Inspection scaffold of large component for boiler and building method thereof Download PDFInfo
- Publication number
- US20070074934A1 US20070074934A1 US11/293,113 US29311305A US2007074934A1 US 20070074934 A1 US20070074934 A1 US 20070074934A1 US 29311305 A US29311305 A US 29311305A US 2007074934 A1 US2007074934 A1 US 2007074934A1
- Authority
- US
- United States
- Prior art keywords
- scaffold
- large component
- lifting
- boiler
- assembled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/305—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables specially adapted for tanks, silos or similar vessels
Definitions
- the present invention relates to an inspection scaffold of large components for a boiler and a building method thereof, and particularly relates to the inspection scaffold and the building method thereof to perform pressure tests and the other inspection works of boiler superheater coils placed at a thermal power station.
- a steam generating equipment of a thermal power station includes a burner, a furnace, a pendant coil group such as a superheater and a reheater, and these are stored inside of a large building.
- the pendant coils such as the superheater and the reheater are positioned at an upper portion of a boiler, and they are suspended and supported by a main-beam positioned particularly at a top end surface of a steel frame structure constituting a power station building.
- An assembling construction method is adopted for equipments including particularly a coil to be a steam passage positioned at the upper portion of the boiler such as the superheater, in which they are assembled at a factory and so on by each equipment, carried in the steel frame, lifted by each equipment by using a lifting equipment to suspend and fix to the main-beam, disposed and equipped at a predetermined position, and thereafter assembly items are assembled with each other.
- a hydraulic test is performed by passing water.
- the above-stated conventional inspection scaffold is used for the test after the facility is settled, and therefore, it is attached after the power station equipments are assembled. Consequently, the scaffold is assembled and attached around the coil by a high-place work at dozens of meters upward because the large components such as the superheater including these coils are positioned at a high place at the upper portion of the boiler.
- a scaffold described in Patent Document 1 is used as such kind of scaffold.
- a suspended scaffold described in this Patent Document 1 is suspended from a boiler main body structure, having a horizontal rigid member to be the scaffold at a top layer, the scaffold of a second layer is composed of two pairs or more of perpendicular rods coupled attachably/detachably to the corresponding horizontal rigid member, horizontal rods provided with flanges at both ends and bridged attachably/detachably between the above-stated paired perpendicular rods,.
- the scaffold of a third layer or later is composed of the perpendicular rods, the horizontal rods and the scaffold boards as same as the second layer, and it is the suspended scaffold within a boiler furnace in which the perpendicular rods are attachably/detachably suspended to the horizontal rods of an upper layer.
- the above-stated scaffold is provided on a wall surface around a peripheral surface inside of the boiler furnace, and it is assembled around the coil at a high place by the same method.
- the building of the scaffold is a high-place work and the scaffold is built after the power station facility is assembled. Consequently, components other than the coil being an inspection object are existing around the coil, and therefore, there is a problem that the assembling work of the scaffold is very difficult.
- a lot of narrow coils are coupled to headers, this is vertically disposed in a structure well-ordered in a plane state, and equipped in a lot of lines with narrow intervals, and therefore, there are also problems that the work for the scaffold assembling is difficult and the time required for the assembling is extremely long.
- Patent Document 1 Japanese Patent Application Laid-open No. Sho 59-044504
- the present invention has an eye on the above-stated conventional problems, and an object thereof is to provide an inspection scaffold and a building method capable of assembling the scaffold safely without performing the scaffold assembling of a large component for a boiler requiring inspections in a high-place work. Secondly, the object thereof is to provide a building method capable of drastically shortening hours of work for the assembling of the scaffold. Thirdly, the object thereof is to provide an inspection scaffold and a building method capable of assembling a power station while the scaffold in itself has a protective function of attendant structures of the large component.
- a building method of an inspection scaffold of a large component for a boiler including: suspending a scaffold lifting/supporting beam interposing in a space of the large component on a wire lifted down from a space of a horizontal member of the large component, to the large component for the boiler supported by a component supporting beam at the ground side before it is attached to a steel frame main-beam; assembling scaffold components sequentially toward downward while the scaffold lifting/supporting beam is lifted to raise little by little inside of the large component; coupling the scaffold lifting/supporting beam to the horizontal member of the large component to be supported, after a required number of steps of scaffolds are assembled; and building the inspection scaffold together with the large component by raising the large component by a lifting means to couple to the main-beam.
- the scaffold is constituted by raising each scaffold unit composed of the scaffold lifting/supporting beams, rods coupled to a lower surface side thereof, and scaffold boards, coupling to the horizontal member of the large component, and thereafter, coupling the scaffold units with each other to be integrated.
- the large component is a pendant coil, and plural lines of coil groups, formed by arranging narrow tubes in similar shapes on respective headers in one plane state, are regarded as one block, and the scaffold unit is assembled by each block.
- the large component is a superheater
- the horizontal member is a ceiling tube wall
- An inspection scaffold of a large component for a boiler including: scaffold lifting/supporting beams interposed in spaces of the large component; horizontal and perpendicular rods at least forming scaffold frames at a lower surface portion of the scaffold lifting/supporting beams and capable of being coupled with each other; and scaffold boards bridged between the horizontal rods at the spaces, and wherein required number of steps of the scaffold boards can be sequentially assembled at a lower surface of the scaffold lifting/supporting beam, and wherein the scaffold lifting/supporting beam has a coupling means with a horizontal member of the large component and capable of being suspended and supported by the large component.
- an inspection scaffold of a large component for a boiler which is assembled to a pendant coil constituted by arranging plural coil groups perpendicularly in which plural narrow tubes are arranged along a plane surface, including: scaffold lifting/supporting beams capable of raising/lowering at spaces of the coil groups, and capable of coupled and supported by a part of a ceiling tube wall of the pendant coil; perpendicular rods and horizontal rods supported at a lower surface of the lifting/supporting beam and capable of being coupled with each other; and scaffold boards capable of bridged between the horizontal rods, and wherein the inspection scaffold is capable of integrally assembled to the pendant coil while suspended and supported by the ceiling tube wall of the pendant coil.
- the scaffold is assembled to the large component before installed to the boiler at the power station by each scaffold unit, the scaffold units are coupled with each other and integrated with the large component, and thereafter, the large component is lifted to the steel frame main-beam, and fix to the main-beam.
- an assembling work of attendant equipments to the large component and the scaffold assembling can be simultaneously performed at the ground, and therefore, hours of work for the scaffold assembling can be eliminated drastically, and at the same time, an effect of an enhanced safety in the work can be obtained because it is not a high-place work.
- the respective scaffold units are disposed at spaces of the large component, and therefore, it has a block structure as a whole, and a merit of preventing a risk of a crash caused by a rolling of each suspended structure of the large component can be obtained.
- it is applied to the pendant coil, in which perpendicular coil lines are in a suspended state, and even if a bending force or the like acts, but they are blocked, and therefore, a protective function can be exerted owing to a frame structure of the scaffold composing member.
- FIG. 1 is a front view showing a working rope for assembling an inspection scaffold to a third superheater on the ground;
- FIG. 2 is a side view of the same
- FIG. 3 is a plan view of the same
- FIG. 4 is an explanatory view of a basic scaffold structure
- FIG. 5 is an exploded perspective view showing an assembling structure of a horizontal rod and perpendicular rods for the scaffold;
- FIG. 6 is a perspective view of a scaffold board
- FIG. 7 is a perspective view showing a state a scaffold unit is assembled and lifted to a superheater
- FIG. 8 is a detail of “A” portion in FIG. 7 ;
- FIG. 9 is a perspective view showing a state the scaffold unit is fixed to the superheater.
- FIG. 10 is a detail of “B” portion in FIG. 9 ;
- FIG. 11 is an internal sectional view of a boiler furnace in a state the superheater to which the scaffold is assembled is installed to a main-beam.
- FIG. 11 an internal sectional view of a boiler furnace 10 is shown.
- a second superheater 12 and a third superheater 14 are provided side by side at an upper position of the boiler furnace 10 having dozens of meters height.
- These are pendant coils suspended and supported by a steel frame main-beam 16 .
- pressure tests are performed by passing water into coils for these pendant coils 12 , 14 as large components for the boiler, and inspections for presence/absence and so on of a coil welding failure are performed.
- an intermediate stage 18 and an inspection scaffold 20 are temporary provided at a lower portion or a peripheral portion of the pendant coils. If the inspection scaffold 20 is built after the pendant coil is assembled to the boiler furnace 10 , it becomes a high-place work, and therefore in the present invention, it is assembled to the pendant coil at the time of a ground work.
- a main-beam 16 for supporting the boilers is provided at a top end portion of a steel frame to be a suspending fabric, and boiler components are supported in a state suspended by this main-beam 16 .
- Plural lifting jacks are placed on the main-beam 16 , a block of the boiler components carried in the steel frame is lifted up to the main-beam 16 by using the lifting jacks, and it is supported and suspended by the main-beam 16 by using a sling rod and so on.
- Attendant equipments are assembled to the boiler components block at the ground work or in the middle of a lifting operation, and this assembling work of the attendant equipments is often performed in a state supported by a component supporting beam provided at the ground side.
- the inspection scaffold 20 of the large component is simultaneously assembled together with the assembling of the attendant equipments in a state the large component of the boiler components is suspended to the component supporting beam at the ground.
- FIG. 1 and FIG. 2 are showing an embodiment applying the present invention for the third superheater 14 being the large component for the boiler, and they are a front view and a side view showing a working rope for assembling the inspection scaffold 20 to the third superheater 14 at the ground.
- the superheater 14 is carried into a steel frame of the power station by a carry-in cart 26 in a state suspended and supported by a component supporting beam 30 provided at a top end portion of a movable jack stand 28 .
- a state in the drawing is that the carry-in cart 26 is stopped under a position where the superheater 14 is installed to the main-beam 16 .
- the assembling work of the inspection scaffold 20 according to the present embodiment is performed to the third superheater 14 as the large component for the boiler supported by the component supporting beam 30 at the ground side under the steel frame main-beam 16 , as follows.
- scaffold lifting/supporting beams 32 interposing in spaces between coil lines of the corresponding third superheater 14 are coupled to wires 36 lifted down from spaces of a ceiling tube wall 34 being a horizontal member of the third superheater 14 to suspend down close to a floor surface.
- This scaffold lifting/supporting beams 32 are lifted to raise little by little in the spaces of the coil group within the third superheater 14 , and the scaffold components are assembled sequentially toward downward.
- the scaffold lifting/supporting beams 32 are coupled to be supported to the ceiling tube wall 34 of the large component for the boiler, the third superheater 14 is raised by the lifting jacks to couple to the main-beam 16 , to thereby build the inspection scaffold together with the large component.
- the scaffold lifting/supporting beams 32 suspended on the wires 36 (refer to FIG. 2 to FIG. 3 ).
- plural pairs of perpendicular rods 40 are suspended under the scaffold lifting/supporting beams 32 , and a second layer scaffold is formed with horizontal rods 42 fit into the respective pairs of the perpendicular rods 40 , and scaffold boards 44 bridged between the respective horizontal rods 42 .
- a pair of perpendicular rods 40 are respectively suspended from the horizontal rods 42 of the second layer, the horizontal rods 42 are fit into the respective pairs of the perpendicular rods 40 , and the scaffold boards 44 are bridged between the respective horizontal rods 42 to thereby form a third layer scaffold.
- the scaffolds of a fourth layer, a fifth layer, and so on are formed as same as the above to come to a required number of steps, and a whole temporary scaffold is constituted by these plural layers of scaffolds.
- FIG. 5 is an exploded perspective view showing details of the perpendicular rods 40 and the horizontal rod 42 forming the scaffold of lower layers under the scaffold lifting/supporting beam 32 .
- Two pieces of flanges 42 A, 42 A are respectively welded at both ends of the horizontal rod 42 .
- coupling boards 40 A are welded at both ends of the perpendicular rod 40
- a potbelly shaped hole 40 B is formed on the coupling board 40 A, which is formed by connecting a large-diameter hole 40 C having a slightly larger diameter than the diameter of the flange 42 A of the horizontal rod 42 and a small-diameter hole 40 D having a slightly larger diameter than the diameter of a bar portion 42 B of the horizontal rod 42 .
- a shape of the potbelly shaped hole 40 B is described in more detail, a semicircular portion of the small-diameter hole 40 D and the large-diameter hole 40 C are connected by a parallel groove having an equal width with the diameter of the small-diameter hole 40 D, and the bar portion 42 B of the horizontal rod 42 is movable between the large-diameter hole 40 C and the small-diameter hole 40 D.
- the spaces between the two pieces of flanges 42 A, 42 A respectively attached at both ends of the horizontal rod 42 are slightly larger than a double of a thickness of the coupling board 40 A attached at the both ends of the perpendicular rod 40 .
- the flange 42 A of the horizontal rod 42 is inserted from the large-diameter holes 40 C of the coupling board 40 A at a lower end of the perpendicular rod 40 suspended from an upper layer and the coupling board 40 A at an upper end of the perpendicular rod 40 to be suspended to a lower layer respectively, and they are engaged to the respective small-diameter holes 40 D with the bar portion 42 B at the space between the two pieces of flanges 42 A, 42 A.
- a gripper 46 for gripping the bar portion 42 B of the horizontal rod 42 engaged with the respective small-diameter holes 40 D is provided at the coupling board 40 A of the upper end of the perpendicular rod 40 .
- FIG. 6 is a perspective view showing the scaffold board 44 .
- the scaffold board 44 is constituted by a scaffold board main body 44 A which is U-shaped in cross section, and hook bases 44 B, 44 B attached at both end portions in a longitudinal direction of the scaffold board main body 44 A to which two hooks 44 C, 44 C are provided respectively.
- the scaffold board 44 is bridged by engaging the hooks 44 C, 44 C provided at the both ends in the longitudinal direction thereof with the horizontal rods 42 , to be the scaffold of each layer.
- plural lines of coil groups are regarded as one block, which are formed by arranging narrow tubes 50 in similar shapes in a plane state at respective headers 48 positioning at an upper end of the superheater 14 , and scaffold units are assembled by each block.
- the superheater 14 has a structure in which a number of narrow tubes 50 are connecting from an entrance header 48 A positioning at an upper end to an exit header 48 B.
- the plural narrow tubes 50 curved in the similar shape in approximately U-shape are arranged in a same plane surface state to form a coil group, and two surfaces of these coil groups in plane arrangement are suspended in parallel state from one header 48 (entrance header 48 A and exit header 48 B) (refer to FIG. 2 ).
- six surfaces of the coil groups suspended from three headers 48 are grouped as one block, and the scaffold is assembled by this block unit. Consequently, as it is understood from FIG. 3 , the scaffold lifting/supporting beams 32 are constituted by framing beams in parallel with a plane surface of the coil group and the beams in orthogonal with the coil surface when viewed from the plane surface in rectangle or in ladder state.
- the scaffold lifting/supporting beams 32 can be raised/lowered between the spaces of the coil group tubes of the superheater 14 without interference with the coils.
- This framed scaffold lifting/supporting beam 32 and scaffold composing members assembled to this constitute a scaffold unit 51 .
- the ceiling tube wall 34 is provided at an upper position of the superheater 14 to horizontally cross the coil groups, in which a number of ceiling tubes are thickly arranged in plane state, and the ceiling tubes are coupled with each other by membrane bars. Consequently, the ceiling tube wall 34 becomes a horizontal member of the superheater 14 , so the above-stated scaffold is assembled to this ceiling tube wall 34 as a mounting base end.
- a concrete attaching procedure of the scaffold is described in detail with reference to FIG. 7 to FIG. 10 .
- the scaffold lifting/supporting beams 32 interposed in spaces formed between each coil group of the third superheater 14 being the large component, framed in rectangle or in ladder state are suspended on the wires 36 lifted down from the spaces of the ceiling tube wall 34 as the above-stated horizontal member.
- the spaces of the ceiling tube wall 34 may be opened on the membrane bar 52 connecting the ceiling tubes with each other.
- the wire 36 suspended by using a wire attaching fixture 54 attached to a crane hook is penetrated into the space of the ceiling tube wall 34 and then reeled out.
- a suspended clasp 56 is provided at a lower end of the wire 36 so as to be coupled to a strip-plate 58 provided at an upper surface portion of the scaffold lifting/supporting beam 32 .
- the sizes of the strip-plate 58 and the suspended clasp 56 are set so that they can penetrate into the opening space of the membrane bar 52 .
- the scaffold lifting/supporting beam 32 suspended on the wire is once lifted down near to the floor surface of the moving jack stand 28 , the perpendicular rods 40 , the horizontal rods 42 as the scaffold composing members are assembled to this, and the scaffold board 44 is bridged between the pair of the horizontal rods 42 to perform the assembling of the scaffold at the first stage.
- the scaffolds are built in the spaces of the coil group within the superheater 14 .
- the scaffold lifting/supporting beam 32 is lifted to raise little by little, and the scaffold components are assembled sequentially toward downward to assemble the required number of steps of the scaffolds, as shown in FIG. 7 .
- two scaffold units 51 are lifted up at the same time, and they are lifted up in a state fixing between the scaffold units 51 by a coupling scaffold board 60 so as not to move mutually.
- the plural scaffold units 51 can be assembled simultaneously.
- the strip-plate 58 is penetrated into the space of the ceiling tube wall 34 , and as shown in FIG. 10 , a receiving beam 62 is coupled to be supported to the strip-plate 58 at an upper surface side of the ceiling tube wall 34 .
- the receiving beam 62 is to transmit a load of the scaffold unit 51 to the ceiling tube wall 34 , and U-shaped steels are combined to be a plane H-shape and welded to be coupled.
- the number of the ceiling tubes by which a weighted load of the scaffold unit 51 can be supported is asked by calculation in advance to determine a length of the receiving beam 62 .
- the scaffold units 51 are assembled to the superheater 14 one after another to thereby build the scaffold on the ground with which a worker is movable to every place facing to the coil of the superheater 14 .
- the scaffold is assembled integrally with the superheater 14 and fixedly supported.
- suspending rods are suspended from lifting jacks 24 as lifting means provided on the main-beam 16 , and coupled to the component supporting beam 30 to raise this superheater 14 integrated with the scaffold.
- the work of the attachment of the attendant equipments for the superheater 14 may be performed simultaneously.
- the lifting jacks 24 are continuously operated so as to raise the superheater 14 with the scaffold to an upper end of the steel frame, then they are coupled to the main-beam 16 , and thereby, the inspection scaffold 20 are built simultaneously with the installation of the superheater 14 as the large component.
- the scaffold lifting/supporting beams 32 capable of raising/lowering in the spaces of the coil groups of the corresponding superheater 14 are disposed as the ground work, and in a state that they are suspended on the wires 36 penetrating the ceiling tube wall 34 of the superheater 14 , the scaffold composing members can be sequentially assembled to a lower surface of the supporting beams 32 by the ground work.
- the scaffold lifting/supporting beams 32 are coupled to the ceiling tube wall 34 by using the strip-plates 58 and the receiving beams 62 as coupling means.
- the scaffold is supported by the superheater 14 in itself.
- the plural scaffold units 51 are coupled mutually by the coupling scaffold boards 60 , and then the entire inspection scaffold 20 is integrally blocked with the superheater 14 to thereby install the superheater 14 together with the scaffold to the main-beam 16 .
- the scaffold assembling for the pendant coil as the large component for the boiler requiring inspections is not performed at the high-place work, but assembled safely.
- the scaffold assembling is performed at the ground work, so the inspection scaffold is simultaneously built when the pendant coil is installed to the main-beam, and therefore, the hours of work for the scaffold assembling can be reduced drastically.
- the scaffold in itself is placed so as to embed the spaces of the pendant coils, and therefore, it is possible to assemble the power station while a protective function for the attendant structures of the pendant coil is added to the scaffold.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
Abstract
Description
- 1. Field Of The Invention
- The present invention relates to an inspection scaffold of large components for a boiler and a building method thereof, and particularly relates to the inspection scaffold and the building method thereof to perform pressure tests and the other inspection works of boiler superheater coils placed at a thermal power station.
- 2. Description of Related Art
- Generally, a steam generating equipment of a thermal power station includes a burner, a furnace, a pendant coil group such as a superheater and a reheater, and these are stored inside of a large building. In such a facility, the pendant coils such as the superheater and the reheater are positioned at an upper portion of a boiler, and they are suspended and supported by a main-beam positioned particularly at a top end surface of a steel frame structure constituting a power station building. An assembling construction method is adopted for equipments including particularly a coil to be a steam passage positioned at the upper portion of the boiler such as the superheater, in which they are assembled at a factory and so on by each equipment, carried in the steel frame, lifted by each equipment by using a lifting equipment to suspend and fix to the main-beam, disposed and equipped at a predetermined position, and thereafter assembly items are assembled with each other. After the assembling of power generating equipments is completed finally, a hydraulic test is performed by passing water. Herewith, it is necessary to perform defect inspections and repair works of welded portions of the coil, and therefore, the inspection works at every portion of the coil are required. Consequently, the inspection scaffold of a large component such as the superheater is assembled, and it is a temporary scaffold which is removed after predetermined tests and inspections are finished.
- The above-stated conventional inspection scaffold is used for the test after the facility is settled, and therefore, it is attached after the power station equipments are assembled. Consequently, the scaffold is assembled and attached around the coil by a high-place work at dozens of meters upward because the large components such as the superheater including these coils are positioned at a high place at the upper portion of the boiler.
- As such kind of scaffold, for example, a scaffold described in Patent Document 1 is used. A suspended scaffold described in this Patent Document 1 is suspended from a boiler main body structure, having a horizontal rigid member to be the scaffold at a top layer, the scaffold of a second layer is composed of two pairs or more of perpendicular rods coupled attachably/detachably to the corresponding horizontal rigid member, horizontal rods provided with flanges at both ends and bridged attachably/detachably between the above-stated paired perpendicular rods,. and a scaffold board bridged between the corresponding horizontal rods, the scaffold of a third layer or later is composed of the perpendicular rods, the horizontal rods and the scaffold boards as same as the second layer, and it is the suspended scaffold within a boiler furnace in which the perpendicular rods are attachably/detachably suspended to the horizontal rods of an upper layer. The above-stated scaffold is provided on a wall surface around a peripheral surface inside of the boiler furnace, and it is assembled around the coil at a high place by the same method.
- However, conventionally, as stated above, the building of the scaffold is a high-place work and the scaffold is built after the power station facility is assembled. Consequently, components other than the coil being an inspection object are existing around the coil, and therefore, there is a problem that the assembling work of the scaffold is very difficult. In particular, in the superheater, a lot of narrow coils are coupled to headers, this is vertically disposed in a structure well-ordered in a plane state, and equipped in a lot of lines with narrow intervals, and therefore, there are also problems that the work for the scaffold assembling is difficult and the time required for the assembling is extremely long.
- [Patent Document 1] Japanese Patent Application Laid-open No. Sho 59-044504
- The present invention has an eye on the above-stated conventional problems, and an object thereof is to provide an inspection scaffold and a building method capable of assembling the scaffold safely without performing the scaffold assembling of a large component for a boiler requiring inspections in a high-place work. Secondly, the object thereof is to provide a building method capable of drastically shortening hours of work for the assembling of the scaffold. Thirdly, the object thereof is to provide an inspection scaffold and a building method capable of assembling a power station while the scaffold in itself has a protective function of attendant structures of the large component.
- To attain the above-stated objects, a building method of an inspection scaffold of a large component for a boiler, including: suspending a scaffold lifting/supporting beam interposing in a space of the large component on a wire lifted down from a space of a horizontal member of the large component, to the large component for the boiler supported by a component supporting beam at the ground side before it is attached to a steel frame main-beam; assembling scaffold components sequentially toward downward while the scaffold lifting/supporting beam is lifted to raise little by little inside of the large component; coupling the scaffold lifting/supporting beam to the horizontal member of the large component to be supported, after a required number of steps of scaffolds are assembled; and building the inspection scaffold together with the large component by raising the large component by a lifting means to couple to the main-beam.
- In the above-stated method, the scaffold is constituted by raising each scaffold unit composed of the scaffold lifting/supporting beams, rods coupled to a lower surface side thereof, and scaffold boards, coupling to the horizontal member of the large component, and thereafter, coupling the scaffold units with each other to be integrated.
- Besides, the large component is a pendant coil, and plural lines of coil groups, formed by arranging narrow tubes in similar shapes on respective headers in one plane state, are regarded as one block, and the scaffold unit is assembled by each block.
- Further, the large component is a superheater, and the horizontal member is a ceiling tube wall.
- An inspection scaffold of a large component for a boiler, including: scaffold lifting/supporting beams interposed in spaces of the large component; horizontal and perpendicular rods at least forming scaffold frames at a lower surface portion of the scaffold lifting/supporting beams and capable of being coupled with each other; and scaffold boards bridged between the horizontal rods at the spaces, and wherein required number of steps of the scaffold boards can be sequentially assembled at a lower surface of the scaffold lifting/supporting beam, and wherein the scaffold lifting/supporting beam has a coupling means with a horizontal member of the large component and capable of being suspended and supported by the large component.
- Besides, more concretely speaking, it is an inspection scaffold of a large component for a boiler, which is assembled to a pendant coil constituted by arranging plural coil groups perpendicularly in which plural narrow tubes are arranged along a plane surface, including: scaffold lifting/supporting beams capable of raising/lowering at spaces of the coil groups, and capable of coupled and supported by a part of a ceiling tube wall of the pendant coil; perpendicular rods and horizontal rods supported at a lower surface of the lifting/supporting beam and capable of being coupled with each other; and scaffold boards capable of bridged between the horizontal rods, and wherein the inspection scaffold is capable of integrally assembled to the pendant coil while suspended and supported by the ceiling tube wall of the pendant coil.
- As having such a constitution, in the present invention, the scaffold is assembled to the large component before installed to the boiler at the power station by each scaffold unit, the scaffold units are coupled with each other and integrated with the large component, and thereafter, the large component is lifted to the steel frame main-beam, and fix to the main-beam. Herewith, an assembling work of attendant equipments to the large component and the scaffold assembling can be simultaneously performed at the ground, and therefore, hours of work for the scaffold assembling can be eliminated drastically, and at the same time, an effect of an enhanced safety in the work can be obtained because it is not a high-place work. The respective scaffold units are disposed at spaces of the large component, and therefore, it has a block structure as a whole, and a merit of preventing a risk of a crash caused by a rolling of each suspended structure of the large component can be obtained. In particular, it is applied to the pendant coil, in which perpendicular coil lines are in a suspended state, and even if a bending force or the like acts, but they are blocked, and therefore, a protective function can be exerted owing to a frame structure of the scaffold composing member.
-
FIG. 1 is a front view showing a working rope for assembling an inspection scaffold to a third superheater on the ground; -
FIG. 2 is a side view of the same; -
FIG. 3 is a plan view of the same; -
FIG. 4 is an explanatory view of a basic scaffold structure; -
FIG. 5 is an exploded perspective view showing an assembling structure of a horizontal rod and perpendicular rods for the scaffold; -
FIG. 6 is a perspective view of a scaffold board; -
FIG. 7 is a perspective view showing a state a scaffold unit is assembled and lifted to a superheater; -
FIG. 8 is a detail of “A” portion inFIG. 7 ; -
FIG. 9 is a perspective view showing a state the scaffold unit is fixed to the superheater; -
FIG. 10 is a detail of “B” portion inFIG. 9 ; and -
FIG. 11 is an internal sectional view of a boiler furnace in a state the superheater to which the scaffold is assembled is installed to a main-beam. - Hereinafter, an optimal embodiment of an inspection scaffold of a large component for a boiler and a building method thereof according to the present invention is described with reference to the drawings.
- At first, in
FIG. 11 , an internal sectional view of aboiler furnace 10 is shown. Asecond superheater 12 and athird superheater 14 are provided side by side at an upper position of theboiler furnace 10 having dozens of meters height. These are pendant coils suspended and supported by a steel frame main-beam 16. After an assembling to the boiler is completed, pressure tests are performed by passing water into coils for thesependant coils intermediate stage 18 and aninspection scaffold 20 are temporary provided at a lower portion or a peripheral portion of the pendant coils. If theinspection scaffold 20 is built after the pendant coil is assembled to theboiler furnace 10, it becomes a high-place work, and therefore in the present invention, it is assembled to the pendant coil at the time of a ground work. - In a power station having large suspending type boilers, a main-
beam 16 for supporting the boilers is provided at a top end portion of a steel frame to be a suspending fabric, and boiler components are supported in a state suspended by this main-beam 16. Plural lifting jacks are placed on the main-beam 16, a block of the boiler components carried in the steel frame is lifted up to the main-beam 16 by using the lifting jacks, and it is supported and suspended by the main-beam 16 by using a sling rod and so on. These works are sequentially repeated from assembling components of an upper portion of the boiler to thereby build up the boiler. Attendant equipments are assembled to the boiler components block at the ground work or in the middle of a lifting operation, and this assembling work of the attendant equipments is often performed in a state supported by a component supporting beam provided at the ground side. In the present invention, theinspection scaffold 20 of the large component is simultaneously assembled together with the assembling of the attendant equipments in a state the large component of the boiler components is suspended to the component supporting beam at the ground. -
FIG. 1 andFIG. 2 are showing an embodiment applying the present invention for thethird superheater 14 being the large component for the boiler, and they are a front view and a side view showing a working rope for assembling theinspection scaffold 20 to thethird superheater 14 at the ground. Thesuperheater 14 is carried into a steel frame of the power station by a carry-incart 26 in a state suspended and supported by acomponent supporting beam 30 provided at a top end portion of amovable jack stand 28. A state in the drawing is that the carry-incart 26 is stopped under a position where thesuperheater 14 is installed to the main-beam 16. - The assembling work of the
inspection scaffold 20 according to the present embodiment is performed to thethird superheater 14 as the large component for the boiler supported by thecomponent supporting beam 30 at the ground side under the steel frame main-beam 16, as follows. At first, scaffold lifting/supportingbeams 32 interposing in spaces between coil lines of the correspondingthird superheater 14 are coupled towires 36 lifted down from spaces of aceiling tube wall 34 being a horizontal member of thethird superheater 14 to suspend down close to a floor surface. This scaffold lifting/supportingbeams 32 are lifted to raise little by little in the spaces of the coil group within thethird superheater 14, and the scaffold components are assembled sequentially toward downward. After a required number of steps of the scaffolds are assembled, the scaffold lifting/supportingbeams 32 are coupled to be supported to theceiling tube wall 34 of the large component for the boiler, thethird superheater 14 is raised by the lifting jacks to couple to the main-beam 16, to thereby build the inspection scaffold together with the large component. - At first, as a basic constitution of the inspection scaffold, there are the scaffold lifting/supporting
beams 32 suspended on the wires 36 (refer toFIG. 2 toFIG. 3 ). As shown inFIG. 4 toFIG. 6 , plural pairs ofperpendicular rods 40 are suspended under the scaffold lifting/supportingbeams 32, and a second layer scaffold is formed withhorizontal rods 42 fit into the respective pairs of theperpendicular rods 40, andscaffold boards 44 bridged between the respectivehorizontal rods 42. Further, a pair ofperpendicular rods 40 are respectively suspended from thehorizontal rods 42 of the second layer, thehorizontal rods 42 are fit into the respective pairs of theperpendicular rods 40, and thescaffold boards 44 are bridged between the respectivehorizontal rods 42 to thereby form a third layer scaffold. The scaffolds of a fourth layer, a fifth layer, and so on are formed as same as the above to come to a required number of steps, and a whole temporary scaffold is constituted by these plural layers of scaffolds. -
FIG. 5 is an exploded perspective view showing details of theperpendicular rods 40 and thehorizontal rod 42 forming the scaffold of lower layers under the scaffold lifting/supportingbeam 32. Two pieces offlanges horizontal rod 42. Besides,coupling boards 40A are welded at both ends of theperpendicular rod 40, and a potbelly shapedhole 40B is formed on thecoupling board 40A, which is formed by connecting a large-diameter hole 40C having a slightly larger diameter than the diameter of theflange 42A of thehorizontal rod 42 and a small-diameter hole 40D having a slightly larger diameter than the diameter of abar portion 42B of thehorizontal rod 42. - A shape of the potbelly shaped
hole 40B is described in more detail, a semicircular portion of the small-diameter hole 40D and the large-diameter hole 40C are connected by a parallel groove having an equal width with the diameter of the small-diameter hole 40D, and thebar portion 42B of thehorizontal rod 42 is movable between the large-diameter hole 40C and the small-diameter hole 40D. - Besides, the spaces between the two pieces of
flanges horizontal rod 42 are slightly larger than a double of a thickness of thecoupling board 40A attached at the both ends of theperpendicular rod 40. - The
flange 42A of thehorizontal rod 42 is inserted from the large-diameter holes 40C of thecoupling board 40A at a lower end of theperpendicular rod 40 suspended from an upper layer and thecoupling board 40A at an upper end of theperpendicular rod 40 to be suspended to a lower layer respectively, and they are engaged to the respective small-diameter holes 40D with thebar portion 42B at the space between the two pieces offlanges gripper 46 for gripping thebar portion 42B of thehorizontal rod 42 engaged with the respective small-diameter holes 40D is provided at thecoupling board 40A of the upper end of theperpendicular rod 40. -
FIG. 6 is a perspective view showing thescaffold board 44. Thescaffold board 44 is constituted by a scaffold boardmain body 44A which is U-shaped in cross section, and hookbases main body 44A to which twohooks - Between the
horizontal rod 42 and the adjacenthorizontal rod 42 bridged to the pairedperpendicular rods 40 of each layer, thescaffold board 44 is bridged by engaging thehooks horizontal rods 42, to be the scaffold of each layer. - In the scaffold having such a basic constitution, in the present embodiment, plural lines of coil groups are regarded as one block, which are formed by arranging
narrow tubes 50 in similar shapes in a plane state atrespective headers 48 positioning at an upper end of thesuperheater 14, and scaffold units are assembled by each block. Namely, as shown inFIG. 1 toFIG. 3 , thesuperheater 14 has a structure in which a number ofnarrow tubes 50 are connecting from anentrance header 48A positioning at an upper end to anexit header 48B. The pluralnarrow tubes 50 curved in the similar shape in approximately U-shape are arranged in a same plane surface state to form a coil group, and two surfaces of these coil groups in plane arrangement are suspended in parallel state from one header 48 (entrance header 48A andexit header 48B) (refer toFIG. 2 ). In the embodiment, six surfaces of the coil groups suspended from threeheaders 48 are grouped as one block, and the scaffold is assembled by this block unit. Consequently, as it is understood fromFIG. 3 , the scaffold lifting/supportingbeams 32 are constituted by framing beams in parallel with a plane surface of the coil group and the beams in orthogonal with the coil surface when viewed from the plane surface in rectangle or in ladder state. Herewith, the scaffold lifting/supportingbeams 32 can be raised/lowered between the spaces of the coil group tubes of thesuperheater 14 without interference with the coils. This framed scaffold lifting/supportingbeam 32 and scaffold composing members assembled to this constitute ascaffold unit 51. - By the way, the
ceiling tube wall 34 is provided at an upper position of thesuperheater 14 to horizontally cross the coil groups, in which a number of ceiling tubes are thickly arranged in plane state, and the ceiling tubes are coupled with each other by membrane bars. Consequently, theceiling tube wall 34 becomes a horizontal member of thesuperheater 14, so the above-stated scaffold is assembled to thisceiling tube wall 34 as a mounting base end. - A concrete attaching procedure of the scaffold is described in detail with reference to
FIG. 7 toFIG. 10 . In this embodiment, the scaffold lifting/supportingbeams 32 interposed in spaces formed between each coil group of thethird superheater 14 being the large component, framed in rectangle or in ladder state, are suspended on thewires 36 lifted down from the spaces of theceiling tube wall 34 as the above-stated horizontal member. As shown inFIG. 8 , the spaces of theceiling tube wall 34 may be opened on themembrane bar 52 connecting the ceiling tubes with each other. As shown inFIG. 1 , thewire 36 suspended by using awire attaching fixture 54 attached to a crane hook is penetrated into the space of theceiling tube wall 34 and then reeled out. Of course, a hoisting machine and so on mounted on thecomponent supporting beam 30 can be used. A suspendedclasp 56 is provided at a lower end of thewire 36 so as to be coupled to a strip-plate 58 provided at an upper surface portion of the scaffold lifting/supportingbeam 32. The sizes of the strip-plate 58 and the suspendedclasp 56 are set so that they can penetrate into the opening space of themembrane bar 52. - As stated above, the scaffold lifting/supporting
beam 32 suspended on the wire is once lifted down near to the floor surface of the movingjack stand 28, theperpendicular rods 40, thehorizontal rods 42 as the scaffold composing members are assembled to this, and thescaffold board 44 is bridged between the pair of thehorizontal rods 42 to perform the assembling of the scaffold at the first stage. Herewith, the scaffolds are built in the spaces of the coil group within thesuperheater 14. The scaffold lifting/supportingbeam 32 is lifted to raise little by little, and the scaffold components are assembled sequentially toward downward to assemble the required number of steps of the scaffolds, as shown inFIG. 7 . In an example shown inFIG. 7 , twoscaffold units 51 are lifted up at the same time, and they are lifted up in a state fixing between thescaffold units 51 by acoupling scaffold board 60 so as not to move mutually. Herewith, theplural scaffold units 51 can be assembled simultaneously. - As shown in
FIG. 9 , when the scaffold lifting/supportingbeam 32 reaches theceiling tube wall 34 of thesuperheater 14, the strip-plate 58 is penetrated into the space of theceiling tube wall 34, and as shown inFIG. 10 , a receivingbeam 62 is coupled to be supported to the strip-plate 58 at an upper surface side of theceiling tube wall 34. The receivingbeam 62 is to transmit a load of thescaffold unit 51 to theceiling tube wall 34, and U-shaped steels are combined to be a plane H-shape and welded to be coupled. The number of the ceiling tubes by which a weighted load of thescaffold unit 51 can be supported is asked by calculation in advance to determine a length of the receivingbeam 62. As stated above, thescaffold units 51 are assembled to thesuperheater 14 one after another to thereby build the scaffold on the ground with which a worker is movable to every place facing to the coil of thesuperheater 14. - As stated above, the scaffold is assembled integrally with the
superheater 14 and fixedly supported. As shown inFIG. 11 , suspending rods are suspended from lifting jacks 24 as lifting means provided on the main-beam 16, and coupled to thecomponent supporting beam 30 to raise thissuperheater 14 integrated with the scaffold. At this time, the work of the attachment of the attendant equipments for thesuperheater 14 may be performed simultaneously. After the attachment of the attendant equipments are completed, the lifting jacks 24 are continuously operated so as to raise thesuperheater 14 with the scaffold to an upper end of the steel frame, then they are coupled to the main-beam 16, and thereby, theinspection scaffold 20 are built simultaneously with the installation of thesuperheater 14 as the large component. - As stated above, in the present embodiment, at a stage before the superheater is attached to the main-
beam 16, in particular, when it is carried in the steel frame of the power station, the scaffold lifting/supportingbeams 32 capable of raising/lowering in the spaces of the coil groups of the correspondingsuperheater 14 are disposed as the ground work, and in a state that they are suspended on thewires 36 penetrating theceiling tube wall 34 of thesuperheater 14, the scaffold composing members can be sequentially assembled to a lower surface of the supportingbeams 32 by the ground work. When the scaffold assembling of required number of steps is completed, the scaffold lifting/supportingbeams 32 are coupled to theceiling tube wall 34 by using the strip-plates 58 and the receiving beams 62 as coupling means. Herewith, the scaffold is supported by thesuperheater 14 in itself. Theplural scaffold units 51 are coupled mutually by thecoupling scaffold boards 60, and then theentire inspection scaffold 20 is integrally blocked with thesuperheater 14 to thereby install thesuperheater 14 together with the scaffold to the main-beam 16. - Incidentally, in the above-stated embodiment, an example applied to the
third superheater 14 is described, but the present invention can be applied to thesecond superheater 12 and to the equipments having the other pendant coils. - From these reasons, in the present embodiment, it is possible that the scaffold assembling for the pendant coil as the large component for the boiler requiring inspections is not performed at the high-place work, but assembled safely. Besides, the scaffold assembling is performed at the ground work, so the inspection scaffold is simultaneously built when the pendant coil is installed to the main-beam, and therefore, the hours of work for the scaffold assembling can be reduced drastically. Further, the scaffold in itself is placed so as to embed the spaces of the pendant coils, and therefore, it is possible to assemble the power station while a protective function for the attendant structures of the pendant coil is added to the scaffold.
Claims (6)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005272371A JP4154534B2 (en) | 2005-09-20 | 2005-09-20 | Construction method for inspection of large boiler parts |
JP2005-272371 | 2005-09-20 |
Publications (2)
Publication Number | Publication Date |
---|---|
US20070074934A1 true US20070074934A1 (en) | 2007-04-05 |
US7726447B2 US7726447B2 (en) | 2010-06-01 |
Family
ID=37890034
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/293,113 Expired - Fee Related US7726447B2 (en) | 2005-09-20 | 2005-12-05 | Inspection scaffold of large component for boiler and building method thereof |
Country Status (5)
Country | Link |
---|---|
US (1) | US7726447B2 (en) |
JP (1) | JP4154534B2 (en) |
CN (1) | CN1944914B (en) |
AU (1) | AU2005242210B2 (en) |
CA (1) | CA2529755C (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103114713A (en) * | 2013-03-21 | 2013-05-22 | 北京六建集团有限责任公司 | Hollow ultrahigh template section steel platform and construction method thereof |
CN103352563A (en) * | 2013-07-16 | 2013-10-16 | 上海建工集团股份有限公司 | Self plate-bearing type steel bar mesh support combined template and construction method thereof |
CN103352564A (en) * | 2013-07-18 | 2013-10-16 | 上海建工集团股份有限公司 | Horizontally-structured framework system and construction method |
CN103953188A (en) * | 2014-04-09 | 2014-07-30 | 天津一建建筑工程有限公司 | High-altitude supporting mold of structureless floor slab |
CN104100090A (en) * | 2014-07-17 | 2014-10-15 | 成都市第四建筑工程公司 | High-altitude comprehensive construction method of big-cantilever steel truss structure |
CN105387740A (en) * | 2015-12-11 | 2016-03-09 | 无锡方盛换热器股份有限公司 | Detachable large-sized aluminum plate-fin heat exchanger |
US20160339277A1 (en) * | 2015-05-19 | 2016-11-24 | Anco Maritime Activities Ltd. | Method for inspecting an inside room of a ship and/or performing works therein |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7779599B2 (en) | 2004-03-31 | 2010-08-24 | Safway Services, Llc | Articulating work platform support system, work platform system, and methods of use thereof |
CA2840414C (en) | 2011-06-29 | 2019-12-03 | Safway Services, Llc | Work platform system configured for use in structure with internal cavity, and related methods of assembly and use |
DE102012109860A1 (en) * | 2012-10-16 | 2014-04-17 | Max Bögl Wind AG | Supply tower for a tower, tower with a utility scaffold and method for erecting a utility scaffolding inside a tower |
JP5814217B2 (en) * | 2012-11-30 | 2015-11-17 | 太平電業株式会社 | How to build a scaffold in a boiler |
CN104120870A (en) * | 2013-04-28 | 2014-10-29 | 中际联合工业技术(北京)有限公司 | Temporary operating platform |
CN103383104A (en) * | 2013-07-03 | 2013-11-06 | 天津二十冶建设有限公司 | Hoisting installation method for quickly mounting economizer and super heater |
CN104344389B (en) * | 2014-10-15 | 2016-01-20 | 四川电力建设三公司 | The hanging method of rear cigarette well snake-like tube row |
KR101547824B1 (en) * | 2015-03-17 | 2015-08-27 | 케이.엘.이.에스 주식회사 | Furnace scaffolding and hoisting system platform support system |
KR101539203B1 (en) * | 2015-03-17 | 2015-07-24 | 케이.엘.이.에스 주식회사 | Furnace scaffolding platform support system and lift system installation and dismantling methods |
CN106185687B (en) * | 2016-08-31 | 2020-01-03 | 江苏能建机电实业集团有限公司 | Boiler furnace maintenance platform adopting M-shaped gangplank |
CN106185688B (en) * | 2016-08-31 | 2019-07-30 | 江苏能建机电实业集团有限公司 | A kind of boiler hearth overhauling platform and its technique using aluminum connector snap-gauge |
CN106185744B (en) * | 2016-08-31 | 2019-05-03 | 江苏能建机电实业集团有限公司 | Boiler hearth overhauling platform and its with positioning enhancing structure main suspension centre and technique |
CN106907698B (en) * | 2017-03-10 | 2019-03-08 | 中国电建集团河南工程有限公司 | High temperature reheater pipe arranges construction method for hanging |
KR102667140B1 (en) * | 2023-07-18 | 2024-05-20 | 주식회사 충력 | Scaffolding for boiler maintenance in thermal power plant |
Citations (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1725183A (en) * | 1926-08-23 | 1929-08-20 | Anthony C Fischer | Scaffold-suspension device |
US3168163A (en) * | 1962-10-15 | 1965-02-02 | Clyde W Prosser | Portable scaffolds |
US3420332A (en) * | 1967-07-14 | 1969-01-07 | Richard A Textor | Elevator for quick assemblage and use in limited access enclosures |
US3853204A (en) * | 1972-05-15 | 1974-12-10 | Steel Corp | Apparatus for and methods of lining a furnace |
US3866382A (en) * | 1974-02-20 | 1975-02-18 | United States Steel Corp | Apparatus for supporting workmen within an open-ended vessel and carrying materials into and out of the vessel, and method of installing such apparatus in a vessel |
US3900080A (en) * | 1974-08-15 | 1975-08-19 | Jones Spencer D | Scaffold apparatus |
US4058184A (en) * | 1976-04-15 | 1977-11-15 | Hugh J. Baker & Company | Scaffold |
US4068738A (en) * | 1974-11-18 | 1978-01-17 | Ronald Reed | Scaffolding |
US4234055A (en) * | 1978-09-25 | 1980-11-18 | Beeche Gregory L | Mobile suspension scaffold system |
US4253549A (en) * | 1977-11-15 | 1981-03-03 | Petren Rolf A M | Method and a system for the erection of high buildings |
US4253548A (en) * | 1979-10-31 | 1981-03-03 | Beeche Gregory L | Folding scaffold system |
US4276956A (en) * | 1978-08-21 | 1981-07-07 | Andco Incorporated | Swing scaffold for hot blast stove checker chamber relining |
US4388982A (en) * | 1978-12-12 | 1983-06-21 | Yoshihiro Yonahara | Foothold device |
US4474497A (en) * | 1983-04-14 | 1984-10-02 | Combustion Engineering, Inc. | Furnace maintenance platform |
US4474143A (en) * | 1983-08-19 | 1984-10-02 | Combustion Engineering, Inc. | Retractable maintenance platform stored outside of the furnace |
US4815563A (en) * | 1988-03-17 | 1989-03-28 | Figgie International, Inc. | Adjustable post and method of using the post to erect suspension scaffolding |
US4967875A (en) * | 1986-05-08 | 1990-11-06 | Garox Corporation | Modular scaffolding system and connecting joints therefor |
US4971169A (en) * | 1989-12-12 | 1990-11-20 | Fruth Duane V | Method and apparatus for scaffolding |
US5007501A (en) * | 1989-09-01 | 1991-04-16 | Baston Peter J | Apparatus for facilitating the internal inspection and repair of large pressure vessels |
US5301770A (en) * | 1992-07-06 | 1994-04-12 | Regan Timothy J | Adjustable work platform assembly |
US5343978A (en) * | 1993-04-23 | 1994-09-06 | New York State Electric & Gas Corporation | Telescoping scaffolding for maintenance and repair of multi-story, power-generating boiler systems |
US5579866A (en) * | 1994-07-08 | 1996-12-03 | Sky Climber, Inc. | Suspended access platform |
US6264001B1 (en) * | 2000-01-04 | 2001-07-24 | Robert Herschbach | Scaffolding hanger |
US6286691B1 (en) * | 1997-07-14 | 2001-09-11 | Industrial Wire Products, Inc. | Shelving for suspension from rafters, or the like |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5944504A (en) | 1982-09-03 | 1984-03-13 | 日立プラント建設株式会社 | Temporarily installed scaffold in boiler furnace |
JPS6222904A (en) | 1985-07-23 | 1987-01-31 | 三菱重工業株式会社 | Method of lifting steam drum |
JPH0932121A (en) | 1995-07-19 | 1997-02-04 | Shimizu Corp | Constructing method of structure and push-up system using constructing method thereof |
JP2001173901A (en) | 1999-12-10 | 2001-06-29 | Babcock Hitachi Kk | Scaffold structure in furnace and method of installation thereof |
CN2474661Y (en) * | 2001-04-02 | 2002-01-30 | 北京康得环保科技股份有限公司 | Quick assembling scaffold in furnace |
JP3703096B2 (en) | 2003-02-19 | 2005-10-05 | 日立プラント建設株式会社 | Temporary scaffolding for structure and construction method thereof |
-
2005
- 2005-09-20 JP JP2005272371A patent/JP4154534B2/en not_active Expired - Fee Related
- 2005-12-05 US US11/293,113 patent/US7726447B2/en not_active Expired - Fee Related
- 2005-12-09 CA CA2529755A patent/CA2529755C/en not_active Expired - Fee Related
- 2005-12-12 AU AU2005242210A patent/AU2005242210B2/en not_active Ceased
- 2005-12-23 CN CN2005101339729A patent/CN1944914B/en not_active Expired - Fee Related
Patent Citations (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1725183A (en) * | 1926-08-23 | 1929-08-20 | Anthony C Fischer | Scaffold-suspension device |
US3168163A (en) * | 1962-10-15 | 1965-02-02 | Clyde W Prosser | Portable scaffolds |
US3420332A (en) * | 1967-07-14 | 1969-01-07 | Richard A Textor | Elevator for quick assemblage and use in limited access enclosures |
US3853204A (en) * | 1972-05-15 | 1974-12-10 | Steel Corp | Apparatus for and methods of lining a furnace |
US3866382A (en) * | 1974-02-20 | 1975-02-18 | United States Steel Corp | Apparatus for supporting workmen within an open-ended vessel and carrying materials into and out of the vessel, and method of installing such apparatus in a vessel |
US3900080A (en) * | 1974-08-15 | 1975-08-19 | Jones Spencer D | Scaffold apparatus |
US4068738A (en) * | 1974-11-18 | 1978-01-17 | Ronald Reed | Scaffolding |
US4058184A (en) * | 1976-04-15 | 1977-11-15 | Hugh J. Baker & Company | Scaffold |
US4253549A (en) * | 1977-11-15 | 1981-03-03 | Petren Rolf A M | Method and a system for the erection of high buildings |
US4276956A (en) * | 1978-08-21 | 1981-07-07 | Andco Incorporated | Swing scaffold for hot blast stove checker chamber relining |
US4234055A (en) * | 1978-09-25 | 1980-11-18 | Beeche Gregory L | Mobile suspension scaffold system |
US4388982A (en) * | 1978-12-12 | 1983-06-21 | Yoshihiro Yonahara | Foothold device |
US4253548A (en) * | 1979-10-31 | 1981-03-03 | Beeche Gregory L | Folding scaffold system |
US4474497A (en) * | 1983-04-14 | 1984-10-02 | Combustion Engineering, Inc. | Furnace maintenance platform |
US4474143A (en) * | 1983-08-19 | 1984-10-02 | Combustion Engineering, Inc. | Retractable maintenance platform stored outside of the furnace |
US4967875A (en) * | 1986-05-08 | 1990-11-06 | Garox Corporation | Modular scaffolding system and connecting joints therefor |
US4815563A (en) * | 1988-03-17 | 1989-03-28 | Figgie International, Inc. | Adjustable post and method of using the post to erect suspension scaffolding |
US5007501A (en) * | 1989-09-01 | 1991-04-16 | Baston Peter J | Apparatus for facilitating the internal inspection and repair of large pressure vessels |
US4971169A (en) * | 1989-12-12 | 1990-11-20 | Fruth Duane V | Method and apparatus for scaffolding |
US5301770A (en) * | 1992-07-06 | 1994-04-12 | Regan Timothy J | Adjustable work platform assembly |
US5343978A (en) * | 1993-04-23 | 1994-09-06 | New York State Electric & Gas Corporation | Telescoping scaffolding for maintenance and repair of multi-story, power-generating boiler systems |
US5579866A (en) * | 1994-07-08 | 1996-12-03 | Sky Climber, Inc. | Suspended access platform |
US6286691B1 (en) * | 1997-07-14 | 2001-09-11 | Industrial Wire Products, Inc. | Shelving for suspension from rafters, or the like |
US6264001B1 (en) * | 2000-01-04 | 2001-07-24 | Robert Herschbach | Scaffolding hanger |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103114713A (en) * | 2013-03-21 | 2013-05-22 | 北京六建集团有限责任公司 | Hollow ultrahigh template section steel platform and construction method thereof |
CN103352563A (en) * | 2013-07-16 | 2013-10-16 | 上海建工集团股份有限公司 | Self plate-bearing type steel bar mesh support combined template and construction method thereof |
CN103352564A (en) * | 2013-07-18 | 2013-10-16 | 上海建工集团股份有限公司 | Horizontally-structured framework system and construction method |
CN103953188A (en) * | 2014-04-09 | 2014-07-30 | 天津一建建筑工程有限公司 | High-altitude supporting mold of structureless floor slab |
CN104100090A (en) * | 2014-07-17 | 2014-10-15 | 成都市第四建筑工程公司 | High-altitude comprehensive construction method of big-cantilever steel truss structure |
US20160339277A1 (en) * | 2015-05-19 | 2016-11-24 | Anco Maritime Activities Ltd. | Method for inspecting an inside room of a ship and/or performing works therein |
CN105387740A (en) * | 2015-12-11 | 2016-03-09 | 无锡方盛换热器股份有限公司 | Detachable large-sized aluminum plate-fin heat exchanger |
Also Published As
Publication number | Publication date |
---|---|
CA2529755A1 (en) | 2007-03-20 |
AU2005242210B2 (en) | 2011-03-10 |
JP4154534B2 (en) | 2008-09-24 |
CA2529755C (en) | 2012-05-15 |
AU2005242210A1 (en) | 2007-04-05 |
US7726447B2 (en) | 2010-06-01 |
CN1944914B (en) | 2011-02-09 |
JP2007085590A (en) | 2007-04-05 |
CN1944914A (en) | 2007-04-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7726447B2 (en) | Inspection scaffold of large component for boiler and building method thereof | |
US5007501A (en) | Apparatus for facilitating the internal inspection and repair of large pressure vessels | |
JP5169549B2 (en) | Large beam block lifting method and jack-up stage used for it | |
KR101539203B1 (en) | Furnace scaffolding platform support system and lift system installation and dismantling methods | |
JP5394334B2 (en) | Construction method of work floor for work at height | |
KR101547824B1 (en) | Furnace scaffolding and hoisting system platform support system | |
AU2020249031A1 (en) | Assembly device and method for carrying out an installation process in a lift shaft of a lift system | |
JPH05178561A (en) | Installation method for guide rail for elevator | |
JP3703096B2 (en) | Temporary scaffolding for structure and construction method thereof | |
KR101846788B1 (en) | Prefabricated Gondola System and Method for Plant Boiler Waterwall Urgent Repairing | |
CN114933231B (en) | Calandria bundle hoisting tool and construction method thereof | |
CN214738789U (en) | Large-span welding ball net rack integral hydraulic lifting construction structure | |
JP6514677B2 (en) | In-furnace scaffolding system for boiler maintenance and its installation method | |
JP4006697B2 (en) | Suspended scaffold for structure and fixing method thereof | |
KR101757288B1 (en) | Method of dismantalling furnace scaffolding support system by way of wire rope | |
KR102046971B1 (en) | Boiler panel lifting method for coal fire power plant construction using winch and large size modularity work | |
JP6781314B2 (en) | How to check the turbine diaphragm | |
JP7209413B2 (en) | CONCRETE FORM EQUIPMENT CONSTRUCTION METHOD, DISMOVERMENT METHOD, AND PULLEY SUPPORT MEMBER FOR CONCRETE FORM EQUIPMENT | |
JP3849139B2 (en) | Temporary scaffolding for vertical piping | |
CN216512349U (en) | Pipe gallery hoist | |
JPH11131789A (en) | Gondola for use in work | |
JP3100574B2 (en) | Suspended scaffold and its erection method | |
JP4065798B2 (en) | Prop work scaffold and method for constructing support work scaffold | |
KR100454121B1 (en) | High place working device | |
CN105464355A (en) | Operating platform used for installation of curved building external window |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: HITACHI PLANT ENGINEERING & CONSTRUCTION CO., LTD. Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KAWAGUCHI, SHIGEYOSHI;NAKAMITSU, KAZUHITO;SAGAWA, SINNICHI;REEL/FRAME:017332/0050 Effective date: 20051129 |
|
AS | Assignment |
Owner name: HITACHI PLANT TECHNOLOGIES, LTD., JAPAN Free format text: CHANGE OF NAME;ASSIGNOR:HITACHI PLANT ENGINEERING & CONSTRUCTION CO., LTD.;REEL/FRAME:019749/0933 Effective date: 20060401 Owner name: HITACHI PLANT TECHNOLOGIES, LTD.,JAPAN Free format text: CHANGE OF NAME;ASSIGNOR:HITACHI PLANT ENGINEERING & CONSTRUCTION CO., LTD.;REEL/FRAME:019749/0933 Effective date: 20060401 |
|
FPAY | Fee payment |
Year of fee payment: 4 |
|
AS | Assignment |
Owner name: HITACHI, LTD., JAPAN Free format text: MERGER;ASSIGNOR:HITACHI PLANT TECHNOLOGIES, LTD.;REEL/FRAME:032384/0877 Effective date: 20130401 |
|
FEPP | Fee payment procedure |
Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
FEPP | Fee payment procedure |
Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.) |
|
LAPS | Lapse for failure to pay maintenance fees |
Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.) |
|
STCH | Information on status: patent discontinuation |
Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362 |
|
FP | Lapsed due to failure to pay maintenance fee |
Effective date: 20180601 |