EA201070207A1 - Способ управления добычей из нефтегазоносного коллектора в режиме реального времени - Google Patents
Способ управления добычей из нефтегазоносного коллектора в режиме реального времениInfo
- Publication number
- EA201070207A1 EA201070207A1 EA201070207A EA201070207A EA201070207A1 EA 201070207 A1 EA201070207 A1 EA 201070207A1 EA 201070207 A EA201070207 A EA 201070207A EA 201070207 A EA201070207 A EA 201070207A EA 201070207 A1 EA201070207 A1 EA 201070207A1
- Authority
- EA
- Eurasian Patent Office
- Prior art keywords
- real time
- real
- field
- parameters
- reservoir
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 238000004088 simulation Methods 0.000 abstract 3
- 230000015572 biosynthetic process Effects 0.000 abstract 1
- 239000012530 fluid Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics And Detection Of Objects (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Изобретение относится к способу выполнения нефтепромысловых операций на месторождении, имеющем по меньшей мере одну буровую площадку, причем каждая буровая площадка имеет ствол скважины, проходящий через подземный пласт для извлечения текучей среды из подземного коллектора в нем. Этапы способа включают в себя получение множества параметров в режиме реального времени от множества датчиков, расположенных на месторождении, при этом множество параметров в режиме реального времени содержат по меньшей мере одно, выбранное из группы, состоящей из данных дебита в режиме реального времени и данных давления в режиме реального времени в стволе скважины, конфигурирование бессеточного аналитического имитационного средства для имитации подземного коллектора на основе множества параметров в режиме реального времени, формирование результатов имитации подземного коллектора в режиме реального времени и по меньшей мере одной буровой площадки в режиме реального времени с использованием бессеточного аналитического имитационного средства и выполнение нефтепромысловой операции на основе результатов имитации подземного коллектора в режиме реального времени.
Applications Claiming Priority (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US95344907P | 2007-08-01 | 2007-08-01 | |
US95607007P | 2007-08-15 | 2007-08-15 | |
US11/924,560 US8145463B2 (en) | 2005-09-15 | 2007-10-25 | Gas reservoir evaluation and assessment tool method and apparatus and program storage device |
US2780108P | 2008-02-11 | 2008-02-11 | |
US12/182,885 US8244509B2 (en) | 2007-08-01 | 2008-07-30 | Method for managing production from a hydrocarbon producing reservoir in real-time |
PCT/US2008/071774 WO2009018450A1 (en) | 2007-08-01 | 2008-07-31 | Method for managing production from a hydrocarbon producing reservoir in real-time |
Publications (2)
Publication Number | Publication Date |
---|---|
EA201070207A1 true EA201070207A1 (ru) | 2010-08-30 |
EA016477B1 EA016477B1 (ru) | 2012-05-30 |
Family
ID=40304881
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EA201070207A EA016477B1 (ru) | 2007-08-01 | 2008-07-31 | Способ управления добычей из нефтегазоносного коллектора в режиме реального времени |
Country Status (7)
Country | Link |
---|---|
US (1) | US8244509B2 (ru) |
EP (1) | EP2185791A4 (ru) |
AR (1) | AR067785A1 (ru) |
CA (2) | CA2694336C (ru) |
EA (1) | EA016477B1 (ru) |
GB (1) | GB201000222D0 (ru) |
WO (1) | WO2009018450A1 (ru) |
Families Citing this family (70)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8145463B2 (en) * | 2005-09-15 | 2012-03-27 | Schlumberger Technology Corporation | Gas reservoir evaluation and assessment tool method and apparatus and program storage device |
WO2009085395A1 (en) * | 2007-12-31 | 2009-07-09 | Exxonmobil Upstream Research Company | Methods and systems for determining near-wellbore characteristics and reservoir properties |
EP2247823B1 (de) * | 2008-02-19 | 2014-06-25 | Rag Aktiengesellschaft | Verfahren zum steuern von strebbetrieben |
US8260573B2 (en) * | 2008-10-17 | 2012-09-04 | Schlumberger Technology Corporation | Dynamic calculation of allocation factors for a producer well |
US8521494B2 (en) * | 2009-03-24 | 2013-08-27 | Chevron U.S.A. Inc. | System and method for characterizing fractures in a subsurface reservoir |
MY158679A (en) * | 2009-05-27 | 2016-10-31 | Halliburton Energy Services Inc | Vibration detection in a drill string based on multi-positioned sensors |
WO2011014912A1 (en) * | 2009-08-03 | 2011-02-10 | Brett Mitchell Walker | System, method and tool for managing activities |
EP2464824B1 (en) * | 2009-08-14 | 2018-10-03 | BP Corporation North America Inc. | Reservoir architecture and connectivity analysis |
US20120211228A1 (en) * | 2009-08-31 | 2012-08-23 | Troshko Andrey A | Artificial Lift Modeling Methods and Systems |
GB2474740A (en) * | 2009-09-03 | 2011-04-27 | Logined Bv | Gridless geological modeling of a structural framework |
US8655632B2 (en) * | 2009-09-03 | 2014-02-18 | Schlumberger Technology Corporation | Gridless geological modeling |
US9703006B2 (en) | 2010-02-12 | 2017-07-11 | Exxonmobil Upstream Research Company | Method and system for creating history matched simulation models |
US8805614B2 (en) * | 2010-08-31 | 2014-08-12 | Schlumberger Technology Corporation | Downhole sample analysis method |
GB201017898D0 (en) * | 2010-10-22 | 2010-12-01 | Internat Res Inst Of Stavanger | Earth model |
US8788252B2 (en) * | 2010-10-26 | 2014-07-22 | Schlumberger Technology Corporation | Multi-well time-lapse nodal analysis of transient production systems |
NO334117B1 (no) | 2010-10-29 | 2013-12-16 | Resman As | En fremgangsmåte for estimering av et innstrømningsprofil for i det minste en av brønnfluidene olje, gass eller vann til en produserende petroleumsbrønn |
CN102305998B (zh) * | 2011-09-19 | 2013-03-13 | 中国石油天然气股份有限公司 | 基于井下多参数实时监测的抽油机闭环控制方法及*** |
US9946986B1 (en) * | 2011-10-26 | 2018-04-17 | QRI Group, LLC | Petroleum reservoir operation using geotechnical analysis |
US9710766B2 (en) | 2011-10-26 | 2017-07-18 | QRI Group, LLC | Identifying field development opportunities for increasing recovery efficiency of petroleum reservoirs |
US9767421B2 (en) | 2011-10-26 | 2017-09-19 | QRI Group, LLC | Determining and considering petroleum reservoir reserves and production characteristics when valuing petroleum production capital projects |
US20130110524A1 (en) * | 2011-10-26 | 2013-05-02 | Nansen G. Saleri | Management of petroleum reservoir assets using reserves ranking analytics |
US20130110474A1 (en) | 2011-10-26 | 2013-05-02 | Nansen G. Saleri | Determining and considering a premium related to petroleum reserves and production characteristics when valuing petroleum production capital projects |
US11481374B2 (en) * | 2012-04-25 | 2022-10-25 | Halliburton Energy Services, Inc. | Systems and methods for anonymizing and interpreting industrial activities as applied to drilling rigs |
US9255473B2 (en) * | 2012-05-07 | 2016-02-09 | Halliburton Energy Services, Inc. | Methods and systems for real-time monitoring and processing of wellbore data |
AU2013263327B2 (en) | 2012-05-14 | 2015-08-20 | Landmark Graphics Corporation | Method and system of selecting hydrocarbon wells for well testing |
WO2013172948A1 (en) | 2012-05-14 | 2013-11-21 | Landmark Graphics Corporation | Method and system of predicting future hydrocarbon production |
US9910938B2 (en) * | 2012-06-20 | 2018-03-06 | Schlumberger Technology Corporation | Shale gas production forecasting |
DK2867808T3 (da) | 2012-06-28 | 2017-11-27 | Landmark Graphics Corp | Fremgangsmåde og system til udvælgelse af carbonhydridbrønde til overhaling |
US8983819B2 (en) * | 2012-07-11 | 2015-03-17 | Halliburton Energy Services, Inc. | System, method and computer program product to simulate rupture disk and syntactic foam trapped annular pressure mitigation in downhole environments |
US9151126B2 (en) | 2012-07-11 | 2015-10-06 | Landmark Graphics Corporation | System, method and computer program product to simulate drilling event scenarios |
US9009014B2 (en) * | 2012-07-11 | 2015-04-14 | Landmark Graphics Corporation | System, method and computer program product to simulate the progressive failure of rupture disks in downhole environments |
US20150205002A1 (en) * | 2012-07-25 | 2015-07-23 | Schlumberger Technology Corporation | Methods for Interpretation of Time-Lapse Borehole Seismic Data for Reservoir Monitoring |
US20140180658A1 (en) * | 2012-09-04 | 2014-06-26 | Schlumberger Technology Corporation | Model-driven surveillance and diagnostics |
WO2014148925A1 (en) * | 2013-03-22 | 2014-09-25 | Auckland Uniservices Limted | Method and system for monitoring and/or controlling fracture connectivity |
SG11201508516QA (en) * | 2013-05-09 | 2015-11-27 | Landmark Graphics Corp | Gridless simulation of a fluvio-deltaic environment |
US10351454B2 (en) | 2013-05-15 | 2019-07-16 | Mineworx Technologies Ltd. | Mining apparatus with water reclamation system |
US9569521B2 (en) | 2013-11-08 | 2017-02-14 | James W. Crafton | System and method for analyzing and validating oil and gas well production data |
US10124345B2 (en) * | 2013-12-05 | 2018-11-13 | Mineworx Technologies, Ltd. | Portable mining apparatus and methods of use |
US9470086B2 (en) | 2013-12-18 | 2016-10-18 | King Fahd University Of Petroleum And Minerals | Inflow performance relationship for horizontal wells producing oil from multi-layered heterogeneous solution gas-drive reservoirs |
US10119396B2 (en) | 2014-02-18 | 2018-11-06 | Saudi Arabian Oil Company | Measuring behind casing hydraulic conductivity between reservoir layers |
US9945703B2 (en) | 2014-05-30 | 2018-04-17 | QRI Group, LLC | Multi-tank material balance model |
US9633067B2 (en) | 2014-06-13 | 2017-04-25 | Landmark Graphics Corporation | Gold data set automation |
US10508532B1 (en) | 2014-08-27 | 2019-12-17 | QRI Group, LLC | Efficient recovery of petroleum from reservoir and optimized well design and operation through well-based production and automated decline curve analysis |
US10565540B2 (en) | 2014-08-27 | 2020-02-18 | Sourcewater, Inc. | Oilfield water and well management using modeled predictions of oilfield water production or hydrocarbon production |
US10392922B2 (en) | 2015-01-13 | 2019-08-27 | Saudi Arabian Oil Company | Measuring inter-reservoir cross flow rate between adjacent reservoir layers from transient pressure tests |
US10180057B2 (en) | 2015-01-21 | 2019-01-15 | Saudi Arabian Oil Company | Measuring inter-reservoir cross flow rate through unintended leaks in zonal isolation cement sheaths in offset wells |
US10094202B2 (en) | 2015-02-04 | 2018-10-09 | Saudi Arabian Oil Company | Estimating measures of formation flow capacity and phase mobility from pressure transient data under segregated oil and water flow conditions |
US10280722B2 (en) | 2015-06-02 | 2019-05-07 | Baker Hughes, A Ge Company, Llc | System and method for real-time monitoring and estimation of intelligent well system production performance |
US11578568B2 (en) * | 2015-08-07 | 2023-02-14 | Schlumberger Technology Corporation | Well management on cloud computing system |
US10101194B2 (en) | 2015-12-31 | 2018-10-16 | General Electric Company | System and method for identifying and recovering from a temporary sensor failure |
CN107780907A (zh) * | 2016-08-29 | 2018-03-09 | 中国石油天然气股份有限公司 | 注聚受益油井举升工艺技术配套模式优选方法及装置 |
FR3055723A1 (fr) | 2016-09-02 | 2018-03-09 | Landmark Graphics Corporation | Modelisation basee sur un point-vecteur des proprietes de reservoir de petrole pour un modele de simulation de reservoir sans grille |
US10401207B2 (en) | 2016-09-14 | 2019-09-03 | GE Oil & Gas UK, Ltd. | Method for assessing and managing sensor uncertainties in a virtual flow meter |
US11940318B2 (en) | 2016-09-27 | 2024-03-26 | Baker Hughes Energy Technology UK Limited | Method for detection and isolation of faulty sensors |
US10689958B2 (en) | 2016-12-22 | 2020-06-23 | Weatherford Technology Holdings, Llc | Apparatus and methods for operating gas lift wells |
US10036219B1 (en) | 2017-02-01 | 2018-07-31 | Chevron U.S.A. Inc. | Systems and methods for well control using pressure prediction |
US10605054B2 (en) | 2017-02-15 | 2020-03-31 | General Electric Co. | System and method for generating a schedule to extract a resource from a reservoir |
US11087221B2 (en) * | 2017-02-20 | 2021-08-10 | Saudi Arabian Oil Company | Well performance classification using artificial intelligence and pattern recognition |
US10508521B2 (en) | 2017-06-05 | 2019-12-17 | Saudi Arabian Oil Company | Iterative method for estimating productivity index (PI) values in maximum reservoir contact (MRC) multilateral completions |
US11755795B2 (en) * | 2017-09-22 | 2023-09-12 | ExxonMobil Technology and Engineering Company | Detecting and mitigating flow instabilities in hydrocarbon production wells |
CN108397186B (zh) * | 2018-01-31 | 2022-01-04 | 中国石油天然气股份有限公司 | 一种水平井温度激动找水装置及方法 |
US11466554B2 (en) | 2018-03-20 | 2022-10-11 | QRI Group, LLC | Data-driven methods and systems for improving oil and gas drilling and completion processes |
GB2585309B (en) * | 2018-04-12 | 2022-09-21 | Landmark Graphics Corp | Recurrent neural network model for bottomhole pressure and temperature in stepdown analysis |
US11506052B1 (en) | 2018-06-26 | 2022-11-22 | QRI Group, LLC | Framework and interface for assessing reservoir management competency |
US11860149B2 (en) | 2020-05-11 | 2024-01-02 | Saudi Arabian Oil Company | Systems and methods for dynamic real-time water-cut monitoring |
US11585202B2 (en) | 2020-05-29 | 2023-02-21 | Saudi Arabian Oil Company | Method and system for optimizing field development |
US11193370B1 (en) | 2020-06-05 | 2021-12-07 | Saudi Arabian Oil Company | Systems and methods for transient testing of hydrocarbon wells |
CN112699554B (zh) * | 2020-12-29 | 2023-03-14 | 西安石油大学 | 一种基于压裂示踪约束的致密油藏水平井压后分段试井分析方法 |
US11674379B2 (en) | 2021-03-11 | 2023-06-13 | Saudi Arabian Oil Company | Method and system for managing gas supplies |
AU2022285745A1 (en) * | 2021-06-03 | 2023-11-02 | Conocophillips Company | Fingerprinting and machine learning for production predictions |
Family Cites Families (70)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2727682A (en) | 1949-11-30 | 1955-12-20 | Sun Oil Co | Analog computer or analyzer |
US3373805A (en) * | 1965-10-14 | 1968-03-19 | Exxon Production Research Co | Steam lifting of heavy crudes |
US4518039A (en) * | 1981-08-20 | 1985-05-21 | Graham John W | Method for treating subterranean formations |
US4828028A (en) * | 1987-02-09 | 1989-05-09 | Halliburton Company | Method for performing fracturing operations |
US5414674A (en) * | 1993-11-12 | 1995-05-09 | Discovery Bay Company | Resonant energy analysis method and apparatus for seismic data |
US5501273A (en) * | 1994-10-04 | 1996-03-26 | Amoco Corporation | Method for determining the reservoir properties of a solid carbonaceous subterranean formation |
FR2744224B1 (fr) | 1996-01-26 | 1998-04-17 | Inst Francais Du Petrole | Methode pour simuler le remplissage d'un bassin sedimentaire |
AU3972197A (en) | 1996-08-05 | 1998-02-25 | Baker Hughes Incorporated | Method for producing images of reservoir boundaries |
US5787050A (en) | 1996-08-13 | 1998-07-28 | Petro-Canada | Well test imaging |
US6131071A (en) | 1996-12-06 | 2000-10-10 | Bp Amoco Corporation | Spectral decomposition for seismic interpretation |
US6018497A (en) | 1997-02-27 | 2000-01-25 | Geoquest | Method and apparatus for generating more accurate earth formation grid cell property information for use by a simulator to display more accurate simulation results of the formation near a wellbore |
US6002985A (en) * | 1997-05-06 | 1999-12-14 | Halliburton Energy Services, Inc. | Method of controlling development of an oil or gas reservoir |
US6106561A (en) | 1997-06-23 | 2000-08-22 | Schlumberger Technology Corporation | Simulation gridding method and apparatus including a structured areal gridder adapted for use by a reservoir simulator |
US6498989B1 (en) | 1997-08-11 | 2002-12-24 | Trans Seismic International, Inc. | Method for predicting dynamic parameters of fluids in a subterranean reservoir |
US5992519A (en) | 1997-09-29 | 1999-11-30 | Schlumberger Technology Corporation | Real time monitoring and control of downhole reservoirs |
US5960369A (en) | 1997-10-23 | 1999-09-28 | Production Testing Services | Method and apparatus for predicting the fluid characteristics in a well hole |
US6052520A (en) | 1998-02-10 | 2000-04-18 | Exxon Production Research Company | Process for predicting behavior of a subterranean formation |
GB2336008B (en) | 1998-04-03 | 2000-11-08 | Schlumberger Holdings | Simulation system including a simulator and a case manager adapted for organizing data files |
US6128580A (en) | 1998-04-17 | 2000-10-03 | Bp Amoco Corporation | Converted-wave processing in many-layered anisotropic media |
US6135966A (en) * | 1998-05-01 | 2000-10-24 | Ko; Gary Kam-Yuen | Method and apparatus for non-invasive diagnosis of cardiovascular and related disorders |
GB9904101D0 (en) | 1998-06-09 | 1999-04-14 | Geco As | Subsurface structure identification method |
US6313837B1 (en) | 1998-09-29 | 2001-11-06 | Schlumberger Technology Corporation | Modeling at more than one level of resolution |
GB2363653B (en) | 1999-04-02 | 2004-01-14 | Conoco Inc | A method for gravity and magnetic data inversion using vector and tensor data with seismic imaging and geopressure prediction for oil gas and mineral explorat |
US6263284B1 (en) | 1999-04-22 | 2001-07-17 | Bp Corporation North America Inc. | Selection of seismic modes through amplitude characteristics |
US6230101B1 (en) | 1999-06-03 | 2001-05-08 | Schlumberger Technology Corporation | Simulation method and apparatus |
GB9916022D0 (en) * | 1999-07-09 | 1999-09-08 | Sensor Highway Ltd | Method and apparatus for determining flow rates |
US6853921B2 (en) * | 1999-07-20 | 2005-02-08 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
US6266619B1 (en) * | 1999-07-20 | 2001-07-24 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
US6374185B1 (en) * | 2000-02-18 | 2002-04-16 | Rdsp I, L.P. | Method for generating an estimate of lithological characteristics of a region of the earth's subsurface |
US6980940B1 (en) | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
AU2001249089A1 (en) * | 2000-03-02 | 2001-09-12 | Shell Canada Limited | Wireless downhole measurement and control for optimizing gas lift well and fieldperformance |
WO2002003263A2 (en) | 2000-06-29 | 2002-01-10 | Object Reservoir, Inc. | Method and system for coordinate transformation to model radial flow near a singularity |
AU2001272642A1 (en) * | 2000-07-19 | 2002-01-30 | Petroleum Research And Development N.V. | A method of determining properties relating to an underbalanced well |
GB0021284D0 (en) | 2000-08-30 | 2000-10-18 | Schlumberger Evaluation & Prod | Compositional simulation using a new streamline method |
US6591201B1 (en) * | 2000-09-28 | 2003-07-08 | Thomas Allen Hyde | Fluid energy pulse test system |
US7062420B2 (en) | 2000-10-04 | 2006-06-13 | Schlumberger Technology Corp. | Production optimization methodology for multilayer commingled reservoirs using commingled reservoir production performance data and production logging information |
US6724687B1 (en) * | 2000-10-26 | 2004-04-20 | Halliburton Energy Services, Inc. | Characterizing oil, gasor geothermal wells, including fractures thereof |
US6901391B2 (en) * | 2001-03-21 | 2005-05-31 | Halliburton Energy Services, Inc. | Field/reservoir optimization utilizing neural networks |
US20040253734A1 (en) * | 2001-11-13 | 2004-12-16 | Cully Firmin | Down-hole pressure monitoring system |
US7248259B2 (en) | 2001-12-12 | 2007-07-24 | Technoguide As | Three dimensional geological model construction |
WO2003060754A1 (en) * | 2001-12-31 | 2003-07-24 | The Board Of Regents Of The University And Community College System, On Behalf Of The University Of Nevada, Reno | Multiphase physical transport modeling method and modeling system |
US7523024B2 (en) | 2002-05-17 | 2009-04-21 | Schlumberger Technology Corporation | Modeling geologic objects in faulted formations |
AU2003234669A1 (en) | 2002-05-31 | 2003-12-19 | Schlumberger Technology Corporation | Method and apparatus for effective well and reservoir evaluation without the need for well pressure history |
GB0216647D0 (en) * | 2002-07-17 | 2002-08-28 | Schlumberger Holdings | System and method for obtaining and analyzing well data |
US6928367B2 (en) * | 2002-09-27 | 2005-08-09 | Veritas Dgc Inc. | Reservoir fracture characterization |
CA2506883C (en) | 2002-11-23 | 2013-11-19 | Schlumberger Technology Corporation | Method and system for integrated reservoir and surface facility networks simulations |
US6856910B2 (en) * | 2003-01-09 | 2005-02-15 | Schlumberger Technology Corporation | Method and apparatus for determining regional dip properties |
US7584165B2 (en) * | 2003-01-30 | 2009-09-01 | Landmark Graphics Corporation | Support apparatus, method and system for real time operations and maintenance |
US7546228B2 (en) | 2003-04-30 | 2009-06-09 | Landmark Graphics Corporation | Stochastically generating facility and well schedules |
US6799117B1 (en) * | 2003-05-28 | 2004-09-28 | Halliburton Energy Services, Inc. | Predicting sample quality real time |
US7243029B2 (en) * | 2003-08-19 | 2007-07-10 | Apex Spectral Technology, Inc. | Systems and methods of hydrocarbon detection using wavelet energy absorption analysis |
US7069148B2 (en) * | 2003-11-25 | 2006-06-27 | Thambynayagam Raj Kumar Michae | Gas reservoir evaluation and assessment tool method and apparatus and program storage device |
US7725302B2 (en) | 2003-12-02 | 2010-05-25 | Schlumberger Technology Corporation | Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model |
US7774140B2 (en) * | 2004-03-30 | 2010-08-10 | Halliburton Energy Services, Inc. | Method and an apparatus for detecting fracture with significant residual width from previous treatments |
WO2006029019A2 (en) * | 2004-09-03 | 2006-03-16 | Baker Hughes Incorporated | Method of removing an invert emulsion filter cake after the drilling process using a single phase microemulsion |
US7707018B2 (en) | 2004-12-14 | 2010-04-27 | Schlumberger Technology Corporation | Finite volume method system and program storage device for linear elasticity involving coupled stress and flow in a reservoir simulator |
US7640149B2 (en) | 2004-12-15 | 2009-12-29 | Schlumberger Technology Corporation | Method system and program storage device for optimization of valve settings in instrumented wells using adjoint gradient technology and reservoir simulation |
US7299131B2 (en) * | 2004-12-17 | 2007-11-20 | Baker Hughes Incorporated | Induction resistivity imaging principles and devices in oil based mud |
US7369979B1 (en) * | 2005-09-12 | 2008-05-06 | John Paul Spivey | Method for characterizing and forecasting performance of wells in multilayer reservoirs having commingled production |
US8145463B2 (en) | 2005-09-15 | 2012-03-27 | Schlumberger Technology Corporation | Gas reservoir evaluation and assessment tool method and apparatus and program storage device |
US7421374B2 (en) * | 2005-11-17 | 2008-09-02 | Honeywell International Inc. | Apparatus and method for analyzing model quality in a process control environment |
US7577527B2 (en) * | 2006-12-29 | 2009-08-18 | Schlumberger Technology Corporation | Bayesian production analysis technique for multistage fracture wells |
US8412500B2 (en) * | 2007-01-29 | 2013-04-02 | Schlumberger Technology Corporation | Simulations for hydraulic fracturing treatments and methods of fracturing naturally fractured formation |
US8082217B2 (en) * | 2007-06-11 | 2011-12-20 | Baker Hughes Incorporated | Multiphase flow meter for electrical submersible pumps using artificial neural networks |
US8086431B2 (en) * | 2007-09-28 | 2011-12-27 | Schlumberger Technology Corporation | Method and system for interpreting swabbing tests using nonlinear regression |
US7890264B2 (en) * | 2007-10-25 | 2011-02-15 | Schlumberger Technology Corporation | Waterflooding analysis in a subterranean formation |
US20090234584A1 (en) * | 2008-03-11 | 2009-09-17 | Schlumberger Technology Corporation | Data gathering, transmission, integration and interpretation during coiled tubing well testing operations |
US8898017B2 (en) * | 2008-05-05 | 2014-11-25 | Bp Corporation North America Inc. | Automated hydrocarbon reservoir pressure estimation |
US8463457B2 (en) * | 2008-06-13 | 2013-06-11 | Schlumberger Technology Corporation | Feedback control using a simulator of a subterranean structure |
US8165986B2 (en) * | 2008-12-09 | 2012-04-24 | Schlumberger Technology Corporation | Method and system for real time production management and reservoir characterization |
-
2008
- 2008-07-30 US US12/182,885 patent/US8244509B2/en active Active
- 2008-07-31 EP EP08796960.6A patent/EP2185791A4/en not_active Withdrawn
- 2008-07-31 CA CA2694336A patent/CA2694336C/en active Active
- 2008-07-31 WO PCT/US2008/071774 patent/WO2009018450A1/en active Application Filing
- 2008-07-31 EA EA201070207A patent/EA016477B1/ru not_active IP Right Cessation
- 2008-07-31 CA CA2763203A patent/CA2763203C/en active Active
- 2008-08-01 AR ARP080103366A patent/AR067785A1/es active IP Right Grant
-
2010
- 2010-01-11 GB GBGB1000222.8A patent/GB201000222D0/en active Pending
Also Published As
Publication number | Publication date |
---|---|
WO2009018450A1 (en) | 2009-02-05 |
US20090084545A1 (en) | 2009-04-02 |
EP2185791A1 (en) | 2010-05-19 |
GB201000222D0 (en) | 2010-02-24 |
EA016477B1 (ru) | 2012-05-30 |
CA2694336A1 (en) | 2009-02-05 |
CA2763203C (en) | 2016-02-02 |
US8244509B2 (en) | 2012-08-14 |
AR067785A1 (es) | 2009-10-21 |
CA2694336C (en) | 2012-10-30 |
EP2185791A4 (en) | 2016-04-20 |
CA2763203A1 (en) | 2009-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA201070207A1 (ru) | Способ управления добычей из нефтегазоносного коллектора в режиме реального времени | |
Yu et al. | Sensitivity analysis of hydraulic fracture geometry in shale gas reservoirs | |
GB2464003B (en) | System and method for performing oilfield simulation operations | |
GB2457823A (en) | System and method for performing oilfield simulation operations | |
CN104040110B (zh) | 复杂压裂网络中水力压裂相互作用建模 | |
Wan et al. | Evaluate EOR potential in fractured shale oil reservoirs by cyclic gas injection | |
US10012069B2 (en) | Method of treatment design and optimization of sequenced fracturing technique | |
GB2463146A (en) | Modeling the transient behavior or BHA/drill string while drilling | |
WO2008157706A3 (en) | System and method for performing oilfield simulation operations | |
GB2455237A (en) | System and method for performing oilfield simulation operations | |
MX2008010963A (es) | Metodo y sistema de planificacion de pozo. | |
GB2462974A (en) | Valuing future information under uncertainty | |
EA200970017A1 (ru) | Способ и система для проектирования и оптимизации операций бурения и заканчивания в углеводородных пластах - коллекторах | |
EA200870537A1 (ru) | Способы извлечения углеводородов с использованием горизонтальных скважин | |
NO20073485L (no) | Fremgangsmate, system og programlagringsutstyr for optimalisering av verdi-innstillinger i instrumenterte bronner ved hjelp av adjungert gradient-teknikk og reservoarsimulering | |
CN105874158A (zh) | 复杂裂缝网络中水力压裂裂缝的相互作用的建模 | |
Huang et al. | Hydraulic fracture design optimization for infill wells: an integrated geomechanics workflow | |
Zhang et al. | Uncertainty Analysis and Assisted History Matching Workflow in Shale Oil Reservoirs | |
Malayalam et al. | Multi-disciplinary integration for lateral length, staging and well spacing optimization in unconventional reservoirs | |
Curnow et al. | Coupled geomechanics and fluid flow model for production optimization in naturally fractured shale reservoirs | |
Gonzales et al. | Understanding production drivers and challenges in converting a vertical to horizontal oil play utilizing single well modeling | |
Ghaderi et al. | Estimation of fracture height growth in layered tight/shale gas reservoirs using flowback gas rates and compositions–Part I: Model development | |
Jin et al. | Successful fracture stimulation in the first joint appraisal shale gas project in China | |
RU2016103097A (ru) | Способ проверки геометрии трещины для микросейсмических событий | |
Ganguly et al. | Multidomain data and modeling unlock unconventional reservoir challenges |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
QB4A | Registration of a licence in a contracting state | ||
MM4A | Lapse of a eurasian patent due to non-payment of renewal fees within the time limit in the following designated state(s) |
Designated state(s): AM AZ BY KZ KG MD TJ TM RU |