WO2011027985A2 - 피시빔 교량용 작업로 구축장치 - Google Patents

피시빔 교량용 작업로 구축장치 Download PDF

Info

Publication number
WO2011027985A2
WO2011027985A2 PCT/KR2010/005622 KR2010005622W WO2011027985A2 WO 2011027985 A2 WO2011027985 A2 WO 2011027985A2 KR 2010005622 W KR2010005622 W KR 2010005622W WO 2011027985 A2 WO2011027985 A2 WO 2011027985A2
Authority
WO
WIPO (PCT)
Prior art keywords
fixed
movable
fish
bar
fish beam
Prior art date
Application number
PCT/KR2010/005622
Other languages
English (en)
French (fr)
Other versions
WO2011027985A3 (ko
Inventor
김진곤
Original Assignee
주식회사 엠앤디
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1020090082659A external-priority patent/KR101112172B1/ko
Priority claimed from KR1020100024756A external-priority patent/KR101143422B1/ko
Application filed by 주식회사 엠앤디 filed Critical 주식회사 엠앤디
Publication of WO2011027985A2 publication Critical patent/WO2011027985A2/ko
Publication of WO2011027985A3 publication Critical patent/WO2011027985A3/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/106Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons

Definitions

  • the present invention relates to a device for building a fish beam bridge, and more particularly, to build a bridge using a fish beam to build a work to easily perform work for formwork installation, safety net installation or concrete placement as well as construction of course.
  • the present invention relates to the provision of a construction device with an improved operation to simultaneously perform a safety fence function that prevents damage to a pedestrian or a vehicle passing by a work tool or remnants falling to the ground during work.
  • a work path is constructed below the fish beam to perform formwork, concrete placing, safety net installation, or other incidental work.
  • the construction apparatus required for constructing the structure using the fish beam is a situation in which various types have been developed and used in the prior art, and the applicant of the present application also has several kinds of applications, among which the recently applied utility model application filed 2009-6205 Looking at the description of the call through Figure 15 as follows.
  • the construction apparatus 1 for a fish beam bridge to which the prior art is applied has an inclined bar 4 having the same inclination to be in contact with the inclined surface 3 of the fish beam 2, and the The longitudinal bar 6 is fixed to be in contact with the vertical plane 5 of the fish beam 2 at an intermediate position.
  • the outer end of the inclined bar (4) further secures the safety and safety by further connecting the auxiliary bar (9) to connect the pipe (8) holding the plywood (7) forming the working path with the longitudinal bar (6) It is to have a truss structure to be able to, and to have a clamp (10) connecting the pipe (8) at the lower end of the longitudinal bar (6) and the auxiliary bar (9).
  • the horizontal bar 12 is coupled to the middle of the longitudinal bar 6 so as to be in contact with the bottom surface 11 of the fish beam 2, and protrudes upward of the inclined bar 4 on the outside of the horizontal bar 12 It comprises a control bar 13 for adjusting the height and height relative to the inclined bar (4).
  • the construction apparatus for fish beam bridges to which the prior art as described above is applied is installed with the construction apparatus at equal intervals in the fish beam, and then the pipes are connected again using clamps, and the plywood is laid on the connected pipes. To build.
  • the pipe is connected to the longitudinal bar connected to the inclined bar and the auxiliary bar, the pipe is connected to the pipe for maintaining the plywood, and then the plywood is disposed so that the worker can walk on the pipe. Not only is the clamping work for the connection difficult, but it also poses significant challenges in handling long lengths of pipe.
  • the construction device When installing the construction device as a work for the fish beam bridge, the construction device is connected to each other. Therefore, when there are no obstacles in the fish beam, there is no big problem in the installation.However, due to the characteristic of the fish beam, In order to prevent the flow and twisting of the fish beam by connecting to each other to install a cross beam.
  • the crossbeam Since the installation of the formwork and the concrete casting are required at the position where the crossbeam is to be installed, the crossbeam is located because the construction device is not installed for the work of the fish beam bridge to exclude the interference phenomenon in the crossbeam installation process. Where it is, it is not completely sealed and an opening is formed.
  • the present invention is to solve the above problems as a walk plate provided with a substantially rectangular plate-like member, and a fixed holding member for fixing to be coupled to the fish beam on one side of the walking plate, A movable holding area provided on an opposite position walking board to be coupled to the fish beam while moving according to the distance between the fish beams, and a traction ring provided to provide ease of towing on the upper surface of the walking board; It includes a close plate to be fixed to the front of the plate to be coupled to each other and the walking board of the construction device in the adjacent operation, and provided freely detachable to the walking board to open the walking board without opening in the cross beam installation position of the fish beam It is equipped with a cross beam jumper that can be connected, and it is possible to use the construction device for the work of fish beam bridge regardless of the cross beam. It can be installed in this way, the installation cost can be greatly reduced by the reuse of the device, and it is possible to maintain a stable state after installation, thereby eliminating the risk of safety accidents such as falling of workers or work
  • the present invention is installed by making it easy to finish the installation work by fixing the retainer to the fish beams by integrally consisting of the holder for fixing the construction device to the fish beam and the foothold for the operator to walk as a work for the fish beam bridge Ease of use.
  • the present invention can install the construction device for the work of the fish beam bridge so that the opening does not occur even in the position for installing the cross-beam installed in the middle of the fish beam.
  • the present invention eliminates the possibility of safety accidents that may occur during the installation and dismantling of the working furnace and can actively respond to the distance between the fish beams, and there is no opening when installing in the working furnace, so that the worker falls or the material through the opening Or the invention has a variety of effects, such as to prevent the occurrence of safety accidents falling tools.
  • FIG. 1 is a perspective view showing a construction apparatus for a work beam for a fish beam bridge to which the technique of the present invention is applied.
  • Figure 2 is a cross-sectional view showing the holding fixture of the work path construction device for the fish beam bridge to which the technique of the present invention is applied.
  • Figure 3 is an exploded perspective view showing an excerpt of the operation holding device of the construction apparatus for the fish beam bridge to which the technique of the present invention is applied.
  • Figure 4 is a cross-sectional view showing the excerpt of the operation holding device of the construction apparatus for the fish beam bridge to which the technique of the present invention is applied.
  • Figure 5 a, b is a schematic view of the close contact plate of the construction apparatus for the fish beam bridge to which the technique of the present invention is applied.
  • Figure 6 a, b is a configuration diagram showing the inclined bar of the work-building apparatus for the fish beam bridge to which the technique of the present invention is applied.
  • Figure 7 is a schematic view of the excerpt of the walking board construction device for fishbeam bridges to which the technique of the present invention is applied.
  • Figure 8 is a perspective view of another example showing the movable holding of the construction apparatus for the fish beam bridge to which the technique of the present invention is applied.
  • Figure 10 is a perspective view showing a crossbeam jumper applied to the construction apparatus for the fish beam bridge to which the technique of the present invention is applied.
  • FIG. 11 is a cross-sectional view taken along the line A-A showing a crossbeam jumper applied to a construction apparatus for a fish beam bridge to which the technique of the present invention is applied.
  • FIG. 12 is a cross-sectional view taken along line B-B showing a crossbeam jumper applied to a construction apparatus for a fish beam bridge to which the technique of the present invention is applied.
  • FIG. 13 is a view showing a state in which a crossbeam jumper to which a technique of the present invention is applied is mounted on a construction device for a work for a fishbeam bridge;
  • FIG. 14 is a state diagram of the installation device for the construction of a fish beam bridge applied to the cross beam jumper of the present invention.
  • 15 is an exemplary view showing a work path construction apparatus for a fish beam bridge to which the prior art is applied.
  • FIG. 1 is a perspective view showing the construction apparatus for a fish beam bridge work applied to the technique of the present invention
  • Figure 2 is a cross-sectional view showing a holding holding portion of the construction apparatus for a fish beam bridge applied to the technology of the present invention
  • Figure 3 Is an exploded perspective view showing an excerpt of the operation apparatus for constructing a fish beam bridge to which the technique of the present invention is applied
  • FIG. 4 is an excerpt of the actuation retaining apparatus of the constructing apparatus for a fish beam bridge to which the technique of the present invention is applied.
  • FIG. 5 a, b is a schematic view of the close contact plate of the construction apparatus for the work of the fish beam bridge to which the technique of the present invention is applied
  • Figure 6 a, b is for the fish beam bridge to which the technique of the present invention is applied
  • Fig. 7 is a configuration diagram showing the inclined bar of the work path construction device
  • Fig. 7 is a schematic view of the foot plate of the work path construction device for the fish beam bridge to which the technology of the present invention is applied
  • Fig. 8 is a fish beam to which the technology of the present invention is applied.
  • Fig. 9 will be described as used with a state diagram of the construction unit to work for fish beam bridge is applied to the technique of the present invention.
  • the work path construction device 100 for a fish beam bridge to which the technique of the present invention is applied is made of a plate-shaped member of a substantially rectangular shape so that the worker can walk when the work is completed, as well as the work process or work that is generated during the dismantling process.
  • a walking board 101 is provided to perform a function of preventing an object or the like from falling to the ground.
  • the walking board 101 may be made of various materials such as metal, non-ferrous metal, wood or reinforced plastic, but it is preferable that the walking board 101 may be made of metal or non-ferrous metal to exhibit sufficient durability, and to form perforations on the surface for weight reduction. In order to prevent slipping, various auxiliary means such as the formation of protrusions and protrusions may be taken.
  • the opposite position of the holding fixture 103 (Fig.
  • the right side of 1) includes a movable holding member 104 to adjust while moving in the left and right directions corresponding to the distance between the fish beam 102 and the fish beam 102.
  • the upper surface of the pedestrian plate 101 is provided with a traction ring 105 to increase the traction easily lifted by the machine or manpower to provide ease of installation and disassembly, the front of the pedestrian plate 101 In the position where the fixed and movable holding zones are not fixed, the close plate 106 is fixed so as to be connected to the walking plate 101 of the construction device 100 in an adjacent operation so as to bind to each other.
  • the towing ring 105 is free to move in the up and down direction of the foot plate 101 to prevent the phenomenon caused by interference caused by the loading process while eliminating the concern of safety accidents that fall over the worker walking. When not equipped and used, it would be desirable not to protrude upward of the foot plate 101.
  • the close contact plate 106 is further provided with a separation prevention 107 so as to prevent the phenomenon of being separated by an external pressure, such as vibration after being connected to the adjacent foot plate 101, the departure prevention tool 107 is
  • the engaging protrusion 108 formed downward at the end of the contact plate 106 is coupled to the engaging hole 108-1 formed in the adjacent walking board 101, or the contact plate 106 and the adjacent walking board ( After forming the interruption hole 109 in the 101, it is good to prevent the easy separation by combining with the interruption means (109-1) such as bolts or pins.
  • the fixing retaining hole 103 protrudes upwardly from the left rear end of the walking board 101 to the fixing retaining bar 110 which is fixed by welding or bolts, rivets, and the like at the top of the fixing retaining bar 110. Protruding obliquely in the direction of the beam 102 is fixed to the inclined bar 112 is connected to the inclined surface 111 of the fish beam 102 is configured.
  • the inclined bar 112 may be used in a state in which the fixed holding bar 110 is firmly fixed by welding, but may be variable and fixed so as to actively respond to the inclined surface 111 that varies depending on the size of the Phoebe core 102. It may be configured in a form that can be.
  • a plurality of adjusting holes 113 are formed at the upper end of the fixed holding bar 110 so as to be fixed in correspondence with the inclined surface 111, and the inclined bar 112 is engaged with the adjusting holes 113 to bolt nuts. It is configured to form a fastening hole 115 for fixing with the intermittent means 114, such as.
  • the fastening hole 115 may fix the entire inclined bar 112 to be in contact with the inclined surface 111, or as another example, the end of the inclined bar 112 may be connected to the inclined surface 111 so that the inclined bar 112 is connected to the inclined bar 111. It may be formed so as to form a right angle with respect to the inclined surface (111).
  • the movable holding hole 104 is interposed between the fish beams 102 by clamping the movable supporter 118 with the bolts 117 to the adjusting holes 116 formed at equal intervals on the right side of the foot plate 101. While moving so as to adjust the fixing retaining 103 and the width.
  • the movable supporter 118 is fixed to the rear end surface of the walking board 101 in the drawing of the present invention, the movable supporter 118 is a L-shaped or an L-shaped rough type. It may be configured in a form that is fixed across both the vertical plane and the horizontal plane of the walking board 101.
  • the fixing supporter 120 is fixed to the movable supporter 118, the inner direction is closed and the outer direction is open, the fixing tube 120 is coupled to the movable tube 121, the outer end of the movable tube 121
  • the movable holding bar 122 having the inclined bar 112 is fixed to protrude upward.
  • the fixing tube 120 and the movable tube 121 are provided with the adjusting means 125 to adjust the width 125 of the fish beam 102.
  • the adjusting means 125 forms a plurality of adjusting holes 126 in the movable tube 121, and the adjusting holes 126 adjust the slots 127 formed in both directions of the fixed tube 120 in the longitudinal direction.
  • the control pin 128 is finely adjusted in the direction of the fish beam 102 by the intermittent nut 129 screwed to the outer surface of the fixed tube 120, regret in the adjusted state To prevent it.
  • the rear end of the movable tube 121 is always pushed in the direction of the fish beam 102 so that the movable retaining bar 122 can maintain a close contact with the fish beam 102 in a pressure spring 130. ) May be embedded.
  • the fixed tube 120 is connected between the movable supporter 118, which is maintained at a constant interval on the right rear side of the walking board 101, and the fixed tube 120 ) May be configured to couple the movable tube 121 to which the movable holding bar 122 is fixed, and the movable tube 121 may be interrupted by fixing means such as bolts.
  • the reinforcing means 135 is further provided in the walking plate 101 on which the fixed holding member 103 and the movable holding member 104 are installed, so as to compensate for weakness due to repeated fastening or concentration of load.
  • the reinforcement means 135 is fixed to the inner surface of the foot plate 101 by the welding or fixing means 137 in the longitudinal direction of the reinforcement bar 136 consisting of a c-shaped channel, L-shaped or I-type angle, etc. It can be maintained that the hole and the like formed for fastening to penetrate the reinforcing bar 136 as well as the foot plate 101.
  • the reinforcing bar 136 may be across the length and breadth of the walking board 101, but it may be preferable to intervene in a heavily loaded area and omit other parts so as not to cause a reduction in weight.
  • the fixed holding member 103 and the movable holding member 104 fixed to the walking board 101 may be fixed in a rigid state, but may be provided on the walking board 101 so as to provide convenience of loading and transporting. It may be configured detachably.
  • the movable holding member After lifting up between the fish beams 102 by using the traction ring 105 provided on the upper surface of the foot plate 101 having the fixed holding member 103 and the movable holding member 104, the movable holding member The foot plate 101 on which the sphere 104 is located is inclined downward to be inserted into the space between the fish beam 102 and the fish beam 102.
  • the inclined bar 112 constituting the fixed and movable holding holes 103 and 104 is in contact with the inclined surface 111 of the fish beam 102 and is fixed and held.
  • the bar 110 and the movable holding bar 122 are in close contact with the vertical surface of the fish beam 102.
  • the movable supporter 118 holding the fixed tube 120 is moved to the left and right sides of the pedestrian plate 101 to adjust, and the distance to the fish beam 102 is narrow. There is a fine adjustment using the control means 125 provided in the fixed tube 120 and the movable tube 121.
  • control pin 128 passes through the slot 127 of the fixed tube 120 and the adjusting hole 126 of the movable tube 121, and then the intermittent nut 129 that has been retracted in the direction of the control pin 128. Move forward and push it.
  • control pin 128 moves in the direction of the fish beam 102 by the force pushed by the intermittent nut 129, and the inclined bar 112 provided in the movable holding bar 122 is an inclined surface of the fish beam 102. 111, the control is completed by stopping the movement of the intermittent nut 129.
  • the fixing holding member 103 is naturally connected to the fish beam 102 on the opposite side and is tightened in a firm state.
  • the work path may be constructed in such a way that the work equipment for the other fish beam bridge construction devices 100 is installed in the same way.
  • the foot plate 101 that the close contact plate 106 fixed to the walking board 101 constitutes the adjacent construction work beam construction device 100 for the fish beam bridge (101)
  • the adjacent construction work beam construction device 100 for the fish beam bridge (101) By being caught on the upper surface of the fish-beam bridge work for each construction device 100 can take a form connected to each other to maintain a stable state.
  • the fixed holding bar 103 is configured to clamp the holding bar 110 and the movable holding bar 122 constituting the movable holding block 104 by clamping and using a pipe once more. If you give it a more solid state can be easily prevented such as shaking due to external pressure.
  • FIG. 10 is a perspective view showing a crossbeam jumper applied to a work beam construction apparatus for a fish beam bridge to which the technique of the present invention is applied
  • FIG. 11 is a crossbeam applied to a work beam construction apparatus for a fish beam bridge to which the technique of the present invention is applied.
  • A-A cross-sectional view showing a jumper
  • Figure 12 is a cross-sectional view B-B line showing a crossbeam jumper applied to the construction device for a fish beam bridge to which the technique of the present invention is applied
  • Figure 13 is a technique of the present invention
  • Fig. 14 is a diagram showing the state in which the applied crossbeam jumper is mounted on the construction device for the work of the fish beam bridge, and Fig. 14 is described together with the installation state diagram of the work arrangement for the fish beam bridge to which the crossbeam jumper of the present invention is applied. .
  • a cross beam jumper which can be detachably provided on the foot plate 101 and can connect the foot plate 101 without openings at the cross beam installation position CA without fixing and movable holding holes 103 and 104. It is characterized by further comprising (140).
  • the cross beam jumper 140 may be fastened to a plurality of adjustment holes 116 formed to fasten the fixed and movable holding holes 103 and 104 to the front or rear of the foot plate 101 by the fastening means 142.
  • the plate-shaped jumper base 145 which provided the fastening hole 143 in the lower part is provided.
  • the upper end of the jumper base 145 is integrally formed with a horizontal plate 146 maintained at a predetermined width, and the reinforcing plate 147 protruding downward is formed at the end of the horizontal plate 146.
  • the horizontal and reinforcing plates 146 and 147 may be implemented in various forms such as bent from the jumper base 145 or integrally formed during extrusion, and the reinforcing plate 147 may be formed at the end of the horizontal plate 146. If the treatment is smooth it may not be formed.
  • the horizontal plate 146 is connected to the walking plate 101 installed at both sides of the cross beam installation position CA and the connecting bar 148 such as the scaffolding pipe to connect the walking plate 101 of the cross beam installation position CA. It has a conventional clamp 149 that can be held.
  • the clamp 149 can be moved by the intermittent means 151 such as a bolt nut through the clamp hole 150 formed in the long plate shape in the horizontal plate 146 to the cross beam installation position CA (149). ) So that it is not positioned.
  • the intermittent means 151 such as a bolt nut
  • the end of the footrest 101 on which the movable retention zone 104 is located moves to the lower end of the fish beam 102 so as to gradually keep the foothold 101 on which the movable retention zone 104 is positioned in a horizontal state.
  • the fixed retention zone 103 is naturally connected to the fish beam 102, and at the same time, the movable retention zone 104 is also connected to the fish beam 102.
  • the movable retention zone 104 is moved to compensate for the gap between the fishbeam 102 and the fishbeam 102 and the gap generated between the fixed and movable retention zones 103 and 104. Installation of the building device 100 is completed, and it is possible to build a work path by continuously connecting to the front or rear of the walking board 101 based on this.
  • the opening 101 is not installed by using the crossbeam jumper 140 at the crossbeam installation location CA. Do not
  • the conventional clamp 149 is fastened to the fixed and movable holding bars (125, 126) constituting the fixed and movable holding spheres (103, 104) provided on the left and the right of the pre-installed work-building device (100),
  • the connection bar 148 is fixed to the clamp 149 to protrude to the cross beam installation position CA.
  • the connecting bar 148 protruded as described above is connected to the walking plate 101 fixed to the cross beam jumper 140 in sequence to cover the cross beam connection position (CA) so that no opening is generated, and the cross beam installation position After the connection of the walking board 101 to the CA is completed, the work path may be constructed by connecting the walking boards 101 having the fixed and movable holding regions 103 and 104.
  • clamp hole 150 formed in the horizontal plate 116 is formed in the form of a long hole, the clamp 149 is moved to match the position and then fixed.
  • connection beam 148 is firmly fastened by using the clamp 149 provided on the horizontal plate 146 to fix the walking board 101 and the fish beams 102 using the movable holding holes 103 and 104. It is possible to maintain a solid connection state with the adjacent walking board 101 without maintaining in, and to be able to build a working path without an opening in the cross beam installation position CA.
  • the foot plate 101 is again held throughout the fish beam 102 by using a fixed and movable holding spheres (103, 104) to maintain a solid state in the fish beam (102) It is possible to construct a safe work path without openings.
  • the present invention can secure the safety by eliminating the opening opening in the cross beam position while having a fixed and movable holding or a cross beam jumper on the foot plate to facilitate the installation of the work path to the structure constructed by the cross beam can do.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 용이하게 설치할 수 있고, 재사용으로 장기적으로 보았을 때 설치비용을 대폭 절감할 수 있으며 설치 후 안정된 상태를 유지하여 안전사고의 우려를 배제할 수 있는 피시빔 교량용 작업로 구축장치에 관한 것으로서, 개략 직사각형상의 판상부재로 구비하는 도보판과, 상기 도보판의 일측에 피시빔과 결합할 수 있도록 고정하는 고정유지구와, 상기 고정유지구의 대향 위치 도보판에 구비하여 피시빔 사이의 간격에 맞게 움직이면서 피시빔과 결합할 할 수 있도록 하는 가동유지구와, 상기 도보판의 상면에 견인의 용이성을 제공할 수 있도록 구비하는 견인고리와, 상기 도보판의 전방에 고정하여 인접한 작업로 구축장치의 도보판과 서로 결속될 수 있도록 하는 밀착판을 포함하는 구성이다.

Description

피시빔 교량용 작업로 구축장치
본 발명은 피시빔 교량용 작업로 구축장치에 관한 것으로서 더욱 상세하게는 피시빔을 이용하여 교량을 구축할 때 거푸집설치, 안전망설치 또는 콘크리트 타설 을 위한 작업을 용이하게 수행하기 위한 작업로 구축은 물론, 작업중 작업공구 또는 잔재물이 지상으로 낙하하여 통행하는 보행자 또는 차량에 손상을 주는 것을 방지하는 안전펜스 기능을 동시에 수행할 수 있도록 개선한 작업로 구축장치의 제공에 관한 것이다.
피시빔을 이용하여 교량과 같은 구조물을 구축할 때 피시빔의 하방에는 거푸집 설치, 콘크리트 타설, 안전망 설치 또는 기타 부수적인 작업을 수행하기 위하여 작업로를 구축하게 된다.
상기와 같이 피시빔을 이용한 구조물 구축시 필요한 작업로 구축장치는 종래에도 여러 종류가 개발되어 사용되고 있는 실정이며, 본원 출원인 또한 여러 종류의 선출원이 있으며, 그 중 최근에 출원한 실용신안출원 2009 - 6205 호의 기술내용을 도 15를 통하여 살펴보면 다음과 같다.
종래 기술이 적용되는 피시빔 교량용 작업로 구축장치(1)는 피시빔(2)의 경사면(3)과 연접되도록 동일한 경사를 가지는 경사바(4)를 구비하고, 상기 경사바(4)의 중간위치에 피시빔(2)의 수직면(5)과 연접되도록 종바(6)를 고정한다.
상기 경사바(4)의 외측단에는 종바(6)와 함께 작업로를 형성하는 합판(7)을 유지하는 파이프(8)를 연결할 수 있도록 보조바(9)를 더 연결하여 견고하면서도 안전성을 확보할 수 있도록 트러스구조를 가지도록 하고, 상기 종바(6)와 보조바(9)의 하단에는 파이프(8)를 연결하는 클램프(10)를 가지도록 한다.
상기 종바(6)의 중도에는 피시빔(2)의 하단면(11)과 연접되도록 수평바(12)를 결합하고, 상기 수평바(12)의 외측에는 경사바(4)의 상방으로 돌출되어 경사바(4)에 대하여 높,낮이 조절되는 조절바(13)를 구비하여 구성하고 있다.
상기와 같은 종래 기술이 적용되는 피시빔 교량용 작업로 구축장치는 피시빔에 구축장치를 등 간격을 유지하여 설치한 후 다시 클램프를 이용하여 파이프를 연결하고, 연결된 파이프 위에 합판을 깔아서 작업로를 구축하게 된다.
이러한 이유에 의하여 피시빔 교량용 작업로 구축장치를 구성하는 구성품이 모두 분리된 상태에 있으므로 전체 작업로를 구축하기 위한 시간이 많이 소요되는 것은 물론, 그에 따르는 작업인력을 많이 확충하여야 하는 번거로움과 더불어 시공비용이 과다하게 소요되는 원인이 된다.
즉, 경사바에 연결되는 종바와 보조바에 구비되는 클램프에 파이프를 연결하고, 상기 파이프에 다시 합판을 유지하기 위한 파이프를 연결한 후 그 위에 작업자가 걸을 수 있도록 합판을 배설하는 형태를 취하기 때문에 파이프의 연결을 위한 클램핑 작업이 쉽지 않은 것은 물론, 긴 길이의 파이프를 취급하는 데에도 상당한 어려움이 따르는 문제가 발생한다.
또한 파이프를 설치하면서 합판을 배설하여 나가는 형태이기 때문에 합판이 불안전한 상태에 있어 피시빔 교량용 작업로 구축장치를 설치하는 과정에서 부품의 불안전한 고정상태 또는 강풍, 진동 등과 같은 외압으로 인한 유동 등에 의하여 자재 또는 작업자가 낙하하게 되는 안전사고의 우려가 높은 실정이다.
상기와 같이 작업로를 구축하여 구축물 구조 또는 설치에 필요한 작업을 수행한 후 해체하는 데에도 상당한 시간을 필요로 하는 것은 물론, 금속재질로 이루어진 다른 부품의 경우에는 재사용이 가능하게 되나, 실질적으로 작업자가 보행하는 데 사용된 합판의 경우에는 높은 곳에서 낙하시키는 과정 등에서 쉽게 파손되어 1회용에 그치는 단점이 있다.
피시빔 교량용 작업로 구축장치를 설치할 때에는 구축장치를 서로 연결하는 형태로 이루어지기 때문에 피시빔에 장애물이 없을 경우에는 설치에 큰 문제가 없으나, 피시빔의 특성상 소정의 길이 중도에는 인접한 피시빔과 서로 연결하여 피시빔의 유동과 비틀림 등을 방지하기 위하여 크로스빔을 설치하게 된다.
상기 크로스빔을 설치하고자 하는 위치에는 거푸집의 설치와 콘크리트타설 등을 필요로 하기 때문에 크로스빔 설치작업 과정에서 간섭현상을 배제하기 위하여 피시빔 교량용 작업로 구축장치를 설치하지 못하게 되므로 크로스빔이 위치하는 곳에는 완전하게 밀폐되지 못하고 개구부가 형성된다.
이와 같이 개구부가 있을 경우에는 작업로를 구축하는 과정 또는 작업과정에서 작업자의 실족에 따르는 신체적인 손상은 물론 심할 경우에는 추락과 같은 안전사고의 우려가 높고, 작업과정에 사용되는 각종 자재와 도구 등이 지상으로 낙하하게 된다.
상기와 같이 개구부를 통하여 자재 또는 도구 등이 지상으로 낙하할 경우에는 지상으로 통행하는 보행자는 물론 차량을 손상시키는 등과 같은 2차적인 위험을 유발하는 원인이 되는 등 여러 문제점이 발생하고 있는 실정이다.
이에 본 발명에서는 상기와 같은 문제점들을 해결하기 위하여 발명한 것으로서 개략 직사각형상의 판상부재로 구비하는 도보판과, 상기 도보판의 일측에 피시빔과 결합할 수 있도록 고정하는 고정유지구와, 상기 고정유지구의 대향 위치 도보판에 구비하여 피시빔 사이의 간격에 맞게 움직이면서 피시빔과 결합할 할 수 있도록 하는 가동유지구와, 상기 도보판의 상면에 견인의 용이성을 제공할 수 있도록 구비하는 견인고리와, 상기 도보판의 전방에 고정하여 인접한 작업로 구축장치의 도보판과 서로 결속될 수 있도록 하는 밀착판을 포함하고, 상기 도보판에 착탈 자유롭게 구비하여 피시빔의 크로스빔 설치위치에 개구부 없는 상태로 도보판을 연결할 수 있는 크로스빔점퍼를 더 구비하여, 크로스빔에 관계없이 피시빔 교량용 작업로 구축장치를 용이하게 설치할 수 있고, 장치의 재사용으로 설치비용을 대폭 절감할 수 있으며 설치 후 안정된 상태를 유지하여 작업자 또는 작업도구 및 자재의 낙하와 같은 안전사고의 우려를 배제할 수 있는 등의 특징을 가진다.
본 발명은 피시빔 교량용 작업로 구축장치를 피시빔에 고정시키는 유지구와 작업자가 보행할 수 있도록 하는 발판을 일체로 구성하여 유지구를 피시빔에 고정시킴으로서 쉽게 설치작업을 종료할 수 있도록 함으로서 설치의 용이성을 제공할 수 있다.
또한 본 발명은 피시빔의 중도에 설치되는 크로스빔을 설치하기 위한 위치에도 개구부가 발생하지 않도록 피시빔 교량용 작업로 구축장치를 설치할 수 있다.
이러한 본 발명은 작업로의 설치와 해체 과정에서 발생할 수 있는 안전사고의 우려를 배제하고 피시빔의 간격에 적극적으로 대응할 수 있고, 작업로에 설치시 개구부가 없도록 함으로서 개구부를 통하여 작업자가 추락하거나 자재 또는 도구 등이 낙하하는 안전사고의 유발을 방지할 수 있는 등 다양한 효과를 가지는 발명이다.
도 1은 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치를 도시한 사시도.
도 2는 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치의 고정유지구를 도시한 단면도.
도 3은 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치의 가동유지구를 발췌하여 도시한 분해 사시도.
도 4는 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치의 가동유지구를 발췌하여 도시한 단면도.
도 5 a,b는 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치의 밀착판을 발췌한 구성도.
도 6 a,b는 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치의 경사바를 도시한 구성도.
도 7은 본 발명의 기술이 적용되는 피시빔 교량용 작업로 구축장치의 도보판을 발췌한 구성도.
도 8은 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치의 가동유지구를 도시한 다른 예의 사시도.
도 9는 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치의 사용상태도.
도 10은 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치에 적용되는 크로스빔점퍼를 도시한 사시도.
도 11은 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치에 적용되는 크로스빔점퍼를 도시한 A - A선 단면도.
도 12는 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치에 적용되는 크로스빔점퍼를 도시한 B - B선 단면도.
도 13은 본 발명의 기술이 적용된 크로스빔점퍼를 피시빔 교량용 작업로 구축장치에 장착한 상태를 도시한 구성도.
도 14는 본 발명의 기술인 크로스빔점퍼가 적용된 피시빔 교량용 작업로 구축장치의 설치상태도.
도 15는 종래 기술이 적용된 피시빔 교량용 작업로 구축장치를 도시한 예시도.
이하 첨부되는 도면과 관련하여 상기 목적을 달성하기 위한 본 발명의 바람직한 구성과 작용에 대하여 설명하면 다음과 같다.
도 1은 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치를 도시한 사시도, 도 2는 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치의 고정유지구를 도시한 단면도, 도 3은 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치의 가동유지구를 발췌하여 도시한 분해 사시도, 도 4는 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치의 가동유지구를 발췌하여 도시한 단면도, 도 5 a,b는 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치의 밀착판을 발췌한 구성도, 도 6 a,b는 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치의 경사바를 도시한 구성도, 도 7은 본 발명의 기술이 적용되는 피시빔 교량용 작업로 구축장치의 도보판을 발췌한 구성도, 도 8은 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치의 가동유지구를 도시한 다른 예의 사시도, 도 9는 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치의 사용상태도로서 함께 설명한다.
본 발명의 기술이 적용되는 피시빔 교량용 작업로 구축장치(100)는 개략 직사각형상의 판상부재로 이루어져 작업로 구축완료시 작업자가 보행할 수 있도록 하는 것은 물론 작업과정 또는 작업 후 해체과정에서 발생하는 물건 등이 지상으로 낙하하는 것을 방지하는 기능을 수행하는 도보판(101)을 구비한다.
상기 도보판(101)은 금속, 비철금속, 목재 또는 강화플라스틱 등 다양한 재질로 구성할 수 있으나, 금속 또는 비철금속 재질로 구성하는 것이 충분한 내구성을 발휘할 수 있어 바람직하며, 경량화를 위하여 표면에 타공을 형성하고 미끄럼방지를 위하여 요철 돌기를 형성하는 등 다양한 보조적인 수단을 강구할 수 있을 것이다.
상기 도보판(101)의 일측(도 1을 기준으로 좌측)에는 피시빔(102)과 결합하여 유지하기 위한 고정유지구(103)를 고정하고, 상기 고정유지구(103)의 대향 위치(도 1을 기준으로 우측)에는 피시빔(102)과 피시빔(102) 사이의 간격에 맞게 대응하여 좌,우측 방향으로 움직이면서 조절할 수 있도록 가동유지구(104)를 구비하여 구성한다.
상기 도보판(101)의 상면에는 설치와 해체의 용이성을 제공할 수 있도록 기계 또는 인력에 의하여 쉽게 들고 내리는 견인성을 높일 수 있도록 견인고리(105)를 구비하고, 상기 도보판(101)의 전방(고정 및 가동유지구가 고정되지 않는 위치)에는 밀착판(106)을 고정하여 인접한 작업로 구축장치(100)의 도보판(101)과 걸쳐져 서로 결속될 수 있도록 한다.
상기 견인고리(105)는 작업자가 보행과정에서 걸려 넘어지는 안전사고의 우려를 배제하면서 적재 과정에서 걸림 되어 간섭을 일으키는 현상을 방지할 수 있도록 도보판(101)의 상,하 방향으로 움직임이 자유롭게 구비하여 사용하지 않을 경우에는 도보판(101)의 상방으로 돌출되지 않도록 하는 것이 바람직할 것이다.
상기 밀착판(106)은 인접한 도보판(101)과 연접된 후 진동 등과 같은 외압에 의하여 이탈되는 현상을 방지할 수 있도록 이탈방지구(107)를 더 구비하고, 상기 이탈방지구(107)는 밀착판(106)의 끝단에 하향 되게 형성하는 걸림돌기(108)가 인접 도보판(101)에 형성하는 걸림홀(108-1)에 결합 되도록 하거나 또는, 밀착판(106)과 인접 도보판(101)에 단속공(109)을 형성한 후 볼트 또는 핀과 같은 단속수단(109-1)로 결합하여 쉽게 분리되는 것을 방지되도록 하는 것이 좋다.
상기 고정유지구(103)는 도보판(101)의 좌측 후미 끝단에 용접 또는 볼트, 리벳 등으로 고정되는 고정유지바(110)를 상방으로 돌출시키고, 상기 고정유지바(110)의 상단에는 피시빔(102) 방향으로 경사지게 돌출되어 피시빔(102)의 경사면(111)과 연접되는 경사바(112)를 고정하여 구성한다.
상기 경사바(112)는 고정유지바(110)에 용접을 통하여 견고하게 고정한 상태로 사용하여도 되나, 피비심(102)의 크기에 따라 달라지는 경사면(111)에 적극적으로 대응할 수 있도록 가변고정할 수 있는 형태로 구성하여도 된다.
이 경우에는 고정유지바(110)의 상단에 경사면(111)에 대응하여 고정할 수 있도록 다수개의 조절공(113)을 형성하고, 경사바(112)에는 조절공(113)과 치합시켜 볼트 너트와 같은 단속수단(114)으로 고정하기 위한 체결공(115)을 형성하여 구성한다.
상기 체결공(115)은 경사바(112) 전체가 경사면(111)과 연접되도록 고정할 수 있도록 하거나, 다른 예로서는 경사바(112)의 끝단이 경사면(111)에 연접되어 경사바(112)가 경사면(111)에 대하여 직각을 이루는 형태가 되도록 형성할 수 있을 것이다.
상기 가동유지구(104)는 도보판(101)의 우측부위 후미에 등 간격으로 형성하는 조절공(116)에 볼트(117)로 가동서포터(118)를 단속하여 피시빔(102) 사이의 간격에 맞게 옮기면서 고정유지구(103)와 폭을 조절할 수 있도록 한다.
상기 가동서포터(118)의 고정을 본 발명의 도면에서는 도보판(101)의 후단면에 밀착되는 형태로 하고 있으나, 가동서포터(118)를 개략 L형상의 앵글타입 또는 ㄱ형상의 앵글타입으로 하여 도보판(101)의 수직면과 수평면 양면에 걸쳐져 고정하는 형태로 구성하여도 무방할 것이다.
상기 가동서포터(118)에는 내측 방향은 폐쇄되고 외측 방향은 개방된 고정관(120)을 고정하고, 상기 고정관(120)에는 가동관(121)을 결합하고, 상기 가동관(121)의 외측 단부에는 경사바(112)를 가지는 가동유지바(122)를 상향 돌출되게 고정한다.
상기 고정관(120)과 가동관(121)에는 조절수단(125)을 구비하여 조절수단(125)을 구비하여 피시빔(102)의 폭 방향에 대하여 미세한 조절이 가능하도록 한다.
상기 조절수단(125)은 가동관(121)에 다수개의 조절공(126)을 형성하고, 상기 조절공(126)은 고정관(120)의 양측에 길이방향으로 형성하는 슬로트(127)를 조절핀(128)으로 관통되도록 하고, 상기 조절핀(128)은 고정관(120)의 외면에 나사결합되는 단속너트(129)에 의하여 피시빔(102) 방향으로 미세 조절되고, 조절된 상태에서 후회하는 것이 방지되도록 한다.
상기 고정관(120) 내부에는 가동관(121)의 후미를 항상 피시빔(102) 방향으로 밀어주어 가동유지바(122)가 피시빔(102)과의 긴밀한 밀착상태를 유지할 수 있도록 가압스프링(130)을 내장하여도 무방하다.
상기 고정관(120)과 가동관(121)의 다른 예로서는, 도보판(101)의 우측 후면에 일정간격을 유지하여 세워지는 가동서포터(118) 사이에 고정관(120)을 연결하고, 상기 고정관(120)에는 가동유지바(122)을 고정한 가동관(121)을 결합하고 가동관(121)은 볼트와 같은 고정수단에 의하여 단속되도록 구성하여도 된다.
상기 고정유지구(103)와 가동유지구(104)가 설치되는 도보판(101)에는 반복적인 체결 또는 하중의 집중에 따라 취약해지는 것을 보완할 수 있도록 보강수단(135)을 더 강구하도록 한다.
상기 보강수단(135)은 도보판(101)의 내면에 ㄷ형태널, L형 또는 I형 앵글 등으로 구성되는 보강바(136)를 길이방향으로 용접 또는 고정수단(137)으로 고정하여 강성을 유지할 수 있도록 하고, 체결을 위하여 형성되는 구멍 등은 도보판(101)은 물론 보강바(136)를 관통하도록 함은 당연할 것이다.
상기 보강바(136)를 도보판(101)의 가로 세로에 걸쳐 할 수도 있으나 집중적으로 하중을 받는 부위에 튼튼하게 개재하고 다른 부위는 생략하여 경량화에 지장을 초래하지 않도록 하는 것이 바람직할 것이다.
상기 도보판(101)에 고정되는 고정유지구(103)와 가동유지구(104)는 견고한 상태로 고정되도록 하여도 되나, 적재, 이송 등의 편리성을 제공할 수 있도록 도보판(101)에 대하여 착탈 가능하게 구성하여도 무방할 것이다.
상기와 같은 본 발명의 기술이 적용되는 피시빔 교량용 작업로 구축장치(100)의 작용에 대하여 설명하면 다음과 같다.
고정유지구(103)와 가동유지구(104)를 가지는 도보판(101)의 상면에 구비되는 견인고리(105)를 이용하여 피시빔(102) 사이로 들어올려 정 위치에 위치시킨 후, 가동유지구(104)가 위치한 도보판(101)을 아래 방향으로 기울여 피시빔(102) 과 피시빔(102) 사이의 공간으로 삽입되도록 한다.
즉. 가동유지구(104)가 위치하는 도보판(101)의 끝단이 피시빔(102)의 하단면으로 이동시키면서 서서히 가동유지구(104)가 위치한 도보판(101)을 수평상태로 유지하게 되면, 고정유지구(103)의 경사바(112)는 자연스럽게 고정유지구(103)가 위치한 피시빔(102)의 경사면(111)과 연접되고 동시에 가동유지구(104)의 경사바(112) 또한 가동유지구(104)가 위치한 피시빔(102)의 경사면과 연접되는 상태가 된다.
물론 이 과정에서는 가동유지구(104)를 움직여 고정유지구(103)와 가동유지구(104) 사이의 간격을 피시빔(102)과 피시빔(102) 사이의 간격보다 좁게 하는 것은 당연할 것이며, 고정 및 가동유지구(103,104)가 피시빔(102)에 연접되면 견고한 상태의 밀착이 이루어지도록 가동유지구(104)를 조절하면 하나의 피시빔 교량용 작업로 구축장치(100) 설치를 완료한다.
상기 피시빔 교량용 작업로 구축장치(100)가 완료된 때에는 고정 및 가동유지구(103,104)를 구성하는 경사바(112)는 피시빔(102)의 경사면(111)과 연접된 상태이고, 고정유지바(110)와 가동유지바(122)는 피시빔(102)의 수직면과 밀착된 상태에 있게 된다.
상기 가동유지구(104)의 설치상태를 더욱 상세하게 살펴보면,
피시빔(102)과의 간격이 넓을 경우에는 고정관(120)을 유지하는 가동서포터(118)를 도보판(101)의 좌,우측으로 움직여 조절하고, 피시빔(102)과의 간격이 좁을 경우에는 고정관(120)과 가동관(121)에 구비되는 조절수단(125)을 이용하여 미세하게 조절한다.
상기 가동서포터(118)를 이용하여 넓은 간격을 조절하고자 할 경우에는, 도보판(101)에 형성되는 조절공(116)과 가동서포터(118)를 고정시키는 볼트(117)를 풀어서 가동서포터(118)를 원하는 위치로 이동시킨 후 다시 볼트(117)로 단속하면 된다.
그리고, 조절수단(125)을 이용하여 좁은 간격을 조절하고자 할 경우에는, 고정관(120)에 결합 된 단속너트(129)을 후퇴(도보판의 내측 방향)시키고 조절핀(128)을 분리시킨 후 가동관(121)을 고정관(120)에 대하여 출입시켜 가동관(121)에 구비되는 가동유지바(122)가 피시빔(102)과 근접되도록 한다.
이러한 상태에서 조절핀(128)을 고정관(120)의 슬로트(127)과 가동관(121)의 조절공(126)을 관통시킨 후 후퇴시켰던 단속너트(129)를 조절핀(128) 방향으로 전진시켜 밀어주면 된다.
즉, 단속너트(129)가 미는 힘에 의하여 조절핀(128)은 피시빔(102) 방향으로 이동하고 가동유지바(122)에 구비되는 경사바(112)가 피시빔(102)의 경사면(111)과 연접되면 단속너트(129)의 움직임을 정지시키면 조절이 완료된다.
물론, 이와 같이 조절된 상태에서는 고정관(120) 내부에 설치된 가압스프링(130)에 의하여 가동관(121)을 항상 피시빔(102) 방향으로 밀어주기 때문에 쉽게 가동유지구(104)가 피시빔(102)을 벗어나는 현상을 방지할 수 있게 된다.
상기와 같이 가동유지구(104)가 일측의 피시빔(102)과 연접되도록 조여주면 고정유지구(103)는 자연스럽게 대향 측의 피시빔(102)과 연접되어 견고한 상태로 조여지게 되는 것이다.
이와 같이 하나의 피시빔 교량용 작업로 구축장치(100)가 설치되면 다른 피시빔 교량용 작업로 구축장치(100)를 그 전방에 동일한 방법으로 설치하는 형태로 작업로를 구축하여 나가면 된다.
이와 같이 피시빔 교량용 작업로 구축장치(100)를 연결할 때에는 도보판(101)에 고정된 밀착판(106)이 인접한 피시빔 교량용 작업로 구축장치(100)를 구성하는 도보판(101)의 상면에 걸림 되는 형태가 됨으로서 각각의 피시빔 교량용 작업로 구축장치(100)가 서로 연결된 형태를 취하여 안정적인 상태를 유지할 수 있게 된다.
또한 작업로가 구축된 상태에서는 고정유지구(103)를 구성하여 고정유지바(110)와 가동유지구(104)를 구성하는 가동유지바(122)를 클램프와 파이프를 이용하여 한번 더 단속하여 주면 더욱 견고한 상태를 유지할 수 있어 쉽게 외압에 의하여 흔들리는 등의 현상을 방지할 수 있다.
도 10은 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치에 적용되는 크로스빔점퍼를 도시한 사시도, 도 11은 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치에 적용되는 크로스빔점퍼를 도시한 A - A선 단면도, 도 12는 본 발명의 기술이 적용된 피시빔 교량용 작업로 구축장치에 적용되는 크로스빔점퍼를 도시한 B - B선 단면도, 도 13은 본 발명의 기술이 적용된 크로스빔점퍼를 피시빔 교량용 작업로 구축장치에 장착한 상태를 도시한 구성도, 도 14는 본 발명의 기술인 크로스빔점퍼가 적용된 피시빔 교량용 작업로 구축장치의 설치상태도로서 함께 설명한다.
본 발명의 다른 예로서는, 상기 도보판(101)에 착탈 자유롭게 구비하여 고정 및 가동유지구(103,104) 없이 도보판(101)을 크로스빔 설치위치(CA)에 개구부 없는 상태로 연결할 수 있는 크로스빔점퍼(140)를 더 구비하는 것을 특징으로 한다.
상기 크로스빔점퍼(140)는 도보판(101)의 전방 또는 후방에 고정 및 가동유지구(103,104)를 체결하기 위하여 형성하는 다수개의 조절공(116)에 체결수단(142)으로 체결할 수 있도록 체결공(143)을 하단에 형성한 판상 형태의 점퍼베이스(145)를 구비한다.
상기 점퍼베이스(145)의 상단에는 소정의 폭으로 유지되는 수평플레이트(146)를 일체로 형성하고, 상기 수평플레이트(146)의 끝단에는 하향 돌출되는 보강플레이트(147)를 형성한다.
상기 수평 및 보강플레이트(146,147)는 점퍼베이스(145)로부터 절곡을 통하여 형성하거나 압출시 일체로 형성하는 등 다양한 형태로의 실시가 가능하며, 보강플레이트(147)는 수평플레이트(146)의 끝단부 처리가 매끄럽게 이루어질 경우에는 형성하지 않아도 무방할 것이다.
상기 수평플레이트(146)에는 크로스빔 설치위치(CA) 양측에 설치되는 도보판(101)과 비계파이프와 같은 연결바(148)로 연결하여 크로스빔 설치위치(CA)의 도보판(101)을 유지할 수 있는 통상적인 클램프(149)를 구비한다.
상기 클램프(149)는 수평플레이트(146)에 장공 형태로 형성하는 클램프홀(150)을 통하여 볼트 너트와 같은 단속수단(151)에 의하여 이동할 수 있도록 함으로서 크로스빔 설치위치(CA)에 클램프(149)가 위치하지 않도록 조절할 수 있도록 한다.
상기와 같은 크로스점퍼(110)가 적용된 피시빔 교량용 작업로 구축장치(100)를 이용하여 크로스빔 설치위치(CA)에 개구부가 발생하지 않도록 설치하는 과정을 살펴보면 다음과 같다.
크로스빔 설치위치(CA) 이외의 위치에서는 종래 기술과 같이 도보판(101) 상면에 구비되는 견인고리(105)를 이용하여 피시빔(102) 사이로 들어올려 정 위치에 위치시킨 후, 가동유지구(104)가 위치한 도보판(101)을 아래 방향으로 기울여 피시빔(102)과 피시빔(102) 사이의 공간으로 삽입되도록 한다.
이러한 상태에서 가동유지구(104)가 위치하는 도보판(101)의 끝단이 피시빔(102)의 하단으로 이동시키면서 서서히 가동유지구(104)가 위치한 도보판(101)을 수평상태로 유지하게 되면 고정유지구(103)는 자연스럽게 피시빔(102)과 연접되고, 동시에 가동유지구(104) 또한 피시빔(102)과 연접되는 상태가 된다.
이 과정에서 가동유지구(104)를 움직여 피시빔(102)과 피시빔(102) 사이의 간격과 고정 및 가동유지구(103,104) 사이에 발생하는 갭을 보상함으로써 하나의 피시빔 교량용 작업로 구축장치(100)의 설치가 완료되며, 이를 기초로 하여 도보판(101)의 전방 또는 후방으로 연속하여 연결하여 작업로를 구축할 수 있게 된다.
그리고, 작업로를 구축하는 과정에서 크로스빔 설치위치(CA)에 도달하였을 경우에는 크로스빔점퍼(140)를 이용하여 도보판(101)을 크로스빔 설치위치(CA)에 설치하여 개구부가 발생하지 않도록 한다.
이를 살펴보면, 기 설치된 작업로구축장치(100)의 좌,우측에 구비되는 고정 및 가동유지구(103,104)를 구성하는 고정 및 가동유지바(125,126)에 통상적인 클램프(149)를 체결하고, 상기 클램프(149)에는 연결바(148)를 고정하여 크로스빔 설치위치(CA)로 돌출되도록 한다.
상기와 같이 돌출된 연결바(148)에는 크로스빔점퍼(140)를 고정한 도보판(101)을 순차적으로 연결하여 크로스빔 연결위치(CA)를 커버 하여 개구부가 발생하지 않도록 하고, 크로스빔 설치위치(CA)에 도보판(101)의 연결이 완료된 후에는 고정 및 가동유지구(103,104)를 가지는 도보판(101)을 연결하여 작업로를 구축하면 된다.
상기 크로스빔 설치위치(CA)에 크로스빔점퍼(140)를 이용하여 도보판(101)을 개구부가 발생하지 않도록 연결하는 과정을 상세하게 살펴보면 다음과 같다.
크로스빔 설치위치(CA)로 돌출된 연결바(148)에 도보판(101)의 좌,우측에 형성되는 조절공(116)과 체결수단(142)으로 고정된 점퍼베이스(145)의 상단 수평플레이트(146)에 고정된 클램프(149)를 고정 및 가동유지바(125,126)에 고정된 클램프(149)와 위치를 일치시킨다.
이는 수평플레이드(116)에 형성되는 클램프홀(150)이 장공 형태로 형성되어 있으므로 클램프(149)를 움직여 위치를 일치시킨 후 고정하면 된다.
이러한 상태에서 수평플레이트(146)에 구비되는 클램프(149)를 이용하여 연결바(148)를 견고하게 체결함으로서 도보판(101)을 고정 및 가동유지구(103,104)를 이용하여 피시빔(102)에 유지하지 않고서도 인접한 도보판(101)과 견고한 연결상태를 유지할 수 있고, 크로스빔 설치위치(CA)에 개구부 없이 작업로를 구축할 수 있게 되는 것이다.
물론, 크로스빔 설치위치(CA)를 벗어나면 다시 도보판(101)은 고정 및 가동유지구(103,104)를 이용하여 피시빔(102)에 견고한 상태로 유지하도록 함으로서 피시빔(102) 전체에 걸처 개구부 없는 안전한 작업로를 구축할 수 있게 된다.
본 발명은 도보판에 고정 및 가동유지구 또는 크로스빔점퍼를 가지도록 함으로서 크로스빔으로 구축되는 구조물에 작업로의 설치를 용이하게 할 수 있으면서, 크로스빔 위치에 개구구 발생을 배제하여 안전성을 확보할 수 있다.

Claims (11)

  1. 개략 직사각형상의 판상부재로 구비하는 도보판(101)과;
    상기 도보판(101)의 일측에 피시빔(102)과 결합할 수 있도록 고정하는 고정유지구(103)와;
    상기 고정유지구(103)의 대향 위치 도보판(101)에 구비하여 피시빔(102) 사이의 간격에 맞게 움직이면서 피시빔(102)과 결합할 할 수 있도록 하는 가동유지구(104)와;
    상기 도보판(101)의 상면에 견인의 용이성을 제공할 수 있도록 구비하는 견인고리(105)와;
    상기 도보판(101)의 전방에 고정하여 인접한 작업로 구축장치(100)의 도보판(101)과 서로 결속될 수 있도록 하는 밀착판(106)을 포함하는 것을 특징으로 하는 피시빔 교량용 작업로 구축장치.
  2. 제 1 항에 있어서;
    상기 고정유지구(103)는 도보판(101)의 일단에 고정되어 상방으로 돌출되는 고정유지바(110)와;
    상기 고정유지바(110)의 상단에 피시빔(102) 방향으로 경사지게 돌출되어 피시빔(102)의 경사면(111)과 연접되도록 고정하는 경사바(112)로 구성하는 것을 특징으로 하는 피시빔 교량용 작업로 구축장치.
  3. 제 1 항에 있어서;
    상기 가동유지구(104)는 고정유지구(103) 대향 위치 도보판(101)에 등 간격으로 형성하는 조절공(116)에 단속되어 가변할 수 있도록 구비하는 가동서포터(118)와;
    상기 가동서포터(118)에 고정되는 고정관(120)과;
    상기 고정관(120)에 결합하는 가동관(121)과;
    상기 가동관(121)의 외측단부에 경사바(112)를 상향 돌출되게 가지는 가동유지바(122)와;
    상기 고정관(120)과 가동관(121)에 구비하여 피시빔(102)의 폭 방향에 대하여 가동관(121)을 미세하게 조절하는 조절수단(125)을 포함하는 것을 특징으로 하는 피시빔 교량용 작업로 구축장치.
  4. 제 1 항에 있어서;
    상기 가동유지구(104)는 도보판(101)의 우측 후면에 일정간격을 유지하여 세워지는 가동서포터(118) 사이에 연결하는 고정관(120)과;
    상기 고정관(120)에 가동유지바(122)을 고정하여 결합 되는 가동관(121)과;
    상기 가동관(121)은 고정수단에 의하여 단속되도록 구성하는 것을 특징으로 하는 피시빔 교량용 작업로 구축장치.
  5. 제 1 항에 있어서;
    상기 고정유지구(103)와 가동유지구(104)가 설치되는 도보판(101)에 반복적인 체결 또는 하중의 집중에 따른 취약성을 보완할 수 있도록 보강수단(135)을 더 구비하는 것을 특징으로 하는 피시빔 교량용 작업로 구축장치.
  6. 제 1 항에 있어서;
    상기 도보판(101)에 착탈 자유롭게 구비하여 피시빔(102)의 크로스빔 설치위치(CA)에 개구부 없는 상태로 도보판(101)을 연결할 수 있는 크로스빔점퍼(140)를 더 구비하는 것을 특징으로 하는 피시빔 교량용 작업로 구축장치.
  7. 제 2 항, 제 3 항, 제 4 항 중 어느 한 항에 있어서;
    상기 경사바(112)는 피비심(102)의 크기에 따라 달라지는 경사면(111)에 대응할 수 있도록 가변가능하게 구비하고;
    상기 고정유지바(110) 또는 가동유지바(122)의 상단에 경사면(111)에 대응하여 고정할 수 있도록 형성하는 다수개의 조절공(113)과;
    상기 경사바(112)에 조절공(113)과 치합시켜 단속수단(114)으로 고정하도록 형성하는 체결공(115)으로 구성하고;
    상기 체결공(115)은 경사바(112) 전체가 경사면(111)과 연접되도록 고정할 수 있도록 하거나 또는 경사바(112)의 끝단이 경사면(111)에 연접되어 경사바(112)가 경사면(111)에 대하여 직각을 이루는 형태가 되게 형성하는 것을 특징으로 하는 피시빔 교량용 작업로 구축장치.
  8. 제 3 항에 있어서;
    상기 조절수단(125)은 가동관(121)에 형성하는 다수개의 조절공(126)과;
    상기 고정관(120)의 양측에 길이방향으로 형성하는 슬로트(127)와;
    상기 조절공(126)과 슬로트(127)를 관통하는 조절핀(128)과;
    상기 고정관(120)의 외면에 나사결합되어 조절핀(128)을 피시빔(102) 방향으로 밀어서 제어하는 단속너트(129)를 포함하는 것을 특징으로 하는 피시빔 교량용 작업로 구축장치.
  9. 제 3 항에 있어서;
    상기 고정관(120) 내부에는 가동관(121)의 후미를 항상 피시빔(102) 방향으로 밀어주는 가압스프링(130)을 내장하는 것을 특징으로 하는 피시빔 교량용 작업로 구축장치.
  10. 제 6 항에 있어서;
    상기 크로스빔점퍼(140)는 도보판(101)의 전방 또는 후방에 형성하는 다수개의 조절공(116)에 체결수단(142)으로 체결할 수 있도록 체결공(143)을 형성하여 구비하는 점퍼베이스(145)와;
    상기 점퍼베이스(145)의 상단에 소정의 폭을 유지하여 형성하는 수평플레이트(146)와;
    상기 수평플레이트(146)에 구비하여 크로스빔 설치위치(CA) 양측에 설치되는 도보판(101)과 연결바(148)로 연결하여 크로스빔 설치위치(CA)의 도보판(101)을 유지하는 클램프(149)를 포함하는 것을 특징으로 하는 피시빔 교량용 작업로 구축장치.
  11. 제 10 항에 있어서;
    상기 클램프(149)는 수평플레이트(146)에 장공 형태로 형성하는 클램프홀(150)을 통하여 단속수단(151)으로 고정되는 것을 특징으로 하는 피시빔 교량용 작업로 구축장치.
PCT/KR2010/005622 2009-09-02 2010-08-24 피시빔 교량용 작업로 구축장치 WO2011027985A2 (ko)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
KR10-2009-0082659 2009-09-02
KR1020090082659A KR101112172B1 (ko) 2009-09-02 2009-09-02 피시빔 교량용 작업로 구축장치
KR10-2010-0024756 2010-03-19
KR1020100024756A KR101143422B1 (ko) 2010-03-19 2010-03-19 피시빔 교량용 작업로 구축장치

Publications (2)

Publication Number Publication Date
WO2011027985A2 true WO2011027985A2 (ko) 2011-03-10
WO2011027985A3 WO2011027985A3 (ko) 2011-07-07

Family

ID=43649751

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2010/005622 WO2011027985A2 (ko) 2009-09-02 2010-08-24 피시빔 교량용 작업로 구축장치

Country Status (1)

Country Link
WO (1) WO2011027985A2 (ko)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997020988A1 (de) * 1995-12-07 1997-06-12 Alfons Moog Vorrichtung zur brückeninspektion
KR200429997Y1 (ko) * 2006-08-21 2006-11-02 김진곤 피시빔 작업로 구축용 설치구
KR100696677B1 (ko) * 2006-03-06 2007-03-19 김진곤 피시빔 작업로 구축용 설치구

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997020988A1 (de) * 1995-12-07 1997-06-12 Alfons Moog Vorrichtung zur brückeninspektion
KR100696677B1 (ko) * 2006-03-06 2007-03-19 김진곤 피시빔 작업로 구축용 설치구
KR200429997Y1 (ko) * 2006-08-21 2006-11-02 김진곤 피시빔 작업로 구축용 설치구

Also Published As

Publication number Publication date
WO2011027985A3 (ko) 2011-07-07

Similar Documents

Publication Publication Date Title
WO2018190584A1 (ko) 구조적 안정성이 향상된 건축용 클라이밍 시스템
WO2017086704A1 (ko) 안전발판을 포함한 건축용 비계장치
WO2020101235A1 (ko) 슬라이드식 슬라브 판넬 지지장치
US20100025151A1 (en) Integral safety system which can be used for construction
WO2020004888A1 (ko) 건축용 시스템 비계
WO2015178584A1 (ko) 철근망의 선조립 공법
CN113323365B (zh) 一种电梯井防护平台及施工方法
WO2019156274A1 (ko) 고장력 볼트의 장력 도입으로 거더 처짐을 제어하는 가설교량 시공 방법
WO2017131257A1 (ko) 인양용 체결구
KR101547824B1 (ko) 플랫폼 지지방식의 노내비계와 인양시스템
WO2019190078A1 (ko) 건축물의 슬라브 시공 장치 및 방법
WO2011027985A2 (ko) 피시빔 교량용 작업로 구축장치
WO2017086666A1 (ko) 다용도 원터치 안전 난간대
CN109914247B (zh) 一种桥梁配件的吊挂工装及其使用方法
KR101116345B1 (ko) 교량용 빔의 전도 방지와 간격 유지대 및 이를 이용한 교량 시공 방법
KR101112172B1 (ko) 피시빔 교량용 작업로 구축장치
WO2021025309A1 (ko) 경량 영구거푸집이 구비된 강합성 콘크리트 기둥용 선조립 철골 조립체
WO2013077536A1 (ko) 굴절지지대를 이용한 버팀보 지지장치
JP6661142B1 (ja) 吊り足場
WO2017003003A1 (ko) 건축물 지붕시공방법 및 그에 사용되는 건축자재
KR100812130B1 (ko) 구명줄 겸용 안전네트
KR20020054259A (ko) 교량 점검 장치 및 그 시공방법
CN220058769U (zh) 单元式吊挂施工操作平台
CN217498503U (zh) 新型塔吊附着安全防护平台
JP2012017596A (ja) 足場用幅木装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10813894

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10813894

Country of ref document: EP

Kind code of ref document: A2