NO20084606L - Fremgangsmate for a optimalisere produksjonen fra en gruppe bronner - Google Patents

Fremgangsmate for a optimalisere produksjonen fra en gruppe bronner

Info

Publication number
NO20084606L
NO20084606L NO20084606A NO20084606A NO20084606L NO 20084606 L NO20084606 L NO 20084606L NO 20084606 A NO20084606 A NO 20084606A NO 20084606 A NO20084606 A NO 20084606A NO 20084606 L NO20084606 L NO 20084606L
Authority
NO
Norway
Prior art keywords
wells
cluster
production
sources
procedure
Prior art date
Application number
NO20084606A
Other languages
English (en)
Other versions
NO341307B1 (no
Inventor
Jan Jozef Maria Briers
Keat-Choon Goh
Charles Edward Moncur
Peter Overschee
Original Assignee
Shell Int Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Int Research filed Critical Shell Int Research
Publication of NO20084606L publication Critical patent/NO20084606L/no
Publication of NO341307B1 publication Critical patent/NO341307B1/no

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B41/0092
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/08Obtaining fluid samples or testing fluids, in boreholes or wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Operations Research (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)
  • Feedback Control In General (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Steroid Compounds (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
  • Forging (AREA)
  • Heat Treatment Of Steel (AREA)

Abstract

Den foreliggende oppfinnelsen vedrører en fremgangsmåte for å optimalisere produksjon fra en gruppe/klynge av brønner på grunnlaget av et anslag av bidragene fra individuelle brønner til produksjonen fra klyngen av brønner, tilpasset til de bestemte begrensninger og krav fra olje- og gassproduksjonsomgivelsene. Brønnene i klyngen kan avvike i beskaffenhet og flyt av deres utstrømninger og/eller virkemåte, stimulering og/eller manipulering. Brønnene kan også produsere fra flere soner eller grener i undergrunnen. Brønnhodene av brønnene i klyngen kan være lokalisert på land eller til sjøs, over overflaten av sjøen eller på sjøbunnen. Fremgangsmåten ifølge oppfinnelsen kan bli brukt til å fremstille én eller flere optimaliseringsmodeller, som bare tar med i beregningen betydelige, relevante karakteristikker og virkninger av brønnene og produksjonssystemet.
NO20084606A 2006-04-07 2008-10-30 Fremgangsmåte for å optimalisere produksjonen fra en gruppe brønner NO341307B1 (no)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP06112401 2006-04-07
EP06112440 2006-04-10
PCT/EP2007/053348 WO2007116008A1 (en) 2006-04-07 2007-04-05 Method for optimising the production of a cluster of wells

Publications (2)

Publication Number Publication Date
NO20084606L true NO20084606L (no) 2008-10-30
NO341307B1 NO341307B1 (no) 2017-10-02

Family

ID=38110150

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20084606A NO341307B1 (no) 2006-04-07 2008-10-30 Fremgangsmåte for å optimalisere produksjonen fra en gruppe brønner

Country Status (10)

Country Link
EP (1) EP2004953B1 (no)
AT (1) ATE445083T1 (no)
AU (1) AU2007235959B2 (no)
BR (1) BRPI0708835B1 (no)
CA (1) CA2645902C (no)
DE (1) DE602007002702D1 (no)
EA (1) EA200802116A1 (no)
NO (1) NO341307B1 (no)
NZ (1) NZ571278A (no)
WO (1) WO2007116008A1 (no)

Families Citing this family (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2008290584B2 (en) 2007-08-17 2011-09-15 Shell Internationale Research Maatschappij B.V. Method for virtual metering of injection wells and allocation and control of multi-zonal injection wells
WO2009024545A1 (en) 2007-08-17 2009-02-26 Shell Internationale Research Maatschappij B.V. Method for controlling production and downhole pressures of a well with multiple subsurface zones and/or branches
CA2690992C (en) 2007-08-24 2014-07-29 Exxonmobil Upstream Research Company Method for predicting well reliability by computer simulation
US8548782B2 (en) 2007-08-24 2013-10-01 Exxonmobil Upstream Research Company Method for modeling deformation in subsurface strata
US8768672B2 (en) 2007-08-24 2014-07-01 ExxonMobil. Upstream Research Company Method for predicting time-lapse seismic timeshifts by computer simulation
US8423337B2 (en) 2007-08-24 2013-04-16 Exxonmobil Upstream Research Company Method for multi-scale geomechanical model analysis by computer simulation
EP2605191A3 (en) 2007-11-10 2013-08-21 Landmark Graphics Corporation, A Halliburton Company Systems and methods for workflow automation, adaptation and integration
CN102640163B (zh) 2009-11-30 2016-01-20 埃克森美孚上游研究公司 用于储层模拟的适应性牛顿法
BR112012025995A2 (pt) 2010-04-30 2016-06-28 Exxonmobil Upstream Res Co método e sistema para simulação de fluxo de volume finito
WO2012003007A1 (en) 2010-06-29 2012-01-05 Exxonmobil Upstream Research Company Method and system for parallel simulation models
WO2012015521A1 (en) 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Method and system for reservoir modeling
EP2599029A4 (en) 2010-07-29 2014-01-08 Exxonmobil Upstream Res Co METHODS AND SYSTEMS FOR AUTOMATIC LEARNING FLOW SIMULATION
US9187984B2 (en) 2010-07-29 2015-11-17 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
BR112013002114A2 (pt) 2010-09-20 2016-05-17 Exxonmobil Upstream Res Co formulações flexíveis e adaptáveis para simulações de reservatório complexas
RU2457320C1 (ru) * 2011-03-29 2012-07-27 Общество С Ограниченной Ответственностью "Дискрит" Способ эксплуатации скважины
US9489176B2 (en) 2011-09-15 2016-11-08 Exxonmobil Upstream Research Company Optimized matrix and vector operations in instruction limited algorithms that perform EOS calculations
WO2014051903A1 (en) 2012-09-28 2014-04-03 Exxonmobil Upstream Research Company Fault removal in geological models
CA2895890C (en) * 2012-12-21 2020-11-24 Seabed Separation As Inclined tubular separator for separating oil well substances
US9952603B2 (en) 2013-06-28 2018-04-24 Sitepp Sistemas Y Technologia Para El Petroleo, S.A. De C.V. System and method for enhancing the production level of wells
US9702243B2 (en) 2013-10-04 2017-07-11 Baker Hughes Incorporated Systems and methods for monitoring temperature using a magnetostrictive probe
US9957781B2 (en) 2014-03-31 2018-05-01 Hitachi, Ltd. Oil and gas rig data aggregation and modeling system
US10319143B2 (en) 2014-07-30 2019-06-11 Exxonmobil Upstream Research Company Volumetric grid generation in a domain with heterogeneous material properties
WO2016028409A1 (en) 2014-08-21 2016-02-25 Exxonmobil Upstream Research Company Gas lift optimization employing data obtained from surface mounted sensors
EP3198113B1 (fr) * 2014-09-25 2020-05-06 Total S.A. Production d'hydrocarbures avec compteur métrique
US10989039B2 (en) * 2014-09-25 2021-04-27 Total Se Production of hydrocarbons with test separator
EP3213125A1 (en) 2014-10-31 2017-09-06 Exxonmobil Upstream Research Company Corp-urc-e2. 4A.296 Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
AU2015339884B2 (en) 2014-10-31 2018-03-15 Exxonmobil Upstream Research Company Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
US10101194B2 (en) 2015-12-31 2018-10-16 General Electric Company System and method for identifying and recovering from a temporary sensor failure
US10401207B2 (en) 2016-09-14 2019-09-03 GE Oil & Gas UK, Ltd. Method for assessing and managing sensor uncertainties in a virtual flow meter
US11940318B2 (en) 2016-09-27 2024-03-26 Baker Hughes Energy Technology UK Limited Method for detection and isolation of faulty sensors
CA3043231C (en) 2016-12-23 2022-06-14 Exxonmobil Upstream Research Company Method and system for stable and efficient reservoir simulation using stability proxies
US10364655B2 (en) 2017-01-20 2019-07-30 Saudi Arabian Oil Company Automatic control of production and injection wells in a hydrocarbon field
US11041976B2 (en) 2017-05-30 2021-06-22 Exxonmobil Upstream Research Company Method and system for creating and using a subsurface model in hydrocarbon operations
US20190093474A1 (en) * 2017-09-22 2019-03-28 General Electric Company System and method for determining production from a plurality of wells
EP3743783A4 (en) * 2018-01-26 2021-10-27 GE Inspection Technologies, LP DETERMINATION OF VIRTUAL PROCESS PARAMETERS
US11180976B2 (en) 2018-12-21 2021-11-23 Exxonmobil Upstream Research Company Method and system for unconventional gas lift optimization
WO2020154468A1 (en) * 2019-01-25 2020-07-30 Ge Inspection Technologies, Lp Flow network model analysis
US11591936B2 (en) 2019-09-04 2023-02-28 Saudi Arabian Oil Company Systems and methods for proactive operation of process facilities based on historical operations data
CN113898323B (zh) * 2020-06-22 2024-02-23 中国石油化工股份有限公司 海上油气田水下生产***及其设计方法
CN112580851B (zh) * 2020-11-17 2024-06-18 西安中控天地科技开发有限公司 丛式井场抽油机井群错峰开井间抽运行调度方法
CN113153281A (zh) * 2021-03-29 2021-07-23 中国地质大学(北京) 一种实现海上平台油气井协同生产的优化模型
KR102599460B1 (ko) * 2021-09-15 2023-11-07 광성지엠(주) 유가스정 지중 생산 조건 및 장애 요소를 반영한 esp 및 튜빙 모니터링 시스템의 시험 방법(tubing leakage)
KR102599305B1 (ko) * 2021-09-15 2023-11-07 광성지엠(주) 유가스정 지중 생산 조건 및 장애 요소를 반영한 esp 및 튜빙 모니터링 시스템의 시험 방법(esp mapping and surging)
WO2023154808A1 (en) * 2022-02-09 2023-08-17 Schlumberger Technology Corporation Integrated asset modeling for energy consumption and emission

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6434435B1 (en) * 1997-02-21 2002-08-13 Baker Hughes Incorporated Application of adaptive object-oriented optimization software to an automatic optimization oilfield hydrocarbon production management system
CA2398545C (en) * 2000-10-04 2009-02-10 Schlumberger Canada Limited Production optimization methodology for multilayer commingled reservoirs using commingled reservoir production performance data and production logging information

Also Published As

Publication number Publication date
EA200802116A1 (ru) 2009-04-28
EP2004953B1 (en) 2009-10-07
CA2645902C (en) 2014-05-20
ATE445083T1 (de) 2009-10-15
DE602007002702D1 (de) 2009-11-19
CA2645902A1 (en) 2007-10-18
NZ571278A (en) 2011-08-26
AU2007235959A1 (en) 2007-10-18
BRPI0708835A2 (pt) 2011-06-14
BRPI0708835B1 (pt) 2017-09-26
WO2007116008A1 (en) 2007-10-18
EP2004953A1 (en) 2008-12-24
AU2007235959B2 (en) 2010-11-11
NO341307B1 (no) 2017-10-02

Similar Documents

Publication Publication Date Title
NO20084606L (no) Fremgangsmate for a optimalisere produksjonen fra en gruppe bronner
GB2468812A (en) Optimizing drilling operations using petrotechnical data
MX346613B (es) Metodo y sistema para producción de presión de poro.
EA200970017A1 (ru) Способ и система для проектирования и оптимизации операций бурения и заканчивания в углеводородных пластах - коллекторах
NO20100029L (no) Fremgangsmate, program og datasystem for a harmonisere modelldata for hydrokarbonreservoarer
DE602005023190D1 (no)
GB2462227A (en) System and method for performing a drilling operation in an oilfield
GB2456925A (en) System and method for performing oilfield simulation operations
NO20076611L (no) Fremgangsmater og anordninger for analysering og styring av forplantningen av bolger i et borehull, generert med vannhammer
WO2009126376A3 (en) System and method for drilling multilateral wells using magnetic ranging while drilling
GB2467487A (en) Method for producing hydrocarbons through a well or well cluster of which the trajectory is optimized by a trajectory optimisation algorithm
MX2009006534A (es) Soporte de datos con ventana transparente y metodo para producirlo.
MX2008016220A (es) Planificación y operación de pozos en yacimiento petrolífero.
WO2007018858A3 (en) Well modeling associated with extraction of hydrocarbons from subsurface formations
NO20091092L (no) Fremgangsmate og system for planlegging hydrokarbonutvinning fra en hydrokarbonformasjon
EA201070207A1 (ru) Способ управления добычей из нефтегазоносного коллектора в режиме реального времени
WO2008157706A3 (en) System and method for performing oilfield simulation operations
WO2007022352A3 (en) Method and system for integrated asset management utilizing multi-level modeling of oil field assets
GB2455237A (en) System and method for performing oilfield simulation operations
EA200700100A1 (ru) Способ разработки глубоких геотермальных резервуаров и отбора из них
NO20090180L (no) Dynamisk reservoarteknikk
GB2509268A (en) Modeling and simulation of complete drill strings
DE602006002489D1 (de) Verfahren zur erleichterung eines bohrlochbetriebes
MX2009013365A (es) Metodo para recuperar petroleo crudo de una formacion subterranea.
GB2468623A (en) Evaluation of acid fracturing treatments in an oilfield