CN106638312B - The construction method of moving door frame in great cantilever Coping Construction - Google Patents

The construction method of moving door frame in great cantilever Coping Construction Download PDF

Info

Publication number
CN106638312B
CN106638312B CN201610899520.XA CN201610899520A CN106638312B CN 106638312 B CN106638312 B CN 106638312B CN 201610899520 A CN201610899520 A CN 201610899520A CN 106638312 B CN106638312 B CN 106638312B
Authority
CN
China
Prior art keywords
door frame
moving door
construction
steel
great cantilever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610899520.XA
Other languages
Chinese (zh)
Other versions
CN106638312A (en
Inventor
王国林
汪树生
程红松
周运志
覃林
赵振加
臧东彦
干业刚
汪朝科
杜洪强
谢志华
张少旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Third Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Third Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Third Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201610899520.XA priority Critical patent/CN106638312B/en
Publication of CN106638312A publication Critical patent/CN106638312A/en
Application granted granted Critical
Publication of CN106638312B publication Critical patent/CN106638312B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a kind of construction methods of the moving door frame in great cantilever Coping Construction, it is characterized in that moving door frame system is arranged in the construction for great cantilever bent cap:Moving door frame system includes three units, is left cell, temporary location and right sided cell respectively;Left cell has symmetrical structure form with right sided cell, is made of two groups of independently arranged moving door frames respectively, and distance is the width for the car lane for keeping normal pass between two groups of moving door frames;Moving door frame is using moveable universal wheel as castor;Temporary location is that sandbox is arranged at the top of helix tube, distribution beam is arranged on sandbox, the Bailey beam for being laid with bent cap bed die is supported on moving door frame system using helix tube as supporting upright post.The present invention applies the construction of the big bent cap on existing road, can effectively shorten the duration, ensures road travel.

Description

The construction method of moving door frame in great cantilever Coping Construction
The application is application No. is 2015109294931, and the applying date 20151214, entitled great cantilever bent cap is applied Moving door frame in work and its construction method apply for artificial Shanghai Civil Engineering Co., Ltd. of Crec and the Shanghai Zhong Tie Engineering Bureau The divisional application of third Engineering Co., Ltd of group application for a patent for invention.
Technical field
Apply big in existing road traffic the present invention relates to a kind of, security requirement is high, the duration is tight, traffic dispersion can not Change the moving door frame and its construction method in the great cantilever Coping Construction in the occasion of shifting.
Background technology
In the prior art, the construction generally use steel pipe post of big bent cap adds the form or calf support Jia Beilei of Bailey bracket The form of frame.But two kinds of forms all there is a problem of it is identical, one is safety issue, in holder assembly, due to by road Road closed can not limit, and can only rely on and personnel is sent to protect construction site, there are larger security risks;The second is Construction speed problem, steel pipe post add the construction period of Bailey bracket method to be about three day time, but in installation column and Bailey bracket It is affected in the process by factors such as traffic, weather, uncontrollable factor is big, greatly influences construction speed, and security risk Greatly even influence construction quality.
Invention content
The present invention is provided in a kind of great cantilever Coping Construction to avoid above-mentioned existing deficiencies in the technology The construction method of moving door frame, to ensure construction quality, improve construction speed, improve safety, and do not influence traffic driving, It is influenced by weather small.
The present invention is to solve technical problem to adopt the following technical scheme that:
Moving door frame in great cantilever Coping Construction of the present invention is structurally characterized in that:For the construction setting of great cantilever bent cap Moving door frame system:The moving door frame system includes three units, is left cell, temporary location and right sided cell respectively; The left cell has symmetrical structure form with right sided cell, is made of two groups of independently arranged moving door frames respectively, Distance is the width for the car lane for keeping normal pass between two groups of moving door frames;The moving door frame is with moveable ten thousand It is castor to wheel;The temporary location is sandbox to be arranged at the top of the helix tube, in sandbox using helix tube as supporting upright post Upper setting temporary location distribution beam, the Bailey beam for being laid with bent cap bed die are supported on the moving door frame system.
The design feature of moving door frame in great cantilever Coping Construction of the present invention is lain also in:The structure of the moving door frame is set It is set to:The castor is mounted on the bottom on the door frame chassis being made of I-steel and steel plate, and four sets of cannulated posts Zhi Li are in door frame On chassis, described sleeve pipe column can be provided at the top of described sleeve pipe column and be in together with adjusting post height using bolt Twice transverse distribution beam in one level height;Bailey beam is supported on the transverse distribution beam, and at both ends in overhanging.
The design feature of moving door frame in great cantilever Coping Construction of the present invention is lain also in:Spiral in the temporary location Pipe is arranged along the horizontal as two rows, has often arranged three;It is reinforced and is connected with channel steel between helix tube, ensure the stabilization of supporting upright post Property.
The design feature of moving door frame in great cantilever Coping Construction of the present invention is lain also in:In the top horizontal of the Bailey beam Row arrangement top layer I-steel distribution beam, the top layer I-steel distribution beam are to be distributed to arrangement in the top layer I-steel along bridge Be fixedly connected using U-typed card between beam and Bailey beam, make top layer I-steel distribution beam connected into jointly with Bailey beam one it is whole Body is for transmitting upper load;The bent cap bed die is laid in the top layer I-steel distribution beam.
The design feature of moving door frame in great cantilever Coping Construction of the present invention is lain also in:Shellfish thunder in three units Beam is disconnected in the joint location punishment of each unit, forms separate stress unit.
The characteristics of construction method of moving door frame in great cantilever Coping Construction of the present invention is:
During Coping Construction, the door frame chassis in moving door frame is the auxiliary bolster wood on backing plate using steel plate as backing plate, Door frame chassis is implemented on sleeper, is carried using steel plate and sleeper;
When the completion of this section section Coping Construction needs to have enough to meet the need moving door frame to next segment Coping Construction, first with crane Moving door frame is sling slightly, so that the bolt in cannulated posts is not stressed, then takes out bolt, moving door frame is dropped into height About 4m;Jack stand door frame chassis is recycled, steel plate and sleeper, the stress check calculation of completion sleeper to castor are taken out;Then Under the sync pulling of two carriages, castor cross-docking moving door frame is utilized;
The temporary location is to reduce height using sandbox, can then be removed.
Compared with the prior art, the present invention has the beneficial effect that:
The present invention is constructed under the premise of not influencing traffic on existing carriage way, be protected from weather influences substantially, Its stable structure safety, door frame are laid with that the time is fast, moves integrally and can greatly reduce the turnaround time, improve construction speed.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is section A-A schematic diagrames in Fig. 1;
Fig. 3 is section B-B schematic diagrames in Fig. 1;
Fig. 4 is the door frame chassis bearing structure schematic diagram of moving door frame in the present invention;
Figure label:1 moving door frame, 11 castors, 12 door frame chassis, 13 cannulated posts, 14 transverse distribution beams, 15 sides top Layer I-steel, 2 temporary locations, 21 helix tubes, 22 sandboxes, 23 temporary location distribution beams, 24 middle part top layer I-steel, 3 Bailey beams, 4 bent cap bed dies, 5 great cantilever bent caps, 6 car lanes.
Specific implementation mode
It is to be directed to great cantilever bent cap referring to the moving door frame in great cantilever Coping Construction in Fig. 1, Fig. 2 and Fig. 3, the present embodiment Moving door frame system is arranged in 5 construction:Moving door frame system includes three units, is left cell, temporary location and the right side respectively Side unit;Left cell has symmetrical structure form with right sided cell, is by two groups of 1 structures of independently arranged moving door frame respectively At the distance between two groups of moving door frames 1 are the width for the car lane 6 for keeping normal pass;Moving door frame 1 is with removable Universal wheel be castor;Temporary location 2 is with helix tube 21 for supporting upright post, and sandbox 22 is arranged at the top of helix tube 21, Temporary location distribution beam 23 is set on sandbox 22, and the Bailey beam 3 for being laid with bent cap bed die 4 is supported on moving door frame system.
As shown in Figure 1, the structure setting of moving door frame 1 is in the present embodiment:Castor 11 is mounted on by I-steel and steel plate The bottom on the door frame chassis 12 of composition, four sets of cannulated posts 13 are stood on door frame chassis 12, and cannulated posts 13 can using bolt With adjusting post height, the twice transverse distribution beam 14 being in same level height is provided at the top of cannulated posts 13; Bailey beam 3 is supported on transverse distribution beam 14, and at both ends in overhanging.
As shown in figure 4, the helix tube 21 in temporary location 2 is arranged along the horizontal as two rows, three have often been arranged;Helix tube 21 Between with channel steel reinforce connect, ensure the stability of supporting upright post.
As shown in Figure 3 and Figure 4, in the present embodiment, in the top of Bailey beam parallel arrangement top layer I-steel distribution beam, including The side top layer I-steel 15 being at moving door frame top position and the middle part top layer work being at temporary location top position Word steel 24, each top layer I-steel distribution beam be along bridge to arrangement, between top layer I-steel distribution beam and Bailey beam 3 use U-typed Card is fixedly connected, and top layer I-steel distribution beam is made to connect into an entirety jointly for transmitting upper load with Bailey beam;Bent cap Bottom plate 4 is laid in top layer I-steel distribution beam.The joint location of Bailey beam in the present embodiment in three units in each unit Punishment is disconnected, forms separate stress unit, keeps structure more firm.
It, can be on construction road by each moving door frame row of two carriage sync pullings using the moving door frame of foot wheel Into into next Coping Construction section, two moving door frames do not influence road travel, the effective solution problem of traffic data process. Simultaneously by calculating, moving door frame system is about 2.13Mpa to basic compression, much smaller than the carrying of existing road surface and cushion cap Power, therefore basis can not have to processing in construction, accelerate construction speed, saved construction cost.
As shown in figure 4, the construction method of the moving door frame in the present embodiment in great cantilever Coping Construction is:
During Coping Construction, the door frame chassis 12 in moving door frame 1 is with steel plate 16 for backing plate, auxiliary on backing plate 16 Bolster wood, door frame chassis 12 is implemented on sleeper, is carried using steel plate and sleeper.
When the completion of this section section Coping Construction needs to have enough to meet the need moving door frame 1 to next segment Coping Construction, first with hanging Vehicle slings moving door frame 1 slightly, so that the bolt in cannulated posts 13 is not stressed, then takes out bolt, and moving door frame 1 is declined It is about 4m to height;Jack stand door frame chassis 12 is recycled, steel plate and sleeper, the stress of completion sleeper to castor 11 are taken out Conversion;Then under the sync pulling of two carriages, using castor cross-docking moving door frame 1, if hauling speed is 10m/ Min, then moving door frame 1 just can draw in place by three minutes;Temporary location 2 is to reduce height using sandbox 22, then It is removed, entire work progress is conveniently, safely, fast.

Claims (3)

1. the construction method of the moving door frame in great cantilever Coping Construction, it is characterized in that:
The structure type of moving door frame in the great cantilever Coping Construction is:
Moving door frame system is arranged in construction for great cantilever bent cap (5):The moving door frame system includes three units, respectively It is left cell, temporary location and right sided cell;The left cell has symmetrical structure form with right sided cell, is respectively It is made of two groups of independently arranged moving door frames (1), distance is to keep the motor vehicle of normal pass between two groups of moving door frames (1) The width in road (6);The moving door frame (1) is using moveable universal wheel as castor (11);The temporary location is with spiral It is that temporary location is arranged on sandbox (22) in the top of the helix tube (21) setting sandbox (22) in supporting upright post to manage (21) Distribution beam (23), the Bailey beam (3) for being laid with bent cap bed die (4) are supported on the moving door frame system;The movement door The structure setting of frame is:The castor is mounted on the bottom on the door frame chassis being made of I-steel and steel plate, four sets of cannulated posts On door frame chassis, described sleeve pipe column can be set with adjusting post height at the top of described sleeve pipe column Zhi Li using bolt It is equipped with the twice transverse distribution beam being in same level height;Bailey beam is supported on the transverse distribution beam, and at both ends In overhanging;Bailey beam in three units is disconnected in the joint location punishment of each unit, forms separate stress unit;
The construction method of moving door frame in the great cantilever Coping Construction is:
During Coping Construction, the door frame chassis (12) in moving door frame (1) be with steel plate (16) be backing plate, in backing plate (16) Upper auxiliary bolster wood, door frame chassis (12) are implemented on sleeper, are carried using steel plate and sleeper;
When the completion of this section section Coping Construction needs to have enough to meet the need moving door frame (1) to next segment Coping Construction, first with crane Moving door frame (1) is sling slightly, so that the bolt in cannulated posts (13) is not stressed, then takes out bolt, by moving door frame (1) It is about 4m to drop to height;It recycles jack stand door frame chassis (12), takes out steel plate and sleeper, complete sleeper to castor (11) stress check calculation;Then under the sync pulling of two carriages, castor cross-docking moving door frame (1) is utilized;
The temporary location (2) is to reduce height using sandbox (22), can then be removed.
2. the construction method of the moving door frame in great cantilever Coping Construction according to claim 1, it is characterized in that:In described Between helix tube in unit be arranged along the horizontal as two rows, often arranged three;It is reinforced and is connected with channel steel between helix tube, ensure branch Hold the stability of column.
3. the construction method of the moving door frame in great cantilever Coping Construction according to claim 1, it is characterized in that:Described The top of Bailey beam is arranged in parallel top layer I-steel distribution beam, and the top layer I-steel distribution beam is along bridge to arrangement, described It is fixedly connected using U-typed card between top layer I-steel distribution beam and Bailey beam, keeps top layer I-steel distribution beam total with Bailey beam It is used to transmit upper load with an entirety is connected into;The bent cap bed die (4) is laid in the top layer I-steel distribution beam.
CN201610899520.XA 2015-12-14 2015-12-14 The construction method of moving door frame in great cantilever Coping Construction Active CN106638312B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610899520.XA CN106638312B (en) 2015-12-14 2015-12-14 The construction method of moving door frame in great cantilever Coping Construction

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510929493.1A CN105386412B (en) 2015-12-14 2015-12-14 Movable portal used in construction of bent cap of large cantilever and construction method of movable portal
CN201610899520.XA CN106638312B (en) 2015-12-14 2015-12-14 The construction method of moving door frame in great cantilever Coping Construction

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510929493.1A Division CN105386412B (en) 2015-12-14 2015-12-14 Movable portal used in construction of bent cap of large cantilever and construction method of movable portal

Publications (2)

Publication Number Publication Date
CN106638312A CN106638312A (en) 2017-05-10
CN106638312B true CN106638312B (en) 2018-07-17

Family

ID=55419147

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610899520.XA Active CN106638312B (en) 2015-12-14 2015-12-14 The construction method of moving door frame in great cantilever Coping Construction
CN201510929493.1A Active CN105386412B (en) 2015-12-14 2015-12-14 Movable portal used in construction of bent cap of large cantilever and construction method of movable portal

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201510929493.1A Active CN105386412B (en) 2015-12-14 2015-12-14 Movable portal used in construction of bent cap of large cantilever and construction method of movable portal

Country Status (1)

Country Link
CN (2) CN106638312B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3786605A1 (en) * 2019-08-21 2021-03-03 Poly Changda Engineering Co., Ltd. Construction method for a cantilever beam on a central pier

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968179B (en) * 2017-04-17 2018-07-10 中铁七局集团第三工程有限公司 A kind of constructing device that Cast-in-situ Beam is carried out using self-propelled entirety falsework method
CN108316152A (en) * 2018-01-30 2018-07-24 中交第三航务工程局有限公司南京分公司 A kind of high pier capping beam construction mobile formwork and its construction technology
CN109267493B (en) * 2018-11-06 2020-05-26 北京市市政二建设工程有限责任公司 Construction method for installing steel cover beam crossing river channel
CN109537477B (en) * 2018-12-11 2021-03-02 北京市政路桥股份有限公司 Construction method for dismantling old beam by portal frame
CN109812014A (en) * 2019-01-07 2019-05-28 中亿丰建设集团股份有限公司 A kind of door frame construction method not influencing traffic
CN109944165A (en) * 2019-04-24 2019-06-28 中铁二十四局集团有限公司 A kind of temporary support method of the modularization regulating posture for the installation of prefabricated bent cap
CN110396944A (en) * 2019-07-11 2019-11-01 武汉二航路桥特种工程有限责任公司 Bridge emergency support unloading and maintenance all-in-one machine and construction method
CN110541353A (en) * 2019-08-12 2019-12-06 中铁广州工程局集团桥梁工程有限公司 Movable type bent cap pouring support and construction method
CN110820561A (en) * 2019-09-17 2020-02-21 浙江大学城市学院 Large cantilever prestress bent cap support device and construction method
CN111005323A (en) * 2020-01-02 2020-04-14 中铁十九局集团第六工程有限公司 Supporting method and device for variable-slope cover beam end mold of highway bridge engineering
CN113089491A (en) * 2021-04-09 2021-07-09 中铁九局集团第七工程有限公司 Construction method of large cantilever prestressed concrete bent cap
CN114016411A (en) * 2021-10-29 2022-02-08 中铁十九局集团第五工程有限公司 Movable bent cap support structure and bent cap construction system

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4339778B2 (en) * 2004-11-17 2009-10-07 三菱重工鉄構エンジニアリング株式会社 How to remove a bridge
CN203021923U (en) * 2012-12-26 2013-06-26 浙江省交通工程建设集团有限公司 Big cantilever bent cap steel truss construction platform
CN203475309U (en) * 2013-05-24 2014-03-12 中国五冶集团有限公司 Bent cap support used in viaduct construction process
CN103469733B (en) * 2013-09-23 2015-09-16 中建五局土木工程有限公司 A kind of from falling molding box joist steel Guan Beilei door opening support and bearing method thereof
CN103774558B (en) * 2014-01-22 2015-08-05 中国公路工程咨询集团有限公司(武汉)建设分公司 A kind of automatic walking type mobile formwork for bridge construction
CN203755177U (en) * 2014-03-10 2014-08-06 中交第三公路工程局有限公司 Large-span cover beam bearing force supporting device
CN104499434A (en) * 2014-12-16 2015-04-08 中铁大桥局集团有限公司 Movable formwork for casting of wide-body box girder and construction method
CN104594204B (en) * 2015-01-29 2016-01-13 中铁十九局集团轨道交通工程有限公司 Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN104878695B (en) * 2015-05-21 2017-01-18 上海市政建设有限公司 Viaduct cover beam shaping bottom die support and application method thereof
CN205205687U (en) * 2015-12-14 2016-05-04 中铁上海工程局集团有限公司 Removal portal in big cantilever bent cap construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3786605A1 (en) * 2019-08-21 2021-03-03 Poly Changda Engineering Co., Ltd. Construction method for a cantilever beam on a central pier

Also Published As

Publication number Publication date
CN105386412A (en) 2016-03-09
CN105386412B (en) 2017-01-18
CN106638312A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106638312B (en) The construction method of moving door frame in great cantilever Coping Construction
CN207932932U (en) A kind of twin beams slope Bridge Erector
CN105484164B (en) Spanning type bailey beam bracket and construction method thereof
CN107386128A (en) Double-T shaped beam bridge changes beam construction system
CN107060823B (en) Non-dismantling trolley for tunnel anchor section secondary lining concrete construction
CN105803947A (en) Integral traversing system and method for portal-type full space support of cast-in-situ box girder
CN202544854U (en) Lining trolley for subway station
CN205205687U (en) Removal portal in big cantilever bent cap construction
CN201065512Y (en) Beret truss beam bridging machine
CN206873495U (en) A kind of Portable piping lane side wall formwork jumbo
CN101967798A (en) Highway double-guide-beam bridge erecting machine and turning method
CN206986640U (en) A kind of travelling bridge device for being used for track slab pavement and removing
CN106289848B (en) The vertical cross force of high-speed railway wheel track couples loading simulator
CN108004930A (en) The construction method of vertical shift bowstring arch bridge
CN106939536B (en) A kind of coal mine inclined shaft assembled is laid a railway track construction method
CN201933423U (en) Movable type protecting canopy frame
CN206396905U (en) A kind of across cylindrical reticulated shell structure integral slipping construction servicing unit of symmetrical doubly-linked
CN201046888Y (en) Bridge-dismantling hoisting device
CN107893377A (en) The on-site consolidation method of Cable-stayed Bridges loop wheel machine bottom basket system
CN108118619A (en) A kind of U beams installation structure and method
CN210599010U (en) Wedge post support body lining cutting platform truck device of tunnel lining construction
CN107217685A (en) A kind of Portable piping lane side wall formwork jumbo
CN220618186U (en) Correcting and paving structure for walking wheels of gantry crane
CN114182654B (en) Railway box girder transverse falling device and dismantling construction method
CN220185119U (en) Trolley is tied up to inner ring reinforcing bar of tunnel open cut tunnel steel reinforcement cage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant