
  • the flushing valve 443 is a valve that adjusts the excess or deficiency of the circulating amount of the hydraulic fluid caused by the difference between the cross-sectional area of the front chamber 435 and the cross-sectional area of the rear chamber 436.
  • It consists of a 4-port spool valve.
  • the first check valve 451 opens when the pressure in the first flow path 401 is lower than the pressure in the tank 413, and supplies the working fluid from the tank 413 to the first flow path 401.
  • the second check valve 452 opens when the pressure in the second flow path 402 is lower than the pressure in the tank 413, and supplies the working fluid from the tank 413 to the second flow path 402.
  • the electromagnetic switching valve 453 is a control valve that controls the flow of hydraulic fluid between the front chamber 435 of the hydraulic cylinder 430 and the first port 411 of the hydraulic pump 410.
  • the electromagnetic switching valve 453 is provided in the middle of the first flow path 401, for example, and controls the flow of hydraulic fluid in the first flow path 401.
  • the electromagnetic switching valve 453 is composed of a 2-position 2-port spool valve as shown in FIGS. 1 and 2, for example.
  • first position the position on the left side in FIGS. 1 and 2
  • second position the right position in FIGS. 1 and 2
  • the flow from the front chamber 435 to the first port 411 is restricted.
  • the flow from the first port 411 to the front chamber 435 is not limited, but may be limited.
  • the first pressure detector 455 detects the hydraulic pressure in the front chamber 435. Since the nozzle touch pressure is generated by the fluid pressure in the front chamber 435, the nozzle touch pressure can be detected using the first pressure detector 455.
  • the first pressure detector 455 is provided in the middle of the first flow path 401, for example, and is provided at a position on the front chamber 435 side with respect to the electromagnetic switching valve 453. Regardless of the state of the electromagnetic switching valve 453, the nozzle touch pressure can be detected.
  • the second pressure detector 456 is provided in the middle of the first flow path 401 and is provided at a position on the first port 411 side with the electromagnetic switching valve 453 as a reference.
  • the second pressure detector 456 detects the hydraulic pressure between the electromagnetic switching valve 453 and the first port 411.
  • the electromagnetic switching valve 453 is allowed to flow in both directions between the first port 411 and the front chamber 435, the hydraulic pressure between the first port 411 and the electromagnetic switching valve 453, the electromagnetic switching valve 453, and the front
  • the hydraulic pressure between the chamber 435 and the chamber 435 is equal. Therefore, in this state, the nozzle touch pressure can be detected using the second pressure detector 456.
  • the nozzle touch pressure is detected using a pressure detector provided in the middle of the first flow path 401, but the nozzle touch pressure may be detected using a load cell provided in the nozzle 320, for example. Good. That is, the pressure detector that detects the nozzle touch pressure may be provided in either the moving device 400 or the injection device 300.
  • the moving device 400 includes the hydraulic cylinder 430, but the present invention is not limited to this.
  • an electric motor and a motion conversion mechanism that converts the rotational motion of the electric motor into a linear motion of the injection device 300 may be used instead of the hydraulic cylinder 430.
  • the control device 700 is configured by a computer, for example, and includes a CPU (Central Processing Unit) 701, a storage medium 702 such as a memory, an input interface 703, and an output interface 704 as shown in FIGS.
  • the control device 700 performs various controls by causing the CPU 701 to execute a program stored in the storage medium 702.
  • the control device 700 receives a signal from the outside through the input interface 703 and transmits a signal to the outside through the output interface 704.
  • the control device 700 repeatedly manufactures a molded product by repeatedly performing a mold closing process, a mold clamping process, a mold opening process, and the like.
  • control device 700 performs a weighing process, a filling process, a pressure holding process, and the like during the mold clamping process.
  • a series of operations for obtaining a molded product for example, operations from the start of the weighing process to the start of the next weighing process are also referred to as “shot” or “molding cycle”.
  • the time required for one shot is also referred to as “molding cycle time”.
  • One molding cycle includes, for example, a metering process, a mold closing process, a mold clamping process, a filling process, a pressure holding process, a cooling process, a mold opening process, and an ejection process in this order. The order here is the order of starting each process.
  • the filling process, the pressure holding process, and the cooling process are performed from the start of the mold clamping process to the end of the mold clamping process.
  • the end of the mold clamping process coincides with the start of the mold opening process.
  • a plurality of steps may be performed simultaneously.
  • the metering step may be performed during the cooling step of the previous molding cycle, and in this case, the mold closing step may be performed at the beginning of the molding cycle.
  • the filling process may be started during the mold closing process.
  • the protruding process may be started during the mold opening process.
  • the mold opening process may be started during the measurement process. This is because even if the mold opening process is started during the measuring process, the molding material does not leak from the nozzle 320 if the on-off valve closes the flow path of the nozzle 320.
  • the control device 700 is connected to the operation device 750 and the display device 760.
  • the operation device 750 receives an input operation by a user and outputs a signal corresponding to the input operation to the control device 700.
  • the display device 760 displays an operation screen corresponding to an input operation on the operation device 750 under the control of the control device 700.
  • the operation screen is used for setting the injection molding machine.
  • a plurality of operation screens are prepared and displayed by switching or overlapping.
  • the user performs settings of the injection molding machine (including input of set values) by operating the operation device 750 while viewing the operation screen displayed on the display device 760.
  • the operation device 750 and the display device 760 may be configured with a touch panel, for example, and may be integrated. In addition, although the operating device 750 and the display device 760 of this embodiment are integrated, you may provide independently. In addition, a plurality of operation devices 750 may be provided.
  • FIG. 3 is a view showing a state in which the valve body is moved from the open position shown in FIG. 5 to the closed position by swinging the swing lever shown in FIG. 5 in the first direction (for example, clockwise).
  • FIG. 4 is a view showing a state in which the swing lever shown in FIG. 3 is swung in a second direction (for example, counterclockwise).
  • FIG. 5 is a view showing a state in which the valve body shown in FIG. 4 is moved from the closed position to the closed position by the pressure of the molding material generated in the measuring step.
  • the injection apparatus 300 includes a flow path opening / closing mechanism 329 that opens and closes the flow path 321 of the molding material in the nozzle 320.
  • the channel opening / closing mechanism 329 has a valve body 322 that is moved between an open position (see FIG. 5) for opening the channel 321 and a closing position (see FIG. 3) for opening the channel 321.
  • a wedge-shaped gap 323 that is tapered forward may be formed between the valve body 322 and the wall surface of the flow path 321.
  • the valve body 322 overcomes the adhesive force of the molding material and is moved from the closed position to the open position.
  • the moving direction of the valve body 322 may be a direction orthogonal to the axial direction of the nozzle 320 or the radial direction of the flow path 321 of the nozzle 320.
  • the moving direction of the valve body 322 is a direction orthogonal to the axial direction of the nozzle 320 in this embodiment, it may be the axial direction of the nozzle 320 as in the prior art.
  • the moving direction of the valve body 322 is the axial direction of the nozzle 320, not only when the valve body 322 is in the closed position but also when it is in the open position, it is inside the flow path 321.
  • the diameter of the flow path 321 is narrowed.
  • the molding material since the valve body 322 retreats from the flow path 321 when the valve body 322 moves from the closed position to the open position, the molding material easily passes through the nozzle in the filling process.
  • the flow resistance of the molding material at the nozzle 320 can be reduced, and heat generation of the molding material can be suppressed. Therefore, the cooling process time can be shortened and the molding cycle can be shortened.
  • the moving direction of the valve body 322 is a direction orthogonal to the axial direction of the nozzle 320 in this embodiment, it may be the axial direction of the nozzle 320 as in the prior art.
  • the flow path opening / closing mechanism 329 includes a valve body moving mechanism 324 that moves the valve body 322 between an open position and a closed position.
  • the valve body moving mechanism 324 moves the valve body 322 in the open position to the closed position, fixes the valve body 322 in the closed position, and releases the fixation of the valve body 322 in the closed position.
  • the operation of allowing the valve body 322 to move to the open position by the pressure of the molding material accumulated in 320 is performed.
  • the valve body moving mechanism 324 is, for example, a swing lever 325 that is swingably attached to the nozzle 320 and contacts the valve body 322, and the swing lever 325 moves the valve body 322 from the open position to the closed position.
  • a first direction clockwise direction in FIGS. 3 to 5
  • a second direction in the counterclockwise direction in FIGS. 3 to 5 for releasing the fixation of the valve body 322 in the closed position opposite to the first direction.
  • a fluid pressure cylinder 326 to be swung.
  • the swing lever 325 is swingable about a swing shaft 371 fixed to the nozzle 320, and is swung by expansion and contraction of the fluid pressure cylinder 326.
  • the swing lever 325 contacts the valve body 322 but is not connected to the valve body 322.
  • the fluid pressure cylinder 326 includes a cylinder body 327 and a piston rod 328 that moves by the pressure of the fluid supplied to the inside of the cylinder body 327.
  • a proximal end portion of the piston rod 328 is connected to a piston that slides inside the cylinder body 327.
  • the piston divides the inside of the cylinder body 327 into two chambers. By supplying pressure to one of the chambers, the piston is moved, and the piston rod 328 is moved.
  • the cylinder body 327 is swingable about a swing shaft 372 fixed to the nozzle 320.
  • the piston rod 328 is swingably connected to the swing lever 325 by a pin 373.
  • the arrangement of the cylinder body 327 and the piston rod 328 may be reversed. That is, the cylinder body 327 may be connected to the swing lever 325 by the pin 373, and the piston rod 328 may be swingable about the swing shaft 372.
  • the swing lever 325 swings in a second direction (for example, counterclockwise) opposite to the first direction. Be moved.
  • the swing lever 325 returns to the original position as shown in FIG. 4 and does not hinder the movement of the valve body 322 from the closed position to the open position. Accordingly, the valve body 322 in the closed position is released, and the valve body 322 can be moved to the open position by the pressure of the molding material accumulated in the nozzle 320.
  • valve body 322 is moved from the closed position shown in FIG. 4 to the open position shown in FIG. 5 by the pressure of the molding material in the wedge-shaped gap 323.
  • the movement of the valve body 322 from the closed position to the open position may be performed simultaneously with the swing of the swing lever 325 in the second direction or after the swing of the swing lever 325 in the second direction. It may be broken.
  • the driving force of the fluid pressure cylinder 326 is used to swing the swing lever 325 in the second direction and return to the original position.
  • the pressure of the molding material generated in the measuring process is used. Is also possible.
  • the control device 700 instead of supplying pressure to the fluid pressure cylinder 326, releases pressure from the fluid pressure cylinder 326 and allows fluid to enter and exit from the two chambers defined by the piston and the outside.
  • the fluid pressure cylinder 326 is a pneumatic cylinder, two rooms defined by the pistons are opened to the atmosphere. This allows the piston to move freely in both directions.
  • the pressure of the molding material generated in the measuring step is used to move the valve body 322 from the closed position to the open position, and the rocking lever 325 is pushed by the valve body 322 to swing the rocking lever 325 in the second direction. Can be made.
  • the swing lever 325 and the valve body 322 may be connected by a pin or the like.
  • the control device 700 reciprocates the valve body 322 between the open position and the closed position during one shot (for example, from the start of the measurement process to the start of the next measurement process).
  • the position of the valve body 322 is, for example, an open position in the filling process and the pressure holding process, and a closed position at the start of the measuring process.
  • the valve body 322 is moved from the open position to the closed position after the pressure holding process is completed and before the measurement process is started. Further, the valve body 322 is moved from the closed position to the open position by the pressure of the molding material accumulated in the nozzle 320 after the start of the metering process and before the start of the filling process.
  • the metering step is a step of storing a molding material in the front portion of the cylinder 310.
  • the start of the metering process means the start of the operation of the screw 330 for storing the molding material in the front portion of the cylinder 310.
  • the start of the weighing process is the start of rotation of the screw 330.
  • the start of the weighing process is the start of the rotation of the screw 330 in this embodiment, but it may be the start of the backward movement of the screw 330. That is, in the weighing step, the screw 330 may be rotated after the screw 330 has been retracted by a predetermined amount.
  • the filling step is a step of filling the molding apparatus 10 with the molding material stored in the front portion of the cylinder 310.
  • the start of the filling process means the start of the operation of the screw 330 for filling the molding apparatus 10 with the molding material stored in the front portion of the cylinder 310.
  • the start of the filling process is the start of advancement of the screw 330.
  • the screw 330 may not rotate.
  • the valve body 322 may be in the closed position from the start of the weighing process to the completion of the weighing process, and may be moved from the closed position to the open position before the filling process is started after the completion of the weighing process. In this case, it is possible to prevent the molding material from leaking from the nozzle 320 when the mold opening process is started after the start of the measuring process and before the completion of the measuring process.
  • FIG. 6 is a diagram illustrating the timing of the process performed by the injection device according to the embodiment, the operation of the swing lever, and the operation of the valve body.
  • the injection apparatus 300 repeatedly performs a weighing process, a suck back process, a filling process, and a pressure holding process.
  • the suck-back process is a process of reducing the pressure of the molding material accumulated in front of the screw 330 by stopping the rotation of the screw 330 and retracting the screw 330 before the filling process is started after the completion of the metering process. It is.
  • the control device 700 supplies pressure to the fluid pressure cylinder 326 at a preset timing to swing the swing lever 325 in the first direction, and pushes the valve body 322 with the swing lever 325 to cause the valve body 322 to move. Move from the open position to the closed position.
  • the swing lever 325 swings in the first direction at a predetermined timing from the completion of the pressure holding process to before the start of the weighing process (for example, when the pressure holding process is completed). ) Done.
  • the movement of the valve body 322 from the open position to the closed position is performed by swinging the swing lever 325 in the first direction. Therefore, the movement of the valve body 322 from the open position to the closed position may be performed simultaneously with the swing of the swing lever 325 in the first direction.
  • the valve body 322 is fixed at the closed position by the pressure of the fluid pressure cylinder 326.
  • the swinging of the swing lever 325 in the first direction and the movement of the valve body 322 from the open position to the closed position may be performed from the completion of the pressure holding process to the start of the mold opening process. It may be performed in the middle of the weighing process. Since the molding material is clogged in the mold apparatus 10 after the pressure holding process is completed and before the mold opening process is started, even if the measurement process is performed with the flow path 321 open, the mold apparatus 10 The molding material does not leak from the touched nozzle 320.
  • control device 700 supplies pressure to the fluid pressure cylinder 326 at a preset timing to swing the swing lever 325 in the second direction, and returns the swing lever 325 to its original position.
  • the swing lever 325 does not interfere with the movement of the valve body 322 from the closed position to the open position. Accordingly, the valve body 322 in the closed position is released, and the valve body 322 can be moved to the open position by the pressure of the molding material accumulated in the nozzle 320.
  • the swing lever 325 swings in a predetermined timing from the middle of the weighing process to before the start of the suck back process (for example, immediately before the completion of the weighing process or in the weighing process). Done on completion).
  • the swing lever 325 is swung in the second direction at a predetermined timing from the middle of the weighing process to before the start of the filling process.
  • the movement of the valve body 322 from the closed position to the open position is performed by the pressure of the molding material accumulated in the nozzle 320 between the start of the metering process and before the start of the filling process.
  • the valve body 322 is moved to the open position by the back pressure of the screw 330 during the measuring process or the residual pressure of the back pressure. Therefore, the movement of the valve body 322 from the closed position to the open position may be performed simultaneously with the swing of the swing lever 325 in the second direction, or from the swing of the swing lever 325 in the second direction. May be delayed.
  • the movement of the valve body 322 from the closed position to the open position is performed at a predetermined timing from the middle of the measuring process to before the start of the suck-back process, for example, as shown in FIG.
  • the movement of the valve body 322 from the closed position to the open position is performed at a predetermined timing from the middle of the weighing process to before the start of the filling process.
  • the control device 700 may set a delay time of a predetermined time from the completion of the weighing process to the start of the suck back process.
  • a pressure increasing step for increasing the pressure of the molding material inside the nozzle 320 may be performed as shown in FIG.
  • the pressure of the molding material inside the nozzle 320 is higher than in the measurement process.
  • a pressure increase process is performed after the completion of the weighing process and before the start of the suck back process. Note that the suck back process may not be performed, and the pressure increasing process may be performed after the completion of the weighing process and before the start of the filling process.
  • the backward speed of the screw 330 in the weighing process is lower than the forward speed of the screw 330 in the filling process. For this reason, the pressure of the molding material generated at the time of reverse stop is lower than the pressure of the molding material generated in the filling process.
  • the pressure of the molding material when the screw 330 is stopped at the measurement completion position is used for the movement of the valve body 322 to the open position, thereby suppressing damage to the valve body 322 and the valve body moving mechanism 324.
  • the valve body 322 can be reliably moved to the open position.
  • the swing lever 325 When it is detected that the screw 330 has reached the measurement completion position with the valve body 322 in the closed position, the swing lever 325 is swung in the second direction. Thereby, the valve body 322 can be moved from the closed position to the open position by the pressure of the molding material when the screw 330 is stopped at the measurement completion position.
  • the filling process may be started after a predetermined time has elapsed.
  • a delay time may be provided from the completion of the weighing process to the start of the filling process.
  • the delay time from the completion of the metering process to the start of the suck-back process may be used as a waiting time for the valve body 322 to move from the closed position to the open position. It may be used as a processing time for further increasing the pressure.
  • the control device 700 after the start of the metering process, before the start of the filling process, by releasing the fixation of the valve body 322 in the closed position, the molding that accumulates inside the nozzle 320.
  • Control that enables the valve body 322 to move to the open position by the pressure of the material is executed. Thereby, the valve body 322 is moved from the closed position to the open position by the pressure of the molding material accumulated inside the nozzle 320 after the start of the metering process and before the start of the filling process.
  • the pressure of the molding material generated from the start of the weighing process to the start of the filling process is smaller than the pressure of the molding material generated in the filling process.
  • the molding process does not inject the molding material from the nozzle 320, unlike the filling process.
  • the pressure of the molding material generated from the start of the metering process to the start of the filling process is used for the movement of the valve body 322 from the closed position to the open position. Therefore, compared with the conventional case where the pressure of the molding material generated in the filling process is used, the momentum of movement of the valve body 322 from the closed position to the open position can be suppressed, and the valve body 322 and the valve body moving mechanism due to the impact can be suppressed. The damage of 324 can be suppressed.
  • the pressure of the molding material generated in the measurement process can be used from the completion of the measurement process to the start of the suck back process.
  • the completion of the metering step means that the screw 330 is retracted to the set position by the rotation of the screw 330 and a predetermined amount of molding material is accumulated in front of the screw 330.
  • the control device 700 stops the advancement / retraction of the screw 330 and rotates the screw 330 before the movement of the valve body 322 from the closed position to the open position after the completion of the metering process, thereby forming the molding material in front of the screw 330.
  • the pressure of the molding material in front of the screw 330 may be increased.
  • the valve body 322 can be moved from the closed position to the open position by using both the pressure of the molding material generated in the metering process and the pressure of the molding material generated by the rotation of the screw 330 after the completion of the metering process. This is particularly effective when the back pressure of the screw 330 in the measuring process is low.
  • the amount of rotation of the screw 330 after the completion of the metering step is adjusted so that the pressure of the molding material used for the movement of the valve body 322 from the closed position to the open position is equal to or lower than the set value. This is to prevent damage to the valve body 322 and the valve body moving mechanism 324.
  • control device 700 stops the rotation of the screw 330 and moves the screw 330 forward before the valve body 322 is moved from the closed position to the open position after the metering process is completed.
  • Material pressure may be increased.
  • the valve body 322 can be moved from the closed position to the open position by using both the pressure of the molding material generated in the metering process and the pressure of the molding material generated by the advancement of the screw 330 after the metering process is completed. This is particularly effective when the back pressure of the screw 330 in the measuring process is low.
  • the advance amount of the screw 330 after the completion of the metering step is adjusted so that the pressure of the molding material used for the movement of the valve body 322 from the closed position to the open position becomes equal to or less than the set value. This is to prevent damage to the valve body 322 and the valve body moving mechanism 324.
  • control device 700 advances the screw 330 and rotates the screw 330 before the movement of the valve body 322 from the closed position to the open position after the metering process is completed, so that the molding material in front of the screw 330 is rotated.
  • the pressure may be increased.
  • the valve body 322 can be moved from the closed position to the open position by using both the pressure of the molding material generated in the metering process and the pressure of the molding material generated by the advancement and rotation of the screw 330 after completion of the metering process. This is particularly effective when the back pressure of the screw 330 in the measuring process is low.
  • the amount of advancement of the screw 330 after the completion of the metering process and the amount of rotation of the screw after the completion of the metering process are such that the pressure of the molding material used to move the valve body 322 from the closed position to the open position is less than the set value. To be adjusted. This is to prevent damage to the valve body 322 and the valve body moving mechanism 324.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Injection Moulding Of Plastics Or The Like (AREA)

Abstract

金型装置内に成形材料を射出するノズルと、前記ノズルにおける前記成形材料の流路を開閉する流路開閉機構と、前端部に前記ノズルが設けられるシリンダと、前記シリンダの内部に回転自在に且つ進退自在に配設されるスクリュと、前記スクリュを駆動する駆動源と、前記流路開閉機構および前記駆動源を制御する制御装置とを備え、前記流路開閉機構は、前記流路を開く開放位置と前記流路を閉じる閉塞位置との間で移動させられる弁体を有し、前記制御装置は、前記シリンダの前部に前記成形材料を溜める計量工程の開始後、前記シリンダの前部に溜めた前記成形材料を前記金型装置の内部に充填する充填工程の開始前に、前記閉塞位置にある前記弁体の固定を解除することにより、前記ノズルの内部に溜まる成形材料の圧力による前記弁体の前記開放位置への移動を可能にする制御を実行する、射出成形機。

Description

射出成形機
 本発明は、射出成形機に関する。
 特許文献1に記載の射出成形機は、金型を開く時などにシリンダ内の溶融樹脂が漏れ出るのを防止するため、シリンダの先頭部にニードル弁によって開閉できるシャットオフノズルを有する。ニードル弁の駆動方式としては、直進カム式、直動式、てこ式などがある。いずれの方式も、ニードル弁を前後移動させるものであって、ニードル弁を閉じる時にアクチュエータの力を利用し、ニードル弁を開く時には樹脂を射出する時に生じる樹脂圧を利用している(特許文献1の段落0004参照)。
日本国特開2002-292683号公報
 ノズルには、樹脂などの成形材料の流路が形成され、流路を開く開放位置と流路を閉じる閉塞位置との間で移動させられる弁体が設けられる。弁体の移動方向は、ノズルの軸方向でもよいし、ノズルの軸方向に直交する方向でもよい。
 従来、閉塞位置から開放位置への弁体の移動には充填工程で生じる成形材料の圧力が利用されており、充填工程で生じる成形材料の圧力が大きかったため、弁体の移動する勢いが強過ぎ、衝撃によって弁体や弁体を移動させる弁体移動機構が破損することがあった。
 本発明は、上記課題に鑑みてなされたものであって、ノズルにおける成形材料の流路を開閉する弁体の移動による衝撃を低減できる、射出成形機の提供を主な目的とする。
 上記課題を解決するため、本発明の一態様によれば、
 金型装置内に成形材料を射出するノズルと、
 前記ノズルにおける前記成形材料の流路を開閉する流路開閉機構と、
 前端部に前記ノズルが設けられるシリンダと、
 前記シリンダの内部に回転自在に且つ進退自在に配設されるスクリュと、
 前記スクリュを駆動する駆動源と、
 前記流路開閉機構および前記駆動源を制御する制御装置とを備え、
 前記流路開閉機構は、前記流路を開く開放位置と前記流路を閉じる閉塞位置との間で移動させられる弁体と、前記開放位置にある前記弁体を前記閉塞位置に移動させ、前記閉塞位置で前記弁体を固定する動作、および、前記閉塞位置にある前記弁体の固定を解除することにより、前記ノズルの内部に溜まる成形材料の圧力による前記弁体の前記開放位置への移動を可能にする動作を行う弁体移動機構とを有し、
 前記制御装置は、前記シリンダの前部に前記成形材料を溜める計量工程の開始後、前記シリンダの前部に溜めた前記成形材料を前記金型装置の内部に充填する充填工程の開始前に、前記閉塞位置にある前記弁体の固定を解除することにより、前記ノズルの内部に溜まる成形材料の圧力による前記弁体の前記開放位置への移動を可能にする制御を実行する、射出成形機が提供される。
 本発明の一態様によれば、ノズルにおける成形材料の流路を開閉する弁体の移動による衝撃を低減できる、射出成形機が提供される。
一実施形態による射出成形機の型開完了時の状態を示す図である。 一実施形態による射出成形機の型締時の状態を示す図である。 図5に示す揺動レバーを第1方向に揺動させることにより、弁体を図5に示す開放位置から閉塞位置に移動させた状態を示す図である。 図3に示す揺動レバーを第2方向に揺動させた状態を示す図である。 図4に示す弁体を、成形材料の圧力によって閉塞位置から閉塞位置に移動させた状態を示す図である。 一実施形態による射出装置が行う工程と、揺動レバーの動作と、弁体の動作とのタイミングを示す図である。 一実施形態による圧力検出器で検出される圧力の時間変化を示す図である。
 以下、本発明を実施するための形態について図面を参照して説明するが、各図面において、同一の又は対応する構成については同一の又は対応する符号を付して説明を省略する。
 (射出成形機)
 図1は、一実施形態による射出成形機の型開完了時の状態を示す図である。図2は、一実施形態による射出成形機の型締時の状態を示す図である。図1~図2において、X方向、Y方向およびZ方向は互いに垂直な方向である。X方向およびY方向は水平方向を表し、Z方向は鉛直方向を表す。型締装置100が横型である場合、X方向は型開閉方向であり、Y方向は射出成形機の幅方向である。図1~図2に示すように、射出成形機は、型締装置100と、エジェクタ装置200と、射出装置300と、移動装置400と、制御装置700と、フレームFrとを有する。以下、射出成形機の各構成要素について説明する。
 (型締装置)
 型締装置100の説明では、型閉時の可動プラテン120の移動方向(図1および図2中右方向)を前方とし、型開時の可動プラテン120の移動方向(図1および図2中左方向)を後方として説明する。
 型締装置100は、金型装置10の型閉、型締、型開を行う。型締装置100は例えば横型であって、型開閉方向が水平方向である。型締装置100は、固定プラテン110、可動プラテン120、トグルサポート130、タイバー140、トグル機構150、型締モータ160、運動変換機構170、および型厚調整機構180を有する。
 固定プラテン110は、フレームFrに対し固定される。固定プラテン110における可動プラテン120との対向面に固定金型11が取付けられる。
 可動プラテン120は、フレームFrに対し型開閉方向に移動自在とされる。フレームFr上には、可動プラテン120を案内するガイド101が敷設される。可動プラテン120における固定プラテン110との対向面に可動金型12が取付けられる。
 固定プラテン110に対し可動プラテン120を進退させることにより、型閉、型締、型開が行われる。固定金型11と可動金型12とで金型装置10が構成される。
 トグルサポート130は、固定プラテン110と間隔をおいて連結され、フレームFr上に型開閉方向に移動自在に載置される。尚、トグルサポート130は、フレームFr上に敷設されるガイドに沿って移動自在とされてもよい。トグルサポート130のガイドは、可動プラテン120のガイド101と共通のものでもよい。
 尚、本実施形態では、固定プラテン110がフレームFrに対し固定され、トグルサポート130がフレームFrに対し型開閉方向に移動自在とされるが、トグルサポート130がフレームFrに対し固定され、固定プラテン110がフレームFrに対し型開閉方向に移動自在とされてもよい。
 タイバー140は、固定プラテン110とトグルサポート130とを型開閉方向に間隔Lをおいて連結する。タイバー140は、複数本(例えば4本)用いられてよい。各タイバー140は、型開閉方向に平行とされ、型締力に応じて伸びる。少なくとも1本のタイバー140には、タイバー140の歪を検出するタイバー歪検出器141が設けられてよい。タイバー歪検出器141は、その検出結果を示す信号を制御装置700に送る。タイバー歪検出器141の検出結果は、型締力の検出などに用いられる。
 尚、本実施形態では、型締力を検出する型締力検出器として、タイバー歪検出器141が用いられるが、本発明はこれに限定されない。型締力検出器は、歪ゲージ式に限定されず、圧電式、容量式、油圧式、電磁式などでもよく、その取付け位置もタイバー140に限定されない。
 トグル機構150は、可動プラテン120とトグルサポート130との間に配設され、トグルサポート130に対し可動プラテン120を型開閉方向に移動させる。トグル機構150は、クロスヘッド151、一対のリンク群などで構成される。各リンク群は、ピンなどで屈伸自在に連結される第1リンク152および第2リンク153を有する。第1リンク152は可動プラテン120に対しピンなどで揺動自在に取付けられ、第2リンク153はトグルサポート130に対しピンなどで揺動自在に取付けられる。第2リンク153は、第3リンク154を介してクロスヘッド151に取付けられる。トグルサポート130に対しクロスヘッド151を進退させると、第1リンク152および第2リンク153が屈伸し、トグルサポート130に対し可動プラテン120が進退する。
 尚、トグル機構150の構成は、図1および図2に示す構成に限定されない。例えば図1および図2では、各リンク群の節点の数が5つであるが、4つでもよく、第3リンク154の一端部が、第1リンク152と第2リンク153との節点に結合されてもよい。
 型締モータ160は、トグルサポート130に取付けられており、トグル機構150を作動させる。型締モータ160は、トグルサポート130に対しクロスヘッド151を進退させることにより、第1リンク152および第2リンク153を屈伸させ、トグルサポート130に対し可動プラテン120を進退させる。型締モータ160は、運動変換機構170に直結されるが、ベルトやプーリなどを介して運動変換機構170に連結されてもよい。
 運動変換機構170は、型締モータ160の回転運動をクロスヘッド151の直線運動に変換する。運動変換機構170は、ねじ軸171と、ねじ軸171に螺合するねじナット172とを含む。ねじ軸171と、ねじナット172との間には、ボールまたはローラが介在してよい。
 型締装置100は、制御装置700による制御下で、型閉工程、型締工程、型開工程などを行う。
 型閉工程では、型締モータ160を駆動してクロスヘッド151を設定速度で型閉完了位置まで前進させることにより、可動プラテン120を前進させ、可動金型12を固定金型11にタッチさせる。クロスヘッド151の位置や速度は、例えば型締モータエンコーダ161などを用いて検出する。型締モータエンコーダ161は、型締モータ160の回転を検出し、その検出結果を示す信号を制御装置700に送る。尚、クロスヘッド151の位置を検出するクロスヘッド位置検出器、およびクロスヘッド151の速度を検出するクロスヘッド速度検出器は、型締モータエンコーダ161に限定されず、一般的なものを使用できる。また、可動プラテン120の位置を検出する可動プラテン位置検出器、および可動プラテン120の速度を検出する可動プラテン速度検出器は、型締モータエンコーダ161に限定されず、一般的なものを使用できる。
 型締工程では、型締モータ160をさらに駆動してクロスヘッド151を型閉完了位置から型締位置までさらに前進させることで型締力を生じさせる。型締時に可動金型12と固定金型11との間にキャビティ空間14(図2参照)が形成され、射出装置300がキャビティ空間14に液状の成形材料を充填する。充填された成形材料が固化されることで、成形品が得られる。キャビティ空間14の数は複数でもよく、その場合、複数の成形品が同時に得られる。
 型開工程では、型締モータ160を駆動してクロスヘッド151を設定速度で型開完了位置まで後退させることにより、可動プラテン120を後退させ、可動金型12を固定金型11から離間させる。その後、エジェクタ装置200が可動金型12から成形品を突き出す。
 型閉工程および型締工程における設定条件は、一連の設定条件として、まとめて設定される。例えば、型閉工程および型締工程におけるクロスヘッド151の速度や位置(型閉開始位置、速度切替位置、型閉完了位置、および型締位置を含む)、型締力は、一連の設定条件として、まとめて設定される。型閉開始位置、速度切替位置、型閉完了位置、および型締位置は、後側から前方に向けてこの順で並び、速度が設定される区間の始点や終点を表す。区間毎に、速度が設定される。速度切替位置は、1つでもよいし、複数でもよい。速度切替位置は、設定されなくてもよい。型締位置と型締力とは、いずれか一方のみが設定されてもよい。
  型開工程における設定条件も同様に設定される。例えば、型開工程におけるクロスヘッド151の速度や位置(型開開始位置、速度切替位置、および型開完了位置を含む)は、一連の設定条件として、まとめて設定される。型開開始位置、速度切替位置、および型開完了位置は、前側から後方に向けて、この順で並び、速度が設定される区間の始点や終点を表す。区間毎に、速度が設定される。速度切替位置は、1つでもよいし、複数でもよい。速度切替位置は、設定されなくてもよい。型開開始位置と型締位置とは同じ位置であってよい。また、型開完了位置と型閉開始位置とは同じ位置であってよい。
  尚、クロスヘッド151の速度や位置などの代わりに、可動プラテン120の速度や位置などが設定されてもよい。また、クロスヘッドの位置(例えば型締位置)や可動プラテンの位置の代わりに、型締力が設定されてもよい。
 ところで、トグル機構150は、型締モータ160の駆動力を増幅して可動プラテン120に伝える。その増幅倍率は、トグル倍率とも呼ばれる。トグル倍率は、第1リンク152と第2リンク153とのなす角θ(以下、「リンク角度θ」とも呼ぶ)に応じて変化する。リンク角度θは、クロスヘッド151の位置から求められる。リンク角度θが180°のとき、トグル倍率が最大になる。
 金型装置10の交換や金型装置10の温度変化などにより金型装置10の厚さが変化した場合、型締時に所定の型締力が得られるように、型厚調整が行われる。型厚調整では、例えば可動金型12が固定金型11にタッチする型タッチの時点でトグル機構150のリンク角度θが所定の角度になるように、固定プラテン110とトグルサポート130との間隔Lを調整する。
 型締装置100は、固定プラテン110とトグルサポート130との間隔Lを調整することで、型厚調整を行う型厚調整機構180を有する。型厚調整機構180は、タイバー140の後端部に形成されるねじ軸181と、トグルサポート130に回転自在に保持されるねじナット182と、ねじ軸181に螺合するねじナット182を回転させる型厚調整モータ183とを有する。
 ねじ軸181およびねじナット182は、タイバー140ごとに設けられる。型厚調整モータ183の回転は、回転伝達部185を介して複数のねじナット182に伝達されてよい。複数のねじナット182を同期して回転できる。尚、回転伝達部185の伝達経路を変更することで、複数のねじナット182を個別に回転することも可能である。
 回転伝達部185は、例えば歯車などで構成される。この場合、各ねじナット182の外周に受動歯車が形成され、型厚調整モータ183の出力軸には駆動歯車が取付けられ、複数の受動歯車および駆動歯車と噛み合う中間歯車がトグルサポート130の中央部に回転自在に保持される。尚、回転伝達部185は、歯車の代わりに、ベルトやプーリなどで構成されてもよい。
 型厚調整機構180の動作は、制御装置700によって制御される。制御装置700は、型厚調整モータ183を駆動して、ねじナット182を回転させることで、ねじナット182を回転自在に保持するトグルサポート130の固定プラテン110に対する位置を調整し、固定プラテン110とトグルサポート130との間隔Lを調整する。
 尚、本実施形態では、ねじナット182がトグルサポート130に対し回転自在に保持され、ねじ軸181が形成されるタイバー140が固定プラテン110に対し固定されるが、本発明はこれに限定されない。
 例えば、ねじナット182が固定プラテン110に対し回転自在に保持され、タイバー140がトグルサポート130に対し固定されてもよい。この場合、ねじナット182を回転させることで、間隔Lを調整できる。
 また、ねじナット182がトグルサポート130に対し固定され、タイバー140が固定プラテン110に対し回転自在に保持されてもよい。この場合、タイバー140を回転させることで、間隔Lを調整できる。
 さらにまた、ねじナット182が固定プラテン110に対し固定され、タイバー140がトグルサポート130に対し回転自在に保持されてもよい。この場合、タイバー140を回転させることで間隔Lを調整できる。
 間隔Lは、型厚調整モータエンコーダ184を用いて検出する。型厚調整モータエンコーダ184は、型厚調整モータ183の回転量や回転方向を検出し、その検出結果を示す信号を制御装置700に送る。型厚調整モータエンコーダ184の検出結果は、トグルサポート130の位置や間隔Lの監視や制御に用いられる。尚、トグルサポート130の位置を検出するトグルサポート位置検出器、および間隔Lを検出する間隔検出器は、型厚調整モータエンコーダ184に限定されず、一般的なものを使用できる。
 型厚調整機構180は、互いに螺合するねじ軸181とねじナット182の一方を回転させることで、間隔Lを調整する。複数の型厚調整機構180が用いられてもよく、複数の型厚調整モータ183が用いられてもよい。
 尚、本実施形態の型厚調整機構180は、間隔Lを調整するため、タイバー140に形成されるねじ軸181とねじ軸181に螺合されるねじナット182とを有するが、本発明はこれに限定されない。
 例えば、型厚調整機構180は、タイバー140の温度を調節するタイバー温調器を有してもよい。タイバー温調器は、各タイバー140に取付けられ、複数本のタイバー140の温度を連携して調整する。タイバー140の温度が高いほど、タイバー140は熱膨張によって長くなり、間隔Lが大きくなる。複数本のタイバー140の温度は独立に調整することも可能である。
 タイバー温調器は、例えばヒータなどの加熱器を含み、加熱によってタイバー140の温度を調節する。タイバー温調器は、水冷ジャケットなどの冷却器を含み、冷却によってタイバー140の温度を調節してもよい。タイバー温調器は、加熱器と冷却器の両方を含んでもよい。
 尚、本実施形態の型締装置100は、型開閉方向が水平方向である横型であるが、型開閉方向が上下方向である竪型でもよい。竪型の型締装置は、下プラテン、上プラテン、トグルサポート、タイバー、トグル機構、および型締モータなどを有する。下プラテンと上プラテンのうち、いずれか一方が固定プラテン、残りの一方が可動プラテンとして用いられる。下プラテンには下金型が取付けられ、上プラテンには上金型が取付けられる。下金型と上金型とで金型装置が構成される。下金型は、ロータリーテーブルを介して下プラテンに取付けられてもよい。トグルサポートは、下プラテンの下方に配設され、タイバーを介して上プラテンと連結される。タイバーは、上プラテンとトグルサポートとを型開閉方向に間隔をおいて連結する。トグル機構は、トグルサポートと下プラテンとの間に配設され、可動プラテンを昇降させる。型締モータは、トグル機構を作動させる。型締装置が竪型である場合、タイバーの本数は通常3本である。尚、タイバーの本数は特に限定されない。
 尚、本実施形態の型締装置100は、駆動源として、型締モータ160を有するが、型締モータ160の代わりに、油圧シリンダを有してもよい。また、型締装置100は、型開閉用にリニアモータを有し、型締用に電磁石を有してもよい。
 (エジェクタ装置)
 エジェクタ装置200の説明では、型締装置100の説明と同様に、型閉時の可動プラテン120の移動方向(図1および図2中右方向)を前方とし、型開時の可動プラテン120の移動方向(図1および図2中左方向)を後方として説明する。
 エジェクタ装置200は、金型装置10から成形品を突き出す。エジェクタ装置200は、エジェクタモータ210、運動変換機構220、およびエジェクタロッド230などを有する。
 エジェクタモータ210は、可動プラテン120に取付けられる。エジェクタモータ210は、運動変換機構220に直結されるが、ベルトやプーリなどを介して運動変換機構220に連結されてもよい。
 運動変換機構220は、エジェクタモータ210の回転運動をエジェクタロッド230の直線運動に変換する。運動変換機構220は、ねじ軸と、ねじ軸に螺合するねじナットとを含む。ねじ軸と、ねじナットとの間には、ボールまたはローラが介在してよい。
 エジェクタロッド230は、可動プラテン120の貫通穴において進退自在とされる。エジェクタロッド230の前端部は、可動金型12の内部に進退自在に配設される可動部材15と接触する。エジェクタロッド230の前端部は、可動部材15と連結されていても、連結されていなくてもよい。
 エジェクタ装置200は、制御装置700による制御下で、突き出し工程を行う。
 突き出し工程では、エジェクタモータ210を駆動してエジェクタロッド230を設定速度で待機位置から突き出し位置まで前進させることにより、可動部材15を前進させ、成形品を突き出す。その後、エジェクタモータ210を駆動してエジェクタロッド230を設定速度で後退させ、可動部材15を元の待機位置まで後退させる。エジェクタロッド230の位置や速度は、例えばエジェクタモータエンコーダ211を用いて検出する。エジェクタモータエンコーダ211は、エジェクタモータ210の回転を検出し、その検出結果を示す信号を制御装置700に送る。尚、エジェクタロッド230の位置を検出するエジェクタロッド位置検出器、およびエジェクタロッド230の速度を検出するエジェクタロッド速度検出器は、エジェクタモータエンコーダ211に限定されず、一般的なものを使用できる。
 (射出装置)
 射出装置300の説明では、型締装置100の説明やエジェクタ装置200の説明とは異なり、充填時のスクリュ330の移動方向(図1および図2中左方向)を前方とし、計量時のスクリュ330の移動方向(図1および図2中右方向)を後方として説明する。
 射出装置300は、フレームFrに対し進退自在なスライドベース301に設置され、金型装置10に対し進退自在とされる。射出装置300は、金型装置10にタッチし、金型装置10内のキャビティ空間14に成形材料を充填する。射出装置300は、例えば、シリンダ310、ノズル320、スクリュ330、計量モータ340、射出モータ350、圧力検出器360などを有する。
 シリンダ310は、供給口311から内部に供給された成形材料を加熱する。成形材料は、例えば樹脂などを含む。成形材料は、例えばペレット状に形成され、固体の状態で供給口311に供給される。供給口311はシリンダ310の後部に形成される。シリンダ310の後部の外周には、水冷シリンダなどの冷却器312が設けられる。冷却器312よりも前方において、シリンダ310の外周には、バンドヒータなどの加熱器313と温度検出器314とが設けられる。
 シリンダ310は、シリンダ310の軸方向(図1および図2中左右方向)に複数のゾーンに区分される。各ゾーンに加熱器313と温度検出器314とが設けられる。ゾーン毎に、温度検出器314の検出温度が設定温度になるように、制御装置700が加熱器313を制御する。
 ノズル320は、シリンダ310の前端部に設けられ、金型装置10に対し押し付けられる。ノズル320の外周には、加熱器313と温度検出器314とが設けられる。ノズル320の検出温度が設定温度になるように、制御装置700が加熱器313を制御する。
 スクリュ330は、シリンダ310内において回転自在に且つ進退自在に配設される。スクリュ330を回転させると、スクリュ330の螺旋状の溝に沿って成形材料が前方に送られる。成形材料は、前方に送られながら、シリンダ310からの熱によって徐々に溶融される。液状の成形材料がスクリュ330の前方に送られシリンダ310の前部に蓄積されるにつれ、スクリュ330が後退させられる。その後、スクリュ330を前進させると、スクリュ330前方に蓄積された液状の成形材料がノズル320から射出され、金型装置10内に充填される。
 スクリュ330の前部には、スクリュ330を前方に押すときにスクリュ330の前方から後方に向かう成形材料の逆流を防止する逆流防止弁として、逆流防止リング331が進退自在に取付けられる。
 逆流防止リング331は、スクリュ330を前進させるときに、スクリュ330前方の成形材料の圧力によって後方に押され、成形材料の流路を塞ぐ閉塞位置(図2参照)までスクリュ330に対し相対的に後退する。これにより、スクリュ330前方に蓄積された成形材料が後方に逆流するのを防止する。
 一方、逆流防止リング331は、スクリュ330を回転させるときに、スクリュ330の螺旋状の溝に沿って前方に送られる成形材料の圧力によって前方に押され、成形材料の流路を開放する開放位置(図1参照)までスクリュ330に対し相対的に前進する。これにより、スクリュ330の前方に成形材料が送られる。
 逆流防止リング331は、スクリュ330と共に回転する共回りタイプと、スクリュ330と共に回転しない非共回りタイプのいずれでもよい。
 尚、射出装置300は、スクリュ330に対し逆流防止リング331を開放位置と閉塞位置との間で進退させる駆動源を有していてもよい。
 計量モータ340は、スクリュ330を回転させる。スクリュ330を回転させる駆動源は、計量モータ340には限定されず、例えば油圧ポンプなどでもよい。
 射出モータ350は、スクリュ330を進退させる。射出モータ350とスクリュ330との間には、射出モータ350の回転運動をスクリュ330の直線運動に変換する運動変換機構などが設けられる。運動変換機構は、例えばねじ軸と、ねじ軸に螺合するねじナットとを有する。ねじ軸とねじナットの間には、ボールやローラなどが設けられてよい。スクリュ330を進退させる駆動源は、射出モータ350には限定されず、例えば油圧シリンダなどでもよい。
 圧力検出器360は、射出モータ350とスクリュ330との間で伝達される圧力を検出する。圧力検出器360は、射出モータ350とスクリュ330との間の力の伝達経路に設けられ、圧力検出器360に作用する圧力を検出する。
 圧力検出器360は、その検出結果を示す信号を制御装置700に送る。圧力検出器360の検出結果は、スクリュ330が成形材料から受ける圧力、スクリュ330に対する背圧、スクリュ330から成形材料に作用する圧力などの制御や監視に用いられる。
 射出装置300は、制御装置700による制御下で、計量工程、充填工程および保圧工程などを行う。
 計量工程では、計量モータ340を駆動してスクリュ330を設定回転数で回転させ、スクリュ330の螺旋状の溝に沿って成形材料を前方に送る。これに伴い、成形材料が徐々に溶融される。液状の成形材料がスクリュ330の前方に送られシリンダ310の前部に蓄積されるにつれ、スクリュ330が後退させられる。スクリュ330の回転数は、例えば計量モータエンコーダ341を用いて検出する。計量モータエンコーダ341は、計量モータ340の回転を検出し、その検出結果を示す信号を制御装置700に送る。尚、スクリュ330の回転数を検出するスクリュ回転数検出器は、計量モータエンコーダ341に限定されず、一般的なものを使用できる。
 計量工程では、スクリュ330の急激な後退を制限すべく、射出モータ350を駆動してスクリュ330に対して設定背圧を加えてよい。スクリュ330に対する背圧は、例えば圧力検出器360を用いて検出する。圧力検出器360は、その検出結果を示す信号を制御装置700に送る。スクリュ330が計量完了位置まで後退し、スクリュ330の前方に所定量の成形材料が蓄積されると、計量工程が完了する。
 充填工程では、射出モータ350を駆動してスクリュ330を設定速度で前進させ、スクリュ330の前方に蓄積された液状の成形材料を金型装置10内のキャビティ空間14に充填させる。スクリュ330の位置や速度は、例えば射出モータエンコーダ351を用いて検出する。射出モータエンコーダ351は、射出モータ350の回転を検出し、その検出結果を示す信号を制御装置700に送る。スクリュ330の位置が設定位置に達すると、充填工程から保圧工程への切替(所謂、V/P切替)が行われる。V/P切替が行われる位置をV/P切替位置とも呼ぶ。スクリュ330の設定速度は、スクリュ330の位置や時間などに応じて変更されてもよい。
 尚、充填工程においてスクリュ330の位置が設定位置に達した後、その設定位置にスクリュ330を一時停止させ、その後にV/P切替が行われてもよい。V/P切替の直前において、スクリュ330の停止の代わりに、スクリュ330の微速前進または微速後退が行われてもよい。また、スクリュ330の位置を検出するスクリュ位置検出器、およびスクリュ330の速度を検出するスクリュ速度検出器は、射出モータエンコーダ351に限定されず、一般的なものを使用できる。
 保圧工程では、射出モータ350を駆動してスクリュ330を前方に押し、スクリュ330の前端部における成形材料の圧力(以下、「保持圧力」とも呼ぶ。)を設定圧に保ち、シリンダ310内に残る成形材料を金型装置10に向けて押す。金型装置10内での冷却収縮による不足分の成形材料を補充できる。保持圧力は、例えば圧力検出器360を用いて検出する。圧力検出器360は、その検出結果を示す信号を制御装置700に送る。保持圧力の設定値は、保圧工程の開始からの経過時間などに応じて変更されてもよい。
 保圧工程では金型装置10内のキャビティ空間14の成形材料が徐々に冷却され、保圧工程完了時にはキャビティ空間14の入口が固化した成形材料で塞がれる。この状態はゲートシールと呼ばれ、キャビティ空間14からの成形材料の逆流が防止される。保圧工程後、冷却工程が開始される。冷却工程では、キャビティ空間14内の成形材料の固化が行われる。成形サイクル時間の短縮のため、冷却工程中に計量工程が行われてよい。
 尚、本実施形態の射出装置300は、インライン・スクリュ方式であるが、プリプラ方式などでもよい。プリプラ方式の射出装置は、可塑化シリンダ内で溶融された成形材料を射出シリンダに供給し、射出シリンダから金型装置内に成形材料を射出する。可塑化シリンダ内にはスクリュが回転自在にまたは回転自在に且つ進退自在に配設され、射出シリンダ内にはプランジャが進退自在に配設される。
  また、本実施形態の射出装置300は、シリンダ310の軸方向が水平方向である横型であるが、シリンダ310の軸方向が上下方向である竪型であってもよい。竪型の射出装置300と組み合わされる型締装置は、竪型でも横型でもよい。同様に、横型の射出装置300と組み合わされる型締装置は、横型でも竪型でもよい。
 (移動装置)
 移動装置400の説明では、射出装置300の説明と同様に、充填時のスクリュ330の移動方向(図1および図2中左方向)を前方とし、計量時のスクリュ330の移動方向(図1および図2中右方向)を後方として説明する。
 移動装置400は、金型装置10に対し射出装置300を進退させる。また、移動装置400は、金型装置10に対しノズル320を押し付け、ノズルタッチ圧力を生じさせる。移動装置400は、液圧ポンプ410、駆動源としてのモータ420、液圧アクチュエータとしての液圧シリンダ430などを含む。
 液圧ポンプ410は、第1ポート411と、第2ポート412とを有する。液圧ポンプ410は、両方向回転可能なポンプであり、モータ420の回転方向を切り替えることにより、第1ポート411および第2ポート412のいずれか一方から作動液(例えば油)を吸入し他方から吐出して液圧を発生させる。尚、液圧ポンプ410はタンク413から作動液を吸引して第1ポート411および第2ポート412のいずれか一方から作動液を吐出することもできる。
 モータ420は、液圧ポンプ410を作動させる。モータ420は、制御装置700からの制御信号に応じた回転方向および回転トルクで液圧ポンプ410を駆動する。モータ420は、電動モータであってよく、電動サーボモータであってよい。
 液圧シリンダ430は、シリンダ本体431、ピストン432、およびピストンロッド433を有する。シリンダ本体431は、射出装置300に対して固定される。ピストン432は、シリンダ本体431の内部を、第1室としての前室435と、第2室としての後室436とに区画する。ピストンロッド433は、固定プラテン110に対して固定される。ピストンロッド433が前室435を貫通しているため、前室435の断面積は後室436の断面積より小さい。
 液圧シリンダ430の前室435は、第1流路401を介して、液圧ポンプ410の第1ポート411と接続される。第1ポート411から吐出された作動液が第1流路401を介して前室435に供給されることで、射出装置300が前方に押される。射出装置300が前進され、ノズル320が固定金型11に押し付けられる。前室435は、液圧ポンプ410から供給される作動液の圧力によってノズル320のノズルタッチ圧力を生じさせる圧力室として機能する。
 一方、液圧シリンダ430の後室436は、第2流路402を介して液圧ポンプ410の第2ポート412と接続される。第2ポート412から吐出された作動液が第2流路402を介して液圧シリンダ430の後室436に供給されることで、射出装置300が後方に押される。射出装置300が後退され、ノズル320が固定金型11から離間される。
 第1リリーフ弁441は、第1流路401内の圧力が設定値を超えた場合に開き、第1流路401内の余分な作動液をタンク413に戻して、第1流路401内の圧力を設定値以下に保つ。
 第2リリーフ弁442は、第2流路402内の圧力が設定値を超えた場合に開き、第2流路402内の余分な作動液をタンク413に戻して、第2流路402内の圧力を設定値以下に保つ。
 フラッシング弁443は、前室435の断面積と後室436の断面積との差に起因する作動液の循環量の過不足を調整する弁であり、例えば図1および図2に示すように3位置4ポートのスプール弁で構成される。
 第1チェック弁451は、第1流路401内の圧力がタンク413内の圧力よりも低い場合に開き、タンク413から第1流路401に作動液を供給する。
 第2チェック弁452は、第2流路402内の圧力がタンク413の圧力よりも低い場合に開き、タンク413から第2流路402に作動液を供給する。
 電磁切替弁453は、液圧シリンダ430の前室435と液圧ポンプ410の第1ポート411との間の作動液の流れを制御する制御弁である。電磁切替弁453は、例えば第1流路401の途中に設けられ、第1流路401における作動液の流れを制御する。
 電磁切替弁453は、例えば図1および図2に示すように2位置2ポートのスプール弁で構成される。スプール弁が第1位置(図1および図2中左側の位置)の場合、前室435と第1ポート411との間の両方向の流れが許容される。一方、スプール弁が第2位置の場合(図1および図2中右側の位置)の場合、前室435から第1ポート411への流れが制限される。この場合、第1ポート411から前室435への流れは制限されないが、制限されてもよい。
 第1圧力検出器455は、前室435の液圧を検出する。前室435の液圧によってノズルタッチ圧力が生じるため、第1圧力検出器455を用いてノズルタッチ圧力が検出できる。第1圧力検出器455は、例えば第1流路401の途中に設けられ、電磁切替弁453を基準として前室435側の位置に設けられる。電磁切替弁453の状態に関係なく、ノズルタッチ圧力が検出できる。
 第2圧力検出器456は、第1流路401の途中に設けられ、電磁切替弁453を基準として第1ポート411側の位置に設けられる。第2圧力検出器456は、電磁切替弁453と第1ポート411との間における液圧を検出する。電磁切替弁453が第1ポート411と前室435との間の両方向の流れを許容する状態の場合、第1ポート411と電磁切替弁453との間における液圧と、電磁切替弁453と前室435との間における液圧とは等しい。よって、この状態の場合、第2圧力検出器456を用いてノズルタッチ圧力が検出できる。
 尚、本実施形態では、第1流路401の途中に設けられる圧力検出器を用いてノズルタッチ圧力を検出するが、例えばノズル320に設けられるロードセルなどを用いてノズルタッチ圧力を検出してもよい。つまり、ノズルタッチ圧力を検出する圧力検出器は、移動装置400、射出装置300のいずれに設けられてもよい。
 尚、本実施形態では移動装置400は液圧シリンダ430を含むが、本発明はこれに限定されない。例えば、液圧シリンダ430の代わりに、電動モータと、その電動モータの回転運動を射出装置300の直線運動に変換する運動変換機構とが用いられてもよい。
 (制御装置)
 制御装置700は、例えばコンピュータで構成され、図1~図2に示すようにCPU(Central Processing Unit)701と、メモリなどの記憶媒体702と、入力インターフェース703と、出力インターフェース704とを有する。制御装置700は、記憶媒体702に記憶されたプログラムをCPU701に実行させることにより、各種の制御を行う。また、制御装置700は、入力インターフェース703で外部からの信号を受信し、出力インターフェース704で外部に信号を送信する。
  制御装置700は、型閉工程や型締工程、型開工程などを繰り返し行うことにより、成形品を繰り返し製造する。また、制御装置700は、型締工程の間に、計量工程や充填工程、保圧工程などを行う。成形品を得るための一連の動作、例えば計量工程の開始から次の計量工程の開始までの動作を「ショット」または「成形サイクル」とも呼ぶ。また、1回のショットに要する時間を「成形サイクル時間」とも呼ぶ。
  一回の成形サイクルは、例えば、計量工程、型閉工程、型締工程、充填工程、保圧工程、冷却工程、型開工程、および突き出し工程をこの順で有する。ここでの順番は、各工程の開始の順番である。充填工程、保圧工程、および冷却工程は、型締工程の開始から型締工程の終了までの間に行われる。型締工程の終了は型開工程の開始と一致する。尚、成形サイクル時間の短縮のため、同時に複数の工程を行ってもよい。例えば、計量工程は、前回の成形サイクルの冷却工程中に行われてもよく、この場合、型閉工程が成形サイクルの最初に行われることとしてもよい。また、充填工程は、型閉工程中に開始されてもよい。また、突き出し工程は、型開工程中に開始されてもよい。ノズル320の流路を開閉する開閉弁が設けられる場合、型開工程は、計量工程中に開始されてもよい。計量工程中に型開工程が開始されても、開閉弁がノズル320の流路を閉じていれば、ノズル320から成形材料が漏れないためである。
 制御装置700は、操作装置750や表示装置760と接続されている。操作装置750は、ユーザによる入力操作を受け付け、入力操作に応じた信号を制御装置700に出力する。表示装置760は、制御装置700による制御下で、操作装置750における入力操作に応じた操作画面を表示する。操作画面は、射出成形機の設定などに用いられる。操作画面は、複数用意され、切り替えて表示されたり、重ねて表示されたりする。ユーザは、表示装置760で表示される操作画面を見ながら、操作装置750を操作することにより射出成形機の設定(設定値の入力を含む)などを行う。操作装置750および表示装置760は、例えばタッチパネルで構成され、一体化されてよい。尚、本実施形態の操作装置750および表示装置760は、一体化されているが、独立に設けられてもよい。また、操作装置750は、複数設けられてもよい。
 (射出装置のノズルの開閉)
 図3は、図5に示す揺動レバーを第1方向(例えば時計回り)に揺動させることにより、弁体を図5に示す開放位置から閉塞位置に移動させた状態を示す図である。図4は、図3に示す揺動レバーを第2方向(例えば反時計回り)に揺動させた状態を示す図である。図5は、図4に示す弁体を、計量工程において生じる成形材料の圧力によって閉塞位置から閉塞位置に移動させた状態を示す図である。
 射出装置300は、ノズル320における成形材料の流路321を開閉する流路開閉機構329を備える。流路開閉機構329は、流路321を開く開放位置(図5参照)と流路321を開く閉塞位置(図3参照)との間で移動させられる弁体322を有する。弁体322が閉塞位置にあるとき、弁体322と流路321の壁面との間に、前方に向けて先細り状のくさび形隙間323が形成されてよい。くさび形隙間323における成形材料の圧力が十分に大きくなると、弁体322が成形材料の粘着力に打ち勝って閉塞位置から開放位置に移動させられる。
 弁体322の移動方向は、ノズル320の軸方向に直交する方向であってよく、ノズル320の流路321の径方向であってよい。なお、弁体322の移動方向は、本実施形態ではノズル320の軸方向に直交する方向であるが、従来と同様にノズル320の軸方向であってもよい。しかしながら、弁体322の移動方向がノズル320の軸方向である場合、弁体322が閉塞位置にあるときだけではなく開放位置にあるときも流路321の内部にあるため、弁体の分だけ流路321の径が狭くなる。一方、本実施形態によれば、弁体322が閉塞位置から開放位置に移動するときに弁体322が流路321内から退出するため、充填工程において成形材料がノズルを通過しやすく、充填工程においてノズル320での成形材料の流動抵抗を低減でき、成形材料の発熱を抑制できる。そのため、冷却工程の時間を短縮でき、成形サイクルを短縮できる。
 尚、弁体322の移動方向は、本実施形態ではノズル320の軸方向に直交する方向であるが、従来と同様にノズル320の軸方向であってもよい。
 流路開閉機構329は、弁体322を開放位置と閉塞位置との間で移動させる弁体移動機構324を有する。弁体移動機構324は、開放位置にある弁体322を閉塞位置に移動させ、閉塞位置で弁体322を固定する動作、および、閉塞位置にある弁体322の固定を解除することにより、ノズル320の内部に溜まる成形材料の圧力による弁体322の開放位置への移動を可能にする動作を行う。弁体移動機構324は、例えば、ノズル320に対し揺動自在に取り付けられて弁体322に当接する揺動レバー325と、揺動レバー325を、弁体322が開放位置から閉塞位置に移動する第1方向(図3~図5において時計回り方向)および該第1方向とは逆方向で閉塞位置にある弁体322の固定を解除する第2方向(図3~図5において反時計回り方向)に揺動させる流体圧シリンダ326とを有する。
 揺動レバー325は、ノズル320に対し固定される揺動軸371を中心に揺動自在とされ、流体圧シリンダ326の伸縮によって揺動させられる。揺動レバー325は、弁体322と接触するが、弁体322と連結されていない。
 流体圧シリンダ326は、シリンダ本体327と、シリンダ本体327の内部に供給される流体の圧力によって移動するピストンロッド328とを有する。ピストンロッド328の基端部は、シリンダ本体327の内部において摺動するピストンに連結される。ピストンは、シリンダ本体327の内部を2つの部屋に区切る。いずれか一方の部屋に圧力を供給することにより、ピストンが移動させられ、ピストンロッド328が移動させられる。
 シリンダ本体327は、ノズル320に対し固定される揺動軸372を中心に揺動自在とされる。一方、ピストンロッド328は、ピン373で揺動レバー325と揺動自在に連結される。尚、シリンダ本体327とピストンロッド328との配置は逆でもよい。つまり、シリンダ本体327はピン373で揺動レバー325と連結され、ピストンロッド328は揺動軸372を中心に揺動自在とされてもよい。
 図5に示すように弁体322が開放位置にある状態で流体圧シリンダ326を伸ばすと、揺動レバー325が第1方向(例えば時計回り)に揺動させられる。これにより、弁体322は、揺動レバー325に押されて、図3に示すように閉塞位置に移動させられ、流体圧シリンダ326の圧力によって閉塞位置で固定される。
 一方、図3に示すように弁体322が閉塞位置にある状態で流体圧シリンダ326を縮めると、揺動レバー325が第1方向とは逆向きの第2方向(例えば反時計回り)に揺動させられる。これにより、揺動レバー325は、図4に示すように元の位置に戻り、弁体322の閉塞位置から開放位置への移動を妨害しなくなる。従って、閉塞位置にある弁体322の固定が解除され、ノズル320の内部に溜まる成形材料の圧力による弁体322の開放位置への移動が可能になる。
 その結果、弁体322は、くさび形隙間323における成形材料の圧力によって、図4に示す閉塞位置から図5に示す開放位置へ移動させられる。弁体322の閉塞位置から開放位置への移動は、揺動レバー325の第2方向の揺動と同時に行われてもよいし、揺動レバー325の第2方向の揺動よりも遅れて行われてもよい。
 尚、本実施形態では揺動レバー325を第2方向に揺動させて元の位置に戻すため、流体圧シリンダ326の駆動力を利用するが、計量工程において生じる成形材料の圧力を利用することも可能である。この場合、制御装置700は、流体圧シリンダ326に圧力を供給する代わりに、流体圧シリンダ326から圧力を抜き、ピストンによって区画される2つの部屋と外部との流体の出入りを自由とする。例えば、流体圧シリンダ326が空気圧シリンダである場合、ピストンによって区画される2つの部屋を大気開放とする。これにより、ピストンが両方向に自由に移動できる。よって、計量工程において生じる成形材料の圧力を利用して、弁体322を閉塞位置から開放位置に移動させると共に、弁体322で揺動レバー325を押して揺動レバー325を第2方向に揺動させることができる。揺動レバー325を元の位置に戻すために計量工程において生じる成形材料の圧力を利用する場合、揺動レバー325と弁体322とはピンなどで連結されていてもよい。
 制御装置700は、1ショット(例えば計量工程の開始から、次回の計量工程の開始まで)の間に、弁体322を開放位置と閉塞位置との間で往復移動させる。弁体322の位置は、例えば、充填工程や保圧工程では開放位置とされ、計量工程の開始時には閉塞位置とされる。弁体322は、保圧工程の完了後、計量工程の開始前に、開放位置から閉塞位置に移動される。また、弁体322は、計量工程の開始後、充填工程の開始前に、ノズル320の内部溜まる成形材料の圧力によって、閉塞位置から開放位置に移動する。
  計量工程は、シリンダ310の前部に成形材料を溜める工程である。計量工程の開始は、シリンダ310の前部に成形材料を溜めるためのスクリュ330の動作の開始を意味する。例えば、計量工程の開始は、スクリュ330の回転の開始である。スクリュ330の回転によって、スクリュ330の螺旋状の溝に沿って成形材料が前方に送られ、シリンダ310の前部に蓄積されるにつれ、スクリュ330が後退させられる。なお、計量工程の開始は、本実施形態ではスクリュ330の回転の開始であるが、スクリュ330の後退の開始でもよい。つまり、計量工程では、スクリュ330を所定量後退させたうえで、スクリュ330を回転させてもよい。スクリュ330が計量完了位置に達すると、計量工程が完了し、スクリュ330の回転および後退が停止させられる。
  充填工程は、シリンダ310の前部に溜めた成形材料を金型装置10の内部に充填する工程である。充填工程の開始は、シリンダ310の前部に溜めた成形材料を金型装置10の内部に充填するためのスクリュ330の動作の開始を意味する。例えば、充填工程の開始は、スクリュ330の前進の開始である。充填工程の間、スクリュ330は、回転しなくてよい。スクリュ330がV/P切替位置に達すると、充填工程が完了し、保圧工程が行われる。
  尚、弁体322は、計量工程の開始から計量工程の完了まで閉塞位置にあってよく、計量工程の完了から、充填工程の開始前に、閉塞位置から開放位置に移動してもよい。この場合、計量工程の開始後、計量工程の完了前に、型開工程が開始される場合に、ノズル320から成形材料が漏れるのを防止できる。
 図6は、実施形態による射出装置が行う工程と、揺動レバーの動作と、弁体の動作とのタイミングを示す図である。図6に示すように、射出装置300は、計量工程、サックバック工程、充填工程、および保圧工程を繰り返し行う。サックバック工程とは、計量工程の完了後、充填工程の開始前に、スクリュ330の回転を停止させると共にスクリュ330を後退させて、スクリュ330の前方に蓄積された成形材料の圧力を低下させる工程である。
 制御装置700は、予め設定されたタイミングで、流体圧シリンダ326に圧力を供給して揺動レバー325を第1方向に揺動させ、揺動レバー325で弁体322を押して、弁体322を開放位置から閉塞位置に移動させる。
 揺動レバー325の第1方向への揺動は、例えば図6に示すように、保圧工程の完了から計量工程の開始の前までの所定のタイミングで(例えば保圧工程の完了時などに)行われる。
 弁体322の開放位置から閉塞位置への移動は、揺動レバー325の第1方向への揺動によって行われる。そのため、弁体322の開放位置から閉塞位置への移動は、揺動レバー325の第1方向への揺動と同時に行われてよい。弁体322は、流体圧シリンダ326の圧力によって閉塞位置で固定される。
 尚、揺動レバー325の第1方向への揺動、および弁体322の開放位置から閉塞位置への移動は、保圧工程の完了から型開工程の開始の前までに行われればよく、計量工程の途中で行われてもよい。保圧工程の完了以降、型開工程の開始前の間は、金型装置10内に成形材料が詰まっているため、流路321を開放したまま計量工程を行っても、金型装置10にタッチされているノズル320から成形材料が漏れない。
 また、制御装置700は、予め設定されたタイミングで、流体圧シリンダ326に圧力を供給して揺動レバー325を第2方向に揺動させ、揺動レバー325を元の位置に戻す。これにより、揺動レバー325は、弁体322の閉塞位置から開放位置への移動を妨害しなくなる。従って、閉塞位置にある弁体322の固定が解除され、ノズル320の内部に溜まる成形材料の圧力による弁体322の開放位置への移動が可能になる。
 揺動レバー325の第2方向への揺動は、例えば図6に示すように計量工程の途中からサックバック工程の開始の前までの所定のタイミング(例えば計量工程の完了の直前または計量工程の完了時に)で行われる。尚、サックバック工程が行われない場合、揺動レバー325の第2方向への揺動は、計量工程の途中から充填工程の開始の前までの所定のタイミングで行われる。
 弁体322の閉塞位置から開放位置への移動は、計量工程の開始から充填工程の開始の前までの間にノズル320の内部に溜まる成形材料の圧力によって行われる。計量工程時のスクリュ330の背圧または背圧の残圧によって弁体322が開放位置に移動させられる。そのため、弁体322の閉塞位置から開放位置への移動は、揺動レバー325の第2方向への揺動と同時に行われてもよいし、揺動レバー325の第2方向への揺動よりも遅れて行われてもよい。
 弁体322の閉塞位置から開放位置への移動は、例えば図6に示すように計量工程の途中からサックバック工程の開始の前までの所定のタイミングで行われる。尚、サックバック工程が行われない場合、弁体322の閉塞位置から開放位置への移動は、計量工程の途中から充填工程の開始の前までの所定のタイミングで行われる。
 制御装置700は、計量工程の完了からサックバック工程の開始までに所定時間の遅延時間を設定してもよい。この遅延時間の間に、弁体322を閉塞位置から開放位置に移動させるべく、図7に示すようにノズル320の内部における成形材料の圧力を上昇させる圧力上昇工程が行われてよい。圧力上昇工程では、計量工程に比べて、ノズル320の内部における成形材料の圧力が高くなる。計量工程の完了からの経過時間が遅延時間に達すると、サックバック工程が開始される。サックバック工程が開始されると、上述の如く、ノズル320の内部における成形材料の圧力が降下する(図7参照)。そのため、本実施形態では、計量工程の完了後、サックバック工程の開始前に、圧力上昇工程が行われる。尚、サックバック工程は行われなくてもよく、計量工程の完了後、充填工程の開始前に圧力上昇工程が行われてもよい。
 計量工程の完了からサックバック工程の開始までに遅延時間を設けると、計量完了位置でスクリュ330が停止しても、成形材料が慣性で流動することによって、図7に示すように成形材料の圧力が高くなる。また、スクリュ330が計量完了位置へ到達したことを検出すると、スクリュ330の回転および移動が停止させられる。スクリュ330の移動が停止しても、まだ、スクリュ330の回転が止まらない場合には、成形材料がスクリュ330の前方に送られるため、成形材料の圧力が高くなる要因となる。
 計量工程におけるスクリュ330の後退速度は、充填工程におけるスクリュ330の前進速度に比べて低い。そのため、後退停止時に発生する成形材料の圧力は、充填工程に発生する成形材料の圧力に比べて低い。
 このため、計量完了位置でスクリュ330を停止させたときの成形材料の圧力を弁体322の開放位置への移動に利用することで、弁体322や弁体移動機構324の破損を抑制しつつ、確実に弁体322を開放位置に移動させることができる。
 弁体322が閉塞位置にある状態でスクリュ330が計量完了位置に到達したことを検出すると、揺動レバー325を第2方向に揺動させる。これにより、計量完了位置でスクリュ330を停止させたときの成形材料の圧力で、弁体322を閉塞位置から開放位置に移動させることができる。
 尚、サックバック工程はなくてもよく、計量完了位置でスクリュ330を停止させた後、所定時間経過後に充填工程を開始してもよい。サックバック工程がない場合に、計量工程の完了から充填工程の開始までに遅延時間を設けてもよい。計量工程の完了からの経過時間が遅延時間に達すると、充填工程が開始される。
 計量工程の完了からサックバック工程の開始までの遅延時間は、弁体322が閉塞位置から開放位置へ移動する待ち時間として利用されてもよいし、詳しくは後述するが、スクリュ330前方の成形材料の圧力をさらに高める処理の時間として利用されてもよい。
 以上説明したように、本実施形態の制御装置700は、計量工程の開始後、充填工程の開始前に、閉塞位置にある弁体322の固定を解除することにより、ノズル320の内部に溜まる成形材料の圧力による弁体322の開放位置への移動を可能にする制御を実行する。これにより、計量工程の開始後、充填工程の開始前に、ノズル320の内部に溜まる成形材料の圧力によって、弁体322を閉塞位置から開放位置へ移動させる。計量工程の開始から充填工程の開始の前までに生じる成形材料の圧力は、充填工程において生じる成形材料の圧力よりも小さい。計量工程では、充填工程とは異なり、ノズル320から成形材料を射出しないためである。また、本実施形態によれば、弁体322の閉塞位置から開放位置への移動に、計量工程の開始から充填工程の開始の前までに生じる成形材料の圧力を利用する。そのため、従来のように充填工程において生じる成形材料の圧力を利用する場合に比べて、弁体322の閉塞位置から開放位置への移動の勢いを抑制でき、衝撃による弁体322や弁体移動機構324の破損を抑制できる。
 ところで、計量工程において生じる成形材料の圧力は、計量工程の完了からサックバック工程の開始の前までは、利用可能である。本明細書において、計量工程の完了とは、スクリュ330の回転によってスクリュ330が設定位置まで後退し、スクリュ330の前方に所定量の成形材料が蓄積されることを意味する。
 そこで、制御装置700は、計量工程の完了後、弁体322の閉塞位置から開放位置への移動前に、スクリュ330の進退を停止させると共に、スクリュ330を回転させることでスクリュ330前方に成形材料を送り、スクリュ330前方の成形材料の圧力を高めてもよい。計量工程において生じる成形材料の圧力と、計量工程の完了後にスクリュ330の回転によって生じる成形材料の圧力の両方を利用して、弁体322を閉塞位置から開放位置に移動できる。計量工程におけるスクリュ330の背圧が低い場合に特に有効である。計量工程の完了後のスクリュ330の回転量は、弁体322の閉塞位置から開放位置への移動に利用する成形材料の圧力が設定値以下になるように調整される。弁体322や弁体移動機構324の破損を抑制するためである。
 また、制御装置700は、計量工程の完了後、弁体322の閉塞位置から開放位置への移動前に、スクリュ330の回転を停止させると共に、スクリュ330を前進させることで、スクリュ330前方の成形材料の圧力を高めてもよい。計量工程において生じる成形材料の圧力と、計量工程の完了後にスクリュ330の前進によって生じる成形材料の圧力の両方を利用して、弁体322を閉塞位置から開放位置に移動できる。計量工程におけるスクリュ330の背圧が低い場合に特に有効である。計量工程の完了後のスクリュ330の前進量は、弁体322の閉塞位置から開放位置への移動に利用する成形材料の圧力が設定値以下になるように調整される。弁体322や弁体移動機構324の破損を抑制するためである。
 さらに、制御装置700は、計量工程の完了後、弁体322の閉塞位置から開放位置への移動前に、スクリュ330を前進させると共に、スクリュ330を回転させることで、スクリュ330前方の成形材料の圧力を高めてもよい。計量工程において生じる成形材料の圧力と、計量工程の完了後にスクリュ330の前進および回転によって生じる成形材料の圧力の両方を利用して、弁体322を閉塞位置から開放位置に移動できる。計量工程におけるスクリュ330の背圧が低い場合に特に有効である。計量工程の完了後のスクリュ330の前進量、および計量工程の完了後のスクリュの回転量は、弁体322の閉塞位置から開放位置への移動に利用する成形材料の圧力が設定値以下になるように調整される。弁体322や弁体移動機構324の破損を抑制するためである。
 (変形および改良)
 以上、射出成形機の実施形態等について説明したが、本発明は上記実施形態等に限定されるものではなく、特許請求の範囲に記載された本発明の要旨の範囲内において、種々の変形、改良が可能である。
 本出願は、2017年1月31日に日本国特許庁に出願した特願2017-016341号に基づく優先権を主張するものであり、特願2017-016341号の全内容を本出願に援用する。
10  金型装置
11  固定金型
12  可動金型
300 射出装置
310 シリンダ
320 ノズル
321 流路
322 弁体
324 弁体移動機構
325 揺動レバー
326 流体圧シリンダ
329 流路開閉機構
330 スクリュ
340 計量モータ
350 射出モータ
700 制御装置

Claims (4)

  1.  金型装置内に成形材料を射出するノズルと、
     前記ノズルにおける前記成形材料の流路を開閉する流路開閉機構と、
     前端部に前記ノズルが設けられるシリンダと、
     前記シリンダの内部に回転自在に且つ進退自在に配設されるスクリュと、
     前記スクリュを駆動する駆動源と、
     前記流路開閉機構および前記駆動源を制御する制御装置とを備え、
     前記流路開閉機構は、前記流路を開く開放位置と前記流路を閉じる閉塞位置との間で移動させられる弁体と、前記開放位置にある前記弁体を前記閉塞位置に移動させ、前記閉塞位置で前記弁体を固定する動作、および、前記閉塞位置にある前記弁体の固定を解除することにより、前記ノズルの内部に溜まる前記成形材料の圧力による前記弁体の前記開放位置への移動を可能にする動作を行う弁体移動機構とを有し、
     前記制御装置は、前記シリンダの前部に前記成形材料を溜める計量工程の開始後、前記シリンダの前部に溜めた前記成形材料を前記金型装置の内部に充填する充填工程の開始前に、前記閉塞位置にある前記弁体の固定を解除することにより、前記ノズルの内部に溜まる前記成形材料の圧力による前記弁体の前記開放位置への移動を可能にする制御を実行する、射出成形機。
  2.  前記弁体移動機構は、前記ノズルに対し揺動自在に取り付けられて前記弁体に当接する揺動レバーと、前記揺動レバーを、前記弁体が前記開放位置から前記閉塞位置に移動する第1方向および該第1方向とは逆方向で前記閉塞位置にある前記弁体の固定を解除する第2方向に揺動させる流体圧シリンダとを有する、請求項1に記載の射出成形機。
  3.  前記制御装置は、前記計量工程の完了後であって、前記弁体の前記閉塞位置から前記開放位置への移動前に、前記スクリュを回転させて、前記スクリュよりも前方の前記成形材料の圧力を高める、請求項1または2に記載の射出成形機。
  4.  前記制御装置は、前記計量工程の完了後であって、前記弁体の前記閉塞位置から前記開放位置への移動前に、前記スクリュを前進させて、前記スクリュよりも前方の前記成形材料の圧力を高める、請求項1~3のいずれか1項に記載の射出成形機。
PCT/JP2018/003263 2017-01-31 2018-01-31 射出成形機 WO2018143291A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN202310797311.4A CN116653213A (zh) 2017-01-31 2018-01-31 注射成型机
CN201880009377.XA CN110234487B (zh) 2017-01-31 2018-01-31 注射成型机
JP2018565617A JP6918841B2 (ja) 2017-01-31 2018-01-31 射出成形機
EP18748469.6A EP3578333B1 (en) 2017-01-31 2018-01-31 Injection molding machine

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017016341 2017-01-31
JP2017-016341 2017-01-31

Publications (1)

Publication Number Publication Date
WO2018143291A1 true WO2018143291A1 (ja) 2018-08-09

Family

ID=63040705

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/003263 WO2018143291A1 (ja) 2017-01-31 2018-01-31 射出成形機

Country Status (4)

Country Link
EP (1) EP3578333B1 (ja)
JP (1) JP6918841B2 (ja)
CN (2) CN110234487B (ja)
WO (1) WO2018143291A1 (ja)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111469337A (zh) * 2020-04-21 2020-07-31 金晓 一种基于光感控制的注塑压力可调节的注塑装置
CN112936780B (zh) * 2021-01-27 2022-09-09 山东华晨饮品有限公司 一种注塑机射胶头板
JP2022157852A (ja) * 2021-03-31 2022-10-14 住友重機械工業株式会社 射出成形機、射出成形機の制御装置、及び制御方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54120580U (ja) * 1978-02-10 1979-08-23
JPS61266215A (ja) * 1985-05-21 1986-11-25 Japan Steel Works Ltd:The 射出成形機の射出制御方法
JP2002292683A (ja) 2001-04-02 2002-10-09 Murata Mfg Co Ltd 射出成形機
JP2012232558A (ja) * 2011-05-09 2012-11-29 Toyo Mach & Metal Co Ltd 発泡成形用射出成形機の射出装置
JP2017016341A (ja) 2015-06-30 2017-01-19 ブラザー工業株式会社 携帯端末及びプログラム

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1070887A (en) * 1965-05-03 1967-06-07 Eric Osten Orrevad Improved injection moulding nozzle for plastics
JPH0720640B2 (ja) * 1990-08-03 1995-03-08 旭化成工業株式会社 射出成形ノズル装置
JP3430214B2 (ja) * 1999-03-17 2003-07-28 新潟鐵工成形機株式会社 射出成形機および射出成形方法
JP4323211B2 (ja) * 2003-05-07 2009-09-02 東芝機械株式会社 射出成形機における成形材料供給装置
KR101040818B1 (ko) * 2009-04-13 2011-06-14 엘에스엠트론 주식회사 배압제어가 가능한 사출장치
CN102059785B (zh) * 2010-10-15 2013-03-27 中国计量学院 螺杆式注塑机的注射装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54120580U (ja) * 1978-02-10 1979-08-23
JPS61266215A (ja) * 1985-05-21 1986-11-25 Japan Steel Works Ltd:The 射出成形機の射出制御方法
JP2002292683A (ja) 2001-04-02 2002-10-09 Murata Mfg Co Ltd 射出成形機
JP2012232558A (ja) * 2011-05-09 2012-11-29 Toyo Mach & Metal Co Ltd 発泡成形用射出成形機の射出装置
JP2017016341A (ja) 2015-06-30 2017-01-19 ブラザー工業株式会社 携帯端末及びプログラム

Also Published As

Publication number Publication date
CN110234487A (zh) 2019-09-13
EP3578333A1 (en) 2019-12-11
CN116653213A (zh) 2023-08-29
CN110234487B (zh) 2023-08-11
JPWO2018143291A1 (ja) 2019-11-21
EP3578333A4 (en) 2020-01-22
JP6918841B2 (ja) 2021-08-11
EP3578333B1 (en) 2023-06-07

Similar Documents

Publication Publication Date Title
WO2018143291A1 (ja) 射出成形機
JP2018171811A (ja) 射出成形機
TWI733004B (zh) 射出成形機
JP7083678B2 (ja) 射出装置および射出成形機
JP2018167518A (ja) 成形機用スクリュ
JP7114284B2 (ja) 射出成形機
JP2019177684A (ja) 射出成形機
JP7118835B2 (ja) 射出成形機
JP6862248B2 (ja) 射出成形機
JP6847742B2 (ja) 射出装置及び方向切替弁
JP2018171919A (ja) 射出成形ユニット
JP2019177535A (ja) 射出成形機
CN110315718B (zh) 注射成型用数据管理装置及注射成型机
JP7317476B2 (ja) 射出成形機
JP6779802B2 (ja) 射出成形機
JP2018122507A (ja) 射出成形機
JP7297660B2 (ja) 金型装置
JP7500469B2 (ja) 射出成形機
JP2018167468A (ja) 射出成形機
JP7293097B2 (ja) 射出成形機
TWI750465B (zh) 射出成形機的頂出桿調整方法
JP6751037B2 (ja) 射出成形機
JP2018140610A (ja) 射出成形機
WO2022210791A1 (ja) 可動プラテン
JP7009280B2 (ja) エジェクタ装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18748469

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2018565617

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2018748469

Country of ref document: EP

Effective date: 20190902