CN106185688B - A kind of boiler hearth overhauling platform and its technique using aluminum connector snap-gauge - Google Patents

A kind of boiler hearth overhauling platform and its technique using aluminum connector snap-gauge Download PDF

Info

Publication number
CN106185688B
CN106185688B CN201610792323.8A CN201610792323A CN106185688B CN 106185688 B CN106185688 B CN 106185688B CN 201610792323 A CN201610792323 A CN 201610792323A CN 106185688 B CN106185688 B CN 106185688B
Authority
CN
China
Prior art keywords
branch pipe
gauge
plate
springboard
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610792323.8A
Other languages
Chinese (zh)
Other versions
CN106185688A (en
Inventor
郭余庆
孙曙光
蒋伟
王军
王读根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU NENGJIAN ELECTROMECHANICAL INDUSTRIAL Co Ltd
Original Assignee
JIANGSU NENGJIAN ELECTROMECHANICAL INDUSTRIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU NENGJIAN ELECTROMECHANICAL INDUSTRIAL Co Ltd filed Critical JIANGSU NENGJIAN ELECTROMECHANICAL INDUSTRIAL Co Ltd
Priority to CN201610792323.8A priority Critical patent/CN106185688B/en
Publication of CN106185688A publication Critical patent/CN106185688A/en
Application granted granted Critical
Publication of CN106185688B publication Critical patent/CN106185688B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00Lifting frames, e.g. for lifting vehicles; Platform lifts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22FCHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
    • C22F1/00Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
    • C22F1/002Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working by rapid cooling or quenching; cooling agents used therefor
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22FCHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
    • C22F1/00Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
    • C22F1/04Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of aluminium or alloys based thereon

Landscapes

  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Engineering & Computer Science (AREA)
  • Thermal Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The invention discloses a kind of boiler hearth overhauling platform and its technique using aluminum connector snap-gauge, platform includes main platform body and lifting appliance;The main platform body, including girder, auxiliary girder, folded beam, limit beam and springboard beam, and in the periphery of main platform body tiling springboard;Girder realizes intersecting vertically for the two by connection snap-gauge with auxiliary girder;Folded beam realizes foldable connection by folding joint and auxiliary girder;Girder is all made of connector snap-gauge with auxiliary girder and concatenates several adjacent seperated beam a, fission beam b, the connector snap-gauge is aluminum U-shape connecting plate, including closed end and the support arms of closed end two sides is set, a part of arm body of support arm is adjacent to the wing plate of seperated beam a, remaining part arm body then with the wing plate of seperated beam b close to.It can thus be appreciated that: the self weight of girder, auxiliary girder can be effectively reduced;Meanwhile the arrangement of U-shape connecting board surface mounting hole, the coupling stiffness between seperated beam can be improved.

Description

A kind of boiler hearth overhauling platform and its technique using aluminum connector snap-gauge
Technical field
The present invention relates to a kind of boiler hearth overhauling platform and its techniques.
Background technique
Boiler hearth overhauling platform is efficient, multi-functional high-altitude maintenance construction operation equipment in burner hearth, it is instead of biography The scaffold of system, is operated by service personnel, and platform is made to be adjusted to required position construction operation.With structurally reasonable, user Just, the features such as securely and reliably, work efficiency is high, light labor intensity and maintenance duration are short is to obtain in current Thermal Power Generation Industry extensively The approved product of application is overhauled for portion each in burner hearth and is used, and large and medium-sized power station is come into operation at home.
Most of boiler hearth overhauling platform is all to pass through steel connector group using the I-shaped aluminum profile of 2A12 material Therefore platform structure frame made of dress adds the springboard that surrounding is laid with using the platform of this structure, self weight can be up to 4 Ton is more.It is current burner hearth inspection platform development so how to reduce boiler hearth overhauling platform self weight for manufacturing enterprise An important research direction.
In order to reduce inspection platform overall weight, in the case where considering cost, light material aluminium inexpensively is selected Alloy connector replaces steel connector, be it would have readily occurred to a person skilled in the art that a kind of technological means, still, due to Platform structure frame is a kind of space structure, including several lateral I-shaped aluminum profiles and several longitudinal I-shaped aluminum profiles, between each other An entirety is constituted by the overlap joint of the aluminum coupling element of which kind of structure type, then needs those skilled in the art to carry out detailed Research after just can determine that.
In connection, between joint face there may be dislocation, turn to etc., using integrally formed aluminum coupling element, for The requirement of integral forming technique can be relatively high, welds aluminum profile of different shapes using welding procedure to make at this point, just may require that At required connector;And the main points that the welding quality and this field for aluminum profile need to pay attention to, especially for It is used in for the connector of inspection platform, welding quality directly affects the security performance of product.
Generally, inspection platform is the driving by hoist engine, and descending operation is completed in boiler furnace;Due to Boiler Furnace Thorax internal diameter is typically all tens meters, and the Outside Dimensions of inspection platform are almost matched with boiler furnace inner wall size, therefore, maintenance Platform area is excessively huge, and in lifting process or in operation process, even if lesser offset, periphery may also be by leading It is touched to wheel with inboard wall of burner hearth;And installation dimension of the existing directive wheel on inspection platform is relatively fixed, it is substantially unadjustable, Therefore, the pulley yoke of directive wheel easily damages, meanwhile, directive wheel is usually that rigidity connects with the direct connection type of inspection platform It connects, therefore, when directive wheel is touched with inboard wall of burner hearth, easily causes the shaking of inspection platform, influence the safety of inspection platform.
Summary of the invention
In view of the above technical problems, the present invention proposes a kind of boiler hearth overhauling platform, by using aluminum coupling element, It is light, the self weight of girder, auxiliary girder can be effectively reduced;Meanwhile the arrangement of U-shape connecting board surface mounting hole, it can be with Improve the coupling stiffness between seperated beam.
In order to achieve the above technical purposes, the present invention adopts the following technical scheme:
A kind of boiler hearth overhauling platform using aluminum connector snap-gauge, including main platform body and lifting appliance;It is described Main platform body, including girder, auxiliary girder, folded beam, limit beam and springboard beam, and tile springboard in the periphery of main platform body, The inner ring of springboard is fitted with fence;Fence is mounted in main platform body by fence support;Girder and auxiliary girder pass through connection snap-gauge Realize intersecting vertically for the two;Folded beam realizes foldable connection by folding joint and auxiliary girder;Girder is all made of with auxiliary girder and connects Head snap-gauge concatenates several adjacent seperated beam a, fission beam b, and the connector snap-gauge is aluminum U-shape connecting plate, packet It includes closed end and the support arm of closed end two sides is set, a part of arm body of support arm is adjacent to the wing plate of seperated beam a, remaining Lower part arm body then with the wing plate of seperated beam b close to;The closed end offers two groups of mounting holes, wherein one group of mounting hole is used It is fixedly connected in the web of seperated beam a, another group of mounting hole is then used to be fixedly connected with the web of seperated beam b.
As a further improvement of the present invention, the surrounding of the main platform body is fitted with elastic spacing wheel mechanism.
Elastic spacing wheel mechanism includes position-limited wheel, pulley yoke, lead rail axis, spring, guide rail sleeve and track base;Wherein, it limits Position wheel is connected to lead rail axis one end by pulley yoke, and the lead rail axis other end is socketed on the inner cavity of guide rail sleeve, and lead rail axis with lead The spring is set between rail set, along the limiting slot that is axially arranged with of guide rail sleeve on guide rail sleeve side wall, a guiding parts passes through described It is fixedly connected after limiting slot with the lead rail axis;The bottom of the guide rail sleeve connects track base, and the track base has and can block The sliding slot on a side wing of I-beam is connect, sliding slot is equipped with bolt hole, makes the track base and work by connecting bolt It is fixed between word beam.
As a further improvement of the present invention, lead rail axis is hollow shaft;Spring is placed in the inner cavity of lead rail axis, and the one of spring End is fixed with pulley yoke, and the other end is connect after then passing through lead rail axis with guide rail sleeve.
As a further improvement of the present invention, the guiding parts is a bolt.
As a further improvement of the present invention, the folding joint includes hinged first axle connecting plate and Two hinge connecting plate;The first axle connecting plate has the second sliding slot being slidably connected with the wing plate of auxiliary girder;Second hinge connects Fishplate bar have the third sliding slot being slidably connected with the wing plate of folded beam and can by auxiliary girder, fold the two of the splicing of web end A clamping plate;Two clamping plates set up separately in auxiliary girder, fold two sides at the splicing seams position of web end, meanwhile, described second Bolt connecting hole is provided on sliding slot, third sliding slot and two clamping plates, and the bolt connecting hole on two clamping plates is pairing Hole;By being equipped with connection bolt in the bolt connecting hole of second sliding slot, by the wing plate of the first axle connecting plate and auxiliary girder It is mutually fixed;By being equipped with connection bolt in the bolt connecting hole of third sliding slot, by the second hinge connecting plate and folded beam Between mutually fix;By being equipped with connection bolt in the bolt connecting hole on two clamping plates, by the web end of auxiliary girder and fold The web end splicing of beam is integral.
As a further improvement of the present invention, the second sliding slot is turned under by the both sides of the edge of first axle connecting plate It rolls over and is formed;The both sides of the edge of the second hinge connecting plate are bent downward to form the second sliding slot after, continue bending with shape The L clevis plate arranged opposite to each other at two.
As a further improvement of the present invention, the back side up of the second sliding slot is provided with one piece with hinge hole a Vertical plate a;The back side up of the third sliding slot is provided with a hinge seat, and the hinge seat includes the tool of two pieces of alternate arrangements There is the vertical plate b of hinge hole b;Vertical plate a is placed between two pieces of vertical plate b, and the hinge hole on the hinge hole a and two vertical plate b on vertical plate a B is mating hole;By installing pin shaft in the hinge hole b on the hinge hole a and two vertical plate b on vertical plate a, first axle is connected Plate, second hinge connecting plate are hinged.
As a further improvement of the present invention, the track base, guide rail sleeve, first axle connecting plate are connected with second hinge Plate is all made of 6061 aluminium alloys and is made;And track base, guide rail sleeve pass through weldering by being welded and fixed between vertical plate a and second sliding slot Fixation is connect, also by being welded and fixed between vertical plate b and third sliding slot;Between track base and guide rail sleeve, vertical plate a and second sliding slot it Between, the process flow that is welded and fixed between vertical plate b and third sliding slot be: including cleaning process, pre-heating technique, welding procedure.
It as a further improvement of the present invention, further include that postwelding reinforces treatment process.
According to above-mentioned technical solution, compared with the existing technology, the present invention have it is following the utility model has the advantages that
1, aluminum U-shape connecting plate advantage
The present invention uses aluminum coupling element, light, can be effectively reduced the self weight of girder, auxiliary girder;Meanwhile U-shape connects The arrangement of fishplate bar plate face mounting hole, can be improved the coupling stiffness between seperated beam.
2, the advantages of elastic spacing wheel mechanism
A kind of boiler hearth overhauling platform of the present invention and its elastic spacing wheel mechanism, due to having between position-limited wheel and platform The buffer structure of lead rail axis, spring and guide rail sleeve composition, so that it is slow to realize certain energy between position-limited wheel and I-beam Punching, when directive wheel is touched with inboard wall of burner hearth, not will lead to position-limited wheel pulley yoke damage the technical issues of.
Detailed description of the invention
Fig. 1 is the main view of boiler hearth overhauling platform of the present invention;
Fig. 2 is the side view of Fig. 1;
In Fig. 1, Fig. 2,1 is single layer π word beam;2 be fence pipe;3 be bilayer π word beam;4 be springboard beam;5 connect for fence cross bar Fitting;6 be the double card button a being mounted between fence pipe and fence upright bar;7 be limit beam;8 be fence strut;9 enclose to be mounted on Double card button b between column pipe and fence strut;10 be fence upright bar;11 hang upright bar for branch;12 be springboard;13 be protector;14 For protection rope;16 be lifting rope;17 be spiral lockset button;18 be aluminum corner brace;19 be wirerope;20 be folding joint;21 be fence branch Pole socket;22 be drawing suspension centre;23 be auxiliary girder;24 be A2, A3, A4 beam;25 is fixed between springboard double end;26 be A1, A5, A6 beam;27 For main suspension centre;28 be secondary suspension centre;29 be twin beams connector;30 hang upright bar seat for branch;31 be fence support;32 fill for position-limited wheel It sets;33 be single-beam connector;34 be springboard connector;35 be folded beam;36 be springboard;37 fix for springboard single head;
Fig. 3 is the main view for connecting snap-gauge;
Wherein, 110 be the first snap-gauge;120 be the second snap-gauge;
Fig. 4 is the side view of Fig. 3;
Wherein, 1101 be first sliding groove;
Fig. 5 is the top view of Fig. 3;
Fig. 6 is that every two intersects attachment structure schematic diagram between I-beam;
Wherein, 140 be I-beam A;150 be I-beam B;
Fig. 7 is first axle connecting plate main view;
Wherein, 210 be first axle connecting plate;2102 be hinged seat;
Fig. 8 is Fig. 7 side view;
Wherein, 2101 be second sliding slot;
Fig. 9 is second hinge connecting plate main view;
Wherein, 310 be second hinge connecting plate;3101 be third sliding slot;3102 be clamping plate;3103 be hinged seat;
Figure 10 is Fig. 9 side view;
Figure 11 is foldable I-beam attachment structure schematic diagram;
Wherein, 240 be I-beam C;350 be I-beam D;
Figure 12 is the folded structural schematic diagram of foldable I-beam;
Figure 13 is the main view that wheel apparatus is limited in the present invention;
Wherein, 321 be position-limited wheel;322 be fixing buckle;
Figure 14 is the side view of Figure 12;
Wherein, 323 be pulley yoke;324 be lead rail axis;325 be spring;326 be guiding parts;327 be guide rail sleeve;328 For guide rail sleeve bottom;329 be track base;330 be connection bolt.
Figure 15 is the partial enlarged view of fence support;
Figure 16 is the structural schematic diagram of fence seat snap-gauge;
Figure 17 is the structural schematic diagram of fence connecting tube;
In figure: fence seat snap-gauge 31-1;Fence seat sliding slot 31-1a;Fence seat card adapter plate 31-1b;Fence connecting tube 31-2; Outer tube wall card slot 31-2a;Inner tubal wall card slot 31-2b;
Figure 18 is the structural schematic diagram of I-beam (by taking A beam as an example) splicing;
Figure 19 is the structural schematic diagram of connector snap-gauge;
In Figure 18: 1-1, seperated beam a;1-2, connector snap-gauge;1-3, seperated beam b;
Figure 20 is the cross-sectional view in main one direction of suspension centre;
Figure 21 is the cross-sectional view in main another direction of suspension centre;
In Figure 20-21: 27-1, U-shaped structure;27-2, card slot;27-3, connecting hole;
Figure 22 is the structural schematic diagram for drawing suspension centre;
In figure: 22-1, card slot;22-2, reinforce column;
Figure 23 is the structural schematic diagram of springboard of the present invention;
In figure: 12-1 is springboard platform;12-2 is third support construction;12-3 is the second support construction;12-4 is first Support construction;L is the width of isosceles trapezoid shape springboard platform big end;C is the height of isosceles trapezoid shape springboard platform;H is first Support construction, the second support construction, the height of third support construction;A is the width of third support construction;B is the first internal layer branch The inside bevel edge of spacing, the second internal layer branch pipe between the bevel edge of pipe and the first outer layer branch pipe bevel edge is interior with the second internal layer branch pipe Spacing between skew back side;D is the spacing between the outside bevel edge of the second internal layer branch pipe and the outside bevel edge of the second internal layer branch pipe; E be the first internal layer branch pipe bottom edge and the first outer layer branch pipe bottom edge between spacing, the second internal layer branch pipe bottom edge and second outside Spacing between layer branch pipe bottom edge;F is the width of the first support construction, the second support construction bottom end;α be the first support construction, The inclination angle of second support construction bevel edge.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Below Description only actually at least one exemplary embodiment be it is illustrative, never as to the present invention and its application or make Any restrictions.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, shall fall within the protection scope of the present invention.Unless specifically stated otherwise, otherwise in these realities Apply the positioned opposite of component and step described in example.Expression formula and numerical value do not limit the scope of the invention.Meanwhile it should be bright White, for ease of description, the size of various pieces shown in attached drawing is not to draw according to actual proportionate relationship.It is right The technology known to person of ordinary skill in the relevant, method and apparatus may be not discussed in detail, but in the appropriate case, institute Stating technology, method and apparatus should be considered as authorizing part of specification.In shown here and discussion all examples, appoint What occurrence should be construed as merely illustratively, not as limitation.Therefore, the other examples of exemplary embodiment can With different values.
For ease of description, spatially relative term can be used herein, as " ... on ", " ... top ", " ... upper surface ", " above " etc., for describing such as a device shown in the figure or feature and other devices or spy The spatial relation of sign.It should be understood that spatially relative term is intended to comprising the orientation in addition to device described in figure Except different direction in use or operation.For example, being described as if the device in attached drawing is squeezed " in other devices It will be positioned as " under other devices or construction after part or construction top " or the device of " on other devices or construction " Side " or " under other devices or construction ".Thus, exemplary term " ... top " may include " ... top " and " in ... lower section " two kinds of orientation.The device can also be positioned with other different modes and (is rotated by 90 ° or in other orientation).
As shown in Figure 1 and Figure 2, as shown in Figure 1 and Figure 2, it discloses the knots of boiler hearth overhauling platform of the present invention Structure schematic diagram, boiler hearth overhauling platform include main platform body and lifting appliance;The main platform body generally includes to lead Beam, auxiliary girder, folded beam 35, limit beam 7 and springboard beam 4, and in the periphery of main platform body tiling springboard 12, the inner ring of springboard 12 It is fitted with fence;Fence is mounted in main platform body by fence support 31;Girder and auxiliary girder pass through both connection snap-gauge realizations Intersect vertically;Folded beam 35 realizes foldable connection by folding joint 20 and auxiliary girder;Springboard beam 4 is also by connection snap-gauge It is mounted on two auxiliary girders in outside.The girder, auxiliary girder include several segments fission beam, two sections of adjacent fissions Beam a, fission beam b are spliced by connector snap-gauge.
In attached drawing, B1-B11 beam is auxiliary girder;A1-A6 beam is girder;C1-C11 beam is folded beam 35;D1, D2 are Limit beam 7, in which:
Girder has two classes, and one kind is single layer π word beam, another kind of, is the double-deck π word beam, and A1, A5, A6 are single layer π word beams, A2, A3, A4 are the double-deck π word beams;Certainly, girder can also select I-beam;Limit beam D1, D2 be periodically installed at girder A2, Between A3;Auxiliary girder, folded beam select I-beam.
Each auxiliary girder is parallel to each other, and each girder is parallel to each other, and each folded beam is also parallel to each other.
Each girder intersects vertically with auxiliary girder, and passes through connection snap-gauge connection at the place of intersecting vertically.
Two girders in end, i.e. the upside that girder A1, A6 is mounted on auxiliary girder, and remaining girder is then mounted on auxiliary girder Downside.
On girder multiple main suspension centres 27 are installed on especially beam A2, A4 for the installation convenient for lifting appliance;And just In the folding or expansion of folded beam 35, if being then provided with dry drawing suspension centre 22 on the auxiliary girder of installation folded beam.
The connection snap-gauge at a kind of I-beam right-angled intersection is disclosed in detail in Fig. 3-Fig. 6, is in vertical phase for connecting I-beam A140, the I-beam B150 at position are handed over, wherein I-beam A140 can be girder, and I-beam B150 can be pair Beam, the two also can be interchanged certainly;The connection snap-gauge includes a bending plate, and there is the bending plate section to be located on different height Two snap-gauges, be the first snap-gauge 110 and the second snap-gauge 120, one group of outside being parallel to each other of first snap-gauge 110 respectively Edge downward bending forms first sliding groove 1101, is slidably matched between the first sliding groove 1101 and the wing plate of I-beam A140, institute The back for stating first sliding groove 1101 has the second snap-gauge 120, the second snap-gauge 120 and I-beam towards the direction of I-beam B150 The wing plate of B150 is parallel;It is equipped with bolt round on first snap-gauge 110 and the second snap-gauge 120, by the first snap-gauge 110 On bolt round in be equipped with connection bolt so that the first snap-gauge 110 is fixed with I-beam A140 phase, by the second snap-gauge Connection bolt is equipped in bolt round on 120, so that being fixed between I-beam B150 and I-beam A140.
Occur for accident after preventing snap-gauge connection from loosening, I-beam A140 of the present invention, I-beam B150 are in the second snap-gauge 120 Between the two neighboring bolt hole of bolt round, it is provided with foil gauge.By the way that foil gauge is arranged on the second snap-gauge 120, thus Realization is measured in real time the contact pressure between the second snap-gauge 120 and I-beam.
1101 back of first sliding groove is connect by the cambered surface of indent with the second snap-gauge 120.The bending plate uses Part is integrally formed made of A356 aluminium alloy.Be equally after I-beam made of aluminum alloy materials is cooperatively connected, compared to existing Have for steel structure platform, weight mitigates significantly.The bending plate may not be integrated molding part, use 6061-T6 at this time It is made, and is connected between the first snap-gauge 110 and the second snap-gauge 120 by welding manner.
As a further improvement of the present invention, I-beam B150 and I-beam A140 are in 120 bolt round of the second snap-gauge Between two neighboring bolt hole, it is provided with foil gauge.By the way that foil gauge is arranged on the second snap-gauge 120, to realize to second Contact pressure between snap-gauge 120 and I-beam is measured in real time, and accident occurs after preventing snap-gauge connection from loosening.
It, will be above-mentioned when above-mentioned connection snap-gauge is used at the girder and auxiliary girder crossover location of inspection platform of the present invention I-beam A140 be set to girder, I-beam B150 is set to auxiliary girder, at this point, sliding between first sliding groove 1101 and the wing plate of girder The back of cooperation, the first sliding groove 1101 has the second snap-gauge 120, the second snap-gauge 120 and auxiliary girder towards the direction of auxiliary girder Wing plate is parallel;When then installing, by being equipped with connection bolt in the bolt round on the first snap-gauge 110, so that the first snap-gauge 110 It is mutually fixed with girder, by being equipped with connection bolt in the bolt round on the second snap-gauge 120, so that being pressed between auxiliary girder and girder It fastens.
Fig. 7 to Figure 12 more at large discloses a kind of folding joint, be connected to I-beam C240, I-beam D350 it Between, it can be realized the folding or expansion between I-beam C240, I-beam D350, connect including hinged first axle Fishplate bar 210 and second hinge connecting plate 310;The first axle connecting plate 210, which has to slide with the wing plate of I-beam C240, to be connected The second sliding slot 2101 connect;Second hinge connecting plate 310 has the third sliding slot being slidably connected with the wing plate of I-beam D350 3101 and can by I-beam C240, I-beam D350 web end splice two clamping plates 3102;Two clamping plates 3102 set up the two sides at I-beam C240, I-beam D350 web end splicing seams position separately, meanwhile, the second sliding slot 2101, bolt connecting hole, and the bolt on two clamping plates 3102 are provided on third sliding slot 3101 and two clamping plates 3102 Connecting hole is mating hole;By being equipped with connection bolt in the bolt connecting hole of second sliding slot 2101, the first axle is connected The wing plate of fishplate bar 210 and I-beam C240 is mutually fixed;By being equipped with connection bolt in the bolt connecting hole of third sliding slot 3101, It will mutually be fixed between the second hinge connecting plate 310 and I-beam D350;By the way that the bolt on two clamping plates 3102 connects It is equipped with connection bolt in hole, the web end of I-beam C240 and the web end of I-beam D350 are spliced integral.
Above-mentioned I-beam C240, I-beam D350 is specific on inspection platform of the present invention, it is known that I-beam C240 is auxiliary girder, and I-beam D350 is folded beam.
As one preferred embodiment of folding joint of the present invention, the second sliding slot 2101 passes through first axle connecting plate 210 both sides of the edge bend downward and are formed.
As a preferred embodiment of folding joint of the present invention, the both sides of the edge of the second hinge connecting plate 310 to Under be bent to form the second sliding slot 2101 after, continue to bend to form two L clevis plates 3102 arranged opposite to each other.
As one preferred embodiment of folding joint technical solution of the present invention, the bolt that is opened up on the clamping plate 3102 connection Hole has 6, wherein three bolt connecting holes clamping plate in equilateral triangle being arranged in the web end face of I-beam C240 3102 plate faces, remaining three bolt connecting holes also folder in equilateral triangle being arranged in the web end face of I-beam D350 3102 plate face of plate.
It is sliding with third in the L clevis plate 3102 as one preferred embodiment of folding joint technical solution of the present invention It is straight there are one at the position that the flanging positioned opposite of slot 3101 and the side adjacent with first axle connecting plate 210 cross The unfilled corner of angle triangle.
As one preferred embodiment of folding joint technical solution of the present invention, the back side up of second sliding slot 2101 is set It is equipped with one piece of vertical plate a with hinge hole a;The back side up of the third sliding slot 3101 is provided with a hinge seat, described Hinge seat includes the vertical plate b with hinge hole b of two pieces of alternate arrangements;Vertical plate a is placed between two pieces of vertical plate b, and on vertical plate a Hinge hole b on hinge hole a and two vertical plate b is mating hole;Pass through the hinge hole on the hinge hole a and two vertical plate b on vertical plate a Pin shaft is installed in b, first axle connecting plate 210, second hinge connecting plate 310 is hinged.
As one preferred embodiment of folding joint technical solution of the present invention, first axle connecting plate 210 and second hinge Connecting plate 310 is all made of 6061-T6 aluminium alloy and is made;And by being welded and fixed between vertical plate a and second sliding slot 2101, vertical plate b Also by being welded and fixed between third sliding slot 3101;Between vertical plate a and second sliding slot 2101, vertical plate b and third sliding slot 3101 Between be welded and fixed.If it is integrated product, can be made of A356 aluminium alloy.
Above-mentioned folding joint is applied to inspection platform of the present invention, the I-beam C can be set to auxiliary girder, I-beam D is set to folded beam 35, at this point, the first axle connecting plate 210 has second to be slidably connected with the wing plate of auxiliary girder Sliding slot 2101;Second hinge connecting plate 310 has the third sliding slot 3101 being slidably connected with the wing plate of folded beam and can incite somebody to action Auxiliary girder, two clamping plates 3102 for folding the splicing of web end;Two clamping plates 3102 set up separately in auxiliary girder, fold web Two sides at the splicing seams position of end, meanwhile, it is all provided on the second sliding slot 2101, third sliding slot 3101 and two clamping plates 3102 It is equipped with bolt connecting hole, and the bolt connecting hole on two clamping plates 3102 is mating hole;Pass through the bolt in second sliding slot 2101 It is equipped with connection bolt in connecting hole, the wing plate of the first axle connecting plate 210 and auxiliary girder is mutually fixed;By in third sliding slot It is equipped with connection bolt in 3101 bolt connecting hole, will mutually be fixed between the second hinge connecting plate 310 and folded beam;Pass through Connection bolt is equipped in the bolt connecting hole on two clamping plates 3102, by the web end of the web end of auxiliary girder and folded beam Splicing is integral.
Referring to shown in Figure 13~Figure 14, the invention discloses a kind of elastic spacing wheel mechanisms, including position-limited wheel 321, pulley Frame 323 and lead rail axis 324;It further include spring 325, guide rail sleeve 327 and track base 329;Wherein, position-limited wheel 321 passes through cunning Wheel carrier 323 is connected to 324 one end of lead rail axis, and 324 other end of lead rail axis is socketed on the inner cavity of guide rail sleeve 327, and lead rail axis 324 The spring 325 is set between guide rail sleeve 327, along the limiting slot that is axially arranged with of guide rail sleeve 327 on 327 side wall of guide rail sleeve, one Guiding parts is fixedly connected after passing through the limiting slot with the lead rail axis 324;The connection of bottom 328 of the guide rail sleeve 327 is led Rail chair 329, the track base 329 have the sliding slot that can be connected on a side wing of I-beam, and sliding slot is equipped with bolt hole, To fix between the track base 329 and I-beam by connecting bolt 330.
Further, lead rail axis 324 is hollow shaft;Spring 325 is placed in the inner cavity of lead rail axis 324, and one end of spring 325 Fixed with pulley yoke 323, the other end is connect after then passing through lead rail axis 324 with guide rail sleeve 327.
Further, the guiding parts 326 is a guide blot.
Further, in order to further mitigate the weight after platform integrated connection, the track base 329, guide rail sleeve 327 are selected It is made of 6016-T6 aluminum alloy material;And track base 329, guide rail sleeve 327 be by being welded and fixed, track base 329, guide rail sleeve 327 Between be welded and fixed.
Above-mentioned elastic spacing wheel mechanism, is fitted in the surrounding of main platform body, due to having between position-limited wheel 321 and platform The buffer structure that lead rail axis 324, spring 325 and guide rail sleeve 327 form, so that being realized between position-limited wheel 321 and I-beam Certain energy snubber not will lead to the skill that the pulley yoke 323 of position-limited wheel 321 damages when directive wheel is touched with inboard wall of burner hearth Art problem.
Referring to shown in Figure 15~Figure 17, the invention discloses a kind of fence supports, for fence to be mounted on main platform body On, it connect, is mostly installed on B beam (auxiliary girder) and C beam (folded beam) with the I-beam on the outside of main platform body;It is described to enclose Column support includes fence seat snap-gauge 31-1 and fence connecting tube 31-2;The fence seat snap-gauge 31-1 has and I-beam wing plate Bolt hole is offered on the fence seat sliding slot 31-1a of cooperation, fence seat sliding slot 31-1a, by being equipped with connection in bolt hole Fence seat snap-gauge 31-1 is mounted on I-beam by bolt;The fence seat snap-gauge 31-1 is at the back of fence seat sliding slot 31-1a Middle position is provided with fence seat card adapter plate 31-1b;The inner wall of fence connecting tube 31-2 is provided with and fence seat card adapter plate 31- The inner tubal wall card slot 31-2b of 1b cooperation, and the outer tube wall of fence connecting tube 31-2 is then provided with several uniformly distributed has anti-skidding work Outer tube wall card slot 31-2a;Fence connecting tube 31-2 is matched by inner tubal wall card slot 31-2b and fence seat card adapter plate 31-1b's It closes, is mounted on the back side of fence seat sliding slot 31-1a.Fence includes fence pipe, fence upright bar, is mounted on fence pipe and fence upright bar Between double card button a, fence strut, the double card button b being mounted between fence pipe and fence strut;Wherein fence upright bar passes through button Part is connect with fence connecting tube 31-2, and fence strut is then connect with I-beam.
The fence seat snap-gauge 31-1 and fence connecting tube 31-2 is all made of 6061-T6 aluminium alloy and is made.It is described to enclose The end face of column connecting tube 31-2 and the back of fence seat sliding slot 31-1a are welded and fixed by welding procedure
Girder, the auxiliary girder for being commonly used for building main platform body are longer, therefore, will using connector snap-gauge 1-2 if generally requiring Dry fission beam is spliced, and is connecting plate of the section at U-shape, the U-shaped referring specifically to Figure 18-Figure 19, the connector snap-gauge 1-2 The connecting plate of shape is connected across between the seperated beam a1-1 of adjacent two sections, seperated beam b1-3, seperated beam a1-1, seperated beam b1-3 seam Connect, the closed end of U-shape connecting plate offers several mounting holes, and seperated beam a1-1, fission beam b1-3 correspond to U-shape connection The mounting hole that the closed end of plate is opened up is provided with corresponding connecting hole, can be by seperated beam a1-1, seperated beam b1- using bolt 3 splicings are integral.
Figure 20-21 specifically discloses the structural schematic diagram of main suspension centre of the present invention, which includes U-shaped structure Card slot 27-2 is accordingly offered on two side arms of 27-1, U-shaped structure 27-1, for being clamped the upper side wing of girder;Meanwhile Two side arms of U-shaped structure 27-1 open up through connecting hole 27-3, for installing lifting appliance;It follows that the present invention is logical The wing plate socket by U-shaped structure 27-1 on the downside of girder is crossed, realizes the connection of main suspension centre and girder, and by card slot 27-2 to master The clamping of side wing on beam can further consolidate positioning of the main suspension centre on girder, prevent the drawstring with girder in 45 ° of inclination angles Suspension centre is pulled to move on girder.
Figure 22 specifically discloses the structural schematic diagram of the present invention for drawing suspension centre, including card slot 22-1 and reinforcement column The crosspiece part card slot of 22-2, the card slot 22-1 t shape, T shape card slot 22-1 can be clamped a flank of auxiliary girder Plate, and the vertical section part card slot of T shape card slot 22-1 can clamp the web of auxiliary girder;Reinforce column 22-2 backwards to T shape The crosspiece part of card slot extends and is formed, and reinforces column 22-2 and fix with folded beam 35, so that folded beam, auxiliary girder pass through Suspension centre is drawn to form triangular connection structure.
Figure 23 specifically discloses the specific structure of springboard of the present invention, and the springboard is M shape springboard, including springboard Platform 12-1 and the support construction being set to below springboard platform 12-1;The cross section of the springboard platform 12-1 is in isosceles ladder Shape setting, support construction is mounted on the small end of aforementioned isosceles trapezoid shape springboard platform 12-1, and isosceles trapezoid shape springboard platform The big end width of 12-1 is L, is highly c;The support construction includes first be arranged at springboard platform 12-1 medium position Support construction 12-4, the two sides of the first support construction 12-4 are symmetrically provided with the second support construction 12-3, third support construction 12-1, third support construction 12-1 is arranged at the end position of springboard platform 12-1, and the second support construction 12-3 is then located at Between first support construction 12-4, third support construction 12-1;Wherein: the first support construction 12-4, including in first Layer branch pipe, the first outer layer branch pipe;First internal layer branch pipe, the first outer layer branch pipe cross section be isosceles trapezoid shape, the first internal layer Branch pipe is socketed in the inner cavity of the first outer layer branch pipe, and the middle line of the first internal layer branch pipe, the first outer layer branch pipe is overlapped;Described second Support construction 12-3, including the second internal layer branch pipe, the second outer layer branch pipe;The cross section of second internal layer branch pipe, the second outer layer branch pipe It is isosceles trapezoid shape, the second internal layer branch pipe is socketed in the inner cavity of the second outer layer branch pipe, and the center of the second internal layer branch pipe is opposite It is deviated in the center of the second outer layer branch pipe to the center position of springboard;The first support construction 12-4, described second The big end of support construction 12-3 is connect with springboard platform 12-1;The third support construction 12-1, section are in a rectangular trapezoid Shape setting, beveled end are connect with springboard platform 12-1.
The inclination angle of the isosceles trapezoid shape springboard platform 12-1 is 60-65 °.The first internal layer branch pipe, the first outer layer branch Pipe, the second internal layer branch pipe, the inclination alpha of the second outer layer branch pipe are consistent, and value is between 70-80 °.First internal layer branch pipe it is oblique The inside bevel edge of spacing, the second internal layer branch pipe between side and the first outer layer branch pipe bevel edge and the inside bevel edge of the second internal layer branch pipe Between spacing, be denoted as b, value 1-2mm;The outside bevel edge of the outside bevel edge of second internal layer branch pipe and the second internal layer branch pipe it Between spacing, be denoted as d, value 3-4mm.Spacing between the bottom edge of first internal layer branch pipe and the first outer layer branch pipe bottom edge, Spacing between the bottom edge of two internal layer branch pipes and the second outer layer branch pipe bottom edge, is denoted as e, value 1-2mm;First support construction, The width of second support construction bottom end is denoted as f, value 13-16mm;The width of third support construction is a, value 7- 10mm。
The present invention uses the advantages of M shape springboard:
Mechanics Performance Testing:
Model Volume/mm3 Maximum distortion/mm Volume is with respect to reduction amount
It is original 4.62×106 6.173×10-5 /
" M " type 4.205×106 6.009×10-5 9%
Original springboard, the supporting mechanism having are rectangular-shaped column.
Conclusion:
By above analysis it is found that " M " type springboard reduces 9%, and maximum distortion relative to original springboard gross weight Also decrease to some degree, it is comparatively also safer.It follows that the present invention can not only reduce cost, Er Qiean There has also been biggish raisings for full property.
In addition, can be used for connecting in snap-gauge the invention also discloses a kind of aluminum alloy piping welding method, the first snap-gauge and Welding between two snap-gauges;It can be used in folding joint, between vertical plate a and second sliding slot, between vertical plate b and third sliding slot Welding;It can be used in elastic spacing wheel mechanism, track base, guide rail sleeve are by being welded and fixed, the weldering between track base, guide rail sleeve It connects;It can be used in fence support, the welding between the end face of fence connecting tube and the back of fence seat sliding slot.
Reinforce treatment process including cleaning process, pre-heating technique, welding procedure and postwelding, in which:
One, cleaning process
The present invention mainly clears up the oxide and greasy dirt on Al alloy parts surface to be welded using chemical method;Specifically The alkalescent that the reagent being related to has alcohol, pH value is 11-13 clears up solution;Wherein: it includes that component is inclined that alkalescent, which clears up solution, Sodium metasilicate, sodium citrate and sodium bicarbonate, the quality proportioning of sodium metasilicate, sodium citrate and sodium bicarbonate three are (10- 16):(2-4):(20-25)。
In use, using alcohol wipe Al alloy parts surface to be welded, first to remove Al alloy parts surface to be welded Greasy dirt, then with clear water it is clean after, then aluminium alloy work to be welded cleaned up using prepared alkalescent cleaning solution above The oxide on part surface, it is dry after finally being cleaned using clear water.
Specifically, the Al alloy parts to be welded Jing Guo alcohol wipe are immersed in 50-60 DEG C of alkalescent cleaning solution Impregnate 10 minutes or more, it takes out workpiece cold water and rinses and remove the residue on workpiece surface, then dry 30 at 80 DEG C Minute.
Two, pre-heating technique
It is using rigid fixture that workpiece to be welded is tight after workpiece is preheated to 150-200 DEG C using induction heating equipment Gu on welding bench, to control welding deformation.
In view of the high-termal conductivity feature that aluminum alloy material has, rigidity fixture of the present invention, the collet having is adopted With thermal insulation material composite plate, including fixed plate, adiabator plate and clamping plate, adiabator plate be pressed on fixed plate and clamping plate it Between, fixed plate is mounted on fixture, and clamping plate then clamps Al alloy parts, and adiabator plate can select asbestos cystosepiment; It follows that one aspect of the present invention may be implemented to rigidly fix with workpiece, prevent the workpiece in the welding process because of expanded by heating Deformation;On the other hand, due to configuring asbestos cystosepiment, can make to keep the temperature in the weld seam molten bath between the welding groove of two workpiece Time is long, is less prone to incomplete fusion and lack of penetration stomata and seminess;Effectively solve stomata and Inclusion Problem.
Three, welding procedure
The present invention carries out soldering to workpiece using variable polarity TIG welding machine.Specifically, comprising the following steps:
In view of Al alloy parts of the present invention are using 6061 material of aluminium alloy, normally, more commonly Welding wire uses the weld metal after the welding of ER5356 welding wire using ER5356, and the hot-cracking resistance intensity having is not high, and Another welding wire ER4043 of recommendation, although having preferable hot-cracking resistance, since it is welded for siliceous 5% alloy Silk, therefore, in the welding process, will form Mg2Si, so that the plasticity and intensity of weld metal are influenced, in addition, ER4043 welding wire Weld metal there are metachromatisms.
Weld metal of the invention includes 5 layers, respectively bottoming layer, intermediate layer and cap weld, in which: bottoming Layer and cap weld use same welding wire ER5356, respectively include 2 layers, and intermediate layer then uses ER4043 welding wire, has The technological parameter of body is as follows:
First layer uses ER5356 welding wire, and current regulation scope 250-290A, current polarity are using exchange, protective gas Using 100%Ar (purity >=99.99%);Gas flow is 10 ± 3 liters/min.
When first layer face of weld temperature is reduced to 220 DEG C, second layer welding is carried out, the second layer is welded using ER5356 Current values when silk, current regulation scope 250-290A, and the second layer weld are greater than current values when first layer welds; Current polarity uses 100%Ar (purity >=99.99%) using exchange, protective gas;Gas flow is 10 ± 3 liters/min.
When second layer face of weld temperature is reduced to 230 DEG C, third layer welding is carried out, third layer is welded using ER4043 Silk, current regulation scope 250-290A, current polarity using exchange, protective gas use 100%Ar (purity >= 99.99%);Gas flow is 10 ± 3 liters/min.
When third layer face of weld temperature is reduced to 220 DEG C, the 4th layer of welding is carried out, the 4th layer is welded using ER5356 Silk, current regulation scope 250-290A, and current values when the 4th layer of welding and the current values one when second layer welding It causes;Current polarity uses 100%Ar (purity >=99.99%) using exchange, protective gas;Gas flow is 10 ± 3 liters/min Clock;
To the 4th layer of face of weld temperature be reduced to Al-alloy parts preheating temperature or slightly above Al alloy parts it is pre- When hot temperature, layer 5 welding is carried out, layer 5 uses ER5356 welding wire, current regulation scope 250-290A, and layer 5 Current values when current values when welding are welded with first layer are consistent;Current polarity is used using exchange, protective gas 100%Ar (purity >=99.99%);Gas flow is 10 ± 3 liters/min;
The present invention is when carrying out welding procedure operation, by selecting different types of welding wire to carry out multi-layer welding, to improve A kind of welding wire is selected to weld the mechanical property defect having;In addition, the present invention also passes through the weld metal weldering in middle layer two sides When connecing, using symmetrically arranged technological parameter (first layer is consistent with layer 5, and the second layer and the 4th layer are consistent), so that weld seam is golden Belonging in interlayer is symmetric construction, effectively improves the mechanical property of welded unit.
Four, postwelding reinforces treatment process
6106 aluminium alloy weldments are heat-treated using the box atmosphere furnace of HMX1100-30A immediately after the completion of welding.Tool Body process is as follows:
The first step, solution treatment.The heating speed of stove is set as 10-15 DEG C/min, it, will after being heated to 450-520 DEG C Substantially the weldment for being cooled to room temperature is put into heating furnace, keeps the temperature 30min.It is taken out after the completion of heat preservation, is put into water cooling pond (room temperature rapidly 20-25 DEG C) in be quenched, be cooled to room temperature, workpiece produced the time to water cooling pond no more than 1 minute from stove;
Step 2: cold water workpiece weld after cooling is placed in cryogenic treatment apparatus, with the speed of (10-15) DEG C/min After rate is rapidly cooled to -80~-110 DEG C, half an hour is maintained, then slowly cool to -140~-160 with (3-6) DEG C/min rate After DEG C, half an hour is maintained, (- 190) DEG C or so are finally cooled to slowly with the rate of 1-1.5 DEG C/min, maintain 2 hours, is tied Beam subzero treatment process.
Third step will be put into heating and heat-insulating device by the processed workpiece of cryogenic treatment apparatus, with (1-3) DEG C/min's After rate is slowly heated to (80-90) DEG C, half an hour is maintained, then be brought rapidly up with the rate of (10-15) DEG C/min to 200-220 After DEG C, 1 hour is kept the temperature;
4th step takes out workpiece, is cooled to room temperature.
(ram load selection 5kg, testing standard GB/ are measured using the hardness of HVA-10A Vickers butt joint T2654-2008), the as-welded average hardness value commissure known to measurement result analysis is about 75.6HV, and heat affected area is about 85.2HV, by the heat treatment of postwelding, hardness Distribution value tends to uniformly, average value has reached 90.5HV, about base material hardness 98% (base material hardness is 95HV)
YDL-2000 Universal motor is used to carry out tensile property test (testing standard GB/T2649-1989, GB/T2651- 2008), as shown in the table.
Note: 101/102/103 represents base material, and 201/202/203 represents as-welded, 301/302/303 representative processing state
The tensile strength that can be seen that 6061 aluminium alloy base materials from experimental result above has reached 276MPa, elongation It is 12%, there is good intensity and plasticity;
Although the present invention is fully considered in cleaning process, preheating procedure and welding sequence, final In weld metal zone, tensile strength has 232MPa for the welding point tension failure position arrived, and is equivalent to the 84.06% of base material, elongation It decreases, only 6.4%, it is seen that connector tensile strength is declined when TIG melting welding, this occurs soft with hardness test result Change phenomenon to be consistent, and plasticity is also declined;
State joint breaking position is handled also in weld metal zone, test specimen rift direction is almost vertical with face of weld, tensile strength Reach 264MPa, be equivalent to base material 95.65%, elongation 10.5%, connector tensile strength is restored very well, and plasticity is relatively welded Connector is also restored.Welding post-processing restores the intensity of 6016 welded joints in aluminium alloy and plasticity recovery has very greatly Help, can satisfy the requirement used.

Claims (10)

1. a kind of boiler hearth overhauling platform using aluminum connector snap-gauge, including main platform body and lifting appliance;Described Main platform body, including girder, auxiliary girder, folded beam, limit beam and springboard beam, and in the periphery of main platform body tiling springboard, it jumps The inner ring of plate is fitted with fence;Fence is mounted in main platform body by fence support;Girder and auxiliary girder are real by connection snap-gauge Both existing intersects vertically;Folded beam realizes foldable connection by folding joint and auxiliary girder;It is characterized in that, girder and auxiliary girder It is all made of connector snap-gauge to concatenate several adjacent seperated beam a, fission beam b, the connector snap-gauge is aluminum U-shape company Including closed end and the support arms of closed end two sides is arranged in fishplate bar, a part of arm body of support arm and the wing plate of seperated beam a Be adjacent to, remaining part arm body then with the wing plate of seperated beam b close to;The closed end offers two groups of mounting holes, wherein one group For being fixedly connected with the web of seperated beam a, another group of mounting hole is then used to be fixedly connected with the web of seperated beam b mounting hole;
The springboard is M shape springboard, including springboard platform and the support construction being set to below springboard platform;The springboard The cross section of platform is arranged in isosceles trapezoid shape, and support construction is mounted on the small end of aforementioned isosceles trapezoid shape springboard platform, and waits The big end width of waist trapezoidal shape springboard platform is L, is highly c;The support construction includes being arranged in springboard platform medium position First support construction at place, the two sides of the first support construction are symmetrically provided with the second support construction, third support construction, third Support construction is arranged at the end position of springboard platform, and the second support construction is then located at the first support construction, third support Between structure;Wherein: first support construction, including the first internal layer branch pipe, the first outer layer branch pipe;First internal layer branch pipe, The cross section of first outer layer branch pipe is isosceles trapezoid shape, and the first internal layer branch pipe is socketed in the inner cavity of the first outer layer branch pipe, and The middle line coincidence of one internal layer branch pipe, the first outer layer branch pipe;Second support construction, including the second internal layer branch pipe, outside second Layer branch pipe;Second internal layer branch pipe, the second outer layer branch pipe cross section be isosceles trapezoid shape, the second internal layer branch pipe is socketed in second The inner cavity of outer layer branch pipe, and the center of the second internal layer branch pipe relative to the second outer layer branch pipe center position from center to springboard Offset;The big end of first support construction, second support construction is connect with springboard platform;The third branch Support structure, section setting in the shape of a right-angled ladder, beveled end are connect with springboard platform;
The inclination angle of the isosceles trapezoid shape springboard platform is 60-65 °, the first internal layer branch pipe, the first outer layer branch pipe, in second Layer branch pipe, the inclination alpha of the second outer layer branch pipe are consistent, and value is between 70-80 °;The bevel edge and first of first internal layer branch pipe Between between the inside bevel edge of spacing, the second internal layer branch pipe and the inside bevel edge of the second internal layer branch pipe between outer layer branch pipe bevel edge Away from being denoted as b, value 1-2mm;Between between the outside bevel edge of second internal layer branch pipe and the outside bevel edge of the second internal layer branch pipe Away from being denoted as d, value 3-4mm;Spacing, the second internal layer between the bottom edge of first internal layer branch pipe and the first outer layer branch pipe bottom edge Spacing between the bottom edge of branch pipe and the second outer layer branch pipe bottom edge, is denoted as e, value 1-2mm;First support construction, second The width of support structure bottom end is denoted as f, value 13-16mm;The width of third support construction is a, value 7-10mm.
2. the boiler hearth overhauling platform according to claim 1 using aluminum connector snap-gauge, which is characterized in that described flat The surrounding of platform main body is fitted with elastic spacing wheel mechanism.
3. the boiler hearth overhauling platform according to claim 2 using aluminum connector snap-gauge, which is characterized in that elasticity limit Wei Lun mechanism includes position-limited wheel, pulley yoke, lead rail axis, spring, guide rail sleeve and track base;Wherein, position-limited wheel passes through pulley yoke It is connected to lead rail axis one end, the lead rail axis other end is socketed on the inner cavity of guide rail sleeve, and institute is arranged between lead rail axis and guide rail sleeve State spring, along the limiting slot that is axially arranged with of guide rail sleeve on guide rail sleeve side wall, a guiding parts pass through after the limiting slot with it is described Lead rail axis is fixedly connected;The bottom of the guide rail sleeve connects track base, and the track base has and can be connected to the one of I-beam Sliding slot on side wing, sliding slot are equipped with bolt hole, to fix between the track base and I-beam by connecting bolt.
4. the boiler hearth overhauling platform according to claim 3 using aluminum connector snap-gauge, which is characterized in that lead rail axis For hollow shaft;Spring is placed in the inner cavity of lead rail axis, and one end of spring is fixed with pulley yoke, the other end then pass through after lead rail axis with Guide rail sleeve connection.
5. the boiler hearth overhauling platform according to claim 4 using aluminum connector snap-gauge, which is characterized in that described to lead It is a bolt to component.
6. the boiler hearth overhauling platform according to claim 3 using aluminum connector snap-gauge, which is characterized in that the folding The head that splices includes hinged first axle connecting plate and second hinge connecting plate;The first axle connecting plate have with The second sliding slot that the wing plate of auxiliary girder is slidably connected;Second hinge connecting plate has the third being slidably connected with the wing plate of folded beam sliding Slot and two clamping plates that auxiliary girder, folding web end can be spliced;Two clamping plates set up separately in auxiliary girder, folded beam Two sides at the splicing seams position of web end, meanwhile, bolt is provided on the second sliding slot, third sliding slot and two clamping plates Connecting hole, and the bolt connecting hole on two clamping plates is mating hole;By being equipped with connection in the bolt connecting hole of second sliding slot Bolt mutually fixes the wing plate of the first axle connecting plate and auxiliary girder;By being equipped in the bolt connecting hole of third sliding slot Bolt is connected, will mutually be fixed between the second hinge connecting plate and folded beam;Pass through the bolt connecting hole on two clamping plates In be equipped with connection bolt, the web end of auxiliary girder and the web end of folded beam are spliced integral.
7. the boiler hearth overhauling platform according to claim 6 using aluminum connector snap-gauge, which is characterized in that described Two sliding slots bend downward to be formed by the both sides of the edge of first axle connecting plate;The both sides of the edge of the second hinge connecting plate It bends downward after forming the second sliding slot, continues to bend to form two L clevis plates arranged opposite to each other.
8. the boiler hearth overhauling platform according to claim 7 using aluminum connector snap-gauge, which is characterized in that described The back side up of two sliding slots is provided with one piece of vertical plate a with hinge hole a;The back side up of the third sliding slot is provided with one Hinge seat, the hinge seat include the vertical plate b with hinge hole b of two pieces of alternate arrangements;Vertical plate a be placed in two pieces of vertical plate b it Between, and the hinge hole b on the hinge hole a and two vertical plate b on vertical plate a is mating hole;Pass through the hinge hole a and two on vertical plate a Pin shaft is installed in hinge hole b on vertical plate b, first axle connecting plate, second hinge connecting plate is hinged.
9. the boiler hearth overhauling platform according to claim 8 using aluminum connector snap-gauge, which is characterized in that described to lead Rail chair, guide rail sleeve, first axle connecting plate and second hinge connecting plate are all made of 6061 aluminium alloys and are made;And track base, guide rail Set is by being welded and fixed, by being welded and fixed between vertical plate a and second sliding slot, also by welding between vertical plate b and third sliding slot It is fixed;The technique being welded and fixed between track base and guide rail sleeve, between vertical plate a and second sliding slot, between vertical plate b and third sliding slot Process is: including cleaning process, pre-heating technique, welding procedure;Wherein:
One, cleaning process
Al alloy parts to be welded Jing Guo alcohol wipe are immersed in 50-60 DEG C of alkalescent cleaning solution and is impregnated 10 minutes More than, it takes out workpiece cold water and rinses and remove the residue on workpiece surface, then dried 30 minutes at 80 DEG C;Alkalescent Clearing up solution includes component sodium metasilicate, sodium citrate and sodium bicarbonate, sodium metasilicate, sodium citrate and sodium bicarbonate three The quality proportioning of person is (10-16): (2-4): (20-25);The pH value that alkalescent clears up solution is 11-13;
Two, pre-heating technique
Using induction heating equipment, after workpiece is preheated to 150-200 DEG C, work piece to be welded is existed using rigid fixture On welding bench;
The rigid fixture, the collet having, using thermal insulation material composite plate, including fixed plate, adiabator plate and folder Plate, adiabator plate are pressed between fixed plate and clamping plate, and fixed plate is mounted on fixture, and clamping plate then clamps aluminium alloy work Part, adiabator plate select asbestos cystosepiment;
Three, welding procedure
Weld metal includes 5 layers, respectively bottoming layer, intermediate layer and cap weld, in which: bottoming layer and cosmetic welding Layer uses same welding wire ER5356, respectively includes 2 layers, and intermediate layer then uses ER4043 welding wire, specific technological parameter It is as follows:
First layer uses ER5356 welding wire, and using exchange, protective gas is used for current regulation scope 250-290A, current polarity 100% Ar gas, purity >=99.99%;Gas flow is 10 ± 3 liters/min;
When first layer face of weld temperature is reduced to 220 DEG C, second layer welding is carried out, the second layer uses ER5356 welding wire, electricity Stream adjustable range is 250-290A, and current values when second layer welding are greater than current values when first layer welds;Electric current Polarity uses 100% Ar gas, purity >=99.99% using exchange, protective gas;Gas flow is 10 ± 3 liters/min;
When second layer face of weld temperature is reduced to 230 DEG C, third layer welding is carried out, third layer uses ER4043 welding wire, electricity Stream adjustable range is 250-290A, current polarity is using exchange, and protective gas uses 100%Ar gas, purity >=99.99%;Gas Body flow is 10 ± 3 liters/min;
When third layer face of weld temperature is reduced to 220 DEG C, the 4th layer of welding is carried out, the 4th layer uses ER5356 welding wire, electricity Stream adjustable range is 250-290A, and current values when the 4th layer of welding are consistent with current values when second layer welding;Electricity Polarity is flowed using exchange, and protective gas uses 100%Ar gas, purity >=99.99%;Gas flow is 10 ± 3 liters/min;
The preheating temperature of Al-alloy parts or the preheating temperature of slightly above Al alloy parts are reduced to the 4th layer of face of weld temperature When spending, layer 5 welding is carried out, layer 5 uses ER5356 welding wire, current regulation scope 250-290A, and layer 5 to weld When current values when welding of current values and first layer it is consistent;Current polarity uses 100%Ar using exchange, protective gas Gas, purity >=99.99%;Gas flow is 10 ± 3 liters/min.
10. the boiler hearth overhauling platform according to claim 9 using aluminum connector snap-gauge, which is characterized in that also wrap It includes postwelding and reinforces treatment process, specifically:
The first step, solution treatment;
The heating speed of stove is set as 10-15 DEG C/min, after being heated to 450-520 DEG C, the weldment of room temperature will be cooled to substantially It is put into heating furnace, keeps the temperature 30min;
It is taken out after the completion of heat preservation, is put into water cooling pond rapidly, is quenched, is cooled to room temperature in 20-25 DEG C of room temperature, workpiece is from furnace It is produced in son to the time of water cooling pond and is no more than 1 minute;
Step 2: cold water workpiece weld after cooling is placed in cryogenic treatment apparatus, it is rapid with the rate of 10-15 DEG C/min After being cooled to -80~-110 DEG C, half an hour is maintained, then after slowly cooling to -140~-160 DEG C with 3-6 DEG C/min rate, maintained Half an hour is finally slowly cooled to -190 DEG C or so with the rate of 1-1.5 DEG C/min, maintains 2 hours, terminates subzero treatment Journey;
Third step will be put into heating and heat-insulating device by the processed workpiece of cryogenic treatment apparatus, slow with the rate of 1-3 DEG C/min Slowly after being heated to 80-90 DEG C, half an hour is maintained, then be brought rapidly up to after 200-220 DEG C with the rate of 10-15 DEG C/min, heat preservation 1 A hour;
4th step takes out workpiece, is cooled to room temperature.
CN201610792323.8A 2016-08-31 2016-08-31 A kind of boiler hearth overhauling platform and its technique using aluminum connector snap-gauge Active CN106185688B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610792323.8A CN106185688B (en) 2016-08-31 2016-08-31 A kind of boiler hearth overhauling platform and its technique using aluminum connector snap-gauge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610792323.8A CN106185688B (en) 2016-08-31 2016-08-31 A kind of boiler hearth overhauling platform and its technique using aluminum connector snap-gauge

Publications (2)

Publication Number Publication Date
CN106185688A CN106185688A (en) 2016-12-07
CN106185688B true CN106185688B (en) 2019-07-30

Family

ID=58085497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610792323.8A Active CN106185688B (en) 2016-08-31 2016-08-31 A kind of boiler hearth overhauling platform and its technique using aluminum connector snap-gauge

Country Status (1)

Country Link
CN (1) CN106185688B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107378205B (en) * 2017-07-19 2020-11-10 新疆八一钢铁股份有限公司 Welding process for cracks of hydraulic coupler shell

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1944914A (en) * 2005-09-20 2007-04-11 日立工程设备建设株式会社 Inspection scaffold of large component for boiler and building method thereof
CN201065649Y (en) * 2007-07-16 2008-05-28 北京住总集团有限责任公司 Adjustable steel truss for construction formwork support
KR100890066B1 (en) * 2008-10-06 2009-03-25 (주)한동엔지니어링 Supporting bar for insulator fixation of an over head line
CN101830415A (en) * 2010-05-28 2010-09-15 江苏能建机电实业集团有限公司 Multifunctional boiler hearth overhauling platform
CN202530730U (en) * 2012-03-05 2012-11-14 北京康得通用设备有限公司 Aluminum alloy maintenance platform in furnace
CN102922098A (en) * 2012-10-29 2013-02-13 北京赛德高科铁道电气科技有限责任公司 Method for welding thick aluminum alloy plate
CN206108789U (en) * 2016-08-31 2017-04-19 江苏能建机电实业集团有限公司 Adopt boiler furnace maintenance platform of aluminium contact cardboard

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1944914A (en) * 2005-09-20 2007-04-11 日立工程设备建设株式会社 Inspection scaffold of large component for boiler and building method thereof
CN201065649Y (en) * 2007-07-16 2008-05-28 北京住总集团有限责任公司 Adjustable steel truss for construction formwork support
KR100890066B1 (en) * 2008-10-06 2009-03-25 (주)한동엔지니어링 Supporting bar for insulator fixation of an over head line
CN101830415A (en) * 2010-05-28 2010-09-15 江苏能建机电实业集团有限公司 Multifunctional boiler hearth overhauling platform
CN202530730U (en) * 2012-03-05 2012-11-14 北京康得通用设备有限公司 Aluminum alloy maintenance platform in furnace
CN102922098A (en) * 2012-10-29 2013-02-13 北京赛德高科铁道电气科技有限责任公司 Method for welding thick aluminum alloy plate
CN206108789U (en) * 2016-08-31 2017-04-19 江苏能建机电实业集团有限公司 Adopt boiler furnace maintenance platform of aluminium contact cardboard

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《锅炉炉膛检修用升降平台》;谢松云;《起重运输机械》;机械工业出版社;19950131;第32卷(第1期);说明书第24页-27页,附图1-5

Also Published As

Publication number Publication date
CN106185688A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN105436788B (en) A kind of large-size box weld industry technique
CN110369941A (en) A kind of H-shaped steel member group moulding bed and H-shaped steel member manufacture method
CN203092040U (en) Aluminum alloy bumper assembly welding device for automobiles
CN206108786U (en) Boiler furnace maintenance platform of hoisting point is strengthened to aluminium system of adoption
CN102941400B (en) Method for welding automobile aluminium alloy bumper assembly
CN106144943B (en) Using the boiler hearth overhauling platform of aluminum coupling element
CN106379850B (en) A kind of boiler hearth overhauling platform and its fence support
CN102689087B (en) Titanium alloy bicycle frame welding tool and welding method
CN106185688B (en) A kind of boiler hearth overhauling platform and its technique using aluminum connector snap-gauge
CN208528433U (en) Lifting pipeline welder
CN106185689B (en) A kind of boiler hearth overhauling platform and its technique for reinforcing suspension centre using aluminum
CN106348216B (en) A kind of connection snap-gauge at boiler hearth overhauling platform and its I-beam right-angled intersection
CN107825037B (en) Multi-functional removable hole system fixed-position welding device
CN107818712A (en) It is a kind of to be used for welders training and the multifunctional operating platform and application method of examination
CN106144981A (en) A kind of boiler hearth overhauling platform and elastic spacing wheel mechanism thereof
CN106185744B (en) Boiler hearth overhauling platform and its with positioning enhancing structure main suspension centre and technique
CN206108838U (en) Boiler furnace maintenance platform and main hoisting point that has location reinforcing structure thereof
CN206111759U (en) Overhaul platform device in boiler furnace and connecting card board thereof
CN206108789U (en) Adopt boiler furnace maintenance platform of aluminium contact cardboard
CN206108839U (en) Overhaul platform device in boiler furnace and spacing round of mechanism of elasticity thereof
CN206108788U (en) Overhaul platform device in boiler furnace and rail support thereof
CN206108785U (en) Adopt interior platform device that overhauls of boiler furnace of M shape springboard
CN206111832U (en) Overhaul platform device in boiler furnace and folding joint thereof
CN206108787U (en) Overhaul platform device in boiler furnace of aluminium system of adoption connecting piece
CN106276727B (en) The folding joint of boiler hearth overhauling platform and its foldable I-beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant