WO2016157657A1 - ユーザ装置及び基地局 - Google Patents

ユーザ装置及び基地局 Download PDF

Info

Publication number
WO2016157657A1
WO2016157657A1 PCT/JP2015/086069 JP2015086069W WO2016157657A1 WO 2016157657 A1 WO2016157657 A1 WO 2016157657A1 JP 2015086069 W JP2015086069 W JP 2015086069W WO 2016157657 A1 WO2016157657 A1 WO 2016157657A1
Authority
WO
WIPO (PCT)
Prior art keywords
base station
subframe
timing
user apparatus
reception timing
Prior art date
Application number
PCT/JP2015/086069
Other languages
English (en)
French (fr)
Inventor
邦彦 手島
徹 内野
Original Assignee
株式会社Nttドコモ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社Nttドコモ filed Critical 株式会社Nttドコモ
Priority to CA2971087A priority Critical patent/CA2971087C/en
Priority to EP15887799.3A priority patent/EP3280197B1/en
Priority to JP2017509179A priority patent/JP6785220B2/ja
Priority to US15/557,493 priority patent/US10833784B2/en
Priority to CN201580078419.1A priority patent/CN107431989B/zh
Publication of WO2016157657A1 publication Critical patent/WO2016157657A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B17/00Monitoring; Testing
    • H04B17/30Monitoring; Testing of propagation channels
    • H04B17/309Measuring or estimating channel quality parameters
    • H04B17/364Delay profiles
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/14Spectrum sharing arrangements between different networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W56/00Synchronisation arrangements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W56/00Synchronisation arrangements
    • H04W56/0005Synchronisation arrangements synchronizing of arrival of multiple uplinks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/56Allocation or scheduling criteria for wireless resources based on priority criteria
    • H04W72/563Allocation or scheduling criteria for wireless resources based on priority criteria of the wireless resources
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/08Testing, supervising or monitoring using real traffic

Definitions

  • the present invention relates to a user apparatus and a base station.
  • the LTE (Long Term Evolution) system employs carrier aggregation (CA: Carrier Aggregation) in which communication is performed using a plurality of carriers simultaneously with a predetermined bandwidth (maximum 20 MHz) as a basic unit.
  • CA Carrier Aggregation
  • a carrier that is a basic unit in carrier aggregation is called a component carrier (CC).
  • PCell Primary Cell
  • SCell Secondary Cell
  • the SCell is a cell that is added to the PCell and set for the user apparatus.
  • the addition and deletion of the SCell is performed by RRC (Radio Resource Control) signaling.
  • LTE Rel-10 CA uses multiple CCs under the same base station. Further, in Rel-10 CA, a maximum data rate is realized by widening the band by bundling up to five CCs.
  • DC dual connectivity
  • DC is a type of CA, also called Inter eNB CA (inter-base station carrier aggregation), and Master-eNB (MeNB) and Secondary-eNB (SeNB) are introduced.
  • FIG. 2 shows an example of DC.
  • MeNB communicates with a user apparatus by CC # 1
  • a cell group composed of cells (one or more) under MeNB is defined as MCG (Master Cell Group), and a cell group composed of cells (one or more) under SeNB is defined as SCG ( Secondary Cell Group).
  • UL CC is set in at least one SCell of SCG, and PUCCH (Physical-Uplink-Control-Channel) is set in one of them. This SCell is called PSCell (PrimaryPrimSCell).
  • each CC is composed of the same base station, and therefore, the SFN (System Frame Number), subframe number, and transmission timing are synchronized among the CCs.
  • each CC is composed of a plurality of base stations (MeNB, SeNB). Therefore, the SFN, the subframe number, and the transmission timing may not be synchronized between the CC belonging to the MCG and the CC belonging to the SCG.
  • FIG. 3A illustrates a state in which the SFN, the subframe number, and the transmission timing are synchronized between CC # 1 and CC # 2.
  • FIG. 3B illustrates a state in which the SFN, the subframe number, and the transmission timing are not synchronized between CC # 1 and CC # 2.
  • DRX Discontinuous Reception
  • the user equipment in the RRC connected state only receives a PDCCH (Physical Downlink Control Channel) for a predetermined time (On duration period), and stops the processing of the RF (Radio Frequency) unit at other times. Is allowed to operate.
  • PDCCH Physical Downlink Control Channel
  • RF Radio Frequency
  • DRX control is performed independently for each base station for each user apparatus. That is, when CA by DC is performed, the user apparatus is instructed by each of the base station (MeNB) that configures the MCG and the base station (SeNB) that configures the SCG to start timing of the On duration period and the On duration period.
  • MeNB base station
  • SeNB base station
  • FIG. 4 is a diagram for explaining a problem in DRX control. It is assumed that the user apparatus performs CA that bundles CC # 1 belonging to MCG and CC # 2 belonging to SCG. As shown in FIG. 4, the on-duration period and on-duration period start timing for CC # 1, and the on-duration period and on-duration period start timing for CC # 2 are independent from the base station to the user equipment. Since the instruction is given, the time during which the RF unit of the user apparatus operates increases.
  • an RF unit used for a CC belonging to an MCG and an RF unit used for a CC belonging to an SCG are often mounted using a part of common elements. Therefore, stopping both RF units is more effective in reducing the power consumption of the user device than stopping each RF unit independently.
  • the user apparatus in order to connect a user apparatus to a cell with higher quality, or to perform load balancing between cells, the user apparatus is made to measure the radio quality of each cell.
  • the user apparatus stops DL (Downlink) and UL (Uplink) communication in order to perform frequency switching of the RF unit.
  • the time for which the communication is stopped is called a measurement gap.
  • the section and timing (specified by Gap Pattern and Gap offset) where the measurement gap is provided are determined by the base station and notified to the user apparatus. Also, the base station allocates radio resources in vain when the user equipment stops communication during the time corresponding to the measurement gap by stopping the scheduling of DL and UL toward the user equipment. I am trying not to.
  • the base station sets a section and a timing in which a measurement gap is provided for all CCs at the same timing.
  • a base station (MeNB) configuring the MCG sets a section and timing in which a measurement gap is provided.
  • FIG. 5 is a diagram for explaining the problems in the measurement gap control. It is assumed that the user apparatus performs CA that bundles CC # 1 belonging to MCG and CC # 2 belonging to SCG. As described above, the user apparatus stops DL and UL communication in order to perform frequency switching of the RF unit while the measurement gap is set. That is, the user apparatus stops communication in CC # 2 in addition to CC # 1 while the measurement gap is set. When the subframes are not synchronized between CC # 1 and CC # 2 as shown in FIG. 5, the user apparatus performs DL in the section indicated by the “communication unavailable section” in the subframe of CC # 2. And UL communication cannot be performed.
  • the base station (SeNB) configuring the SCG does not recognize the “communication unavailable section”, the base station (SeNB) performs DL and UL scheduling for the user apparatus in CC # 2. That is, there is a problem that radio resources are allocated uselessly even though the user apparatus cannot communicate.
  • the disclosed technique has been made in view of the above, and provides a technique in which a user apparatus detects a shift of each subframe of radio signals transmitted from a plurality of base stations and notifies the base station of the deviation. Objective.
  • a user apparatus of the disclosed technology is a user apparatus that communicates with a first base station and a second base station in a communication system that supports carrier aggregation, and the first apparatus receives from the first base station A measurement unit that measures a timing shift between a reception timing of a radio signal and a reception timing of a second radio signal received from the second base station, and the timing shift measured by the measurement unit A transmitter that transmits information indicating the above to the first base station or the second base station.
  • the base station of the disclosed technique is a base station that communicates with a user apparatus in a communication system that supports carrier aggregation, and receives a first radio signal transmitted from the base station from the user apparatus.
  • a technique in which a user apparatus detects a shift of each subframe of radio signals transmitted from a plurality of base stations and notifies the base station.
  • LTE corresponds to not only a communication method corresponding to Release 8 or 9 of 3GPP but also Release 10, 11, 12, 13, or Release 14 or later of 3GPP. It is used in a broad sense that includes communication methods.
  • FIG. 6 is a diagram illustrating a configuration of the communication system according to the embodiment.
  • the communication system according to the present embodiment is a communication system including a user apparatus 1, a base station (MeNB) 2 a configuring MCG, and a base station (SeNB) 2 b configuring SCG.
  • the base station 2a and the base station 2b constitute a CA by DC, and the user apparatus 1 can perform CA communication between the base station 2a and the base station 2b.
  • the base station 2a constitutes a cell 3a (PCell), and the base station 2b constitutes a cell 3b (PSCell).
  • Each cell (3a, 3b) is composed of, for example, one CC or a set of downlink CC and uplink CC. In the following description, each cell may be considered synonymous with CC.
  • the base station 2a and the base station 2b are illustrated so as to constitute the cell 3a and the cell 3b, respectively, but for convenience of illustration, the base station 2a and the base station 2b are respectively Another cell (SCell) may be further configured.
  • the base station 2a and the base station 2b may be collectively referred to as the base station 2. Further, the cell 3a and the cell 3b may be collectively referred to as the cell 3.
  • the user apparatus 1 has a function of communicating with the base station 2 and the core network through wireless.
  • the user device 1 is, for example, a mobile phone, a smartphone, a tablet, a mobile router, or a wearable terminal.
  • the user device 1 may be any user device 1 as long as the device has a communication function.
  • the user device 1 includes a CPU such as a processor, a memory device such as a ROM, a RAM, or a flash memory, an antenna for communicating with the base station 2, and hardware resources such as an RF (Radio Frequency) device.
  • Each function and process of the user device 1 may be realized by a processor processing or executing data or a program stored in the memory device.
  • the user apparatus 1 is not limited to the hardware configuration described above, and may have any other appropriate hardware configuration.
  • the base station 2 communicates with the user device 1 through wireless communication.
  • the base station 2 includes a CPU such as a processor, a memory device such as a ROM, a RAM, or a flash memory, an antenna for communicating with the user device 1 and the like, a communication interface device for communicating with the adjacent base station 2 and the core network, and the like. It consists of hardware resources. Each function and process of the base station 2 may be realized by a processor processing or executing data or a program stored in a memory device. However, the base station 2 is not limited to the hardware configuration described above, and may have any other appropriate hardware configuration.
  • the user apparatus 1 measures the subframe shift of the radio signal received from each of the base station 2a and the base station 2b, and determines the measured subframe shift to the base station 2a and / or The base station 2b is notified. Further, the base station 2a and the base station 2b perform scheduling control in consideration of DRX control and measurement gap based on the subframe shift notified from the user apparatus 1.
  • FIG. 7 is a diagram illustrating an example of a functional configuration of the user apparatus according to the embodiment.
  • the user device 1 includes a signal reception unit 11, a signal transmission unit 12, a reception timing measurement unit 13, and a report unit 14.
  • FIG. 7 shows only functional units that are particularly related to the embodiment of the present invention in the user apparatus 1, and has at least a function (not shown) for performing an operation based on LTE.
  • the functional configuration shown in FIG. 7 is merely an example. As long as the operation according to the present embodiment can be performed, the function classification and the name of the function unit may be anything.
  • the signal receiving unit 11 includes a function of wirelessly receiving various signals from the base station 2 and acquiring higher layer signals from the received physical layer signals.
  • the signal transmission unit 12 includes a function of generating various physical layer signals from the upper layer signal to be transmitted from the user apparatus 1 and wirelessly transmitting the signals.
  • each of the signal receiving unit 11 and the signal transmitting unit 12 includes a function of executing CA for bundling a plurality of CCs for communication.
  • Each of the signal reception unit 11 and the signal transmission unit 12 includes a packet buffer, and is assumed to perform layer 1 (PHY) and layer 2 (MAC, RLC, PDCP) processing. However, it is not limited to this.
  • the signal receiving unit 11 includes the base station 2a and the base station 2b based on a synchronization signal (PSS, SSS) transmitted from the base station 2a, an MIB (Master Information Block) included in the PBCH (Physical Broadcast Channel), and the like.
  • PSS synchronization signal
  • SSS synchronization signal
  • MIB Master Information Block
  • Receiving timing symbol timing
  • SFN subframe number of each radio signal transmitted from.
  • the reception timing measurement unit 13 includes a reception timing (symbol timing) of a radio signal transmitted from the base station 2a, an SFN and a subframe number, a reception timing (symbol timing) of a radio signal transmitted from the base station 2b, an SFN and The subframe number is compared, and a shift in reception timing between the radio signal transmitted from the base station 2a and the radio signal transmitted from the base station 2b is measured.
  • the reporting unit 14 transmits information indicating a shift in reception timing measured by the reception timing measurement unit 13 (hereinafter referred to as “reception timing information”) via the signal transmission unit 12 to the base station 2a and / or the base station 2b. Send (notify) to.
  • FIG. 8 is a diagram illustrating an example of a functional configuration of the base station according to the embodiment.
  • the base station 2 includes a signal reception unit 21, a signal transmission unit 22, an inter-base station communication unit 23, a cooperation information exchange unit 24, a storage unit 25, a DRX control unit 26, and a scheduling control unit 27.
  • FIG. 8 shows only the functional units particularly related to the embodiment of the present invention in the base station 2, and has at least a function (not shown) for performing an operation based on LTE.
  • the functional configuration shown in FIG. 8 is only an example. As long as the operation according to the present embodiment can be performed, the function classification and the name of the function unit may be anything.
  • the signal receiving unit 21 includes a function of wirelessly receiving various signals from the user apparatus 1 and acquiring higher layer signals from the received physical layer signals.
  • the signal transmission unit 22 includes a function of generating various types of physical layer signals from a higher layer signal to be transmitted from the base station 2 and wirelessly transmitting the signals.
  • Each of the signal receiving unit 21 and the signal transmitting unit 22 may include a function of executing CA for performing communication by bundling a plurality of CCs.
  • each of the signal receiving unit 21 and the signal transmitting unit 22 includes a packet buffer and performs layer 1 (PHY) and layer 2 (MAC, RLC, PDCP) processing.
  • PHY layer 1
  • MAC layer 2
  • PDCP PDCP
  • the inter-base station communication unit 23 communicates with other base stations. Further, the inter-base station communication unit 23 may include a function of processing a signal transmitted / received via the X2 interface.
  • the cooperation information exchanging unit 24 receives the reception timing information from the user device 1 and, based on the reception timing information, information for performing the scheduling control in consideration of DRX control and measurement gap (hereinafter referred to as “cooperation information”). Is exchanged with other base stations. Further, the cooperation information exchanged with other base stations is stored in the storage unit 25.
  • the storage unit 25 stores linkage information.
  • the cooperation information is different for each user apparatus 1, and includes, for example, information for aligning the duration period between the base stations 2 in the DRX control, information on a section and timing for providing a measurement gap in the MeNB, and the like. It is.
  • the DRX control unit 26 instructs the user device 1 of the on duration period and the start time of the on duration period based on the reception timing information and / or the cooperation information stored in the storage unit 25.
  • the scheduling control unit 27 performs scheduling so that DL and UL radio resources are not allocated to the subframe corresponding to the measurement gap section based on the reception timing information or / and the cooperation information stored in the storage unit 25. Do.
  • the functional configurations of the user apparatus 1 and the base station 2 described above may be realized entirely by hardware circuits (for example, one or a plurality of IC chips), or may be partially configured by hardware circuits. This part may be realized by a CPU and a program.
  • FIG. 9 is a diagram illustrating a hardware configuration example of the user apparatus according to the embodiment.
  • FIG. 9 shows a configuration closer to the mounting example than FIG.
  • the user apparatus 1 performs processing such as an RE (Radio Equipment) module 101 that performs processing related to a radio signal, a BB (Base Band) processing module 102 that performs baseband signal processing, and a higher layer. It has a device control module 103 and a SIM slot 104 which is an interface for accessing a SIM card.
  • RE Radio Equipment
  • BB Base Band
  • the RE module 101 should transmit the digital baseband signal received from the BB processing module 102 from the antenna by performing D / A (Digital-to-Analog) conversion, modulation, frequency conversion, power amplification, and the like. Generate a radio signal. In addition, a digital baseband signal is generated by performing frequency conversion, A / D (Analog-to-Digital) conversion, demodulation, and the like on the received radio signal, and is passed to the BB processing module 102.
  • the RE module 101 includes, for example, a part of the signal reception unit 11 and a part of the signal transmission unit 12 illustrated in FIG.
  • the BB processing module 102 performs processing for mutually converting IP packets and digital baseband signals.
  • a DSP (Digital Signal Processor) 112 is a processor that performs signal processing in the BB processing module 102.
  • the memory 122 is used as a work area for the DSP 112.
  • the BB processing module 102 includes, for example, a part of the signal reception unit 11, a part of the signal transmission unit 12, and the reception timing measurement unit 13 illustrated in FIG. 7.
  • the device control module 103 performs IP layer protocol processing, various application processing, and the like.
  • the processor 113 is a processor that performs processing performed by the device control module 103.
  • the memory 123 is used as a work area for the processor 113.
  • the processor 113 reads and writes data from and to the SIM via the SIM slot 104.
  • the device control module 103 includes, for example, a report unit 14 illustrated in FIG.
  • FIG. 10 is a diagram illustrating a hardware configuration example of the base station according to the embodiment.
  • FIG. 10 shows a configuration closer to the mounting example than FIG.
  • the base station 2 includes an RE module 201 that performs processing related to a radio signal, a BB processing module 202 that performs baseband signal processing, a device control module 203 that performs processing such as an upper layer, a network, And a communication IF 204 which is an interface for connection.
  • the RE module 201 generates a radio signal to be transmitted from the antenna by performing D / A conversion, modulation, frequency conversion, power amplification, and the like on the digital baseband signal received from the BB processing module 202.
  • a digital baseband signal is generated by performing frequency conversion, A / D conversion, demodulation, and the like on the received radio signal and passed to the BB processing module 202.
  • the RE module 401 includes, for example, a part of the signal reception unit 21 and a part of the signal transmission unit 22 illustrated in FIG.
  • the BB processing module 202 performs processing for mutually converting an IP packet and a digital baseband signal.
  • the DSP 212 is a processor that performs signal processing in the BB processing module 202.
  • the memory 222 is used as a work area for the DSP 212.
  • the BB processing module 202 includes, for example, a part of the signal reception unit 21 and a part of the signal transmission unit 22 illustrated in FIG. 8, a storage unit 25, a DRX control unit 26, and a scheduling control unit 27.
  • the device control module 203 performs IP layer protocol processing, OAM (Operation and Maintenance) processing, and the like.
  • the processor 213 is a processor that performs processing performed by the device control module 203.
  • the memory 223 is used as a work area for the processor 213.
  • the auxiliary storage device 233 is, for example, an HDD or the like, and stores various setting information for operating the base station 2 itself.
  • the device control module 203 includes, for example, the cooperation information exchange unit 24 shown in FIG.
  • the communication IF 204 includes, for example, the inter-base station communication unit 23 illustrated in FIG.
  • FIG. 11 is a sequence diagram illustrating an example of a processing procedure of the communication system according to the embodiment.
  • the user apparatus 1 measures a shift in reception timing of radio signals transmitted from the base station 2a and the base station 2b, and information indicating the measurement result (reception timing information) is stored in the base station 2a and / or the base station.
  • a processing procedure to be transmitted to the station 2b will be described. It is assumed that the user apparatus 1 performs CA between the cell 3a formed by the base station 2a and the cell 3b formed by the base station 2b.
  • processing procedure 1 indicates a processing procedure when the user apparatus 1 transmits reception timing information only to a predetermined base station 2a
  • processing procedure 2 indicates that the user apparatus 1 receives the reception timing.
  • the process procedure in the case of transmitting information to all the base stations 2 which comprise CA by DC is shown.
  • the user apparatus 1 may transmit the reception timing information only to the predetermined base station 2b.
  • the signal transmission unit 22 of the base station 2a and the base station 2b transmits a radio signal to the user apparatus 1.
  • the radio signal includes a synchronization signal (PSS, SSS), PBCH, and the like.
  • the signal reception unit 11 of the user apparatus 1 receives each of the reception timings of the radio signals transmitted from the base station 2a and the base station 2b (based on the synchronization signal transmitted from the base station 2a and the base station 2b, PBCH, etc. Symbol timing), SFN, subframe number, and information for uniquely identifying a cell are recognized.
  • step S102 the reception timing measurement unit 13 of the user apparatus 1 receives the reception timing (symbol timing) of the radio signal transmitted from the base station 2a, the SFN and the subframe number, and the reception of the radio signal transmitted from the base station 2b.
  • the timing (symbol timing), the SFN, and the subframe number are compared, and a shift in reception timing between the radio signal transmitted from the base station 2a and the radio signal transmitted from the base station 2b is measured.
  • the reporting unit 14 of the user apparatus 1 transmits, to the base station 2a, the reception timing information report signal including the reception timing information indicating the reception timing shift measured in step S102 via the signal transmission unit 12.
  • the reception timing information report signal may be, for example, an RRC control signal, a MAC signal command, or physical channel control information.
  • step S104 the base station 2a exchanges cooperation information with the base station 2b.
  • the exchange of cooperation information may be performed using, for example, an X2 interface or an interface used for OAM.
  • step S105 and step S107 are the same as step S103 and step S104, respectively, description thereof will be omitted.
  • the reporting unit 14 of the user apparatus 1 transmits a reception timing information report signal including reception timing information indicating the reception timing shift measured in step S102 to the base station 2b via the signal transmission unit 12.
  • the reception timing information report signal may be, for example, an RRC control signal, a MAC signal command, or physical channel control information.
  • 12A and 12B are diagrams for explaining an example (part 1) of a method for measuring a reception timing shift and reception timing information.
  • 13A and 13B are diagrams for explaining an on duration section (part 1) in DRX control.
  • “a” indicates SFN in CC # 1
  • “i” indicates a subframe number in CC # 1. That is, the subframes indicated by “a / i + 1”, “a / i + 2”, and “a / i + 3” indicate three consecutive subframes in CC # 1.
  • “b” indicates the SFN in CC # 2
  • “n” indicates the subframe number in CC # 2. That is, the subframes indicated by “b / n”, “b / n + 1”, and “b / n + 2” indicate three consecutive subframes in CC # 2.
  • “i” indicates a subframe number in CC # 1
  • “n” indicates a subframe number in CC # 2.
  • the reception timing measurement unit 13 selects any one subframe in CC # 1, and stores the SFN and subframe number of the selected subframe.
  • the selected CC # 1 subframe is a subframe that serves as a reference when the reception timing measurement unit 13 measures a shift in reception timing.
  • FIGS. 12A and 12B it is assumed that the reception timing measurement unit 13 has selected the subframe “a / i + 2”.
  • the reception timing measurement unit 13 determines that the start point is between the start point and the end point of the selected CC # 1 subframe (the subframe “a / i + 2” in the examples of FIGS. 12A and 12B).
  • a subframe of a certain CC # 2 is selected, and the SFN and subframe number of that subframe are stored.
  • the subframe “b / n + 1” is selected.
  • the reception timing measurement unit 13 starts the sub-frame of the selected CC # 1 (the subframe of “a / i + 2” in the examples of FIGS. 12A and 12B) and the sub-frame of the selected CC # 2.
  • the time shift “X” from the start point of the frame (“b / n + 1” subframe in the examples of FIGS. 12A and 12B) is measured, and the measured X value is stored.
  • the reporting unit 14 uniquely identifies the SFN, subframe number, and CC # 1 of the selected CC # 1 subframe (the subframe “a / i + 2” in the examples of FIGS. 12A and 12B).
  • the identifier, the SFN of the selected CC # 2 subframe (the subframe of “b / n + 1” in the examples of FIGS. 12A and 12B), the subframe number, and the identifier uniquely identifying CC # 2 were measured.
  • the value of X is stored in the reception timing information and transmitted to the base station 2a or / and the base station 2b (step S103, S105 or S106 in FIG. 11).
  • the identifier for uniquely identifying CC # 1 and the identifier for uniquely identifying CC # 2 may be, for example, CellIndex or another identifier. Any identifier may be used as long as the base station 2 can uniquely identify a cell or CC constituting the CA.
  • FIG. 12A shows that the time lag (value of X) between the selected CC # 1 subframe and the selected CC # 2 subframe is less than half the subframe interval (0.5 ms).
  • FIG. 12B shows an example in which the value of X is longer than half the subframe interval (0.5 ms).
  • the base station 2 makes the CC # 1 subframe and CC # 2 subframe reported in the reception timing information more than half (0. It can be determined that they overlap).
  • the DRX control unit 26 of the base station 2a reports the CC # 1 reported in the radio frame after a predetermined radio frame period (for example, after the Z period) from the SFN of the reported CC # 1 subframe.
  • An On duration section may be set starting from a subframe having a subframe number of.
  • the DRX control unit 26 of the base station 2b is reported in a radio frame after a predetermined radio frame period (after a Z period similar to CC # 1) from the SFN of the reported CC # 2 subframe.
  • the On duration section may be set starting from the subframe of CC # 2 subframe number (“n + 1”).
  • FIG. 13A shows the state when the On duration section is set as described above.
  • a subframe indicated by a bold frame indicates a subframe corresponding to the subframe number reported in the reception timing information.
  • the base station 2 overlaps the CC # 1 subframe and CC # 2 subframe reported in the reception timing information as shown in FIG. 12B. Can be determined to be less than half of the subframe interval.
  • the DRX control unit 26 of the base station 2a reports the CC # 1 reported in the radio frame after a predetermined radio frame period (for example, after the Z period) from the SFN of the reported CC # 1 subframe.
  • An On duration section may be set starting from a subframe having a subframe number of.
  • the DRX control unit 26 of the base station 2b is reported in a radio frame after a predetermined radio frame period (after a Z period similar to CC # 1) from the SFN of the reported CC # 2 subframe.
  • the On duration section may be set starting from the subframe (“n”) immediately before the subframe number (“n + 1”) of CC # 2.
  • FIG. 13B shows a state where the On duration section is set as described above.
  • a subframe indicated by a bold frame indicates a subframe corresponding to the subframe number reported in the reception timing information.
  • the reception timing measurement unit 13 selects the CC # 2 subframe having a start point between the start point and end point of the CC # 1 subframe serving as a reference. For example, the reception timing measurement unit 13 May select the subframe of CC # 2 having an end point between the start point and end point of the reference subframe selected in CC # 1. As another example, for example, the reception timing measurement unit 13 may select a subframe of CC # 2 having the same subframe number as the reference subframe selected in CC # 1. The subframe of CC # 2 having the same SFN and subframe number as the reference subframe selected in CC # 1 may be selected.
  • the selection criterion of the CC # 1 subframe and CC # 2 subframe notified by the reception timing information and the time difference “X” indicates the time difference of the user apparatus.
  • any processing procedure may be used.
  • a specific time for example, in microseconds
  • a value discretized by a predetermined number for example, 100 microseconds
  • It may be stored, or an index number or the like associated with a predetermined time lag may be stored.
  • the reception timing measurement unit 13 may compare the start points of the sub-frames of the selected CC # 1 and CC # 2 with each other or between the end points. May be compared, or midpoints of subframes may be compared with each other. Further, the points of predetermined symbol timing may be compared. The reception timing measurement unit 13 may measure the time difference “X” by any method.
  • the reporting unit 14 for example, instead of the SFN and the subframe number of the CC # 2 subframe, the difference from the SFN of the CC # 1 subframe (for example, the CC # 2 SFN to the CC # 1
  • the value obtained by subtracting SFN) and the difference between the subframe number of CC # 1 are stored in the reception timing information. It may be.
  • the reporting unit 14 for example, instead of the SFN of the subframe of CC # 1 and the subframe number, the difference from the SFN of the subframe of CC # 2 (for example, from the SFN of CC # 1 to CC # 2
  • the difference between the subframe number of CC # 2 and the difference (for example, the value obtained by subtracting the subframe number of CC # 2 from the subframe number of CC # 1) is stored in the reception timing information. You may do it.
  • the reporting unit 14 does not calculate the difference between each of the SFN and the subframe number, but calculates the difference by subtracting the values obtained by concatenating the SFN and the subframe number, and receives the calculated difference at the reception timing. You may make it store in information.
  • the base station 2a and the base station 2b exchange cooperation information based on the reception timing information notified from the user apparatus 1, and perform various controls on the user apparatus 1 based on the exchanged cooperation information. Also good.
  • the base station 2a and the base station 2b may perform measurement gap control based on the reception timing information notified from the user apparatus 1 or the exchanged cooperation information by the above processing procedure. For example, when the scheduling control unit 27 of the base station 2a sets subframes “i + 2” to “i + 7” as measurement gap sections in CC # 1 of FIGS. 13A and 13B, the scheduling control unit 27 of the base station 2b Starts from the subframe (“n”) immediately before the reported CC # 2 subframe (“n + 1”), that is, for the subframes “n” to “n + 6”, the DL and UL Scheduling may be performed so that radio resources are not allocated.
  • the reception timing deviation is measured by the same processing procedure as the specific example of the processing procedure (part 1).
  • the reception timing information includes the time deviation “X”. Do not. Points that are not particularly mentioned in the following description may be the same as the specific (part 1) of the processing procedure.
  • the reception timing measurement unit 13 selects any one subframe in CC # 1, and stores the SFN and subframe number of the selected subframe.
  • the selected CC # 1 subframe is a subframe that serves as a reference when the reception timing measurement unit 13 measures a shift in reception timing.
  • FIGS. 12A and 12B it is assumed that the reception timing measurement unit 13 has selected the subframe “a / i + 2”.
  • the reception timing measurement unit 13 determines that the start point is between the start point and the end point of the selected CC # 1 subframe (the subframe “a / i + 2” in the examples of FIGS. 12A and 12B).
  • a subframe of a certain CC # 2 is selected, and the SFN and subframe number of that subframe are stored.
  • the subframe “b / n + 1” corresponds to this.
  • the reporting unit 14 uniquely identifies the SFN, subframe number, and CC # 1 of the selected CC # 1 subframe (the subframe “a / i + 2” in the examples of FIGS. 12A and 12B).
  • the identifier and the SFN, the subframe number, and the identifier for uniquely identifying CC # 2 of the selected CC # 2 subframe (subframe “b / n + 1” in the examples of FIGS. 12A and 12B) are received. It is stored in the timing information and transmitted to the base station 2a or / and the base station 2b (step S103, S105 or S106 in FIG. 11).
  • the base station 2 determines whether the subframe shift is in the state of FIG. 13A (that is, when there are many sections in which the reported subframes overlap each other). It is not possible to determine the state (that is, when the reported subframes have few overlapping sections). Therefore, for example, the DRX control unit 26 of the base station 2b is reported in a radio frame after a predetermined radio frame period (after a Z period similar to CC # 1) from the SFN of the reported subframe of CC # 2. Alternatively, the On duration section may be set starting from the subframe of the CC # 2 subframe number (“n + 1”). In other words, in either case of FIGS. 13A and 13B, the DRX control unit 26 of the base station 2b may set the subframes “n + 1” to “n + 6” as the On duration section.
  • the base station 2a and the base station 2b may perform measurement gap control based on the reception timing information notified from the user apparatus 1 or the exchanged cooperation information by the above processing procedure. For example, when the scheduling control unit 27 of the base station 2a sets subframes “i + 2” to “i + 7” as measurement gap sections in CC # 1 of FIGS. 13A and 13B, the scheduling control unit 27 of the base station 2b Starts from the subframe (“n”) immediately preceding the reported CC # 2 subframe number (“n + 1”), that is, DL and UL for subframes “n” to “n + 6”. Scheduling may be performed so that no radio resource is allocated.
  • the reception timing measurement unit 13 selects the CC # 2 subframe having a start point between the start point and end point of the CC # 1 subframe serving as a reference. For example, the reception timing measurement unit 13 May select the subframe of CC # 2 having an end point between the start point and end point of the reference subframe selected in CC # 1.
  • the scheduling control unit 27 of the base station 2a sets the subframes “i + 2” to “i + 7” as the measurement gap section in CC # 1 in FIGS. 13A and 13B
  • the scheduling control unit 27 of the base station 2b uses the reported CC # 2 subframe number ("n") as a starting point, that is, DL and UL radio resources for subframes "n" to "n + 6". You may make it schedule so that it may not allocate.
  • the reception timing measurement unit 13 determines that the user apparatus has a small difference in the context between the CC # 1 and CC # 2 subframe start points (for example, when the difference in the context is equal to or less than a predetermined threshold).
  • the first reporting unit 14 may select the CC # 2 subframe having the longest section overlapping with the reference CC # 1 subframe and store the selected subframe in the reception timing information.
  • the reception timing measurement unit 13 receives subframes between CGs (for example, PCell and PSCell) defined in, for example, synchronous DC A difference in timing (in other words, a difference in maximum DL reception timing or a difference in maximum UL transmission timing) may be used.
  • the reporting unit 14 may notify the base station 2 by including information indicating that the difference in the context is very small in the reception timing information.
  • base station 2a and base station 2b can perform measurement gap control by the process procedure similar to the specific example (the 2) of the process procedure mentioned later, for example. it can.
  • FIG. 14A and FIG. 14B are diagrams for explaining an example (part 2) of a reception timing shift measuring method and reception timing information.
  • FIG. 15A and FIG. 15B are diagrams for explaining an On duration section (part 2) in DRX control. Points that are not particularly mentioned in the following description may be the same as the specific (part 1) of the processing procedure.
  • the reception timing measurement unit 13 selects any one subframe in CC # 1, and stores the SFN and subframe number of the selected subframe.
  • the selected CC # 1 subframe is a subframe that serves as a reference when the reception timing measurement unit 13 measures a shift in reception timing.
  • FIGS. 14A and 14B it is assumed that the reception timing measurement unit 13 has selected the subframe “a / i + 2”.
  • the reception timing measurement unit 13 sets a start point between the start point and the end point of the selected CC # 1 subframe (the subframe “a / i + 2” in the examples of FIGS. 14A and 14B).
  • a subframe of a certain CC # 2 is selected, and the SFN and subframe number of that subframe are stored.
  • the subframe “b / n + 1” corresponds.
  • the reception timing measurement unit 13 starts the sub-frame of the selected CC # 1 (the subframe of “a / i + 2” in the examples of FIGS. 14A and 14B), and the selected CC # 2 sub-frame.
  • the time difference “X” from the start point of the frame (“b / n + 1” subframe in the examples of FIGS. 14A and 14B) is measured, and the measured X value is stored.
  • the reporting unit 14 determines the SFN, subframe number, and subframe number of the selected CC # 1 subframe (the subframe “a / i + 2” in the example of FIG. 14A).
  • An identifier that uniquely identifies CC # 1, and an SFN, a subframe number, and CC # 2 of the selected CC # 2 subframe (subframe “b / n + 1” in the example of FIG. 14A) are uniquely identified.
  • the identifier is stored in the reception timing information and transmitted to the base station 2a and / or the base station 2b.
  • the reporting unit 14 determines the SFN, the subframe number, and the CC of the selected CC # 1 subframe (the subframe “a / i + 2” in the example of FIG. 14B).
  • An identifier for uniquely identifying # 1 and the SFN, subframe number, and CC # of the subframe immediately before the subframe of the selected CC # 2 (subframe “b / n” in the example of FIG. 14B) 2 is stored in the reception timing information and transmitted to the base station 2a and / or the base station 2b.
  • FIG. 14A shows that the time lag (value of X) between the selected CC # 1 subframe and the selected CC # 2 subframe is less than half the subframe interval (0.5 ms).
  • An example of a short case is shown
  • FIG. 14B shows an example of a case where the value of X is half (0.5 ms) or more of the subframe interval.
  • the base station 2 overlaps at least half (0.5 ms or more) of the CC # 1 subframe and CC # 2 subframe reported in the reception timing information. Judge that it is.
  • the DRX control unit 26 of the base station 2a sets the reported CC # 1 subframe number in the radio frame after a predetermined radio frame period (for example, after the Z period) from the SFN of the reported CC # 1 subframe.
  • An On duration section may be set starting from a subframe.
  • the DRX control unit 26 of the base station 2b is reported in a radio frame after a predetermined radio frame period (after a Z period similar to CC # 1) from the SFN of the reported CC # 2 subframe.
  • the On duration section may be set starting from the subframe of the subframe number (“n” or “n + 1”) of CC # 2.
  • FIG. 15A and FIG. 15B show the situation when the On duration section is set in this way.
  • a subframe indicated by a bold frame indicates a subframe corresponding to the subframe number reported in the reception timing information.
  • FIG. 15A shows an example when the value of X is less than 0.5 ms
  • FIG. 15B shows an example when the value of X is 0.5 ms or more.
  • the specific (No. 2) of the processing procedure described above is different from the specific (No. 1) of the processing procedure so that the time difference “X” is not included in the reception timing information. That is, the specific processing procedure (part 2) can reduce control signals (signaling signals) compared to the specific processing procedure (part 1).
  • the reporting unit 14 may, for example, instead of the SFN of the CC # 2 subframe and the subframe number, the difference from the SFN of the CC # 1 subframe (for example, from the CC # 2 SFN to the CC # 1
  • the value obtained by subtracting SFN) and the difference between the subframe number of CC # 1 are stored in the reception timing information. It may be.
  • the reporting unit 14 for example, instead of the SFN of the subframe of CC # 1 and the subframe number, the difference from the SFN of the subframe of CC # 2 (for example, from the SFN of CC # 1 to CC # 2
  • the difference between the subframe number of CC # 2 and the difference (for example, the value obtained by subtracting the subframe number of CC # 2 from the subframe number of CC # 1) is stored in the reception timing information. You may do it.
  • the reporting unit 14 does not calculate the difference between each of the SFN and the subframe number, but calculates the difference by subtracting the values obtained by concatenating the SFN and the subframe number, and receives the calculated difference at the reception timing. You may make it store in information.
  • the base station 2a and the base station 2b may perform measurement gap control based on the reception timing information notified from the user apparatus 1 or the exchanged cooperation information by the above processing procedure. For example, when the scheduling control unit 27 of the base station 2a sets subframes “i + 2” to “i + 7” as measurement gap sections in CC # 1 of FIGS. 15A and 15B, for example, the scheduling control unit of the base station 2b 27, in CC # 2, for example, eight subframes starting from the subframe immediately preceding the reported subframe of CC # 2, that is, subframes “n” to “n + 7” in FIG. 15A In FIG. 15B, scheduling is performed so that DL and UL radio resources are not allocated for subframes “n ⁇ 1” to “n + 6”.
  • 15A includes the subframe “n + 7” of CC # 2, and the subframe “n ⁇ 1” of CC # 2 in FIG. 15B includes the base station 2b from the user apparatus 1. It is not known whether the CC # 2 subframe start point set in the notified reception timing information is before or after the CC # 1 subframe start point (that is, which of FIGS. 15A and 15B). This is because I don't know if
  • the base station 2 stores the start point of the CC # 1 subframe and the CC # 2 stored in the reception timing information notified from the user apparatus 1. It is impossible to grasp the context of the start point of the subframe.
  • the reporting unit 14 of the user apparatus 1 adds information indicating the front-rear relationship between the start point of the CC # 1 subframe and the start point of the CC # 2 subframe to the reception timing information.
  • the information may be, for example, 1-bit information in which the state in FIG. 14A is “0” and the state in FIG. 14B is “1”, or the state in FIG. 14A is “1”. It may be 1-bit information whose state is “0”.
  • the reception timing measurement unit 13 of the user apparatus 1 may be configured to fixedly select whether the context is the state of FIG. 14A or the state of FIG. 14B without strictly determining the context.
  • the reporting unit 14 may not notify the information indicating the context, and may implicitly indicate to the base station 2 that the difference in the context is very small.
  • the base station 2a and the base station 2b may perform measurement gap control based on the reception timing information notified from the user apparatus 1 by the above processing procedure or the exchanged cooperation information. For example, when the scheduling control unit 27 of the base station 2a sets subframes “i + 2” to “i + 7” as measurement gap sections in CC # 1 of FIGS. 15A and 15B, for example, the scheduling control unit of the base station 2b 15A, in the case of FIG. 15A, in CC # 2, the subframe (“n”) immediately before the reported subframe (“n + 1”) of CC # 2 is used as a starting point, that is, “n” to “n + 6”. For the subframe of "", scheduling may be performed so as not to allocate DL and UL radio resources.
  • the scheduling control unit 27 of the base station 2b starts from the reported subframe (“n”) of CC # 2 in CC # 2, that is, sub-bands of “n” to “n + 6”. Scheduling may be performed so that DL and UL radio resources are not allocated to frames.
  • the scheduling control unit 27 of the base station 2b since the reception timing information includes information indicating the context of the start point of the CC # 1 subframe and the CC # 2 subframe, the scheduling control unit 27 of the base station 2b. Can determine whether the subframe shift is in the state of FIG. 15A or the state of FIG. 15B.
  • the reception timing measurement unit 13 of the user apparatus 1 measures a time lag between the CC # 1 subframe and the CC # 2 subframe, but a measurement error may actually occur. For example, when the value of the time difference “X” is close to 0.5 ms, it is assumed that an error occurs in the reception timing information notified to the base station 2.
  • FIG. 16 is a diagram for explaining measurement errors in the user apparatus.
  • the start point of the CC # 2 subframe is present at the approximate center of the CC # 1 subframe (that is, when the value of X is approximately 0.5 ms)
  • the user Even if the apparatus 1 determines that the reception timing shift is in the state of FIG. 12A or 14A, it is assumed that the actual reception timing shift is in the state of FIG. 12B or FIG. 14B. In this case, incorrect reception timing information is notified to the base station 2.
  • the reporting unit 14 includes information indicating that there is a possibility of reporting an incorrect state due to a measurement error in the reception timing information. It may be included and transmitted to the base station 2.
  • the predetermined threshold value may be stored in the user apparatus 1 in advance, or may be notified from the base station 2 to the user apparatus 1 by broadcast information, system information, or the like.
  • the base station 2 can determine that there is a possibility that the reception timing information notified from the user apparatus 1 includes a measurement error when performing DRX control or measurement gap control. It is possible to perform control in consideration of the inclusion of
  • a user apparatus in a communication system that supports carrier aggregation, a user apparatus that communicates with a first base station and a second base station, the first base station receiving from the first base station A measurement unit for measuring a timing shift between the reception timing of the radio signal of the second radio signal and the reception timing of the second radio signal received from the second base station, and the timing measured by the measurement unit
  • a user apparatus including a transmission unit that transmits information indicating a deviation to the first base station or the second base station.
  • the user apparatus 1 provides a technique in which the user apparatus 1 detects a shift of each subframe of radio signals transmitted from the plurality of base stations 2 and notifies the base station.
  • the measurement unit determines whether or not the timing shift is included in a predetermined threshold value, and the transmission unit determines that the timing shift is included when the timing shift is included in the predetermined threshold value. May be transmitted to the first base station or the second base station.
  • the base station 2 can determine that the reception timing information notified from the user apparatus 1 may include a measurement error, and perform various controls in consideration of the measurement error being included. It becomes possible to do.
  • the information indicating the timing deviation includes the system frame number and subframe number of the subframe constituting the first radio signal, and the system frame number and subframe of the subframe constituting the second radio signal. Number may be included.
  • the base station 2 can identify a shift in reception timing in units of subframes.
  • this makes it possible to perform DRX control or measuremanet gap control in cooperation between the base stations 2 constituting the CA by DC, and reduce the power consumption of the user apparatus 1. It is possible to prevent uselessly allocating radio resources during a period when the user apparatus 1 cannot communicate (measuremanet gap section).
  • the information indicating the timing deviation further includes a predetermined measurement timing of a subframe constituting the first radio signal and a predetermined measurement of a subframe constituting the second radio signal.
  • Information indicating a time difference from the timing may be included.
  • the base station 2 can identify in detail the reception timing shift of the subframe for each CC.
  • the power consumption of the user apparatus 1 can be further reduced, and it is possible to prevent useless allocation of radio resources during a period in which the user apparatus 1 cannot communicate.
  • the measurement unit compares a predetermined measurement timing of a subframe constituting the first radio signal with a predetermined measurement timing of a subframe constituting the second radio signal.
  • the timing deviation may be measured.
  • the predetermined measurement timing may be a subframe start timing, a subframe start timing and an intermediate timing, or a subframe end timing.
  • the user apparatus 1 can measure the shift of the reception timing of the subframe between the CCs at various measurement timings.
  • a base station that communicates with a user apparatus, the reception timing of the first radio signal transmitted from the user apparatus from the base station And receiving means for receiving information indicating a timing shift between the reception timing of the second radio signal transmitted from another base station different from the base station, and based on the information indicating the timing shift
  • a base station having control means for controlling the user apparatus is provided.
  • the base station 2 provides a technique in which the user apparatus 1 detects a shift in each subframe of radio signals transmitted from the plurality of base stations 2 and notifies the base station.
  • control means may instruct scheduling of radio resources for the user apparatus or intermittent reception timing to the user apparatus based on the information indicating the timing deviation.
  • DRX control or measuremanet gap control can be performed in cooperation between the base stations 2 constituting the CA by DC, and the power consumption of the user apparatus 1 can be reduced, and the user apparatus It is possible to prevent useless allocation of radio resources during a period in which 1 cannot communicate.
  • the operations of a plurality of functional units may be physically performed by one component, or the operations of one functional unit may be physically performed by a plurality of components.
  • the order of the sequences and flowcharts described in the embodiments may be changed as long as there is no contradiction.
  • the user apparatus 1 and the base station 2 have been described using functional block diagrams. However, such an apparatus may be realized by hardware, software, or a combination thereof.
  • the software operated by the processor of the user apparatus 1 according to the embodiment of the present invention and the software operated by the processor of the base station 2 according to the embodiment of the present invention are random access memory (RAM), flash memory, and read-only, respectively. It may be stored in any appropriate storage medium such as a memory (ROM), EPROM, EEPROM, register, hard disk (HDD), removable disk, CD-ROM, database, server or the like.
  • the reception timing measurement unit 13 is an example of a measurement unit.
  • the report unit 14 and the signal transmission unit 12 are examples of transmission means.
  • Reception timing information or cooperation information is an example of information indicating a timing shift.
  • the signal receiving unit 21 and the cooperation information exchanging unit 24 are examples of receiving means.
  • the DRX control unit 26 or the scheduling control unit 27 is an example of a control unit.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

 キャリアアグリゲーションをサポートする通信システムにおいて、第一の基地局と第二の基地局と通信を行うユーザ装置であって、前記第一の基地局から受信する第一の無線信号の受信タイミングと、前記第二の基地局から受信する第二の無線信号の受信タイミングとの間のタイミングのずれを測定する測定部と、前記測定部により測定された、前記タイミングのずれを示す情報を前記第一の基地局又は前記第二の基地局に送信する送信部と、を有するユーザ装置を提供する。

Description

ユーザ装置及び基地局
 本発明は、ユーザ装置及び基地局に関する。
 LTE(Long Term Evolution)システムでは、所定の帯域幅(最大20MHz)を基本単位として、複数のキャリアを同時に用いて通信を行うキャリアアグリゲーション(CA:Carrier Aggregation)が採用されている。キャリアアグリゲーションにおいて基本単位となるキャリアはコンポーネントキャリア(CC:Component Carrier)と呼ばれる。
 CAが行われる際には、ユーザ装置に対して、接続性を担保する信頼性の高いセルであるPCell(Primary Cell:プライマリセル)及び付随的なセルであるSCell(Secondary Cell:セカンダリセル)が設定される。ユーザ装置は、第1に、PCellに接続し、必要に応じて、SCellを追加することができる。
 SCellは、PCellに追加されてユーザ装置に対して設定されるセルである。SCellの追加及び削除は、RRC(Radio Resource Control)シグナリングによって行われる。
 図1に示すように、LTEのRel-10のCAでは、同一基地局配下の複数のCCを用いている。また、Rel-10のCAでは、最大で5つのCCを束ねることで、広帯域化により高速なデータレートを実現している。
 一方、Rel-12では、異なる基地局配下のCCを用いて同時通信を行い、高スループットを実現するDual Connectivity(二重接続、以下「DC」という)が提案されている。つまり、DCでは、ユーザ装置は、2つの物理的に異なる基地局の無線リソースを同時に使用して通信を行う。
 DCはCAの一種であり、Inter eNB CA(基地局間キャリアアグリゲーション)とも呼ばれ、Master-eNB(MeNB)と、Secondary-eNB(SeNB)が導入される。図2に、DCの例を示す。図2の例では、MeNBがCC#1でユーザ装置と通信を行い、SeNBがCC#2でユーザ装置と通信を行うことでDCを実現している。
 DCにおいて、MeNB配下のセル(1つ又は複数)で構成されるセルグループをMCG(Master Cell Group、マスターセルグループ)、SeNB配下のセル(1つ又は複数)で構成されるセルグループをSCG(Secondary Cell Group、セカンダリセルグループ)と呼ぶ。SCGのうちの少なくとも1つのSCellにはULのCCが設定され、そのうちの1つにPUCCH(Physical Uplink Control Channel)が設定される。このSCellをPSCell(Primary SCell)と呼ぶ。
3GPP TS 36.300 V12.4.0 (2014-12) 3GPP TS 36.331 V12.5.0 (2015-03)
 DCによらないCAでは、各CCは同一の基地局で構成されるため、各CCの間では、SFN(System Frame Number)、サブフレーム番号及び送信タイミングは同期されている。一方、DCでは、各CCは複数の基地局(MeNB、SeNB)から構成される。従って、MCGに属するCC及びSCGに属するCCの間では、SFN、サブフレーム番号及び送信タイミングは同期されていない場合がある。図3Aは、CC#1とCC#2との間で、SFN、サブフレーム番号及び送信タイミングが同期されている様子を図示したものである。図3Bは、CC#1とCC#2との間で、SFN、サブフレーム番号及び送信タイミングが同期されていない様子を図示したものである。
 ここで、ユーザ装置の消費電力を抑えるために、DRX(間欠受信:Discontinuous Reception)制御と呼ばれる仕組みがLTEで規定されている。DRX制御によれば、RRC connected状態のユーザ装置は、PDCCH(Physical Downlink Control Channel)の受信を所定の時間(On duration期間)のみ行い、それ以外の時間はRF(Radio Frequency)部の処理を停止させるように動作することが許容されている。
 DRX制御は、ユーザ装置ごとに基地局毎に独立して行われる。すなわち、DCによるCAが行われる場合、ユーザ装置は、MCGを構成する基地局(MeNB)及びSCGを構成する基地局(SeNB)の各々から、On duration期間及びOn duration期間の開始タイミングを指示される。
 図4は、DRX制御における課題を説明するための図である。ユーザ装置は、MCGに属するCC#1とSCGに属するCC#2とを束ねたCAを行っていると仮定する。図4に示すように、CC#1に対するOn duration期間及びOn duration期間の開始タイミングと、CC#2に対するOn duration期間及びOn duration期間の開始タイミングとが、基地局からユーザ装置に対して独立に指示されるため、ユーザ装置のRF部が動作する時間が長くなる。
 一般的なユーザ装置において、MCGに属するCCの為に用いられるRF部と、SCGに属するCCの為に用いられるRF部とは、一部共通の素子を用いて実装されていることが多い。従って、各RF部を独立して停止させるより、両方のRF部を停止させるほうが、ユーザ装置の消費電力を抑える効果が高くなる。
 しかしながら、DRX制御はユーザ装置ごとに基地局毎に独立して行われることから、両方のRF部を停止させるように、CC#1及びCC#2のOn duration期間を揃えることができないという問題がある。
 また、LTEでは、ユーザ装置をより品質の良いセルに接続させるため、又は、セル間のロードバランシング等を行うために、ユーザ装置に各セルの無線品質を測定させるようにしている。ユーザ装置は、通信している周波数とは異なる周波数のセルの無線品質を測定する場合、RF部の周波数切替えを行うためにDL(Downlink)及びUL(Uplink)の通信を停止させる。当該通信を停止させる時間は、measurement gapと呼ばれる。
 measurement gapを設ける区間及びタイミング(Gap Pattern及びGap offsetで指定される)は、基地局で決定されてユーザ装置に通知される。また、基地局は、measurement gapに該当する時間は、当該ユーザ装置に向けたDL及びULのスケジューリングを停止することで、ユーザ装置が通信を停止させている時間帯に、無駄に無線リソースを割当てないようにしている。
 なお、CAが行われる場合、基地局は、全てのCCに対して同一タイミングでmeasurement gapを設ける区間及びタイミングを設定する。一方、DCによるCAが行われる場合、MCGを構成する基地局(MeNB)がmeasurement gapを設ける区間及びタイミングを設定する。
 図5は、Measurement gap制御における課題を説明するための図である。ユーザ装置は、MCGに属するCC#1とSCGに属するCC#2とを束ねたCAを行っていると仮定する。前述の通り、ユーザ装置は、measurement gapが設定されている間、RF部の周波数切替えを行うためにDL及びULの通信を停止させる。すなわち、ユーザ装置は、Measurement gapが設定されている間、CC#1に加えてCC#2における通信も停止させる。図5のようにCC#1とCC#2との間でサブフレームが同期されていない場合、CC#2のサブフレームのうち、「通信不可区間」で示される区間において、ユーザ装置は、DL及びULの通信を行うことができないことになる。
 しかしながら、SCGを構成する基地局(SeNB)は、「通信不可区間」を認識していなければ、CC#2において当該ユーザ装置に向けたDL及びULのスケジューリングを行ってしまう。すなわち、ユーザ装置が通信出来ない状態であるにも関わらず、無駄に無線リソースを割当ててしまうという問題がある。
 LTEのRel-12の規定によれば、DCにおいて、各CCを構成する基地局(MeNB、SeNB)の間で、OAM(Operation And Management)等を介してSFN、サブフレーム番号及び送信タイミングの差分に関する情報をお互いに把握するようにすることが想定されている。各基地局の間で当該情報をお互いに把握することで、上述の問題は解決できると想定される。
 しかしながら、実際には、各CCを構成する基地局のベンダが異なる場合、OAMのインタフェースが統一されていない等の理由により、各基地局の間で当該情報をお互いに把握することが困難であった。
 開示の技術は上記に鑑みてなされたものであって、複数の基地局から送信される無線信号の各々のサブフレームのずれをユーザ装置が検出して基地局に通知する技術を提供することを目的とする。
 開示の技術のユーザ装置は、キャリアアグリゲーションをサポートする通信システムにおいて、第一の基地局と第二の基地局と通信を行うユーザ装置であって、前記第一の基地局から受信する第一の無線信号の受信タイミングと、前記第二の基地局から受信する第二の無線信号の受信タイミングとの間のタイミングのずれを測定する測定部と、前記測定部により測定された、前記タイミングのずれを示す情報を前記第一の基地局又は前記第二の基地局に送信する送信部と、を有する。
 また、開示の技術の基地局は、キャリアアグリゲーションをサポートする通信システムにおいて、ユーザ装置と通信を行う基地局であって、前記ユーザ装置から、当該基地局から送信される第一の無線信号の受信タイミングと、当該基地局とは異なる他の基地局から送信される第二の無線信号の受信タイミングとの間のタイミングのずれを示す情報を受信する受信手段と、前記タイミングのずれを示す情報に基づいて、前記ユーザ装置を制御する制御手段と、を有する。
 開示の技術によれば、複数の基地局から送信される無線信号の各々のサブフレームのずれをユーザ装置が検出して基地局に通知する技術が提供される。
Rel-10LTEのCAを説明するための図である。 Rel-12で導入されたDual connectivityの例を示す図である。 CCの同期状態を説明するための図である。 CCの同期状態を説明するための図である。 DRX制御における課題を説明するための図である。 Measurement gap制御における課題を説明するための図である。 実施の形態に係る通信システムの構成を示す図である。 実施の形態に係るユーザ装置の機能構成の一例を示す図である。 実施の形態に係る基地局の機能構成の一例を示す図である。 実施の形態に係るユーザ装置のハードウェア構成の一例を示す図である。 実施の形態に係る基地局のハードウェア構成の一例を示す図である。 実施の形態に係る通信システムの処理手順の一例を示すシーケンス図である。 受信タイミングのずれの測定方法及び受信タイミング情報の一例(その1)を説明するための図である。 受信タイミングのずれの測定方法及び受信タイミング情報の一例(その1)を説明するための図である。 DRX制御におけるOn duration区間(その1)を説明するための図である。 DRX制御におけるOn duration区間(その1)を説明するための図である。 受信タイミングのずれの測定方法及び受信タイミング情報の一例(その2)を説明するための図である。 受信タイミングのずれの測定方法及び受信タイミング情報の一例(その2)を説明するための図である。 DRX制御におけるOn duration区間(その2)を説明するための図である。 DRX制御におけるOn duration区間(その2)を説明するための図である。 ユーザ装置における測定誤差を説明するための図である。
 以下、図面を参照して本発明の実施の形態を説明する。なお、以下で説明する実施の形態は一例に過ぎず、本発明が適用される実施の形態は、以下の実施の形態に限られるわけではない。本実施の形態では、LTEの移動通信システムを対象とするが、本発明はLTEに限らず他の移動通信システムにも適用可能である。また、本実施の形態では、キャリアアグリゲーション技術が導入されている移動通信システムである前提で説明するが、これに限定されるわけではない。
 なお、本明細書及び特許請求の範囲において、「LTE」は、3GPPのリリース8、又は9に対応する通信方式のみならず、3GPPのリリース10、11、12、13、又はリリース14以降に対応する通信方式も含む広い意味で使用する。
 <システム全体構成>
 図6は、実施の形態に係る通信システムの構成を示す図である。図6に示すように、本実施の形態における通信システムは、ユーザ装置1とMCGを構成する基地局(MeNB)2aとSCGを構成する基地局(SeNB)2bとを含む通信システムである。基地局2aと基地局2bとは、DCによるCAを構成しており、ユーザ装置1は、基地局2aと基地局2bとの間でCA通信を行うことができる。
 また、基地局2aはセル3a(PCell)を構成しており、基地局2bはセル3b(PSCell)を構成している。各セル(3a、3b)は、例えば、1つのCC、もしくは、下りCCと上りCCとの組とからなるが、以下の説明では、各セルはCCと同義と考えてよい。また、図6において、基地局2a及び基地局2bは、それぞれセル3a及びセル3bを構成するように図示されているが、図示の便宜上のものであり、基地局2a及び基地局2bは、それぞれ他のセル(SCell)を更に構成するようにしてもよい。
 なお、以下の説明において、基地局2a及び基地局2bを、まとめて基地局2と記載することがある。また、セル3a及びセル3bを、まとめてセル3と記載することがある。
 ユーザ装置1は、無線を通じて基地局2及びコアネットワーク等と通信を行う機能を有する。ユーザ装置1は、例えば、携帯電話、スマートフォン、タブレット、モバイルルータ、ウェアラブル端末などである。ユーザ装置1は、通信機能を有する機器であれば、どのようなユーザ装置1であってもよい。ユーザ装置1は、プロセッサなどのCPU、ROM、RAM又はフラッシュメモリなどのメモリ装置、基地局2と通信するためのアンテナ、RF(Radio Frequency)装置などのハードウェアリソースにより構成される。ユーザ装置1の各機能及び処理は、メモリ装置に格納されているデータやプログラムをプロセッサが処理又は実行することによって実現されてもよい。しかしながら、ユーザ装置1は、上述したハードウェア構成に限定されず、他の何れか適切なハードウェア構成を有してもよい。
 基地局2は、無線を通じてユーザ装置1との間で通信を行う。基地局2は、プロセッサなどのCPU、ROM、RAM又はフラッシュメモリなどのメモリ装置、ユーザ装置1等と通信するためのアンテナ、隣接する基地局2及びコアネットワーク等と通信するための通信インタフェース装置などのハードウェアリソースにより構成される。基地局2の各機能及び処理は、メモリ装置に格納されているデータやプログラムをプロセッサが処理又は実行することによって実現されてもよい。しかしながら、基地局2は、上述したハードウェア構成に限定されず、他の何れか適切なハードウェア構成を有してもよい。
 実施の形態に係る通信システムにおいて、ユーザ装置1は、基地局2a及び基地局2bの各々から受信した無線信号のサブフレームのずれを測定し、測定したサブフレームのずれを基地局2a又は/及び基地局2bに通知するようにする。また、基地局2a及び基地局2bは、ユーザ装置1から通知されたサブフレームのずれに基づき、DRX制御及びmeasurement gapを考慮したスケジューリング制御を行うようにする。
 <機能構成>
 (ユーザ装置)
 図7は、実施の形態に係るユーザ装置の機能構成の一例を示す図である。図7に示すように、ユーザ装置1は、信号受信部11、信号送信部12、受信タイミング測定部13、及び報告部14を有する。図7は、ユーザ装置1において本発明の実施の形態に特に関連する機能部のみを示すものであり、少なくともLTEに準拠した動作を行うための図示しない機能も有するものである。また、図7に示す機能構成は一例に過ぎない。本実施の形態に係る動作を実行できるのであれば、機能区分や機能部の名称はどのようなものでもよい。
 信号受信部11は、基地局2から各種の信号を無線受信し、受信した物理レイヤの信号からより上位のレイヤの信号を取得する機能を含む。信号送信部12は、ユーザ装置1から送信されるべき上位のレイヤの信号から、物理レイヤの各種信号を生成し、無線送信する機能を含む。また、信号受信部11及び信号送信部12はそれぞれ、複数のCCを束ねて通信を行うCAを実行する機能を含む。信号受信部11と信号送信部12はそれぞれ、パケットバッファを備え、レイヤ1(PHY)及びレイヤ2(MAC、RLC、PDCP)の処理を行うことを想定している。ただし、これに限られるわけではない。
 また、信号受信部11は、基地局2aから送信される同期信号(PSS、SSS)及びPBCH(Physical Broadcast Channel)に含まれるMIB(Master Information Block)等に基づいて、基地局2a及び基地局2bから送信される無線信号の各々の受信タイミング(シンボルタイミング)、SFN及びサブフレーム番号を認識する。
 受信タイミング測定部13は、基地局2aから送信される無線信号の受信タイミング(シンボルタイミング)、SFN及びサブフレーム番号と、基地局2bから送信される無線信号の受信タイミング(シンボルタイミング)、SFN及びサブフレーム番号とを比較し、基地局2aから送信される無線信号と基地局2bから送信される無線信号との間の受信タイミングのずれを測定する。
 報告部14は、受信タイミング測定部13で測定された受信タイミングのずれを示す情報(以下、「受信タイミング情報」という)を、信号送信部12を介して、基地局2a又は/及び基地局2bに送信(通知)する。
 (基地局)
 図8は、実施の形態に係る基地局の機能構成の一例を示す図である。図8に示すように、基地局2は、信号受信部21、信号送信部22、基地局間通信部23、連携情報交換部24、記憶部25、DRX制御部26、及びスケジューリング制御部27を有する。図8は、基地局2において本発明の実施の形態に特に関連する機能部のみを示すものであり、少なくともLTEに準拠した動作を行うための図示しない機能も有するものである。また、図8に示す機能構成は一例に過ぎない。本実施の形態に係る動作を実行できるのであれば、機能区分や機能部の名称はどのようなものでもよい。
 信号受信部21は、ユーザ装置1から各種の信号を無線受信し、受信した物理レイヤの信号からより上位のレイヤの信号を取得する機能を含む。信号送信部22は、基地局2から送信されるべき上位のレイヤの信号から、物理レイヤの各種信号を生成し、無線送信する機能を含む。信号受信部21及び信号送信部22はそれぞれ、複数のCCを束ねて通信を行うCAを実行する機能を含むようにしてもよい。
 信号受信部21と信号送信部22はそれぞれ、パケットバッファを備え、レイヤ1(PHY)及びレイヤ2(MAC、RLC、PDCP)の処理を行うことを想定している。ただし、これに限られるわけではない。
 基地局間通信部23は、他の基地局との間で通信を行う。また、基地局間通信部23は、X2インタフェースを介して送受信される信号を処理する機能を含むようにしてもよい。
 連携情報交換部24は、ユーザ装置1から受信タイミング情報を受信すると共に、受信タイミング情報に基づいて、DRX制御及びmeasurement gapを考慮したスケジューリング制御を連携して行うための情報(以下、「連携情報」という)を他の基地局との間で交換する。また、他の基地局との間で交換した連携情報を、記憶部25に格納する。
 記憶部25は、連携情報を記憶する。なお、連携情報は、ユーザ装置1ごとに異なる情報であり、例えば、DRX制御において基地局2の間でOn duration期間を揃えるための情報、MeNBでmeasurement gapを設ける区間及びタイミングに関する情報等が含まれる。
 DRX制御部26は、受信タイミング情報又は/及び記憶部25に記憶されている連携情報に基づいて、ユーザ装置1に対して、On duration期間及びOn duration期間の開始タイミングを指示する。
 スケジューリング制御部27は、受信タイミング情報又は/及び記憶部25に記憶されている連携情報に基づいて、measurement gapの区間に該当するサブフレームについてはDL及びULの無線リソースを割当てないようにスケジューリングを行う。
 以上説明したユーザ装置1及び基地局2の機能構成は、全体をハードウェア回路(例えば、1つ又は複数のICチップ)で実現してもよいし、一部をハードウェア回路で構成し、その他の部分をCPUとプログラムとで実現してもよい。
 図9は、実施の形態に係るユーザ装置のハードウェア構成例を示す図である。図9は、図7よりも実装例に近い構成を示している。図9に示すように、ユーザ装置1は、無線信号に関する処理を行うRE(Radio Equipment)モジュール101と、ベースバンド信号処理を行うBB(Base Band)処理モジュール102と、上位レイヤ等の処理を行う装置制御モジュール103と、SIMカードにアクセスするインタフェースであるSIMスロット104とを有する。
 REモジュール101は、BB処理モジュール102から受信したデジタルベースバンド信号に対して、D/A(Digital-to-Analog)変換、変調、周波数変換、及び電力増幅等を行うことでアンテナから送信すべき無線信号を生成する。また、受信した無線信号に対して、周波数変換、A/D(Analog to Digital)変換、復調等を行うことでデジタルベースバンド信号を生成し、BB処理モジュール102に渡す。REモジュール101は、例えば、図7に示す信号受信部11の一部及び信号送信部12の一部を含む。
 BB処理モジュール102は、IPパケットとデジタルベースバンド信号とを相互に変換する処理を行う。DSP(Digital Signal Processor)112は、BB処理モジュール102における信号処理を行うプロセッサである。メモリ122は、DSP112のワークエリアとして使用される。BB処理モジュール102は、例えば、図7に示す信号受信部11の一部、信号送信部12の一部及び受信タイミング測定部13を含む。
 装置制御モジュール103は、IPレイヤのプロトコル処理、各種アプリケーションの処理等を行う。プロセッサ113は、装置制御モジュール103が行う処理を行うプロセッサである。メモリ123は、プロセッサ113のワークエリアとして使用される。また、プロセッサ113は、SIMスロット104を介してSIMとの間でデータの読出し及び書込みを行う。装置制御モジュール103は、例えば、図7に示す報告部14を含む。
 図10は、実施の形態に係る基地局のハードウェア構成例を示す図である。図10は、図8よりも実装例に近い構成を示している。図6に示すように、基地局2は、無線信号に関する処理を行うREモジュール201と、ベースバンド信号処理を行うBB処理モジュール202と、上位レイヤ等の処理を行う装置制御モジュール203と、ネットワークと接続するためのインタフェースである通信IF204とを有する。
 REモジュール201は、BB処理モジュール202から受信したデジタルベースバンド信号に対して、D/A変換、変調、周波数変換、及び電力増幅等を行うことでアンテナから送信すべき無線信号を生成する。また、受信した無線信号に対して、周波数変換、A/D変換、復調等を行うことでデジタルベースバンド信号を生成し、BB処理モジュール202に渡す。REモジュール401は、例えば、図8に示す信号受信部21の一部及び信号送信部22の一部を含む。
 BB処理モジュール202は、IPパケットとデジタルベースバンド信号とを相互に変換する処理を行う。DSP212は、BB処理モジュール202における信号処理を行うプロセッサである。メモリ222は、DSP212のワークエリアとして使用される。BB処理モジュール202は、例えば、図8に示す信号受信部21の一部及び信号送信部22の一部、記憶部25、DRX制御部26及びスケジューリング制御部27を含む。
 装置制御モジュール203は、IPレイヤのプロトコル処理、OAM(Operation and Maintenance)処理等を行う。プロセッサ213は、装置制御モジュール203が行う処理を行うプロセッサである。メモリ223は、プロセッサ213のワークエリアとして使用される。補助記憶装置233は、例えばHDD等であり、基地局2自身が動作するための各種設定情報等が格納される。装置制御モジュール203は、例えば、図8に示す連携情報交換部24を含む。通信IF204は、例えば、図8に示す基地局間通信部23を含む。
 <処理手順>
 (処理シーケンス)
 図11は、実施の形態に係る通信システムの処理手順の一例を示すシーケンス図である。
図11を用いて、基地局2a及び基地局2bから送信される無線信号の受信タイミングのずれをユーザ装置1が測定し、測定結果を示す情報(受信タイミング情報)を基地局2a又は/及び基地局2bに送信する処理手順について説明する。ユーザ装置1は、基地局2aが構成するセル3aと基地局2bが構成するセル3bとの間でCAを行っている前提とする。
 なお、図11において、「処理手順1」は、ユーザ装置1が受信タイミング情報を所定の基地局2aのみに送信する場合の処理手順を示し、「処理手順2」は、ユーザ装置1が受信タイミング情報をDCによるCAを構成する全ての基地局2に送信する場合の処理手順を示している。なお、「処理手順1」において、ユーザ装置1は、受信タイミング情報を所定の基地局2bのみに送信するようにしてもよい。
 ステップS101で、基地局2a及び基地局2bの信号送信部22は、ユーザ装置1に無線信号を送信する。無線信号には、同期信号(PSS、SSS)、PBCH等が含まれている。また、ユーザ装置1の信号受信部11は、基地局2a及び基地局2bから送信される同期信号、PBCH等に基づき、基地局2a及び基地局2bから送信される無線信号の各々の受信タイミング(シンボルタイミング)、SFN、サブフレーム番号及びセルを一意に識別する情報を認識する。
 ステップS102で、ユーザ装置1の受信タイミング測定部13は、基地局2aから送信される無線信号の受信タイミング(シンボルタイミング)、SFN及びサブフレーム番号と、基地局2bから送信される無線信号の受信タイミング(シンボルタイミング)、SFN及びサブフレーム番号とを比較し、基地局2aから送信される無線信号と基地局2bから送信される無線信号との間の受信タイミングのずれを測定する。
 ステップS103で、ユーザ装置1の報告部14は、信号送信部12を介して、ステップS102で測定した受信タイミングのずれを示す受信タイミング情報を含む受信タイミング情報報告信号を基地局2aに送信する。なお、受信タイミング情報報告信号は、例えば、RRCの制御信号でもよいし、MAC信号のコマンドでもよいし、物理チャネルの制御情報であってもよい。
 ステップS104で、基地局2aは、基地局2bとの間で連携情報を交換する。連携情報の交換は、例えば、X2インタフェースを用いて行われてもよいし、OAMに用いられるインタフェースを用いて行われてもよい。
 ステップS105及びステップS107は、それぞれステップS103及びステップS104と同一であるため説明は省略する。
 ステップS106で、ユーザ装置1の報告部14は、信号送信部12を介して、ステップS102で測定した受信タイミングのずれを示す受信タイミング情報を含む受信タイミング情報報告信号を基地局2bに送信する。なお、受信タイミング情報報告信号は、例えば、RRCの制御信号でもよいし、MAC信号のコマンドでもよいし、物理チャネルの制御情報であってもよい。
 (処理手順の具体例(その1))
 続いて、ユーザ装置1がステップS102で行う処理の内容、及び、ステップS103又はステップS106で基地局2に送信する受信タイミング情報の内容について具体的に説明する。更に、図11による処理手順が行われた後、基地局2a及び基地局2bが行うDRX制御の動作を具体的に説明する。なお、以下の説明において、基地局2aがCC#1を構成し、基地局2bがCC#2を構成するものとする。また、以下の説明において、CC#1は、PCellでもよいしSCellでもよい。また、CC#2は、PSCellでもよいしSCellでもよい。
 図12A及び図12Bは、受信タイミングのずれの測定方法及び受信タイミング情報の一例(その1)を説明するための図である。図13A及び図13Bは、DRX制御におけるOn duration区間(その1)を説明するための図である。
 図12A及び図12Bにおいて、「a」は、CC#1におけるSFNを示しており、「i」は、CC#1におけるサブフレーム番号を示している。つまり「a/i+1」、「a/i+2」及び「a/i+3」で示されるサブフレームは、CC#1における連続する3つのサブフレームを示している。同様に、「b」は、CC#2におけるSFNを示しており、「n」は、CC#2におけるサブフレーム番号を示している。つまり、「b/n」、「b/n+1」及び「b/n+2」で示されるサブフレームは、CC#2における連続する3つのサブフレームを示している。同様に、図13A及び図13Bにおいて、「i」は、CC#1におけるサブフレーム番号を示しており、「n」は、CC#2におけるサブフレーム番号を示している。
 まず、受信タイミング測定部13は、CC#1におけるいずれか1つのサブフレームを選択し、選択したサブフレームのSFN及びサブフレーム番号を記憶しておく。選択されたCC#1のサブフレームは、受信タイミング測定部13が受信タイミングのずれを測定する際の基準になるサブフレームである。図12A及び図12Bの例では、受信タイミング測定部13は、「a/i+2」のサブフレームを選択したと仮定する。
 続いて、受信タイミング測定部13は、選択されたCC#1のサブフレーム(図12A及び図12Bの例では「a/i+2」のサブフレーム)の開始地点~終了地点までの間に開始地点があるCC#2のサブフレームを選択し、そのサブフレームのSFN及びサブフレーム番号を記憶しておく。図12A及び図12Bの例では、「b/n+1」のサブフレームが選択される。
 続いて、受信タイミング測定部13は、選択されたCC#1のサブフレーム(図12A及び図12Bの例では「a/i+2」のサブフレーム)の開始地点と、選択されたCC#2のサブフレーム(図12A及び図12Bの例では「b/n+1」のサブフレーム)の開始地点との間の時間のずれ「X」を測定し、測定したXの値を記憶しておく。
 続いて、報告部14は、選択されたCC#1のサブフレーム(図12A及び図12Bの例では「a/i+2」のサブフレーム)のSFN、サブフレーム番号及びCC#1を一意に識別する識別子と、選択されたCC#2のサブフレーム(図12A及び図12Bの例では「b/n+1」のサブフレーム)のSFN、サブフレーム番号及びCC#2を一意に識別する識別子と、測定したXの値とを、受信タイミング情報に格納して基地局2a又は/及び基地局2bに送信する(図11のステップS103、S105又はS106)。
 なお、CC#1を一意に識別する識別子及びCC#2を一意に識別する識別子は、例えば、CellIndexであってもよいし、他の識別子でもよい。基地局2がCAを構成するセル又はCCを一意に識別できる識別子であれば、どのような識別子でもよい。
 なお、図12Aは、選択されたCC#1のサブフレームと選択されたCC#2のサブフレームとの間の時間のずれ(Xの値)が、サブフレーム間隔の半分(0.5ms)より短い場合の一例を示しており、図12Bは、Xの値が、サブフレーム間隔の半分(0.5ms)より長い場合の一例を示している。
 基地局2は、Xの値が0.5msより短い場合、図12Aのように、受信タイミング情報で報告されたCC#1のサブフレーム及びCC#2のサブフレーム同士が、半分以上(0.5ms以上)重なっていると判断することができる。
 この場合、例えば、基地局2aのDRX制御部26は、報告されたCC#1のサブフレームのSFNから所定の無線フレーム区間後(例えばZ区間後)の無線フレームにおいて、報告されたCC#1のサブフレーム番号のサブフレームを開始点としてOn duration区間を設定するようにしてもよい。同様に、基地局2bのDRX制御部26は、報告されたCC#2のサブフレームのSFNから所定の無線フレーム区間後(CC#1と同様のZ区間後)の無線フレームにおいて、報告されたCC#2のサブフレーム番号(「n+1」)のサブフレームを開始点としてOn duration区間を設定するようにしてもよい。このようにOn duration区間が設定された場合の様子を図13Aに示す。なお、太枠で示されているサブフレームは、受信タイミング情報で報告されたサブフレーム番号に該当するサブフレームを示している。
 一方、基地局2は、Xの値が0.5ms以上の場合、図12Bのように、受信タイミング情報で報告されたCC#1のサブフレーム及びCC#2のサブフレーム同士が重なっている区間は、サブフレーム間隔の半分未満であると判断することができる。この場合、例えば、基地局2aのDRX制御部26は、報告されたCC#1のサブフレームのSFNから所定の無線フレーム区間後(例えばZ区間後)の無線フレームにおいて、報告されたCC#1のサブフレーム番号のサブフレームを開始点としてOn duration区間を設定するようにしてもよい。同様に、基地局2bのDRX制御部26は、報告されたCC#2のサブフレームのSFNから所定の無線フレーム区間後(CC#1と同様のZ区間後)の無線フレームにおいて、報告されたCC#2のサブフレーム番号(「n+1」)の1つ前のサブフレーム(「n」)を開始点としてOn duration区間を設定するようにしてもよい。このようにOn duration区間が設定された場合の様子を図13Bに示す。なお、太枠で示されているサブフレームは、受信タイミング情報で報告されたサブフレーム番号に該当するサブフレームを示している。
 なお、上述の処理手順の具体例(その1)は一例であり、これに限られない。受信タイミング測定部13は、基準となるCC#1のサブフレームの開始地点~終了地点の間に開始地点があるCC#2のサブフレームを選択するようにしたが、例えば、受信タイミング測定部13は、CC#1で選択した基準となるサブフレームの開始地点~終了地点の間に終了地点があるCC#2のサブフレームを選択するようにしてもよい。また、別の例として、例えば、受信タイミング測定部13は、CC#1で選択した基準となるサブフレームと同一のサブフレーム番号を有するCC#2のサブフレームを選択するようにしてもよいし、CC#1で選択した基準となるサブフレームと同一のSFN及びサブフレーム番号を有するCC#2のサブフレームを選択するようにしてもよい。
 つまり、受信タイミング情報で通知されるCC#1のサブフレーム及びCC#2のサブフレームの選択基準と、時間のずれ「X」がどの区間の時間のずれを示しているのかとが、ユーザ装置1と基地局2との間で認識が統一されていれば、どのような処理手順であってもよい。
 また、時間のずれ「X」には、例えば、具体的な時間(例えばマイクロ秒単位)を格納するようにしてもよいし、所定の数(例えば、100マイクロ秒)で離散化された値を格納するようにしてもよいし、所定の時間のずれに対応づけられるインデックス番号等を格納するようにしてもよい。
 また、受信タイミング測定部13は、時間のずれ「X」を測定する場合、選択されたCC#1及びCC#2のサブフレームの開始地点どうしを比較するようにしてもよいし、終了地点どうしを比較するようにしてもよいし、サブフレームの中間地点どうしを比較するようにしてもよい。また、所定のシンボルタイミングの地点どうしを比較するようにしてもよい。受信タイミング測定部13は、どのような方法で時間のずれ「X」を測定するようにしてもよい。
 また、報告部14は、例えば、CC#2のサブフレームのSFN、及びサブフレーム番号の代わりに、CC#1のサブフレームのSFNとの差分(例えば、CC#2のSFNからCC#1のSFNを引いた値)と、CC#1のサブフレーム番号との差分(例えば、CC#2のサブフレーム番号からCC#1のサブフレーム番号を引いた値)とを受信タイミング情報に格納するようにしてもよい。逆に、報告部14は、例えば、CC#1のサブフレームのSFN、及びサブフレーム番号の代わりに、CC#2のサブフレームのSFNとの差分(例えば、CC#1のSFNからCC#2のSFNを引いた値)と、CC#2のサブフレーム番号との差分(例えば、CC#1のサブフレーム番号からCC#2のサブフレーム番号を引いた値)とを受信タイミング情報に格納するようにしてもよい。また、報告部14は、SFN及びサブフレーム番号の各々の差分を計算するのではなく、SFN及びサブフレーム番号が連結された値どうしを引き算することで差分を計算し、計算した差分を受信タイミング情報に格納するようにしてもよい。
 なお、基地局2a及び基地局2bは、ユーザ装置1から通知された受信タイミング情報に基づいて連携情報を交換し、交換された連携情報に基づいて、ユーザ装置1に対する各種制御を行うようにしてもよい。
 また、基地局2a及び基地局2bは、上記の処理手順によりユーザ装置1から通知された受信タイミング情報又は交換された連携情報に基づいて、measurement gap制御を行うようにしてもよい。例えば、基地局2aのスケジューリング制御部27が、図13A及び図13BのCC#1において、「i+2」~「i+7」のサブフレームをmeasurement gap区間として設定した場合、基地局2bのスケジューリング制御部27は、報告されたCC#2のサブフレーム(「n+1」)の1つ前のサブフレーム(「n」)を起点として、すなわち、「n」~「n+6」のサブフレームについてはDL及びULの無線リソースを割当てないようにスケジューリングを行うようにしてもよい。
 (処理手順の具体例(その1の変形例))
 処理手順の具体例(その1の変形例)は、処理手順の具体例(その1)と同様の処理手順により受信タイミングのずれを測定するが、受信タイミング情報に時間のずれ「X」を含めないようにする。以下の説明において特に言及しない点は、処理手順の具体的(その1)と同一でよい。
 まず、受信タイミング測定部13は、CC#1におけるいずれか1つのサブフレームを選択し、選択したサブフレームのSFN及びサブフレーム番号を記憶しておく。選択されたCC#1のサブフレームは、受信タイミング測定部13が受信タイミングのずれを測定する際の基準になるサブフレームである。図12A及び図12Bの例では、受信タイミング測定部13は、「a/i+2」のサブフレームを選択したと仮定する。
 続いて、受信タイミング測定部13は、選択されたCC#1のサブフレーム(図12A及び図12Bの例では「a/i+2」のサブフレーム)の開始地点~終了地点までの間に開始地点があるCC#2のサブフレームを選択し、そのサブフレームのSFN及びサブフレーム番号を記憶しておく。図12A及び図12Bの例では、「b/n+1」のサブフレームが該当する。
 続いて、報告部14は、選択されたCC#1のサブフレーム(図12A及び図12Bの例では「a/i+2」のサブフレーム)のSFN、サブフレーム番号及びCC#1を一意に識別する識別子と、選択されたCC#2のサブフレーム(図12A及び図12Bの例では「b/n+1」のサブフレーム)のSFN、サブフレーム番号及びCC#2を一意に識別する識別子とを、受信タイミング情報に格納して基地局2a又は/及び基地局2bに送信する(図11のステップS103、S105又はS106)。
 処理手順の具体例(その1の変形例)では、基地局2は、サブフレームのずれが図13Aの状態(すなわち、報告されたサブフレームどうしが重なる区間が多い場合)なのか、図13Bの状態(すなわち、報告されたサブフレームどうしが重なる区間が少ない場合)なのか判断が出来ない。従って、例えば、基地局2bのDRX制御部26は、報告されたCC#2のサブフレームのSFNから所定の無線フレーム区間後(CC#1と同様のZ区間後)の無線フレームにおいて、報告されたCC#2のサブフレーム番号(「n+1」)のサブフレームを開始点としてOn duration区間を設定するようにしてもよい。言い換えると、図13A及び図13Bのどちらの場合であっても、基地局2bのDRX制御部26は、「n+1」~「n+6」のサブフレームをOn duration区間に設定するようにしてもよい。
 また、基地局2a及び基地局2bは、上記の処理手順によりユーザ装置1から通知された受信タイミング情報又は交換された連携情報に基づいて、measurement gap制御を行うようにしてもよい。例えば、基地局2aのスケジューリング制御部27が、図13A及び図13BのCC#1において、「i+2」~「i+7」のサブフレームをmeasurement gap区間として設定した場合、基地局2bのスケジューリング制御部27は、報告されたCC#2のサブフレーム番号(「n+1」)の1つ前のサブフレーム(「n」)を起点として、すなわち、「n」~「n+6」のサブフレームについてはDL及びULの無線リソースを割当てないようにスケジューリングを行うようにしてもよい。
 なお、上述の処理手順の具体例(その1の変形例)は一例であり、これに限られない。受信タイミング測定部13は、基準となるCC#1のサブフレームの開始地点~終了地点の間に開始地点があるCC#2のサブフレームを選択するようにしたが、例えば、受信タイミング測定部13は、CC#1で選択した基準となるサブフレームの開始地点~終了地点の間に終了地点があるCC#2のサブフレームを選択するようにしてもよい。
 この場合、measurement gap制御において、例えば、基地局2aのスケジューリング制御部27が、図13A及び図13BのCC#1において、「i+2」~「i+7」のサブフレームをmeasurement gap区間として設定した場合、基地局2bのスケジューリング制御部27は、報告されたCC#2のサブフレーム番号(「n」)を起点として、すなわち、「n」~「n+6」のサブフレームについてはDL及びULの無線リソースを割当てないようにスケジューリングを行うようにしてもよい。
 なお、受信タイミング測定部13は、CC#1及びCC#2のサブフレーム開始地点の前後関係の差が非常に小さい場合(例えば、前後関係の差が所定の閾値以下である場合)、ユーザ装置1の報告部14は、基準になるCC#1のサブフレームと重なる区間が最も
長いCC#2のサブフレームを選択して受信タイミング情報に格納するようにしてもよい。また、当該前後関係の差を判断する際に用いられる所定の閾値として、受信タイミング測定部13は、例えば、同期DCにおいて規定されている、CG間(例えば、PCell及びPSCell)におけるサブフレームの受信タイミングの差(言い換えると、最大DL受信タイミングの差、又は、最大UL送信タイミングの差)を用いるようにしてもよい。また、報告部14は、当該前後関係の差が非常に小さいことを示す情報を、受信タイミング情報に含めて基地局2に通知するようにしてもよい。
 これにより、当該前後関係の差が非常に小さい場合、基地局2a及び基地局2bは、measurement gap制御を、例えば、後述の処理手順の具体例(その2)と同様の処理手順により行うことができる。
 (処理手順の具体例(その2))
 図14A及び図14Bは、受信タイミングのずれの測定方法及び受信タイミング情報の一例(その2)を説明するための図である。図15A及び図15Bは、DRX制御におけるOn duration区間(その2)を説明するための図である。以下の説明において特に言及しない点は、処理手順の具体的(その1)と同一でよい。
 まず、受信タイミング測定部13は、CC#1におけるいずれか1つのサブフレームを選択し、選択したサブフレームのSFN及びサブフレーム番号を記憶しておく。選択されたCC#1のサブフレームは、受信タイミング測定部13が受信タイミングのずれを測定する際の基準になるサブフレームである。図14A及び図14Bの例では、受信タイミング測定部13は、「a/i+2」のサブフレームを選択したと仮定する。
 続いて、受信タイミング測定部13は、選択されたCC#1のサブフレーム(図14A及び図14Bの例では「a/i+2」のサブフレーム)の開始地点~終了地点までの間に開始地点があるCC#2のサブフレームを選択し、そのサブフレームのSFN及びサブフレーム番号を記憶しておく。図14A及び図14Bの例では、「b/n+1」のサブフレームが該当する。
 続いて、受信タイミング測定部13は、選択されたCC#1のサブフレーム(図14A及び図14Bの例では「a/i+2」のサブフレーム)の開始地点と、選択されたCC#2のサブフレーム(図14A及び図14Bの例では「b/n+1」のサブフレーム)の開始地点との間の時間のずれ「X」を測定し、測定したXの値を記憶しておく。
 続いて、報告部14は、Xの値が0.5msより短い場合、選択されたCC#1のサブフレーム(図14Aの例では「a/i+2」のサブフレーム)のSFN、サブフレーム番号及びCC#1を一意に識別する識別子と、選択されたCC#2のサブフレーム(図14Aの例では「b/n+1」のサブフレーム)のSFN、サブフレーム番号及びCC#2を一意に識別する識別子とを、受信タイミング情報に格納して基地局2a又は/及び基地局2bに送信する。
 また、報告部14は、Xの値が0.5ms以上の場合、選択されたCC#1のサブフレーム(図14Bの例では「a/i+2」のサブフレーム)のSFN、サブフレーム番号及びCC#1を一意に識別する識別子と、選択されたCC#2のサブフレームの1つ前のサブフレーム(図14Bの例では「b/n」のサブフレーム)のSFN、サブフレーム番号及びCC#2を一意に識別する識別子とを、受信タイミング情報に格納して基地局2a又は/及び基地局2bに送信する。
 なお、図14Aは、選択されたCC#1のサブフレームと選択されたCC#2のサブフレームとの間の時間のずれ(Xの値)が、サブフレーム間隔の半分(0.5ms)より短い場合の一例を示しており、図14Bは、Xの値が、サブフレーム間隔の半分(0.5ms)以上の場合の一例を示している。
 処理手順の具体例(その2)において、基地局2は、受信タイミング情報で報告されたCC#1のサブフレーム及びCC#2のサブフレームは、少なくとも、半分以上(0.5ms以上)重なっていると判断するようにする。基地局2aのDRX制御部26は、報告されたCC#1のサブフレームのSFNから所定の無線フレーム区間後(例えばZ区間後)の無線フレームにおいて、報告されたCC#1のサブフレーム番号のサブフレームを開始点としてOn duration区間を設定するようにしてもよい。同様に、基地局2bのDRX制御部26は、報告されたCC#2のサブフレームのSFNから所定の無線フレーム区間後(CC#1と同様のZ区間後)の無線フレームにおいて、報告されたCC#2のサブフレーム番号(「n」又は「n+1」)のサブフレームを開始点としてOn duration区間を設定するようにしてもよい。このようにOn duration区間が設定された場合の様子を図15A及び図15Bに示す。なお、太枠で示されているサブフレームは、受信タイミング情報で報告されたサブフレーム番号に該当するサブフレームを示している。図15Aは、Xの値が0.5ms未満であった場合の一例を示し、図15Bは、Xの値が0.5ms以上であった場合の一例を示している。
 以上説明した処理手順の具体的(その2)は、処理手順の具体的(その1)と異なり、受信タイミング情報に時間のずれ「X」を含めないようにしている。すなわち、処理手順の具体的(その2)は、処理手順の具体的(その1)と比較して、制御信号(シグナリング信号)を削減することができる。
 なお、報告部14は、例えば、CC#2のサブフレームのSFN、及びサブフレーム番号の代わりに、CC#1のサブフレームのSFNとの差分(例えば、CC#2のSFNからCC#1のSFNを引いた値)と、CC#1のサブフレーム番号との差分(例えば、CC#2のサブフレーム番号からCC#1のサブフレーム番号を引いた値)とを受信タイミング情報に格納するようにしてもよい。逆に、報告部14は、例えば、CC#1のサブフレームのSFN、及びサブフレーム番号の代わりに、CC#2のサブフレームのSFNとの差分(例えば、CC#1のSFNからCC#2のSFNを引いた値)と、CC#2のサブフレーム番号との差分(例えば、CC#1のサブフレーム番号からCC#2のサブフレーム番号を引いた値)とを受信タイミング情報に格納するようにしてもよい。また、報告部14は、SFN及びサブフレーム番号の各々の差分を計算するのではなく、SFN及びサブフレーム番号が連結された値どうしを引き算することで差分を計算し、計算した差分を受信タイミング情報に格納するようにしてもよい。
 なお、基地局2a及び基地局2bは、上記の処理手順によりユーザ装置1から通知された受信タイミング情報又は交換された連携情報に基づいて、measurement gap制御を行うようにしてもよい。例えば、基地局2aのスケジューリング制御部27が、例えば図15A及び図15BのCC#1において、「i+2」~「i+7」のサブフレームをmeasurement gap区間として設定した場合、基地局2bのスケジューリング制御部27は、CC#2において、例えば、報告されたCC#2のサブフレームの1つ前のサブフレームを起点として8つのサブフレーム、すなわち、図15Aでは、「n」~「n+7」のサブフレームについてはDL及びULの無線リソースを割当てないようにスケジューリングを行うようにして、図15Bでは「n-1」~「n+6」のサブフレームについてはDL及びULの無線リソースを割当てないようにスケジューリングを行うようにしてもよい。なお、図15AでCC#2の「n+7」のサブフレーム、図15BでCC#2の「n-1」のサブフレームも含まれるようにしているのは、基地局2bは、ユーザ装置1から通知された受信タイミング情報に設定されているCC#2のサブフレームの開始地点が、CC#1のサブフレームの開始地点より前なのか後ろなのか分からない(つまり、図15A及び図15Bのどちらの状態なのか分からない)ためである。
 (処理手順の具体例(その2の変形例))
 前述のとおり、処理手順の具体例(その2)において、基地局2は、ユーザ装置1から通知された受信タイミング情報に格納されている、CC#1のサブフレームの開始地点とCC#2のサブフレームの開始地点との前後関係を把握することができない。
 そこで、ユーザ装置1の報告部14は、受信タイミング情報に、CC#1のサブフレームの開始地点とCC#2のサブフレームの開始地点との前後関係を示す情報を追加するようにする。当該情報は、例えば、図14Aの状態を「0」とし、図14Bの状態を「1」とする1ビットの情報であってもよいし、図14Aの状態を「1」とし、図14Bの状態を「0」とする1ビットの情報であってもよい。また、CC#1及びCC#2のサブフレーム開始地点の前後関係の差が非常に小さい場合(例えば、前後関係の差が所定の閾値以下である場合)、ユーザ装置1の受信タイミング測定部13又は報告部14は、前後関係を厳密に判断せずに、前後関係が図14Aの状態であるのか図14Bの状態であるのかを固定的に選択するようにしてもよい。また、報告部14は、当該前後関係を示す情報を通知しないようにして、当該前後関係の差が非常に小さいことを基地局2に暗に示すようにしてもよい。
 基地局2a及び基地局2bは、上記の処理手順によりユーザ装置1から通知された受信タイミング情報又は交換された連携情報に基づいて、measurement gap制御を行うようにしてもよい。例えば、基地局2aのスケジューリング制御部27が、例えば図15A及び図15BのCC#1において、「i+2」~「i+7」のサブフレームをmeasurement gap区間として設定した場合、基地局2bのスケジューリング制御部27は、図15Aの場合、CC#2において、報告されたCC#2のサブフレーム(「n+1」)の1つ前のサブフレーム(「n」)を起点として、すなわち「n」~「n+6」のサブフレームについてはDL及びULの無線リソースを割当てないようにスケジューリングを行うようにしてもよい。また、基地局2bのスケジューリング制御部27は、図15Bの場合、CC#2において、報告されたCC#2のサブフレーム(「n」)を起点として、すなわち「n」~「n+6」のサブフレームについてはDL及びULの無線リソースを割当てないようにスケジューリングを行うようにしてもよい。上述の通り、受信タイミング情報に、CC#1のサブフレームの開始地点とCC#2のサブフレームの開始地点との前後関係を示す情報が含まれているため、基地局2bのスケジューリング制御部27は、サブフレームのずれが、図15Aの状態なのか、図15Bの状態なのかを判断することができる。
 (ユーザ装置における測定誤差について)
 ユーザ装置1の受信タイミング測定部13は、CC#1のサブフレーム及びCC#2のサブフレームの間の時間のずれを測定するが、実際には測定誤差が発生する可能性がある。例えば、時間のずれ「X」の値が0.5msに近い場合、基地局2に通知される受信タイミング情報に誤りが生じることが想定される。
 図16は、ユーザ装置における測定誤差を説明するための図である。例えば、図16に示すように、CC#1のサブフレームのほぼ中心に、CC#2のサブフレームの開始地点が存在する場合(すなわち、Xの値がほぼ0.5msである場合)、ユーザ装置1が受信タイミングのずれは図12A又は図14Aの状態であると判断したとしても、実際の受信タイミングのずれは図12B又は図14Bの状態であることが想定される。この場合、基地局2には、誤った受信タイミング情報が通知されることになる。
 そこで、時間のずれ「X」の値が所定の閾値の範囲である場合、報告部14は、受信タイミング情報に、測定誤差により誤った状態を通知している可能性がある旨を示す情報を含めるようにして、基地局2に送信するようにしてもよい。
 また、当該所定の閾値は、予めユーザ装置1に記憶されていてもよいし、基地局2から報知情報やシステム情報等でユーザ装置1に通知されるようにしてもよい。
 これにより、基地局2は、DRX制御やmeasurement gap制御を行う際に、ユーザ装置1から通知された受信タイミング情報に測定誤差が含まれている可能性があると判断することができ、測定誤差が含まれていることを考慮した制御を行うことが可能になる。
 <効果>
 以上、実施の形態によれば、キャリアアグリゲーションをサポートする通信システムにおいて、第一の基地局と第二の基地局と通信を行うユーザ装置であって、前記第一の基地局から受信する第一の無線信号の受信タイミングと、前記第二の基地局から受信する第二の無線信号の受信タイミングとの間のタイミングのずれを測定する測定部と、前記測定部により測定された、前記タイミングのずれを示す情報を前記第一の基地局又は前記第二の基地局に送信する送信部と、を有するユーザ装置が提供される。
 このユーザ装置1により、複数の基地局2から送信される無線信号の各々のサブフレームのずれをユーザ装置1が検出して基地局に通知する技術が提供される。
 また、前記測定部は、前記タイミングのずれが所定の閾値に含まれているか否かを判断し、前記送信部は、前記タイミングのずれが所定の閾値に含まれている場合、前記タイミングのずれが所定の閾値に含まれていることを示す情報を、前記第一の基地局又は前記第二の基地局に送信するようにしてもよい。
 これにより、基地局2は、ユーザ装置1から通知された受信タイミング情報に測定誤差が含まれている可能性があると判断することができ、測定誤差が含まれていることを考慮した各種制御を行うことが可能になる。
 また、前記タイミングのずれを示す情報は、前記第一の無線信号を構成するサブフレームのシステムフレーム番号及びサブフレーム番号と、前記第二の無線信号を構成するサブフレームのシステムフレーム番号及びサブフレーム番号とを含むようにしてもよい。
 これにより、基地局2は、受信タイミングのずれをサブフレーム単位で識別することが可能になる。また、これにより、DCによるCAを構成する各基地局2の間で、DRX制御又はmesuremanet gap制御を連携して行うことができ、ユーザ装置1の消費電力を削減することが可能になると共に、ユーザ装置1が通信出来ない期間(measuremanet gap区間)において、無駄に無線リソースを割当ててしまうことを防止することができる。
 また、前記タイミングのずれを示す情報は、更に、前記第一の無線信号を構成するサブフレームの予め定められた測定タイミングと、前記第二の無線信号を構成するサブフレームの予め定められた測定タイミングとの間の時間の差分を示す情報を含むようにしてもよい。
 これにより、基地局2は、CCごとのサブフレームの受信タイミングのずれを、詳細に識別することが可能になる。また、これにより、ユーザ装置1の消費電力を更に削減することが可能になると共に、ユーザ装置1が通信出来ない期間において、無駄に無線リソースを割当ててしまうことを防止することができる。
 また、前記測定部は、前記第一の無線信号を構成するサブフレームの予め定められた測定タイミングと、前記第二の無線信号を構成するサブフレームの予め定められた測定タイミングとを比較することで、前記タイミングのずれを測定するようにしてもよい。
 また、前記予め定められた測定タイミングは、サブフレームの開始タイミング、サブフレームの開始タイミング及び終了タイミングの中間のタイミング、又は、サブフレームの終了タイミングであってもよい。
 これにより、ユーザ装置1は、様々な測定タイミングにより、各CCの間のサブフレームの受信タイミングのずれを測定することが可能になる。
 また、実施の形態によれば、キャリアアグリゲーションをサポートする通信システムにおいて、ユーザ装置と通信を行う基地局であって、前記ユーザ装置から、当該基地局から送信される第一の無線信号の受信タイミングと、当該基地局とは異なる他の基地局から送信される第二の無線信号の受信タイミングとの間のタイミングのずれを示す情報を受信する受信手段と、前記タイミングのずれを示す情報に基づいて、前記ユーザ装置を制御する制御手段と、を有する基地局が提供される。
 この基地局2により、複数の基地局2から送信される無線信号の各々のサブフレームのずれをユーザ装置1が検出して基地局に通知する技術が提供される。
 また、前記制御手段は、前記タイミングのずれを示す情報に基づいて、前記ユーザ装置に対する無線リソースのスケジューリング、又は、前記ユーザ装置に間欠受信タイミングを指示するようにしてもよい。
 これにより、DCによるCAを構成する各基地局2の間で、DRX制御又はmesuremanet gap制御を連携して行うことができ、ユーザ装置1の消費電力を削減することが可能になると共に、ユーザ装置1が通信出来ない期間において、無駄に無線リソースを割当ててしまうことを防止することができる。
 <実施形態の補足>
 以上、本発明の実施の形態を説明してきたが、開示される発明はそのような実施形態に限定されず、当業者は様々な変形例、修正例、代替例、置換例等を理解するであろう。発明の理解を促すため具体的な数値例を用いて説明がなされたが、特に断りのない限り、それらの数値は単なる一例に過ぎず適切な如何なる値が使用されてもよい。上記の説明における項目の区分けは本発明に本質的ではなく、2以上の項目に記載された事項が必要に応じて組み合わせて使用されてよいし、ある項目に記載された事項が、別の項目に記載された事項に(矛盾しない限り)適用されてよい。機能ブロック図における機能部又は処理部の境界は必ずしも物理的な部品の境界に対応するとは限らない。複数の機能部の動作が物理的には1つの部品で行われてもよいし、あるいは1つの機能部の動作が物理的には複数の部品により行われてもよい。実施の形態で述べたシーケンス及びフローチャートは、矛盾の無い限り順序を入れ替えてもよい。処理説明の便宜上、ユーザ装置1及び基地局2は機能的なブロック図を用いて説明されたが、そのような装置はハードウェアで、ソフトウェアで又はそれらの組み合わせで実現されてもよい。本発明の実施の形態に従ってユーザ装置1が有するプロセッサにより動作するソフトウェア及び本発明の実施の形態に従って基地局2が有するプロセッサにより動作するソフトウェアはそれぞれ、ランダムアクセスメモリ(RAM)、フラッシュメモリ、読み取り専用メモリ(ROM)、EPROM、EEPROM、レジスタ、ハードディスク(HDD)、リムーバブルディスク、CD-ROM、データベース、サーバその他の適切な如何なる記憶媒体に保存されてもよい。
 本発明は上記実施形態に限定されず、本発明の精神から逸脱することなく、様々な変形例、修正例、代替例、置換例等が本発明に包含される。
 なお、実施の形態において、受信タイミング測定部13は測定手段の一例である。報告部14及び信号送信部12は、送信手段の一例である。受信タイミング情報又は連携情報は、タイミングのずれを示す情報の一例である。信号受信部21及び連携情報交換部24は、受信手段の一例である。DRX制御部26又はスケジューリング制御部27は、制御手段の一例である。
 本特許出願は2015年4月3日に出願した日本国特許出願第2015-077225号に基づきその優先権を主張するものであり、日本国特許出願第2015-077225号の全内容を本願に援用する。
1 ユーザ装置
2 基地局
3 セル
11 信号受信部
12 信号送信部
13 受信タイミング測定部
14 報告部
21 信号受信部
22 信号送信部
23 基地局間通信部
24 連携情報交換部
25 記憶部
26 DRX制御部
27 スケジューリング制御部
101 REモジュール
102 BB処理モジュール
103 装置制御モジュール
104 SIMスロット
201 REモジュール
202 BB処理モジュール
203 装置制御モジュール
204 通信IF

Claims (8)

  1.  キャリアアグリゲーションをサポートする通信システムにおいて、第一の基地局と第二の基地局と通信を行うユーザ装置であって、
     前記第一の基地局から受信する第一の無線信号の受信タイミングと、前記第二の基地局から受信する第二の無線信号の受信タイミングとの間のタイミングのずれを測定する測定部と、
     前記測定部により測定された、前記タイミングのずれを示す情報を前記第一の基地局又は前記第二の基地局に送信する送信部と、
     を有するユーザ装置。
  2.  前記測定部は、前記タイミングのずれが所定の閾値に含まれているか否かを判断し、
     前記送信部は、前記タイミングのずれが所定の閾値に含まれている場合、前記タイミングのずれが所定の閾値に含まれていることを示す情報を、前記第一の基地局又は前記第二の基地局に送信する、請求項1に記載のユーザ装置。
  3.  前記タイミングのずれを示す情報は、前記第一の無線信号を構成するサブフレームのシステムフレーム番号及びサブフレーム番号と、前記第二の無線信号を構成するサブフレームのシステムフレーム番号及びサブフレーム番号とを含む、請求項1又は2に記載のユーザ装置。
  4.  前記タイミングのずれを示す情報は、更に、前記第一の無線信号を構成するサブフレームの予め定められた測定タイミングと、前記第二の無線信号を構成するサブフレームの予め定められた測定タイミングとの間の時間の差分を示す情報を含む、請求項3に記載のユーザ装置。
  5.  前記測定部は、前記第一の無線信号を構成するサブフレームの予め定められた測定タイミングと、前記第二の無線信号を構成するサブフレームの予め定められた測定タイミングとを比較することで、前記タイミングのずれを測定する、請求項1乃至4のいずれか一項に記載のユーザ装置。
  6.  前記予め定められた測定タイミングは、サブフレームの開始タイミング、サブフレームの開始タイミング及び終了タイミングの中間のタイミング、又は、サブフレームの終了タイミングである、請求項5に記載のユーザ装置。
  7.  キャリアアグリゲーションをサポートする通信システムにおいて、ユーザ装置と通信を行う基地局であって、
     前記ユーザ装置から、当該基地局から送信される第一の無線信号の受信タイミングと、当該基地局とは異なる他の基地局から送信される第二の無線信号の受信タイミングとの間のタイミングのずれを示す情報を受信する受信手段と、
     前記タイミングのずれを示す情報に基づいて、前記ユーザ装置を制御する制御手段と、
     を有する基地局。
  8.  前記制御手段は、前記タイミングのずれを示す情報に基づいて、前記ユーザ装置に対する無線リソースのスケジューリング、又は、前記ユーザ装置に間欠受信タイミングを指示する、請求項7に記載の基地局。
PCT/JP2015/086069 2015-04-03 2015-12-24 ユーザ装置及び基地局 WO2016157657A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CA2971087A CA2971087C (en) 2015-04-03 2015-12-24 User apparatus and base station
EP15887799.3A EP3280197B1 (en) 2015-04-03 2015-12-24 User device and base station
JP2017509179A JP6785220B2 (ja) 2015-04-03 2015-12-24 ユーザ装置及び基地局
US15/557,493 US10833784B2 (en) 2015-04-03 2015-12-24 User apparatus and base station
CN201580078419.1A CN107431989B (zh) 2015-04-03 2015-12-24 用户装置以及基站

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015-077225 2015-04-03
JP2015077225 2015-04-03

Publications (1)

Publication Number Publication Date
WO2016157657A1 true WO2016157657A1 (ja) 2016-10-06

Family

ID=57004117

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/086069 WO2016157657A1 (ja) 2015-04-03 2015-12-24 ユーザ装置及び基地局

Country Status (6)

Country Link
US (1) US10833784B2 (ja)
EP (1) EP3280197B1 (ja)
JP (1) JP6785220B2 (ja)
CN (1) CN107431989B (ja)
CA (1) CA2971087C (ja)
WO (1) WO2016157657A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI691194B (zh) * 2018-02-12 2020-04-11 聯發科技股份有限公司 上行鏈路傳送方法及使用者設備

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10681576B2 (en) * 2015-04-13 2020-06-09 Qualcomm Incorporated Measurement gap enhancements
US10512046B2 (en) * 2016-06-09 2019-12-17 Samsung Electronics Co., Ltd. Method and apparatus for measurement reference signal and synchronization
US11304164B2 (en) * 2016-11-18 2022-04-12 Qualcomm Incorporated Asynchronous CA handling
WO2018145083A1 (en) * 2017-02-06 2018-08-09 Intel IP Corporation Determining timing differences between primary and secondary component carriers having variable transmission time intervals
WO2018213396A1 (en) * 2017-05-16 2018-11-22 Intel IP Corporation Per ue network controlled small gap (ncsg) signalling
US10951497B2 (en) * 2018-09-10 2021-03-16 Verizon Patent And Licensing Inc. System and method for a service-based interface architecture
US11246107B2 (en) * 2018-11-02 2022-02-08 Qualcomm Incorporated Throughput modification for time delayed carriers
WO2020161907A1 (ja) * 2019-02-08 2020-08-13 株式会社Nttドコモ ユーザ装置
JP7386223B2 (ja) * 2019-02-21 2023-11-24 株式会社Nttドコモ 端末、基地局装置、通信方法、及び無線通信システム
EP3735049A1 (en) * 2019-04-30 2020-11-04 Comcast Cable Communications LLC Wireless communications for network access configuration

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013137806A1 (en) * 2012-03-15 2013-09-19 Telefonaktiebolaget L M Ericsson (Publ) Verification in a wireless communication system
WO2015008749A1 (ja) * 2013-07-19 2015-01-22 株式会社Nttドコモ ユーザ装置、基地局、発見信号受信方法、及び発見信号送信方法

Family Cites Families (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9819482D0 (en) * 1998-09-07 1998-10-28 Nokia Telecommunications Oy Communication system
JP4286629B2 (ja) * 2003-10-17 2009-07-01 富士通コンポーネント株式会社 ポインティングデバイス及び受信ユニット
CN1947407A (zh) * 2004-04-09 2007-04-11 日本电气株式会社 音频通信方法和装置
JP2006246440A (ja) * 2005-02-03 2006-09-14 Toshiba Corp 無線通信端末及びハンドオーバ制御方法
JP4812479B2 (ja) * 2006-03-20 2011-11-09 株式会社エヌ・ティ・ティ・ドコモ 移動局及び周辺セル測定方法
US20080189970A1 (en) * 2007-01-08 2008-08-14 Interdigital Technology Corporation Measurement gap pattern scheduling to support mobility
JP4730979B2 (ja) * 2008-03-19 2011-07-20 シャープ株式会社 移動通信システム、基地局装置、移動局装置及び移動通信方法
US8391244B2 (en) * 2008-08-14 2013-03-05 Intel Mobile Communications GmbH Radio communication terminal devices, radio communication network system, method for operating a radio communication terminal device
US8639239B2 (en) * 2008-09-22 2014-01-28 Sharp Kabushiki Kaisha Base station apparatus, mobile station apparatus, mobile communication system and communication method having selectable inter-frequency measurement methods
US8554075B2 (en) * 2009-01-13 2013-10-08 Hitachi, Ltd. Communication system, subscriber accommodating apparatus and communication method
JPWO2010109764A1 (ja) * 2009-03-27 2012-09-27 パナソニック株式会社 基地局および無線通信システム
US9002354B2 (en) * 2009-06-12 2015-04-07 Google Technology Holdings, LLC Interference control, SINR optimization and signaling enhancements to improve the performance of OTDOA measurements
JP5048746B2 (ja) * 2009-12-09 2012-10-17 シャープ株式会社 通信システム、移動局装置、無線リンク状態管理方法及び集積回路
WO2011124010A1 (zh) * 2010-04-06 2011-10-13 上海贝尔股份有限公司 载波聚合的无线网络中用于定时提前的方法和装置
US9125072B2 (en) * 2010-04-13 2015-09-01 Qualcomm Incorporated Heterogeneous network (HetNet) user equipment (UE) radio resource management (RRM) measurements
US8744367B2 (en) * 2010-08-31 2014-06-03 At&T Intellectual Property I, L.P. Tail optimization protocol for cellular radio resource allocation
US9402255B2 (en) * 2010-09-30 2016-07-26 Panasonic Intellectual Property Corporation Of America Timing advance configuration for multiple uplink component carriers
EP2684402B1 (en) 2011-03-08 2020-02-05 Panasonic Intellectual Property Corporation of America Propagation delay difference reporting for multiple component carriers
JP5644672B2 (ja) * 2011-05-24 2014-12-24 富士通株式会社 移動局装置及び同期タイミング決定方法
JP5778507B2 (ja) 2011-07-11 2015-09-16 株式会社日立国際電気 受信機、列車無線システム及び復調方法
EP2768170B1 (en) * 2011-07-14 2018-09-05 LG Electronics Inc. Methods and apparatus for allocating transmission timings to multilpe timing advance groups in a wireless communication system for supporting carrier aggregation
CN102340797B (zh) * 2011-09-30 2014-07-09 电信科学技术研究院 一种辅小区上定时时间差的测量方法和设备
CN103037516B (zh) * 2011-09-30 2018-04-03 中兴通讯股份有限公司 一种对服务小区进行分组的方法、用户设备及基站
US9848411B2 (en) * 2011-11-17 2017-12-19 Lg Electronics Inc. Method for transmitting uplink control channel by terminal in wireless communication system
EP2938123A4 (en) 2012-12-21 2016-08-10 Kyocera Corp MOBILE COMMUNICATION SYSTEM, COMMUNICATION CONTROL METHOD, BASE STATION, USER TERMINAL, AND PROCESSOR
US9392512B2 (en) * 2013-07-11 2016-07-12 Apple Inc. Multiple cell measurement and data reception in a wireless communication device
CN111614453B (zh) * 2013-07-30 2023-07-25 北京三星通信技术研究有限公司 配置上行传输定时的方法和设备
US9854506B2 (en) * 2013-08-08 2017-12-26 Qualcomm Incorporated Timing synchronization for device-to-device discovery for asynchronous LTE deployments
US20150189574A1 (en) * 2013-12-26 2015-07-02 Samsung Electronics Co., Ltd. Methods for dormant cell signaling for advanced cellular network
US20150201338A1 (en) * 2014-01-13 2015-07-16 Qualcomm Incorporated Configuring measurement gap groups for wireless systems
US9900844B2 (en) * 2014-01-13 2018-02-20 Samsung Electronics Co., Ltd. Uplink transmissions for dual connectivity
US9635621B2 (en) * 2014-01-17 2017-04-25 Samsung Electronics Co., Ltd. Adaptations of dual connectivity operation to UE capability
EP2911462B1 (en) * 2014-01-31 2020-04-15 Avago Technologies International Sales Pte. Limited Time offset acquisition for dual connectivity

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013137806A1 (en) * 2012-03-15 2013-09-19 Telefonaktiebolaget L M Ericsson (Publ) Verification in a wireless communication system
WO2015008749A1 (ja) * 2013-07-19 2015-01-22 株式会社Nttドコモ ユーザ装置、基地局、発見信号受信方法、及び発見信号送信方法

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
HUAWEI ET AL.: "Discussion on testing methodology for DC", 3GPP TSG-RAN WG4#74 R4-150271, 13 February 2015 (2015-02-13), XP050937761, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/tsg_ran/WG4_Radio/TSGR4_74/Docs/R4-150271.zip> *
INTEL CORPORATION: "Discussion on SFN timing difference in Dual connectivity", 3GPP TSG-RAN WG4#71 R4-143028, 23 May 2014 (2014-05-23), XP050797797, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/tsg_ran/WG4_Radio/TSGR471/Docs/R4-143028.zip> *
NTT DOCOMO: "RRM requirements for Dual Connectivity", 3GPP TSG-RAN WG4#71 R4-143336, 23 May 2014 (2014-05-23), XP050798063, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/tsgran/WG4_Radio/TSGR4_71/Docs/R4-143336.zip> *
SAMSUNG: "Measurement gap handling in SeNB in asynchronuous", 3GPP TSG-RAN WG2#87 R2-143080, 22 August 2014 (2014-08-22), XP050794207, Retrieved from the Internet <URL:http://www.3gpp.org/ftp/tsgran/WG2_RL2/TSGR287/Docs/R2-143080.zip> *
See also references of EP3280197A4 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI691194B (zh) * 2018-02-12 2020-04-11 聯發科技股份有限公司 上行鏈路傳送方法及使用者設備

Also Published As

Publication number Publication date
CN107431989B (zh) 2021-02-09
US10833784B2 (en) 2020-11-10
JP6785220B2 (ja) 2020-11-18
EP3280197A4 (en) 2018-04-18
EP3280197A1 (en) 2018-02-07
JPWO2016157657A1 (ja) 2017-10-05
CN107431989A (zh) 2017-12-01
CA2971087A1 (en) 2016-10-06
CA2971087C (en) 2021-03-23
EP3280197B1 (en) 2022-01-19
US20180062776A1 (en) 2018-03-01

Similar Documents

Publication Publication Date Title
WO2016157657A1 (ja) ユーザ装置及び基地局
US10383110B2 (en) Timing advance group in LTE small cell enhancement
US11622360B2 (en) Terminal and communication method to provide communication services
WO2016133123A1 (ja) ユーザ装置、及び上り送信切り替え方法
CN113455049B (zh) 主小区改变
CN106664586B (zh) 用户装置、基站以及时间差信息通知方法
JP6651465B2 (ja) ユーザ装置、及びセル測定方法
US10536954B2 (en) User apparatus, base station, and gap configuration method
WO2017077898A1 (ja) ユーザ装置、基地局、測定条件通知方法及び測定方法
US20160269982A1 (en) RRC Diversity
WO2015044769A2 (en) Method and apparatus for scheduling user equipment
JP6301082B2 (ja) 通信装置並びにその制御方法、基地局装置並びにその制御方法、及びプログラム
JP2017092827A (ja) ユーザ装置、基地局、通知方法及び設定方法
WO2016133126A1 (ja) 端末、及び通信制御方法
US10880866B2 (en) User apparatus and cell control method
JP2019062542A (ja) ユーザ端末、通信方法及び通信システム
WO2024099719A1 (en) Layer 1 or 2 mobility in wireless communication systems
JP2015149683A (ja) ユーザ装置、基地局及び通信方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15887799

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017509179

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2971087

Country of ref document: CA

REEP Request for entry into the european phase

Ref document number: 2015887799

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 15557493

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE