RU2449449C1 - Method to monitor sectionalising circuit breaker disconnection fault in case of stable short circuit at section of circular network line adjacent to main circuit breaker - Google Patents

Method to monitor sectionalising circuit breaker disconnection fault in case of stable short circuit at section of circular network line adjacent to main circuit breaker Download PDF

Info

Publication number
RU2449449C1
RU2449449C1 RU2011107820/07A RU2011107820A RU2449449C1 RU 2449449 C1 RU2449449 C1 RU 2449449C1 RU 2011107820/07 A RU2011107820/07 A RU 2011107820/07A RU 2011107820 A RU2011107820 A RU 2011107820A RU 2449449 C1 RU2449449 C1 RU 2449449C1
Authority
RU
Russia
Prior art keywords
time
switch
circuit breaker
moment
circuit
Prior art date
Application number
RU2011107820/07A
Other languages
Russian (ru)
Inventor
Леонид Дмитриевич Суров (RU)
Леонид Дмитриевич Суров
Игорь Леонидович Суров (RU)
Игорь Леонидович Суров
Original Assignee
Федеральное государственное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГОУ ВПО ОрелГАУ)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Федеральное государственное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГОУ ВПО ОрелГАУ) filed Critical Федеральное государственное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГОУ ВПО ОрелГАУ)
Priority to RU2011107820/07A priority Critical patent/RU2449449C1/en
Application granted granted Critical
Publication of RU2449449C1 publication Critical patent/RU2449449C1/en

Links

Images

Landscapes

  • Keying Circuit Devices (AREA)
  • Driving Mechanisms And Operating Circuits Of Arc-Extinguishing High-Tension Switches (AREA)

Abstract

FIELD: electricity.
SUBSTANCE: from the moment of SC current surge on the buses of the main power source transformer, time is counted which is equal to the time of switching-off delay of the main circuit breaker of line powered from this source, in this process, SC current interruption moment is checked and if this moment coincides with the moment of tripping delay time expiration for the main circuit breaker of this line then it is decided that the main circuit breaker has been switched off, and from this moment the count of time equal to time of switching-on delay of automatic load transfer switch begins, herewith, on the buses of backup power source transformer at the moment of this delay expiration, SC current surge is checked and if it occurs and disappears after time period of actuating protection with acceleration of the switch for automatic backup switching on it is decided that this SC-switch has switched on and the sectionalising circuit breaker has failed.
EFFECT: improving reliability and enlarging functional capabilities.
2 dwg

Description

Изобретение относится к автоматике электрических сетей и предназначено для контроля отказа отключения секционирующего выключателя при устойчивом коротком замыкании (КЗ) на смежном с головным выключателем участке линии кольцевой сети, питающейся от разных шин двухтрансформаторной подстанции.The invention relates to the automation of electrical networks and is intended to control the failure of the disconnection of the sectionalizing circuit breaker with a stable short circuit (short circuit) in the adjacent to the head switch section of the ring network line powered by different buses of a two-transformer substation.

Известен способ контроля отказа отключения пункта автоматического включения резерва при включении его выключателя на устойчивое короткое замыкание в кольцевой сети, питающейся от разных шин двухтрансформаторной подстанции, заключающийся в фиксации бросков токов КЗ и в измерении времени между ними. Для этого на шинах трансформатора основного источника питания с момента появления броска тока КЗ отсчитывают время, равное времени выдержки срабатывания сетевого пункта автоматического включения резерва (АВР) плюс время срабатывания защиты его выключателя. При этом контролируют появление броска тока КЗ на шинах резервного источника питания, и если после включения выключателя пункта АВР он появляется, а в момент окончания отсчета суммарного времени не происходит отключение броска тока КЗ, то устанавливают факт отказа отключения пункта АВР при включении его выключателя на устойчивое КЗ в кольцевой сети [патент РФ №2304339, кл. Н02J 13/00, опубл. 2007 г, бюл. №22].There is a method of monitoring the failure of turning off the point of automatically turning on the reserve when it is turned on for a stable short circuit in the ring network, powered by different buses of the two-transformer substation, which consists in fixing the surges of short-circuit currents and in measuring the time between them. To do this, on the transformer tires of the main power source, from the moment of the inrush current short circuit, the time equal to the response time of the operation of the network point for automatically switching on the reserve (ATS) plus the response time of the protection of its circuit breaker is counted. At the same time, the occurrence of a fault inrush current on the tires of the backup power supply is controlled, and if it appears after turning on the switch of the ATS point, and at the end of the countdown of the total time, the inrush of a short-circuit current does not occur, then the fact of failure to turn off the ATS point when its breaker is turned on is stable KZ in the ring network [RF patent No. 2304339, cl. H02J 13/00, publ. 2007, bull. No. 22].

Недостатком известного способа является невозможность осуществления с его помощью контроля отказа отключения секционирующего выключателя при устойчивом КЗ на смежном с головным выключателем участке линии кольцевой сети.A disadvantage of the known method is the impossibility of using it to control the failure of opening the sectionalizing circuit breaker with a stable short circuit on a section of the ring network line adjacent to the main circuit breaker.

Задачей предлагаемого изобретения является расширение функциональных возможностей способа путем получения информации об отказе отключения секционирующего выключателя при устойчивом КЗ на смежном с головным выключателем участке линии кольцевой сети, питающейся от разных шин двухтрансформаторной подстанции.The objective of the invention is to expand the functionality of the method by obtaining information about the failure to disconnect the sectionalizing circuit breaker with a stable short circuit in the adjacent section of the ring network line powered by different buses of a two-transformer substation adjacent to the main circuit breaker.

Согласно предлагаемому способу с момента появления броска тока КЗ на шинах трансформатора основного источника питания отсчитывают время, равное времени выдержки отключения головного выключателя линии, питающийся от этого источника, при этом контролируют момент отключения тока КЗ, и если этот момент совпадает с моментом окончания времени выдержки отключения головного выключателя этой линии, то делают вывод об отключении головного выключателя и с этого момента начинают отсчет времени, равного времени выдержки включения выключателя автоматического включения резерва, при этом на шинах трансформатора резервного источника питания в момент окончания этой выдержки контролируют появление броска тока КЗ, и если он появляется, а через время выдержки срабатывания защиты с ускорением выключателя АВР исчезает, то делают вывод о включении этого выключателя на КЗ и об отказе отключения секционирующего выключателя.According to the proposed method, from the moment of the appearance of a short-circuit current surge on the transformer buses of the main power source, the time equal to the shutdown delay time of the line head switch powered from this source is counted, while the short-circuit current shutdown time is controlled, and if this moment coincides with the end time of the shutdown shutdown time the main switch of this line, then make a conclusion about turning off the main switch and from this moment begin the countdown of the time equal to the shutter speed aromatic inclusion of the reserve, while on the tires of the transformer of the backup power source at the moment of the end of this exposure, the occurrence of a short circuit current is controlled, and if it appears, and after the time of the protection tripping with the acceleration of the ABP switch disappears, then we conclude that this switch is turned on to the short circuit and about refusal of disconnection of the sectioning switch.

Суть предлагаемого изобретения поясняется чертежами, где:The essence of the invention is illustrated by drawings, where:

на фиг.1 - представлена структурная схема, содержащая элементы для реализации способа;figure 1 - presents a structural diagram containing elements for implementing the method;

на фиг.2 - диаграммы сигналов на выходах элементов, показанных на фиг.1 при КЗ в точке 3 (см. фиг.1).figure 2 - diagrams of the signals at the outputs of the elements shown in figure 1 with short circuit at point 3 (see figure 1).

Схема (см. фиг.1) содержит: силовой трансформатор основного источника питания 1, головной выключатель линии основного источника питания 2, точку КЗ 3, секционирующий выключатель линии основного источника питания 4, выключатель сетевого пункта АВР 5, секционирующий выключатель линии резервного источника питания 6, головной выключатель линии резервного источника питания 7, выключатель шинного АВР 8, силовой трансформатор резервного источника питания 9, датчик тока короткого замыкания (ДТКЗ) 10, элемент НЕ 11, элемент ПАМЯТЬ 12, элемент ЗАДЕРЖКА 13, элемент ОДНОВИБРАТОР 14, элемент И 15, элемент ПАМЯТЬ 16, элемент ЗАДЕРЖКА 17, элемент ОДНОВИБРАТОР 18, элемент И 19, датчик тока КЗ 20, элемент НЕ 21, элемент ПАМЯТЬ 22, элемент ЗАДЕРЖКА 23, элемент ОДНОВИБРАТОР 24, элемент И 25, регистрирующее устройство 26.The circuit (see Fig. 1) contains: a power transformer of the main power source 1, a main circuit breaker of the main power supply line 2, a short circuit point 3, a sectionalizing switch of the main power supply line 4, a circuit breaker of the AVR 5 station, a sectioning circuit breaker of the backup power supply line 6 , the main switch of the backup power supply line 7, the bus switch ABP 8, the power transformer of the backup power supply 9, the short-circuit current sensor (DTKZ) 10, the element NOT 11, the element MEMORY 12, the element DELAY 13, e SINGLE-VIBRATOR element 14, AND element 15, MEMORY element 16, DELAY element 18, SINGLE-DISPLAY element 18, And 19 element, KZ sensor 20, element NOT 21, MEMORY 22 element, DELAY 23 element, SINGLE VIBRATOR 24, element AND 25, registering device 26.

Диаграммы сигналов на выходах элементов, показанных на фиг.1 при КЗ в точке 3 (см. фиг.1), имеют вид (см. фиг.2): 27 - на выходе элемента 10, 28 - на выходе элемента 11, 29 - на выходе элемента 12, 30 - на выходе элемента 13, 31 - на выходе элемента 14, 32 - на выходе элемента 15, 33 - на выходе элемента 16, 34 - на выходе элемента 17, 35 - на выходе элемента 18, 36 - на выходе элемента 19, 37 - на выходе элемента 20, 38 - на выходе элемента 21, 39 - на выходе элемента 22, 40 - на выходе элемента 23, 41 - на выходе элемента 24, 42 - на выходе элемента 25, регистрирующее устройство 26, t1 - момент времени возникновения КЗ, t2 - момент отключения тока КЗ в линии основного источника питания, t3 - момент включения выключателя сетевого пункта АВР 5, t4 - момент времени отключения выключателя сетевого пункта АВР 5.The signal diagrams at the outputs of the elements shown in figure 1 with a short circuit at point 3 (see figure 1) have the form (see figure 2): 27 - at the output of element 10, 28 - at the output of element 11, 29 - at the output of element 12, 30 - at the output of element 13, 31 - at the output of element 14, 32 - at the output of element 15, 33 - at the output of element 16, 34 - at the output of element 17, 35 - at the output of element 18, 36 - the output of the element 19, 37 - at the output of the element 20, 38 - at the output of the element 21, 39 - at the output of the element 22, 40 - at the output of the element 23, 41 - at the output of the element 24, 42 - at the output of the element 25, the recording device 26, t 1 - time vozniknit veniya RS, t 2 - time of short-circuit current interruption in the primary power source line, t 3 - the moment of switching on the switch network ABP points 5, t 4 - time off switch network paragraph 5 ABP.

Способ осуществляется следующим образом.The method is as follows.

В нормальном режиме выключатели 2, 4, 6 и 7 включены, а выключатели 5 и 8 отключены, короткого замыкания в точке 3 нет, поэтому на выходе ДТКЗ 10 сигнала нет и схема находится в режиме контроля.In normal mode, switches 2, 4, 6, and 7 are on, and switches 5 and 8 are off, there is no short circuit at point 3, so there is no signal at the DTKZ 10 output and the circuit is in control mode.

При КЗ в точке 3 (см. фиг.1) на выходе ДТКЗ 10 появится сигнал (фиг.2, диагр. 27, момент времени t1). Он поступит на вход элемента НЕ 11, при этом существовавший до этого его выходной сигнал исчезнет (фиг.2, диагр. 28). Параллельно с этим выходной сигнал ДТКЗ 10 поступит на вход элемента ПАМЯТЬ 12, он запомнится им (фиг.2, диагр. 29) и поступит на вход элемента ЗАДЕРЖКА 13, с выхода которого он появится через время, равное времени выдержки отключения головного выключателя 2 (фиг.2, диагр. 30, момент времени t2). По истечении этого времени сигнал поступит на элемент ОДНОВИБРАТОР 14, он совершит одно колебание и своим сигналом «сбросит» память с элемента 18 (фиг.2, диагр. 31) и его сигнал поступит на первый вход элемента И 15. В момент времени t2 головной выключатель 2 отключит ток КЗ, поэтому с выхода ДТКЗ 10 сигнал исчезнет. При этом на выходе элемента НЕ 11 вновь появится сигнал (фиг.2, диагр. 28), который поступит на второй вход элемента И 15. Наличие двух входных сигналов на И 15 приведет к появлению его входного сигнала (фиг.2, диагр. 32). Этот сигнал поступит в РУ 26 и обеспечит появление информации о том, что головной выключатель 2 отключился (фиг.2, диагр. 43). А также он поступит на вход элемента ПАМЯТЬ 16, где запомнится (фиг.2, диагр. 33), и поступит на вход элемента ЗАДЕРЖКА 17. С выхода этого элемента сигнал появится через время, равное времени выдержки включения выключателя сетевого АВР 5 (фиг.2, диагр. 34, момент времени t3). Выходной сигнал с этого элемента «сбросит» память с элемента 16 и поступит на первый вход элемента И 19. Включение сетевого выключателя 5 пункта АВР в момент времени t3 произойдет на КЗ в точке 3 по причине отказа отключения секционирующего выключателя 4. Поэтому на выходе ДТКЗ 20 появится выходной сигнал (фиг.2, диагр. 37, момент времени t3), а сигнал, существовавший на выходе элемента НЕ 21, исчезнет (фиг.2, диагр. 38, момент времени 1з). Сигнал, поступивший на вход элемента ПАМЯТЬ 22, запомнится им (фиг.2, диагр. 39) и поступит на вход элемента ЗАДЕРЖКА 23. С выхода этого элемента сигнал появится через время, равное времени выдержки срабатывания защиты с ускорением выключателя 5 сетевого пункта АВР (фиг.2, диагр. 40). В момент времени t4 этот выключатель с ускорением отключит ток КЗ, при этом на выходе элемента НЕ 21 вновь появится свой сигнал (фиг.2, диагр. 38). Этот сигнал поступит на второй вход элемента И 25, на выходе которого появится сигнал (фиг.2, диагр. 42). Этот сигнал поступит в РУ 26 и там появится информация о том, что выключатель 5 сетевого пункта АВР отключился с ускорением по причине отказа отключения секционирующего выключателя 4.When short circuit at point 3 (see figure 1) at the output of the DTKZ 10 signal will appear (figure 2, Fig. 27, time t 1 ). It will go to the input of the element NOT 11, while the output signal that existed before that will disappear (Fig. 2, Diagram 28). In parallel with this, the output signal of the DTKZ 10 will go to the input of the MEMORY 12 element, it will be remembered by it (Fig. 2, Diagram 29) and will go to the input of the DELAY 13 element, from the output of which it will appear after a time equal to the shutdown delay time of the head switch 2 ( figure 2, Fig. 30, time t 2 ). After this time, the signal will go to the SINGLE-VIBRATOR element 14, it will make one oscillation and its signal will “discard” the memory from the element 18 (Fig. 2, Diagram 31) and its signal will go to the first input of the And element 15. At time t 2 the head switch 2 will turn off the short-circuit current, so the signal disappears from the output of the DTKZ 10. In this case, at the output of the element NOT 11, a signal will again appear (Fig. 2, Diagram 28), which will go to the second input of the And 15 element. The presence of two input signals at And 15 will lead to the appearance of its input signal (Fig. 2, Diagram 32 ) This signal will go to RU 26 and will provide information that the head switch 2 has been turned off (Fig. 2, Diagram 43). And also it will go to the input of the MEMORY 16 element, where it will be remembered (Fig. 2, Diagram 33), and will go to the input of the DELAY 17 element. From the output of this element the signal will appear after a time equal to the holding time of the on-off switch of the network ABP 5 (Fig. 2, Fig. 34, time t 3 ). The output signal from this element will “erase” the memory from element 16 and will go to the first input of element And 19. The power switch 5 of the ATS point will turn on at time t 3 at the fault at point 3 due to a failure to disconnect the partition switch 4. Therefore, at the output of the DTC 20, the output signal will appear (Fig. 2, diagram 37, time instant t 3 ), and the signal that existed at the output of the element NOT 21 will disappear (Fig. 2, diagram 38, time instant 1h). The signal received at the input of the MEMORY element 22 will be remembered by him (Fig. 2, Diagram 39) and will be received at the input of the DELAY 23 element. From the output of this element, the signal will appear after a time equal to the protection delay time with the acceleration of the switch 5 of the ABP network point ( figure 2, diag. 40). At time t 4, this switch accelerates off the short-circuit current, while the output of the element HE 21 again appears its signal (figure 2, Fig. 38). This signal will go to the second input of the And 25 element, at the output of which a signal will appear (Fig. 2, Fig. 42). This signal will go to RU 26 and there will appear information that the switch 5 of the ABP network point has tripped with acceleration due to a failure to turn off the sectioning switch 4.

Таким образом предлагаемый способ позволяет получать своевременную информацию об отказе отключения секционирующего выключателя при устойчивом КЗ на смежном с головным выключателем участке линии кольцевой сети. Это приведет к повышению надежности электроснабжения потребителей за счет принятия на основе полученной информации оперативным персоналом необходимых решений.Thus, the proposed method allows you to receive timely information about the failure of the sectionalizing circuit breaker with a stable short circuit in the adjacent to the main switch section of the ring network line. This will lead to an increase in the reliability of power supply to consumers through the adoption of necessary decisions based on the information received by operational personnel.

Claims (1)

Способ контроля отказа отключения секционирующего выключателя при устойчивом коротком замыкании (КЗ) на смежном с головным выключателем участке линии кольцевой сети, питающейся от разных шин двухтрансформаторной подстанции, заключающийся в фиксации бросков токов КЗ и в измерении времени между ними, отличающийся тем, что с момента появления броска тока КЗ на шинах трансформатора основного источника питания отсчитывают время, равное времени выдержки отключения головного выключателя линии, питающейся от этого источника, при этом контролируют момент отключения тока КЗ, и если этот момент совпадает с моментом окончания времени выдержки отключения головного выключателя этой линии, то делают вывод об отключении головного выключателя и с этого момента начинают отсчет времени, равного времени выдержки включения выключателя автоматического включения резерва, при этом на шинах трансформатора резервного источника питания в момент окончания этой выдержки контролируют появление броска тока КЗ и, если он появляется, а через время срабатывания защиты с ускорением выключателя автоматического включения резерва исчезнет, то делают вывод о включении этого выключателя на КЗ и об отказе отключения секционирующего выключателя. A method for monitoring the failure of opening the sectionalizing circuit breaker during a stable short circuit (short circuit) on a section of the ring network line adjacent to the main circuit breaker, powered by different buses of a two-transformer substation, which consists in fixing the surges of short-circuit currents and in measuring the time between them, characterized in that from the moment of occurrence Short-circuit inrush current on the transformer tires of the main power source counts the time equal to the shutdown delay time of the line circuit breaker powered by this source, while the moment of short-circuit current shutdown is determined, and if this moment coincides with the end time of the shutdown time of the head switch for this line, then a conclusion is made about the shutdown of the head switch and from this moment the time is set equal to the shutdown time of the automatic switch of the standby switch, while on the tires the transformer of the backup power source at the end of this exposure control the appearance of an inrush current short-circuit and, if it appears, and after the time of operation of the protection with the acceleration of the switch a -automatic transfer switch will disappear, that concluded the inclusion of this switch on to fault and refusal partitioned off switch.
RU2011107820/07A 2011-02-28 2011-02-28 Method to monitor sectionalising circuit breaker disconnection fault in case of stable short circuit at section of circular network line adjacent to main circuit breaker RU2449449C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2011107820/07A RU2449449C1 (en) 2011-02-28 2011-02-28 Method to monitor sectionalising circuit breaker disconnection fault in case of stable short circuit at section of circular network line adjacent to main circuit breaker

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2011107820/07A RU2449449C1 (en) 2011-02-28 2011-02-28 Method to monitor sectionalising circuit breaker disconnection fault in case of stable short circuit at section of circular network line adjacent to main circuit breaker

Publications (1)

Publication Number Publication Date
RU2449449C1 true RU2449449C1 (en) 2012-04-27

Family

ID=46297681

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2011107820/07A RU2449449C1 (en) 2011-02-28 2011-02-28 Method to monitor sectionalising circuit breaker disconnection fault in case of stable short circuit at section of circular network line adjacent to main circuit breaker

Country Status (1)

Country Link
RU (1) RU2449449C1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106787153A (en) * 2017-02-21 2017-05-31 国网山东省电力公司莱芜供电公司 A kind of inlet wire for internal bridge form is for throwing method
CN109193553A (en) * 2018-09-20 2019-01-11 深圳供电局有限公司 A kind of closing switch method and device of backup auto-activating device available power supply
RU2716838C1 (en) * 2019-05-14 2020-03-17 Федеральное государственное бюджетное образовательное учреждение высшего образования "Орловский государственный аграрный университет имени Н.В. Парахина" Method for control of false disconnection and failure of automatic reclosure of head switch of power transmission line

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU851644A1 (en) * 1979-07-19 1981-07-30 Целиноградский Сельскохозяйственныйинститут Method of obtaining information about result of automatic reconnection of sectionalizing apparatus
GB2259199A (en) * 1991-08-27 1993-03-03 Seikosha Kk Backup power supply apparatus with disconnect switch for use during shipping
RU2214667C2 (en) * 2001-12-26 2003-10-20 Орловский государственный аграрный университет Method for power-up control of automatic load transfer center in ring mains
RU2304339C1 (en) * 2006-04-24 2007-08-10 Федеральное государственное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГОУ ВПО ОрелГАУ) Method for checking automatic load transfer center for off-operation failure with its circuit breaker adjusted to respond to steady short circuit in ring circuit

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU851644A1 (en) * 1979-07-19 1981-07-30 Целиноградский Сельскохозяйственныйинститут Method of obtaining information about result of automatic reconnection of sectionalizing apparatus
GB2259199A (en) * 1991-08-27 1993-03-03 Seikosha Kk Backup power supply apparatus with disconnect switch for use during shipping
RU2214667C2 (en) * 2001-12-26 2003-10-20 Орловский государственный аграрный университет Method for power-up control of automatic load transfer center in ring mains
RU2304339C1 (en) * 2006-04-24 2007-08-10 Федеральное государственное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГОУ ВПО ОрелГАУ) Method for checking automatic load transfer center for off-operation failure with its circuit breaker adjusted to respond to steady short circuit in ring circuit

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106787153A (en) * 2017-02-21 2017-05-31 国网山东省电力公司莱芜供电公司 A kind of inlet wire for internal bridge form is for throwing method
CN109193553A (en) * 2018-09-20 2019-01-11 深圳供电局有限公司 A kind of closing switch method and device of backup auto-activating device available power supply
CN109193553B (en) * 2018-09-20 2020-06-02 深圳供电局有限公司 Switching-on method and device for spare power supply of spare power automatic switching device
RU2716838C1 (en) * 2019-05-14 2020-03-17 Федеральное государственное бюджетное образовательное учреждение высшего образования "Орловский государственный аграрный университет имени Н.В. Парахина" Method for control of false disconnection and failure of automatic reclosure of head switch of power transmission line

Similar Documents

Publication Publication Date Title
RU2304339C1 (en) Method for checking automatic load transfer center for off-operation failure with its circuit breaker adjusted to respond to steady short circuit in ring circuit
RU2378754C1 (en) Method of controlling spurious tripping of sectionalising circuit breaker in ring network line
RU2410817C1 (en) Method to control variances of condition of head circuit breaker in circuit of circular network
RU2394331C1 (en) Method to control cut-off of line main circuit breaker at cut-off fault of sectionalising circuit breaker in its repeated cut-in at stable short circuit in circular circuit
RU2337454C1 (en) Method of control of disconnection and failure of automatic repeated connection of sectionalising circuit breaker in ring line
RU2449449C1 (en) Method to monitor sectionalising circuit breaker disconnection fault in case of stable short circuit at section of circular network line adjacent to main circuit breaker
RU2463695C1 (en) Method for control of actuation failure of circuit breaker of automatic load transfer station in ring network
RU2305356C1 (en) Method for checking circuit breakers of ring-circuit sectionalized line for successful and unsuccessful automatic reclosure
RU2371826C1 (en) Method of controllig sectionalising circuit breaker operation with faulty automatic load transfer switch
RU2453023C2 (en) Method for inhibit of automatic reclosure of sectionalising circuit breaker which has been deactivated at failure of circuit breaker of network station of automatic load transfer which has been activated to stable short circuit in loop circuit
RU2502173C1 (en) Control method of spurious trip of sectional bus switch at operation of annular network in substation standby mode
RU2305355C1 (en) Method for checking circuit breaker of automatic load transfer center in ring-circuit supplied with power from different buses of double-transformer substation for successful operation
RU2335059C1 (en) Method of inhibiting automatic reclosure in short-circuit state at main power source busses and close short-circuit in out coming line with faulty circuit breaker
RU2421862C1 (en) Method for prohibiting network automatic load transfer to short circuit
RU2502175C1 (en) Control method of trip of network station switch of automatic load transfer at restoration of normal electric power supply circuit of ring network
RU2551385C1 (en) Control method of double false tripping of master circuit breaker in line of ring network
RU2461945C1 (en) Method for control of prohibition failure of reserve automatic switching in ring network line
RU2504061C1 (en) Method to monitor disconnection of input circuit breaker of buses and false disconnection of input circuit breaker of substation transformer
RU2446544C1 (en) Method to monitor main switch disconnection fault in case of stable short circuit at adjacent section of circular network line
RU2501145C1 (en) Method for control of spurious tripping of main and sectionalising circuit breakers with subsequent switching on of network breaker for automatic transfer switch (ats) in ring network line
RU2502174C1 (en) Control method of trip of isolating switch of substation buses with further trip of main switch and switch-on of standby switch of ring network line
RU2474029C1 (en) Method to monitor failure of disconnection of sectionalising circuit breaker and disconnection of head circuit breaker of main power supply source line, connection and failure of disconnection of circuit breaker of network station of automatic load transfer and disconnection of sectionalising circuit breaker of reserve power supply source line in circular network
RU2543072C2 (en) Method of control of spurious tripping and successful automatic reclosure of main circuit breaker in ring network line
RU2447567C1 (en) Method for sort circuit control at areas neighbouring to section switches and prohibition of automatic reclosing for bus disconnect switches of double-transformer substation
RU2454771C1 (en) Control method of substation buses local switch disconnection in case of one of line main switches failure after its re-switching to sustained short circuit

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20130301