WO2017146615A1 - Wall panel - Google Patents

Wall panel Download PDF

Info

Publication number
WO2017146615A1
WO2017146615A1 PCT/RU2017/000090 RU2017000090W WO2017146615A1 WO 2017146615 A1 WO2017146615 A1 WO 2017146615A1 RU 2017000090 W RU2017000090 W RU 2017000090W WO 2017146615 A1 WO2017146615 A1 WO 2017146615A1
Authority
WO
WIPO (PCT)
Prior art keywords
panel
insulation
wall panel
panels
plywood
Prior art date
Application number
PCT/RU2017/000090
Other languages
French (fr)
Russian (ru)
Inventor
Рустем Раисович КУЧКАРОВ
Original Assignee
Рустем Раисович КУЧКАРОВ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Рустем Раисович КУЧКАРОВ filed Critical Рустем Раисович КУЧКАРОВ
Publication of WO2017146615A1 publication Critical patent/WO2017146615A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/70Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of wood
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/10Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of wood, fibres, chips, vegetable stems, or the like; of plastics; of foamed products
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/26Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups
    • E04C2/284Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating

Definitions

  • the inventive wall panel relates to the construction of ground low-rise buildings and is applicable in the construction of wall structures, ceilings, coatings and the installation of pitched roofs.
  • SIP panels are polystyrene sheets enclosed between two sheets of 0SB boards.
  • the assembly of buildings is carried out by introducing into the panel vertical and horizontal connecting boards forming the frame of the building, and working in conjunction with the SIP panel.
  • SIP panels low vapor permeability.
  • a forced-air and exhaust ventilation device is required, preferably with heating or heat recovery.
  • polystyrene foam and polyurethane foam used in sealing joints have low sound absorption.
  • the aim of the invention is to create a unified, convenient to install, with the possibility of installation without lifting mechanisms, and not requiring laborious fitting on the construction site of wall structures.
  • Increased operational characteristics namely: environmental safety, sound absorption, heat-insulating properties and vapor permeability is achieved by using cellulose ecowool, supporting and connecting elements - softwood boards and glued plywood of class E1 as insulation.
  • a special method of arranging the diaphragms in the cavity of the panel provides a small shrinkage of the insulation and the inability to form a through air gap in it.
  • the wall panel is shown in Fig. 1. and consists of racks 1; glued into racks 1 plywood diaphragms 2; bottoms 8; triangular rails 3 of different sections designed for - connecting the diaphragm 2 with the inner 4 and outer 5 plywood sheaths, securing the internal walls / partitions for them, securing the elements of the connecting system 14; insulation 7 - cellulose ecowool; technological holes for - blowing heater 19, additional water vapor removal from heater 9; holes for fasteners 25,26,27,28,33,34,35; groove 10 for a foam rubber seal.
  • the extension of the panels in height of FIGS. 4, 5 is carried out by sanitary studs 23 and guide bushings 24.
  • the panel is fastened on the basis of FIGS. 6, 7 by studs 20 and bushings 22.
  • SUBSTITUTE SHEET (RULE 26)
  • the connecting elements of the panels are shown in Figs. 8, 9, 10, 11, 12.
  • the groove element 14 is composite and is dialed onto the side edges of the panel depending on the required marks fixed on its console, floors, roof structure, stairwells and marches.
  • the step of the floor beams and rafters corresponds to the size of the panel.
  • the element "spike” 15 has the function of compensating for the geometric error in the manufacture of the panel of Fig. 10 consisting of a sleeve 30, a compression spring 31, a locking screw 32 and is installed along the entire height of the panel with a certain step. Reducing heat loss in the seam between the panels is achieved by packing from a jute bundle 16 and lining 17.
  • Figure 1 wall of the building in the assembly of two panels.
  • FIG. 8 In FIG. , 5 - node A in figure 1, the splicing of the panels in height. In FIG. b, 7 - node B of figure 1, the fastening of the panel to the base. On Fig - connecting element "spike”. In Fig. 9 - section aa in Fig. 8
  • Figure 10 is a section bB in Fig. 8 Assembling the compensation mechanism and attaching the spike to the panel stand.
  • the inventive wall panel is made in the conditions of a carpentry workshop as follows:
  • Composite racks 1 are made of dry tongue-and-groove floor boards, with a large panel length, it is desirable to use a spliced board. Cut on the rack 1 inclined grooves for gluing with a diaphragm 2. Assemble the panel by compression on the clamps. Fixing the diaphragm 2 to the rack 1 glue; triangular slats 3 to the diaphragm 2 and the casing 4,5, the casing 4,5 to the racks 1 - pneumatic tools with the application of silicone sealant. Drilling the necessary technological holes
  • Blowing the heater 7 can be done both in the workshop and in order to facilitate the panel, on the construction site.
  • the element "spike” 15 is attached to the rack 1 through the holes 33 and bushings 30 with confirmations 29, in accordance with the marking of the technological holes 34.
  • the element is "grooved” 14., is attached to the panel through wooden dowels 18 with silicone sealant applied and screwing confirmations 34 on the construction site by type and size of the corresponding fixed on its console, floors, rafter structures, staircases
  • SUBSTITUTE SHEET (RULE 26) platforms and marches.
  • the panel is fastened to the base of the building in Figs. 6, 7 by a pin 20 and a sleeve 22 glued to the rack 1. It is proposed to use screw piles with the headband around the perimeter of the channel 21 as a foundation in a lying position on adjustable screw ties.
  • undercutting of the binder 4,5 is made under the protruding shelf of the console of the connecting element "groove" 14, taking into account the course of the connection of the connecting element "spike” 15.
  • the panels are fastened vertically through the inner lining 4 to the rack 1 and the connecting element "groove" 14 with screws, through the lining 17 from the outside.
  • the dimensions of the panels are unified, based on this, it is necessary: - to complete the project layout of the panels in the plan; installation scheme of floors, rafters, flights of stairs and landings; window and doorways.
  • the size of the openings of windows and doors is calculated in multiples of the width of the panels and the installation step of the connecting element "spike" 15.
  • the splicing of the panels in height is performed with the condition of a spacing relative to the joint of adjacent panels in the wall and the joint of the connecting elements “grooved”.
  • SUBSTITUTE SHEET (RULE 26)
  • the design of the ceilings and the rafter system involves the use of box-shaped load-bearing elements, like an I-beam with two spaced walls, by the thickness of the connecting element 14.
  • the cantilever wall shelf is enclosed in the cavity of the floor beam box, rafter legs and pulled together with a hairpin. Additionally, a U-shaped bracket is installed, with the shelf facing down, combining the adjacent walls of the panels with the cantilevered shelf for their joint operation under the influence of loads from the floors and the rafter system.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Wood Science & Technology (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Building Environments (AREA)
  • Finishing Walls (AREA)

Abstract

The claimed wall panel can be used in the construction of ground-based low-rise buildings. The aim of the invention includes: low panel weight, easy assembly, environmental safety, vapour permeability, and good thermal, strength and sound-insulating properties. These characteristics are achieved by the use of cellulose heat insulation and wooden load-bearing members made from softwood and E1 grade plywood (i.e. interior plywood). The vertically continuous panel design shown in figure 13 allows for the construction of an attic, with the load being transmitted from the rafter system directly to a cantilever shelf of the panel without the need for additional purlins, posts and walls to hold up the rafters. Interior walls and partitions can be mounted at any point on the panel and are fastened to reinforcing ribs formed by a reinforced triangular ledge and a diaphragm. Linear shrinkage of the insulation is limited by placing the insulation in cells of limited dimensions. In addition, the arrangement of the diaphragms prevents the formation of through air spaces as a result of shrinkage of the insulation. Groove-type connecting elements are assembled in accordance with the floor levels and the fastening of the rafter system to the wall. The panels are connected in plan by a system comprising a biplanar wedge lock and a compensating mechanism.

Description

Стеновая панель  Wall panel
Описание изобретения  Description of the invention
Область техники: Field of Technology:
Заявляемая стеновая панель относится к строительству наземных малоэтажных зданий и применима в возведении стеновых конструкций, перекрытиях, покрытиях и устройстве скатных крыш. The inventive wall panel relates to the construction of ground low-rise buildings and is applicable in the construction of wall structures, ceilings, coatings and the installation of pitched roofs.
Уровень техники : The prior art:
Известна стеновая конструкция состоящая из панелей закрепленных с помощью клиновидных шипов к соединительным стойкам (патент US W2850771A Е04В2/70, Е04В1/343) . Known wall structure consisting of panels fixed with wedge-shaped spikes to the connecting posts (US patent W2850771A Е04В2 / 70, Е04В1 / 343).
Недостатком данной конструкции является сложность изготовления и обеспечение герметичности соединений. The disadvantage of this design is the complexity of manufacturing and ensuring the tightness of the joints.
Известна также технология строительства малоэтажных зданий из СИП панелей. СИП панели это листовой пенополистирол заключенный между двух листов плит 0SB. Сборка зданий осуществляется путем введения в панель вертикальных и горизонтальных соединительных досок, формирующих каркас здания, и работающих совместно с СИП панелью. Also known is the construction technology of low-rise buildings from SIP panels. SIP panels are polystyrene sheets enclosed between two sheets of 0SB boards. The assembly of buildings is carried out by introducing into the panel vertical and horizontal connecting boards forming the frame of the building, and working in conjunction with the SIP panel.
Недостатком СИП панелей является низкая паропроницаемость . Требуется устройство принудительной приточно - вытяжной вентиляции, желательно с подогревом или рекуперацией тепла. The disadvantage of SIP panels is low vapor permeability. A forced-air and exhaust ventilation device is required, preferably with heating or heat recovery.
Также пенополистирол и используемый при герметизации швов пенополиуретан обладает низким звукопоглащением . Also, polystyrene foam and polyurethane foam used in sealing joints have low sound absorption.
Особенность возведения стен из СИП панелей предполагает устройство обвязок стен и укладки на них балок перекрытия, стропильной системы. Что создает множество трудно герметизируемых у. утепляемых сквозных щелей между досок обвязки и балками, образующимися как при монтаже так и при усушке и короблении древесины. Известны случаи использования сырого пиломатериала, что негативно сказывается на теплоэффективности конструкции в зоне перекрытий, возможно образование плесневых поражений на The peculiarity of the construction of walls from SIP panels involves the device of wall bindings and laying on them floor beams, rafters. Which creates a lot of difficult to seal. insulated through slots between the strapping boards and beams formed both during installation and during drying and warping of wood. There are known cases of using raw lumber, which negatively affects the heat efficiency of the structure in the overlapping zone, the formation of mold lesions on
ЗАМЕНЯЮЩИЙ ЛИСТ (ПРАВИЛО 26) поверхности древесины, ввиду низкой паронепроницаемости используемых материалов панели. SUBSTITUTE SHEET (RULE 26) wood surface, due to the low vapor tightness of the panel materials used.
Наиболее близким к предполагаемому изобретению является УСП панель Компании «УралСтройПанель» состоящую из гнутых стальных профилей и монолитно связанного с ним базальтового утеплителя Closest to the alleged invention is the USP panel of the UralStroyPanel Company consisting of bent steel profiles and a basalt heater insulated with it
Раскрытие изобретения : Disclosure of the invention:
Целью изобретения является создания унифицированных, удобных в монтаже, с возможностью установки без грузоподъемных механизмов, и не требующей трудоемкой подгонки на стройплощадке стеновых конструкций. Повышенные эксплуатационные характеристики , а именно: экологическая безопасность, звукопоглощение, теплоизолирующие свойства и паропроницаемость достигается применением в качестве утеплителя — целлюлозной эковаты, несущих и соединительных элементов - доски хвойных пород и клееная фанера класса Е1. Особый метод раскладки диафрагм в полости панели обеспечивает малую усадку утеплителя и невозможность образования сквозной воздушной прослойки в ней. The aim of the invention is to create a unified, convenient to install, with the possibility of installation without lifting mechanisms, and not requiring laborious fitting on the construction site of wall structures. Increased operational characteristics, namely: environmental safety, sound absorption, heat-insulating properties and vapor permeability is achieved by using cellulose ecowool, supporting and connecting elements - softwood boards and glued plywood of class E1 as insulation. A special method of arranging the diaphragms in the cavity of the panel provides a small shrinkage of the insulation and the inability to form a through air gap in it.
Стеновая панель представлена на фиг .1. и состоит из стоек 1; вклеенных в стойки 1 фанерных диафрагм 2; днища 8; треугольных реек 3 разного сечения предназначенных для - соединения диафрагмы 2 с внутренней 4 и наружной 5 фанерной обшивками, закрепления за них внутренних стен/перегородок, закрепления элементов соединительной системы 14; утеплителя 7 - целлюлозная эковата; технологических отверстий для - задува утеплителя 19, дополнительного отвода водяных паров из утеплителя 9; отверстий для крепежа 25,26,27,28,33,34,35; паза 10 для уплотнителя из вспененной резины. Наращивание панелей по высоте фиг.4, 5 осуществляется санитарными шпильками 23 и направляющими втулками 24. Закрепление панели на основании фиг.6, 7 производится шпильками 20 и втулками 22. The wall panel is shown in Fig. 1. and consists of racks 1; glued into racks 1 plywood diaphragms 2; bottoms 8; triangular rails 3 of different sections designed for - connecting the diaphragm 2 with the inner 4 and outer 5 plywood sheaths, securing the internal walls / partitions for them, securing the elements of the connecting system 14; insulation 7 - cellulose ecowool; technological holes for - blowing heater 19, additional water vapor removal from heater 9; holes for fasteners 25,26,27,28,33,34,35; groove 10 for a foam rubber seal. The extension of the panels in height of FIGS. 4, 5 is carried out by sanitary studs 23 and guide bushings 24. The panel is fastened on the basis of FIGS. 6, 7 by studs 20 and bushings 22.
ЗАМЕНЯЮЩИЙ ЛИСТ (ПРАВИЛО 26) Соединительные элементы панелей представлены на фиг .8 , 9 , 10 , 11 , 12. Элемент « пазовый» 14, является составным и набирается на боковые ребра панели в зависимости от требуемых отметок, закрепляемых на ее консоли, перекрытий, стропильной конструкции, лестничных площадок и маршей. Шаг балок перекрытий и стропильных ног соответствует размеру панели. Элемент «шип» 15 имеет функцию компенсации геометрической погрешности изготовления панели фиг.10 состоящую из втулки 30, пружины сжатия 31, стопорного винта 32 и устанавливается по всей высоте панели с определенным шагом. Снижение теплопотерь в шве между панелями достигается набивкой из джутового жгута 16 и накладки 17. SUBSTITUTE SHEET (RULE 26) The connecting elements of the panels are shown in Figs. 8, 9, 10, 11, 12. The groove element 14 is composite and is dialed onto the side edges of the panel depending on the required marks fixed on its console, floors, roof structure, stairwells and marches. The step of the floor beams and rafters corresponds to the size of the panel. The element "spike" 15 has the function of compensating for the geometric error in the manufacture of the panel of Fig. 10 consisting of a sleeve 30, a compression spring 31, a locking screw 32 and is installed along the entire height of the panel with a certain step. Reducing heat loss in the seam between the panels is achieved by packing from a jute bundle 16 and lining 17.
Описание чертежей и графических материалов: Description of drawings and graphic materials:
На фиг.1 — стена здания в сборе из двух панелей. Figure 1 - wall of the building in the assembly of two panels.
На фиг.2 — разрез А-А по фиг.1 стыковка панелей в плане. In Fig.2 - section aa in Fig.1 docking panels in plan.
На фиг.З — разрез Б-Б по фиг.1. In Fig.Z - section BB in Fig.1.
На фиг. , 5 — узел А по фиг.1 сращивание панелей по высоте. На фиг. б, 7 — узел Б по фиг.1 крепление панели к основанию. На фиг.8 — соединительный элемент «шип». На фиг .9 — разрез А-А по фиг .8 In FIG. , 5 - node A in figure 1, the splicing of the panels in height. In FIG. b, 7 - node B of figure 1, the fastening of the panel to the base. On Fig - connecting element "spike". In Fig. 9 - section aa in Fig. 8
На фиг.10 — разрез Б-Б по фиг .8 Сборка компенсационного механизма и крепление соединительного элемента «шип» к стойке панели. Figure 10 is a section bB in Fig. 8 Assembling the compensation mechanism and attaching the spike to the panel stand.
На фиг.11 — Соединительный элемент «пазовый». Figure 11 - Connecting element "groove".
На фиг.12 — разрез А-А по фиг.11 крепление элемента «пазовый» к стойке панели. In Fig.12 - section aa in Fig.11 the fastening of the element "grooved" to the rack panel.
На фиг.13 — Вариант расчетной схемы одноэтажного здания с мансардным этажом. On Fig - Variant of the design scheme of a one-story building with an attic floor.
На фиг.14 — Фото сборки панели на струбцинах. On Fig - Photo of the assembly of the panel on the clamps.
ЗАМЕНЯЮЩИЙ ЛИСТ (ПРАВИЛО 26) На фиг.15 — Фото крепления соединительного элемента «пазовый» к стойке панели. SUBSTITUTE SHEET (RULE 26) On Fig - Photo of the fastening of the connecting element "groove" to the panel rack.
На фиг.16 — Фото крепления соединительного элемента «шип» к стойке панели. On Fig - Photo mounting the connecting element "spike" to the panel rack.
На фиг.17 — Фото процесс стыковки панелей. On Fig - Photo process of docking panels.
На фиг.18 — Фото смонтированных и закрепленных на основании панелей с консолью для перекрытия и покрытия. On Fig - Photo mounted and fixed on the basis of the panels with the console for overlapping and coating.
Осуществление изобретения: The implementation of the invention:
Заявляемую стеновую панель изготавливают в условиях столярного цеха следующим образом: The inventive wall panel is made in the conditions of a carpentry workshop as follows:
Все деревянные изделия проходят обработку огне-биозащитным составом . All wooden products are processed with a bioprotective composition.
Изготавливают составные стойки 1 из сухой шпунтованной доски пола, при большой длине панели желательно использование срощенной доски. Прорезают на стойке 1 наклонные пазы для склеивания с диафрагмой 2. Собирают панель обжатием на струбцинах. Крепление дифрагмы 2 к стойке 1 клеевое; треугольной рейки 3 к диафрагме 2 и обшивке 4,5, обшивки 4,5 к стойкам 1 - пневмоскозабивным инструментом с нанесением силиконового герметика. Производят сверление необходимых технологических отверстийComposite racks 1 are made of dry tongue-and-groove floor boards, with a large panel length, it is desirable to use a spliced board. Cut on the rack 1 inclined grooves for gluing with a diaphragm 2. Assemble the panel by compression on the clamps. Fixing the diaphragm 2 to the rack 1 glue; triangular slats 3 to the diaphragm 2 and the casing 4,5, the casing 4,5 to the racks 1 - pneumatic tools with the application of silicone sealant. Drilling the necessary technological holes
9,19, 25,26,27,28,-33, 34, 35 по шаблону. Задув утеплителя 7 может быть произведен как в цеху, так и в целях облегчения панели, на стройплощадке. Элемент «шип» 15 крепится к стойке 1 через отверстия 33 и втулки 30 конфирматами 29, в соответствии с разметкой технологических отверстий 34. Элемент «пазовый» 14., крепят к панели через деревянные шканты 18 с нанесением силиконового герметика и вкручиванием конфирматов 34 на стройплощадке по типу и размерам соответствующих закрепляемых на ее консоли, перекрытий, стропильной конструкции, лестничных 9.19, 25,26,27,28, -33, 34, 35 according to the pattern. Blowing the heater 7 can be done both in the workshop and in order to facilitate the panel, on the construction site. The element "spike" 15 is attached to the rack 1 through the holes 33 and bushings 30 with confirmations 29, in accordance with the marking of the technological holes 34. The element is "grooved" 14., is attached to the panel through wooden dowels 18 with silicone sealant applied and screwing confirmations 34 on the construction site by type and size of the corresponding fixed on its console, floors, rafter structures, staircases
ЗАМЕНЯЮЩИЙ ЛИСТ (ПРАВИЛО 26) площадок и маршей. Крепление панели к основанию здания фиг.6, 7 производится шпилькой 20 и вклеиваемой к стойке 1 втулки 22. Предлагается использовать в качестве фундамента винтовые сваи с обвязкой оголовков по периметру швеллером 21 в положении лежа на регулируемых винтовых связях. SUBSTITUTE SHEET (RULE 26) platforms and marches. The panel is fastened to the base of the building in Figs. 6, 7 by a pin 20 and a sleeve 22 glued to the rack 1. It is proposed to use screw piles with the headband around the perimeter of the channel 21 as a foundation in a lying position on adjustable screw ties.
При необходимости на стройплощадке выполняются подрезы подшивки 4,5 под выступающую полку консоли соединительного элемента «пазовый» 14 с учетом хода стыковки соединительного элемента «шип» 15. If necessary, undercutting of the binder 4,5 is made under the protruding shelf of the console of the connecting element "groove" 14, taking into account the course of the connection of the connecting element "spike" 15.
Также скрепление панелей по вертикали производится через внутреннюю обшивку 4 к стойке 1 и соединительному элементу «пазовый» 14 саморезами, через накладку 17 с внешней стороны. Also, the panels are fastened vertically through the inner lining 4 to the rack 1 and the connecting element "groove" 14 with screws, through the lining 17 from the outside.
Размеры панелей унифицированы, исходя из этого, необходимо: - выполнить проект раскладки панелей в плане; схему установки перекрытий, стропильной системы, лестничных маршей и площадок; оконных и дверных проемов. The dimensions of the panels are unified, based on this, it is necessary: - to complete the project layout of the panels in the plan; installation scheme of floors, rafters, flights of stairs and landings; window and doorways.
Размер проемов окон и дверей рассчитывают кратно ширины панелей и шага установки соединительного элемента «шип» 15 . The size of the openings of windows and doors is calculated in multiples of the width of the panels and the installation step of the connecting element "spike" 15.
При необходимости сужения размеров проема, дополнительно монтируют доборные элементы, схожие по конструкции с заявляемой панелью . If it is necessary to narrow the dimensions of the opening, additional elements are installed that are similar in design to the claimed panel.
По краям проема монтируются дополнительные стойки, их крепление к нижним и верхним панелям выполняется в соответствии с фиг.4,5. На дополнительные стойки проема устанавливается деревянная перемычка, закрепление на ней вышележащих панелей выполняют в соответствии с фиг. 4,5. At the edges of the opening additional racks are mounted, their fastening to the lower and upper panels is carried out in accordance with Fig. 4,5. A wooden lintel is installed on additional racks of the opening, overlying panels are fixed on it in accordance with FIG. 4,5.
Сращивание панелей по высоте выполняется с условием разбежки относительно стыка соседних панелей в стене и стыка соединительных элементов «пазовый». The splicing of the panels in height is performed with the condition of a spacing relative to the joint of adjacent panels in the wall and the joint of the connecting elements “grooved”.
ЗАМЕНЯЮЩИЙ ЛИСТ (ПРАВИЛО 26) Конструкция перекрытий и стропильной системы предполагает использование несущих элементов коробчатого сечения, по типу двутавра с двумя разнесенными стенками на величину толщины соединительного элемента 14. Консольная полка стены заключена в полость коробки балки перекрытий, стропильных ног и стянута шпилькой. Дополнительно устанавливают П-образную скобу, полкой вниз, объединяющую примыкающие стенки панелей с консольной полкой для их совместной работы под воздействием нагрузок от перекрытий и стропильной системы. SUBSTITUTE SHEET (RULE 26) The design of the ceilings and the rafter system involves the use of box-shaped load-bearing elements, like an I-beam with two spaced walls, by the thickness of the connecting element 14. The cantilever wall shelf is enclosed in the cavity of the floor beam box, rafter legs and pulled together with a hairpin. Additionally, a U-shaped bracket is installed, with the shelf facing down, combining the adjacent walls of the panels with the cantilevered shelf for their joint operation under the influence of loads from the floors and the rafter system.
ЗАМЕНЯЮЩИЙ ЛИСТ (ПРАВИЛО 26) SUBSTITUTE SHEET (RULE 26)

Claims

Формула, изобретения Claim
1. Стеновая панель, содержащая деревянные составные стойки, вклеиваемые в стойки фанерные диафрагмы, треугольные рейки, фанерные наружную и внутреннюю обшивки, теплоизолирующий целлюлозный материал — эковата, технологические отверстия для установки соединительных элементов и окошки для сухого задува целлюлозного утеплителя, отличающаяся тем, что продольное соединение панелей np-оисходит с помощью клиновидного стыкового механизма, исключена возможность образования сквозной воздушной прослойки в утеплителе в результате его усадки. 1. A wall panel containing wooden composite racks, glued into the racks of plywood diaphragms, triangular slats, plywood outer and inner cladding, insulating cellulosic material - ecowool, technological holes for installing connecting elements and windows for dry blowing of cellulose insulation, characterized in that the longitudinal the connection of the np-panels occurs with a wedge-shaped butt mechanism, the possibility of the formation of a through air gap in the insulation as a result of its shrinkage is excluded.
2. Стеновая панель по п.1, отличающаяся тем, что укладка утеплителя осуществляется задувом в полость панели, особенность которой заключается в наличии двух рядов наклонных диафрагм жесткости, расположенных зеркально и со смещением друг к другу относительно центральной продольной оси панели. 2. The wall panel according to claim 1, characterized in that the insulation is laid by blowing into the cavity of the panel, the peculiarity of which is the presence of two rows of inclined stiffness diaphragms that are mirrored and offset to each other relative to the central longitudinal axis of the panel.
3. Стеновая панель по п.1. отличающаяся тем, что их стыковку обеспечивают соединительные элементы «шип» и «пазовый» с двухплоскостным клиновым замком и механизмом компенсации геометрической погрешности изготовления панели. 3. The wall panel according to claim 1. characterized in that their connection is provided by the "tenon" and "groove" connecting elements with a two-plane wedge lock and a mechanism for compensating the geometric error of panel manufacturing.
4. Стеновая панель по п.1, отличающаяся тем, что конструкция соединительного элемента «пазовый» предусматривает наличие консольных полок для закрепления на них перекрытий, стропильной' системы, лестничных маршей и площадок, в результате чего не нарушается цельность контура утепления наружных ограждающих конструкций здания. 4. A wall panel according to claim 1, characterized in that the structure "Recess" connecting member provides for cantilevered shelves for fixing them overlaps, rafter 'system, stairways and platforms, whereby the integrity of the circuit is not disturbed insulation external walling of the building .
5. Стеновая панель по п.1, отличающаяся тем, что ее работа под воздействием нагрузок от перекрытий и стропильной системы, происходит неразрывно по всей высоте, от основания до узла сопряжения с крышей. 5. The wall panel according to claim 1, characterized in that its operation under the influence of loads from the floors and the rafter system occurs inextricably throughout the entire height, from the base to the interface with the roof.
PCT/RU2017/000090 2016-02-25 2017-02-22 Wall panel WO2017146615A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
RU2016106164A RU2665333C2 (en) 2016-02-25 2016-02-25 Wall panel and two-plane wedge-shaped wall panels longitudinal joining mechanism
RU2016106164 2016-02-25

Publications (1)

Publication Number Publication Date
WO2017146615A1 true WO2017146615A1 (en) 2017-08-31

Family

ID=59686457

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/RU2017/000090 WO2017146615A1 (en) 2016-02-25 2017-02-22 Wall panel

Country Status (2)

Country Link
RU (1) RU2665333C2 (en)
WO (1) WO2017146615A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023281218A1 (en) * 2021-07-08 2023-01-12 Saint-Gobain Isover Prefabricated insulating panel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995034721A1 (en) * 1994-06-10 1995-12-21 Neste Oy Wall element arrangement
WO2000003850A1 (en) * 1998-07-13 2000-01-27 Erwin Thoma Prefabricated laminated wood member
RU2211898C1 (en) * 2002-01-18 2003-09-10 Андрианов Рудольф Алексеевич Construction panel
RU69539U1 (en) * 2007-08-08 2007-12-27 Александр Владимирович Греков EASY WALL PANEL
RU2535866C1 (en) * 2013-10-09 2014-12-20 Автономная некоммерческая организация научно-технический парк Оренбургского государственного университета "Технопарк ОГУ" (АНО "Технопарк ОГУ") Glued boarding panel for antiseismic construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995034721A1 (en) * 1994-06-10 1995-12-21 Neste Oy Wall element arrangement
WO2000003850A1 (en) * 1998-07-13 2000-01-27 Erwin Thoma Prefabricated laminated wood member
RU2211898C1 (en) * 2002-01-18 2003-09-10 Андрианов Рудольф Алексеевич Construction panel
RU69539U1 (en) * 2007-08-08 2007-12-27 Александр Владимирович Греков EASY WALL PANEL
RU2535866C1 (en) * 2013-10-09 2014-12-20 Автономная некоммерческая организация научно-технический парк Оренбургского государственного университета "Технопарк ОГУ" (АНО "Технопарк ОГУ") Glued boarding panel for antiseismic construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023281218A1 (en) * 2021-07-08 2023-01-12 Saint-Gobain Isover Prefabricated insulating panel
FR3125073A1 (en) * 2021-07-08 2023-01-13 Saint-Gobain Isover prefabricated insulation panel

Also Published As

Publication number Publication date
RU2016106164A (en) 2017-08-30
RU2665333C2 (en) 2018-08-29

Similar Documents

Publication Publication Date Title
CA3069629C (en) Dry partition wall system and method for installation of a dry partition wall system of this kind
RU2678341C2 (en) Modular building
US20100300037A1 (en) Insulating Structure
US20170030072A1 (en) System and method for panelized, superinsulated building envelopes
US9587399B2 (en) Insulating wall, a column assembly therefore and a method of constructing such an insulating wall
WO2017146615A1 (en) Wall panel
US20110067346A1 (en) Prefabritcated framing member support system and methods for installing a prefabricated framing member support system in a construction application
EP2348161A2 (en) Modular system for house building
US20200199871A1 (en) Wall module for buildings
RU2596167C1 (en) Construction method of using frameless wooden panel
CA3112892A1 (en) A building system and method
RU2630319C1 (en) Smooth angled construction
EP1953300B1 (en) Arrangement for joining wood-based construction elements
JPS60215957A (en) Wall panel for prefabricated structure and prefabricated structure containing said wall panel
RU2762659C1 (en) Method for mounting sandwich-structured panels for wall fencing in half-timbered houses
RU2794438C1 (en) Method for forming a bay window for a wooden building
EP4069911B1 (en) Prefabricated boarding for cladding a wooden frame of a building with walls and method for applying such a prefabricated boarding to a wooden frame
RU161377U1 (en) WOODEN FRAMELESS PANEL
Loebus et al. The multifunctional TES-façade joint
JP5010361B2 (en) Large wall panel installation structure
WO2003004786A2 (en) Structural apparatus and method
RU2135708C1 (en) Wooden structure made of prefabricated panels
WO2023140777A1 (en) A collaborating joist and suspended ceiling system and a method for assembling the system
WO2013079971A2 (en) Improvements relating to construction
GB2610279A (en) Timber frame building and method of assembly thereof

Legal Events

Date Code Title Description
NENP Non-entry into the national phase

Ref country code: DE

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17756911

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 17756911

Country of ref document: EP

Kind code of ref document: A1