WO2017024535A1 - Four de séparation par fusion et procédé de traitement de matériau à faire fondre et à séparer avec celui-ci - Google Patents

Four de séparation par fusion et procédé de traitement de matériau à faire fondre et à séparer avec celui-ci Download PDF

Info

Publication number
WO2017024535A1
WO2017024535A1 PCT/CN2015/086683 CN2015086683W WO2017024535A1 WO 2017024535 A1 WO2017024535 A1 WO 2017024535A1 CN 2015086683 W CN2015086683 W CN 2015086683W WO 2017024535 A1 WO2017024535 A1 WO 2017024535A1
Authority
WO
WIPO (PCT)
Prior art keywords
melting
zone
air
gas
melting furnace
Prior art date
Application number
PCT/CN2015/086683
Other languages
English (en)
Chinese (zh)
Inventor
吴道洪
谢善清
刘行波
裴芬
王东方
林景龙
Original Assignee
北京神雾环境能源科技集团股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 北京神雾环境能源科技集团股份有限公司 filed Critical 北京神雾环境能源科技集团股份有限公司
Priority to PCT/CN2015/086683 priority Critical patent/WO2017024535A1/fr
Publication of WO2017024535A1 publication Critical patent/WO2017024535A1/fr

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B13/00Making spongy iron or liquid steel, by direct processes

Definitions

  • the present invention relates to a melting furnace and a method of treating a material to be melted using the melting furnace.
  • the separation of slag iron is usually carried out by using a blast furnace.
  • the blast furnace is an upright furnace type, which requires coke as a material rack to keep the air passage in the furnace unobstructed, and the reduced iron generated in the upper reduction zone is melted into a liquid by the heat energy generated by the combustion of the coke.
  • the slag and the molten metal are separated in the hearth, and after accumulating to a certain amount, they are discharged from the slag iron port to obtain molten metal and slag.
  • the present invention aims to solve at least one of the technical problems in the related art to some extent. Accordingly, it is an object of the present invention to provide a melting furnace and a method for treating a material to be melted by using the melting furnace, which can realize continuous processing of a material to be melted and heat storage in a regenerator The body is not easy to block.
  • the invention provides a melting furnace, according to an embodiment of the invention, the melting furnace comprises:
  • the melting furnace body has a melting space, the bottom of the melting space defines a molten pool, and the melting space sequentially forms a feeding zone, a melting zone, and a separation zone along the melt flow direction And a discharge area, a feeding port is arranged on a side wall of the feeding zone, and a discharge port and a slag opening are arranged on a side wall of the discharging zone;
  • each pair of the first regenerative burners includes a nozzle, a gas deposition chamber, an air deposition chamber, a gas regenerator in communication with the gas deposition chamber, and an air regenerator in communication with the air deposition chamber; as well as
  • each pair of said A second regenerative burner is disposed on opposite sidewalls of the melting furnace body.
  • the melting furnace according to the embodiment of the present invention can realize continuous processing of the material to be melted, and the heat storage body of the regenerator burner is not easily blocked, and the metal melt and the slag are separated efficiently and the energy consumption is relatively high. low.
  • the melting furnace according to the above embodiment of the present invention may have the following additional technical features:
  • the gas regenerator and the gas sludge chamber are in communication with the nozzle through a first air flow passage, and the air regenerator and the air sediment chamber pass through a second air flow passage The nozzle is in communication.
  • the air sediment chamber is located upstream of the air regenerator in a flow direction of the flue gas, and the gas dump chamber is located The gas regenerator is upstream of the gas storage chamber. Thereby, clogging of the heat storage body can be effectively reduced.
  • the flow area of the first air flow passage gradually increases in a direction from the nozzle to the gas deposition chamber, in a direction from the nozzle to the air sediment chamber
  • the flow area of the second air flow passage is gradually increased. Specifically, the transition section of the first airflow passage to the gas deposition chamber suddenly increases, and the transition section of the second airflow passage to the air sedimentation chamber abruptly increases. Thereby, the dust in the flue gas can be removed, thereby further reducing the clogging of the regenerator.
  • the gas regenerator and the air regenerator have respectively a regenerator stacked with lattice bricks, wherein the lattice brick has a pore size of 10 to 100 mm.
  • the melting furnace body at the molten pool is stacked from a plurality of layers of erosion resistant refractory bricks, and a steel furnace shell is disposed around the refractory bricks at the molten pool.
  • a cooling device is disposed between the refractory brick located at the molten pool and the steel furnace shell, wherein a cooling wall is disposed between the refractory brick located at the sidewall of the molten pool and the steel furnace shell
  • a water-cooled tube or an air-cooled tube is disposed between the refractory brick located at the bottom of the molten pool and the steel furnace shell.
  • the front end wall, the rear end wall, the side wall, and the top of the portion of the melting furnace body located at an upper portion of the molten pool are independently made of gas-resistant, high-temperature resistant, and Insulation refractory bricks are piled up. Thereby, the life of the melting furnace can be further improved.
  • the front end wall of the portion of the melting furnace body located at the upper portion of the molten pool is a curved end wall. Therefore, the sealing of the feed opening can be achieved.
  • the melting furnace further includes: a silo; and a charging device coupled to the silo and the feed port, respectively.
  • the invention provides a method of treating a material to be melted using the melting furnace described above, according to an embodiment of the invention, the method comprising:
  • combustion material comprises gas and air
  • the separation treatment is performed to obtain a molten metal and slag, and the molten metal is discharged from the discharge port, and the slag is discharged from the slag discharge port.
  • the method for treating a material to be melted according to an embodiment of the present invention can achieve continuous processing of the material to be melted by using the above-mentioned melting furnace to treat the material to be melted, and the heat storage body of the regenerator burner is not easy. Blockage, while molten metal and slag separation efficiency is higher and energy consumption is lower.
  • the method of processing a material to be melted according to the above embodiment of the present invention may further have the following additional technical features:
  • the temperature of the melting zone is between 1000 and 1800 degrees Celsius, and the temperature of the separation zone is between 100 and 200 degrees Celsius lower than the temperature of the melting zone.
  • FIG. 1 is a top plan view of a melting furnace in accordance with one embodiment of the present invention.
  • Figure 2 is a front structural view showing a melting furnace according to still another embodiment of the present invention.
  • Figure 3 is a front elevational view showing a melting furnace according to still another embodiment of the present invention.
  • Fig. 4 is a front structural view showing a melting furnace according to still another embodiment of the present invention.
  • first and second are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or Implicitly indicates the number of technical features indicated.
  • features defining “first” or “second” may include at least one of the features, either explicitly or implicitly.
  • the meaning of "a plurality” is at least two, such as two, three, etc., unless specifically defined otherwise.
  • the terms “installation”, “connected”, “connected”, “fixed” and the like shall be understood broadly, and may be either a fixed connection or a detachable connection, unless explicitly stated and defined otherwise. , or integrated; can be mechanical or electrical connection; can be directly connected, or indirectly connected through an intermediate medium, can be the internal communication of two elements or the interaction of two elements, unless otherwise specified Limited.
  • the specific meanings of the above terms in the present invention can be understood on a case-by-case basis.
  • the first feature "on” or “under” the second feature may be a direct contact of the first and second features, or the first and second features may be indirectly through an intermediate medium, unless otherwise explicitly stated and defined. contact.
  • the first feature "above”, “above” and “above” the second feature may be that the first feature is directly above or above the second feature, or merely that the first feature level is higher than the second feature.
  • the first feature “below”, “below” and “below” the second feature may be that the first feature is directly below or obliquely below the second feature, or merely that the first feature level is less than the second feature.
  • the invention provides a melting furnace.
  • the melting furnace comprises: a melting furnace body, the melting furnace body has a melting space, the melting space bottom defines a molten pool, the melting space along the melt
  • the flow direction sequentially forms a feed zone, a melting zone, a separation zone and a discharge zone, the feed zone being located at one end of the melting furnace body, the discharge zone being located at the other end of the melting furnace body, a feeding port is arranged on a side wall of the feeding zone, a discharging port and a slag opening are arranged on a side wall of the discharging zone; and a first regenerative burner, the melting zone is correspondingly provided with at least one pair
  • the first regenerative burner each pair of the first regenerative burners is disposed on opposite sidewalls of the melting furnace body, and each of the first regenerative burners includes a nozzle and a gas a sediment chamber, an air sediment chamber, a gas regenerator connected to the gas sediment chamber
  • the inventors have found that by providing a regenerative burner on the body of the melting furnace to heat the melting space, the material to be melted can be heated and melted while sequentially passing through various regions in the melting space, and the separation region is set. The metal melt and the slag can be completely separated. When the molten metal and the slag are collected in the molten pool to a certain amount, they can be discharged from the discharge port and the slag outlet respectively, so that the melting furnace can be melted.
  • Continuous processing of materials, and the use of a regenerative burner to heat the melting space can achieve precise temperature control of the melting space and uniform temperature field distribution in the melting space, which can significantly improve the material to be melted Melting efficiency, and by providing a regenerative burner having a gas-sink chamber and an air-sink chamber on the side wall of the melting zone, the dust and semi-molten slag entrained in the high-temperature flue gas are sedimented during the exhausting process
  • the chamber is separated, and the flue gas after the sediment enters the regenerator for heat storage, thereby effectively reducing the blockage of the regenerator in the regenerator, reducing the maintenance cost, and further improving the heat.
  • the regenerator recovers the waste heat from the high-temperature flue gas, and fully utilizes the part of the residual heat to preheat the combustion materials (gas and air), thereby reducing the energy cost per unit product, and the flue gas obtained by the regenerative burner is low temperature.
  • the melting furnace of the present invention has lower material strength and particle size requirements for the molten material, and the present invention does not cause serious environmental pollution as compared with the use of coke as a fuel and a column, and the present invention can be applied to low Melting treatment of grade ore, refractory ore and composite ore.
  • the melting furnace comprises:
  • the melting furnace body 100 has a melting space 10 therein, the bottom of the melting space 10 defines a molten pool 11, and the melting space 10 sequentially forms a feed along the melt flow direction.
  • the zone 12, the melting zone 13, the separation zone 14 and the discharge zone 15, the feed zone 12 is located at one end of the melting furnace body 100, and the discharge zone 15 is located at the other end of the melting furnace body 100, the side wall of the feed zone 12
  • a feed port 101 is provided, and a discharge port 102 and a tap hole 103 are provided on the side wall of the discharge zone 15, and the tap hole 103 is located above the discharge port 102 in the height direction.
  • the molten pool 11 may have a rectangular shallow pool structure. Thereby, the material to be melted can be spread in a thin layer horizontally in the molten pool, so that the melting efficiency of the material can be significantly improved.
  • the melting furnace body 100 at the molten pool 11 may be stacked from a plurality of layers of erosion resistant refractory bricks, for example, the refractory bricks may be carbon composite bricks, microporous corundum bricks, and semi-graphite carbon bricks. .
  • the erosion resistance of the molten pool can be significantly improved, thereby avoiding the damage of the melt to the molten pool, thereby improving the service life of the melting furnace.
  • the periphery of the refractory brick at the molten pool 11 may be provided with a steel furnace shell 16. Thereby, the stability of the furnace body can be effectively maintained.
  • a cooling device 17 may be disposed between the refractory brick located at the molten pool 11 and the steel furnace shell 16.
  • a cooling wall may be disposed between the refractory brick located at the sidewall of the molten pool 11 and the steel furnace shell 16.
  • the material of the cooling wall may be selected by a person skilled in the art according to actual needs, for example, Cast steel, cast iron or copper stave.
  • a water-cooled tube or an air-cooled tube may be disposed between the refractory brick located at the bottom of the molten pool 11 and the steel furnace shell 16. Thereby, the service life of the melting furnace can be further improved.
  • the front end wall 18, the rear end wall 19, the side wall 20, and the furnace roof 21 of the portion of the melting furnace body 100 located at the upper portion of the molten pool 11 may be independently gas-resistant.
  • the refractory bricks with high temperature resistance and thermal insulation properties are stacked, for example, refractory bricks such as magnesia-alumina spinel brick, mullite heat-insulating brick, high-purity mullite turn, and fused half-recombined magnesia chrome brick.
  • the front end wall 18 of the portion of the melting furnace body 100 located at the upper portion of the molten pool 11 may be a curved end wall. Thereby, it is possible to seal the feed port.
  • the feed port 101 may be disposed on the wall of the molten pool at the lower end of the front wall, the discharge port The 102 and the slag opening 103 may be located on the wall of the sump at the lower end of the rear end wall. Specifically, the discharge port and the slag outlet can be blocked by the mud.
  • the discharger is used to drill through the discharge port of the mud mud and After the discharge is completed, the discharge port and the slag outlet are blocked by the gun mud, and the obtained metal melt is sent to the cast iron workshop for casting or sent to the steelmaking workshop for steel making, and the slag can be used for the production of cement and other buildings. material.
  • First regenerative burner 200 comprising a plurality of first regenerative burners, each of which is disposed on a side wall of the melting furnace body 100, and The melting zone 13 is correspondingly provided with at least one pair of first regenerative burners, each pair of first regenerative burners being disposed on opposite side walls of the melting furnace body 100, ie, a plurality of first regenerative burners along the The melt flow direction is disposed on the side wall of the melting furnace body, and each pair of regenerative burners are disposed opposite to each other on the side wall.
  • each first regenerative burner 200 comprises a nozzle 22, a gas sludge chamber 23, an air sediment chamber 24, a gas regenerator 25 and an air regenerator 26, in accordance with an embodiment of the invention.
  • the gas-sink chamber 23 is in communication with the gas regenerator 25
  • the air-sink chamber 24 is in communication with the air regenerator chamber 26
  • the gas regenerator chamber 25 and the gas-sink chamber 23 are in communication with the nozzle 22 through the first airflow passage 27,
  • the air regenerator 26 and the air sedimentation chamber 24 communicate with the nozzle 22 through the second air flow passage 28, and when the first regenerative burner is in the exhausting state, the air sediment chamber 24 is located in the air storage direction in the flow direction of the flue gas.
  • the gas sludge chamber 23 is located upstream of the gas regenerator 25.
  • the inventors have found that by providing a first regenerative burner having a gas-sink chamber and an air-sink chamber on the side wall of the melting zone, the dust and semi-molten slag entrained in the high-temperature flue gas are discharged during the exhausting process.
  • the sediment chamber is separated, and the flue gas after the sediment enters the regenerator for heat storage, thereby effectively reducing the blockage of the heat storage body in the regenerator, reducing the maintenance cost, and thereby improving the thermal efficiency.
  • the gas regenerator and the air regenerator are cavities constructed of refractory materials, and the gas regenerator and the air regenerator have heat storage stacked by checkered bricks, respectively. body.
  • the aperture of the checker brick is not particularly limited, and those skilled in the art can select according to actual needs.
  • the lattice of the checker brick may have a diameter of 10 to 100 mm. The inventors have found that if the aperture of the lattice brick is too large, the heat storage effect of the heat storage body is not good, and if the aperture diameter of the lattice brick is too low, the clogging of the heat storage body lattice brick is likely to occur. Thus, by selecting a checker brick having a hole diameter of 10 to 100 mm, it is possible to reduce the clogging of the heat storage body while ensuring that the heat storage body has a high heat storage effect.
  • the gas regenerator can be divided into a first high temperature regenerator zone and a first low temperature regenerator zone from top to bottom, and the air regenerator can be divided into a second high temperature heat storage from top to bottom.
  • the zone and the second low temperature heat storage zone have different materials of the first heat storage zone and the first low temperature heat storage zone, and the materials of the second high temperature heat storage zone and the second low temperature heat storage zone are different.
  • the temperature of the first high temperature heat storage zone and the second high temperature heat storage zone may be 1000 to 1600 ° C
  • the temperature of the first low temperature heat storage zone and the second low temperature heat storage zone may be 100 to 1000 ° C.
  • the air sediment chamber and the gas sludge chamber may each be a cavity structure constructed of refractory bricks, and the lower portion of the cavity structure has a hammer structure.
  • the air sludge chamber and the lower end of the gas sludge chamber are respectively opened to discharge the dust out of the gas sediment chamber and the air sediment chamber.
  • the gas deposition chamber may be disposed adjacent to the melting furnace body, and a partition wall made of refractory brick is disposed between the gas deposition chamber and the gas regenerator chamber, and the partition wall has an opening so that The flue gas after the sediment in the gas sediment chamber enters the gas regenerator for heat storage, the air sediment chamber is disposed away from the melting furnace body, and the partition wall made of refractory brick is arranged between the air sediment chamber and the air regenerator
  • the upper portion also has an opening for allowing the flue gas discharged from the air sediment chamber to enter the air regenerative type for heat storage.
  • the plurality of first regenerative burners may be commutated in a concentrated manner, or may be dispersed and commutated.
  • the air inlet and the gas inlet of one of the pair of first regenerative burners are separately supplied with gas and air to be heated into the melting space, and the melting space is
  • the generated high-temperature flue gas enters the gas sediment chamber through the first air flow passage of the other first regenerative burner, enters the air sediment chamber through the second gas flow passage, and the high-temperature flue gas separates the gas sediment chamber and the air sediment chamber
  • the entrained dust and the semi-molten slag are separated, and the separated flue gas is discharged after being stored in the gas regenerator and the air regenerator, respectively.
  • the regenerator is stored to a certain extent, the first one is cut off.
  • the regenerative burner supplies gas and air, and the low temperature flue gas is used to purify the gas regenerator, and the other regenerative burner is supplied with gas and air, so that the gas and air make full use of the regenerator
  • the heat storage is preheated, and the generated high temperature flue gas is discharged after being stored by the first first regenerative burner, and the two first regenerative burners are alternately used.
  • the flow area of the first gas passage gradually increases in a direction from the nozzle to the gas deposition chamber
  • the flow area of the second gas passage gradually increases in a direction from the nozzle to the air sediment chamber.
  • Increase Specifically, the transition section of the first airflow passage to the gas deposition chamber suddenly increases, and the transition section of the second airflow passage to the air sedimentation chamber abruptly increases.
  • the inventors have found that a sudden increase in the flow section of the high-speed airflow causes a decrease in the airflow speed, and after the high-speed airflow speed is lowered, dust in the airflow, especially some large particulate dust, is separated from the airflow.
  • the dust and semi-molten slag in the flue gas can naturally fall into the gas sludge chamber and the air sediment chamber, and the flue gas after passing through the sediment chamber passes through the gas regenerator and the air.
  • the regenerator stores heat in the regenerator of the regenerator, and discharges it from the lower duct of the regenerator, and the exhaust gas temperature is controlled below 300 °C.
  • Second regenerative burner 300 comprising a plurality of second regenerative burners, each of which is disposed on a side wall of the melting furnace body 100, and At least one pair of second regenerative burners are disposed correspondingly in the separation zone 14, and each pair of second regenerative burners is disposed on opposite sidewalls of the melting furnace body 100, ie, a plurality of second regenerative burners
  • the melt flow direction is disposed on the side wall of the melting furnace body, and each pair of second regenerative burners are disposed opposite to each other on the side wall.
  • the second regenerative burner may be composed of a gas regenerator, an air regenerator and a nozzle, and the air regenerator and the gas regenerator are composed of two adjacent brick masonry spaces.
  • top masonry vault, side wall Refractory brick masonry, the outside is a fixed steel structure composed of steel and steel plates, wherein the plurality of second regenerative burners can be commutated in a concentrated manner or dispersed.
  • the supply of gas and air is first cut off, and then the gas regenerator is performed using the low-temperature flue gas.
  • Backflushing causes the gas remaining in the gas regenerator to be blown into the melting space for combustion, thereby improving fuel utilization and preventing explosion of high-temperature flue gas mixed with residual gas when exhausting smoke.
  • the temperature ratio of the separation zone is set by providing the second regenerative burner in the separation zone.
  • the temperature of the melting zone is lowered by 100 to 200 degrees Celsius.
  • the first regenerative burner is disposed in the melting zone so that the temperature of the melting zone is 1450 to 1700 degrees Celsius
  • the second regenerative burner is disposed in the separation zone to separate
  • the temperature of the zone is 100 to 200 degrees Celsius lower than the temperature of the melt zone.
  • the alternate time for alternately supplying the combustion materials in each of the pair of first regenerative burners and the second regenerative burner is from 1 to 20 minutes.
  • the temperature of the flue gas discharged through the first regenerative burner and the second regenerative burner is controlled below 300 ° C, and the temperature of the gas after preheating through the gas regenerator is 1000 ° C or higher, and the air is stored in heat.
  • the air temperature after preheating of the chamber is 1200 ° C or higher.
  • the melting furnace heats the melting space by providing a regenerative burner on the melting furnace body, so that the material to be melted is heated and melted while sequentially passing through various regions in the melting space, and
  • the separation of the metal melt and the slag can be achieved by setting the separation zone.
  • the molten furnace can be The continuous treatment of the material to be melted is realized, and at the same time, since the refining burner is used to heat the melting space, precise temperature control of the melting space can be realized and the temperature field distribution in the melting space is uniform, thereby significantly improving the waiting The melting efficiency of the molten material, and by providing a regenerative burner having a gas-sinking chamber and an air-sinking chamber on the side wall of the melting zone, so that the dust and the half entrained in the high-temperature flue gas during the exhausting process The molten slag is separated through the sediment chamber, and the flue gas after the sediment enters the regenerator for heat storage, thereby effectively reducing the blockage of the regenerator in the regenerator and reducing the maintenance cost.
  • the thermal efficiency is improved, and by using the first regenerative burner and the second regenerative burner, the regenerator in the regenerative burner can be effectively utilized to recover waste heat from the high-temperature flue gas, and the part of the waste heat is fully utilized.
  • the requirements are low, and the present invention does not cause serious environmental pollution as compared with the use of coke as a fuel and a column, and the present invention can be applied to a melting treatment of low-grade ore, refractory ore and composite ore.
  • a melting furnace according to an embodiment of the present invention further includes:
  • the silo 400 is adapted to store material to be melted.
  • the charging device 500 is connected to the silo 400 and the feed port 101, respectively, and is adapted to supply the material to be melted into the melting space. Specifically, the material to be melted is sent from the heat conveyor to the high level silo above the feed port, and then discharged into the feeding device (feeder) by the high level silo, and the feeding device continuously performs mechanical reciprocating motion, thereby waiting The molten material is continuously and uniformly supplied into the melting furnace to achieve continuous uniform feeding.
  • the invention provides a method of treating a material to be melted.
  • the method is carried out using the above-described melting furnace.
  • the method includes: alternately supplying combustion materials to each of the pair of the first regenerative burner and the second regenerative burner to respectively heat the melting space
  • the combustion material comprises gas and air
  • the material to be melted is supplied from the feed port at one end of the melting furnace body into the melting space to cause the to-be-melted
  • the material is sequentially subjected to melting and separation treatment through the feed zone, the melting zone, the separation zone and the discharge zone, thereby obtaining a molten metal and molten slag, and the molten metal is taken from the other end of the melting furnace body
  • the discharge port is discharged, and the slag is discharged from the tap hole.
  • the above-mentioned melting furnace to treat the molten material, continuous processing of the material to be melted can be realized, and the heat storage body of the regenerator burner is not easily blocked, and the technical melt and slag separation efficiency is high. And the energy consumption is low. It should be noted that the above described features and advantages for the melting furnace are also applicable to the method for processing the material to be melted, and details are not described herein again.
  • the alternate time for alternately supplying the combustion materials in each of the first regenerative burner and the second regenerative burner is from 1 to 20 minutes.
  • the temperature ratio of the separation zone is set by providing the second regenerative burner in the separation zone.
  • the temperature of the melting zone is lowered by 100 to 200 degrees Celsius.
  • the first regenerative burner is disposed in the melting zone so that the temperature of the melting zone is 1450 to 1700 degrees Celsius
  • the second regenerative burner is disposed in the separation zone to separate
  • the temperature of the zone is 100 to 200 degrees Celsius lower than the temperature of the melt zone.
  • the direct reduced iron (DRI) produced by the direct reduction device is sent from the heat conveyor to the high level silo above the feed port, and then discharged into the feeding device (feeder) from the high level silo, and the feeding device continuously performs mechanical reciprocating Movement, thereby continuously supplying the direct reduced iron into the melting furnace through the feed port, and the DRI is heated and melted into a melt in the molten pool by the flame sprayed by the first regenerative burner and the second regenerative burner And slowly flowing in the molten pool, as the temperature gradually increases, after reaching the melting temperature, due to the different specific gravity of molten iron and slag, the iron and slag in the molten metal will naturally form stratification, forming molten iron and The molten slag, molten iron and slag are collected in a molten pool in the discharge area to a certain amount, respectively, from the discharge port, The slag outlet is discharged.
  • the high-temperature flue gas generated by the melting zone and the separation zone enters one of each pair of the first regenerative burner and the second regenerative burner, enters the gas-sink chamber through the first airflow passage, and passes through the second airflow passage.
  • the air sediment chamber After entering the air sediment chamber, after the gas sediment chamber and the air sediment chamber are respectively sedimented, the entrained dust and the semi-molten slag are separated (the second regenerative burner flue gas directly enters the fuel regenerator and the air storage through the airflow passage)
  • the hot chamber after the separated flue gas, the heat storage body of the gas regenerator (the lattice hole is 40 mm) and the air regenerator (the aperture of the lattice brick is 40 mm) are stored to a certain extent and discharged, after the commutation,
  • the normal temperature gas and air are supplied to one burner of each pair of the first regenerative burner and the second regenerator burner, and the gas is preheated by the gas regenerator and the temperature is above 1000
  • the temperature reaches 1200 ° C or higher, and the preheated gas and air are mixed and then sprayed through the nozzle to supply heat to the melting space, and each pair of the first regenerative burner and the second regenerative burner are Between fuel supply state and smoke exhaust state Alternate use, alternating time is 5 minutes. Before each pair of the first regenerative burner and the second regenerative burner are switched from the fuel supply state to the exhaust state, the fuel supply is first cut off, and the low temperature flue gas is introduced to backflush the fuel regenerator, leaving the residue After the fuel is blown into the melting space, the flue gas is discharged.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Gasification And Melting Of Waste (AREA)

Abstract

L'invention concerne un four de séparation par fusion et un procédé de traitement d'un matériau à faire fondre et à séparer avec le four de séparation par fusion. Le four de séparation par fusion comprend un corps de four de séparation par fusion (100), à l'intérieur duquel se trouve un espace de séparation par fusion (10), le fond de l'espace de séparation par fusion (10) délimitant une cuve de fusion (11), une zone d'alimentation (12), une zone de fusion (13), une zone de séparation (14) et une zone d'évacuation (15) étant formées successivement dans l'espace de séparation par fusion (10) dans la direction d'écoulement de la masse fondue, la zone d'alimentation (12) étant située à une extrémité du corps de four de séparation par fusion (100), la zone d'évacuation (15) étant située à l'autre extrémité du corps de four de séparation par fusion (100), un orifice d'alimentation (101) étant ménagé sur une paroi latérale de la zone d'alimentation (12) et un orifice d'évacuation (102) et une sortie de laitier (103) étant ménagés sur une paroi latérale de la zone d'évacuation (15) ; des premiers brûleurs de régénération (200), au moins une paire de premiers brûleurs de régénération (200) étant disposés de façon correspondante au niveau de la zone de fusion (13), chaque paire de premiers brûleurs de régénération étant disposés sur les parois latérales opposées du corps de four de séparation par fusion (100) et chaque premier brûleur de régénération (200) comprenant une buse (24), une chambre de laitier sous gaz combustible (23), une chambre de laitier à l'air (24), une chambre de régénération sous gaz combustible et une chambre de régénération à l'air (26) ; des seconds brûleurs de régénération (300), au moins une paire de seconds brûleurs de régénération (300) étant disposés de façon correspondante au niveau de la zone de séparation (14) et chaque paire de seconds brûleurs de régénération (300) étant disposés sur les parois latérales opposées du corps de four de séparation par fusion (100).
PCT/CN2015/086683 2015-08-11 2015-08-11 Four de séparation par fusion et procédé de traitement de matériau à faire fondre et à séparer avec celui-ci WO2017024535A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2015/086683 WO2017024535A1 (fr) 2015-08-11 2015-08-11 Four de séparation par fusion et procédé de traitement de matériau à faire fondre et à séparer avec celui-ci

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2015/086683 WO2017024535A1 (fr) 2015-08-11 2015-08-11 Four de séparation par fusion et procédé de traitement de matériau à faire fondre et à séparer avec celui-ci

Publications (1)

Publication Number Publication Date
WO2017024535A1 true WO2017024535A1 (fr) 2017-02-16

Family

ID=57983995

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2015/086683 WO2017024535A1 (fr) 2015-08-11 2015-08-11 Four de séparation par fusion et procédé de traitement de matériau à faire fondre et à séparer avec celui-ci

Country Status (1)

Country Link
WO (1) WO2017024535A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11555255B2 (en) 2017-12-04 2023-01-17 Shin-Etsu Chemical Co., Ltd. Tantalum carbide coated carbon material, manufacturing method thereof, and member for apparatus for manufacturing semiconductor single crystal

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1563433A (zh) * 2004-03-17 2005-01-12 北京科技大学 一种转底炉还原接火焰炉熔分的炼铁方法及熔炼设备
CN1570153A (zh) * 2004-05-12 2005-01-26 李振洪 “一步半”熔融还原炼铁法
JP4854385B2 (ja) * 2006-05-24 2012-01-18 古河電池株式会社 金属鉛の回収方法
CN102409124A (zh) * 2011-11-23 2012-04-11 李振洪 一种熔融还原连续炼铁装置
CN102732662A (zh) * 2012-06-02 2012-10-17 胡长春 一种利用铝土矿或赤泥进行无渣生产的工艺方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1563433A (zh) * 2004-03-17 2005-01-12 北京科技大学 一种转底炉还原接火焰炉熔分的炼铁方法及熔炼设备
CN1570153A (zh) * 2004-05-12 2005-01-26 李振洪 “一步半”熔融还原炼铁法
JP4854385B2 (ja) * 2006-05-24 2012-01-18 古河電池株式会社 金属鉛の回収方法
CN102409124A (zh) * 2011-11-23 2012-04-11 李振洪 一种熔融还原连续炼铁装置
CN102732662A (zh) * 2012-06-02 2012-10-17 胡长春 一种利用铝土矿或赤泥进行无渣生产的工艺方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11555255B2 (en) 2017-12-04 2023-01-17 Shin-Etsu Chemical Co., Ltd. Tantalum carbide coated carbon material, manufacturing method thereof, and member for apparatus for manufacturing semiconductor single crystal

Similar Documents

Publication Publication Date Title
US8747524B2 (en) Method and equipment for separating out molten dust in high temperature gas and use thereof
WO2015196887A1 (fr) Technique de fusion d'étain à projection latérale continue
CN101922861A (zh) 冶炼熔炉
CN104833203A (zh) 一种蓄热式水泥煅烧装置
CN207276500U (zh) 一种轻烧氧化镁竖窑冷却预热循环装置
CN204301511U (zh) 熔炼炉
CN204918643U (zh) 熔分炉
CN106381403B (zh) 一种粗铜的联合冶炼方法
CN108060283A (zh) 一种高炉
WO2017024535A1 (fr) Four de séparation par fusion et procédé de traitement de matériau à faire fondre et à séparer avec celui-ci
CN104817084B (zh) 电石冶炼炉
CN108754176B (zh) 一种连续精炼炉及利用该连续精炼炉进行再生铜精炼的工艺方法
CN102121788A (zh) 冶炼熔炉
CN102146490B (zh) 一种还原炼铁的方法和装置
CN206724695U (zh) 一种燃气燃烧与电弧联合加热熔炼炉
WO2017024537A1 (fr) Four de séparation par fusion et procédé pour le traitement de matériau à faire fondre et à séparer l'utilisant
CN105603208A (zh) 冶金炉
CN214735335U (zh) 一种用于玄武岩电熔窑炉的挡砖结构
CN106500507A (zh) 一种重油燃烧、燃气燃烧与电弧联合加热熔炼炉
CN210916131U (zh) 一种新型复合铁口结构
WO2017202119A1 (fr) Système de fusion par réduction et procédé de fusion par réduction pour minerai de magnétite de vanadium-titane ou ilménite
CN201440036U (zh) 热法炼磷设备
CN204897955U (zh) 熔分炉
CN107176606A (zh) 回收电石液显热的***和方法
CN105039623B (zh) 熔分炉和采用该熔分炉处理待熔分物料的方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15900733

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15900733

Country of ref document: EP

Kind code of ref document: A1