RU2012152616A - METHOD FOR PRODUCING SEAMLESS HOT-ROLLED PIPES OF 610 × 28-32 mm SIZE FROM STEELS OF BRANDS 15X1M1F AND 10X9MFB-SH TO TPU 8-16 "WITH PILGRIM MILLS FOR PIPELINES OF AN OPENING SITES - Google Patents

METHOD FOR PRODUCING SEAMLESS HOT-ROLLED PIPES OF 610 × 28-32 mm SIZE FROM STEELS OF BRANDS 15X1M1F AND 10X9MFB-SH TO TPU 8-16 "WITH PILGRIM MILLS FOR PIPELINES OF AN OPENING SITES Download PDF

Info

Publication number
RU2012152616A
RU2012152616A RU2012152616/02A RU2012152616A RU2012152616A RU 2012152616 A RU2012152616 A RU 2012152616A RU 2012152616/02 A RU2012152616/02 A RU 2012152616/02A RU 2012152616 A RU2012152616 A RU 2012152616A RU 2012152616 A RU2012152616 A RU 2012152616A
Authority
RU
Russia
Prior art keywords
diameter
size
sleeves
ingots
blanks
Prior art date
Application number
RU2012152616/02A
Other languages
Russian (ru)
Other versions
RU2523394C1 (en
Inventor
Анатолий Васильевич Сафьянов
Александр Анатольевич Федоров
Анатолий Андреевич Воронин
Алексей Владимирович Дуб
Владимир Яковлевич Осадчий
Владимир Николаевич Скоробогатых
Валерий Александрович Головинов
Владимир Петрович Пашнин
Владимир Сергеевич Баричко
Николай Петрович Климов
Александр Юрьевич Матюшин
Александр Анатольевич Сафьянов
Константин Эдуардович Бубнов
Виктор Николаевич Еремин
Original Assignee
Открытое акционерное общество "Челябинский трубопрокатный завод"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое акционерное общество "Челябинский трубопрокатный завод" filed Critical Открытое акционерное общество "Челябинский трубопрокатный завод"
Priority to RU2012152616/02A priority Critical patent/RU2523394C1/en
Publication of RU2012152616A publication Critical patent/RU2012152616A/en
Application granted granted Critical
Publication of RU2523394C1 publication Critical patent/RU2523394C1/en

Links

Landscapes

  • Reduction Rolling/Reduction Stand/Operation Of Reduction Machine (AREA)
  • Metal Rolling (AREA)

Abstract

1. Способ производства бесшовных горячекатаных труб размером 610×28-32 мм из сталей марок 15Х1М1Ф и 10Х9МФБ-Ш на ТПУ 8-16'' с пилигримовыми станами для трубопроводов промежуточного перегрева пара котельных установок, включающий выплавку слитков в электрических и мартеновских печах, ковку слитков в поковки размером 680×1400±50 мм, обточку поковок в трубные заготовки размером 650×1400±50 мм, выплавку слитков электрошлаковым переплавом размером 640×1750±50 мм, механическую обработку-обточку слитков в слитки-заготовки размером 620×750±50 мм, сверление в заготовках и слитках-заготовках центрального отверстия диаметром 100±5 мм, нагрев заготовок и слитков-заготовок до температуры пластичности, прошивку их в стане поперечно-винтовой прокатки в гильзы-заготовки размером соответственно 660×вн.340×1690-1810 мм и 650×вн.340×2010-2120 мм на оправке диаметром 325 мм с вытяжками µ=1,25 и µ=1,18 и подъемом по диаметру Δ=1,54 и Δ=4,84, охлаждение гильз-заготовок, ремонт гильз-заготовок при необходимости, повторный нагрев гильз-заготовок с холодного посада до температуры пластичности, прошивку-раскатку гильз-заготовок в стане поперечно-винтовой прокатки из кованых заготовок в гильзы размером 680×вн.530×2890-3100 мм на оправке диаметром 515 мм с вытяжкой µ=1,71 и подъемом по диаметру Δ=3,03%, прошивку-раскатку гильз-заготовок ЭШП в гильзы размером 680×вн.530×3300-3480 мм на оправке диаметром 515 мм с вытяжкой Δ=1,64 и подъемом по диаметру Δ=4,62%, прокатку гильз на пилигримовых станах в валках диаметром 1045 мм с калибром 562 мм в товарные трубы размером 550×28-32×6000-8800 мм, длина которых зависит от толщины стенки труб, размеров заготовок и слитков-заготовок ЭШП, с подачей гильз в очаг деформации m=20-25 мм, коэффиц1. Method for the production of seamless hot-rolled pipes of 610 × 28-32 mm in size from 15Kh1M1F and 10Kh9MFB-Sh steels on 8-16 '' TPU with pilgrim mills for pipelines for the intermediate overheating of steam of boiler plants, including ingot smelting in electric and open-hearth furnaces, forging ingots into forgings of size 680 × 1400 ± 50 mm, turning of forgings into pipe billets of size 650 × 1400 ± 50 mm, smelting of ingots by electroslag remelting of size 640 × 1750 ± 50 mm, machining-turning of ingots into ingots-blanks of 620 × 750 ± 50 mm, drilling in workpieces and ingots-billets of the central hole with a diameter of 100 ± 5 mm, heating the billets and ingots-billets to a temperature of plasticity, piercing them in a cross-helical rolling mill into billet sleeves measuring respectively 660 × in. 340 × 1690-1810 mm and 650 × in. 340 × 2010-2120 mm on a mandrel with a diameter of 325 mm with hoods μ = 1.25 and μ = 1.18 and a rise in diameter Δ = 1.54 and Δ = 4.84, cooling of sleeve blanks, repair of sleeve blanks with if necessary, re-heating the sleeve blanks from a cold embankment to a plasticity temperature, flashing-rolling of the sleeve blanks in the cross-section mill rolling from forged billets into sleeves of size 680 × ext. 530 × 2890-3100 mm on a mandrel with a diameter of 515 mm with a hood µ = 1.71 and a rise in diameter Δ = 3.03%, firmware rolling of EBP shells-blanks into sleeves measuring 680 × in. 530 × 3300-3480 mm on a mandrel with a diameter of 515 mm with a hood Δ = 1.64 and a rise in diameter Δ = 4.62%, rolling the sleeves on pilgrim mills in rolls with a diameter of 1045 mm and 562 mm caliber pipes with a size of 550 × 28-32 × 6000-8800 mm, the length of which depends on the pipe wall thickness, sizes of blanks and ingots-blanks ESR, with the supply of sleeves into the deformation zone m = 20-25 mm, coefficients

Claims (2)

1. Способ производства бесшовных горячекатаных труб размером 610×28-32 мм из сталей марок 15Х1М1Ф и 10Х9МФБ-Ш на ТПУ 8-16'' с пилигримовыми станами для трубопроводов промежуточного перегрева пара котельных установок, включающий выплавку слитков в электрических и мартеновских печах, ковку слитков в поковки размером 680×1400±50 мм, обточку поковок в трубные заготовки размером 650×1400±50 мм, выплавку слитков электрошлаковым переплавом размером 640×1750±50 мм, механическую обработку-обточку слитков в слитки-заготовки размером 620×750±50 мм, сверление в заготовках и слитках-заготовках центрального отверстия диаметром 100±5 мм, нагрев заготовок и слитков-заготовок до температуры пластичности, прошивку их в стане поперечно-винтовой прокатки в гильзы-заготовки размером соответственно 660×вн.340×1690-1810 мм и 650×вн.340×2010-2120 мм на оправке диаметром 325 мм с вытяжками µ=1,25 и µ=1,18 и подъемом по диаметру Δ=1,54 и Δ=4,84, охлаждение гильз-заготовок, ремонт гильз-заготовок при необходимости, повторный нагрев гильз-заготовок с холодного посада до температуры пластичности, прошивку-раскатку гильз-заготовок в стане поперечно-винтовой прокатки из кованых заготовок в гильзы размером 680×вн.530×2890-3100 мм на оправке диаметром 515 мм с вытяжкой µ=1,71 и подъемом по диаметру Δ=3,03%, прошивку-раскатку гильз-заготовок ЭШП в гильзы размером 680×вн.530×3300-3480 мм на оправке диаметром 515 мм с вытяжкой Δ=1,64 и подъемом по диаметру Δ=4,62%, прокатку гильз на пилигримовых станах в валках диаметром 1045 мм с калибром 562 мм в товарные трубы размером 550×28-32×6000-8800 мм, длина которых зависит от толщины стенки труб, размеров заготовок и слитков-заготовок ЭШП, с подачей гильз в очаг деформации m=20-25 мм, коэффициентом вытяжки µ от 2,74 до 3,1, обжатием по диаметру Δ=17,7% и коэффициентом полировки kn от 4,8 до 5,3, термическую обработку, травление, правку, ультразвуковой контроль и приемку труб с допуском по диаметру +1,25/-1,0% и толщине стенки +20/-5,0%, отличающийся тем, что трубы размером 610×28-32 мм производят из слитков-заготовок электрошлакового переплава размером 620×100×1250±50 мм, которые нагревают до температуры соответственно 1270-1290 и 1190-1210°C, прошивают в стане поперечно-винтовой прокатки в гильзы-заготовки размером 650×вн.390×91610-1740 мм на оправке диаметром 375 мм с вытяжкой µ=1,34 и подъемом по диаметру 4,84%, гильзы-заготовки охлаждают, ремонтируют при необходимости, гильзы-заготовки с холодного посада повторно нагревают до температуры соответственно 1270-1290 и 1200-1210°С, гильзы-заготовки прошивают-раскатывают в стане поперечно-винтовой прокатки в гильзы размером 690×вн.590×3300-3570 мм на оправке диаметром 575 мм с вытяжкой µ=2,05 и подъемом по диаметру 6,15%, гильзы прокатывают на ТПУ 8-16'' с пилигримовыми станами в товарные трубы размером 610×28-32×4500-5500 мм в валках с диаметром бочки 1150 мм и калибром 618 мм, с вытяжками µ от 1,73 до 1,96, обжатием по диаметру 10,2%, с подачами гильз в очаг деформации при прокатке труб размером 610×28 мм m=18-20 мм, а при прокатке труб размером 610×32 мм m=20-25 мм, отрезают технологические отходы пилой горячей резки, правят на шестивалковой правильной машине, термообрабатывают, травят, ремонтируют при необходимости, правят, проводят УЗК и принимают с допуском по диаметру +1,25/-1,0% и толщине стенки +20/-5,0%.1. Method for the production of seamless hot-rolled pipes 610 × 28-32 mm in size from steel grades 15X1M1F and 10X9MFB-Sh on TPU 8-16 '' with pilgrim mills for pipelines for the intermediate overheating of steam of boiler plants, including ingots in electric and open-hearth furnaces, forging ingots into forgings of size 680 × 1400 ± 50 mm, turning of forgings into pipe billets of size 650 × 1400 ± 50 mm, smelting of ingots by electroslag remelting of size 640 × 1750 ± 50 mm, machining-turning of ingots into ingots-blanks of 620 × 750 ± 50 mm, drilling in workpieces and ingots-billets of the central hole with a diameter of 100 ± 5 mm, heating the billets and ingots-billets to a temperature of plasticity, piercing them in a cross-helical rolling mill into billet sleeves measuring respectively 660 × in. 340 × 1690-1810 mm and 650 × in. 340 × 2010-2120 mm on a mandrel with a diameter of 325 mm with hoods μ = 1.25 and μ = 1.18 and a rise in diameter Δ = 1.54 and Δ = 4.84, cooling of sleeve blanks, repair of sleeve blanks with if necessary, re-heating the sleeve blanks from a cold embankment to a plasticity temperature, flashing-rolling of the sleeve blanks in the cross-section mill rolling from forged billets into sleeves of size 680 × ext. 530 × 2890-3100 mm on a mandrel with a diameter of 515 mm with a hood µ = 1.71 and a rise in diameter Δ = 3.03%, firmware rolling of EBP shells-blanks into sleeves measuring 680 × in. 530 × 3300-3480 mm on a mandrel with a diameter of 515 mm with a hood Δ = 1.64 and a rise in diameter Δ = 4.62%, rolling the sleeves on pilgrim mills in rolls with a diameter of 1045 mm and 562 mm caliber pipes with a size of 550 × 28-32 × 6000-8800 mm, the length of which depends on the pipe wall thickness, sizes of blanks and ingots-blanks ESR, with the supply of sleeves into the deformation zone m = 20-25 mm, coefficients exhaust hood µ from 2.74 to 3.1, diameter compression Δ = 17.7% and polishing coefficient k n from 4.8 to 5.3, heat treatment, pickling, straightening, ultrasonic inspection and pipe acceptance with a tolerance of diameter + 1.25 / -1.0% and wall thickness + 20 / -5.0%, characterized in that pipes 610 × 28-32 mm in size are produced from ingots-blanks of electroslag remelting with a size of 620 × 100 × 1250 ± 50 mm, which are heated to a temperature of 1270-1290 and 1190-1210 ° C, respectively, is flashed in a cross-helical rolling mill into billet sleeves of 650 × ext. 390 × 91610-1740 mm in size on a mandrel with a diameter of 375 mm with µ μ = 1.34 and a rise in diameter of 4.84%, the billet sleeves are cooled, repaired if necessary, the billet sleeves from a cold seat are reheated to a temperature of 1270-1290 and 1200-1210 ° C, respectively, the billet sleeves are stitched in a cross-rolling mill, they are rolled into sleeves of size 690 × ext. 590 × 3300-3570 mm on a mandrel with a diameter of 575 mm with a hood µ = 2.05 and a rise in diameter of 6.15%, the sleeves are rolled on TPU 8-16 '' with pilgrim mills into commodity pipes measuring 610 × 28-32 × 4500-5500 mm in rolls with a barrel diameter of 1150 mm and a caliber of 618 mm, with hoods µ from 1.73 to 1, 96, with a diameter reduction of 10.2%, with sleeves fed into the deformation zone when rolling pipes with a size of 610 × 28 mm m = 18-20 mm, and when rolling pipes with a size of 610 × 32 mm m = 20-25 mm, process waste is cut hot cutting saw, rule on a six-roll straightening machine, heat treat, pickle, repair if necessary, edit, conduct ultrasonic testing and accept with a tolerance of + 1.25 / -1.0% in diameter and + 20 / -5.0% in wall thickness. 2. Способ по п.1, отличающийся тем, что прокатку труб производят с коэффициентами полировки kn=6,0-8,0, большее значение которого относится к трубам с толщиной стенки 28 мм, а значения определяют из выражения2. The method according to claim 1, characterized in that the rolling of the pipes is carried out with polishing coefficients k n = 6.0-8.0, the greater value of which relates to pipes with a wall thickness of 28 mm, and the values are determined from the expression k n ω R o Θ n m i μ i
Figure 00000001
,
k n ω R o Θ n m i μ i
Figure 00000001
,
где ω=1,05 - среднее значение коэффициента опережения течения металла на полирующем участке пилигримового валка;where ω = 1.05 is the average value of the coefficient of advance of the metal flow in the polishing section of the pilgrim roll; Ro - радиус валка по вершине калибра на полирующем участке, мм;R o is the radius of the roll at the top of the caliber in the polishing section, mm; Θn=1,22 - центральный угол полирующего участка пилигримового валка, радиан;Θ n = 1.22 is the central angle of the polishing section of the pilgrim roll, radians; mi - величина подачи гильз в очаг деформации при прокатке труб с i-й толщиной стенки, мм;m i - the value of the supply of sleeves in the deformation zone when rolling pipes with the i-th wall thickness, mm; µi - коэффициент вытяжки при прокатке труб с i-й толщиной стенки, мм. µ i - drawing coefficient when rolling pipes with the i-th wall thickness, mm.
RU2012152616/02A 2012-12-06 2012-12-06 PRODUCTION OF SEAMLESS HOT-ROLLED PIPES SIZED TO 610×28-32 mm FROM "15Х1М1Ф"- AND "10Х9МФБ-Ш"-GRADE STEELS AT PRU 8-16'' WITH PILGER MILLS FOR PIPELINES OF BOILER UNIT STEAM INTERMEDIATE OVERHEATING WITH HIGHER MECHANICAL PROPERTIES RU2523394C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2012152616/02A RU2523394C1 (en) 2012-12-06 2012-12-06 PRODUCTION OF SEAMLESS HOT-ROLLED PIPES SIZED TO 610×28-32 mm FROM "15Х1М1Ф"- AND "10Х9МФБ-Ш"-GRADE STEELS AT PRU 8-16'' WITH PILGER MILLS FOR PIPELINES OF BOILER UNIT STEAM INTERMEDIATE OVERHEATING WITH HIGHER MECHANICAL PROPERTIES

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2012152616/02A RU2523394C1 (en) 2012-12-06 2012-12-06 PRODUCTION OF SEAMLESS HOT-ROLLED PIPES SIZED TO 610×28-32 mm FROM "15Х1М1Ф"- AND "10Х9МФБ-Ш"-GRADE STEELS AT PRU 8-16'' WITH PILGER MILLS FOR PIPELINES OF BOILER UNIT STEAM INTERMEDIATE OVERHEATING WITH HIGHER MECHANICAL PROPERTIES

Publications (2)

Publication Number Publication Date
RU2012152616A true RU2012152616A (en) 2014-06-20
RU2523394C1 RU2523394C1 (en) 2014-07-20

Family

ID=51213389

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2012152616/02A RU2523394C1 (en) 2012-12-06 2012-12-06 PRODUCTION OF SEAMLESS HOT-ROLLED PIPES SIZED TO 610×28-32 mm FROM "15Х1М1Ф"- AND "10Х9МФБ-Ш"-GRADE STEELS AT PRU 8-16'' WITH PILGER MILLS FOR PIPELINES OF BOILER UNIT STEAM INTERMEDIATE OVERHEATING WITH HIGHER MECHANICAL PROPERTIES

Country Status (1)

Country Link
RU (1) RU2523394C1 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2180874C2 (en) * 1998-09-14 2002-03-27 АООТ "Челябинский трубопрокатный завод" Method for making large-diameter boiler tubes of ingots of electroslag refining
RU2247612C2 (en) * 2003-05-06 2005-03-10 ОАО "Челябинский трубопрокатный завод" Method for making hot deformed and conversion mean- and large-diameter tubes of corrosion resistant hard-to-form steels and alloys in tube rolling aggregate with pilger mills
RU2288058C2 (en) * 2004-12-27 2006-11-27 ОАО "Челябинский трубопрокатный завод" Boiler tubes of continuously cast billets manufacturing method
RU2353446C2 (en) * 2007-02-14 2009-04-27 ОАО "Челябинский трубопрокатный завод" Production method of seamless pipes of major and middle diametres for steam boilers, steam pipelines and collectors of units with high and overcritical steam parameters

Also Published As

Publication number Publication date
RU2523394C1 (en) 2014-07-20

Similar Documents

Publication Publication Date Title
CN102274854A (en) Process for manufacturing superascoloy stainless steel tube
RU2007105627A (en) METHOD FOR PRODUCING SEAMLESS PIPES OF LARGE AND MEDIUM DIAMETERS FOR STEAM BOILERS, STEAM PIPES AND MANIFOLDERS OF PLANTS WITH HIGH AND SUPERCRITICAL STEAM PARAMETERS
RU2012152616A (en) METHOD FOR PRODUCING SEAMLESS HOT-ROLLED PIPES OF 610 × 28-32 mm SIZE FROM STEELS OF BRANDS 15X1M1F AND 10X9MFB-SH TO TPU 8-16 "WITH PILGRIM MILLS FOR PIPELINES OF AN OPENING SITES
RU2537682C2 (en) PRODUCTION OF 377×14-60 mm SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS FROM ESR INGOTS OF "10Х9МФБ-Ш"-GRADE STEEL
RU2567427C2 (en) METHOD OF PRODUCTION OF 426×15-30 mm SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH CRITICAL AND SUPERCRITICAL STEAM PARAMETERS OF STEEL GRADE "10Х9МФБ-Ш"
RU2522512C1 (en) PRODUCTION OF 299×10-60 mm SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS OF "10Х9МФБ-Ш"-GRADE STEEL
RU2527560C2 (en) PRODUCTION OF 550×25-30 mm SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS OF "10Х9МФБ-Ш"-GRADE STEEL
RU2545924C2 (en) PRODUCTION OF 377×14-19 mm SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS FROM ESR INGOTS OF "10Х9МФБ-Ш"-GRADE STEEL
RU2638264C1 (en) METHOD OF PRODUCTION OF SEAMLESS MACHINED PIPES WITH SIZE OF 610×15-20 mm FROM STEEL TO 08Cr18N10T-S GRADE
RU2530087C2 (en) PRODUCTION OF 465×15-60 mm SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS FROM ESR INGOTS OF "10Х9МФБ-Ш"-GRADE STEEL
RU2522513C1 (en) PRODUCTION OF 299×10-60 mm SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS FROM ESR INGOTS OF "10Х9МФБ-Ш"-GRADE STEEL
RU2638263C1 (en) METHOD OF PRODUCTION OF SEAMLESS MACHINED PIPES WITH SIZE OF 610×28-32 mm FROM STEEL OF 08Cr18N10T-S GRADE
RU2638265C1 (en) METHOD OF PRODUCTION OF SEAMLESS MACHINED PIPES WITH SIZE OF 610×21-27 mm FROM STEEL OF 08Cr18N10T-S GRADE
RU2545962C2 (en) Manufacturing method of seamless hot-deformed pipes of large and mean diameters on pipe rolling units with pilger mills from continuously cast billets
RU2012155945A (en) METHOD FOR PRODUCING SEAMLESS HOT-ROLLED PIPES SIZING 630 × 28-32 × 4800-5500 mm FROM STEELS OF BRANDS 15X1M1F and 10X9MFB-SH TO 8-16 "TPU WITH PILGRIM STATIONS FOR OPERATION PERIOD
RU2522514C1 (en) PRODUCTION OF SEAMLESS HOT-ROLLED PIPES SIZED TO 610×28-32×4700-5400 mm FROM "15Х1М1Ф"- AND "10Х9МФБ"-GRADE STEELS AT PRU 8-16'' WITH PILGER MILLS FOR PIPELINES OF BOILER UNIT STEAM INTERMEDIATE OVERHEATING WITH HIGHER MECHANICAL PROPERTIES
RU2558025C1 (en) PRODUCTION OF 325×46-60 mm SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS OF "10Х9МФБ-Ш"-GRADE STEEL
RU2542053C1 (en) MANUFACTURING METHOD OF SEAMLESS TUBES WITH DIMENSIONS OF 530×25-30 mm FOR STEAM BOILERS, STEAM LINES AND HEADERS OF PLANTS WITH HIGH AND SUPERCRITICAL STEAM PARAMETERS FROM INGOTS OF ELECTROSLAG REMELTING PROCESS FROM STEEL GRADE "10Х9МФБ-Ш"
RU2613812C1 (en) METHOD FOR PRODUCING SEAMLESS PIPES WITH DIAMETER 377 mm AND WALL THICKNESS 14-18 mm OF STEEL OF "08Х18Н10Т-Ш" GRADE
RU2545925C2 (en) PRODUCTION OF 426×15-60 mm SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS OF "10Х9МФБ-Ш"-GRADE STEEL
RU2617080C1 (en) Method of producing seamless machined pipes with 610x10-14 mm size from steel of "08х18н10т-ш" grade
RU2514240C1 (en) Production of 530x25-60 mm seamless hot-rolled pipes for steam boilers, steam pipelines and manifolds of plants with high and superhigh steam parameters of "10х9мфб-ш"-grade steel
RU2012151057A (en) METHOD FOR PRODUCING SEAMLESS PIPES SIZED 426X15-60 MM FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDERS OF PLANTS WITH HIGH AND SUPERCRITICAL STEAM PARAMETERS FROM STEEL 10X9MFB-SH STEEL
RU2523376C1 (en) PRODUCTION OF 325×13-15 mm SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS OF "10Х9МФБ-Ш"-GRADE STEEL
RU2527523C2 (en) PRODUCTION OF SEAMLESS HOT-ROLLED PIPES SIZED TO 610×28-32×5300-6000 mm FROM "15Х1М1Ф"- AND "10Х9МФБ-Ш"-GRADE STEELS FOR PIPELINES OF BOILER UNIT STEAM INTERMEDIATE OVERHEATING

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20181207