RU2215356C2 - Method for checking failure of automatic load transfer center in ring power mains - Google Patents

Method for checking failure of automatic load transfer center in ring power mains Download PDF

Info

Publication number
RU2215356C2
RU2215356C2 RU2001135773/09A RU2001135773A RU2215356C2 RU 2215356 C2 RU2215356 C2 RU 2215356C2 RU 2001135773/09 A RU2001135773/09 A RU 2001135773/09A RU 2001135773 A RU2001135773 A RU 2001135773A RU 2215356 C2 RU2215356 C2 RU 2215356C2
Authority
RU
Russia
Prior art keywords
load transfer
short
automatic load
inrush
transformer
Prior art date
Application number
RU2001135773/09A
Other languages
Russian (ru)
Inventor
В.Г. Васильев
Л.Д. Суров
А.В. Виноградов
С.М. Астахов
Original Assignee
Орловский государственный аграрный университет
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Орловский государственный аграрный университет filed Critical Орловский государственный аграрный университет
Priority to RU2001135773/09A priority Critical patent/RU2215356C2/en
Application granted granted Critical
Publication of RU2215356C2 publication Critical patent/RU2215356C2/en

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Emergency Protection Circuit Devices (AREA)
  • Locating Faults (AREA)

Abstract

FIELD: automatic control of power mains. SUBSTANCE: method used for checking failure of automatic load transfer center in ring power mains fed from different buses of double-transformer substation where automatic load transfer center is not provided with device inhibiting its closure to short circuit depends for its operation on recording inrush currents and counting time from moment of occurrence of first inrush short-circuit current at buses of main power supply transformer equal to time delay for closing automatic load transfer center; as soon as time counting is ceased, second inrush current exceeding rated value or short-circuit current at buses of stand-by power supply transformer is checked and if it fails, fact of automatic load transfer failure in ring power mains is stated. EFFECT: enlarged functional capabilities. 1 cl, 2 dwg

Description

Изобретение относится к автоматике электрических сетей и предназначено для контроля отказа включения пункта автоматического включения резерва (АВР) в кольцевой сети, питающейся от разных шин двухтрансформаторной подстанции, причем пункт АВР не снабжен устройством запрета его включения на короткое замыкание. The invention relates to the automation of electrical networks and is intended to control the failure of the inclusion of the automatic transfer switch (ATS) point in a ring network powered by different buses of a two-transformer substation, and the ATS station is not equipped with a device for prohibiting its inclusion on a short circuit.

Известен способ контроля неуспешного включения пункта автоматического включения резерва на короткое замыкание (к.з.) в кольцевой сети, питающейся от шин двухтрансформаторной подстанции, заключающийся в фиксации бросков токов короткого замыкания и в измерении времени между ними. Отсчитывают время с момента появления первого броска тока к.з. на шинах трансформатора основного источника питания, равное выдержке времени срабатывания сетевого пункта АВР, в момент окончания его отсчета контролируют появление второго броска тока к.з. на шинах резервного источника питания и при его появлении устанавливают факт неуспешного включения пункта АВР на короткое замыкание [1]. A known method of controlling the failure of the automatic switch-on of the reserve for short circuit (short circuit) in the ring network, powered by two-transformer substation buses, which consists in fixing the surges of short-circuit currents and in measuring the time between them. Count the time from the moment of the appearance of the first inrush short-circuit current on the tires of the transformer of the main power source, equal to the time delay of the operation of the ABP network item, at the moment of the end of its countdown, the appearance of a second inrush current short circuit is controlled. on the tires of the backup power source and when it appears, the fact of the unsuccessful inclusion of the ABP point for a short circuit is established [1].

Недостатком известного способа является невозможность осуществления с помощью его контроля отказа включения пункта АВР в кольцевой сети. The disadvantage of this method is the impossibility of using it to control the failure of the inclusion of an ABP point in a ring network.

Задачей предлагаемого изобретения является расширение функциональных возможностей способа путем получения информации об отказе включения пункта АВР в кольцевой сети, питающейся от разных шин двухтрансформаторной подстанции. При этом пункт АВР не снабжен устройством запрета его включения на короткое замыкание. The objective of the invention is to expand the functionality of the method by obtaining information about the failure of the inclusion of an ABP point in a ring network powered by different buses of a two-transformer substation. In this case, the ATS item is not equipped with a device for prohibiting its inclusion in a short circuit.

Согласно предлагаемому способу, на шинах трансформатора основного источника питания фиксируют появление броска тока, вызванного коротким замыканием в линии, питающейся от этого трансформатора. При появлении броска тока короткого замыкания начинают отсчет времени, равного выдержке времени включения пункта АВР. По окончании отсчета этого времени контролируют появление броска тока (ток может увеличиваться до значения более нормального рабочего, не менее тока короткого замыкания - бросок рабочего тока или до величины тока короткого замыкания - бросок тока короткого замыкания) на шинах трансформатора резервного источника питания. Если по окончании отсчета времени нет броска тока на шинах трансформатора резервного источника питания, то это свидетельствует о том, что произошел отказ включения пункта АВР. According to the proposed method, the appearance of an inrush caused by a short circuit in the line powered by this transformer is detected on the tires of the transformer of the main power source. When the appearance of an inrush short-circuit current, a countdown begins, equal to the delay time of the inclusion of the item ABP. At the end of this time, the appearance of a current surge is controlled (the current can increase to a value of a more normal operating current, not less than a short circuit current — an inrush current or up to a short circuit current — an inrush current) on the buses of a transformer for a backup power source. If at the end of the countdown there is no inrush on the tires of the transformer of the backup power source, then this indicates that there was a failure to turn on the ABP item.

Суть предлагаемого изобретения поясняется с помощью чертежей где:
на фиг.1 представлена структурная схема, содержащая элементы для реализации способа;
на фиг.2 - диаграммы сигналов на выходах элементов, показанных на фиг.1 при коротком замыкании в точке 21 или 24 (см. фиг.1) при отказе включения пункта АВР.
The essence of the invention is illustrated using the drawings where:
figure 1 presents a structural diagram containing elements for implementing the method;
figure 2 - diagrams of the signals at the outputs of the elements shown in figure 1 with a short circuit at point 21 or 24 (see figure 1) in case of failure to enable the item ABP.

Схема (см. фиг.1) содержит: выключатель пункта АВР 1, трансформатор тока 2, датчик тока короткого замыкания 3, элемент ПАМЯТЬ 4, элемент ЗАДЕРЖКА 5, одновибратор 6, элемент И 7, регистрирующее устройство (РУ) 8, трансформатор тока 9, датчик тока короткого замыкания 10, одновибратор 11, элемент ИЛИ 12, элемент НЕ 13 головной выключатель линии основною источника питания 14, секционный выключатель линии 15, головной выключатель линии, отходящей от шин трансформатора резервного источника питания 16, секционный выключатель линии 17, трансформатор основного источника питания 18, трансформатор резервного источника питания 19, подстанционный секционный выключатель 20, точку короткого замыкания 21, потребители 22 и 23, точку короткого замыкания 24. The circuit (see Fig. 1) contains: ATS switch 1, current transformer 2, short-circuit current sensor 3, MEMORY element 4, DELAY element 5, single-vibrator 6, And 7 element, recording device (RU) 8, current transformer 9 , short-circuit current sensor 10, one-shot 11, element OR 12, element NOT 13 head switch of the main power supply line 14, section switch of the line 15, head switch of the line leaving the transformer bus of the backup power source 16, section switch of the line 17, main transformer isto nick supply 18, a backup power supply transformer 19, the substation section switch 20, the short-circuit point 21, users 22 and 23, the short-circuit point 24.

Диаграммы сигналов на выходах элементов, показанных на фиг.1 при коротком замыкании в точке 21 или точке 24 (см. фиг.1) и отказе включения пункта АВР, имеют вид (см. фиг.2): 25 - на выходе элемента 2; 26 - на выходе элемента 3; 27 - на выходе элемента 4; 28 - на выходе элемента 5; 29 - на выходе элемента 6; 30 - на выходе элемента 9; 31 - на выходе элемента 10; 32 - на выходе элемента 11; 33 - на выходе элемента 12; 34 - на выходе элемента 13; 35 - на выходе элемента 7; 36 - наличие информации в элементе 8. The diagrams of the signals at the outputs of the elements shown in FIG. 1 during a short circuit at point 21 or point 24 (see FIG. 1) and the failure to turn on the ATS point have the form (see FIG. 2): 25 - at the output of element 2; 26 - at the output of element 3; 27 - at the output of element 4; 28 - at the output of element 5; 29 - at the output of element 6; 30 - at the output of element 9; 31 - at the output of element 10; 32 - at the output of element 11; 33 - at the output of element 12; 34 - at the output of element 13; 35 - at the output of element 7; 36 - the presence of information in element 8.

В нормальном режиме выключатель пункта АВР 1 отключен и потребители 22 и 23 питаются через головной выключатель 14 и секционный выключатель 15 от шин трансформатора основного источника питания 18. На выходах трансформаторов тока 2 и 9 есть некоторая величина выходных сигналов (фиг.2, диаграммы 25, 30), обусловленная рабочими токами, но недостаточная для срабатывания датчиков тока короткого замыкания 3 и 10, и элемента одновибратор 11, поэтому нет сигналов на входах остальных элементов схемы и схема не запускается. In normal mode, the switch point ABP 1 is turned off and consumers 22 and 23 are fed through the head switch 14 and the sectional switch 15 from the buses of the transformer of the main power source 18. At the outputs of the current transformers 2 and 9 there is some value of the output signals (figure 2, diagrams 25, 30), due to operating currents, but insufficient for the operation of the short-circuit current sensors 3 and 10, and the single-shot element 11, so there are no signals at the inputs of the remaining circuit elements and the circuit does not start.

При коротком замыкании в точке 21 или точке 24 (см. фиг.1) величина выходного сигнала трансформатора тока 2 достаточна для срабатывания датчика тока короткого замыкания 3 (фиг.2 диаграмма 25), на выходе которого появляется сигнал (фиг.2 диаграмма 26). Этот сигнал запоминается элементом ПАМЯТЬ 4 (фиг.2, диаграмма 27) и поступает на вход элемента ЗАДЕРЖКА 5, с выхода которого сигнал появится через время, равное выдержке времени включения выключателя пункта АВР (фиг.2 диаграмма 28). Сигнал с элемента 5 поступит на вход одновибратора 6, этот элемент выдаст однократный импульс (фиг.2 диаграмма 29), который "сбросит" элемент ПАМЯТЬ 4 и поступит на один из входов элемента И 7. In case of a short circuit at point 21 or point 24 (see Fig. 1), the output signal of current transformer 2 is sufficient to trigger the short-circuit current sensor 3 (Fig. 2, diagram 25), at the output of which a signal appears (Fig. 2, diagram 26) . This signal is stored by the element MEMORY 4 (figure 2, diagram 27) and is fed to the input of the element DELAY 5, from the output of which the signal will appear after a time equal to the delay time of the on-off switch of the ABP item (figure 2 diagram 28). The signal from element 5 will go to the input of one-shot 6, this element will give a single pulse (Fig. 2 diagram 29), which will "reset" the element MEMORY 4 and go to one of the inputs of the element And 7.

Если произошел отказ пункта АВР по какой-то причине, то его выключатель не включится, и поэтому на выходе трансформатора тока 9 сигнал не изменится (фиг.2 диаграмма 30), не будет наблюдаться и бросков рабочего тока и бросков тока короткого замыкания. Поэтому нет сигналов на выходах элементов одновибратор 11 и датчик тока короткого замыкания 10 (фиг.2 диаграмма 32, 31). Соответственно нет сигнала на входах элемента ИЛИ 12 и на его выходе (фиг.2 диаграмма 33). На выходе элемента НЕ 13 присутствует сигнал (фиг.2 диаграмма 34), который подается на второй вход элемента И 7. Следовательно, на его выходе появляется сигнал (фиг. 2 диаграмма 35). Данный сигнал включает регистрирующее устройство РУ 8. В регистрирующем устройстве РУ 8 присутствует информация (фиг. 2 диаграмма 36) об отказе включения пункта АВР в кольцевой сети, питающейся от разных шин двухтрансформаторной подстанции. If there is a failure of the ABP point for some reason, then its switch will not turn on, and therefore, the signal will not change at the output of current transformer 9 (Fig. 2, diagram 30), and there will be no inrush current and inrush current short circuits. Therefore, there are no signals at the outputs of the elements of the one-shot 11 and the short-circuit current sensor 10 (figure 2 diagram 32, 31). Accordingly, there is no signal at the inputs of the OR element 12 and at its output (Fig. 2 diagram 33). At the output of the element NOT 13 there is a signal (Fig. 2 diagram 34), which is fed to the second input of the element And 7. Therefore, a signal appears at its output (Fig. 2 diagram 35). This signal includes the RU 8 recording device. The RU 8 recording device contains information (Fig. 2, diagram 36) about the failure to turn on the ABP point in a ring network powered by different buses of a two-transformer substation.

Если же пункт АВР включится, то соответственно на выходе трансформатора тока 9 будет сигнал достаточный для срабатывания датчика тока короткого замыкания 10, или элемента одновибратор 11 (при коротком замыкании в точке 21 или 24 соответственно). При этом элемент одновибратор 11 сработает при наличии броска рабочего тока более нормального. Сигнал с них поступит на вход элемента ИЛИ 12, а значит пропадет сигнал с выхода элемента НЕ 13. Будет отсутствовать сигнал на втором входе элемента И 7. Следовательно, не поступит информация в регистрирующее устройство РУ 8. If the ABP item is turned on, then, at the output of the current transformer 9, there will be a signal sufficient to trigger the short-circuit current sensor 10, or the one-shot element 11 (for a short circuit at point 21 or 24, respectively). In this case, the one-shot element 11 will work if there is a surge in operating current that is more than normal. The signal from them will go to the input of the OR element 12, which means that the signal from the output of the element NOT 13 will disappear. There will be no signal at the second input of the And 7 element. Therefore, information will not be received in the RU 8 recording device.

При отказе включения пункта АВР в кольцевой сети информация об этом на основании предлагаемого способа поступит к обслуживающему персоналу. In case of failure to include the ABP point in the ring network, information about this on the basis of the proposed method will go to the maintenance personnel.

Таким образом, предлагаемый способ позволяет выдать своевременную информацию об отказе включения пункта АВР в кольцевой сети, питающейся от разных шин двухтрансформаторной подстанции. Это несомненно приведет к повышению надежности электроснабжения потребителей за счет принятия, на основе полученной информации, оперативным персоналом необходимых решений. Thus, the proposed method allows to provide timely information about the failure of the inclusion of the point ABP in the ring network, powered by different buses of a two-transformer substation. This will undoubtedly lead to an increase in the reliability of power supply to consumers through the adoption, on the basis of the information received, by the operational staff of the necessary decisions.

Источник информации
1. Патент РФ 2169979 С1, 27.06.2001, кл. Н 02 J 9/04 - прототип.
Sourse of information
1. RF patent 2169979 C1, 06/27/2001, cl. H 02 J 9/04 - prototype.

Claims (1)

Способ контроля отказа включения пункта автоматического включения резерва (АВР) в кольцевой сети, питающейся от разных шин двухтрансформаторной подстанции, заключающийся в фиксации двух бросков тока и в отсчете времени с момента появления первого броска тока короткого замыкания (к. з. ) на шинах трансформатора основного источника питания, равного выдержке времени включения пункта АВР, отличающийся тем, что в момент окончания отсчета времени контролируют появление второго броска рабочего тока больше нормального или тока короткого замыкания на шинах трансформатора резервного источника питания и если они отсутствуют, то устанавливают факт отказа включения пункта АВР в кольцевой сети. A method for monitoring the failure of turning on the automatic transfer switch (ATS) point in a ring network powered by different buses of a two-transformer substation, which consists in fixing two inrush currents and in counting the time from the moment the first inrush of a short circuit current occurs (short circuit) on the main transformer buses a power source equal to the time delay for turning on the ATS item, characterized in that at the time the time countdown ends, the appearance of a second surge of the operating current is greater than normal or short circuit current Nia busbar transformer backup power source, and if they are absent, then set the denial inclusion ABP points on the ring.
RU2001135773/09A 2001-12-26 2001-12-26 Method for checking failure of automatic load transfer center in ring power mains RU2215356C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2001135773/09A RU2215356C2 (en) 2001-12-26 2001-12-26 Method for checking failure of automatic load transfer center in ring power mains

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2001135773/09A RU2215356C2 (en) 2001-12-26 2001-12-26 Method for checking failure of automatic load transfer center in ring power mains

Publications (1)

Publication Number Publication Date
RU2215356C2 true RU2215356C2 (en) 2003-10-27

Family

ID=31988639

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2001135773/09A RU2215356C2 (en) 2001-12-26 2001-12-26 Method for checking failure of automatic load transfer center in ring power mains

Country Status (1)

Country Link
RU (1) RU2215356C2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2461945C1 (en) * 2011-07-27 2012-09-20 Федеральное государственное бюджетное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО ОрелГАУ) Method for control of prohibition failure of reserve automatic switching in ring network line
RU2463695C1 (en) * 2011-07-21 2012-10-10 Федеральное государственное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГОУ ВПО ОрелГАУ) Method for control of actuation failure of circuit breaker of automatic load transfer station in ring network
RU2479911C1 (en) * 2012-02-24 2013-04-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО ОрелГАУ) Method to control disconnection and unsuccessful automatic reclosure of sectionalising circuit breaker in radial lines of substation
RU2502175C1 (en) * 2012-07-02 2013-12-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО ОрелГАУ) Control method of trip of network station switch of automatic load transfer at restoration of normal electric power supply circuit of ring network
RU2505906C1 (en) * 2012-08-21 2014-01-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО ОрелГАУ) Method of inspecting on state of main switch of line feeding transformer substation during power outage
RU2531385C1 (en) * 2013-07-08 2014-10-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО Орел ГАУ) Method to control successful automatic reclosure of main line breaker with reduction of reclosure delay time
RU2536813C1 (en) * 2013-05-22 2014-12-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО Орел ГАУ) Control method of failure of activation of sectionalising switch at recovery of normal circuit of ring network
RU2551665C1 (en) * 2013-12-04 2015-05-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО Орел ГАУ) Control method of failure of activation of disconnect switch of buses for two-transformer substation at recovery of normal circuit of electric power supply of ring network

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2463695C1 (en) * 2011-07-21 2012-10-10 Федеральное государственное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГОУ ВПО ОрелГАУ) Method for control of actuation failure of circuit breaker of automatic load transfer station in ring network
RU2461945C1 (en) * 2011-07-27 2012-09-20 Федеральное государственное бюджетное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО ОрелГАУ) Method for control of prohibition failure of reserve automatic switching in ring network line
RU2479911C1 (en) * 2012-02-24 2013-04-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО ОрелГАУ) Method to control disconnection and unsuccessful automatic reclosure of sectionalising circuit breaker in radial lines of substation
RU2502175C1 (en) * 2012-07-02 2013-12-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО ОрелГАУ) Control method of trip of network station switch of automatic load transfer at restoration of normal electric power supply circuit of ring network
RU2505906C1 (en) * 2012-08-21 2014-01-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО ОрелГАУ) Method of inspecting on state of main switch of line feeding transformer substation during power outage
RU2536813C1 (en) * 2013-05-22 2014-12-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО Орел ГАУ) Control method of failure of activation of sectionalising switch at recovery of normal circuit of ring network
RU2531385C1 (en) * 2013-07-08 2014-10-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО Орел ГАУ) Method to control successful automatic reclosure of main line breaker with reduction of reclosure delay time
RU2551665C1 (en) * 2013-12-04 2015-05-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГБОУ ВПО Орел ГАУ) Control method of failure of activation of disconnect switch of buses for two-transformer substation at recovery of normal circuit of electric power supply of ring network

Similar Documents

Publication Publication Date Title
RU2304339C1 (en) Method for checking automatic load transfer center for off-operation failure with its circuit breaker adjusted to respond to steady short circuit in ring circuit
RU2378754C1 (en) Method of controlling spurious tripping of sectionalising circuit breaker in ring network line
RU2304338C1 (en) Method for checking sectionalizing circuit breaker for disconnection and automatic reclosure failure in ring-network line
US20010017485A1 (en) Control system and method for switching and intercepting power supplies
RU2215356C2 (en) Method for checking failure of automatic load transfer center in ring power mains
RU2214667C2 (en) Method for power-up control of automatic load transfer center in ring mains
GB2482644A (en) Method for protecting resistive ac load from being shorted, device and switch
RU2169979C1 (en) Method for checking automatic backup control center for failure to operate in response to short circuit
RU2305356C1 (en) Method for checking circuit breakers of ring-circuit sectionalized line for successful and unsuccessful automatic reclosure
RU2463695C1 (en) Method for control of actuation failure of circuit breaker of automatic load transfer station in ring network
RU2713630C1 (en) Method for signaling and informing personnel of electric network organization and disconnection of input switchgear of transformer substation at unauthorized supply of voltage from low side of transformer substation
RU2305355C1 (en) Method for checking circuit breaker of automatic load transfer center in ring-circuit supplied with power from different buses of double-transformer substation for successful operation
KR102058400B1 (en) Apparatus for discriminating instantaneous current in power grid line
RU2371826C1 (en) Method of controllig sectionalising circuit breaker operation with faulty automatic load transfer switch
RU2449449C1 (en) Method to monitor sectionalising circuit breaker disconnection fault in case of stable short circuit at section of circular network line adjacent to main circuit breaker
RU2453023C2 (en) Method for inhibit of automatic reclosure of sectionalising circuit breaker which has been deactivated at failure of circuit breaker of network station of automatic load transfer which has been activated to stable short circuit in loop circuit
RU2335059C1 (en) Method of inhibiting automatic reclosure in short-circuit state at main power source busses and close short-circuit in out coming line with faulty circuit breaker
RU2214666C2 (en) Method for checking inhibition of automatic load transfer center closure to short circuit in rung mains
US5850330A (en) Electronic trip device that detects an imminent drop of the power system voltage and comprises a numerical processing circuit and a thermal memory
RU2502173C1 (en) Control method of spurious trip of sectional bus switch at operation of annular network in substation standby mode
RU2501145C1 (en) Method for control of spurious tripping of main and sectionalising circuit breakers with subsequent switching on of network breaker for automatic transfer switch (ats) in ring network line
RU2218647C2 (en) Method for inhibiting automatic load transfer in response to short circuit at substation buses
RU2502175C1 (en) Control method of trip of network station switch of automatic load transfer at restoration of normal electric power supply circuit of ring network
RU2461945C1 (en) Method for control of prohibition failure of reserve automatic switching in ring network line
RU2811677C2 (en) Electric protection systems and methods

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20031227