KR20160023622A KR1020150153207A KR20150153207A KR20160023622A KR 20160023622 A KR20160023622 A KR 20160023622A KR 1020150153207 A KR1020150153207 A KR 1020150153207A KR 20150153207 A KR20150153207 A KR 20150153207A KR 20160023622 A KR20160023622 A KR 20160023622A
Authority
KR
South Korea
Prior art keywords
pile
steel pipe
pipe pile
phc
phc pile
Prior art date
Application number
KR1020150153207A
Other languages
Korean (ko)
Inventor
오성남
Original Assignee
(주)스마텍엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)스마텍엔지니어링 filed Critical (주)스마텍엔지니어링
Priority to KR1020150153207A priority Critical patent/KR20160023622A/en
Publication of KR20160023622A publication Critical patent/KR20160023622A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

According to the present invention, a PHC pile (10) has no tables on an upper plane, a buried nut (15) is buried along a circumference of the upper plane of the PHC pile (10), and an upper part of a tendon (11) is tensioned and settled in the buried nut (15). A joint combining part (40) including a bottom plate (41) and an upper vertical plate (42) is located between the PHC pile (10) and a steel pipe pile (20). The joint combining part (40) is integrated with the PHC pile (10) by combining a first bolt (49) to the buried nut (15) by penetrating a first bolt hole (45) after the joint combining part (40) is placed on the upper part of the PHC pile (10). The joint combining part (40) is integrated with the steel pipe pile (20) under the state that the upper vertical plate (42) is inserted into the steel pipe pile (20).

Description

콘크리트 기초 일체 결합구성을 가지는 좌판 생략구조의 PHC 말뚝과 강관말뚝의 일체 결합형 복합말뚝{Composite Pile with PHC Pile and Steel Tubular Pile}{Composite Pile with PHC Pile and Steel Tubular Pile with PHC Pile and Steel Pipe Pile}

본 발명은 중공 프리스트레스트 콘크리트 말뚝과 강관말뚝의 일체 결합으로 이루어진 복합말뚝에 관한 것으로서, 구체적으로는 하부에는 중공형 프리스트레스트 콘크리트 말뚝(Pretensioned spun high strength concrete pile/ 이하, "PHC 말뚝"이라고 함)이 위치하고 상부에는 강관말뚝이 위치하여 PHC 말뚝과 강관말뚝이 일체화된 복합말뚝으로서, PHC 말뚝과 강관말뚝의 일체화 및 연속화를 위하여 접합결합구를 설치할 때, 종래기술의 PHC 말뚝에서 긴장재의 정착을 위하여 사용되었던 PHC 말뚝 상단의 좌판을 생략함과 동시에 용접이 아닌 볼트결합에 의해 PHC 말뚝과 접합결합구의 일체화를 이룸으로써, 재료비의 절감, 작업성 향상과 그에 따른 경제성 향상 등의 효과를 발휘하며, 더 나아가 복수개가 개별적으로 강관말뚝의 상단에 설치되는 결합구로 구성된 기초연결조립체를 이용하여 콘크리트 기초에 매립되는 수직매립철근을 설치함으로써 콘크리트 기초와의 견고한 일체화를 이룰 수 있게 되는 새로운 구성의 PHC 말뚝과 강관말뚝의 일체 결합형 복합말뚝에 관한 것이다. The present invention relates to a composite pile composed of a hollow prestressed concrete pile and a steel pipe pile integrally coupled to each other. More specifically, the present invention relates to a composite pile having a hollow prestressed concrete pile (hereinafter referred to as "PHC pile" A PHC pile and a steel pipe pile are integrally formed with a steel pipe pile located at the upper part of the PHC pile, and the PHC pile and the steel pipe pile are integrally formed. The PHC pile top and the joining port are unified by bolt coupling rather than welding, thereby achieving effects such as reduction of material cost, improvement of workability, and improvement of economical efficiency, and furthermore, Are formed separately at the upper end of the steel pipe pile. Using the assembly by providing the vertical embedded rebar embedded in the concrete foundation relates to integrally bonded composite peg of the PHC pile and the steel pipe pile of the new configuration of being able to achieve a firm integration of the concrete foundation.

하부의 PHC 말뚝과 상부의 강관말뚝으로 이루어진 복합말뚝이 대한민국 등록특허 제10-1010028호에 개시되어 있다. 이러한 종래기술의 복합말뚝에서는 PHC 말뚝과 강관말뚝을 접속하기 위하여 접합결합구를 이용하게 되는데, PHC 말뚝 내에 배치되는 긴장재의 정착을 위한 좌판을 PHC 말뚝의 상단에 그대로 남겨둔 상태에서, 좌판 위에 접합결합구를 설치하고 있다. A composite pile composed of a lower PHC pile and an upper steel pipe pile is disclosed in Korean Patent Registration No. 10-1010028. In such a conventional composite pile, a joining coupling is used to connect the PHC pile and the steel pipe pile. In the state where the seat for fixing the tension material disposed in the PHC pile is left at the top of the PHC pile, I am installing a sphere.

그런데 강재로 이루어져서 PHC 말뚝의 상단에 설치되는 좌판을 그대로 남겨두는 것은 그만큼 재료비의 상승을 가져오게 된다. 또한 좌판을 PHC 말뚝의 상단에 남겨둔 상태로 그 위에 접합결합구를 설치할 때, 종래에는 좌판과 접합결합구의 일체화를 위하여 현장 용접 작업을 이용하였는데, 이러한 현장 용접 작업은 기상과 현장 조건에 따라 용접 진행 속도, 용접 품질 등에 변동이 생기게 되고, 숙련된 용접공이 필요할 뿐만 아니라, 용접 작업을 수행할 때 감전사고, 화재 등의 안전사고의 발생 위험이 매우 크다는 문제점이 있다. However, leaving the left side plate, which is made of steel material, on the top of the PHC pile leads to an increase in material cost. In addition, when the joint plate is installed on the top of the PHC pile with the seat plate left on the top of the PHC pile, field welding is conventionally used for unifying the seat plate and joint joint. Speed, welding quality, and the like, requires a skilled welder, and there is a problem in that there is a great risk of occurrence of safety accidents such as electric shock and fire when performing welding work.

대한민국 등록특허공보 제10-1010028호(2011. 01. 21. 공고).Korean Registered Patent No. 10-1010028 (issued on January 21, 2011).

본 발명은 위와 같은 종래 기술의 문제점과 한계를 극복하기 위하여 개발된 것으로서, 구체적으로는 하부에는 PHC 말뚝을 배치하고 그 위의 상부에는 강관말뚝을 위치시키고 PHC 말뚝과 강관말뚝 사이에는 접합결합구를 배치하여 이들을 서로 일체화시켜 복합말뚝을 형성함에 있어서, 종래기술의 PHC 말뚝에서 긴장재의 정착을 위하여 사용되었던 PHC 말뚝 상단의 좌판을 생략함으로써, 복합말뚝의 제작에 소요되는 자재 및 재료비를 절감하여 경제성을 향상시킬 수 있도록 하는 것을 목적으로 한다. The present invention has been developed in order to overcome the problems and limitations of the prior art as described above. Specifically, the PHC pile is disposed at the lower part, the steel pipe pile is positioned at the upper part of the PHC pile, and the joint between the PHC pile and the steel pipe pile In order to form composite piles by integrating them with each other, by omitting the upper plate of the PHC pile which was used for the fixation of the tensile material in the prior art PHC pile, it is possible to reduce the material and material cost required for manufacturing the composite pile, The present invention has been made to solve the above problems.

또한 본 발명은 접합결합구와 PHC 말뚝을 일체 결합함에 있어서, 용접이 아닌 볼트결합을 이용함으로써, 종래 기술의 문제점이던 현장에서의 용접 작업 수행으로 인하여 야기되었던 용접 진행 속도, 용접 품질 등의 변동, 숙련된 용접공의 필요성, 용접 작업 수행시의 안전사고의 높은 발생 위험 등의 문제점을 해소하는 것을 목적으로 한다. In addition, the present invention uses a bolt coupling rather than a welding to integrally join the jointing joint and the PHC pile, and thus it is possible to improve the welding speed, the quality of welding, etc., which are caused by the welding work in the field, The necessity of a welder to be welded, and a risk of occurrence of a safety accident at the time of performing a welding operation.

더 나아가, 본 발명은 복수개가 개별적으로 강관말뚝의 상단에 설치되는 결합구로 구성된 기초연결조립체를 이용하여 콘크리트 기초에 매립되는 수직매립철근을 설치함으로써 콘크리트 기초와의 견고한 일체화를 이룰 수 있도록 하는 것을 목적으로 한다. It is a further object of the present invention to achieve a solid integration with a concrete foundation by installing a vertical buried reinforced concrete which is embedded in a concrete foundation by using a foundation connection assembly composed of a plurality of individual joints provided at the upper end of a steel pipe pile .

위와 같은 과제를 달성하기 위하여 본 발명에서는, 하부에는 PHC 말뚝이 위치하고 그 상부에는 강관말뚝이 위치하여 PHC 말뚝과 강관말뚝이 일체로 결합되어 형성된 복합말뚝으로서, PHC 말뚝은 상면에 좌판이 존재하지 않은 채, 상단이 개방되고 내면에는 나사가 형성된 매립너트가 PHC 말뚝의 상면에 원주를 따라 매립되어 있고, PHC 말뚝의 길이 방향으로 매립 배치된 긴장재의 상단이 매립너트에 긴장 정착되어 있는 구성을 가지며; 원형테 형태의 바닥판과, 상기 바닥판의 가장자리에서 상향으로 연직하게 세워져 있는 상부수직판과, 상기 바닥판의 가장자리에서 하향으로 연직하게 세워져서 PHC 말뚝의 상단 외면을 감싸게 되는 하부수직판을 포함하는 접합결합구가, PHC 말뚝과 강관말뚝 사이에 위치하는데; 접합결합구의 바닥판에는 제1볼트공이 매립너트와 대응되는 위치에서 원주를 따라 복수개로 형성되어 있고; PHC 말뚝의 상단 측면이 하부수직판에 의해 감싸지도록 접합결합구가 PHC 말뚝의 상단에 씌워진 후 제1볼트가 제1볼트공을 관통하여 매립너트에 나사결합됨으로써 접합결합구가 PHC 말뚝과 일체화되며, 접합결합구의 상부수직판이 강관말뚝의 하단 내부에 끼워진 상태에서 볼트결합 또는 용접 결합에 의해 접합결합구가 강관말뚝과 일체화되어 있는 구성을 가지는 것을 특징으로 하는 강관말뚝과 PHC 말뚝의 복합말뚝이 제공된다. In order to achieve the above object, according to the present invention, a PHC pile is disposed at a lower portion thereof and a steel pipe pile is positioned at an upper portion thereof. The PHC pile is a composite pile formed integrally with a PHC pile and a steel pipe pile. And an upper end of the tensile material buried in the longitudinal direction of the PHC pile is tension-fixed to the buried nut; An upper vertical plate vertically upright from an edge of the bottom plate, and a lower vertical plate vertically extending downward from the edge of the bottom plate to surround the upper end surface of the PHC pile Is located between the PHC pile and the steel pipe pile; A plurality of first bolt holes are formed in the bottom plate of the jointing fitting along the circumference at positions corresponding to the buried nuts; The joint bolt is screwed to the fillet nut through the first bolt hole so that the joint bolt is integrated with the PHC pile after the joint bolt is put on the upper end of the PHC pile so that the upper side of the PHC pile is wrapped by the lower vertical plate, A composite pile of a steel pipe pile and a PHC pile is provided, wherein the joint piercing hole is integrated with a steel pipe pile by a bolt or welded joint in a state where an upper vertical plate of the jointing fitting is fitted in a lower end of a steel pipe pile .

상기한 본 발명의 복합말뚝에서, 강관말뚝의 상단에는 콘크리트 기초와의 결합을 위한 기초연결조립체가 더 구비될 수 있는데; 기초연결조립체는, 콘크리트 기초에 매립되는 수직매립철근과, 강관말뚝의 내부로 유입되는 콘크리트의 깊이를 제한하기 위하여 강관말뚝의 두부에서 일정 깊이로 강관말뚝의 내부 중공을 가로막도록 강관말뚝의 내부 중공에 설치되는 바닥판과, 바닥판에 하단이 결합되고 상향으로 연장되는 지지봉과, 강관말뚝의 두부에 걸쳐져서 강관말뚝의 원주를 따라 복수개가 설치되며 수직매립철근의 하단과 지지봉의 상단이 모두 결합되어 있는 결합구를 포함하여 구성될 수 있다. In the above-described composite pile of the present invention, a foundation connection assembly for coupling with a concrete foundation may be further provided at the upper end of the steel pipe pile; In order to limit the depth of the vertical embedded steel reinforced concrete embedded in the concrete foundation and the concrete flowing into the interior of the steel pipe pile, the foundation connection assembly is designed so as to interpose the inner hollow of the steel pipe pile at a certain depth from the head of the steel pipe pile. A plurality of support bars extending along the circumference of the steel pipe pile so as to extend from the bottom of the steel pipe pile to the bottom of the steel pipe pile, And a coupling member which is formed of a metal plate.

특히, 이와 같이 본 발명의 복합말뚝에 기초연결조립체가 구비되는 경우, 결합구는, 강관말뚝의 두부 상면에 걸쳐지도록 놓이는 수평걸침부와, 상기 수평걸침부와 하향 연직방향으로 연속하여 강관말뚝의 내면에 위치하게 되는 연직부와, 상기 연직부와 연속하며 지지봉의 상단이 결합되는 제1결합공과 수직매립철근의 하단이 결합되는 제2결합공이 형성되어 있는 봉 결합부를 포함하여 구성될 수 있다. In particular, in the case where the composite connection pile of the present invention is provided with the foundation connection assembly, the coupling hole includes a horizontal hooking part that is placed so as to span over the top surface of the steel pipe pile and a horizontal hooking part that is continuous with the horizontal hooking part in the downward vertical direction, And a second coupling hole in which a first coupling hole, which is continuous with the vertical portion and which is coupled to the upper end of the support rod, is coupled to a lower end of the vertical embedded steel bar, is formed.

본 발명에 의하면, PHC 말뚝과 강관말뚝 사이에 접합결합구를 배치하고 이들을 서로 일체화시켜 복합말뚝을 형성함에 있어서, 종래기술의 PHC 말뚝에서 긴장재의 정착을 위하여 사용되었던 PHC 말뚝 상단의 좌판을 생략할 수 있게 된다. 따라서 본 발명에 의하면, 복합말뚝의 제작에 소요되는 자재 절감 및 재료비의 절감 효과가 발휘되며, 따라서 복합말뚝 제작시의 경제성을 크게 향상시키게 되는 장점을 가진다. According to the present invention, in order to form a composite pile by disposing joints between the PHC pile and the steel pipe pile and forming a composite pile therebetween, a seat plate at the upper end of the PHC pile, which has been used for fixing the tension member in the prior art PHC pile, . Therefore, according to the present invention, it is possible to reduce the material cost and the material cost required for manufacturing the composite pile, and thus the economical efficiency in manufacturing the composite pile can be greatly improved.

또한 본 발명에서는 접합결합구와 PHC 말뚝을 일체 결합할 때 용접이 아닌 볼트결합을 이용하고 있으므로, 종래 기술에서 현장 용접 작업 수행으로 인하여 야기되었던 용접 진행 속도, 용접 품질 등의 변동, 숙련된 용접공의 필요성, 용접 작업 수행시의 안전사고의 높은 발생 위험 등의 문제점을 해소하게 되는 효과가 발휘된다. Further, in the present invention, since the bolt connection is used instead of welding when the joint joint and the PHC pile are integrally combined, it is possible to improve the welding speed, welding quality, and the necessity of skilled welders And the risk of occurrence of a safety accident at the time of carrying out a welding operation are solved.

더 나아가, 본 발명에서는 기초연결조립체가 강관말뚝의 두부에 설치된 상태에서, 기초연결조립체와 강관말뚝의 두부가 콘크리트 내에 매립되도록 콘크리트가 타설되어 콘크리트 기초가 시공되므로, 콘크리트 기초와 강관말뚝 간의 견고한 결합을 이룰 수 있으며, 그에 따라 큰 인발저항력을 발현되는 효과가 발휘된다. Further, in the present invention, in the state where the foundation connection assembly is installed on the head portion of the steel pipe pile, since the concrete foundation is installed so that the foundation connection assembly and the head of the steel pipe pile are embedded in the concrete, So that an effect of exhibiting a large pulling resistance force is exhibited.

특히, 본 발명에서는 강관말뚝의 두부와 체결되어 콘크리트 기초에 매립되는 수직보강철근이 결합구에 의하여 연직 상태를 안정적으로 유지할 수 있으며, 그에 따라 수직보강철근의 인발저항력의 발휘가 효과적으로 이루어질 수 있게 될 뿐만 아니라, 강관말뚝과 콘크리트 기초 사이의 결합에서 발휘되는 휨내력이 더욱 증가하게 되는 효과가 발휘된다. Particularly, in the present invention, the vertical reinforcing steel reinforced with the head of the steel pipe pile and embedded in the concrete foundation can be stably maintained in the vertical state by the joining portion, so that the pulling resistance of the vertical reinforcing steel can be effectively exhibited In addition, the effect that the flexural strength exerted in the connection between the steel pipe pile and the concrete foundation is further increased.

도 1은 본 발명의 실시예에 따른 복합말뚝의 개략적인 결합 사시도이다.
도 2는 도 1에 도시된 본 발명의 실시예에 따른 복합말뚝의 개략적인 분해 사시도이다.
도 3은 본 발명에 따른 복합말뚝의 상부가 콘크리트 기초에 매립되어 있는 상태를 보여주는 개략적인 단면도이다.
도 4는 본 발명의 복합말뚝에서 PHC 말뚝과 강관말뚝이 결합되는 부분에 대한 개략적인 확대 사시도이다.
도 5는 도 4의 선 B-B에 따른 개략적인 횡방향 단면 사시도이다.
도 6은 본 발명에서 PHC 말뚝이 접합결합구에 의해 강관말뚝과 일체화된 상태를 보여주는 도 5에 대응되는 개략적인 횡방향 단면 사시도이다.
도 7은 도 6에 도시된 상태에 대한 개략적인 단면도이다.
도 8은 용접에 의해 강관말뚝과 접합결합구를 일체화시키는 본 발명의 또다른 실시예에 대한 도 6에 대응되는 개략적인 횡방향 단면 사시도이다.
도 9는 도 8에 도시된 상태에 대한 개략적인 단면도이다.
도 10은 본 발명의 복합말뚝에서 강관말뚝의 상단에 기초연결조립체가 설치되는 구성을 보여주는 개략적인 분해 사시도이다.
도 11은 본 발명의 복합말뚝에서 강관말뚝의 상단에 기초연결조립체가 설치된 후의 상태를 보여주는 개략적인 결합 사시도이다.
도 12는 기초연결조립체가 구비된 본 발명의 복합말뚝의 상단이 콘크리트 기초에 매립되어 일체화되는 구성을 보여주는 개략적인 단면도이다.
도 13 및 도 14는 각각 본 발명에서 기초연결조립체를 이루는 결합구를 바라보는 방향을 달리하여 보여주는 개략적인 사시도이다.
BRIEF DESCRIPTION OF THE DRAWINGS Figure 1 is a schematic perspective view of a composite pile according to an embodiment of the present invention.
2 is a schematic exploded perspective view of a composite pile according to an embodiment of the present invention shown in FIG.
3 is a schematic cross-sectional view showing a state in which an upper part of a composite pile according to the present invention is embedded in a concrete foundation.
4 is a schematic enlarged perspective view of a portion of the composite pile of the present invention where the PHC pile and the steel pipe pile are coupled.
Fig. 5 is a schematic lateral cross-sectional perspective view along line BB of Fig. 4;
6 is a schematic lateral cross-sectional perspective view corresponding to FIG. 5 showing PHC piles integrated with a steel pipe pile by a jointing joint in the present invention.
7 is a schematic cross-sectional view of the state shown in Fig.
8 is a schematic lateral cross-sectional perspective view corresponding to FIG. 6 of yet another embodiment of the present invention in which a steel pipe pile and a joint fitting are integrated by welding.
9 is a schematic cross-sectional view of the state shown in Fig.
10 is a schematic exploded perspective view showing a structure in which a foundation connection assembly is installed on the upper end of a steel pipe pile in a composite pile of the present invention.
11 is a schematic perspective view of a composite pile of the present invention after a foundation connection assembly is installed at the upper end of a steel pipe pile.
FIG. 12 is a schematic cross-sectional view showing a structure in which the upper end of the composite pile of the present invention having the foundation connection assembly is embedded in a concrete foundation.
FIGS. 13 and 14 are perspective views schematically showing different views of a coupling member constituting the base connection assembly according to the present invention, respectively.

이하, 본 발명의 바람직한 실시예를 첨부한 도면을 참조하여 설명한다. 본 발명은 도면에 도시된 실시예를 참고로 설명되었으나 이는 하나의 실시예로서 설명되는 것이며, 이것에 의해 본 발명의 기술적 사상과 그 핵심 구성 및 작용이 제한되지 않는다. Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings. Although the present invention has been described with reference to the embodiments shown in the drawings, it is to be understood that the technical idea of the present invention and its essential structure and operation are not limited thereby.

도 1 및 도 2에는 각각 본 발명의 실시예에 따른 복합말뚝(100)의 개략적인 결합 사시도(도 1)와 분해 사시도(도 2)가 도시되어 있다. 도 3에는 본 발명에 따른 복합말뚝(100)의 상부가 콘크리트 기초(C)에 매립되어 있는 상태를 보여주는 개략적인 단면도가 도시되어 있다. 도면에 도시된 것처럼, 본 발명의 복합말뚝(100)은, 하부에는 PHC 말뚝(10)이 위치하고 그 상부에는 강관말뚝(20)이 위치하여 서로 일체로 결합되어 있는 구성을 가지는데, 추가적으로 강관말뚝(20)의 상단(두부)에는 콘크리트 기초와의 결합을 위한 기초연결조립체(30)가 더 구비될 수 있다. 1 and 2 show schematically an assembled perspective view (FIG. 1) and an exploded perspective view (FIG. 2) of a composite pile 100 according to an embodiment of the present invention, respectively. 3 is a schematic cross-sectional view showing a state in which an upper portion of the composite pile 100 according to the present invention is embedded in a concrete foundation C. FIG. As shown in the drawing, the composite pile 100 of the present invention has a structure in which a PHC pile 10 is located at the bottom and a steel pipe pile 20 is located at an upper portion thereof and are integrally connected to each other. (Base) connection assembly 30 for coupling with a concrete foundation may be further provided at the upper end (head portion) of the base 20.

도 4에는 도 2의 원 A부분 즉, PHC 말뚝(10)과 강관말뚝(20)이 결합되는 부분에 대한 개략적인 확대 사시도가 도시되어 있고, 도 5에는 도 4의 선 B-B에 따른 개략적인 횡방향 단면 사시도가 도시되어 있다. 도 6에는 도 5에 대응되는 횡방향 단면 사시도로서, PHC 말뚝(10)이 접합결합구(40)에 의해 강관말뚝(20)과 일체화된 상태를 보여주는 개략적인 횡방향 단면 사시도가 도시되어 있고, 도 7에는 도 6에 도시된 상태에 대한 개략적인 단면도가 도시되어 있다. 우선 도 4 내지 도 7을 참조하여 본 발명의 복합말뚝(100)에서 접합결합구(40)를 이용하여 PHC 말뚝(10)과 강관말뚝(20)이 결합되는 구조에 대해 설명한다. Fig. 4 is a schematic enlarged perspective view of the circle A portion of Fig. 2, that is, the portion where the PHC pile 10 and the steel pipe pile 20 are coupled. Fig. 5 is a schematic cross- Sectional perspective view. Fig. 6 is a transverse cross-sectional perspective view corresponding to Fig. 5, showing a schematic lateral cross-sectional perspective view showing a state in which the PHC pile 10 is integrated with the steel pipe pile 20 by the jointing fitting 40, Fig. 7 is a schematic cross-sectional view of the state shown in Fig. 4 to 7, the structure of the composite pile 100 of the present invention in which the PHC pile 10 and the steel pipe pile 20 are coupled using the joint 40 will be described.

도면에 도시된 것처럼, 하부에 위치하는 PHC 말뚝(10)에 대해, 그 상부에 강관말뚝(20)이 위치하여 서로 일체로 결합됨에 있어서, 접합결합구(40)가 이용된다. 접합결합구(40)는 원형테 형태의 바닥판(41)과, 상기 바닥판(41)의 가장자리에서 강관말뚝(20)의 두께만큼 내측으로 간격을 두고 연직하게 세워지는 상부수직판(42)을 포함하여 구성된다. 필요에 따라서는 상부수직판(42)의 내면과 바닥판(41) 사이에는 보강리브(44)가 더 구비될 수 있다. 상기 바닥판(41)에는 제1볼트(49)가 관통하게 되는 제1볼트공(45)이 원주를 따라 복수개로 형성되어 있는데, 상기 제1볼트공(45)의 위치는 PHC 말뚝(10)의 상면에서 매립너트(15)가 매립되어 있는 위치와 일치한다. As shown in the figure, the joint piercing hole 40 is used in the case where the steel pipe pile 20 is located on the upper portion of the PHC pile 10 located at the lower portion and integrally joined with each other. The joining fitting 40 includes a bottom plate 41 having a circular cross-sectional shape and an upper vertical plate 42 vertically installed at an inner side of the edge of the bottom plate 41 by a thickness of the steel pipe pile 20, . If necessary, a reinforcing rib 44 may be further provided between the inner surface of the upper vertical plate 42 and the bottom plate 41. A plurality of first bolt holes 45 through which the first bolt 49 passes are formed in the bottom plate 41 along the circumference of the PHC pile 10. The position of the first bolt hole 45 is defined by the PHC pile 10, And the buried nuts 15 are buried in the upper surface.

PHC 말뚝(10)은 중공을 가지는 원형의 콘크리트 말뚝으로서, 그 길이 방향으로 긴장재(11)가 매립 배치되어 있는데, PHC 말뚝(10)의 상면에는 매립너트(15)가 원주를 따라 간격을 두고 복수개로 매립되어 있다. 매립너트(15)는 상단이 개방된 원통형상의 부재로서 내면에는 나사가 형성되어 있다. 매립너트(15)의 하단은 하부판에 의해 막혀 있되, 긴장재(11)가 관통할 수 있는 구멍이 하부판에 형성되어 있다. PHC 말뚝(10)에 긴장재(11)가 매립 배치될 때, 긴장재(11)는 긴장된 상태에서 그 상단이 매립너트(15)의 하부판에 형성된 구멍을 관통하여 매립너트(15)의 하부판에 걸려서 정착된다. 도면에서 도면부호 43으로 표시된 부재는 PHC 말뚝(10)을 제작할 때, PHC 말뚝(10)의 단부 외면을 감싸는 강재띠(43)로서, 본 발명의 필수 구성요소는 아니며, PHC 말뚝(10)의 종류에 따라서는 생략될 수 있는 것이다. The PHC pile 10 is a circular concrete pile having a hollow structure and a tensile member 11 is embedded in the longitudinal direction of the PHC pile 10. A plurality of buried nuts 15 are formed on the upper surface of the PHC pile 10, Respectively. The embedding nut 15 is a cylindrical member whose upper end is opened, and a screw is formed on the inner surface. A lower end of the buried nut 15 is closed by a lower plate, and a hole through which the tension member 11 can penetrate is formed in the lower plate. When the tensile member 11 is embedded in the PHC pile 10, the tensile member 11 is stuck in the lower plate of the buried nut 15 through the hole formed in the lower plate of the buried nut 15, do. The member denoted by reference numeral 43 in the figure is a steel band 43 which surrounds the outer surface of the end portion of the PHC pile 10 when the PHC pile 10 is manufactured and is not an essential component of the present invention, It may be omitted depending on the kind.

PHC 말뚝(10)의 상면에 접합결합구(40)의 바닥판(41)이 밀착되도록 접합결합구(40)가 PHC 말뚝(10) 위에 놓이게 되는데, 제1볼트공(45)의 위치와 매립너트(15)의 위치가 일치한 상태에서, 제1볼트(49)가 상부에서부터 제1볼트공(45)을 관통하여 매립너트(15) 내로 삽입되어 나사결합됨으로써, 접합결합구(40)가 PHC 말뚝(10)과 견고하게 일체화된다. A joint 40 is placed on the PHC pile 10 in such a manner that the bottom plate 41 of the joint 40 is in close contact with the upper surface of the PHC pile 10. The position of the first bolt hole 45, The first bolt 49 is inserted into and screwed into the buried nut 15 through the first bolt hole 45 from the top in a state where the positions of the nuts 15 coincide with each other, PHC pile (10).

위와 같이 PHC 말뚝(10) 위에 접합결합구(40)가 놓여 일체로 결합되고, 강관말뚝(20)에는 접합결합구(40)가 끼워져 결합된다. 즉, 강관말뚝(20)의 내부로 상부수직판(42)이 삽입되도록 강관말뚝(20)이 접합결합구(40)의 외부로 끼워지는 것이다. 도 4 내지 도 7에 도시된 실시예의 경우, 상부수직판(42)에 관통공을 형성하고, 상부수직판(42)을 감싸는 강관말뚝(20)의 하단에도 이에 대응되는 관통공을 형성한 상태에서, 위와 같이 강관말뚝(20)의 하단 내부에 상부수직판(42)이 끼워지도록 한 후, 제2볼트(46)를 강관말뚝(20)과 상부수직판(42)의 모두에 관통시키는 볼트결합 방식으로 강관말뚝(20)의 하단과 접합결합구(40)를 일체로 결합하고 있다. As shown above, the bonding piercing hole 40 is placed on the PHC pile 10 and integrally joined to the steel pipe pile 20, and the joint fitting hole 40 is fitted and coupled to the steel pipe pile 20. That is, the steel pipe pile 20 is fitted to the outside of the joint fitting hole 40 so that the upper vertical plate 42 is inserted into the steel pipe pile 20. [ 4 to 7, a through hole is formed in the upper vertical plate 42 and a corresponding through hole is formed in the lower end of the steel pipe pile 20 surrounding the upper vertical plate 42 The upper vertical plate 42 is inserted into the lower end of the steel pipe pile 20 and then the bolt 46 is inserted into both the steel pipe pile 20 and the upper vertical plate 42, The lower end of the steel pipe pile 20 and the joint fitting hole 40 are integrally joined.

그러나 상부수직판(42)이 강관말뚝(20)의 내부에 끼워진 상태에서, 강관말뚝(20)의 하단과 접합결합구(40)를 일체화시키는 방법은 이와 같은 볼트 결합에 한정되지 않는다. 도 8에는 용접에 의해 강관말뚝(20)과 접합결합구(40)를 일체화시키는 본 발명의 또다른 실시예에 대한 도 6에 대응되는 개략적인 횡방향 단면 사시도가 도시되어 있고, 도 9에는 도 8에 도시된 상태에 대한 개략적인 단면도가 도시되어 있다. 도 8 및 도 9에 도시된 것처럼, 본 발명에서 강관말뚝(20)의 하단과 접합결합구(40)를 일체화시킬 때에는, 강관말뚝(20)의 하단과 접합결합구(40)의 바닥판(41) 가장자리가 용접되어 강관말뚝(20)과 접합결합구(40)가 일체화될 수도 있다. 도면에서 도면부호 47은 용접부(47)를 나타낸다. However, the method of integrating the lower end of the steel pipe pile 20 with the joint fitting hole 40 in a state where the upper vertical plate 42 is fitted in the steel pipe pile 20 is not limited to such bolt connection. 8 is a schematic cross-sectional perspective view in cross section, corresponding to Fig. 6, of another embodiment of the present invention in which the steel pipe pile 20 and the jointing fitting 40 are integrated by welding. Fig. 9 8 is a schematic cross-sectional view of the state shown in Fig. 8 and 9, when the lower end of the steel pipe pile 20 is integrated with the joint fitting hole 40, the lower end of the steel pipe pile 20 and the bottom plate of the joint fitting hole 40 41 are welded so that the steel pipe pile 20 and the joint fitting hole 40 may be integrated. In the drawing, reference numeral 47 denotes a welding portion 47.

본 발명에서는 통상적으로 PHC 말뚝(10)의 상단에 존재하는 좌판을 생략한 상태에서 접합결합구(40)를 이용하여 PHC 말뚝(10)과 강관말뚝(20)을 결합하여 견고하게 일체화시키고 있다. 따라서 좌판의 생략에 따른 재료비 등을 절감할 수 있으며, 접합결합구(40)를 용접이 아닌 볼트에 의해 PHC 말뚝(10)과 결합하게 되므로 현장에서의 용접 작업을 최소화시켜서 용접 작업에 따른 품질 변동, 작업상의 어려움, 비용 상승, 안전사고 위험 증가 등의 문제를 해결할 수 있게 되는 효과가 발휘된다. In the present invention, the PHC pile 10 and the steel pipe pile 20 are combined and firmly integrated using the joint fitting hole 40 in the state where the left side plate existing at the upper end of the PHC pile 10 is omitted. Therefore, it is possible to reduce the material cost due to the omission of the seat, and the joint 40 is welded to the PHC pile 10 by means of bolts rather than welding, thereby minimizing the welding work in the field, , Difficulty in operation, increase in cost, increase in risk of safety accident, and the like can be solved.

앞서 언급한 것처럼, 하부의 PHC 말뚝(10)과 상부의 강관말뚝(20)으로 이루어진 본 발명의 복합말뚝(100)에서, 강관말뚝(20)의 상단에는 콘크리트 기초(C)와의 결합을 위한 기초연결조립체(30)가 더 구비될 수 있는 바, 다음에서는 기초연결조립체(30)의 구성과, 이를 이용한 본 발명의 복합말뚝(100)과 콘크리트 기초(C) 간의 결합 구성에 대해 설명한다. As described above, in the composite pile 100 of the present invention composed of the lower PHC pile 10 and the upper steel pipe pile 20, the upper end of the steel pipe pile 20 is provided with a foundation for coupling with the concrete foundation C, The connection assembly 30 may further be provided. In the following, the structure of the foundation connection assembly 30 and the coupling structure between the composite pile 100 and the concrete foundation C of the present invention will be described.

도 10 및 도 11에는 각각 본 발명의 복합말뚝(100)에서 강관말뚝(20)의 상단(頭部)에 기초연결조립체(30)가 설치되는 구성을 보여주는 개략적인 분해 사시도(도 10)와 결합 사시도(도 11)가 도시되어 있고, 도 12에는 기초연결조립체(30)가 구비된 본 발명의 복합말뚝(100)에서 강관말뚝(20)의 상단이 콘크리트 기초(C)에 매립되어 일체화되는 구성을 보여주는 개략적인 단면도가 도시되어 있다. 도 13 및 도 14에는 각각 기초연결조립체(30)에 구비되는 결합구(31)를 바라보는 방향을 달리하여 보여주는 개략적인 사시도가 도시되어 있다. 10 and 11 are a schematic exploded perspective view (FIG. 10) showing a configuration in which the foundation connection assembly 30 is installed at the upper end (head portion) of the steel pipe pile 20 in the composite pile 100 of the present invention, 12 shows the composite pile 100 according to the present invention in which the foundation connection assembly 30 is provided and the upper end of the steel pipe pile 20 is embedded in the concrete foundation C and integrated Lt; / RTI > is shown. Figs. 13 and 14 are schematic perspective views showing a direction in which the coupling hole 31 of the base connection assembly 30 is viewed, respectively.

강관말뚝(20)과 콘크리트 기초(C)의 결합을 위하여 강관말뚝(20)의 두부에 결합 설치되는 기초연결조립체(30)는, 콘크리트 기초(C)에 매립되는 수직매립철근(32)과, 강관말뚝(20)의 내부로 유입되는 콘크리트의 깊이를 제한하기 위하여 강관말뚝(20)의 두부에서 일정 깊이로 강관말뚝(20)의 내부 중공을 가로막도록 강관말뚝(20)의 내부 중공에 설치되는 바닥판(33)과, 바닥판(33)에 하단이 결합되고 상향으로 연장되는 지지봉(34)과, 강관말뚝(20)의 두부에 걸쳐져서 강관말뚝(20)의 원주를 따라 복수개가 설치되며 각각에는 수직매립철근(32)의 하단과 지지봉(34)의 상단이 모두 결합되어 있는 결합구(31)를 포함하여 구성된다.  The foundation connection assembly 30 which is coupled to the head of the steel pipe pile 20 for the connection between the steel pipe pile 20 and the concrete foundation C includes a vertical buried reinforcing bar 32 embedded in the concrete foundation C, In order to limit the depth of the concrete flowing into the inside of the steel pipe pile 20, it is installed in the inner hollow of the steel pipe pile 20 so as to block the inner hollow of the steel pipe pile 20 to a certain depth from the head of the steel pipe pile 20 A plurality of support bars 34 are provided along the circumference of the steel pipe pile 20 so as to extend over the head of the steel pipe pile 20 And each includes a coupling hole 31 in which both the lower end of the vertical embedded steel bar 32 and the upper end of the support rod 34 are coupled.

우선 도 13 및 도 14를 참조하여 결합구(31)에 대하여 설명한다. 결합구(31)는 복수개가 강관말뚝(20)의 두부에서 원주를 따라 설치되는 것으로서, 강관말뚝(20)의 두부 상면에 걸쳐지도록 놓이는 수평걸침부(310), 상기 수평걸침부(310)와 연속하여 연직하게 위치하는 연직부(311), 상기 연직부(311)와 연속하며 지지봉(34)의 상단이 결합되는 제1결합공(340)과 수직매립철근(32)의 하단이 결합되는 제2결합공(320)이 형성되어 있는 봉결합부(312)를 포함하여 구성된다. First, the coupling port 31 will be described with reference to Figs. 13 and 14. Fig. A plurality of coupling members 31 are installed along the circumference of the head of the steel pipe pile 20 and include a horizontal hooking part 310 laid over the upper surface of the head of the steel pipe pile 20, A first coupling hole 340 continuous to the vertical portion 311 and coupled to the upper end of the support rod 34 and a lower end coupled to the lower end of the vertical embedded reinforcing bar 32; And a rod coupling portion 312 having a coupling hole 320 formed therein.

수평걸침부(310)가 강관말뚝(20)의 두부 상면에 놓이고 연직부(311)가 강관말뚝(20)의 두부 내면 전방에 위치하도록 결합구(31)가 강관말뚝(20)의 두부에 설치되는데, 도면에 예시된 실시예의 경우, 연직부(311)에 볼트관통공(314)을 형성하고, 강관말뚝(20)의 두부에도 상기 볼트관통공(314)에 대응되는 구멍을 형성하여, 결합구(31)가 강관말뚝(20)의 두부에 걸쳐져 배치된 상태에서, 제3볼트(39)를 강관말뚝(20) 두부에 형성된 구멍과 볼트관통공(314)에 관통 삽입하여 체결함으로써, 결합구(31)를 강관말뚝(20)의 두부에 일체로 결합할 수 있다. 물론 결합구(31)가 강관말뚝(20)의 두부에 걸쳐져 배치된 상태에서, 상기한 볼트결합 이외에도 수평걸침부(310)를 강관말뚝(20)의 두부에 용접하여 일체로 결합할 수도 있다. 강관말뚝(20)의 두부 가장자리에 구비되는 결합구(20)의 전부에 지지봉(34)이 결합될 수도 있지만, 도면에 예시된 것처럼, 결합구(20)의 일부(2개 이상의 결합구)에만 지지봉(34)이 결합되어 구비될 수도 있다. The coupling hole 31 is formed in the head portion of the steel pipe pile 20 such that the horizontal hooking portion 310 is placed on the top surface of the head portion of the steel pipe pile 20 and the vertical portion 311 is positioned in front of the inner surface of the head portion of the steel pipe pile 20. [ A bolt through hole 314 is formed in the vertical portion 311 and a hole corresponding to the bolt through hole 314 is formed in the head portion of the steel pipe pile 20, The third bolt 39 is inserted and inserted into the hole formed in the head of the steel pipe pile 20 and the bolt through hole 314 in a state in which the coupling hole 31 is disposed over the head portion of the steel pipe pile 20, It is possible to integrally join the coupling hole 31 to the head of the steel pipe pile 20. It is also possible to weld the horizontal hooking part 310 to the head of the steel pipe pile 20 in addition to the above bolt connection in a state where the coupling hole 31 is disposed over the head of the steel pipe pile 20. The support rod 34 may be coupled to the entirety of the coupling hole 20 provided at the edge of the head of the steel pipe pile 20. However, as illustrated in the figure, only a portion (two or more coupling holes) of the coupling hole 20 And a support rod 34 may be coupled.

상기한 결합구(31)를 이용한 본 발명의 구성에서는 수직보강철근(32)이 결합구(31)에 의하여 연직 상태를 안정적으로 유지할 수 있으며, 그에 따라 수직보강철근(32)의 인발저항력의 발휘가 효과적으로 이루어질 수 있게 되고 강관말뚝(20)과 콘크리트 기초(C) 사이의 결합에서 발휘되는 휨내력이 더욱 증가하게 되는 효과가 발휘된다. The vertical reinforcing bar 32 can be stably maintained in the vertical state by the coupling hole 31 in the structure of the present invention using the coupling hole 31 described above and thereby the vertical reinforcing bar 32 can exert the pull resistance of the vertical reinforcing bar 32 And the flexural strength exerted in the coupling between the steel pipe pile 20 and the concrete foundation C is further increased.

콘크리트 기초(C)에 매립되는 수직매립철근(32)은 그 하단이 결합구(31)의 봉결합부(312)에 형성된 제2결합공(320)에 결합되어 연직하게 설치된다. 도면에 예시된 것처럼, 복수개의 수직매립철근(32)을 감싸도록 횡방향 띠철근(38)을 결합할 수도 있다. The vertical embedded reinforcing bars 32 embedded in the concrete foundation C are installed vertically at the lower ends of the reinforced reinforcing bars 32 coupled to the second coupling holes 320 formed in the rod connecting portions 312 of the coupling holes 31. As illustrated in the figure, the transverse band bars 38 may be joined to enclose a plurality of vertical buried reinforcing bars 32.

콘크리트 기초(C)의 시공을 위하여 콘크리트를 타설할 때, 타설된 콘크리트가 강관말뚝(20)의 중공부 내부로 유입되도록 하면서도 그 유입 깊이를 제한하기 위하여 강관말뚝(20)의 내부에는 강관말뚝(20)의 내부 중공을 가로막게 되는 판재로 이루어진 바닥판(33)이 설치된다. 상기 바닥판(33)은 봉부재로 이루어진 지지봉(34)에 의하여 설치될 수 있는데, 상기 지지봉(34)의 하단은 상기 바닥판(33)과 결합되고 상단은 결합구(31)의 제1결합공(340)에 결합된다. In order to limit the inflow depth of the concrete, when the concrete is laid for the construction of the concrete foundation C, the poured concrete is introduced into the hollow portion of the steel pipe pile 20, And a bottom plate 33 made of a plate that interrupts the inner hollow of the main body 20 is installed. The bottom plate 33 may be provided by a support rod 34 made of a rod member and the lower end of the support rod 34 is coupled to the bottom plate 33, And is coupled to the ball 340.

위와 같은 구성의 기초연결조립체(30)가 강관말뚝(20)의 두부에 설치된 상태에서, 도 12에 도시된 것처럼 콘크리트가 타설되어 콘크리트 기초(C)가 시공된다. 즉, 지상 위로 돌출되어 있는 강관말뚝(20)의 두부와, 기초연결조립체(30)의 수직매립철근(32)이 매립되도록 콘크리트 기초(C)가 형성되는 것이다. 이 때, 타설된 콘크리트는 강관말뚝(20)의 중공 내부로 유입되어 바닥판(33)의 위쪽으로 강관말뚝(20) 내부에도 채워진다. 이와 같이, 강관말뚝(20)의 두부에 기초연결조립체(30)가 설치되고, 이러한 강관말뚝(20)의 두부와 기초연결조립체(30)가 콘크리트 기초(C)에 매립되어 일체를 이루게 된다. 따라서 콘크리트 기초(C)와 강관말뚝(20) 즉, 콘크리트 기초(C)와 본 발명의 복합말뚝(100) 간의 견고한 결합을 이룰 수 있으며, 그에 따라 큰 인발저항력을 발휘하게 된다. In the state where the foundation connection assembly 30 having the above-described structure is installed on the head of the steel pipe pile 20, concrete is installed as shown in FIG. 12 to construct the concrete foundation C. That is, the concrete foundation C is formed so that the head portion of the steel pipe pile 20 protruding above the ground and the vertical embedded steel bar 32 of the foundation connection assembly 30 are embedded. At this time, the poured concrete flows into the hollow interior of the steel pipe pile 20, and is filled in the steel pipe pile 20 upwardly of the bottom plate 33. Thus, the foundation connecting assembly 30 is installed on the head of the steel pipe pile 20, and the head of the steel pipe pile 20 and the foundation connecting assembly 30 are embedded in the concrete foundation C to form an integral body. Therefore, the concrete foundation C and the steel pipe pile 20, that is, the concrete foundation C and the composite pile 100 of the present invention can be firmly connected, thereby exhibiting a large pulling resistance.

10: PHC 말뚝
20: 강관말뚝
30: 기초연결조립체
40: 접합결합구
10: PHC piles
20: Steel pipe pile
30: Foundation connection assembly
40:

Claims (2)

하부에는 PHC 말뚝(10)이 위치하고 상부에는 강관말뚝(20)이 위치하여 PHC 말뚝(10)과 강관말뚝(20)이 일체로 결합되어 형성된 복합말뚝(100)으로서,
PHC 말뚝(10)은 상면에 좌판이 존재하지 않은 채, 상단이 개방되고 내면에는 나사가 형성된 매립너트(15)가 PHC 말뚝(10)의 상면에 원주를 따라 매립되어 있고, PHC 말뚝(10)의 길이 방향으로 매립 배치된 긴장재(11)의 상단이 매립너트(15)에 긴장 정착되어 있는 구성을 가지며;
원형테 형태의 바닥판(41)과 상기 바닥판(41)의 가장자리에서 상향으로 연직하게 세워져 있는 상부수직판(42)을 포함하는 접합결합구(40)가, PHC 말뚝(10)과 강관말뚝(20) 사이에 위치하는데;
접합결합구(40)의 바닥판(41)에는 제1볼트공(45)이 매립너트(15)와 대응되는 위치에서 원주를 따라 복수개로 형성되어 있고;
접합결합구(40)가 PHC 말뚝(10)의 상단에 놓인 후 제1볼트(49)가 제1볼트공(45)을 관통하여 매립너트(15)에 나사결합됨으로써 접합결합구(40)가 PHC 말뚝(10)과 일체화되며, 접합결합구(40)의 상부수직판(42)이 강관말뚝(20)의 하단 내부에 끼워진 상태에서 볼트결합 또는 용접 결합에 의해 접합결합구(40)가 강관말뚝(20)과 일체화되어 있는 구성을 가지는 것을 특징으로 하는 강관말뚝(20)과 PHC 말뚝(10)의 복합말뚝.
The PHC pile 10 is located at the bottom and the steel pipe pile 20 is located at the top of the PHC pile 10. The PHC pile 10 and the steel pipe pile 20 are integrally joined to each other,
The PHC pile 10 has a fillet 15 with an upper end opened and a screw on the inner surface thereof embedded in the upper surface of the PHC pile 10 along the circumference without a seat on the upper surface, The upper end of the tensile material 11 buried in the longitudinal direction of the buried nuts 15 is tension-fixed to the buried nuts 15;
A jointing fitting 40 including a bottom plate 41 of a round tee shape and an upper vertical plate 42 vertically standing upright from the edge of the bottom plate 41 is provided between the PHC pile 10 and the steel pipe pile (20);
A plurality of first bolt holes (45) are formed in the bottom plate (41) of the joint fitting hole (40) along the circumference at positions corresponding to the buried nuts (15);
The first bolt 49 passes through the first bolt hole 45 and is screwed into the buried nut 15 after the joint fitting hole 40 is placed on the upper end of the PHC pile 10, PHC pile 10 and the upper vertical plate 42 of the joint member 40 is inserted into the lower end of the steel pipe pile 20, (20) and the PHC pile (10). The composite pile of the pile (20) and the PHC pile (20)
제1항에 있어서,
강관말뚝(20)의 상단에는 콘크리트 기초와의 결합을 위한 기초연결조립체(30)가 더 구비되는데;
기초연결조립체(30)는, 콘크리트 기초(C)에 매립되는 수직매립철근(32)과, 강관말뚝(20)의 내부로 유입되는 콘크리트의 깊이를 제한하기 위하여 강관말뚝(20)의 두부에서 일정 깊이로 강관말뚝(20)의 내부 중공을 가로막도록 강관말뚝(20)의 내부 중공에 설치되는 바닥판(33)과, 바닥판(33)에 하단이 결합되고 상향으로 연장되는 지지봉(34)과, 강관말뚝(20)의 두부에 걸쳐져서 강관말뚝(20)의 원주를 따라 복수개가 설치되며 수직매립철근(32)의 하단이 결합되는 결합구(31)를 포함하여 구성되는 것을 특징으로 하는 강관말뚝과 PHC 말뚝의 복합말뚝.
The method according to claim 1,
The upper end of the steel pipe pile 20 is further provided with a foundation connection assembly 30 for coupling with a concrete foundation;
The foundation connection assembly 30 includes a vertical buried reinforcing bar 32 embedded in a concrete foundation C and a plurality of reinforcing bars 32 extending from the head of the steel pipe pile 20 to a depth A bottom plate 33 installed in the hollow of the steel pipe pile 20 so as to block the inner hollow of the steel pipe pile 20 to a depth and a support rod 34 connected to the bottom plate 33 and extending upward, , And a coupling hole (31) formed on the head of the steel pipe pile (20) and provided along the circumference of the steel pipe pile (20) and to which the lower end of the vertical buried steel pipe (32) is connected. Composite pile of pile and PHC pile.
KR1020150153207A 2015-11-02 2015-11-02 Composite Pile with PHC Pile and Steel Tubular Pile KR20160023622A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020150153207A KR20160023622A (en) 2015-11-02 2015-11-02 Composite Pile with PHC Pile and Steel Tubular Pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020150153207A KR20160023622A (en) 2015-11-02 2015-11-02 Composite Pile with PHC Pile and Steel Tubular Pile

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020140109551A Division KR101575737B1 (en) 2014-08-22 2014-08-22 Composite Pile with PHC Pile and Steel Tubular Pile

Publications (1)

Publication Number Publication Date
KR20160023622A true KR20160023622A (en) 2016-03-03

Family

ID=55535521

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020150153207A KR20160023622A (en) 2015-11-02 2015-11-02 Composite Pile with PHC Pile and Steel Tubular Pile

Country Status (1)

Country Link
KR (1) KR20160023622A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101964678B1 (en) * 2018-07-31 2019-04-02 에스오씨기술지주 주식회사 Combination structure of pile and copping and girder and method of construction
KR20190049007A (en) * 2017-11-01 2019-05-09 대림산업 주식회사 Method and Structure for Connecting Steel Pipe Modules in Water, and Combined Structure of Steel Pipe Modules constructed such Method
CN110004944A (en) * 2019-03-27 2019-07-12 河海大学 Miniature steel pipe pile soil-slope supporting construction and its construction method with stake end concrete enlarged footing
CN110004945A (en) * 2019-03-27 2019-07-12 河海大学 The outside weld steel reinforcement cage miniature steel pipe pile supporting construction and its construction method of harnessing landslide
KR102206257B1 (en) * 2020-07-14 2021-01-22 에스오씨기술지주 주식회사 File slab combination structure
CN114687298A (en) * 2022-03-31 2022-07-01 中交路桥华南工程有限公司 Ultrahigh vertical temporary anchoring structure and construction method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101010028B1 (en) 2009-06-26 2011-01-21 주식회사 스마텍엔지니어링 Composit pile combined steel tubular pile and concrete pile reinforced with connecting structure

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101010028B1 (en) 2009-06-26 2011-01-21 주식회사 스마텍엔지니어링 Composit pile combined steel tubular pile and concrete pile reinforced with connecting structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190049007A (en) * 2017-11-01 2019-05-09 대림산업 주식회사 Method and Structure for Connecting Steel Pipe Modules in Water, and Combined Structure of Steel Pipe Modules constructed such Method
KR101964678B1 (en) * 2018-07-31 2019-04-02 에스오씨기술지주 주식회사 Combination structure of pile and copping and girder and method of construction
CN110004944A (en) * 2019-03-27 2019-07-12 河海大学 Miniature steel pipe pile soil-slope supporting construction and its construction method with stake end concrete enlarged footing
CN110004945A (en) * 2019-03-27 2019-07-12 河海大学 The outside weld steel reinforcement cage miniature steel pipe pile supporting construction and its construction method of harnessing landslide
KR102206257B1 (en) * 2020-07-14 2021-01-22 에스오씨기술지주 주식회사 File slab combination structure
CN114687298A (en) * 2022-03-31 2022-07-01 中交路桥华南工程有限公司 Ultrahigh vertical temporary anchoring structure and construction method thereof
CN114687298B (en) * 2022-03-31 2023-10-20 中交路桥华南工程有限公司 Super-high vertical temporary anchoring structure and construction method thereof

Similar Documents

Publication Publication Date Title
KR20160023622A (en) Composite Pile with PHC Pile and Steel Tubular Pile
KR101055672B1 (en) Prefabricated internal hollow hollow pier pier using corrugated steel pipe and construction method
CN105888080B (en) Assembled steel tube casing reinforced concrete combined joint and installation method
JP5946041B2 (en) Column beam connection structure, column beam connection method, and precast concrete stigma member
KR101751698B1 (en) Structure Of Connecting Steel Colum And PC beam
KR20100005830A (en) Development of a set bridge post connector using unit filled concrete with internally confined hollow and a method for construction
KR101945369B1 (en) Connecting device for PHC pile and manufacturing method thereof
KR101713141B1 (en) Hybrid bridge connecting structure and method for constructing thereof
KR20110049189A (en) Composite beam by prestressed concrete filled tube
KR101797314B1 (en) Connecting structure of steel tube
KR101299023B1 (en) The structure of matching splicing point of box type steel columns and top level of steel beam using diaphragm
KR20200044740A (en) Connecting and Reinforcing Apparatus, Structure and Method for PHC Pile
KR20110000170A (en) Composit pile combined steel tubular pile and concrete pile reinforced with connecting structure
KR101253438B1 (en) Concrete filling reinforced frame steel post
KR101750177B1 (en) Punching shear stiffening member of cutting bridge type and method for constructing footing using of the same
KR102069419B1 (en) Composite pile internally reinforced by steel tube
KR101575737B1 (en) Composite Pile with PHC Pile and Steel Tubular Pile
KR20200089793A (en) Non-welding beam-to-column connection structure with reinforcing plate and through bolt
KR101805434B1 (en) Sturcture of composite beam using wire tensioning and Construction method thereof
KR101726278B1 (en) Coupling structure for PHC file
KR20180126939A (en) composite girder which uses a filled steel pipe as a web member and ties and connects with a steel wire
KR101254983B1 (en) Joint structure of concrete filled tube and beam
KR101354084B1 (en) Light of the holding device structure without ribs
JP2016089549A (en) Structure and method for joining reinforced concrete beam and steel column or column comprising steel column
JP5950331B2 (en) Column member connection structure and assembly method thereof

Legal Events

Date Code Title Description
A107 Divisional application of patent
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application