RU2551665C1 - Control method of failure of activation of disconnect switch of buses for two-transformer substation at recovery of normal circuit of electric power supply of ring network - Google Patents

Control method of failure of activation of disconnect switch of buses for two-transformer substation at recovery of normal circuit of electric power supply of ring network Download PDF

Info

Publication number
RU2551665C1
RU2551665C1 RU2013153771/07A RU2013153771A RU2551665C1 RU 2551665 C1 RU2551665 C1 RU 2551665C1 RU 2013153771/07 A RU2013153771/07 A RU 2013153771/07A RU 2013153771 A RU2013153771 A RU 2013153771A RU 2551665 C1 RU2551665 C1 RU 2551665C1
Authority
RU
Russia
Prior art keywords
power supply
ring network
transformer substation
failure
switch
Prior art date
Application number
RU2013153771/07A
Other languages
Russian (ru)
Inventor
Леонид Дмитриевич Суров
Original Assignee
Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО Орел ГАУ)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО Орел ГАУ) filed Critical Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО Орел ГАУ)
Priority to RU2013153771/07A priority Critical patent/RU2551665C1/en
Application granted granted Critical
Publication of RU2551665C1 publication Critical patent/RU2551665C1/en

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Keying Circuit Devices (AREA)

Abstract

FIELD: electricity.
SUBSTANCE: at switched on condition of disconnect busbar switches, at sections connected to sectionalising switch, occurrence of equalising current is controlled, and if it appears at the above sections simultaneously, then conclusion is made about false activation of bus sectionalising switch at the double-transformer substation at operation of ring network as per normal power supply scheme. The suggested method allows receiving data on false tripping by bus sectionalising switch of double-transformer substation at operation of ring network as per normal power supply scheme.
EFFECT: reduction of energy consumption by exclusion of sounding method, by control of equalising current at sections of busbars adjoining the sectionalising switch.
2 dwg

Description

Изобретение относится к автоматике электрических сетей и предназначено для контроля отказа включения вводного выключателя (ВВ) шин двухтрансформаторной подстанции при восстановлении нормальной схемы электроснабжения кольцевой сети.The invention relates to the automation of electrical networks and is intended to control the failure of the input switch (BB) of the buses of a two-transformer substation when restoring a normal power supply circuit of a ring network.

Известен способ контроля отказа включения пункта автоматического включения резерва (АВР) в кольцевой сети, заключающийся в том, что на шинах трансформатора основного источника питания фиксируют появление броска тока, вызванное коротким замыканием (КЗ) в линии, питающейся от этого трансформатора. При появление броска тока КЗ начинают отсчет времени, равного выдержке времени выключения пункта АВР. По окончании отсчета этого времени контролируют появление броска тока (ток может увеличиваться до значения более нормального рабочего, не менее тока К3 - бросок рабочего тока или до величины тока короткого замыкания - бросок тока КЗ) на шинах трансформатора резервного источника питания. Если по окончании отсчета времени нет броска тока на шинах трансформатора резервного источника питания, то это свидетельствует о том, что произошел отказ пункта АРВ [патент RU №2215356 C2, кл. 7H2J 13/00, 9/04, опубл. 27.10.2003, бюл. №30].There is a method of monitoring the failure of the inclusion of the automatic transfer switch (ATS) in the ring network, which consists in the fact that the appearance of an inrush caused by a short circuit (short circuit) in the line powered by this transformer is recorded on the buses of the transformer of the main power source. When the appearance of an inrush current, the short circuit begins to count down the time equal to the shutdown time of the shutdown point ABP. At the end of this time, the appearance of a current surge is controlled (the current can increase to a value of a more normal operating current, at least K3 current - an inrush current or to a short circuit current - a short-circuit current surge) on the tires of a transformer of a backup power source. If at the end of the countdown there is no inrush on the tires of the transformer of the backup power source, then this indicates that the ARV point has failed [patent RU No. 2215356 C2, cl. 7H2J 13/00, 9/04, publ. 10/27/2003, bull. No. 30].

Недостатком известного способа является невозможность с его помощью осуществления контроля отказа включения вводного выключателя шин двухтрансформаторной подстанции при восстановлении нормальной схемы электроснабжения кольцевой сети.The disadvantage of this method is the impossibility of using it to control the failure of the input switch of the bus switch of the two-transformer substation when restoring the normal power supply circuit of the ring network.

Задачей предлагаемого изобретения является расширение функциональных возможностей способа путем получения информации об отказе включения ВВ шин двухтрансформаторной подстанции при восстановлении нормальной схемы электроснабжения кольцевой сети.The objective of the invention is to expand the functionality of the method by obtaining information about the refusal to turn on the EXPLOSIVES of the buses of the two-transformer substation when restoring the normal power supply circuit of the ring network.

Согласно предлагаемому способу с момента появления напряжения на трансформаторе начинают отсчет суммарного времени, равного времени выдержки включения ВВ и времени выдержки отключения секционного выключателя шин, при этом на вводе основного источника питания контролируют появление броска рабочего тока и, если он не появится в момент окончания отсчета суммарного времени, делают вывод об отказе включения ВВ шин двухтрансформаторной подстанции при восстановлении нормальной схемы электроснабжения кольцевой сети.According to the proposed method, from the moment the voltage on the transformer appears, the countdown of the total time equal to the shut-off delay time and the shut-off delay time of the sectional bus switch is started, while the inrush of the operating current is controlled at the input of the main power source and, if it does not appear at the end of the countdown, time, make a conclusion about the failure to turn on the explosive tires of a two-transformer substation when restoring the normal power supply circuit of the ring network.

Суть предлагаемого изобретения поясняется чертежами, где:The essence of the invention is illustrated by drawings, where:

- на фиг.1 представлена структурная схема, содержащая элементы для реализации способа;- figure 1 presents a structural diagram containing elements for implementing the method;

- на фиг.2 - диаграммы сигналов на выходах элементов, показанных на фигуре 1.- figure 2 is a diagram of the signals at the outputs of the elements shown in figure 1.

Схема (см. фиг.1) содержит: силовые трансформаторы 1 и 2 основного и резервного источников питания, вводные выключатели ВВ 3 и 4, выключатель 5 шинного пункта АВР, головные выключатели 6 и 10, секционирующие выключателями 7 и 9, выключатель 8 сетевого пункта АВР, датчика напряжения (ДН) 11, элемент ПАМЯТЬ 12, датчик рабочего тока (ДРТ) 13, элементы: НЕ 14, ЗАДЕРЖКА 15; ОДНОВИБРАТОР 16, И 17, регистрирующее устройство (РУ) 18.The circuit (see Fig. 1) contains: power transformers 1 and 2 of the main and backup power supplies, input switches BB 3 and 4, switch 5 of the bus station ABP, head switches 6 and 10, sectionalizing switches 7 and 9, switch 8 of the network item ATS, voltage sensor (DN) 11, MEMORY element 12, operating current sensor (DRT) 13, elements: NOT 14, DELAY 15; SINGLE-VIBRATOR 16, AND 17, recording device (RU) 18.

Диаграммы сигналов на выходах элементов, показанных на фигуре 1, имеют вид (см. фиг.2): 19 - на выходе элемента 11, 20 - на выходе элемента 12, 21 - на выходе элемента 13, 22 - на выходе элемента 14, 23 на выходе элемента 15, 24 - на выходе элемента 16, 25 - на выходе элемента 17, 26 - в РУ 18. На фиг.2, кроме диаграмм выходных сигналов элементов схемы, также показаны: t1 - момент времени появления напряжения на трансформаторе 1, t2 - момент времени окончания времени выдержки включения ВВ 3.The signal diagrams at the outputs of the elements shown in figure 1 have the form (see figure 2): 19 - at the output of element 11, 20 - at the output of element 12, 21 - at the output of element 13, 22 - at the output of element 14, 23 at the output of element 15, 24 - at the output of element 16, 25 - at the output of element 17, 26 - in RU 18. In Fig.2, in addition to the diagrams of the output signals of the circuit elements, also shown: t 1 - the time of voltage on the transformer 1 , t 2 - the time point of the end of the holding time of the inclusion of BB 3.

Способ осуществляется следующим образом.The method is as follows.

В нормальном режиме работы кольцевой сети выключатели 3, 6, 7, 9, 10 и 4 включены, а выключатели 5 и 8 отключены.In normal operation of the ring network, switches 3, 6, 7, 9, 10, and 4 are turned on, and switches 5 and 8 are turned off.

Исчезновение напряжения на трансформаторе 1, вызванное аварийным или плановым отключением, приведет в действие автоматику и ВВ 3 отключится, а выключатель 5 включится. Схема при этом перейдет в режим питания резервируемой линии. После устранения неисправностей или проведения необходимых работ напряжение на силовой трансформатор 1 будет подано. При этом должна прийти в действие автоматика ВВ 3 и он должен включиться, однако, по причине какой-либо неисправности, возникшей в схеме автоматики (отказ реле, обрыв цепи управления и т.п.) или в приводе включения выключателя произойдет отказ и он не включится. Для получения информации об отказе включения ВВ 3 необходимо осуществлять контроль наличия напряжения на нем как со стороны силового трансформатора 1, так и со стороны шин подстанции. Работа схемы такого контроля будет осуществляться следующим образом.The disappearance of voltage on the transformer 1, caused by an emergency or planned shutdown, will activate the automation and BB 3 will turn off and switch 5 will turn on. In this case, the circuit will switch to the redundant line power mode. After troubleshooting or the necessary work, the voltage to the power transformer 1 will be applied. In this case, the BB 3 automation must come into action and it should turn on, however, due to some malfunction that arose in the automation circuit (relay failure, open circuit control, etc.) or in the circuit breaker drive, a failure occurs and it does not will turn on. To obtain information about the failure to turn on the BB 3, it is necessary to monitor the presence of voltage on it both from the side of the power transformer 1 and from the side of the substation buses. The operation of the scheme of such control will be carried out as follows.

При появлении напряжения на силовом трансформаторе 1 на выходе ДН 11 появится сигнал (фиг.2, диагр. 19, момент времени t1). Этот сигнал поступит на вход элемента ПАМЯТЬ 12, запомнится в нем (фиг.2, диагр. 20) и поступит на вход элемента ЗАДЕРЖКА 15. С выхода этого элемента сигнал появится через время выдержки включения ВВ 3 (фиг.2, диагр. 23) и поступит на вход элемента Одновибратор 15. Он произведет одно колебание (фиг.2, диагр. 24), своим сигналом «сбросит» память с элемента 12 (фиг.2, диагр. 20) и поступит на второй вход элемента И 17. К этому моменту времени ВВ 3 должен включиться, однако по причине отказа он не включится, поэтому на вводе шин основного источника питания броска рабочего тока не будет, при этом не будет и сигнала на выходе ДРТ 13 (фиг.2, диагр.21), но будет сигнал на выходе элемента НЕ 14 (фиг.2, диагр.22). И этот сигнал будет присутствовать на первом входе элемента И 17, поэтому он сработает, появится его выходной сигнал (фиг.2, диагр.25). Этот сигнал поступит в РУ 18 и в нем появится информация о том, что выключатель 3 не включился (фиг.2, диагр.26)When voltage appears on the power transformer 1, a signal appears at the output of DN 11 (Fig. 2, Diagram 19, time t 1 ). This signal will go to the input of the MEMORY 12 element, will be remembered in it (Fig. 2, Diagram 20) and will be fed to the input of the DELAY 15 element. From the output of this element, the signal will appear after the holding time of the inclusion of BB 3 (Fig. 2, Diagram 23) and it will go to the input of the One-Vibrator 15 element. It will produce one oscillation (Fig. 2, Diagram 24), with its signal it will “discard” the memory from the Element 12 (Fig. 2, Diagram 20) and will go to the second input of the And 17 element. K At this point in time, BB 3 should turn on, however, due to a failure, it will not turn on, therefore, on the input of the buses of the main power supply, the throw surge of which there will be no current, while there will be no signal at the output of the DRT 13 (Fig. 2, Diagram 21), but there will be a signal at the output of the element NOT 14 (Fig. 2, Diagram 22). And this signal will be present at the first input of the And 17 element, so it will work, its output signal will appear (Fig. 2, Diagram 25). This signal will arrive in RU 18 and information will appear in it that the switch 3 has not turned on (Fig. 2, Diagram 26)

Таким образом, при использовании предлагаемого способа можно получать информацию об отказе включения вводного выключателя шин двухтрансформаторной подстанции при восстановлении нормальной схемы электроснабжения кольцевой сети.Thus, when using the proposed method, it is possible to obtain information about the failure to turn on the input bus switch of the two-transformer substation when restoring the normal power supply circuit of the ring network.

Claims (1)

Способ контроля отказа включения вводного выключателя (ВВ) шин двухтрансформаторной подстанции при восстановлении нормальной схемы электроснабжения кольцевой сети, заключающийся в фиксации бросков тока и в измерении времени между ними, отличающийся тем, что с момента появления напряжения на трансформаторе начинают отсчет суммарного времени, равного времени выдержки включения ВВ и времени выдержки отключения секционного выключателя шин, при этом на вводе основного источника питания контролируют появление броска рабочего тока и, если он не появится в момент окончания отсчета суммарного времени, то делают вывод об отказе включения ВВ шин двухтрансформаторной подстанции при восстановлении нормальной схемы электроснабжения кольцевой сети. A method for monitoring the failure of the input switch (BB) of the two-transformer substation to turn on when restoring the normal power supply circuit of the ring network, which consists in fixing the inrush currents and measuring the time between them, characterized in that from the moment the voltage appears on the transformer, the total time equal to the exposure time the inclusion of explosives and the shutter speed of the sectional bus switch, while the input of the main power source controls the appearance of an inrush current and, if if he does not appear at the end of the countdown of the total time, then they conclude about the failure to turn on the HV tires of the two-transformer substation when restoring the normal power supply circuit of the ring network.
RU2013153771/07A 2013-12-04 2013-12-04 Control method of failure of activation of disconnect switch of buses for two-transformer substation at recovery of normal circuit of electric power supply of ring network RU2551665C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2013153771/07A RU2551665C1 (en) 2013-12-04 2013-12-04 Control method of failure of activation of disconnect switch of buses for two-transformer substation at recovery of normal circuit of electric power supply of ring network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2013153771/07A RU2551665C1 (en) 2013-12-04 2013-12-04 Control method of failure of activation of disconnect switch of buses for two-transformer substation at recovery of normal circuit of electric power supply of ring network

Publications (1)

Publication Number Publication Date
RU2551665C1 true RU2551665C1 (en) 2015-05-27

Family

ID=53294564

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2013153771/07A RU2551665C1 (en) 2013-12-04 2013-12-04 Control method of failure of activation of disconnect switch of buses for two-transformer substation at recovery of normal circuit of electric power supply of ring network

Country Status (1)

Country Link
RU (1) RU2551665C1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2259199A (en) * 1991-08-27 1993-03-03 Seikosha Kk Backup power supply apparatus with disconnect switch for use during shipping
RU2215356C2 (en) * 2001-12-26 2003-10-27 Орловский государственный аграрный университет Method for checking failure of automatic load transfer center in ring power mains
RU2378754C1 (en) * 2008-12-09 2010-01-10 Федеральное государственное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГОУ ВПО ОрелГАУ) Method of controlling spurious tripping of sectionalising circuit breaker in ring network line

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2259199A (en) * 1991-08-27 1993-03-03 Seikosha Kk Backup power supply apparatus with disconnect switch for use during shipping
RU2215356C2 (en) * 2001-12-26 2003-10-27 Орловский государственный аграрный университет Method for checking failure of automatic load transfer center in ring power mains
RU2378754C1 (en) * 2008-12-09 2010-01-10 Федеральное государственное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГОУ ВПО ОрелГАУ) Method of controlling spurious tripping of sectionalising circuit breaker in ring network line

Similar Documents

Publication Publication Date Title
TR201802364T4 (en) High speed circuit breaker for a high performance battery in an isolated direct current network.
JP5425567B2 (en) Superconducting DC feeding system and fault detection method
RU2304339C1 (en) Method for checking automatic load transfer center for off-operation failure with its circuit breaker adjusted to respond to steady short circuit in ring circuit
RU2337454C1 (en) Method of control of disconnection and failure of automatic repeated connection of sectionalising circuit breaker in ring line
CN103117592B (en) 220kV spare power automatic switching system and backup auto-activating device mother are for the determination methods of throwing mode
JP2019527013A (en) Insulator for solar cell string
EP2834897B1 (en) Backup power system and grounding device for a backup power system
RU2463695C1 (en) Method for control of actuation failure of circuit breaker of automatic load transfer station in ring network
RU2551665C1 (en) Control method of failure of activation of disconnect switch of buses for two-transformer substation at recovery of normal circuit of electric power supply of ring network
RU2449449C1 (en) Method to monitor sectionalising circuit breaker disconnection fault in case of stable short circuit at section of circular network line adjacent to main circuit breaker
RU2335059C1 (en) Method of inhibiting automatic reclosure in short-circuit state at main power source busses and close short-circuit in out coming line with faulty circuit breaker
US9269940B2 (en) System for bypassing and isolating electrical power cells
RU2305355C1 (en) Method for checking circuit breaker of automatic load transfer center in ring-circuit supplied with power from different buses of double-transformer substation for successful operation
RU2371826C1 (en) Method of controllig sectionalising circuit breaker operation with faulty automatic load transfer switch
JP2019511891A (en) Solar module, operating method of solar module, and solar power generation system
RU2502173C1 (en) Control method of spurious trip of sectional bus switch at operation of annular network in substation standby mode
RU2502175C1 (en) Control method of trip of network station switch of automatic load transfer at restoration of normal electric power supply circuit of ring network
RU2536808C1 (en) Control method of recovery of normal circuit of electric power supply of ring network with reference automation
RU2503109C1 (en) Method to control failure of disconnection of head circuit breaker of line and disconnection of sectional circuit breaker of buses during operation of ring circuit in mode of substation redundancy
RU2504061C1 (en) Method to monitor disconnection of input circuit breaker of buses and false disconnection of input circuit breaker of substation transformer
RU2536812C1 (en) Control method of failure of deactivation of sectionalising switch of buses of two-transformer substation at recovery of normal circuit of electric power supply of ring network
US10658830B2 (en) Power system and method of forming the same
RU2359385C1 (en) Method of monitoring unsuccessful operation of unit for automatic load transfer during failure of separating automation of sectionalising circuit breaker in line
RU2551385C1 (en) Control method of double false tripping of master circuit breaker in line of ring network
RU2536813C1 (en) Control method of failure of activation of sectionalising switch at recovery of normal circuit of ring network

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20151205