RU3952U1 - SLIDING FORMWORK FOR ESTABLISHING WALLS AND FLOORS - Google Patents

SLIDING FORMWORK FOR ESTABLISHING WALLS AND FLOORS Download PDF

Info

Publication number
RU3952U1
RU3952U1 RU96108631/20U RU96108631U RU3952U1 RU 3952 U1 RU3952 U1 RU 3952U1 RU 96108631/20 U RU96108631/20 U RU 96108631/20U RU 96108631 U RU96108631 U RU 96108631U RU 3952 U1 RU3952 U1 RU 3952U1
Authority
RU
Russia
Prior art keywords
formwork
floors
floor
possibility
walls
Prior art date
Application number
RU96108631/20U
Other languages
Russian (ru)
Inventor
Андрей Николаевич Машкоев
Original Assignee
Андрей Николаевич Машкоев
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Андрей Николаевич Машкоев filed Critical Андрей Николаевич Машкоев
Priority to RU96108631/20U priority Critical patent/RU3952U1/en
Application granted granted Critical
Publication of RU3952U1 publication Critical patent/RU3952U1/en

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

1. Скользящая опалубка для возведения здания, содержащая несущие элементы щитов опалубки стен и перекрытий и телескопические колонны в виде направляющих стоек, установленных в соответствующих трубах с возможностью их вертикального перемещения посредством домкратов и перемещения одна относительно другой, отличающаяся тем, что она снабжена стойками перекрытий, несущие элементы щитов опалубки внешних стен и перекрытий жестко закреплены посредством кронштейнов к трубам телескопических колонн с возможностью подъема труб относительно направляющих стоек и направляющих стоек относительно перекрытий создаваемого здания, стойка перекрытия установлена с возможностью упора в несущий элемент щитов опалубки перекрытий и выполнена съемной.2. Опалубка по п.1, отличающаяся тем, что стойка перекрытия установлена с возможностью упора в несущий элемент щитов опалубки перекрытий посредством балки.3. Опалубка по п.1, отличающаяся тем, что направляющая стойка оперта на нижнее перекрытие в опорной подушке.1. Sliding formwork for the erection of a building, containing the supporting elements of the panels of the formwork of walls and floors and telescopic columns in the form of guide racks installed in the respective pipes with the possibility of vertical movement by jacks and moving one relative to another, characterized in that it is equipped with floor racks, the supporting elements of the formwork panels of the external walls and floors are rigidly fixed by means of brackets to the pipes of telescopic columns with the possibility of lifting the pipes relative to control racks and guide racks relative to the floors of the building being created, the floor rack is installed with the possibility of abutment against the supporting element of the formwork panels of the floors and is removable. 2. The formwork according to claim 1, characterized in that the floor stand is installed with the possibility of abutment in the supporting element of the formwork panels of the floor form by means of a beam. The formwork according to claim 1, characterized in that the guide post is supported on the lower floor in the support pillow.

Description

СКОЛЬЗЯЩАЯ ОПАЛУБКА ДЛЯ ВОЗВЕДЕНИЯ СТЕН И ПЕРЕКРЫТИЙ Предложенное устройство скользящей опалубки для возведения стен и перекрытий относится к строительству монолитных многоярусных сооружений. Известна скользящая опалубка для возведения сборномонолитных стен зданий, сдерживающая распорную штангу, установленную между перекрытиями этажа и распорным фаркопфом, закрепленным на нижней части распорной штанги и взаимодействующим с внутренним щитом опалубки, закрепленным в горизонтальной балке, и внещним щитом, установленным в балке с внещней стороны стены (1), Известен способ сооружения перекрытий монолитного здания, который реализован в устройстве опалубки, содержащем опалубки перекрытий и стен, и временные опоры. Устройство опалубки таково, что позволяет вести одновременное бетонирование стен и перекрытий (2). Наиболее близким аналогом по технической сущности к данной скользящей опалубки для возведения здания является конструкция скользящей опалубки, содержащая несущие элементы щитов опалубки стен и перекрытий и телескопические колонны в виде направляющих стоек, установленных в соответствующих трубах с возможностью вертикального перемещения посредством домкратов и друг относительно друга (3). Данная конструкция выполнена за прототип. Выполнение скользящей опалубки известным в аналогах и прототипе образом требует использования сложных конструкций и сложной технологии при одновременном бетонировании стен и перекрытий. Кроме того, в известных конструкциях требуется распалубка и последующий монтаж основного оборудования на каждом этаже возведения здания. ,, Техническим результатом предложения является упрощение скользящей опалубки при возведении с одновременным бетонированием стен и перекрытий, позволяющей не разбирать основных несущих элементов щитов опалубки до завершения строительства здания, обеспечивающей самоподъемность опалубки без наращивания направляющих стоек, позволяющей при возведении здания изменять расположение стен от этажа к этажу {один этаж без внутренних стен и т.п.)/ обеспечивающей возможность устанавливать перекрытия на разных уровнях, например, при возведении лестниц и площадок. Технический результат достигается тем, что скользящая опалубка для возведения здания, содержащая несущие элементы щитов опалубки стен и перекрытий и телескопические колонны в виде направляющих стоек, установленных в соответствующих трубах с возможностью их вертикального перемещения посредством домкратов и перемещения друг относительно друга, снабжена стойками перекрытий, несущие элементы щитов опалубки внешних стен и перекрытий жестко закреплены посредством кронштейнов к трубам телескопических колонн с возможностью подъема относительно перекрытий создаваемого здания, стойка перекрытия установлена с возможностью упора в несущий элемент щитов опалубки перекрытий и выполнена съемной. Стойка перекрытия установлена с возможностью упора в несущий элемент щитов опалубки перекрытий посредством балки. Направляющая стойка оперта на нижнее перекрытие в опорной подушке. На чертежах представлены примеры выполнения скользящей опалубки по предложенной конструкции. На фиг.1 приведен пример конструкции в момент бетонирования очередного перекрытия здания, на фиг.2 приведен пример скользящей опалубки при возведении здания. V Скользящая опалубка содержит направляющую стойку 1 телескопических колонн, на которой закреплены посредством кронштейнов 2 несущие элементы щитов опалубки 3 и 4 соответственно внутренних и наружных стен, в качестве элементов крепления используют различные элементы, например, болтовые соединения 5. Направляющая стойка 1 установлена в трубе 6 с возможностью перемещения друг относительно друга и перемещения в вертикальном направлении посредством домкратов 7 двойного действия. Несущие элементы щитов опалубки перекрытий 8 крепятся посредством балки 9. Стойка перекрытия 10 может упираться в балку 9. Направляющая стойка 1 и труба б закреплены в домкрате 7 и стойка 1 упираются при начале возведения здания в опорную подушку 11. Скользящая опалубка при возведении стен, перекрытий, колонн и ригелей работает следующим образом. На готовый фундамент (на чертеже не показан) укладываются щиты перекрытий 7 и опорная подушка 11. Затем монтируется кронштейн 2 с несущими элементами щитов опалубки стен 3 и 4 и закрепляются на трубе б, полученную конструкцию закрепляют посредством болтового соединения 5. В трубу б устанавливают направляющую стойку 1, на которой размещают домкрат 7 двойного действия. Далее начинают укладку бетонной смеси в опалубку стен по 10 - 15 см. После набора прочности необходимой для сохранения заданной формы первого слоя начинают равномерный подъем конструкции со скоростью 5-6см в час с помощью домкратов 7. При достижении отметки низа перекрытия бетонирование прекращается до момента занятия несущих элементов 8 щитов опалубки перекрытий проектного положения. Движение конструкции прекращают и производят бетонирование перекрытий и стен одновременно. i Несущие элементы щитов опалубки перекрытий 8 фиксируются с помощью стоек 10 перекрытий. После того/ как первое перекрытие наберет проектную прочность, конструкция опускается вниз. Опускание конструкции производят путем крепления к болтам 5, например, тросов лебедки, установленной на готовом перекрытии. Затем несущие элементы щитов опалубки перекрытий 8 разбираются и подаются на последующий монтаж через окна. Несущие элементы щитов опалубки наружных и внутренних стен закрепленные на скользящей трубе перемещают в вертикальном направлении вдоль направляющей стойки 1. Процесс повторяется при подъеме конструкции от одного забетонированного этажа к другому. Работы по формированию проемов, ригелей и колонн, арматурные работы и установка, например, теплоизоляции производится в процессе бетонирования. Можно использовать конструкцию с четырьмя направляющими стойками 1, по которым перемещается конструкция жестко скрепленных с трубой б кронштейна 2 и несущих элементов щитов опалубки стен 4 и перекрытий 8 при помощи домкратов 7 двойного действия. Щиты опалубки перекрытия 8 закрепляются в кронщтейне 2 посредством балки 9 при помощи болтового соединения 5 на расстоянии равном толщине перекрытия. Стойка перекрытия 10 служит для переопирания несущих элементов опалубки перекрытия 8 перед началом бетонирования перекрытия. При движении вверх несущих элементов опалубки стен и перекрытий 3,4,8 направляющая стойка 1 опирается в опорной подущке 11. При выдвижении направляющей стойки 1 нагрузка передается на стойку перекрытия. Предложенная конструкция скользящей опалубки расширяет возможности проектирования без изменения конструкции опалубки при возведении здания, например, за счет произвольной расстановки опалубок во время бетонирования одного пролета. В этом случае можно поднимать домкратом только использующие в данном пролете опалубки стен, зоны в которых стены не формируются на данном этаже можно проходить, поднимая конструкцию на следующий этаж без бетонирования.SLIDING FORMWORK FOR CONSTRUCTION OF WALLS AND CEILINGS The proposed device of sliding formwork for the construction of walls and floors refers to the construction of monolithic multi-tiered structures. Known sliding formwork for the erection of prefabricated walls of buildings, restraining the spacer rod installed between the floors of the floor and the spacer towbar, mounted on the lower part of the spacer rod and interacting with the inner formwork shield, mounted in a horizontal beam, and an external shield installed in the beam with the outside of the wall (1), A known method of constructing the floors of a monolithic building, which is implemented in the formwork device containing the formwork of floors and walls, and temporary supports. The formwork device is such that it allows simultaneous concreting of walls and floors (2). The closest analogue in technical essence to this sliding formwork for erecting a building is the design of the sliding formwork containing the supporting elements of the wall and floor formwork panels and telescopic columns in the form of guide racks installed in the corresponding pipes with the possibility of vertical movement by means of jacks and relative to each other (3 ) This design is made for the prototype. Performing sliding formwork in a manner known in the art and prototype requires the use of complex structures and sophisticated technology while concreting walls and ceilings. In addition, the well-known structures require stripping and subsequent installation of the main equipment on each floor of the building. ,, The technical result of the proposal is to simplify the sliding formwork during erection with simultaneous concreting of walls and floors, which allows not to disassemble the main load-bearing elements of the formwork panels until the construction of the building is completed, self-lifting the formwork without building up guide racks, which allows changing the location of the walls from floor to floor during construction (one floor without internal walls, etc.) / providing the ability to install floors at different levels, for example, during the construction of sites and platforms. The technical result is achieved in that the sliding formwork for the erection of the building, containing the supporting elements of the formwork panels of walls and floors and telescopic columns in the form of guide racks installed in the respective pipes with the possibility of vertical movement by jacks and moving relative to each other, is equipped with floor racks supporting the elements of the formwork panels of the external walls and floors are rigidly fixed by means of brackets to the pipes of telescopic columns with the possibility of lifting In total, the floors of the building being created, the floor rack is installed with the possibility of abutment against the supporting element of the floor formwork panels and is removable. The floor rack is installed with the possibility of abutment in the supporting element of the formwork panels of the floors through the beam. The guide post is supported on the lower floor in the support pillow. The drawings show examples of sliding formwork according to the proposed design. Figure 1 shows an example of a structure at the time of concreting the next building floor, figure 2 shows an example of a sliding formwork during the construction of a building. V Sliding formwork contains a guide rack 1 of telescopic columns, on which are supported by brackets 2 supporting elements of the formwork panels 3 and 4, respectively, of the internal and external walls, various elements are used as fasteners, for example, bolted joints 5. The guide rack 1 is installed in the pipe 6 with the possibility of moving relative to each other and moving in the vertical direction by means of jacks 7 double action. The load-bearing elements of the shuttering formwork boards 8 are fastened by means of a beam 9. The floor stand 10 can abut against the beam 9. The guide post 1 and pipe b are fixed in the jack 7 and the stand 1 abut at the beginning of the construction of the building into the support pillow 11. The sliding formwork during the construction of walls and ceilings , columns and crossbars works as follows. On the finished foundation (not shown in the drawing), the floorboards 7 and the support cushion 11 are installed. Then the bracket 2 with the supporting elements of the formwork panels 3 and 4 is mounted and fixed to the pipe b, the structure obtained is fixed by means of a bolt connection 5. A guide is installed in the pipe b. rack 1, on which the double-acting jack 7 is placed. Next, they begin laying concrete mixture into the wall formwork of 10-15 cm. After gaining the strength necessary to maintain the given shape of the first layer, they begin to uniformly lift the structure at a speed of 5-6 cm per hour using jacks 7. Upon reaching the mark of the bottom of the floor, concreting stops until the moment of occupation load-bearing elements of 8 panels formwork floors design position. The movement of the structure is stopped and concreted floors and walls at the same time. i The load-bearing elements of the shuttering formwork panels 8 are fixed with the help of racks 10 of the ceilings. After / the first overlap gains design strength, the structure lowers down. Lowering the structure is carried out by fastening to the bolts 5, for example, winch cables mounted on the finished floor. Then the supporting elements of the panels formwork floors 8 are disassembled and fed for subsequent installation through the windows. The load-bearing elements of the formwork panels of the external and internal walls mounted on a sliding pipe are moved vertically along the guide rack 1. The process is repeated when the structure is lifted from one concrete floor to another. Work on the formation of openings, girders and columns, reinforcement work and installation, for example, thermal insulation, is carried out in the process of concreting. You can use the design with four guide racks 1, which moves the structure rigidly fastened to the pipe b bracket 2 and the supporting elements of the formwork panels of the walls 4 and floors 8 with the help of jacks 7 double action. The shuttering formwork boards 8 are fixed in the bracket 2 by means of the beam 9 by means of a bolt joint 5 at a distance equal to the thickness of the overlap. The floor slab 10 serves to reshape the load-bearing elements of the slab formwork 8 before concreting the slab. When the load-bearing elements of the formwork of walls and floors 3,4,8 move up, the guide rack 1 rests in the support cushion 11. When the guide rack 1 is pulled out, the load is transferred to the floor pillar. The proposed design of sliding formwork expands the design possibilities without changing the design of the formwork during the construction of a building, for example, due to the arbitrary arrangement of formwork during concrete casting of one span. In this case, it is only possible to jack the jackets using wall formwork in a given span, the zones in which the walls are not formed on this floor can be passed by lifting the structure to the next floor without concreting.

Данная конструкция позволяет формировать перекрытия на разных уровнях в пределах одного пролета, например, лестничная клетка.This design allows the formation of ceilings at different levels within one flight, for example, a staircase.

Кроме того, поскольку несущие элементы опалубки перекрытий поднимаются совместно с несущими элементами щитовой опалубки стен они могут быть использованы как рабочее место. В результате отпадает необходимость в устройстве палуб для бетонщиков.In addition, since the load-bearing elements of the formwork of the floors rise together with the load-bearing elements of the shield formwork of the walls, they can be used as a workplace. As a result, there is no need for decking for concrete workers.

1.SU, 2040656, кл. E04G 11/22, 1995.1.SU, 2040656, cl. E04G 11/22, 1995.

2.SU, 2018603, кл. E04G 11/38, 1994.2.SU, 2018603, cl. E04G 11/38, 1994.

3.SU, заявка N94009389, кл. E04G 11/20, опубл. 1995.3.SU, application N94009389, cl. E04G 11/20, publ. 1995.

Claims (3)

1. Скользящая опалубка для возведения здания, содержащая несущие элементы щитов опалубки стен и перекрытий и телескопические колонны в виде направляющих стоек, установленных в соответствующих трубах с возможностью их вертикального перемещения посредством домкратов и перемещения одна относительно другой, отличающаяся тем, что она снабжена стойками перекрытий, несущие элементы щитов опалубки внешних стен и перекрытий жестко закреплены посредством кронштейнов к трубам телескопических колонн с возможностью подъема труб относительно направляющих стоек и направляющих стоек относительно перекрытий создаваемого здания, стойка перекрытия установлена с возможностью упора в несущий элемент щитов опалубки перекрытий и выполнена съемной.1. Sliding formwork for the erection of a building, containing the supporting elements of the panels of the formwork of walls and floors and telescopic columns in the form of guide racks installed in the respective pipes with the possibility of vertical movement by jacks and moving one relative to another, characterized in that it is equipped with floor racks, the supporting elements of the formwork panels of the external walls and floors are rigidly fixed by means of brackets to the pipes of telescopic columns with the possibility of lifting the pipes relative to control racks and guide racks relative to the floors of the building being created, the floor rack is installed with the possibility of abutment against the supporting element of the formwork panels of the floors and is removable. 2. Опалубка по п.1, отличающаяся тем, что стойка перекрытия установлена с возможностью упора в несущий элемент щитов опалубки перекрытий посредством балки. 2. The formwork according to claim 1, characterized in that the floor stand is installed with the possibility of abutment in the supporting element of the shuttering formwork boards by means of a beam. 3. Опалубка по п.1, отличающаяся тем, что направляющая стойка оперта на нижнее перекрытие в опорной подушке.
Figure 00000001
3. The formwork according to claim 1, characterized in that the guide post is supported on the lower floor in the support pillow.
Figure 00000001
RU96108631/20U 1996-04-29 1996-04-29 SLIDING FORMWORK FOR ESTABLISHING WALLS AND FLOORS RU3952U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU96108631/20U RU3952U1 (en) 1996-04-29 1996-04-29 SLIDING FORMWORK FOR ESTABLISHING WALLS AND FLOORS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU96108631/20U RU3952U1 (en) 1996-04-29 1996-04-29 SLIDING FORMWORK FOR ESTABLISHING WALLS AND FLOORS

Publications (1)

Publication Number Publication Date
RU3952U1 true RU3952U1 (en) 1997-04-16

Family

ID=48266171

Family Applications (1)

Application Number Title Priority Date Filing Date
RU96108631/20U RU3952U1 (en) 1996-04-29 1996-04-29 SLIDING FORMWORK FOR ESTABLISHING WALLS AND FLOORS

Country Status (1)

Country Link
RU (1) RU3952U1 (en)

Similar Documents

Publication Publication Date Title
US20060260238A1 (en) Refinement to the construction systems for structures in reinforced concrete or some other material of high-precision intergral modular forms
WO2019133406A1 (en) Precast concrete system with rapid assembly formwork
GB1451611A (en) Building construction
US3239990A (en) Multi-storey buildings
CN111779248A (en) High formwork system and construction method thereof
RU2552506C1 (en) Method for construction of monolithic structures of buildings and non-removable universal modular formwork system
CN114215333B (en) Quick construction method for outer cornices of high-rise buildings
RU3952U1 (en) SLIDING FORMWORK FOR ESTABLISHING WALLS AND FLOORS
US3156071A (en) Building structure
JP2657577B2 (en) Large roof self-elevating device for construction work and method of constructing middle and high-rise building
KR20210068283A (en) Structural Systems and Methods for Floor Structural Work in Elevator Machine Room of Apartment Housing
RU2087650C1 (en) House-building combine
RU2633602C1 (en) Method of accelerated building erection using method of screwdriver assembly and building from facade panels with decorative external finishing and metal framework
RU2032047C1 (en) Building skeleton erection method
JPH01256636A (en) Construction method of building
JP2621748B2 (en) All-weather temporary shed
CN213038820U (en) Stereotype elevator shaft way construction operation platform
RU190322U1 (en) Device for the construction of multi-storey underground structures
SU1079785A1 (en) Method of constructing a multistorey building by adding floors from below
RU2617813C2 (en) The method of erection of prefabricated multi-storey reinforced concrete frame of a building
SU1263793A1 (en) Method of erecting buildings with prefabricated solid skeleton
SU1048093A1 (en) Method of erecting multistorey building by floor-rising technique
SU972021A1 (en) Building construction combination machine
RU2338843C1 (en) Method of multistorey building carcassing
SU552395A1 (en) The method of construction of high-rise buildings