US20210054584A1 - Construction method for a cantilever beam on a central pier - Google Patents

Construction method for a cantilever beam on a central pier Download PDF

Info

Publication number
US20210054584A1
US20210054584A1 US16/999,143 US202016999143A US2021054584A1 US 20210054584 A1 US20210054584 A1 US 20210054584A1 US 202016999143 A US202016999143 A US 202016999143A US 2021054584 A1 US2021054584 A1 US 2021054584A1
Authority
US
United States
Prior art keywords
cantilever beam
scaled model
pier
installation groove
rotating shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US16/999,143
Other versions
US10914043B1 (en
Inventor
Gangliang Liu
Chengmin WANG
Zhongwen Wang
Jie Chen
Yiming Xu
Rongfeng Chen
Baihong Deng
Taihao Chen
Yi Zhou
Zungui Lei
Lichuan Cui
Yadang Zhao
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Highway Consultants Co Ltd
Poly Changda Engineering Co Ltd
Original Assignee
CCCC Highway Consultants Co Ltd
Poly Changda Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Highway Consultants Co Ltd, Poly Changda Engineering Co Ltd filed Critical CCCC Highway Consultants Co Ltd
Assigned to CCCC HIGHWAY CONSULTANTS CO., LTD., Poly Changda Engineering Co., Ltd. reassignment CCCC HIGHWAY CONSULTANTS CO., LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: CHEN, JIE, CHEN, RONGFENG, CHEN, TAIHAO, CUI, LICHUAN, DENG, BAIHONG, LEI, ZUNGUI, LIU, GANGLIANG, WANG, Chengmin, WANG, Zhongwen, XU, YIMING, ZHAO, YADANG, ZHOU, YI
Application granted granted Critical
Publication of US10914043B1 publication Critical patent/US10914043B1/en
Publication of US20210054584A1 publication Critical patent/US20210054584A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M5/00Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
    • G01M5/0033Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings by determining damage, crack or wear
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M5/00Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
    • G01M5/0025Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings of elongated objects, e.g. pipes, masts, towers or railways
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M5/00Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
    • G01M5/0075Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings by means of external apparatus, e.g. test benches or portable test systems
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete

Definitions

  • the present application relates to bridge beam construction, and more particularly to a construction method for a cantilever beam on a central pier.
  • Chinese Patent Application Publication No. 102261042 A discloses an inclined cantilever support for pouring a pier capping beam, where the full space supports built by the steel pipes are not involved, which can reduce the manpower and steel pipe support materials consumption. However, it is not convenient to move the inclined cantilever support during the use, reducing the turnover rate of the inclined cantilever support.
  • the present application aims to provide a construction method for a cantilever beam on a central pier, where a scaled model of the cantilever beam on the central pier is established and tested. According to test data and analysis results of the scaled model, the stress distribution regularities of the cantilever beam are obtained, so as to find out week parts of the cantilever beam, and thus the optimization design can be performed to make the cantilever beam reasonably carry the load and improve the materials with a higher utilization ratio.
  • a wheeled stand support used in the present application has a high turnover rate and it is easy and convenient to dismantle and assemble the wheeled stand support, so as to ensure the construction period requirement and the construction safety and improve the utilization ratio of the materials, being time-consuming and labor-saving.
  • a height of the cantilever beam mold can be adjusted by the hydraulic cylinder, benefiting the construction of the cantilever beam.
  • the present application aims to solve the following technical problems.
  • a construction method for a cantilever beam on a central pier comprising:
  • testing the scaled model comprising:
  • K 1 M P M 1 ;
  • K 2 M P M 2 ;
  • the wheeled stand support comprises a first frame and a second frame; the first frame and the second frame each comprise two bases; two ends of each base are respectively provided with a road wheel; and two guides are symmetrically provided on an upper end surface of the base;
  • a hydraulic cylinder is provided inside each guide; an oil pump is provided at a side of the guide via bolts and is configured to supply power to the hydraulic cylinder; a top end of a piston rod of the hydraulic cylinder is connected to a bottom of a support beam provided inside the guide; a top end of the support beam is fixedly connected to an end of an H-shaped beam; a cross beam is provided at a middle of the H-shaped beam; a triangular bracket is provided on a top of the cross beam; and a support base is welded onto a top of the triangular bracket to support the cantilever beam;
  • a groove is provided on a bottom of the support base; a plurality of threaded holes are symmetrically provided on both side walls of the groove of the support base; a threaded rod is in threaded connection with each threaded hole; a stopper is welded at an end of the threaded rod; and a rotating handle is welded at the other end of the threaded rod;
  • first bracing frames are symmetrically welded on both sides of the triangular bracket; second bracing frames are symmetrically welded on both sides of the triangular bracket; each first bracing frame and each second bracing frame are respectively provided with a first installation groove; a first rotating shaft provided on the first installation groove is rotatably connected to an end of a first connecting rod; a second installation groove is provided in a middle of a side of the first bracing frame and the second bracing frame, respectively; a second rotating shaft is provided at the second installation groove; an end of a first Y-shaped connecting rod is connected to a middle of the second rotating shaft; and a U-shaped end of a second Y-shaped connecting rod is connected to two ends of the second rotating shaft;
  • the cantilever beam mold comprises two opposite side plates installed in parallel and two opposite end plates installed in parallel; and each end plate is perpendicular to each side plate;
  • each side plate comprises a middle side plate, two first side plates and two second side plates; the two second side plates are respectively provided on two sides of the middle side plate; and the two first side plates are respectively provided on sides of the two second side plates away from the middle side plate;
  • a rectangular baffle plate is welded on the middle side plate; and two ends of the rectangular baffle plate are respectively fixed to the two second side plates via bolts;
  • a third installation groove is provided on each first side plate and each second side plate, respectively; a third rotating shaft is provided at the third installation groove; the other end of the first connecting rod is connected to a middle of the third rotating shaft; and a U-shaped end of the first Y-shaped connecting rod is connected to two ends of the third rotating shaft;
  • a fourth installation groove is provided under the third installation groove; a fourth rotating shaft is provided at the fourth installation groove; and an end of the second Y-shaped connecting rod is connected to a middle of the fourth rotating shaft;
  • a rectangular slot is provided on the middle side plate to clamp a pier-top.
  • the present application has the following beneficial effects.
  • a scaled model of the cantilever beam on the central pier is established and tested. According to test data and analysis results of the scaled model, the stress distribution regularities of the cantilever beam are obtained, so as to find out week parts of the cantilever beam, and thus the optimization design can be performed to make the cantilever beam reasonably carry the load and improve the materials with a higher utilization ratio.
  • a wheeled stand support used in the present application has a high turnover rate and it is easy and convenient to dismantle and assemble the wheeled stand support, so as to ensure the construction period requirement and the construction safety and improve the utilization ratio of the materials, being time-consuming and labor-saving.
  • a height of the cantilever beam mold can be adjusted by the hydraulic cylinder, benefiting the construction of the cantilever beam.
  • FIG. 1 is a schematic diagram of a cantilever beam on a central pier according to the present application
  • FIG. 2 is a front view of a wheeled stand support according to the present application.
  • FIG. 3 is a schematic diagram of the wheeled stand support according to the present application.
  • FIG. 4 is an enlarged view of Detail Ain FIG. 3 ;
  • FIG. 5 shows control sections of a scaled model of the cantilever beam in a second test according to the present application
  • FIG. 6 shows a damaged section of the cantilever beam in the second test according to the present application
  • FIG. 7 shows control sections of the scaled model of the cantilever beam in a first test according to the present application.
  • FIG. 8 shows a damaged section of the cantilever beam in the first test according to the present application.
  • the present application provides a construction method for a cantilever beam on a central pier.
  • a cantilever beam 1 As shown in FIGS. 1-8 , there is shown a cantilever beam 1 .
  • a bottom end of the cantilever beam 1 is installed in a pier groove 6 which is provided on a pier-top 2 .
  • a bottom of the pier-top 2 is installed on a top of a bridge pier 3 .
  • a bottom of the bridge pier 3 is installed on an upper end surface of a rectangular bearing platform 4 .
  • Four cast-in-place bored piles 5 are provided on a lower end surface of the rectangular bearing platform 4 .
  • Two blocks 7 are symmetrically provided on both sides of an upper end surface of the cantilever beam 1 .
  • the pier-top 2 and the bridge pier 3 are integrally poured and formed using C50 concrete.
  • the rectangular bearing platform 4 is poured and formed using C35 concrete.
  • the four cast-in-place bored piles 5 are poured and formed using C30 underwater concrete.
  • the construction method for the cantilever beam on the central pier includes the following steps.
  • Scaled models of the cantilever beam on the central pier are established.
  • the scaled models are tested.
  • the cantilever beam 1 can be constructed when a test result of the scaled model reaches a given threshold.
  • a 1:4 scaled model having an upper structure with a span length of 30 m is tested in the first test, and a 1:4 scaled model having an upper structure with a span length of 35 m is tested in the second test.
  • Control sections of the scaled model are selected. On-site loading is applied at the control sections of the scaled model under normal conditions and overload conditions.
  • the scaled model is tested for the first time.
  • FIGS. 7-8 show the on-site loading applied at the control sections of the scaled model under normal conditions and overload conditions. It can be seen that there is no crack at A-A and C-C of the control sections of the scaled model. After the on-site loading continues to be applied, the cantilever beam breaks prior to the bridge pier. The fissure of the damaged section is close to a root of the cantilever beam. Load combinations on the scaled model under various use conditions in the first test are shown in Table 1. Safety factors and overload factors of the cantilever beam and the bridge pier are shown in Table 2.
  • Case 1 constant load + first-classed road (No. 4 lane)
  • Case 2 constant load + first-classed road (No. 3 lane) + two heavy vehicles with 120 t (No. 1 lane on the outermost side) + wind-induced load
  • Case 3 constant load + first-classed road (No. 2 lane next to the outermost side) + two heavy vehicles with 120 t (No. 1 lane on the outermost side) + wind-induced load
  • Case 4 constant load + first-classed road (No. 1 lane next to the outermost side) + two heavy vehicles with 120 t (No.
  • Bending moments at Ai of the scaled model are acquired by a motion detector.
  • a bending moment at Ai of the scaled model before applying the on-site loading is set as M 0 .
  • a bending moment at Ai of the scaled model when the scaled model breaks is set as M p .
  • a bending moment at Ai of the scaled model under maximum normal conditions is set as M 1 .
  • a bending moment at Ai under maximum overload conditions is set as M 2 .
  • K 1 M P M 1 .
  • a second safety factor K 2 at Ai of the scaled model under the maximum overload conditions is calculated according to
  • K 2 M P M 2 ;
  • the cantilever beam and the bridge pier are in an elastic state in the processes of prestress tension and applying the weight, i.e., in the construction process.
  • the cantilever beam and the bridge pier under predetermined overload conditions are basically in an elastic state and no cracks are found, indicating the structure of the cantilever beam and the bridge pier has the good mechanical performance.
  • a second test is performed on the scaled model.
  • the second test only adjusts the size of the cantilever beam and changes a three-fold line at a bottom of the cantilever beam into a double-fold line.
  • the cantilever beam breaks prior to the bridge pier, and the damaged section is located at the lower edge of the cantilever beam.
  • the cantilever beam and the bridge pier are in an elastic state in the processes of prestress tension and applying weight, i.e., in the construction process.
  • load reaches 240 kN at the loading point marked as 1, and load reaches 660 kN at the loading point marked as 2.
  • the concrete at the pier groove of the pier-top collapses, indicating the structure is damaged.
  • a maximum vertical displacement of the cantilever beam is 31 cm, and a maximum horizontal displacement of the pier-top is 5.91 mm.
  • cantilever beam After being disassembled, cantilever beam has a maximum vertical residual deformation of 24 cm.
  • a wheeled stand support 8 is used to support a bottom of the cantilever beam.
  • the wheeled stand support 8 includes a first frame 81 and a second frame 82 .
  • the first frame 81 and the second frame 82 each comprise two bases 811 .
  • Two ends of each base 811 are respectively provided with a road wheel 812 .
  • Two guides 816 are symmetrically provided on an upper end surface of the base 811 .
  • a hydraulic cylinder 813 is provided inside each guide 816 .
  • An oil pump 814 is provided at a side of the guide 816 via bolts and is configured to supply power to the hydraulic cylinder 813 .
  • a top end of a piston rod of the hydraulic cylinder 813 is connected to a bottom of a support beam 815 provided inside the guide 816 .
  • a top end of the support beam 815 is fixedly connected to an end of an H-shaped beam 817 .
  • a cross beam 819 is provided at a middle of the H-shaped beam 817 .
  • a triangular bracket 818 is provided on a top of the cross beam 819 .
  • a support base 85 is welded onto a top of the triangular bracket 818 to support the cantilever beam.
  • a groove 851 is provided on a bottom of the support base 85 .
  • a plurality of threaded holes 852 are symmetrically provided on both side walls of the groove 851 of the support base.
  • a threaded rod 853 is in threaded connection with each threaded hole 852 .
  • a stopper 854 is welded at an end of the threaded rod 853 .
  • a rotating handle 855 is welded at the other end of the threaded rod 853 .
  • First bracing frames 83 are symmetrically welded on both sides of the triangular bracket 818 .
  • Second bracing frames 84 are symmetrically welded on both sides of the triangular bracket 818 .
  • Each first bracing frame 83 and each second bracing frame 84 are respectively provided with a first installation groove 841 .
  • a first rotating shaft 842 provided on the first installation groove 841 is rotatably connected to an end of a first connecting rod 844 .
  • a second installation groove 843 is provided in a middle of a side of the first bracing frame 83 and the second bracing frame 84 , respectively.
  • a second rotating shaft 850 is provided at the second installation groove 843 .
  • An end of a first Y-shaped connecting rod 848 is connected to a middle of the second rotating shaft 850 .
  • a U-shaped end of a second Y-shaped connecting rod 849 is connected to two ends of the second rotating shaft 850 .
  • a cantilever beam mold 9 is installed.
  • the cantilever beam mold 9 includes two opposite side plates 96 installed in parallel and two opposite end plates 94 installed in parallel. Each end plate 94 is perpendicular to each side plate 96 .
  • Each side plate 96 includes a middle side plate 93 , two first side plates 92 and two second side plates 91 .
  • the two second side plates 91 are respectively provided on two sides of the middle side plate 93 .
  • the two first side plates 92 are respectively provided on sides of the two second side plates 91 away from the middle side plate 93 .
  • a rectangular baffle plate 931 is welded on the middle side plate 93 . Two ends of the rectangular baffle plate 931 are respectively fixed to the two second side plates 92 via bolts.
  • a third installation groove 911 is provided on each first side plate 91 and each second side plate 92 , respectively.
  • a third rotating shaft 845 is provided at the third installation groove 911 .
  • the other end of the first connecting rod 844 is connected to a middle of the third rotating shaft 845 .
  • a U-shaped end of the first Y-shaped connecting rod 848 is connected to two ends of the third rotating shaft 845 .
  • a fourth installation groove 846 is provided under the third installation groove 911 .
  • a fourth rotating shaft 847 is provided at the fourth installation groove 846 .
  • An end of the second Y-shaped connecting rod 849 is connected to a middle of the fourth rotating shaft 847 .
  • a rectangular slot 932 is provided on the middle side plate 93 to clamp a pier-top 2 .
  • the wheeled stand support 8 and the middle side plate 93 are installed through the following steps.
  • the first frame 81 and the second frame 82 are respectively installed on both sides of the bridge pier 3 , simultaneously.
  • a bottom of the hydraulic cylinder 813 is provided on the base 811 .
  • the bottom of the support beam 815 is connected to the piston rod of the hydraulic cylinder 813 via flanges and bolts.
  • the oil pump 814 is provided on the guide 816 via screws and connected to the hydraulic cylinder 813 by an oil pipe.
  • the two bases 811 are placed in parallel.
  • the H-shaped beam 817 is placed above the support beam 815 by a crane and fixedly connected to the support beam 815 via bolts.
  • the threaded rod 853 is in threaded connection with each threaded hole 852 and passes through the threaded hole 852 .
  • the stopper 854 is welded to an end of the threaded rod 853 that passes through the threaded hole 852 .
  • the rotating handle 855 is welded at the other end of the threaded rod 853 .
  • the other end of the first Y-shaped connecting rod 848 is located inside the second installation groove 843 , and the U-shaped end of the second Y-shaped connecting rod 849 is located on both sides of the second installation groove 843 .
  • the first Y-shaped connecting rod 848 and the second Y-shaped connecting rod 849 are fixed in the second installation groove 843 through the second rotating shaft 850 .
  • the other end of the second Y-shaped connecting rod 849 is installed in the fourth installation groove 846 through the fourth rotating shaft 847 .
  • the triangular bracket 818 is hoisted on the cross beam 819 by a crane and fixed to the cross beam 819 via bolts.
  • the locations of the first frame 81 and the second frame 82 are adjusted to make two cross beams 819 symmetrical to the bridge pier 3 .
  • the oil pump 814 is controlled to provide power to the hydraulic cylinder 813 to allow the hydraulic cylinder 813 to move the support beam 815 , the H-shaped beam 817 and the triangular bracket 818 upward.
  • the rectangular baffle plate 931 is welded on the middle side plate 93 . Two ends of the rectangular baffle plate 931 are respectively fixed to the two second side plates 92 via bolts.
  • the rectangular slot 932 is provided on the middle side plate 93 to clamp the pier-top 2 .
  • the two end plates 94 are inserted at two ends of the side plates 96 to realize the installation of the wheeled stand support 8 and the cantilever beam mold.
  • the wheeled stand support used in the present application has a high turnover rate and it is easy and convenient to dismantle and assemble the wheeled stand support, so as to ensure the construction period requirement and the construction safety and improve the utilization ratio of the materials, being time-consuming and labor-saving.
  • a height of the cantilever beam mold can be adjusted by the hydraulic cylinder, benefiting the construction of the cantilever beam.
  • Cantilever beam rebar is secured by tying wire.
  • the cantilever beam rebar is hoisted into the cantilever beam mold 9 by a crane followed by concrete pouring.
  • the concrete pouring is implemented as follows.
  • the concrete is mixed in a centralized batch plant and then is transported to the pouring site by a concrete transport truck and sent to a pouring surface of the cantilever beam mold 9 by a concrete pump. If the concrete pouring height exceeds or equals to 2 m, a connecting tube can be used to transport the concrete to the working surface.
  • an immersion vibrator is inserted to vibrate the concrete at a depth of 50-100 mm of a lower concrete layer, so that the concrete at the joint of the two layers is evenly integrated.
  • the distance between the immersion vibrator and the cantilever beam mold 9 ranges from 50 to 100 mm.
  • the scaled model of the cantilever beam on the central pier is established and tested. According to test data and analysis results of the scaled model, the stress distribution regularities of the cantilever beam are obtained, so as to find out week parts of the cantilever beam, and thus the optimization design can be performed to make the cantilever beam reasonably carry the load and improve the materials with a higher utilization ratio.
  • the first frame 81 and the second frame 82 are respectively installed on both sides of the bridge pier 3 , simultaneously.
  • a bottom of the hydraulic cylinder 813 is provided on the base 811 .
  • the bottom of the support beam 815 is connected to the piston rod of the hydraulic cylinder 813 via flanges and bolts.
  • the oil pump 814 is provided on the guide 816 via screws and connected to the hydraulic cylinder 813 by an oil pipe.
  • the two bases 811 are placed in parallel.
  • the H-shaped beam 817 is placed above the support beam 815 by a crane and fixedly connected to the support beam 815 via bolts.
  • the threaded rod 853 is in threaded connection with each threaded hole 852 and passes through the threaded hole 852 .
  • the stopper 854 is welded to an end of the threaded rod 853 that passes through the threaded hole 852 .
  • the rotating handle 855 is welded at the other end of the threaded rod 853 .
  • the end of the first connecting rod 844 is installed in the first installation groove 841 through the first rotating shaft 842 .
  • the other end of the first connecting rod 844 is located inside the third installation groove 911 .
  • the U-shaped end of the first Y-shaped connecting rod 848 is located at two sides of the third installation groove 911 .
  • the first connecting rod 844 and the first Y-shaped connecting rod 848 are fixed on the third installation groove 911 through the third rotating shaft 845 .
  • the other end of the first Y-shaped connecting rod 848 is located inside the second installation groove 843
  • the U-shaped end of the second Y-shaped connecting rod 849 is located on both sides of the second installation groove 843 .
  • the first Y-shaped connecting rod 848 and the second Y-shaped connecting rod 849 are fixed in the second installation groove 843 through the second rotating shaft 850 .
  • the other end of the second Y-shaped connecting rod 849 is installed in the fourth installation groove 846 through the fourth rotating shaft 847 .
  • the triangular bracket 818 is hoisted on the cross beam 819 by a crane and fixed to the cross beam 819 via bolts.
  • the locations of the first frame 81 and the second frame 82 are adjusted to make two cross beams 819 symmetrical to the bridge pier 3 .
  • the oil pump 814 is controlled to provide power to the hydraulic cylinder 813 to allow the hydraulic cylinder 813 to move the support beam 815 , the H-shaped beam 817 and the triangular bracket 818 upward.
  • the rectangular baffle plate 931 is welded on the middle side plate 93 . Two ends of the rectangular baffle plate 931 are respectively fixed to the two second side plates 92 via bolts.
  • the rectangular slot 932 is provided on the middle side plate 93 to clamp the pier-top 2 .
  • the two end plates 94 are inserted at two ends of the side plates 96 to realize the installation of the wheeled stand support 8 and the cantilever beam mold.
  • the wheeled stand support used in the present application has a high turnover rate and it is easy and convenient to dismantle and assemble the wheeled stand support, so as to ensure the construction period requirement and the construction safety and improve the utilization ratio of the materials, being time-consuming and labor-saving.
  • a height of the cantilever beam mold 9 can be adjusted by the hydraulic cylinder 813 , benefiting the construction of the cantilever beam.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Disclosed is a construction method for a cantilever beam on a central pier. A scaled model of the cantilever beam on the central pier is established and tested to obtain the stress distribution regularities of the cantilever beam according to test data and analysis results of the scaled model, so as to find out week parts of the cantilever beam, and thus the optimization design can be performed to make the cantilever beam reasonably carry the load and improve the materials with a higher utilization ratio. The wheeled stand support used in the present application has a high turnover rate and it is easy and convenient to dismantle and assemble the wheeled stand support. A height of the cantilever beam mold can be adjusted by a hydraulic cylinder.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application claims the benefit of priority from Chinese Patent Application No. 201910774803.5, filed on Aug. 21, 2019. The content of the aforementioned application, including any intervening amendments thereto, is incorporated herein by reference in its entirety.
  • TECHNICAL FIELD
  • The present application relates to bridge beam construction, and more particularly to a construction method for a cantilever beam on a central pier.
  • BACKGROUND
  • There are two methods for constructing a capping beam in the prior art. One is to support the capping beam by building full space supports via steel pipes, and the other is to reserve holes in a pier to pass through steel rods, so as to support the capping beam. The former method requires a lot of manpower to build steel pipe scaffolds, which consumes time and a large number of steel pipes, greatly increasing the construction cost. The latter method reserves the holes in the pier to pass through the steel rods, and these holes are required to be repaired after the construction of the capping beam is completed, which not only affects the appearance of the pier, but also increases the construction processes. These existing construction methods no longer meet the appearance and quality requirements of the newly designed bridges.
  • Chinese Patent Application Publication No. 102261042 A discloses an inclined cantilever support for pouring a pier capping beam, where the full space supports built by the steel pipes are not involved, which can reduce the manpower and steel pipe support materials consumption. However, it is not convenient to move the inclined cantilever support during the use, reducing the turnover rate of the inclined cantilever support.
  • SUMMARY
  • The present application aims to provide a construction method for a cantilever beam on a central pier, where a scaled model of the cantilever beam on the central pier is established and tested. According to test data and analysis results of the scaled model, the stress distribution regularities of the cantilever beam are obtained, so as to find out week parts of the cantilever beam, and thus the optimization design can be performed to make the cantilever beam reasonably carry the load and improve the materials with a higher utilization ratio. A wheeled stand support used in the present application has a high turnover rate and it is easy and convenient to dismantle and assemble the wheeled stand support, so as to ensure the construction period requirement and the construction safety and improve the utilization ratio of the materials, being time-consuming and labor-saving. A height of the cantilever beam mold can be adjusted by the hydraulic cylinder, benefiting the construction of the cantilever beam.
  • The present application aims to solve the following technical problems.
  • 1) How to establish the scaled model of the cantilever beam on the central pier and test the scaled model to identify the performance of the cantilever beam; by determining the stress distribution regularities of the cantilever beam, week parts of the cantilever beam can be found out, so as to perform the optimization design to make the cantilever beam reasonably carry the load.
  • 2) How to construct a wheeled stand support for the construction of the cantilever beam on the central pier to improve the turnover rate of a capping beam support.
  • A construction method for a cantilever beam on a central pier, comprising:
  • 1) establishing a scaled model of the cantilever beam on the central pier; and testing the scaled model and constructing the cantilever beam when a test result of the scaled model reaches a given threshold;
  • 2) supporting a bottom of the cantilever beam with a wheeled stand support;
  • 3) installing a cantilever beam mold;
  • 4) securing cantilever beam rebar by tying wire; and
  • 5) hoisting the cantilever beam rebar into the cantilever beam mold by a crane followed by concrete pouring;
  • in step (1), testing the scaled model comprising:
  • 1) determining control sections of the scaled model; applying on-site loading at the control sections of the scaled model under normal conditions and overload conditions; and setting the control sections of the scaled model as Ai, i=1, 2 . . . n;
  • 2) recording bending moments at Ai of the scaled model by a motion detector; setting a bending moment at Ai of the scaled model before applying the on-site loading as M0; setting a bending moment at Ai of the scaled model when the scaled model breaks as Mp; setting a bending moment at Ai of the scaled model under maximum normal conditions as M1; and setting a bending moment at Ai of the scaled model under maximum overload conditions as M2;
  • 3) calculating a first safety factor K1 at Ai of the scaled model under the maximum normal conditions according to
  • K 1 = M P M 1 ;
  • 4) calculating a first overload factor P1 at Ai of the scaled model under the maximum normal conditions according to
  • P 1 = M P - M 0 M 1 - M 0 ;
  • 5) calculating a second safety factor K2 at Ai of the scaled model under the maximum overload conditions according to
  • K 2 = M P M 2 ;
  • 6) calculating a second overload factor P2 at Ai of the scaled model under the maximum overload conditions according to
  • P 2 = M P - M 0 M 2 - M 0 ;
  • and
  • 7) acquiring pictures of the scaled model at Ai of the scaled model by an acquisition device and identifying the number of cracks in the pictures; and constructing the cantilever beam when all of the first safety factor, the second safety factor, the first overload factor and the second overload factor are within a preset threshold range and there are no cracks;
  • wherein the wheeled stand support comprises a first frame and a second frame; the first frame and the second frame each comprise two bases; two ends of each base are respectively provided with a road wheel; and two guides are symmetrically provided on an upper end surface of the base;
  • a hydraulic cylinder is provided inside each guide; an oil pump is provided at a side of the guide via bolts and is configured to supply power to the hydraulic cylinder; a top end of a piston rod of the hydraulic cylinder is connected to a bottom of a support beam provided inside the guide; a top end of the support beam is fixedly connected to an end of an H-shaped beam; a cross beam is provided at a middle of the H-shaped beam; a triangular bracket is provided on a top of the cross beam; and a support base is welded onto a top of the triangular bracket to support the cantilever beam;
  • a groove is provided on a bottom of the support base; a plurality of threaded holes are symmetrically provided on both side walls of the groove of the support base; a threaded rod is in threaded connection with each threaded hole; a stopper is welded at an end of the threaded rod; and a rotating handle is welded at the other end of the threaded rod;
  • first bracing frames are symmetrically welded on both sides of the triangular bracket; second bracing frames are symmetrically welded on both sides of the triangular bracket; each first bracing frame and each second bracing frame are respectively provided with a first installation groove; a first rotating shaft provided on the first installation groove is rotatably connected to an end of a first connecting rod; a second installation groove is provided in a middle of a side of the first bracing frame and the second bracing frame, respectively; a second rotating shaft is provided at the second installation groove; an end of a first Y-shaped connecting rod is connected to a middle of the second rotating shaft; and a U-shaped end of a second Y-shaped connecting rod is connected to two ends of the second rotating shaft;
  • the cantilever beam mold comprises two opposite side plates installed in parallel and two opposite end plates installed in parallel; and each end plate is perpendicular to each side plate;
  • each side plate comprises a middle side plate, two first side plates and two second side plates; the two second side plates are respectively provided on two sides of the middle side plate; and the two first side plates are respectively provided on sides of the two second side plates away from the middle side plate;
  • a rectangular baffle plate is welded on the middle side plate; and two ends of the rectangular baffle plate are respectively fixed to the two second side plates via bolts;
  • a third installation groove is provided on each first side plate and each second side plate, respectively; a third rotating shaft is provided at the third installation groove; the other end of the first connecting rod is connected to a middle of the third rotating shaft; and a U-shaped end of the first Y-shaped connecting rod is connected to two ends of the third rotating shaft;
  • a fourth installation groove is provided under the third installation groove; a fourth rotating shaft is provided at the fourth installation groove; and an end of the second Y-shaped connecting rod is connected to a middle of the fourth rotating shaft; and
  • a rectangular slot is provided on the middle side plate to clamp a pier-top.
  • The present application has the following beneficial effects.
  • 1) A scaled model of the cantilever beam on the central pier is established and tested. According to test data and analysis results of the scaled model, the stress distribution regularities of the cantilever beam are obtained, so as to find out week parts of the cantilever beam, and thus the optimization design can be performed to make the cantilever beam reasonably carry the load and improve the materials with a higher utilization ratio.
  • 2) A wheeled stand support used in the present application has a high turnover rate and it is easy and convenient to dismantle and assemble the wheeled stand support, so as to ensure the construction period requirement and the construction safety and improve the utilization ratio of the materials, being time-consuming and labor-saving. A height of the cantilever beam mold can be adjusted by the hydraulic cylinder, benefiting the construction of the cantilever beam.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The present application will be further described below with reference to the accompanying drawings.
  • FIG. 1 is a schematic diagram of a cantilever beam on a central pier according to the present application;
  • FIG. 2 is a front view of a wheeled stand support according to the present application;
  • FIG. 3 is a schematic diagram of the wheeled stand support according to the present application;
  • FIG. 4 is an enlarged view of Detail Ain FIG. 3;
  • FIG. 5 shows control sections of a scaled model of the cantilever beam in a second test according to the present application;
  • FIG. 6 shows a damaged section of the cantilever beam in the second test according to the present application;
  • FIG. 7 shows control sections of the scaled model of the cantilever beam in a first test according to the present application; and
  • FIG. 8 shows a damaged section of the cantilever beam in the first test according to the present application.
  • DETAILED DESCRIPTION OF EMBODIMENTS
  • The technical solutions of the embodiments will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present application. Obviously, the embodiments disclosed herein are merely illustrative, and are not intended to limit the present application. Any other embodiments made by those skilled in the art based on the embodiments of the present application without sparing any creative efforts shall fall within the scope of the present application.
  • The present application provides a construction method for a cantilever beam on a central pier. As shown in FIGS. 1-8, there is shown a cantilever beam 1. A bottom end of the cantilever beam 1 is installed in a pier groove 6 which is provided on a pier-top 2. A bottom of the pier-top 2 is installed on a top of a bridge pier 3. A bottom of the bridge pier 3 is installed on an upper end surface of a rectangular bearing platform 4. Four cast-in-place bored piles 5 are provided on a lower end surface of the rectangular bearing platform 4. Two blocks 7 are symmetrically provided on both sides of an upper end surface of the cantilever beam 1.
  • The pier-top 2 and the bridge pier 3 are integrally poured and formed using C50 concrete. The rectangular bearing platform 4 is poured and formed using C35 concrete. The four cast-in-place bored piles 5 are poured and formed using C30 underwater concrete.
  • The construction method for the cantilever beam on the central pier includes the following steps.
  • 1) Scaled models of the cantilever beam on the central pier are established. The scaled models are tested. The cantilever beam 1 can be constructed when a test result of the scaled model reaches a given threshold. A 1:4 scaled model having an upper structure with a span length of 30 m is tested in the first test, and a 1:4 scaled model having an upper structure with a span length of 35 m is tested in the second test.
  • S1) Control sections of the scaled model are selected. On-site loading is applied at the control sections of the scaled model under normal conditions and overload conditions. The control sections of the scaled model are set as Ai, i=1, 2 . . . n. The scaled model is tested for the first time.
  • FIGS. 7-8 show the on-site loading applied at the control sections of the scaled model under normal conditions and overload conditions. It can be seen that there is no crack at A-A and C-C of the control sections of the scaled model. After the on-site loading continues to be applied, the cantilever beam breaks prior to the bridge pier. The fissure of the damaged section is close to a root of the cantilever beam. Load combinations on the scaled model under various use conditions in the first test are shown in Table 1. Safety factors and overload factors of the cantilever beam and the bridge pier are shown in Table 2.
  • TABLE 1
    Load combinations on the scaled model under
    various use conditions in the first test
    Use Condition Type Load combinations
    Normal conditions Case 1: constant load + first-classed road
    (No. 4 lane)
    Case 2: constant load + first-classed road
    (No. 3 lane) + two heavy vehicles with 120 t
    (No. 1 lane on the outermost side) +
    wind-induced load
    Case 3: constant load + first-classed road
    (No. 2 lane next to the outermost side) +
    two heavy vehicles with 120 t (No. 1 lane on
    the outermost side) + wind-induced load
    Case 4: constant load + first-classed road
    (No. 1 lane next to the outermost side) +
    two heavy vehicles with 120 t (No. 1 lane on
    the outermost side) + wind-induced load
    Case 5: constant load + first-classed road
    (No. 3 lane) + 3.4 times first-classed road
    (No. 1 lane next to the outermost side) +
    wind-induced load
    Overload conditions Case 1: constant load + first-classed road
    (No. 2 lane next to the outermost side) +
    two heavy vehicles with 120 t (No. 1 lane on
    the outermost side) + wind-induced load
    Case 2: constant load + first-classed road
    (No. 2 lane next to the outermost side) +
    two heavy vehicles with 120 t (No. 2 lane on
    the outermost side) + wind-induced load
    Case 3: constant load + first-classed road
    (No. 2 lane next to the outermost side) +
    two heavy vehicles with 120 t (No. 2 lane on
    the outermost side) + wind-induced load
  • TABLE 2
    Safety factors and overload factors of the cantilever beam and the bridge pier
    Maximum normal conditions Maximum overload conditions
    First safety First overload Second safety Second overload
    Cross sections factor factor factor factor
    A 2.42 7.21 1.89 4.09
    C 2.58 7.42 2.02 4.29
    Pier top 1.81 6.45 1.47 3.4
    Pier bottom 1.77 6.45 1.45 3.4
    Damaged section 2.82 7.8 2.2 4.65
  • S2) Bending moments at Ai of the scaled model are acquired by a motion detector. A bending moment at Ai of the scaled model before applying the on-site loading is set as M0. A bending moment at Ai of the scaled model when the scaled model breaks is set as Mp. A bending moment at Ai of the scaled model under maximum normal conditions is set as M1. A bending moment at Ai under maximum overload conditions is set as M2.
  • S3) A first safety factor K1 at Ai of the scaled model under the maximum normal conditions is calculated according to
  • K 1 = M P M 1 .
  • S4) A first overload factor P1 at Ai of the scaled model under the maximum normal conditions is calculated according to
  • P 1 = M P - M 0 M 1 - M 0 ;
  • S5) A second safety factor K2 at Ai of the scaled model under the maximum overload conditions is calculated according to
  • K 2 = M P M 2 ;
  • S6) A second overload factor P2 at Ai of the scaled model under the maximum overload conditions is calculated according to
  • P 2 = M P - M 0 M 2 - M 0 ;
  • S7) Pictures of the scaled model at Ai of the scaled model are acquired by an acquisition device and the number of cracks in the pictures is identified. When all of the first safety factor, the second safety factor, the first overload factor and the second overload factor are within a preset threshold range and there are no cracks, the cantilever beam can be constructed.
  • The cantilever beam and the bridge pier are in an elastic state in the processes of prestress tension and applying the weight, i.e., in the construction process. The cantilever beam and the bridge pier under predetermined overload conditions are basically in an elastic state and no cracks are found, indicating the structure of the cantilever beam and the bridge pier has the good mechanical performance.
  • Operating conditions that can cause damage reach when load is gradually enlarged based on maximum axial force conditions of the bridge pier. Load is gradually applied at loading points marked as 2, 2′, 1 and 1′. Finally, when load reaches 1200 kN at the loading points marked as 2 and 2′ and load reaches 700 kN at the loading points marked as 1 and 1′, the concrete collapses at the junction of a lower edge of the cantilever beam and a top of the pier-top, indicating the structure is damaged. Through the tests, the normal conditions and the carrying capacity of the cantilever beam are designed and verified.
  • A second test is performed on the scaled model.
  • Compared to the first test, the second test only adjusts the size of the cantilever beam and changes a three-fold line at a bottom of the cantilever beam into a double-fold line. As shown in FIGS. 5-6, the cantilever beam breaks prior to the bridge pier, and the damaged section is located at the lower edge of the cantilever beam.
  • TABLE 3
    Load combinations on the scaled model under
    various use conditions in the second test
    Use Condition Type Load combinations
    Normal conditions Case 1: constant load + first-classed road
    (No. 4 lane)
    Overload conditions Case 1: constant load + first-classed road
    (No. 3 lane) + two heavy vehicles with 120 t
    (No. 1 lane on the outermost side) +
    wind-induced load
    Case 2: constant load + first-classed road
    (No. 2 lane next to the outermost side) +
    two heavy vehicles with 120 t (No. 1 lane on
    the outermost side) + wind-induced load
    Case 3: constant load + first-classed road
    (No. 1 lane next to the outermost side) +
    two heavy vehicles with 120 t (No. 1 lane on
    the outermost side) + wind-induced load
    Case 4: constant load + first-classed road
    (No. 3 lane) + 3.4 times first-classed road
    (No. 1 lane next to the outermost side) +
    wind-induced load
    Case 5: constant load + first-classed road
    (No. 2 lane next to the outermost side) +
    two heavy vehicles with 120 t (No. 1 lane on
    the outermost side) + wind-induced load
    Case 6: constant load + first-classed road
    (No. 2 lane next to the outermost side) +
    two heavy vehicles with 120 t (No. 2 lane on the
    outermost side) + wind-induced load
    Case 7: constant load + first-classed road
    (No. 2 lane next to the outermost side) +
    two heavy vehicles with 120 t (No. 2 lane on the
    outermost side) + wind-induced load
  • Safety factors of control sections of the cantilever beam are shown in Table 4.
  • TABLE 4
    Safety factors of the control sections of the cantilever beam
    Case
    1 of Case 1 of Case 3 of Case 4 of Case 7 of
    normal overload overload overload overload
    Factors conditions conditions conditions conditions conditions
    Safety factors 6.91 2.6 2.84 2.54 1.45
  • The cantilever beam and the bridge pier are in an elastic state in the processes of prestress tension and applying weight, i.e., in the construction process.
  • When the load is gradually applied until the case 5 of the overload conditions reaches, there are cracks appeared in the bridge pier. When the load increases until the cases 6 and 7 of the overload conditions reach, the cracks merge in the horizontal direction. The merged crack is enlarged in length and width, for example, a maximum width of the merged crack is 0.14 mm, at this time, the structure is not damaged.
  • Under the operating conditions that cause damage, load reaches 240 kN at the loading point marked as 1, and load reaches 660 kN at the loading point marked as 2. The concrete at the pier groove of the pier-top collapses, indicating the structure is damaged. A maximum vertical displacement of the cantilever beam is 31 cm, and a maximum horizontal displacement of the pier-top is 5.91 mm. After being disassembled, cantilever beam has a maximum vertical residual deformation of 24 cm.
  • Through these tests, it is concluded that the structure meets the design requirements.
  • 2) A wheeled stand support 8 is used to support a bottom of the cantilever beam. The wheeled stand support 8 includes a first frame 81 and a second frame 82. The first frame 81 and the second frame 82 each comprise two bases 811. Two ends of each base 811 are respectively provided with a road wheel 812. Two guides 816 are symmetrically provided on an upper end surface of the base 811.
  • A hydraulic cylinder 813 is provided inside each guide 816. An oil pump 814 is provided at a side of the guide 816 via bolts and is configured to supply power to the hydraulic cylinder 813. A top end of a piston rod of the hydraulic cylinder 813 is connected to a bottom of a support beam 815 provided inside the guide 816. A top end of the support beam 815 is fixedly connected to an end of an H-shaped beam 817. A cross beam 819 is provided at a middle of the H-shaped beam 817. A triangular bracket 818 is provided on a top of the cross beam 819. A support base 85 is welded onto a top of the triangular bracket 818 to support the cantilever beam.
  • A groove 851 is provided on a bottom of the support base 85. A plurality of threaded holes 852 are symmetrically provided on both side walls of the groove 851 of the support base. A threaded rod 853 is in threaded connection with each threaded hole 852. A stopper 854 is welded at an end of the threaded rod 853. A rotating handle 855 is welded at the other end of the threaded rod 853.
  • First bracing frames 83 are symmetrically welded on both sides of the triangular bracket 818. Second bracing frames 84 are symmetrically welded on both sides of the triangular bracket 818. Each first bracing frame 83 and each second bracing frame 84 are respectively provided with a first installation groove 841. A first rotating shaft 842 provided on the first installation groove 841 is rotatably connected to an end of a first connecting rod 844. A second installation groove 843 is provided in a middle of a side of the first bracing frame 83 and the second bracing frame 84, respectively. A second rotating shaft 850 is provided at the second installation groove 843. An end of a first Y-shaped connecting rod 848 is connected to a middle of the second rotating shaft 850. A U-shaped end of a second Y-shaped connecting rod 849 is connected to two ends of the second rotating shaft 850.
  • 3) A cantilever beam mold 9 is installed. The cantilever beam mold 9 includes two opposite side plates 96 installed in parallel and two opposite end plates 94 installed in parallel. Each end plate 94 is perpendicular to each side plate 96.
  • Each side plate 96 includes a middle side plate 93, two first side plates 92 and two second side plates 91. The two second side plates 91 are respectively provided on two sides of the middle side plate 93. The two first side plates 92 are respectively provided on sides of the two second side plates 91 away from the middle side plate 93.
  • A rectangular baffle plate 931 is welded on the middle side plate 93. Two ends of the rectangular baffle plate 931 are respectively fixed to the two second side plates 92 via bolts.
  • A third installation groove 911 is provided on each first side plate 91 and each second side plate 92, respectively. A third rotating shaft 845 is provided at the third installation groove 911. The other end of the first connecting rod 844 is connected to a middle of the third rotating shaft 845. A U-shaped end of the first Y-shaped connecting rod 848 is connected to two ends of the third rotating shaft 845.
  • A fourth installation groove 846 is provided under the third installation groove 911. A fourth rotating shaft 847 is provided at the fourth installation groove 846. An end of the second Y-shaped connecting rod 849 is connected to a middle of the fourth rotating shaft 847.
  • A rectangular slot 932 is provided on the middle side plate 93 to clamp a pier-top 2.
  • The wheeled stand support 8 and the middle side plate 93 are installed through the following steps.
  • SS1) The first frame 81 and the second frame 82 are respectively installed on both sides of the bridge pier 3, simultaneously. A bottom of the hydraulic cylinder 813 is provided on the base 811. The bottom of the support beam 815 is connected to the piston rod of the hydraulic cylinder 813 via flanges and bolts. The oil pump 814 is provided on the guide 816 via screws and connected to the hydraulic cylinder 813 by an oil pipe.
  • SS2) The two bases 811 are placed in parallel. The H-shaped beam 817 is placed above the support beam 815 by a crane and fixedly connected to the support beam 815 via bolts.
  • SS3) The threaded rod 853 is in threaded connection with each threaded hole 852 and passes through the threaded hole 852. The stopper 854 is welded to an end of the threaded rod 853 that passes through the threaded hole 852. The rotating handle 855 is welded at the other end of the threaded rod 853.
  • SS4) Bottoms of the first side plate 91 and the second side plate 92 are placed in the groove 851. The end of the first connecting rod 844 is installed in the first installation groove 841 through the first rotating shaft 842. The other end of the first connecting rod 844 is located inside the third installation groove 911. The U-shaped end of the first Y-shaped connecting rod 848 is located at two sides of the third installation groove 911. The first connecting rod 844 and the first Y-shaped connecting rod 848 are fixed on the third installation groove 911 through the third rotating shaft 845. The other end of the first Y-shaped connecting rod 848 is located inside the second installation groove 843, and the U-shaped end of the second Y-shaped connecting rod 849 is located on both sides of the second installation groove 843. The first Y-shaped connecting rod 848 and the second Y-shaped connecting rod 849 are fixed in the second installation groove 843 through the second rotating shaft 850. The other end of the second Y-shaped connecting rod 849 is installed in the fourth installation groove 846 through the fourth rotating shaft 847.
  • SS5) The triangular bracket 818 is hoisted on the cross beam 819 by a crane and fixed to the cross beam 819 via bolts. The locations of the first frame 81 and the second frame 82 are adjusted to make two cross beams 819 symmetrical to the bridge pier 3. At the same time, the oil pump 814 is controlled to provide power to the hydraulic cylinder 813 to allow the hydraulic cylinder 813 to move the support beam 815, the H-shaped beam 817 and the triangular bracket 818 upward. The rectangular baffle plate 931 is welded on the middle side plate 93. Two ends of the rectangular baffle plate 931 are respectively fixed to the two second side plates 92 via bolts.
  • The rectangular slot 932 is provided on the middle side plate 93 to clamp the pier-top 2. The two end plates 94 are inserted at two ends of the side plates 96 to realize the installation of the wheeled stand support 8 and the cantilever beam mold. The wheeled stand support used in the present application has a high turnover rate and it is easy and convenient to dismantle and assemble the wheeled stand support, so as to ensure the construction period requirement and the construction safety and improve the utilization ratio of the materials, being time-consuming and labor-saving. A height of the cantilever beam mold can be adjusted by the hydraulic cylinder, benefiting the construction of the cantilever beam.
  • 4) Cantilever beam rebar is secured by tying wire.
  • 5) The cantilever beam rebar is hoisted into the cantilever beam mold 9 by a crane followed by concrete pouring. The concrete pouring is implemented as follows.
  • The concrete is mixed in a centralized batch plant and then is transported to the pouring site by a concrete transport truck and sent to a pouring surface of the cantilever beam mold 9 by a concrete pump. If the concrete pouring height exceeds or equals to 2 m, a connecting tube can be used to transport the concrete to the working surface. After the concrete pouring is completed, an immersion vibrator is inserted to vibrate the concrete at a depth of 50-100 mm of a lower concrete layer, so that the concrete at the joint of the two layers is evenly integrated. The distance between the immersion vibrator and the cantilever beam mold 9 ranges from 50 to 100 mm.
  • The working principle of the present application is described as follows.
  • The scaled model of the cantilever beam on the central pier is established and tested. According to test data and analysis results of the scaled model, the stress distribution regularities of the cantilever beam are obtained, so as to find out week parts of the cantilever beam, and thus the optimization design can be performed to make the cantilever beam reasonably carry the load and improve the materials with a higher utilization ratio.
  • The first frame 81 and the second frame 82 are respectively installed on both sides of the bridge pier 3, simultaneously. A bottom of the hydraulic cylinder 813 is provided on the base 811. The bottom of the support beam 815 is connected to the piston rod of the hydraulic cylinder 813 via flanges and bolts. The oil pump 814 is provided on the guide 816 via screws and connected to the hydraulic cylinder 813 by an oil pipe.
  • The two bases 811 are placed in parallel. The H-shaped beam 817 is placed above the support beam 815 by a crane and fixedly connected to the support beam 815 via bolts.
  • The threaded rod 853 is in threaded connection with each threaded hole 852 and passes through the threaded hole 852. The stopper 854 is welded to an end of the threaded rod 853 that passes through the threaded hole 852. The rotating handle 855 is welded at the other end of the threaded rod 853.
  • Bottoms of the first side plate 91 and the second side plate 92 are placed in the groove 851. The end of the first connecting rod 844 is installed in the first installation groove 841 through the first rotating shaft 842. The other end of the first connecting rod 844 is located inside the third installation groove 911. The U-shaped end of the first Y-shaped connecting rod 848 is located at two sides of the third installation groove 911. The first connecting rod 844 and the first Y-shaped connecting rod 848 are fixed on the third installation groove 911 through the third rotating shaft 845. The other end of the first Y-shaped connecting rod 848 is located inside the second installation groove 843, and the U-shaped end of the second Y-shaped connecting rod 849 is located on both sides of the second installation groove 843. The first Y-shaped connecting rod 848 and the second Y-shaped connecting rod 849 are fixed in the second installation groove 843 through the second rotating shaft 850. The other end of the second Y-shaped connecting rod 849 is installed in the fourth installation groove 846 through the fourth rotating shaft 847.
  • The triangular bracket 818 is hoisted on the cross beam 819 by a crane and fixed to the cross beam 819 via bolts. The locations of the first frame 81 and the second frame 82 are adjusted to make two cross beams 819 symmetrical to the bridge pier 3. At the same time, the oil pump 814 is controlled to provide power to the hydraulic cylinder 813 to allow the hydraulic cylinder 813 to move the support beam 815, the H-shaped beam 817 and the triangular bracket 818 upward. The rectangular baffle plate 931 is welded on the middle side plate 93. Two ends of the rectangular baffle plate 931 are respectively fixed to the two second side plates 92 via bolts.
  • The rectangular slot 932 is provided on the middle side plate 93 to clamp the pier-top 2. The two end plates 94 are inserted at two ends of the side plates 96 to realize the installation of the wheeled stand support 8 and the cantilever beam mold. The wheeled stand support used in the present application has a high turnover rate and it is easy and convenient to dismantle and assemble the wheeled stand support, so as to ensure the construction period requirement and the construction safety and improve the utilization ratio of the materials, being time-consuming and labor-saving. A height of the cantilever beam mold 9 can be adjusted by the hydraulic cylinder 813, benefiting the construction of the cantilever beam.
  • The descriptions herein are intended to illustrate the present invention. Any modifications, additions and replacements made by those skilled in the art based on the embodiments disclosed herein and without departing from the spirit of the present application shall fall within the scope as defined by the appended claims.

Claims (1)

What is claimed is:
1. A construction method for a cantilever beam on a central pier, comprising:
1) establishing a scaled model of the cantilever beam on the central pier; and testing the scaled model and constructing the cantilever beam when a test result of the scaled model reach a given threshold;
2) supporting a bottom of the cantilever beam with a wheeled stand support;
3) installing a cantilever beam mold;
4) securing cantilever beam rebar by tying wire; and
5) hoisting the cantilever beam rebar into the cantilever beam mold by a crane followed by concrete pouring;
wherein in step (1), testing the scaled model comprising:
1) determining control sections of the scaled model; applying on-site loading at the control sections of the scaled model under normal conditions and overload conditions; setting the control sections of the scaled model as Ai, and i is an integer greater than or equal to 1;
2) recording bending moments at Ai of the scaled model by a motion detector; setting a bending moment at Ai of the scaled model before applying the on-site loading as M0; setting a bending moment at Ai of the scaled model when the scaled model breaks as Mp; setting a bending moment at Ai of the scaled model under maximum normal conditions as M1; and setting a bending moment at Ai of the scaled model under maximum overload conditions as M2;
3) calculating a first safety factor K1 at Ai of the scaled model under the maximum normal conditions according to
K 1 = M P M 1 ;
4) calculating a first overload factor P1 at Ai of the scaled model under the maximum normal conditions according to
P 1 = M P - M 0 M 1 - M 0 ;
5) calculating a second safety factor K2 at Ai of the scaled model under the maximum overload conditions according to
K 2 = M P M 2 ;
6) calculating a second overload factor P2 at Ai of the scaled model under the maximum overload conditions according to
P 2 = M P - M 0 M 2 - M 0 ;
and
7) acquiring pictures of the scaled model at Ai of the scaled model by an acquisition device and identifying the number of cracks in the pictures; and constructing the cantilever beam when all of the first safety factor, the second safety factor, the first overload factor and the second overload factor are within a preset threshold range and there are no cracks;
wherein the wheeled stand support comprises a first frame and a second frame; the first frame and the second frame each comprise two bases; two ends of each base are respectively provided with a road wheel; and two guides are symmetrically provided on an upper end surface of the base;
a hydraulic cylinder is provided inside each guide; an oil pump is provided at a side of the guide via bolts and is configured to supply power to the hydraulic cylinder; a top end of a piston rod of the hydraulic cylinder is connected to a bottom of a support beam provided inside the guide; a top end of the support beam is fixedly connected to an end of an H-shaped beam; a cross beam is provided at a middle of the H-shaped beam; a triangular bracket is provided on a top of the cross beam; and a support base is welded onto a top of the triangular bracket to support the cantilever beam;
a groove is provided on a bottom of the support base; a plurality of threaded holes are symmetrically provided on both side walls of the groove of the support base; a threaded rod is in threaded connection with each threaded hole; a stopper is welded at an end of the threaded rod; and a rotating handle is welded at the other end of the threaded rod;
a plurality of first bracing frames are symmetrically welded on both sides of the triangular bracket; a plurality of second bracing frames are symmetrically welded on both sides of the triangular bracket; each first bracing frame and each second bracing frame are respectively provided with a first installation groove; a first rotating shaft provided on the first installation groove is rotatably connected to an end of a first connecting rod; a second installation groove is provided in a middle of a side of the first bracing frame and the second bracing frame, respectively; a second rotating shaft is provided at the second installation groove; an end of a first Y-shaped connecting rod is connected to a middle of the second rotating shaft; and a U-shaped end of a second Y-shaped connecting rod is connected to two ends of the second rotating shaft;
the cantilever beam mold comprises two opposite side plates installed in parallel and two opposite end plates installed in parallel; and each end plate is perpendicular to each side plate;
each side plate comprises a middle side plate, two first side plates and two second side plates; the two second side plates are respectively provided on two sides of the middle side plate; and the two first side plates are respectively provided on sides of the two second side plates away from the middle side plate;
a rectangular baffle plate is welded on the middle side plate; and two ends of the rectangular baffle plate are respectively fixed to the two second side plates via bolts;
a third installation groove is provided on each first side plate and each second side plate, respectively; a third rotating shaft is provided at the third installation groove; the other end of the first connecting rod is connected to a middle of the third rotating shaft; and a U-shaped end of the first Y-shaped connecting rod is connected to two ends of the third rotating shaft;
a fourth installation groove is provided under the third installation groove; a fourth rotating shaft is provided at the fourth installation groove; and an end of the second Y-shaped connecting rod is connected to a middle of the fourth rotating shaft;
a rectangular slot is provided on the middle side plate to clamp a pier-top;
a bottom end of the cantilever beam is installed in a pier groove which is provided on the pier-top; a bottom of the pier-top is installed on a top of a bridge pier; a bottom of the bridge pier is installed on an upper end surface of a rectangular bearing platform; four cast-in-place bored piles are provided on a lower end surface of the rectangular bearing platform; and two blocks are symmetrically provided on both sides of an upper end surface of the cantilever beam; and
the pier-top and the bridge pier are integrally formed by pouring with C50 concrete; the rectangular bearing platform is formed by pouring with C35 concrete; and the four cast-in-place bored piles are formed by pouring with C30 underwater concrete.
US16/999,143 2019-08-21 2020-08-21 Construction method for a cantilever beam on a central pier Active US10914043B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201910774803 2019-08-21
CN201910774803.5A CN110485264B (en) 2019-08-21 2019-08-21 Construction method of central pier large cantilever cover beam
CN201910774803.5 2019-08-21

Publications (2)

Publication Number Publication Date
US10914043B1 US10914043B1 (en) 2021-02-09
US20210054584A1 true US20210054584A1 (en) 2021-02-25

Family

ID=68552538

Family Applications (1)

Application Number Title Priority Date Filing Date
US16/999,143 Active US10914043B1 (en) 2019-08-21 2020-08-21 Construction method for a cantilever beam on a central pier

Country Status (3)

Country Link
US (1) US10914043B1 (en)
EP (1) EP3786605B1 (en)
CN (1) CN110485264B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA3173174A1 (en) * 2020-05-21 2021-11-25 Blaine Miller Bridge support system
CN112051081B (en) * 2020-09-08 2022-08-23 安徽工业大学 Large-cantilever safe intelligent construction system and method for directly guiding construction by experimental data
CN113789724A (en) * 2021-09-10 2021-12-14 中国一冶集团有限公司 Sizing template and construction method
CN114855590B (en) * 2022-03-25 2023-10-24 中鑫建设集团有限公司 Safety positioning device for assembling large-frame concrete building structure
CN115162173A (en) * 2022-06-22 2022-10-11 中铁四局集团有限公司 Construction method of square steel-concrete combined type portal pier
CN117845776B (en) * 2024-03-05 2024-05-31 保利长大工程有限公司 Installation and construction method of steel box girder

Family Cites Families (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3706125A (en) * 1970-08-10 1972-12-19 John P Hopkins Co Pipe line construction method
GB2011980B (en) * 1977-11-02 1982-05-26 Dinardo & Partners Bridges and method of bridge construction
US4977636A (en) * 1989-08-30 1990-12-18 King John B Pile supported bridge assembly
JPH07224409A (en) * 1994-02-10 1995-08-22 Sekisui Chem Co Ltd Drainage structure of elevated structure and construction method of drain pipeline of elevated structure
US5655243A (en) * 1995-07-14 1997-08-12 Kim; Sun Ja Method for connecting precast concrete beams
US5940917A (en) * 1997-08-14 1999-08-24 Wilson; Richard D. Adjustable metal haunch form for bridge building
JP2002146720A (en) * 2000-11-14 2002-05-22 Nkk Corp Joint construction between column and beam
US7546656B2 (en) * 2005-08-16 2009-06-16 Daewoo Engineering & Construction Co., Ltd Method of installing prefabricated, segment concrete filled tube members
JP4318694B2 (en) * 2006-02-13 2009-08-26 朝日エンヂニヤリング株式会社 Floor slab bridge structure
US8458839B2 (en) * 2009-07-27 2013-06-11 Encon Technologies, Llc Apparatus and method for replacing a bridge using a pre-cast construction techniques
KR100950715B1 (en) * 2009-10-26 2010-03-31 (주)대우건설 Method for constructing precast coping for bridge
KR101203980B1 (en) * 2010-09-30 2012-11-22 주식회사 아앤시티 upper structure of bridge
CN102261042B (en) 2011-06-09 2013-03-06 四川川交路桥有限责任公司 Cantilever diagonal bracing bracket for casting bridge pier cover beam
KR20140084107A (en) * 2011-10-07 2014-07-04 엔알에스 컨설팅 컴퍼니 리미티드 Self-Launching Movable Scaffolding System
US10120835B2 (en) * 2014-04-08 2018-11-06 Gci, Inc. Load rating of bridges, including substructure
CN106638312B (en) * 2015-12-14 2018-07-17 中铁上海工程局集团有限公司 The construction method of moving door frame in great cantilever Coping Construction
CN206512588U (en) * 2016-11-23 2017-09-22 重庆市中科大业建筑科技有限公司 A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled
CN108086130B (en) * 2016-11-23 2023-10-13 重庆市中科大业建筑科技有限公司 Assembled T-shaped steel pipe constraint reinforced concrete bridge pier beam column connection node
US10344480B2 (en) * 2017-12-04 2019-07-09 The Florida International University Board Of Trustees Composite construct and methods and devices for manufacturing the same
CN107974921B (en) * 2017-12-04 2024-03-12 中交一公局第三工程有限公司 Viaduct, bridge pier and special-shaped variable-section bent cap
CN108316152A (en) * 2018-01-30 2018-07-24 中交第三航务工程局有限公司南京分公司 A kind of high pier capping beam construction mobile formwork and its construction technology

Also Published As

Publication number Publication date
EP3786605B1 (en) 2022-02-23
CN110485264A (en) 2019-11-22
CN110485264B (en) 2020-06-02
US10914043B1 (en) 2021-02-09
EP3786605A1 (en) 2021-03-03

Similar Documents

Publication Publication Date Title
US10914043B1 (en) Construction method for a cantilever beam on a central pier
CN109763569B (en) Construction method of cantilever awning
CN109208488B (en) High pier pre-pressing device with high combined weight at high altitude and construction method thereof
CN115467421B (en) Hoisting construction method for complex large-span steel roof
CN104790299B (en) Internal-span unsupported convenient construction support and method for bridge cast-in-place box beam
CN214695184U (en) Pre-pressing system for double-thin-wall pier beam support bracket
CN110318344B (en) Novel steel box girder No. 0 block support and No. 0 block erection construction method
CN210887278U (en) Fixing device for cup mouth type concrete foundation pit stand column
CN105735228B (en) High-lift tooth climbs formula ship lift rack system construction method and installation accuracy control method
CN209907206U (en) Auxiliary device for installing dumbbell-shaped arch ribs
CN111622091B (en) Stress test method for prefabricated bridge pier
CN111927111B (en) Construction method of ultrahigh special-shaped outer frame steel structure
CN111485887B (en) Construction method of novel working well
CN210420898U (en) Novel No. 0 block support of steel box girder
CN110847257B (en) Pile foundation static load experiment device and method suitable for narrow space
CN110700574A (en) Post-cast strip supporting structure and construction method thereof
CN219450404U (en) Thin-wall hollow pier top prestress steel strand construction positioning framework
CN115324277B (en) Construction method of high-altitude large-span arc-shaped prestressed beam
CN211368428U (en) Cable tower box type steel anchor beam pre-assembled jig frame
CN215948208U (en) Beam string concrete support composite structure
CN218779941U (en) A support system for floor is pour
CN211899626U (en) Support early-dismantling structure
CN110607765B (en) Intelligent bridge hanging basket prepressing device and control method thereof
CN209891093U (en) Prepressing device of continuous rigid frame hanging basket of triangular bracket
CN218623298U (en) Face empty side and hang concrete body upside down and pour template device

Legal Events

Date Code Title Description
FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

FEPP Fee payment procedure

Free format text: ENTITY STATUS SET TO SMALL (ORIGINAL EVENT CODE: SMAL); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY

AS Assignment

Owner name: CCCC HIGHWAY CONSULTANTS CO., LTD., CHINA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:LIU, GANGLIANG;WANG, CHENGMIN;WANG, ZHONGWEN;AND OTHERS;REEL/FRAME:054112/0422

Effective date: 20200805

Owner name: POLY CHANGDA ENGINEERING CO., LTD., CHINA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:LIU, GANGLIANG;WANG, CHENGMIN;WANG, ZHONGWEN;AND OTHERS;REEL/FRAME:054112/0422

Effective date: 20200805

STCF Information on status: patent grant

Free format text: PATENTED CASE