KR910007276Y1 - Device for adjusting the precast form on the bridge - Google Patents

Device for adjusting the precast form on the bridge Download PDF

Info

Publication number
KR910007276Y1
KR910007276Y1 KR2019880008304U KR880008304U KR910007276Y1 KR 910007276 Y1 KR910007276 Y1 KR 910007276Y1 KR 2019880008304 U KR2019880008304 U KR 2019880008304U KR 880008304 U KR880008304 U KR 880008304U KR 910007276 Y1 KR910007276 Y1 KR 910007276Y1
Authority
KR
South Korea
Prior art keywords
formwork
bridge
adjusting
tie rods
exposed
Prior art date
Application number
KR2019880008304U
Other languages
Korean (ko)
Other versions
KR890023055U (en
Inventor
김양선
Original Assignee
삼환기업 주식회사
최용권
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼환기업 주식회사, 최용권 filed Critical 삼환기업 주식회사
Priority to KR2019880008304U priority Critical patent/KR910007276Y1/en
Publication of KR890023055U publication Critical patent/KR890023055U/en
Application granted granted Critical
Publication of KR910007276Y1 publication Critical patent/KR910007276Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

내용 없음.No content.

Description

조립식 교량가설에서의 거푸집 수평조정및 고정장치Forming Leveling and Fixing Device for Prefabricated Bridge Construction

제1도는 본 고안의 적용상태를 도시한 분해도.1 is an exploded view showing an application state of the present invention.

제2도는 본 고안의 주요부분품을 발췌한 분해사시도.Figure 2 is an exploded perspective view of the main parts of the present invention.

제3도의 본 고안을 적용한 교량가설상태를 도시한 조립정면도.Assembly front view showing the bridge construction state to which the present invention of FIG.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

1 : 교각 2 : 타이로드1: pier 2: tie rod

3 : 빔지보체 4 : 받침형강3: beam support body 4: bearing steel

5 : 밀착부재 6 : 파이프잭5: contact member 6: pipe jack

6c : 이동체 6d : 보디6c: mobile body 6d: body

6f : 조절볼트6f: Adjusting bolt

본 고안은 교량가설을 위해 축조된 교각상부의 슬라브 콘크리트타설전에 거푸집을 설치키위한 조립식 공법으로서 티이-빔(T-Beam) 혹은 피시-빔(PC-Beam)을 이용할 경우 거푸집을 정확히 설치키 위한 높이조정 즉 수평정도를 맞출수 있도록 한 조립식 교량가설에서의 거푸집 수평조정 및 고정장치에 관한것이다.The present invention is a prefabricated method for installing formwork before slab concrete placing on the pier on the pier constructed for bridge construction. When T-Beam or PC-Beam is used, It is about formwork leveling and fixing device in prefabricated bridge hypothesis to adjust height, ie level.

종래의 경우 교량가설을 위해 축조된 교량상부의 슬라브 콘크리트타설을 위한 거푸집 설치시에 티빔교량은 지면에서부터 동바리를 세워 거푸집을 설치하고 P.C빔교량은 P.C빔간에 동바리를 설치하여 거푸집을 설치한 후 슬라브 콘크리트를 타설하게 되는 작업공정을 지니게 된다. 이 경우 티이-빔, 피시-빔위에 착설하게되는 거푸집 설치상태의 정확한 수평상태 정도에 따라 교량의 슬라브 콘크리트 정밀시공의 여부가 결정된다.In the conventional case, when installing the formwork for slab concrete placing on the upper part of the bridge constructed for bridge construction, the T-beam bridge is installed from the ground to install the formwork, and the PC beam bridge is installed between the PC beams to install the formwork after installing the formwork. It will have a working process of pouring concrete. In this case, the precise construction of the slab concrete in the bridge is determined by the exact horizontality of the formwork installed on the tie-beam and fish-beam.

종래에는 거푸집의 수평정도를 맞추기 위한 작업으로 동바리를 설치 후 보통 받침목재를 이용하게 되었으나 정밀한 수평상태 조정이 어려울 뿐 아니라 많은 인력소모, 자재낭비, 안전사고, 마모리작업 및 작업완료후 철거작업시 많은 어려움이 따르는 결점이 있다.Conventionally, the base timber is usually used after installing the copper bar as a work to adjust the level of formwork, but it is difficult to precisely adjust the horizontal level, and it consumes a lot of manpower, waste of materials, safety accidents, wear and tearing work after the completion of work. There is a drawback that comes with difficulty.

이러한 결점을 해소키 위해 본인의 선출원된 발명특허출원 제88-1733호와 88-1734호로 부터 교각상부에서의 고공작업으로 실시하는 재래식 교량 슬라브 설치해체에 따른 결함과 거푸집 철거시 결함을 해소시키기 위해 조립식 교량가설 공법이 소개되고 있으나 본 고안은 이를 구체화하여 실제 지상에서 작업자가 용이한 조정수단으로 거푸집의 수평상태를 조정할 수 있도록 한것이다.In order to solve these shortcomings, in order to solve the defects caused by the dismantling of the conventional bridge slab, which is carried out by high-working work on the upper part of the piers from the prior invention patent applications 88-1733 and 88-1734, The prefabricated bridge construction method has been introduced, but the present invention embodies it so that the worker can adjust the horizontal state of the formwork as an easy adjustment means on the actual ground.

그 실시예를 도시한 첨부도면에 따라 그 구성 및 작용효과를 상세히 설명하면 다음과 같다.According to the accompanying drawings showing the embodiment illustrating the configuration and operation effects in detail as follows.

일정구간으로 다수 축조된 교각(1)상부의 슬라브 콘크리트 타설을 위해 적정간격으로 타이로드(2)가 노출되게 매립되어진 빔지보체(3)를 이용한 구조를 공사에 있어서, 노출된 타이로드(2)의 매립간격과 일치된 위치로 타원형 구멍(4a)이 다수 형성된 받침형강(4)을 타이로드(2)에 끼워맞추면서 밀착부재(5)의 조립공(5a)의통해 밀착시켜 조립함과 각각의 타이로드(2)에 파이프잭(6)의 안내공(6a)과 지지공(6b)을 통해 끼워맞춰 고정너트(7)조임으로 파이프잭(6)을 완전 밀착장치하여 이동체(6c)의 상면이 받침형강(4)에 접지되게 하는 한편, 파이프잭(6)은 보디(6d)의 중앙에 나사홀(6e)이 성형되어 조절볼트(6f)가 체결됨과 보디(6d)내부에는 안내공(6a)이 형성된 이동체(6c)가 조립되어져 조절볼트(6f)의 조정에 따라 보디(6d)의 지지공(6b)으로부터 위치고정된 상태에서 이동체(6c)가 상하 이동되어 그 직상부로 안착시킨 거푸집(8)의 수평정도를 조절할 수 있게 구성된 것이다.In the construction of the structure using the beam support body 3, in which the tie rods 2 are embedded at appropriate intervals for slab concrete placing on the upper part of the piers 1, which are constructed in a plurality of sections, the exposed tie rods 2 Assemble by fitting the supporting steel (4) formed with a plurality of oval holes (4a) to the tie rod (2) in close contact with the buried interval of the assembly through the assembly hole (5a) of the contact member (5) and each tie The pipe jack 6 is completely attached to the rod 2 through the guide hole 6a and the support hole 6b of the pipe jack 6, and the fastening nut 7 is tightened so that the upper surface of the movable body 6c is closed. The pipe jack 6 is formed with a screw hole 6e at the center of the body 6d, and the adjustment bolt 6f is fastened to the ground jack 4, and the guide hole 6a inside the body 6d. In the state where the movable body 6c in which the) is formed is fixed from the support hole 6b of the body 6d according to the adjustment of the adjustment bolt 6f. The body 6c is configured to be able to adjust the horizontal degree of the formwork 8, which is moved up and down and seated in the upper portion thereof.

이와같이 구성되어진 본 고안의 작용효과를 상세히 설명하면 다음과 같다.Referring to the effect of the present invention configured in this way in detail as follows.

축조된 교각(1)상부로 슬라브 콘크리트 타설을 위해 거푸집(8)을 설치하기 위한 수단으로 일정구간에 축조된 교각(1)직상부로 구조물 작업에서 일반적으로 피시-빔 혹은 티이-빔을 빔지보체(3)로 채택하게되는데 빔지 보체(3)를 제작시 일정간격을 두고 다수의 타이로드(2)가 노출되게 매립하여 제작한 것을 교각(1)의 상부에 빔지보체(3)을 올려놓은 상태에서든 혹은 지상에서 빔지보체(3)에 노출되어진 타이로드(2)에 타원형구멍(4a)을 통한 받침형성(4)과 조립공(5a)을 통한 밀착부재(5)및 각각의 타이로드(2)에 파이프잭(6)을 순차끼워 맞춰 고정너트(7)를 조임하여 빔지보체(3)의 타이로드(2)에 받침형강(4), 말착부재(5), 파이프잭(6)을 순차적으로 고정장착 완료한후 교각(1)상부로 다수의 빔지보체(3)를 나열배치하여 근접된 빔지보체(3)간의 받침형강(4)의 상면으로 도면 제3도에 도시된 바와같이 거푸집(8)을 안착시키게 되는데 이때 안착시킨 거푸집(8)의 수평정도에 따라 교량의 슬라브 콘크리트 타설상태가 결정되는 것으로 만약 소정위치가 낮거나 높은 상태로 거푸집(8)이 안착되었을 때 해당부위를 받치고 있는 받침형강(4)의 상하높이 조정이 요구되는 것으로서 빔지보체(3)에 돌출형성된 타이로드(2)에 제반구조물을 조임하고 있는 고정너트(7)를 약간 느슨하게 해제시킨 상태에서 파이프잭(6)의 보디(6d)하단에 성형된 나하올(6e)에 체결되어진 조절볼트(6f)을 좌, 우 회전시키므로서 조절볼트(6f)와 나사홈(6e)이 상호간 나사체결에 의해 되었기때문에 승하강하게 되므로서 이동체(6c)가 타이로드(2)와 안내공(6a)의 안내를 받으면서 고정된 파이프잭(6)의 보디(6d)내에서 상하 이동하여 이동체(6c)상면에 접지되어 장착되어 있는 받침형강(4)이 상하 이동하므서 받침형강(4)상부로 안착된 거푸집(8)의 수평정도를 다수의 파이프잭(6)조정에 이해 정확한 거푸집(8) 수평상태를 조정할 수 있게되었고, 수평조절후 고정너트(7)를 완전히 조임하여 거푸집(8)의 설치를 완료할 수 있게 된것이며 또한, 본 고안의 기술수단을 적용실시 하므로서 슬라브 콘크리트 타설 완료후 거푸집(8)을 철거하고자 할때에는 조절볼트(6f)의 해제와 고정너트(7)의 단순한 해제 작업만으로 거푸집(8) 및 제반 구조물의 철거를 손쉽게 완료할수 있게 된것이다.As a means for installing the formwork (8) for slab concrete placement on top of the built piers (1), it is generally used to construct fish-beams or T-beams in the construction work. It is adopted as (3), the beam beam complement (3) is produced by embedding a plurality of tie rods (2) exposed at a predetermined interval when manufacturing the beam beam complement (3) on top of the pier (1) Tie rod 2 exposed to beam support 3 in the ground or on the ground, support member 5 through elliptical hole 4a and contact member 5 through assembly hole 5a and each tie rod 2 The pipe jacks 6 in turn and tighten the fixing nuts 7 to sequentially tighten the supporting steels 4, the attachment members 5, and the pipe jacks 6 to the tie rods 2 of the beam retainer 3, respectively. After the fixed mounting is completed, a plurality of beam retainers 3 are arranged in a row above the pier 1 so that the upper surface of the supporting steel 4 between the adjacent beam support 3 is disposed. As shown in FIG. 3, the formwork 8 is seated. At this time, the slab concrete placing state of the bridge is determined according to the horizontality of the seated form 8, and if the predetermined position is low or high, Fixing nuts (7) fastening the overall structure to tie rods (2) protruding from the beam support (3), where adjustment of the up and down height of the supporting steel (4) supporting the corresponding part is required when (8) is seated. The bolts 6f and the screw grooves by rotating left and right the adjusting bolts 6f fastened to the Nahaol 6e formed at the bottom of the body 6d of the pipe jack 6 in a state of loosening the 6e) is moved up and down in the body 6d of the fixed pipe jack 6 while being guided by the tie rod 2 and the guide hole 6a, as it moves up and down because of mutual screwing. Grounded on the upper surface of the movable body 6c Since the supporting steel (4) moves up and down, the leveling of the formwork (8) seated above the supporting steel (4) is understood by adjusting the number of pipe jacks (6) so that the correct form (8) can be adjusted. After the horizontal adjustment, the fixing nut (7) is completely tightened to complete the installation of the formwork (8), and also to remove the formwork (8) after the slab concrete is finished by applying the technical means of the present invention. When it is possible to easily complete the demolition of the formwork (8) and the overall structure by simply releasing the adjustment bolt (6f) and the simple release of the fixing nut (7).

즉, 본 고안은 슬라브 콘크리트 타설을 위해 설치하게 되는 거푸집(8)의 수평정도를 파이프잭(6)에 의한 조정으로 정확한 수평상태의 거푸집(8)설치를 완료할수 있도록 한 조립식 교량가설에서의 거푸집 수평조정 및 고정장치인 것이다.That is, the present invention is the formwork in the prefabricated bridge hypothesis to complete the installation of the formwork (8) in the correct horizontal state by adjusting the horizontal degree of the formwork (8) to be installed for slab concrete casting by the pipe jack (6) It is a leveling and fixing device.

Claims (1)

축조된 교각(1)상부로 슬라브 콘크리트 타성을 위해 일정간격으로 타이로드(2)가 노출되게 매립되어진 빔지보체(3)를 이용하는 구조물공사에 있어서, 노출된 각각의 타이로드(2)에 받침형강(4)과 밀착부재(5) 파이프잭(6)을 순차 끼워맞춰 고정너트(7)로 밀착고정하여 조절볼트(6f)조정에 의해 보디(6d) 내에 조립되어진 이동체(6c)가 상,하 이동으로 거푸집(8)이 안착된 받침형강(4)의 상하 높이정도를 조절할수 있도록 구성됨을 특징으로 하는 조립식 교량가설에서의 거푸집 수평조정 및 고정장치.In the construction work using the beam support body 3 in which the tie rods 2 are embedded at regular intervals for the slab concrete inertia on the constructed piers 1, the supporting steels are exposed to the respective tie rods 2 exposed. (4) and the close contact member (5) The pipe jack (6) is sequentially fitted and fixed by the fixing nut (7), the moving body (6c) assembled in the body (6d) by adjusting the adjustment bolt (6f) is up and down Forming horizontal adjustment and fixing device in the prefabricated bridge hypothesis, characterized in that the formwork (8) is configured to adjust the vertical height of the supporting steel (4) seated by moving.
KR2019880008304U 1988-05-31 1988-05-31 Device for adjusting the precast form on the bridge KR910007276Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019880008304U KR910007276Y1 (en) 1988-05-31 1988-05-31 Device for adjusting the precast form on the bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019880008304U KR910007276Y1 (en) 1988-05-31 1988-05-31 Device for adjusting the precast form on the bridge

Publications (2)

Publication Number Publication Date
KR890023055U KR890023055U (en) 1989-12-02
KR910007276Y1 true KR910007276Y1 (en) 1991-09-25

Family

ID=19275853

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019880008304U KR910007276Y1 (en) 1988-05-31 1988-05-31 Device for adjusting the precast form on the bridge

Country Status (1)

Country Link
KR (1) KR910007276Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100908266B1 (en) * 2009-02-12 2009-07-20 주식회사 공간이동 Height regulation device with handle for steal box abridge

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020082966A (en) * 2001-04-24 2002-11-01 손석환 The construction method and device for slab panel which can instal psc bridge beam
KR20030060263A (en) * 2002-01-08 2003-07-16 박영재 PCCbridge beam and method of constructing the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100908266B1 (en) * 2009-02-12 2009-07-20 주식회사 공간이동 Height regulation device with handle for steal box abridge

Also Published As

Publication number Publication date
KR890023055U (en) 1989-12-02

Similar Documents

Publication Publication Date Title
EP1123443B1 (en) Method for manufacturing a ground slab field and a ground slab field
JPH08269911A (en) Structure of attaching part of concrete wall transom
JPH08199510A (en) Execution method of cast-in-place floor slab section of precast concrete girder and form thereof
KR910007276Y1 (en) Device for adjusting the precast form on the bridge
JPS627344B2 (en)
JPH02164931A (en) Foundation construction method for building
KR910007423B1 (en) Method for construction p.c - beam on the bridge
KR910007424B1 (en) Method for construction t - beam on the bridge
KR0158029B1 (en) Support device for structure stanchion lower end
JP2567631Y2 (en) Level adjuster for steel foundation beams
JP2734985B2 (en) Cantilever shed and its construction method
KR200378428Y1 (en) Bridge bearing one body
JP2780861B2 (en) Block structure for foundation construction
KR20060079395A (en) Bridge bearing one body and installation method thereof
JP3824242B2 (en) Viaduct-free support construction method
JPH0649982A (en) Formwork unit and its construction
KR200253546Y1 (en) A short pillar propping up a veranda floor equipment
KR102474998B1 (en) Steel Cross Beam for PSC Beam Connections on PSC Bridges and Method of Construction
KR0165570B1 (en) Fabricated retaining wall
JPH07116691B2 (en) Support structure for frame forming mold device and bridge construction method using the support structure
KR200201606Y1 (en) The psc bridge beam which can institute slab mold and safety net
JP3690463B2 (en) Construction method of viaduct
JP3121713B2 (en) Level adjustment support device for outer concrete columns
JPH0226027B2 (en)
KR200326597Y1 (en) Apparatus for preventing grider from being collapsed

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 19970910

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee